Loading...
HomeMy WebLinkAboutPC 2013-220 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DIAMOND BAR, CALIFORNIA, APPROVING DEVELOPMENT REVIEW NO.PL2013-215 TO CONSTRUCT A NEW BUILDING FOR RETAIL AUTOMOTIVE PARTS AND SERVICE ESTABLISHMENT WITH FOUR SERVICE BAYS LOCATED AT 2875 S. DIAMOND BAR BOULEVARD (ASSESSOR'S PARCEL NO. 8285-020-006 and 8285-020-007). RECITALS 1 Property owner, Diamond Bar Plaza, LLC, and applicant, Dan Wainwright, America's Tire Company, have filed an application for Development Review Project No. PL 2012-215 to construct a 7,149 square -foot building for retail automotive parts and service establishment with four service bays located at 2875 S. Diamond Bar Boulevard, Diamond Bar, Los Angeles County, California. Hereinafter in this resolution, the subject Development Review shall collectively be referred to as the "Project." 2. The subject property is comprised of one legal lot totaling 23,877 square feet (0.55 gross acres). It is located in the Community Commercial (C-2) zone and is consistent with the General Commercial land use designation of the General Plan. 3. The Assessor's Parcel Numbers associated with the subject property are 8285-020-006 and 8285-020-007. 4. On September 27, 2013, notification of the public hearing for this project was published in the San Gabriel Valley Tribune and the Inland Valley Daily Bulletin newspapers. Public hearing notices were mailed to property owners within a 500 - foot radius of the Project site and public notices were posted at the City's designated community posting sites. In addition to the published and mailed notices, the project site was posted with a display board. 5, On October 8, 2013, the Planning Commission of the City of Diamond Bar conducted a duly noticed public hearing, solicited testimony from all interested individuals, and concluded said hearing on that date. B. RESOLUTION NOW, THEREFORE, it is found, determined and resolved by the Planning Commission of the City of Diamond Bar as follows: 1. The Planning Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct; and 2. The Planning Commission hereby determines the Project to be Categorically Exempt from the provisions of the California Environmental Quality Act (CEQA) pursuant to the provisions of Article 19, Section 15303(c) (a new commercial structure not exceeding 10,000 square feet in floor area) of the CEQA Guidelines. Therefore, no further environmental review is required. C. FINDINGS OF FACT Based on the findings and conclusions set forth herein and as prescribed under Diamond Bar Municipal Code (DBMC) Sections 22.48 this Planning Commission hereby finds and recommends as follows: Development Review Findings (DBMC Section 22.48) 1. The design and layout of the proposed development are consistent with the general plan, development standards of the applicable district, design guidelines, and architectural criteria for special areas (e.g., theme areas, specific plans, community plans, boulevards or planned developments); The Project is consistent with the applicable elements of the City's General Plan, City Design Guidelines and development standards by meeting all of the required setbacks. The proposed building has been designed to be complementary with new and remodeled commercial buildings throughout the City and its messing has been skillfully designed to fit the site and its surroundings. The project site is not a part of any theme areas, specific plans, community plans, boulevards or planned developments. 2. The design and layout of the proposed development will not interfere with the use and enjoyment of neighboring existing or future developments, and will not create traffic or pedestrian hazards; The Project will not interfere with the use or enjoyment of neighboring existing or future developments because the use of the project site is designated for commercial uses. The proposed building for retail automotive parts and service establishment will not interfere with vehicular or pedestrian movements, such as access or other functional requirements. 3. The architectural design for the Project is compatible with the character of the surrounding neighbor -hood and will maintain and enhance the harmonious, orderly and attractive development contemplated by this chapter, the general plan, or any applicable specific plan; The architectural style is contemporary,- and is designed to be compatible with surrounding buildings, and incorporates architectural details and colors that relate well to the existing renovated buildings in the City. 4. The design of the proposed development will provide a desirable environment for its occupants and visiting public as well as its neighbors through good aesthetic use of materials, texture and color, and will remain aesthetically appealing-, Variation in the building elements has been achieved through the utilization of varying architectural features such as towers and parapet walls, building colors 2 Planning Commission Resolution No 2013-22 and materials, and landscaping. The project has a sense of balance, involving well-proportioned masses and roof design. 