HomeMy WebLinkAboutRE_ City-Initiated Change Order No_2-DRAFTThank you Dick for the clarification. Can you take one last look at the Draft Change Order #2 and let me know if you (or AJ) see any mistakes? Thanks, Ryan From: Richard Fisher <rfisher@rfaland.com> Sent: Monday, December 19, 2022 2:34 PM To: Ryan Wright <RWright@DiamondBarCA.Gov>; Anthony Jordan <AJordan@DiamondBarCA.Gov> Subject: RE: City-Initiated Change Order No.1 CAUTION: This message originated outside of our City of Diamond Bar network. **Please exercise caution when opening attachments or clicking links, especially from unknown senders.** Easy things first: Location #4 IS on the attached plan. You’ll need to see the entire 11 X 17 image as it’s near the top/left of the Plan. Dick Fisher Richard Fisher Associates 4902 Kron Street, Irvine CA 92604 (714) 342-5467 rfisher@rfaland.com <mailto:rfisher@rfaland.com> From: Ryan Wright <RWright@DiamondBarCA.Gov <mailto:RWright@DiamondBarCA.Gov> > Sent: Monday, December 19, 2022 2:16 PM To: Richard Fisher <rfisher@rfaland.com <mailto:rfisher@rfaland.com> >; Anthony Jordan <AJordan@DiamondBarCA.Gov <mailto:AJordan@DiamondBarCA.Gov> > Subject: RE: City-Initiated Change Order No.1 Thanks Dick. Just to be clear from previous email….in summary, we would request the following in exchange for the removal of the 3rd tier of wall #3? Construction of C-1 and C-2 in Location #3, as detailed below and in my 12/15/email. ITEM C Location #3 / Westerly-End Timber Steps Complex C-1 Install Concrete Swale directly adjacent to the