I approved the plans. Please contact the applicant to issue the permit through their contractor. Thank you.
https://www.dropbox.com/s/gy2i091nxvu0z4r/Golden%20Springs%2023601%20%28Balcony%20Repair%29%20PR%2022-016_1ST%20REVIEW%20PLANS.pdf?dl=0
Raymond Tao l Building Official
City of Diamond Bar l Building and Safety Division
21810 Copley Drive l Diamond Bar, CA 91765-4178
909.839.7021 l 909.396.7486 (f)
www.DiamondBarCA.gov<http://www.diamondbarca.gov/>
[EmailSignatureLogo15]<http://www.diamondbarca.gov/>
[Graphical Banner for the City's Online Appointment Scheduling System. Clicking on it will open a new tab to the appointment scheduling page]<https://www.diamondbarca.gov/1019/Make-An-Appointment>
From: Raymond Tao <RTao@DiamondBarCA.Gov>
Sent: Friday, January 7, 2022 11:18 AM
To: Esmeralda Magallanes <EMagallanes@DiamondBarCA.Gov>
Subject: Re: Repair Progress Report - Diamond Bar Village HOA
Hi Esmmy,
Thanks for working on this. It’s for plan check. They are repairing balconies based on the city’s Notice of Order. They are missing one unit which I’ll follow up on once you start
processing.
Raymond Tao l Building Official
City of Diamond Bar l Building and Safety Division
21810 Copley Drive l Diamond Bar, CA 91765-4178
909.839.7021 l 909.396.7486 (f)
www.DiamondBarCA.gov<http://www.diamondbarca.gov/>
On Jan 7, 2022, at 10:40 AM, Esmeralda Magallanes <EMagallanes@diamondbarca.gov<mailto:EMagallanes@diamondbarca.gov>> wrote:
I’m confused. Am I issuing an OTC roof repair for (6) units only? If so, which 6 units?
Or taking this in for plan check? Please advise.
Thank you,
Esmeralda Magallanes | Permit Services Coordinator
City of Diamond Bar | Building & Safety Division
21810 Copley Drive, Diamond Bar, CA 91765
t (909) 839-7020| (909) 839-7000 main | f (909) 861-3117
emagallanes@diamondbarca.gov<mailto:emagallanes@diamondbarca.gov> | www.DiamondBarCA.gov<http://www.diamondbarca.gov/>
Connect with Us... Facebook<http://www.facebook.com/cityofdiamondbarca>|Twitter<http://www.twitter.com/diamondbarcity>|YouTube<http://www.youtube.com/diamondbarca>|Instagram<http://www.instagram.com/
cityofdiamondbar>
21810 Copley Drive | Diamond Bar, CA 91765
(909) 839-7020 | (909) 861-3117 (f)
www.DiamondBarCa.Gov<http://www.diamondbarca.gov/> | EMagallanes@DiamondBarCA.Gov<mailto:EMagallanes@DiamondBarCA.Gov>
[cid:image003.png@01D80623.0A270120]<https://www.diamondbarca.gov/1019/Make-An-Appointment>
From: Raymond Tao <RTao@DiamondBarCA.Gov<mailto:RTao@DiamondBarCA.Gov>>
Sent: Tuesday, January 4, 2022 1:27 PM
To: Esmeralda Magallanes <EMagallanes@DiamondBarCA.Gov<mailto:EMagallanes@DiamondBarCA.Gov>>
Subject: FW: Repair Progress Report - Diamond Bar Village HOA
Esmmy,
When you’re able, please process this application as it’s the one for the DB Village. We want to make sure we don’t delay the permits on this if possible. Thanks.