5. The proposed development will not be detrimental to the public health, safety or welfare or materially injurious (e.g., negative effect on property values or resale(s) of property) to the properties or improvements in the vicinity, and Before the issuance of any City permits, the Project is required to comply with all conditions within the approved resolution, and the Building and Safety Division and Public Works Departments, and Los Angeles County Fire Department requirements. The referenced agencies, through the permit and inspection process will ensure that the proposed project is not detrimental to the public health, safety or welfare or materially injurious to the properties or improvements in the vicinity. 6. The proposed project has been reviewed in compliance with the provisions of the California Environmental Quality Act (CEQA). The Project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) as set forth under Article 19 Section 15303(c) (a new commercial structure not exceeding 10,000 square feet in floor area)of the CEQA guidelines. Based upon the findings and conclusion set .forth above, the Planning Commission hereby approves Development Review No. PL2013-215 subject to the following conditions: 1. The development shall comply with the Conditions of Approval attached hereto and referenced herein. Z A permanent maintenance program shall be implemented ensuring regular irrigation, fertilization, and weed removal. All landscaping shall be maintained in a healthy, neat and orderly condition, free of weeds and debris and with operating irrigation at all times. 3. Development shall substantially comply with the plans and documents presented to the Planning Commission at the public hearing, 4. Prior to building permit issuance, landscape and irrigation plans shall be reviewed and approved by the City's Consulting Landscape Architect and shall comply with the Water Conservation Landscaping Ordinance. 3 Planning Commission Resolution No 2013-22 The Planning Commission shall: (a) Certify to the adoption of this Resolution; and (b) Forthwith transmit a certified copy of this Resolution, by certified mail, to: Larry Zerner, Diamond Bar Plaza, 1801 Century Park East, Suite 2400, Los Angeles, CA 90067; and Dan Wainwright, America's Tire Company, 20225 N. Scottsdale Rd., Scottsdale, AZ 85255. APPROVED AND ADOPTED THIS 8T" DAY OF OCTOBER 2013, BY THE PLANNING COMMISSION OF THE CITY OF DIAMOND BAR. BY: ''� orng, Ch irr 1, Greg Gubman, Planning Commission Secretary, do hereby certify that the foregoing Resolution was duly introduced, passed, and adopted by the Planning Commission of the City of Diamond Bar-, at a regular meeting of the Planning Commission held on the 8t" day of October 2013, by the following vote: AYES: Commissioners NOES: Commissioners: BSTAIN: Commissioners: ABSENT: Commissioners: ATTEST: Gubrn—an, Secretary Dhingra, Lin, Shah, VC/Farago, Chair/Torng None None 4 DR PL2013-215 ll 11! - ro I �111 SUBJECT: A Development Review to construct a new 7,14 square -foot building for a retail automotive parts and service establishment with four service bays. PROPERTY Diamond Bar Plaza, 1800 Century Park East, Suite 2400, OWNER(S): Los Angeles, CA 90067 APPLICANT: Dan Wainwright- America's Tire Company, 20225 N. Scottsdale Rd. Scottsdale, -AZ 85255 LOCATION: 2875 South Diamond Bar Boulevard, Diamond Bar, CA 91765 ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DIVISION AT (909) 839-7030, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. GENERAL REQUIREMENTS In accordance with Government Code Section 66474.9(b) (1), the applicant shall defend, indemnify, and hold harmless the City, and its officers, agents and employees, from any claim, action, or proceeding to attack, set-aside, void or annul the approval of Development Review No. PL 2013-215 brought within the time period provided by 5 Planning Commission Resolution No 2013-22 Government Code Section 66499.37. In the event the city and/or its officers, agents and employees are made a party of any such action: (a) Applicant shall provide a defense to the City defendants or at the City's option reimburse the City its costs of defense, including reasonable attorneys fees, incurred in defense of such claims. (b) Applicant shall promptly pay any final judgment rendered against the City defendants. The City shall promptly notify the applicant of any claim, action of proceeding, and shall cooperate fully in the defense thereof. 