Loading...
HomeMy WebLinkAboutDiamond Bar Village - Structural Repair - 220621 f - Approved Plan.pdf 888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com K A B C J I H G D F E CLUB HOUSE (NOT IN SCOPE) GOLDEN SPRINGS DR SITE PLAN THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 06/21/2022 FIGURE SK-1REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao Approved for Cannon Corporation THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-2  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING A UNIT A20 Roof beam to treated from further termite and fungi damage. BLDG A UNIT A13 To be waterproofed and patched BLDG A UNIT A12 To be waterproofed and patched BLDG A UNIT A11 To be waterproofed and patched BLDG A UNIT A11 Soffit plaster to be repaired and re-attached. BLDG A 1234 5 Provide building paper and stucco to match existing. Provide building paper and stucco to match existing. Provide building paper and stucco to match existing. See 1/SK-30 Structural drawings, as part of contract documents, indicate information sufficient to convey design intent. If errors, inconsistencies or omissions are discovered, promptly notify Architect (Structural Engineer) before proceeding with work. Verify field measurement and conditions with contract documents. If errors, inconsistencies or omissions are discovered, promptly notify Architect (Structural Engineer) before proceeding with work. Contract documents represent the finished structure. Unless otherwise shown, they do not indicate method of construction. Provide construction means, methods, techniques, sequences and procedures as required. Provide adequate shoring, bracing and erection procedures complying with national, state and local safety ordinances. Provide WCLIB or WWPA grade marked Douglas fir structural lumber. Provide air dry lumber with a 19% maximum moisture content. Moisture content may be measured just prior to placement in structure. Provide Grade No. 2 U.N.O. Treat structural lumber with preservative complying with CBC 2303.1.9. Provide hot dipped galvanized hardware per ASTM A153, stainless steel fasteners and hardware connectors per ASTM A123 at preservative treated. All nails, unless indicated otherwise, are common nails with dimensional properties complying with AF & PA NDS Table L4 and ASTM F1667. Install nails in compliance with CBC Chapter 23, including Table 2304.10.1. Existing structural drawings prepared by John J. Mullen & Assoc. INC., dated November 6, 1972 including all addenda and revisions, are a part of these contract documents. General notes described above apply to all buildings. 1. 2. 3. 4. 5. 6. 7. 8. GENERAL NOTE 6MISCELLANEOUS NOTES 1. 2. Repair patch on Unit A15 entrance wing wall with stucco. Repair hole on Unit A20 entrance wing wall with stucco. 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao BLDG B THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-3  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING B UNIT B9 Roof sheathing to be replaced BLDG B UNIT B8 Roof sheathing to be replaced BLDG B UNIT B7 Roof sheathing to be replaced BLDG B 123 See 2/SK-30 See 2/SK-30 See 2/SK-30 4 UNIT B6 Add 4x8 PER 1/SK-32 UNIT B7 Add 4x8 PER 1/SK-32 UNIT B8 Add 4x8 PER 1/SK-32 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-4  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING C UNIT C7 & C8 Roof beam to be treated from further termite or fungi damage BLDG C UNIT C8 Roof beam to be replaced BLDG C UNIT C7 Roof beam to be treated from further termite or fungi damage BLDG C UNIT C6 Roof beam to be treated from further termite or fungi damage BLDG C UNIT C6 Stair landing and connection to be fixed BLDG C UNIT C6 Roof sheathing to be replaced BLDG C UNIT C10 Roof beam to be replaced BLDG C UNIT C10 Waterproofing and stucco required. BLDG C 1234 5678 See 1/SK-31 See 2/SK-30 See 1/SK-30 See 1/SK-30 See 1/SK-30 See 2/SK-31See 2/SK-31 Provide building paper and stucco to match existing. 