Raymond Tao l Building Official
City of Diamond Bar l Building and Safety Division
21810 Copley Drive l Diamond Bar, CA 91765-4178
909.839.7021 l 909.396.7486 (f)
www.DiamondBarCA.gov<http://www.diamondbarca.gov/>
[EmailSignatureLogo15]<http://www.diamondbarca.gov/>
[Graphical Banner for the City's Online Appointment Scheduling System. Clicking on it will open a new tab to the appointment scheduling page]<https://www.diamondbarca.gov/1019/Make-An-Appointment>
From: Tom Sabol <tom.sabol@englekirk.com<mailto:tom.sabol@englekirk.com>>
Sent: Monday, January 3, 2022 9:41 AM
To: Raymond Tao <RTao@DiamondBarCA.Gov<mailto:RTao@DiamondBarCA.Gov>>; 'Roger Li' <rliandjli@gmail.com<mailto:rliandjli@gmail.com>>
Cc: 'Julie Alarcon H8 DBV' <Jalarcon099@gmail.com<mailto:Jalarcon099@gmail.com>>; 'Peter DBV' <sneekers44@yahoo.com<mailto:sneekers44@yahoo.com>>; 'Mira Cheikh K15 DBV' <hamaday01@gmail.com<mailto:ha
maday01@gmail.com>>; 'Susi F2 DBV' <susishack@yahoo.com<mailto:susishack@yahoo.com>>; Greg Gubman <GGubman@DiamondBarCA.Gov<mailto:GGubman@DiamondBarCA.Gov>>
Subject: RE: Repair Progress Report - Diamond Bar Village HOA
CAUTION: This message originated outside of our City of Diamond Bar network.
Raymond,
The temporary shoring drawings were submitted via the City’s online portal on the December 29. Here is the application form.
Tom
Thomas A. Sabol, PhD, SE 3175
Principal
Englekirk Institutional
888 S. Figueroa Street
18th Floor
Los Angeles, California 90017
323.733.6673 x360
www.Englekirk.com<https://linkprotect.cudasvc.com/url?a=http%3a%2f%2fwww.englekirk.com%2f&c=E,1,kWamHk2MWtaJRia_r0z1yvD3BmyZHOrZ4quQKE7CSa0mknZ-hEj-rV70lAuqUiUdqlnAPjRAXrzRIMB4dJ_MLGxR7eWMhTLVfwe3c_w
yRumWBVqfZI9A4M5f8GKmNw,,&typo=1>
From: Raymond Tao <RTao@DiamondBarCA.Gov<mailto:RTao@DiamondBarCA.Gov>>
Sent: Monday, January 3, 2022 9:37 AM
To: 'Roger Li' <rliandjli@gmail.com<mailto:rliandjli@gmail.com>>
Cc: 'Julie Alarcon H8 DBV' <Jalarcon099@gmail.com<mailto:Jalarcon099@gmail.com>>; 'Peter DBV' <sneekers44@yahoo.com<mailto:sneekers44@yahoo.com>>; 'Mira Cheikh K15 DBV' <hamaday01@gmail.com<mailto:ha
maday01@gmail.com>>; 'Susi F2 DBV' <susishack@yahoo.com<mailto:susishack@yahoo.com>>; Greg Gubman <GGubman@DiamondBarCA.Gov<mailto:GGubman@DiamondBarCA.Gov>>; Tom Sabol <tom.sabol@englekirk.com<mailt
o:tom.sabol@englekirk.com>>
Subject: RE: Repair Progress Report - Diamond Bar Village HOA
Good morning Roger,
Hope you had a good holiday and Happy New Year. I’m checking in on the status of the submittal documents. You had indicated that we would have a submittal for the temporary shoring
by now. Can you please give me an update? Thanks.