2. This approval shall not be effective for any purpose until the applicant and owner of the property involved have filed, within twenty-one (21) days of approval of this Development Review No. PL 2013-215 at the City of Diamond Bar Community Development Department, their affidavit stating that they are aware of and agree to accept all the conditions of this approval. Further, this approval shall not be effective until the applicants pay remaining City processing fees, school fees and fees for the review of submitted reports. 3. All designers, architects, engineers, and contractors associated with this project shall obtain a Diamond Bar business license, and zoning approval for those businesses located in Diamond Bar, 4. Signed copies of Planning Commission Resolution No. 2013-22, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all partied involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 5. Prior to the plan check, revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for Planning Division review and approval. 6. Prior to any use of the project site or business activity being cornmenced thereon, all conditions of approval shall be completed. 7. The project site shall be maintained and operated in full compliance with the conditions of approval and all laws, or other applicable Federal, State, or City regulations. 8. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and any applicable Specific Plan in effect at the time of building permit issuance. 6 Planning Commission Resolution No 2013-22 9. All site, grading, landscape/irrigation, roof, and elevation plans shall be coordinated for consistency prior to issuance of City permits (such as grading, tree removal, encroachment permit, etc.,) or approved use has commenced, whichever comes first. 10. Property owner/applicant shall remove the public hearing notice board within three (3) days of this project's approval. 11. The applicant shall comply with the requirements of City Planning, Building and Safety Divisions, Public Works Department, and the Fire Department. B. FEES/DEPOSITS 1. Applicant shall pay development fees (including but not limited to Planning, Building and Safety Divisions, and Public Works Department) at the established rates, prior to issuance of building permits, as required by the City. School fees as required shall be paid prior to the issuance of building permit. In addition, the applicant shall pay all remaining prorated City project review and processing fees prior to issuance of grading or building permit, whichever comes first. 2. Prior to any plan check, all deposit accounts for the processing of this project shall have no deficits. C. TIME LIMITS 1. The approval of Development Review shall expire within two (2) years from the date of approval if the use has not been exercised as defined per Diamond Bar Municipal Code (DBMC) Section 22.66.050 (b) (1). The applicant may request in writing a one year time extension subject to DBMC Section 22.66.050 (c) for Planning Commission approval. D. SITE DEVELOPMENT 1. The project site shall be developed and maintained in substantial conformance with the approved plans submitted to, approved, and amended herein by the Planning Commission, on file with the Planning Division: site plans, floor plans, architectural elevations, and landscaping file in the Planning Division, the conditions contained herein, Development Code regulations. 2. All ground -mounted utility appurtenances such as transformers, air conditioning condensers, etc., shall be located out of public view and 7 Planning Commission Resolution No. 2013-22 a adequately screened through the use of a combination of concrete or masonry walls, berms, and/or landscaping to the satisfaction of the Planning Division. 3. All roof --mounted equipment shall be screened from public view. 4. All structures, including walls, trash enclosures, canopies, etc., shall be maintained in a structurally sound, safe manner with a clean, orderly appearance. All graffiti shall be removed within 72 hours by the property owners/occupant. 5. No occupancy permit can be granted, until all improvements required by this approval have been properly constructed, inspected, and approved. 6. All landscaping, structures, architectural features and public improvements damaged during construction shall be repaired or replaced upon project completion. SOLID WASTE 1. The site shall be maintained in a condition, which is free of debris both during and after the construction, addition, or implementation of the entitlement approved herein. The removal of all trash, debris, and refuse, whether during or subsequent to construction shall be done only by the property owner, applicant or by a duly permitted waste contractor, who has been authorized by the City to provide collection, transportation, and disposal of solid waste from residential, commercial, construction, and industrial areas within the City. It shall be the applicant's obligation to insure that the waste contractor used has obtained permits from the City of Diamond Bar to provide such services. 