Loading...
HomeMy WebLinkAboutSuccessful Proposal - Inspection Services (7)��� EnranFFRanr • PLAN REVIEW • INSPECTION • ADMINISTRATION 556 N. Diamond Baz Blvd. #301, Diamond Bu, CA 91765 Phone (909) 396-6984 • Fa '(909) 396-7634 December 13, 1999 - Mr. Bob Rose Director, Community Services - - City of Diamond Bar 21660 E. Copley Drive, Suite 170 Diamond Bar, CA 91765 c� r•, 6� Re: Plan Check and Inspection Services for Peterson Park \ Skate Park Dear Mr. Rose: Per your requests, D&J Engineering is pleased to submit this letter of proposal for plan check and inspection services for the Peterson Park \ Skate Park. D&J Engineering proposes the following scope of services: 1. Plan Check submitted plans for code compliance. 2. Provide field inspection of construction to verify work is in conformance with the approved plans and specifications. Interpret the approved plans and to assure the field changes (due to soils conditions, and topography) meet approved standard construction methods. Changes requiring extra work and change orders will be brought to the attention of the City Project Manager for review and approval. 4. Review progress payment requests before approval by the City. Prepare project punch list for items needed to be completed by the contractor prior to acceptance of the work. 6. Provide the Project Manager Daily Inspection Update., In addition, keep Project Manager apprised of any site construction concerns. Attend meetings with designer and contractor Proposal to provide Plan check and inspection services for Peterson park \ Skate park Page 2 FEESCHEDULE The total not to exceed estimate fee is based on the estimated time required to complete each task as shown. Should additional time is required, the City will be notified and additional compensation will be requested at the time and material rates shown on the attached schedule of hourly billing rates: Field inspection: Inspector — 4 hours/day x 15days 60 hours @ $65.00/hr. _ $ 3,900.00 Construction meeting (pre -construction, etc.) 5 hours @ $65.00/hr. = $ 325.00 Plan Check: I' Plan Check (14) 2nd plan check (4) Total Plan Check Hours — 18 hours @ $75.00/hr. _ $ 1,350.00 Accelerated Plan Check Rate (additional fee) $ 675.00 (* 18 hours @ $112.50/hr.= $ 2,025.00) * Accelerated plan check (5day turn around) fee 1.5 the plan check rate. MUM Should you have any questions regarding this proposal, please call me at (909) 396-6984. Very truly y Den;is A. Tarango, C.B. D& Engineering