Raymond Tao l Building Official
City of Diamond Bar l Building and Safety Division
21810 Copley Drive l Diamond Bar, CA 91765-4178
909.839.7021 l 909.396.7486 (f)
www.DiamondBarCA.gov<https://linkprotect.cudasvc.com/url?a=http%3a%2f%2fwww.diamondbarca.gov%2f&c=E,1,O8ZoCzuNJM-PMDyx76IAgqr4Uz6IFOBynGiMk0puaZqo663TMhaPhqWuStWTNyw8Tyon75uc9ltFQOd0Gaduk5NMUOyY5M14x
AW6hSynZ0NFfw,,&typo=1>
[EmailSignatureLogo15]<https://linkprotect.cudasvc.com/url?a=http%3a%2f%2fwww.diamondbarca.gov%2f&c=E,1,-jKBD8wyjKxM2v76lBCfCpw-6--7pzhul5ndepkUPD_fbaCnMcFGkXiVisq60EcIVPSRdzWxA3lP4eRP6D4h1pjLcGJ-3BJ
DacavZ8XmmHkaUNOlZXoJbZTyf2v5&typo=1>
[Graphical Banner for the City's Online Appointment Scheduling System. Clicking on it will open a new tab to the appointment scheduling page]<https://linkprotect.cudasvc.com/url?a=https%3a%2f%2fwww.d
iamondbarca.gov%2f1019%2fMake-An-Appointment&c=E,1,Fih6KlDwTj5b9pcOcJxv17gv4VItNcytcTBAEmjVTG2WCgVkZozogICAmMDHdMDeS810RuCX9D7-06vGe7JT4kUqsr13C12-4yIJRalmhj140CXmosw,&typo=1>
From: Raymond Tao
Sent: Thursday, December 16, 2021 3:22 PM
To: 'Roger Li' <rliandjli@gmail.com<mailto:rliandjli@gmail.com>>
Cc: Julie Alarcon H8 DBV <Jalarcon099@gmail.com<mailto:Jalarcon099@gmail.com>>; Peter DBV <sneekers44@yahoo.com<mailto:sneekers44@yahoo.com>>; Mira Cheikh K15 DBV <hamaday01@gmail.com<mailto:hamaday0
1@gmail.com>>; Susi F2 DBV <susishack@yahoo.com<mailto:susishack@yahoo.com>>; Greg Gubman <GGubman@DiamondBarCA.Gov<mailto:GGubman@DiamondBarCA.Gov>>
Subject: RE: Repair Progress Report - Diamond Bar Village HOA
Good afternoon Roger,
Thank you for discussing your engineer’s schedule earlier today. I have included the work schedule items from the November 4, 2021 Notice of Order below for reference. To memorialize
our discussion, you had indicated that the shoring plan check submittal and plan documents for the red tagged balconies will be submitted by December 31, 2021 (item 1 below). You had
also told me that all the remainder of work would be submitted prior to January 31, 2022 (items 2 through 5). The remainder of work documents would be plan check submittal, plan drawings,
and supporting calculations. I had mentioned that the expectation is that some destructive testing will be needed.
Additionally, the remaining items 6-7 as well as work for item 5 will be expected to start in February 2022 (based on your prior email). Based on this, you are in compliance with the
current Notice of Order deadline. Please ensure that you submit plan documents for the shoring by December 31, 2021 and the comprehensive design documents prior to January 31, 2022.
Please let me know if you have any questions.
1. Temporary shoring of areas of immediate hazard which includes balconies of units D8, F6, E8, B8, H7, G7, and H8.
2. Permanent repair of areas listed in item 1 above.
3. Permanent repair of stairs and support which includes units C6 and K8.
4. Repair of any loose tile throughout the sloped roof areas.
5. A comprehensive repair plan shall be completed based on exposure of the structural elements of the building. The repair plan shall prioritize and include a clear timeline on when
each repair item will be completed.
6. A contractor or remediation company shall review the extent of any water damage and prioritize repairs or remediation necessary for any substandard or hazardous water damaged conditions
such as for mold or protection of the structure.
7. Any unpermitted construction work shall be removed or appropriately permitted.
Raymond Tao l Building Official
City of Diamond Bar l Building and Safety Division
21810 Copley Drive l Diamond Bar, CA 91765-4178
909.839.7021 l 909.396.7486 (f)
www.DiamondBarCA.gov<https://linkprotect.cudasvc.com/url?a=http%3a%2f%2fwww.diamondbarca.gov%2f&c=E,1,JfQLrJPCKZB5aP6FOJB3es-HQu0htq-hO8wAz4X9u2-yOUPOywVPsEZ0tDAKZ24O9tPmoo9Lim8CmldWoui8j4acoqIDq7DJH
Sq3AwBio4b2wvHV&typo=1>
