HomeMy WebLinkAboutSuccessful Proposal - DesignCity of Diamond Bar MEMORANDUM DATE: December 21, 1995 TO: Dennis Tarango, Building Official � IJ FROM: Bob Rose, Community Services Director�%� 4, /gt✓ SUBJECT: Construction of Maple Hill Park - Phase II Please find attached the proposed scope of work for RJM Design Group, Inc. to complete during the construction of Maple Hill Park, Phase II. I would like for D & J Engineering to complete the following scope of work: 1. Attend Pre -Construction Meeting 2. Review submittals and change order requests and provide written recommendations on their approval or rejection during the construction period. 3. Provide continuous inspection of the construction of the project. 4. Attend final walk-through and provide written recommendation on the acceptance of the project. 5. Review contractor prepared as -built drawings on mylar after the completion of project construction and provide drawings to the City of Diamond Bar. Per your proposal dated December 18,1995, item #5 is not listed as part of your scope of work. Please let me know if you will need to revise your proposal to complete the scope of work I am seeking. Thanks for your help. few(9 900EC �� December 20, 1995 Larry Ryan RIM Duian Group, Inc. 27285 Lu Rambla,, suits P,23u Mission Viejo, CA 92691 Dou Mr. Ryan. . ON WN a .. . I. Review submitted low bid for completeness sad check refrer=& The billing for the above services shall be made on an hourly basis for a nowt®® exceed amount of $1,500. If you have any questions about thus arranpannta, please cohtact me at (909) 396- 5694. Sine"Yr Bob Rose Community services Director cc: Terrence L. Belanger, City Manager Dennis Tarango, Building Official «fid 0LTt7 LIT£-T9B-7TL Ofi `L31 2kiB QngWaiIQ �0 t11�:QI £I:6T CaM 56.-02-:)3a T 'd OZSM&-G 64!L S6, C (I 3sud 0mmmd) i 35Ud Ll IEl9 IV S66I- 9I,:6a IZ/2I a3n 13333 I December 19, 1995 DESIGN i11 . PLANNING AND LANDSCAPE ARCHITECTURE Mr. Bob Rose City of Diamond Bar 21660 E Copley Dr Ste 100 Diamond Bar, CA 91765 RE: Maple Hill Park, Phase H Dear Bob, nECE«VED t, :r DEC 20 E,°E Ile 20 "j,tj'1J C0'r Sr R VICES Pursuant to your request and our recent conversation, I have prepared the following letter outlining construction administration services for Phase II of Maple Hill Park (picnic structure, walkway improvements). The proposed services to be provided by our office are as follows: 1. Review submitted low bid for completeness and check references. 2. Prepare revised Walkway Grading Plan to accommodate grading revisions to existing parking lot area. 3. Attend the pre -construction meeting to present information on the construction documents. 4. Review submittals and change order requests and provide written recommendations on their approval or rejection during the construction period. 5. Provide support of the construction documents by attending three (3) meetings on-site and by providing telephone support as -needed to City staff, project manager, general contractor and City inspector. a. Excavation and grading of walkway/ramp/landing areas and picnic structure area. b. Forms and alignment of paving areas prior to the pouring of concrete. C. Picnic structure construction (masonry columns and wood trellis structure). Maple Hill Park Phase Il, 586-03-4 Page 1 27285 LAS RAMBLAS, SUITE 250 . MISSION VIEJO, CA 92691 . (714) 582-7516 . FAX (714) 582-0429 6. Attend final walk-through of project and provide written recommendation on the acceptance of the project. 7. Review contractor prepared as -built drawings on mylar after the completion of project construction and provide drawings to the City of Diamond Bar. We propose to provide these construction services on an hourly basis for an estimated, not -to - exceed amount of $4,000.00. It is our intention to provide only the above outlined services to provide continuity with the original ddesign intent. The more detailed, inspection services are to be provided by the city's building official (i.e. review and approval of reinforcing materials, footings, concrete design mix, oversee concrete pours, verification of slope gradients, etc.) Should you have any questions or comments, please contact our office. Sincerely, RJM Design Group 0 Larry Vice P d t LPR/le Maple Hill ParkPhase II, 586-03-4 Page 2 I RECEIVED US/16 14:19 1995 AT 613117 PAGE i (PHINTED PAGE 1) ; Aug.16 '95 13:42 SANFAX520 series DES GN GR®UP, INC. �. PLANNING AND LANDSCAPE ARCHITECTURE August 16, 1995 Mr. Boll Rose City of Diamond 21660 E. Copley Drive, Ste 100 Diamond Bar, CA 91765-4177 P. i Pursuant to our discussion, I have prepared the following letter pertaining to your request to modify the existing construction drawing package for Maple Bill Park to protide a separate set of plans to construct the picnic structure and new access walk. For your review, I have outlined below the proposed services to be offered during this phase. 1. Revise Construction Drawings, Scope and Limit of Work. 2. Revise Specifications. 3. Revise Bid Form. 4. Coordination and Meeting with City. We shall provide these services on an hourly basis for an estimated not to exceed amount of $750.00. Should have any questions, please contact our office. Sincerely, WU Design Group r Larry P, AS Vico Pres 272M LAS RAMBLAS, SUITE 25e . MISSION VIEIO, CA 91691 . (714) SM7516 . FAX (714) 512.9429 o u� �b �7 3 .lc c= '; .ril �^c _co -� fl cn �o N Pursuant to our discussion, I have prepared the following letter pertaining to your request to modify the existing construction drawing package for Maple Bill Park to protide a separate set of plans to construct the picnic structure and new access walk. For your review, I have outlined below the proposed services to be offered during this phase. 1. Revise Construction Drawings, Scope and Limit of Work. 2. Revise Specifications. 3. Revise Bid Form. 4. Coordination and Meeting with City. We shall provide these services on an hourly basis for an estimated not to exceed amount of $750.00. Should have any questions, please contact our office. Sincerely, WU Design Group r Larry P, AS Vico Pres 272M LAS RAMBLAS, SUITE 25e . MISSION VIEIO, CA 91691 . (714) SM7516 . FAX (714) 512.9429