2. Mandatory solid waste disposal services shall be provided by the City franchised waste hauler to all parcels/lots or uses affected by approval of this project. APPLICANT SHALL CONTACT THE PUBLIC WORKS DEPARTMENT, (909) 839- 7040, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. GENERAL 1. An Erosion Control Plan shall be submitted concurrently with the grading plan clearly detailing erosion control measures. These measures shall be implemented during construction. The erosion 8 Planning Commission Resolution No 2013-22 control plan shall conform to national Pollutant Discharge Elimination System (NPDES) standards and incorporate the appropriate Best Management Practices (BMP's) as specified in the Storm Water BMP Certification. 2. The applicant shall comply with the 2012 MS4 Permit requirements to the satisfaction of the City Engineer. 3. Grading and construction activities and the transportation of equipment and materials and operation of heavy grading equipment shall be limited to between the hours of 7:00 a.m. and 5:00 p.m., Monday through Saturday. Dust generated by grading and construction activities shall be reduced by watering the soil prior to and during the activities and in accordance with South Coast Air Quality Management District Rule 402 and Rule 403. Reclaimed water shall be used whenever possible. Additionally, all construction equipment shall be properly muffled to reduce noise levels. B. SOILS REPORT/GRADING/RETAINING WALLS 1. Prior to grading plan submittal, a geotechnical report prepared by a Geotechnical Engineer, licensed by the State of California, shall be submitted by the applicant for approval by the City. 2. Upon approval of the geotechnical report, the applicant shall submit drainage and grading plans prepared by a Civil Engineer, licensed by the State of California, prepared in accordance with the City's requirements for the City's review and approval. A list of requirements for grading plan check is available from the Public Works Department. All grading (cut and fill) calculations shall be submitted to the City concurrently with the grading plan. 3. Finished slopes shall conform to DBMC Section 22.22.080 -Grading. 4. All easements and flood hazard areas shall be clearly identified on the grading plan. 5, The grading plan shall show the location of any retaining walls and the elevations of the top of wall/footing/retaining and the finished grade on both sides of the retaining wall. Construction details for retaining walls shall be shown on the grading plan. Calculations and details of retaining walls shall be submitted to the Building and Safety Division for review and approval. 9 Planning Commission Resolution No 2013-22 6. All equipment staging areas shall be located on the project site. Staging area, including material stockpile and equipment storage area, shall be enclosed within a six foot -high chain link fence. All access points in the defense shall be locked whenever the construction site is not supervised. 7. Grading of the subject property shall be in accordance with the California Building Code, City Grading Ordinance, Hillside Management Ordinance and acceptable grading practices. 8. Submit a stockpile plan showing the proposed location for stockpile for grading export materials, and the route of transport. 9. A pre -construction meeting shall be held at the project site with the grading contractor, applicant, and city grading inspector at least 48 hours prior to commencing grading operations. 10. Rough grade certifications by project soils and civil engineers and the as -graded geotechnical report shall be submitted for review and approval prior to issuance of building permits for the foundation of the residential structure. Retaining wall permits may be issued without a rough grade certificate. 11. Final grade certifications by project soils and civil engineers shall be submitted to the Public Works Department prior to the issuance of any project final inspections/certificate of occupancy respectively. 1. Detailed drainage system information of the lot with careful attention to any flood hazard area shall be submitted. All drainage/runoff from the development shall be conveyed from the site to the natural drainage course. No on-site drainage shall be conveyed to adjacent parcels, unless that is the natural drainage course. 2. Prior to the issuance of a grading permit, a complete hydrology and hydraulic study shall be prepared by a Civil Engineer registered in the State of California to the satisfaction of the City Engineer and Los Angeles Public Works Department. 3. Additional flow through the existing parkway drain (curb cores) will not be permitted. 