Loading...
HomeMy WebLinkAboutArea 1 Slurry Seal Project.msgHi Joe, Per our conversation this morning, our next slurry seal Area 1 project is scheduled as follows: Construction Period: June 27, 2022 – August 31, 2022 Project Description Residential and collector streets (Area 1) · Slurry seal · Chip seal · Localized asphalt concrete · Curb ramp reconstruction I have attached the project map for your information. We’re asking for citing to halt during the construction period. Let us know if you have any questions or comments in the meantime. Thank you. EmailSignatureLogo15 <http://www.diamondbarca.gov/> Christian Malpica | Associate Engineer City of Diamond Bar | Public Works/Engineering Department 21810 Copley Drive, Diamond Bar, CA 91765 t 909.839.7042 | 909.839.7000 main | f 909.861.3117 cmalpica@diamondbarca.gov <mailto:cmalpica@diamondbarca.gov> | www.DiamondBarCA.gov <http://www.diamondbarca.gov/> Connect with Us... Facebook <http://www.facebook.com/cityofdiamondbarca> | Twitter <http://www.twitter.com/diamondbarcity> | YouTube <http://www.youtube.com/diamondbarca> | Instagram <http://www.instagram.com/cityofdiamondbar> For more information on the City’s COVID-19 response, please visit www.diamondbarca.gov/covid19 <http://www.diamondbarca.gov/covid19>