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-5  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING C UNIT C19 Roof beam to be replaced BLDG C UNIT C19 To be waterproofed and patched BLDG C UNIT C18 Roof beam to be treated from further termite or fungi damage BLDG C UNIT C18 Roof beam to be treated from further termite or fungi damage BLDG C UNIT C17&C18 Roof beam to be treated from further termite or fungi damage UNIT C17&C18 Roof beam to be replaced BLDG C UNIT C17 Roof beam to be replaced BLDG C UNIT C16 Roof beam to be treated from further termite or fungi damage UNIT C16 Roof beam to be replaced BLDG C UNIT C16 Roof sheathing to be replaced BLDG C 1234 5678 See 2/SK-30 See 1/SK-32 See 1/SK-30 See 2/SK-31 See 2/SK-31 See 1/SK-30 See 1/SK-30 See 1/SK-30 See 2/SK-31 Provide building paper and stucco to match existing. 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-6  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING C UNIT C20 Roof beam to be replaced BLDG C 1 See 2/SK-31 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao BLDG D THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-7  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING D EAST PARAPET Excessive displacement observed. Fix required. BLDG D UNIT D12 Roof beam to be treated from further termite or fungi damage BLDG D UNIT D12 Roof beam to be treated from further termite or fungi damage BLDG D UNIT D9 Roof beam to be replaced BLDG D UNIT D9 Roof beam to be treated from further termite or fungi damage BLDG D UNIT D8 Roof beam to be fixed BLDG D UNIT D7 Roof beam to be treated from further termite or fungi damage BLDG D 1234 567 See 1/SK-30See 1/SK-30See 2/SK-31 See 1/SK-30 See 1/SK-30 See 2/SK-32See 1/SK-33 8 UNIT D11 Beam to be replaced per 2/SK-31. 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-8  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING E UNIT E8 Roof beam to be treated from further termite or fungi damage BLDG E UNIT E8 Roof beam to be treated from further termite or fungi damage BLDG E UNIT E6 Roof sheathing to be replaced BLDG E UNIT E6 Roof sheathing to be replaced BLDG E UNIT E6 Fascia plate to be replaced. BLDG E BLDG E NORTH Parapet to be fixed BLDG E UNIT E4 Wall to exposed for inspection of any further structural damage inside. Water proofing to be fixed after repair. BLDG E 1234 567 See 2/SK-30 See 2/SK-30 See 1/SK-30 See 1/SK-30 See 1/SK-33 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-9  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING F UNIT F8 Roof sheathing to be replaced. BLDG F UNIT F8 Roof beam and sheathing to be replaced. BLDG F UNIT F6 Roof sheathing to be replaced. BLDG F BLDG F WEST Parapet to be fixed BLDG F 1234 See 2/SK-30See 2/SK-30 & 1/SK-32See 2/SK-30 See 1/SK-33 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-10  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING G UNIT G12 Roof beam to be replaced Roof beam to be treated from further termite and fungi damage. BLDG G UNIT G10 Roof beam to be replaced BLDG G UNIT G9 Roof beam to be treated from further termite and fungi damage. BLDG G UNIT G9 Roof beam to be treated from further termite and fungi damage. BLDG G UNIT G8 Roof beam to be replaced BLDG G UNIT G7 Roof beam to be replaced BLDG G BLDG G WEST Parapet to be fixed BLDG G BLDG G EAST Parapet to be fixed BLDG G 1234 5678 See 2/SK-31See 2/SK-31 See 1/SK-30See 1/SK-30 See 2/SK-31 See 2/SK-31 See 1/SK-30 See 1/SK-33See 1/SK-33 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-11  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING H UNIT H8 Roof sheathing to be replaced BLDG H UNIT H8 Roof beam to be replaced BLDG H UNIT H7 Roof beam to be replaced BLDG H UNIT H7 Stucco to be repaired. BLDG H UNIT H7 Wall waterproofing and stucco to be fixed. Roof beam to be treated from further termite and fungi damage BLDG H UNIT H6 & H7 Roof beam to be treated from further termite and fungi damage BLDG H UNIT H6 Wall waterproofing and stucco to be fixed. UNIT H6 Roof beam to be treated from further termite and fungi damage BLDG H 1234 567 See 1/SK-30 Provide building paper and stucco to match existing. See 1/SK-30 See 1/SK-30 Provide building paper and stucco to match existing. See 2/SK-31 See 2/SK-30 See 2/SK-31 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao UNIT I10 Roof beam to be replaced BLDG I THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-12  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING I UNIT I7 Roof sheathing to be replaced BLDG I UNIT I8 Roof beam to be treated from further termite and fungi damage BLDG I UNIT I8 Roof beam to be treated from further termite and fungi damage BLDG I UNIT I9 Roof beam to be treated from further termite and