10 Planning Commission Resolution No 2013-22 1. Applicant shall construct the sidewalk as shown in the preliminary grading plan where the existing driveway approaches are to be removed. New Driveway approaches shall be constructed in accordance with current American Public Works Association (APWA) standards and the American's with Disability Act (ADA). All public improvements shall be approved by the City Engineer, constructed with an encroachment permit and completed prior to final inspection/certificate of occupancy issuance. 2. A landscaped parkway and street trees shall be added to the parkway areas along Cold Spring Lane and Diamond Bar Blvd. Separate plans shall be submitted for review and approval by the Public Works Department, Planning Division and the Community Services Department prior to Building Permit issuance. Improvements shall be fully installed and accepted prior to issuance of Occupancy or final inspection. This area will be the responsibility of the property owner to irrigate and maintain. E. UTILITIES 1. Easements, satisfactory to the City Engineer and the utility companies, for public utility and public services purpose shall be offered and shown on the detailed site plan for dedication to the City or affected utility company. 2. Will Serve Letters shall be submitted stating that adequate facilities are or will be available to serve the proposed project shall be submitted to the City from all utilities such as, but not limited to, phone, gas, water, electric, and cable. 3. Applicant shall relocate and underground any existing on-site utilities to the satisfaction of the City Engineer and the respective utility owner. 4. Underground utilities shall not be constructed within the drip line of any mature tree except as approved by a registered arborist. F. SEWERS/SEPTIC TANK 1. Applicant shall obtain sewer connection permit(s) to the main line along Cold Spring Lane from the City prior to issuance of building permits. Inspections will be required by both the City and Los Angeles County. 11 Planning Commission Resolution No 2013-22 2. Applicant, at applicant's sole cost and expense, shall construct the sewer system in accordance with the City Public Works Department and Building & Safety Division, and Los Angeles County Public Works Division. Sewer plans shall be submitted for review and approval by the City. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION, (909) 839-7020, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: 1. Plans shall conform to current State and Local Building Code (i.e. Currently the 2010 California Building Code, California Plumbing Code, California Mechanical Code, and the California Electrical Code but the 2013 version will apply if plan check applied after January 1, 2014) requirements and all other applicable construction codes, ordinances and regulations in effect at the time of plan check submittal. 2. Provisions for Cal Green shall be implemented onto plans and certification provided by a third party as required by the Building Division. Specific water, waste, low VOC, and related conservation measures shall be shown on plans. 3. Occupancy of the facilities shall not commence until such time as all California Building Code and State Fire Marshal regulations have been met. The buildings shall be inspected for compliance prior to occupancy. 4. Every permit issued by the Building and Safety Division shall expire if the building or work authorized by such permit is not commenced within 180 days from the date of such permit or work has discontinued and not been signed -off on the job card by the building inspector, 5. Construction activities causing the operation of any tools or equipment used in construction, drilling, repair, alteration, or demolition work shall be conducted Mon. -- Sat. between the hours of 7:00 a.m. and 7:00 p.m. & The project shall be protected by a construction fence to the satisfaction of the Building Official. All fencing shall be view obstructing with opaque surfaces. 7. All structures and property shall be maintained in a safe and clean manner during construction. The property shall be free of debris, trash, and weeds. 12 Planning Commission Resolution No 2013-22 8. All equipment staging areas shall be maintained in an orderly manner and screened behind a minimum 6' high fence. 9. Solid waste management of construction material shall incorporate recycling material collection per Diamond Bar Municipal Code 8.16 of Title 8. 10. The minimum design load for wind in this area is 85 M.P.H. exposures "C" and the site is within seismic zone D or E. The applicant shall submit drawings and calculations prepared by a California State licensed ArchitectlEngineer with wet stamp and signature. 