[EmailSignatureLogo15]<https://linkprotect.cudasvc.com/url?a=http%3a%2f%2fwww.diamondbarca.gov%2f&c=E,1,ZPqsfWVDx8jawQlyAxXoQ_Gq9bb-gwGTGsb7RZtFzISgcvhpkd5-Qj1Cpdg_SQTB9pKs_mPe4Yph0t-WSJxiRT5hKEkfZ9w
d0Y64_4_4D_wTGBGLoSRE&typo=1>
[Graphical Banner for the City's Online Appointment Scheduling System. Clicking on it will open a new tab to the appointment scheduling page]<https://linkprotect.cudasvc.com/url?a=https%3a%2f%2fwww.d
iamondbarca.gov%2f1019%2fMake-An-Appointment&c=E,1,gjRsn-0BS-hmc8ZI_JHxK21xMGUK8RwKPN9K9DVTQjPT2b-MEqzFk9rfKBW3i4TeybjSK1QPIzJ4VUuY-GxobC2FkuY-zyYW51VcoqcfDSFEiHD4Mxv70w,,&typo=1>
From: Roger Li <rliandjli@gmail.com<mailto:rliandjli@gmail.com>>
Sent: Thursday, December 16, 2021 12:15 AM
To: Raymond Tao <RTao@DiamondBarCA.Gov<mailto:RTao@DiamondBarCA.Gov>>
Cc: Julie Alarcon H8 DBV <Jalarcon099@gmail.com<mailto:Jalarcon099@gmail.com>>; Peter DBV <sneekers44@yahoo.com<mailto:sneekers44@yahoo.com>>; Mira Cheikh K15 DBV <hamaday01@gmail.com<mailto:hamaday0
1@gmail.com>>; Susi F2 DBV <susishack@yahoo.com<mailto:susishack@yahoo.com>>
Subject: Re: Repair Progress Report - Diamond Bar Village HOA
CAUTION: This message originated outside of our City of Diamond Bar network.
Hello Raymond,
According to the City's November Order: "Prior to December 31, 2021, plans and a work schedule for correction of all conditions described below must be submitted to the City of Diamond
Bar." I emailed you the plans and a work schedule this morning. We don't find the City's November Order requires all work to be done before December 31, 2021. We believe we are in compliance
with the City's November Order. Englekirk Engineers will address the shoring of the balconies and fixing the loose roof tiles in their design.
Respectfully,
Roger Li
Member of Board
Diamond Bar Village HOA
On Wed, Dec 15, 2021 at 10:39 AM Raymond Tao <RTao@diamondbarca.gov<mailto:RTao@diamondbarca.gov>> wrote:
Good morning Roger,
These dates look like they are all past the deadline. I thought the Board indicated all the work could be done within the time frame. We still have balconies to shore up and tile to
be fixed which I don’t see indicated. Can you please clarify?
Raymond Tao l Building Official
City of Diamond Bar l Building and Safety Division
21810 Copley Drive l Diamond Bar, CA 91765-4178
909.839.7021 l 909.396.7486 (f)
www.DiamondBarCA.gov<https://linkprotect.cudasvc.com/url?a=http%3a%2f%2fwww.DiamondBarCA.gov&c=E,1,m8gBeXsdbz57P8kVHja15_1HP6V15fV0t3UeWb_qmkJg-QWBqo8z4AmlWP3vGf4BxCXb-P9lXdene2DvUAhgs7VCINbDnDZhMeK6
MWvlauI,&typo=1><http://www.diamondbarca.gov/<https://linkprotect.cudasvc.com/url?a=http%3a%2f%2fwww.diamondbarca.gov%2f&c=E,1,s0ZXBXH2f4XWdRgJhHjzJMbZeh-nN6zWLDD8pNSC9L4Uu7ICVqW5WoL46nT07hEIN1B3Ai1A
kYagNewUBYJHhgIbSNRJQtXfWViXyg0U8ExPkA,,&typo=1>>
On Dec 15, 2021, at 9:53 AM, Roger Li <rliandjli@gmail.com<mailto:rliandjli@gmail.com>> wrote:
CAUTION: This message originated outside of our City of Diamond Bar network.
Hello Raymond,
I'd like to report to you the progress we have made to satisfy the City's requirements in the November's Order.
1. We have retained Englekirk Engineers to perform structural design to address all the structural related requirements in the City's November Order. Englekirk Engineers will submit
the required drawings and calculations to the City for permit once the design is completed. We expect we will have the permit in January 2022.
2. We will have contractors' bids for construction after structural design is permitted by the City. We expect we will select the final bid and start construction in February 2022.
3. We have obtained multiple bids for the termite work. Termite work will start once the structural repairs are complete so all the new wood brought to the buildings could also be treated
for termites. We expect all termite work will be completed in June 2022.
Sincerely,
Roger Li
Member of the Board,
Diamond Bar Village HOA