north side of the timber step improvements, running the full length of the timber steps complex / 80 LF. C-2 Customize the design of the Velocity Reducer at the extreme west end of the trail improvement project / timber step complex as follows: * Start at Concrete Swale’s low end @ 4’ wide, widened to 14’ wide, and is to be 10’ long / 90 SF ITEM D Location #4 / Westerly-End of Trail Improvements D-1 Delete the Concrete Swale as indicated on the approved Plans that wraps around the backside of the Oak Tree grove, as indicated on the Approved Plans / 71 LF D-2 Delete the Velocity Reducer as indicated on the approved Plans for the above-described location / 5 SF ***Can you include the new specs for the larger reducer that were discussed to day and I will include? Quarry Stone Rubble presses deeply into a 12” deep concrete base slab (See Detail #5 on Title Sheet of approved Plans). I also didn’t see (Location #4) on the attached plan?***** With that information, I think its reasonable to reach out to Danny and work though this change order. Thanks, Ryan From: Richard Fisher <rfisher@rfaland.com <mailto:rfisher@rfaland.com> > Sent: Monday, December 19, 2022 1:59 PM To: Ryan Wright <RWright@DiamondBarCA.Gov <mailto:RWright@DiamondBarCA.Gov> >; Anthony Jordan <AJordan@DiamondBarCA.Gov <mailto:AJordan@DiamondBarCA.Gov> > Subject: RE: City-Initiated Change Order No.1 CAUTION: This message originated outside of our City of Diamond Bar network. **Please exercise caution when opening attachments or clicking links, especially from unknown senders.