fungi damage BLDG I UNIT I10 Balcony waterproofing to be repaired BLDG I UNIT I11 Roof beam to be treated from further termite and fungi damage BLDG I UNIT I11 & I12 Roof beam to be treated from further termite and fungi damage BLDG I 1234 5678 See 2/SK-30See 1/SK-30 See 1/SK-30 See 1/SK-30 UNIT I10 Roof sheathing to be replaced per 2/SK-30 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-13  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING J UNIT J12 Wall damage to be repaired BLDG J UNIT J12 Roof beam to be replaced. BLDG J UNIT J12 Roof sheathing and beam to be replaced BLDG J UNIT J11 Roof sheathing to be replaced BLDG J UNIT J9 Roof sheathing to be replaced BLDG J BLDG J WEST Parapet to be fixed BLDG J 1234 56 See 2/SK-30 See 2/SK-30See 2/SK-30See 1/SK-32 Provide building paper and stucco to match existing. See 1/SK-31 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-14  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING K UNIT K13 Roof beam to be treated from further termite and fungi damage BLDG K UNIT K13 Roof beam to be treated from further termite and fungi damage BLDG K UNIT K13 Roof sheathing & beam to be replaced BLDG K UNIT K12 Roof sheathing to be replaced BLDG K UNIT K12 Roof beam to be replaced BLDG K UNIT K10 Roof beam to be replaced. BLDG K UNIT K9 Roof beam to be treated from further termite and fungi damage BLDG K UNIT K8 Stair landing to be strengthened. BLDG K 1234 5678 See 1/SK-30 See 2/SK-31 See 2/SK-31 See 2/SK-30 See 2/SK-30 & 1/SK-32 See 1/SK-30 See 1/SK-30 See 2/SK-33 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-15  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING K UNIT K14 Wall damage to be repaired. BLDG K UNIT k14 Wall damage to be repaired. Roof beam to be replaced BLDG K UNIT K28 Roof beam to be treated from further termite and fungi damage BLDG K UNIT K27 Roof beam to be treated from further termite and fungi damage BLDG K UNIT K26 Roof beam to be replaced BLDG K UNIT K26 Roof beam to be treated from further termite and fungi damage BLDG K UNIT K26 Roof beam to be treated from further termite and fungi damage BLDG K UNIT K22 Roof beam to be replaced BLDG K 1234 5678 See 2/SK-31 Provide building paper and stucco to match existing.Provide building paper and stucco to match existing. K14 See 2/SK-31See 1/SK-30 See 2/SK-31 See 1/SK-30 See 1/SK-30See 1/SK-30 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-16  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING K BLDG K WEST Roof sheathing to be replaced. BLDG K UNIT K28 Wall damage to be repaired BLDG K 12 See 2/SK-30 Provide building paper and stucco to match existing. 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-17  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING A ROOF Waterproofing to be fixed at top of wall to prevent further weather damage to the structure inside. (Waterproofing consultant to advise fix detail ) Expose structure framing for further inspection. structural repair may be required. verify in field BLDG A Waterproofing to be fixed at top of wall to prevent further weather damage to the structure inside. (Waterproofing consultant to advise fix detail ) BLDG A Waterproofing to be fixed at top of wall to prevent further weather damage to the structure inside.(Waterproofing consultant to advise fix detail ) BLDG A Waterproofing to be fixed at top of wall to preventfurther weather damage to the structure inside. (Waterproofing consultant to advise fix detail ) BLDG A Waterproofing to be fixed at top of wall to prevent further weather damage to the structure inside. (Waterproofing consultant to advise fix detail ) BLDG A Waterproofing to be fixed at top of wall to prevent further weather damage to the structure inside.(Waterproofing consultant to advise fix detail ) BLDG A Waterproofing to be fixed at top of wall to prevent further weather damage to the structure inside.(Waterproofing consultant to advise fix detail ) BLDG A Waterproofing to be fixed at top of wall to prevent further weather damage to the structure inside.