11. This project shall comply with the energy conservation requirements of the State of California Energy Commission. All lighting shall be high efficacy or equivalent per the current California Energy Code 119 and 150(k). 12. Indoor air quality shall be provided consistent with ASHRAE 62.2 as required per California Energy Code 150(0). 13. This project shall comply with all Accessibility Code requirements including accessible parking, path of travel, elevators, restrooms, drinking fountains, etc. Provide compliance with van accessible parking, path of travel, etc. Reception counter shall comply with the Title 24 accessibility requirements. 14. Submit Public Works Department approved grading plans showing clearly all finish elevations, and drainage. 15. "Separate permit shall be required for all wall and monument signs, storage racks, vehicle lifts, and fire sprinklers" and shall be noted on plans. Otherwise these items shall be submitted for plan check. 16. Vehicle lifts shall be designed prior to installation for lateral loads and listing information provided which identifies the required design criteria. 17. Location for low -emitting vehicle parking is required as required per CALGreen 5.710.6.3. 18. The quantity of hazardous materials storage shall be provided for review by Building & Safety and Fire Department as required per CBC 414, This includes listing the quantities of oil, tires, lubricants, batteries, and other vehicle maintenance supplies. They shall not be in excess of the listed in CBC Tables 307.1(1) and 307.1(2). 13 Planning Commission Resolution No 2013-22 19. Prior to Building permit issuance, all school district fees must be paid. Please obtain a form from the Building and Safety Division to take directly to the school district. 20. Number of plumbing fixtures shall be in compliance with CPC T-4-1. 21. Provide exit analysis showing occupant load for each space, exit width, exit signs, etc. This includes requiring two exits for the sales area. 22. Indicate the proposed addition and existing building on the plans. Submit code analysis and justification showing the following: a. Each building square foot; b. Each building height; C. Type of construction; d. Sprinkler system; e. Each group occupancy; f. Property line location in relation to each building (side yard); g. Exit analysis for each building (occupant load/corridor rating/exit width/exit signs, etc.); h. Accessibility analysis for the entire site and for each building; and i. Shaft rating/ exterior walls construction/ opening protection. 2.3. Verify adequate exit requirements. The distance between required exits shall be'/2 of the building diagonal. This includes the sales area. 24. Indicate all easements on the site plan. 25. Submit grading plans showing clearly all finish elevations, drainage, and retaining wall locations. No building permits shall be issued prior to submitting a pad certification. 26. The project shall be protected by a construction fence and shall comply with the NPDES & BMP requirements (sand bags, etc.). 27. Drainage patterns shall match the approved grading/drainage plan from the Engineering Department. Surface water shall drain away from building at a 2% minimum slope. The final as -built conditions shall match the grading/drainage plan or otherwise approved as -built grading/drainage plan. 14 Planning Commission Resolution No. 2013-22 28. All glazing in hazardous locations shall be labeled as safety glass, The labeling shall be visible for final inspection. 29. Specify 1/4"/ft slope for all flat surfaces/ decks with approved water proofing material. Also, provide guardrail connection detail (height, spacing, etc.) 30. Private property sewer system shall be approved by the Los Angeles County Sanitation District. 31. Special inspections and structural observation will be required in conformance to CBC 1704 to 1709. 32. A soils report is required and all recommendations of the soils report shall be adhered to. 33. The applicant shall contact Dig Alert and have underground utility locations marked by the utility companies prior to any excavation. Contact Dig Alert by dialing 811 or their website at www.digalert.org. 34. The location of property lines and building pad may require a survey. 35. All workers on the job shall be covered by workman's compensation insurance under a licensed general contractor. 36. Any changes to approved plans during the course of construction shall be approved by the City prior to proceeding with any work. 37. LA County Industrial Waste approval is required prior to permit issuance for grease separators. 38, Features provided by the architect for design of the accessible parking stall adjacent to the drive aisle shall be incorporated onto plans including truncated domes, warning signs, colored concrete, and other features as deemed necessary by the architect. WEN 15 Planning Commission Resolution No 2013-22