** Ryan & Anthony: So, on Gabion Wall No. 3, with the deletion of all 3rd tier cages, as the grades behind the Gabion Walls don’t warrant the additional height, this will delete the installation of (41) 12” high cages, and (11) 24” high cages. To determine the contracted price for these deleted cages, I summed up the total cages in Gabion Wall #3, placing a value for 12” high cages as 0.5 of the value of standard 24” high cages making up the majority of this Gabion Wall. As there are 225.5 (equivalent) units in the design on the approved plans, I divided the Lump Sum amount of $93,660 by 225.5 to get an “equivalent 24” cage” at $415.33 each. Then, I added (11) X $415.33 plus (41) X [415.33 divided by 2] for the 12” cages. The credit due the City adds up to $13,082.90 With the equivalent cage reduction of 31.5 cages, the construction time should be reduced. Can we get Danny to agree to “call it even” with less cages but more work as discussed this morning? Dick Fisher Richard Fisher Associates 4902 Kron Street, Irvine CA 92604 (714) 342-5467 rfisher@rfaland.com <mailto:rfisher@rfaland.com> From: Richard Fisher Sent: Thursday, December 15, 2022 10:17 PM To: Ryan Wright <RWright@DiamondBarCA.Gov <mailto:RWright@DiamondBarCA.Gov> >; Anthony Jordan (AJordan@DiamondBarCA.Gov <mailto:AJordan@DiamondBarCA.Gov> ) <AJordan@DiamondBarCA.Gov <mailto:AJordan@DiamondBarCA.Gov> > Subject: City-Initiated Change Order No.1 Hi Guys: I have attached both a Red-texted Plan highlighting the locations and notes for revised