(Waterproofing consultant to advise fix detail ) BLDG A Waterproofing to be fixed at top of wall to prevent further weather damage to the structure inside. (Waterproofing consultant to advise fix detail ) BLDG A Waterproofing to be fixed at top of wall to prevent further weather damage to the structure inside. (Waterproofing consultant to advise fix detail ) BLDG A Waterproofing to be fixed at top of wall to prevent further weather damage to the structure inside. (Waterproofing consultant to advise fix detail ) BLDG A Waterproofing to be fixed at top of wall to prevent further weather damage to the structure inside. (Waterproofing consultant to advise fix detail ) BLDG A Waterproofing to be fixed at top of wall to prevent further weather damage to the structure inside.(Waterproofing consultant to advise fix detail ) BLDG A Waterproofing to be fixed at top of wall to prevent further weather damage to the structure inside.(Waterproofing consultant to advise fix detail ) BLDG A Waterproofing to be fixed at top of wall to prevent further weather damage to the structure inside. (Waterproofing consultant to advise fix detail ) BLDG A Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to matchexisting. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-18  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING A ROOF Waterproofing to be fixed at top of wall to prevent further weather damage to the structure inside. (Waterproofing consultant to advise fix detail ) BLDG A Wall to be exposed. Damage to be repaired pending findings from investigation after wall exposed. BLDG A Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap. 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-19  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING B ROOF 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-20  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING C ROOF Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-21  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING D ROOF Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-22  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING E ROOF Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-23  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING F ROOF Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-24  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING G ROOF Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-25  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING H ROOF Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap. 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-26  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING I ROOF Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-27  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING J ROOF Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap. 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-28  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING K ROOF Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap. 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-29  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com BUILDING K ROOF Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap. Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper and stucco to match existing. Flash top of parapet with G.I. cap.Remove damaged stucco. Provide building paper andstucco to match existing. Flash top of parapet with G.I. cap. 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao 2TYPICAL ROOF SHEATHING REPLACEMENT DETAIL N.T.S. THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-30  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com DETAIL 1TYPICAL WOOD BEAM EPOXY DETAIL N.T.S. (E) ROOF SHEATHING (E) BEAM OR WALL (E) TILE (E) BEAM VOID IN BEAM TO BE FILLED w/ WOOD EPOXY TYPICAL LIQUIDWOOD EPOXY A A SECTION A-A PLYWOOD SHEATHIGN OVER VOID @ FACE OF BEAM VOID IN BEAM TO BE FILLED w/ WOOD EPOXY (E) ROOF TILE (E) ROOF SHEATHING DRILL 1/8" HOLE @ 6"o.c. AS REQ'D TO INJECT EPOXY NOTE: 1. VOID SHOWN IN DETAIL IS CONCEPTUAL. FIELD VERIFY VOID LOCATION AND SIZE AT EACH BEAM. 2. CLEAN FACE OF BEAM BY REMOVING LOOSE MATERIAL w/ WALNUT SHELL BLASTING MEDIA. THOROUGHLY CLEAN BEAM OF WALNUT SHELL MEDIA WITH COMPRESSED AIR PRIOR TO REPAIR WORK. 3. SHEATHING OVER VOID SHALL BE STRIPPED AFTER EPOXY SETS. 4. REPAIR SHALL BE PERFORMED AFTER LOOSE BEAM MATERIAL IS REMOVED FROM FACE OF BEAM. 5. PEST CONTROL SHALL BE DONE PRIOR TO REPAIR WORK. 6. ARCHITECT OR WATERPROOFING CONSULTANT TO PROVIDE WATERPROOFING REPAIR DETAIL INCLUDING FLASHING, BUILDING PAPER, ETC. (E) WALL (E) SHEATHING (E) BEAM A A SECTION A-A (E) WALL ROOF SHEATHING TO MATCH EXISTING TYPICAL (2) 10d NAILING PER SHEATHING CUT (E) DAMAGED SHEATHING AT CENTER OF BEAM NOTE: 1. ROOF TILE NOT SHOWN FOR CLARITY. CONTRACTOR SHALL REMOVE AND REINSTALL ROOF TILE UNDER IMPACT. 