Per our conversation this morning, our next slurry seal Area 1 project is scheduled as follows:
Construction Period: June 27, 2022 – August 31, 2022
Project Description
Residential and collector streets (Area 1)
· Slurry seal
· Chip seal
· Localized asphalt concrete
· Curb ramp reconstruction
I have attached the project map for your information. We’re asking for citing to halt during the construction period.
Let us know if you have any questions or comments in the meantime.
Thank you.
EmailSignatureLogo15 <http://www.diamondbarca.gov/>
Christian Malpica | Associate Engineer
City of Diamond Bar | Public Works/Engineering Department
21810 Copley Drive, Diamond Bar, CA 91765
t 909.839.7042 | 909.839.7000 main | f 909.861.3117
cmalpica@diamondbarca.gov <mailto:cmalpica@diamondbarca.gov> | www.DiamondBarCA.gov <http://www.diamondbarca.gov/>
Connect with Us... Facebook <http://www.facebook.com/cityofdiamondbarca> | Twitter <http://www.twitter.com/diamondbarcity> | YouTube <http://www.youtube.com/diamondbarca> | Instagram
<http://www.instagram.com/cityofdiamondbar>
For more information on the City’s COVID-19 response, please visit www.diamondbarca.gov/covid19 <http://www.diamondbarca.gov/covid19>