work items and their quantities (both projected additional costs and earned credits), and the DRAFT language for the descriptions of revised construction items directly relating to these highlighted amenities. With a small exception of MINIMAL construction supervision required for the item A-2, I have taken the awarded Contracts Bid Schedule prices and applied these to both additional quantities and deleted quantities of work. Hopefully, there is an extremely minimal need to get involved in “Negotiated Costs” dialogue. I have not determined the precise additional work days involved, but suggest perhaps NMT 10 working days would be warranted. Let me know what questions you may have. Best, Dick Fisher Richard Fisher Associates 4902 Kron Street, Irvine CA 92604 (714) 342-5467 rfisher@rfaland.com <mailto:rfisher@rfaland.com> 㡑麄윿꽘뭠挆ㅤ✩撕椹༤龓析翈୐魽쵾놦噄㳀쯌뉶�銗똸ﱺ媛皃혿悒揍╱煫⺞ࣘ택�❡骞ぽⶈ햄褻앍鹺尋盄긙䟂鱄Ᵽ쟉༶㥛銱搕뤭뒗Ẓ顲䢼郎綠岐讧拨䩚퍗�뭊⽩儍蚕㧩襺㯾奦螬製撝댯��ɛ⬈鼄⻐፬ጞ싏ズ舮您ራ뇑잧됛괜歜໒Ⅺ坬욱牬ᜠ폧ꮀ蟪��ﻘ嬊혿⽮㰐떅헣ᅻ韒統ÿ쉯㡛뾿﯀װ襼鯳챁邤쟌ﻺⲀ뛅휞辩⓬搃㲐疁錎�졆鰅㣥烎篐Ὠ䧝툏㩉䝌⣨蒮ೆኸ汩猩뮰ۙྲྀ旫��謈ᆰ߶ઁ䉥낃�萣Ꞅច垄ׂ鹱⹘넆 䍥↲냓䐴ڌ復⊺쎍砩숕柛☣蘒▿顗ۀ䷔�ﰭ줓ᗅ₨ภᛂ೸鰳﹍靈뮐龙재⴦ͤ෼얛暞煵焋ڲ೒�缔㸇䠱ᢇ茕豬䥼䉏ఛ﯒軆ṫല紘眖⻌肨ℼ䘃ꥩ䰰榲㴞ﱧ褕ꕀ샑奊钙�瘱팑䩴ﳱ螼ꭧ㺑쮄苤㕱㝦廆魀偝蹉➍燁䏑撽㴖噆﬙皤ꒄ영욒榪떸৚ᙺ蔾੟싯繁갶럅徆㤿�澎疚鍰特篢�番啕ꃾ벢뒬쥤譝⸖㾘뢯남鋀㞟㜷笧犎妧뫎첬馴㎩Ꙓ✧ኙ▧쟄웅䙈⢃䨰삠풮敹융ફ쨹斲鲅籗⛝꫰訲ꛪ꣚垲錷媧텚陛৖▤줱倕塑� 夕썽좦눑赾㚃⏅ᾫ鴪爖♴ᤁᦳ搽婻䶛襖뙗疫浽뭁蛗藣拣镫䃚慬萁貐䩃ꦝ蝴쳉ꉊ琓붦䰬䩁곀೔曅퍗ᬕ䅏�彶�우띭驥黍˂풕闺ᔦ᪔턵鮢굀䘞퐵䚪谽컜Χ셰쑀䴄䭞덼饖쏏④す䶮劣䯃�㢰牸ﮭ�馵栬歏㦗ఛ⠾䞫룗흯禚ᣠ䯨솼఺}쩰贘喸ឲ쩃♼噼⠋⹶滱햖ꔘ楆渋據唄༷摥蝘瞵쌡ܮ湝곅敖Ḫ涟㡖舅ﶍ튧犭哺慍�㒔�듰⣄鼑㭰頑溔⧎敤켉奈㮎镂㋽灖╎஼䂔忐暂磸稈충⊸櫭굌样誯⛙ๅ๾θ辔騿╅沆䧀侾텯얪戭 얬씵⬜﹵슮뺂괈멖㉍Ⱒ㐟浠鹽抲뼬쳙砗쑿䴊꣈欃Ꮬ಼饍恃똭呸醚驛欙暹雠퉦ꯝ仠ാ鋼䌷犕F䴒펩淭⩥﵉甞䉠烯踪닝획슚♋兵鵊饦䨴䳑殦危鱮㮌ᕞꃏ裦쉑꥝衋Ꝝ벚⛋佺񻏼詴흨鞸뺎譱ꦦ妖句⧸엩ᤇⰦ僤殇ぽ㬘蝅밇갦綐쉫뉖맏㷞쉬霾衻娒귫蓱ꃧ㷎̬畘鴩犔㠜済⇘첪뱡༄嫨ᝁ볨䈿靀띉Ѥᇼ℺簲脊ꆯ㜔瞎楫鯉퉅紕潕칿漊꿠缼슾㏛稢⸂꞉⟁搀촋우ɰ᪖慊�攃玨ᐡ퐑ꍥ雽縨隄ᩪ埊尠⡃灀젢䴈Ḉ閄㬈협勐◸绂귴ﻠ댜듦⫸袤쑎 