2. FIELD VERIFY EXISTING CONDITION AND APPLY DETAIL ACCORDINGLY. 3. ARCHITECT OR WATERPROOFING CONSULTANT TO PROVIDE WATERPROOFING REPAIR DETAIL INCLUDING FLASHING, BUILDING PAPER, ETC. (E) ROOF SHEATHING (E) BEAM (E) TILE (E) BEAM ROOF SHEATHING TO MATCH EXISTING ROOF SHEATHING TO MATCH EXISTING 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao 2TYPICAL WOOD BEAM REPLACEMENT DETAIL N.T.S. THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-31  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com DETAIL 1TYPICAL STEEL STAIR STRENGTHEN DETAIL N.T.S. (E) STAIR LANDING (E) STAIR STRINGER (E) CONNECTION PLATE PIPE 3 STD. @ EA. STAIR STRINGER (2 IN TOTAL) 1/4" CAP PL 3/16 PL1/2x4x0'-7" w/ (2) 1/2" DIA. SIMPSON TITEN HD SCREWS (2" EMBED) NOTE: 1. STAIR LANDING SHALL BE ERECTED TO BE LEVEL PRIOR TO INSTALLATION OF STEEL POST. 2. FASCIA PLATE SHALL BE REPLACED WITH PRESSURE TREATED LUMBER. (E) ROOF SHEATHING (E) TILE REPLACE (E) DAMAGED BEAM w/ NEW BEAM. SIZE TO MATCH EXISTING (E) WALL STUD (E) TOP PLATE SIMPSON A35 (E) UNDAMAGED BEAM TO REMAIN. FIELD VERIFY 3'-6" MI N 10d NAILING @6" o.c. (2) 10d NAILING @ EA. ROOF SHEATHING SIMPSON LTP4 NOTE: 1. CONTRACTOR SHALL REMOVE AND REINSTALL ROOF TILE UNDER IMPACT WHERE REQUIRED. 2. FIELD VERIFY EXISTING CONDITION AND APPLY DETAIL ACCORDINGLY. 3. ALL NEW LUMBER SHALL BE PRESSURE TREATED. (E) S.O.G. 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao 2TYPICAL WOOD BEAM STRENGTHEN DETAIL N.T.S. THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-32  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com DETAIL 1TYPICAL WOOD BEAM REPLACEMENT DETAIL N.T.S. NOTE: 1. CONTRACTOR SHALL REMOVE AND REINSTALL ROOF TILE UNDER IMPACT WHERE REQUIRED. 2. FIELD VERIFY EXISTING CONDITION AND APPLY DETAIL ACCORDINGLY. REPLACE (E) DAMAGED BEAM w/ NEW BEAM. SIZE TO MATCH EXISTING (E) BEAM REMAINED(E) ROOF SHEATHING (E) TILE NOTCH TO FIT (E) BEAM OR WALL SIMPSON A34 EA. SIDE (E) WALL SHEATHING (E) WALL A A SECTION A-A ADDED BEAM (E) SHEATHING SIMPSON A34 EA. SIDE @ 24" o.c. SIMPSON A34 3x6 LEDGER (E) STUD BEHIND (E) SHEATHING (3) 16d NAILING @ EA. END (E) DBL. TOP PLATES CUT (E) BEAM TO FACE OF WALL 10d NAILING TO BLOCKING BELOW (E) WALL (E) SHEATHING (E) BEAM ADD 4x10 w/ 1/4" DIA. THRU BOLT @ 24" o.c.(E) BEAM CL A A SECTION A-A (E) ROOF SHEATHING (E) BEAM (E) TILE ADDED 4x BEAM (E) BEAM NOTCH AS REQ'D 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao 2STEEL STAIR STRENGHEN DETAIL N.T.S. THE VILLAGE AT DIAMOND BAR STRUCTURAL REPAIR 23601 GOLDEN SPRINGS DR. DIAMOND BAR, CA 91765 JOB NUMBER DATE21-L137 02/04/2022 FIGURE SK-33  888 S. Figueroa Street 18th Floor Los Angeles, CA 90017 323.733.6673 T 323.733.8682 F www.englekirk.com DETAIL 1TYPICAL PARAPET STRENGTHEN DETAIL N.T.S. (E) PARAPET STUD NOTE: 1. CONTRACTOR SHALL REMOVE AND REINSTALL WATERPROOFING AND WALL FINISH WHERE REQUIRED. 2. FIELD VERIFY EXISTING CONDITION AND APPLY DETAIL ACCORDINGLY. 3. EXISTING PARAPET w/ EXCESSIVE DEFLECTION SHALL BE PLUMBED PRIOR TO REPAIR. 4. CONTRACTOR TO NOTIFY OWNER FOR INSPECTION AFTER PARAPET STRUCTURAL FRAMING IS EXPOSED. FURTHER REPAIR MAY BE REQUIRED PENDING ANY OTHER DAMAGE FOUND AFTER FRAMING IS EXPOSED. (3) SIMPSON SDS25300 T&B7"(E) JOIST (E) STUD(E) BLOCKING PIPE 3 STD. @ EXT. CORNER OF STAIR LANDING 3/16 PL1/2x4x0'-7" w/ (2) 1/2" DIA. SIMPSON TITEN HD SCREWS (2" EMBED) NOTE: 1. STAIR LANDING SHALL BE ERECTED TO BE LEVEL PRIOR TO INSTALLATION OF STEEL POST. (E) STAIR LANDING (E) STAIR STRINGER 1/4 CAP PL. 3/16 (E) STAIR STRINGER (E) S.O.G. 03/22/202206/21/2022REGISTEREDPROFESSIONAL E NGINEERSTATEOF C A L IFORNIASTRUCTURALTHOMASANDREWSABOLSE 3175 Building and Safety 04/06/2020 APPROVED By: ______________________________ This set of plans and specifications MUST be kept on the job at all times and it is unlawful to make any changes or alterations on same without written permission from the Building and Safety Department. The stamping of this plan and specifications SHALL NOT be held to permit or to be an approval of the Violation of any provisions of any City Ordinance or State Law. RKA Consulting Group. 10/26/2022 rtao