Loading...
HomeMy WebLinkAbout1st City Plan Correction - RESPONSE 061022.pdfDE Project #22-069 June 10, 2022 Raymond Tao, Building Official City of Diamond Bar Building and Safety Division 21810 Copley Drive Diamond Bar, CA 91765 Re: Diamond Bar Village Condominiums – PLAN CHECK RESPONSES 23601 Golden Springs Drive Diamond Bar, CA Plan Check Corrections Response Letter: Please see Du Mont Engineering’s responses below in green. 1) Typical Stucco Patch/Repair Detail Correction on Page 1:  RESPONSE: See the added waterproofing details on sheet A-2.0 2) Typical Wall Cap Flashing Detail Correction on Page 2:  RESPONSE: See the added waterproofing details on sheet A-3.0, A-3.1, and A- 4.0. Re: Diamond Bar Village Condominiums – PLAN CHECK RESPONSES 23601 Golden Springs Drive Diamond Bar, CA Page 2 of 2 3) Typical Parapet Wall Finish Detail Correction on Page 2:  RESPONSE: See the added waterproofing details on sheet A-3.0. 4) Typical Roof Eave & Roof-to-Wall Waterproofing Detail Correction on Page 2:  RESPONSE: See the added waterproofing details on sheet A-4.0.   If you have any questions or need further information regarding this response letter, please contact this office. DATED:_______06/10/2022________ By:______________________________ Du Mont Engineering Westin Gaudet, AIA Architect Architect License #C35358 DATED:_______06/10/2022________ By:______________________________ Du Mont Engineering Borna Bahrami, P.E. Engineer Civil Engineer License #C91510