싉逇尡岄♃ጬ菎늂谜傿螌ꑺ얳遝鱢緍ꮴ꿈搴춣頧གྷࣤ䄯降讖ⅻ猕詟ኺ༱౪ㄛ䗞안鹱尳鬡꼑洐̨叭�㡛ஶꡇ흣軁쮾ଅ攬瀫邡ാ袵꣭膟弰᧸짎猂⿹�뢃洝퇪苗ꗺ콘챪膵ٽရ᮸㿘秃Ӳ䌜証诶ᮄ鴰ꕼ귇렠ᢳի̆ᬌ搌ု䡮⃫㠁ﱰ띍嬰ⴈ皼轨듖ﴟせ㕎ᗻ蹬飖᳃䬞렂鰬ꖧ栒焇닮ს瑩⠮�揜胼웬핚烫簈垈쁱䫱阐鐠ꅇ㱌才繄ꆅﰑ谜끙紀る讖෯췔㳃衵뿦騲躿켱걢缭ૃ䟈ଟً淧錀ᵰ㿯䮻礼䍬䫿Ἲ쮿텶❧樀뉙⣶ꙋ⚛⠰h의䯨ਗ鹌릇眷楬튍콂촄 妿ﴽᲝ껂騔ⶋᝀ䕉篷绵�ㅽ槯僱噱葖ഖ您癨ꈞ혹눲朦繲떦⎼Ꮭ姩⇯천遝꾵䅢Ỗ抄㺄매벉꺬껜껎璟⠽脬哔⧌䤹䚲었휗쒦쒤ब졅欹ㆩ᯴㆔櫔㔌䌛᭷畃탆换좨눘䌘웙᳐詣Ⲕ꒙剩ᒼ䤫䆒␒脪ኔ�媵⵸౒踦Ȍׯ㚝�觓兒儢㳼ꝕܳ㡵衫ᵃ菱䦣潖锸褈㟅ꢥე�ก䵗媚煢豄ꍚ쒺僢ඍ�䉡㴆唨㻩荼�ꈑ텱䳞⥾ؙ둂޽ꌳ풁ꪴꪾ쫤튤�瑷棞說䧦�㣾祥艟눬羍鈽叞곆赇楄靈뢆ꐴ퍋ꭦᲇ띎扺䞶쁝洉螶ꪜ挾쇝㇯앞䀞꫰ﯻ틚臔夦嬎䓏㠯�缦윛肾䙺�ꭔ鍢 헃븻뵃ꮃᖫᡛ�໰쁫吶국⮶鬾ᡧ䧪㡓灿롊溇ᮅ粆䝟邌㸦㹤墏ᄝ뤇麺᱇ᇤ礇竄뵫턞컞뀗᷁ꂖ菆鸿㸺煢밭暙䵏ꦪ劻顟獲Ϛ뾙耖༼硱袗篇ɩ圂嘕嘗ᕳᡮ骮꿆冬�쳦鍟ꏧጪ鎊᪔沰粳࿡�淛〜憓葭ఎ朥뀭ⱸ䟼켉킡잱⬵�ち䇋ﰔ戌ꈍ㆟ᆚᑣӼꗒ銼䬴앺놪窊跓喊놦ꠊᢪ缰싞猤뙒줹⫝̸䷀趙드︵赀뱌츅럓己ܙ懦疴豚㈑ఒ鼉連隰䯺쮦땐詈륁䖮ឋ䠮澥ẏ籾쏱뒣ɺ鏯%髏￧ⱏ〼绹㣟껹遧�ⴄ素鑟‶䏽苔茐ќ訞Ӓ⃮凕슚爴鑯⡦賯˒﯒뒣 껣譀῏辐껋肶ꪼ䭫⽗껚�孝뵽巭໮酿﫵쾾모䎣汮浯ᮑ㴃궁腽闦ᴫ똵譺뾳꦳掫姻䅰琿C�墏⸈퍨嗩אၛꍺ㉖⋔ᖷ�僻껞졛`ꐢ멬ḿ᪩�銈藮鴞​ꀎὭ췶ኰΛな뵚迾线蓨ᰦΡ뤣�鲆㴏�翶趣髮఑蒻ং憊刭袟庖ྤΆォ�諄ꗏ鋙︮닅쪗︹㯓獣洵劼⊺⇅眛䝫ꟾ̀蠀鶚൷攊摮瑳敲浡攍摮扯൪㈳〠漠橢㰍⼼楆瑬牥䘯慬整敄潣敤䰯湥瑧⁨ㄲ㸹猾牴慥൭栊哞㵐쑏ర㰫ᢂꮒ윐畐䎸ᵈჸ쒹鄭Ꭸ翐቏螵氘쿋穾雏▩䄗뎾ᴷᡆ夜�氯⸐ 㨸䎂혅뢙╵䦛逇�玭꧄솥嵃喇蚑渕ﻺ仡苝捼䱨緈淋邕८ߡꐧਈښฬ鹂瑟핸舓쐬뀿͟啂쏺츭ᭁ䵤䈣풭뇱௙ﶒ�静糁ᙫ㪳ᬝ뚑㰷坍星乡쬖엡뙈࣠뾯㸉땤聗ӵ뭪਍湥獤牴慥൭湥潤橢㌍″‰扯൪㰼䈯瑩偳牥潃灭湯湥⁴⼸潃潬卲慰散㌠‶‰⽒楆瑬牥䘯慬整敄潣敤䠯楥桧⁴㘲⼸敌杮桴㔠㐱㔷匯扵祴数䤯慭敧启灹⽥佘橢捥⽴楗瑤⁨ㄵ㸲猾牴慥൭栊糧ᑿ뿵髱䉎跶ꂄ⩬䶆ශ䁅呅쐐灝׆健ᑁ윕ᔑ䑅儑�㣯躠㢂蠸茈訬ꢲॡ塛鋂뮤喳叞ꩵ༏줍﯃硍璘涔몥 ꧺ䎧篞맮枞翸욁䛆㞝㔵㜵蜷帧即⍃魞些휩㪙橵䙖躦�妙ᶙ串敤䡷Ὃ栴結㵽டӠ╋㗠謖ⷩ恤䷫欏ᠰ,∆鹞헔藕擧䛾ဿ�᎛敨ꖝ靋曦胧징榩鄭༿蝄ﰿ࿡瞤舾㓫㐴䭨㨌ƍԘ⏰큯䦝㊻㟾ఘニꐄ빙亂缳잓쀨��㫪棑㔴舥坮퀕裸鄃럭軟礤荮肁ਧ訁먑⿶とఘ㗿赜磥ိ羐絣踃羟駾䆥糫︋넇䖧䥒᧻ᷩ໿㨝敤絥﷿滷会坺ꂂ쳀�੭ච㽣ᶈ梺ᠰ蘌ן뻒竣뵋ɟ㴜ꑼ跪㜛馒奛㐊鎞鶕鎗⇛鴭%乏︭杤奣㡰ો룒♔瑜龕欵鑾缌ᥟꐎ�ꂿ惁 ﰰ灷甕ꫲ뀗卮࿃о܂ꞥꞧ羏퍴史ήἲ쥸䲥寻ﳩ䣲䭋⠫怨懴눥땽᠛琺僨௖䧘奙龎㽱眞៲ᠱ،翃ለ钬蚟鼀奄툩へ젹꼟香ₙ磞츼䌩笀㟟ퟞ퉶ḩ蔿薅⃸룼绚ᨴ病ﲟ䌃ฑ౬埧봍堈怡ᠰ뼌䨗馹濹닙殥껗ᤙ뉰譗篜틩䶥鰉鵲ⱘ玲᪊ﮭ넿�齧තﲈ蒽꾼ꏨ⊏꤀䢬䵏껣鈐筞뗭úᒬਬఘ쌆郉튗淋ॸꛝꆩ娱㭓損酯䳤ݏ᝝ᐔꯐ틣㱃闛봡㸧ዞ揿柍綟箖뙠﫯롹㌦ꋼ⊢�㫒טּ뾋깿腦 솃䡠ꮂ螫켎㟭齞�膖ᚇス㌤Čᔕᐕ岈꣗᭸ᔧ瘻⏢ĜႠ拔​猳꫕摕㕬됝�煐龏柼�恇꿗畟땵ߊʋ茆⃁딨犆⠍ꭷ㗲⮓蛅�쁐쳏滑蒃뫯⻫㒲�ᷭ誄嵍읽⋂쟸큛呿碏�椿០毚쳏敬ಈ敛缯᩾䱕絣덃뵧荠惁Ĉ⪜孟㭛쁠帧넹�ٞ᱾�䠹㯾삻㤹鐹�鿌盹蟘桭훬⮥蔾낥⭦鿼骚숪�ਊ�ꇰ蝃☐�㡄냘⴮ꖏ祟隍᯿،燃垐삽卲啕樅彥咕჏ꆠ虝逃虿﷏̾ꖧ膥៿帯ᆬ圭⟹⍻뻷ꋤ릋ᜠ襩놮ܔ쓊䧼␶Ⲝ끘愀㜢᜷溏礪ࣽ䐕옮ꊲ䊂硿惁ᠰऌ垐륥뭟⵶B彩耡 㿢睓閾ኚ淁殠ゐ䄂线쓽勛㑩햍㗬롏ǿ詼ꎁ︕㠟⁰䟊缢࠯┇┥ᤙ꓾⭘忽悷⯁肪䝣᪎᯿،ஃ冷׫㯄⩬艕�鼹鿎와。嶗鰀庸葽夀ﲉ큰ⷤथ⮙쒷폛䶦앳镐丅쯊᧋偱 罒廓燿檟蝺毵㗗倫ホఘ茆헠ᯨ酆鄹ﮱ륣咑㿺酹吧쁾᧼영ᾏ�ꭇ醅뺥⺡霖돹5羟᫮딾蘱