HomeMy WebLinkAboutRE_ Canyon Loop Trail Estimate (5)CAUTION: This message originated outside of our City of Diamond Bar network.
**Please exercise caution when opening attachments or clicking links, especially from unknown senders.**
My days both tomorrow and Wednesday are flexible and could work for me.
Dick Fisher
Richard Fisher Associates
4902 Kron Street, Irvine CA 92604
(714) 342-5467
rfisher@rfaland.com <mailto:rfisher@rfaland.com>
From: Ryan Wright <RWright@DiamondBarCA.Gov>
Sent: Monday, February 13, 2023 8:04 AM
To: Danny Daher <acecd99@gmail.com>; Richard Fisher <rfisher@rfaland.com>
Subject: RE: Canyon Loop Trail Estimate
Good Morning Danny and Dick,
Please let me know your availability this week and I will coordinate a meeting.
Thank You
From: Danny Daher <acecd99@gmail.com <mailto:acecd99@gmail.com> >
Sent: Sunday, February 12, 2023 12:40 PM
To: Ryan Wright <RWright@DiamondBarCA.Gov <mailto:RWright@DiamondBarCA.Gov> >; Richard Fisher <rfisher@rfaland.com <mailto:rfisher@rfaland.com> >
Subject: Re: Canyon Loop Trail Estimate
CAUTION: This message originated outside of our City of Diamond Bar network.
**Please exercise caution when opening attachments or clicking links, especially from unknown senders.**
Hello Gents,
I am only addressing the items that do mismatch the bid ESTIMATE.
6. I used the Civil Plans and the numbers indicating the beginning of the trail and the end of the trail. The total length according to the plans would be: beginning of trail
Station (1+00.00BP) - (24+26.04EP) = 2,426.04'.
I used the same process to calculate the areas marked as "Protect in place" and came up with a total length of 306.13'
Deducting "Protect in place length 306.13 out of the total length of the trail 2,426.04 would result in 2,119.91' of length that DD Systems Improved.
Item #6 of the bid schedule would be 2,119.91'.
9. This item is no different than Gabion wall #3 addressed in change order #2. Portions of the baskets were deleted and purchased materials were returned to the City, Credit
for LABOR was issued to compensate for the removal of the estimated number of baskets removed. DD Systems installed 90' of steps, that leaves 63' of canceled steps. Several
RFI's are exchanged and do indicate the removal of the majority of the steps shown on plans with the exception of steps adjacent to GB#2 and steps below GB#4 for a total
of 100'. Materials were on hand and on site ready for installation of the above mentioned steps. Materials given to City were cut, drilled, transported to site and ready to install
not to mention that areas receiving the steps were graded, compacted and ready for the steps installation. Please refer to Estimate for credit.
18. This item should be 112' not 155'. We installed 56' at Summit Ridge Connector, 16' at bottom of old trail, 24 at top of same old trail and 16' adjacent to GB#4
for a total of 112' Increment of 8' spacing.
Change orders were revised to follow City's numbering of these orders with the exception of CO#2 under "ADD TO SCOPE" ITEM 3. Splash Walls.
We installed 16 SF of Slash Walls in a similar manner to Velocity Reducers as instructed. Therefore we are billing for 16 SF at $420/SF = $6,720.
I show the splash wall square footage as CO#2A.
I also added CO#4 Credit for canceling 63' of steps.
I would appreciate a face to face meeting if we need to review, comment and discuss further.
Attached please find the revised Estimate as a reference.
Thank you
Danny Daher
DD Systems Inc.
Tel: 626 852-0257
Fax: 626 852-0258
On Fri, Feb 10, 2023 at 11:36 AM Ryan Wright <RWright@diamondbarca.gov <mailto:RWright@diamondbarca.gov> > wrote:
Hi Danny,
Dick and I have gone through the Estimate you provided earlier this week and did my best to match up the original bid sheet and three change orders to this document. At this point,
I think it’s best to go through each line item and process for payment or discuss further. Here’s my initial thoughts:
1. Paid in Full (PIF)
2. PIF
3. PIF
4. PIF
5. PIF
6. The estimate LF does not match the bid estimate. Please provide additional information, change order, or written documentation for modification.
7. PIF
8. Please bill the remaining 10%
9. Please provide additional information, change order, or written documentation for modification.
10. Please bill the remaining 100%
11. Please bill for the 19 diverters on this line item. Additional diverters should be under change order #3.
12. Please bill for the remaining 25%
13. Please bill for the remaining 20%
14. Please bill for the remaining 10%.
15. Please bill for the remaining 10%.
16. Please bill for the remaining 10%.
17. Please bill for the remaining 10%.
18. The estimate LF does not match the bid estimate. Please provide additional information, change order, or written documentation for modification.
19. PIF
20. PIF
21. Please bill for remaining 50%
22. PIF
23. PIF
CO#1-Line item #19 was updated to reflect this change. PIF
CO#2-Please list as one line item which include all approved expenses.
CO#2A-Please add to appropriate CO.
CO#3-Please include in line item #9 explanation (see above).
CO#4-Please remove. City has provided all artwork to Fossil. DD Systems to provide posts, panels, and payment to Fossil per line item #21.
CO#5-Please remove. It is included in CO#3.
Please spend some extra time explaining the details behind items 6, 9, and 18 as I do not have a written change order and these quantities do no match the bid sheet. In addition, please
note the next City check run is February 28, therefore, if we wish to submit an invoice for that date, we need to have a final/approved invoice by February 22.
Thank You,
Ryan
From: Danny Daher <acecd99@gmail.com <mailto:acecd99@gmail.com> >
Sent: Tuesday, February 7, 2023 5:32 PM
To: Ryan Wright <RWright@DiamondBarCA.Gov <mailto:RWright@DiamondBarCA.Gov> >
Subject: Canyon Loop Trail Estimate8, 10
CAUTION: This message originated outside of our City of Diamond Bar network.
**Please exercise caution when opening attachments or clicking links, especially from unknown senders.**
Hello Ryan,
I wanted to avoid the back and forth between us regarding Quantities and handling the deleted items credit and or charge. So I am attaching the Estimate that is generated by Quickbooks
and it's used to generate invoices. Everytime you asked me to change invoices, I had to go back to the estimate and revise it. Let's review the estimate and then generate invoices
that we agree upon.
keep in mind that the previously billed items will be automatically deducted from future invoices.
I thought it's a good idea to review the estimate.
Thank you
Danny Daher
DD Systems Inc.
Tel: 626 852-0257
Fax: 626 852-0258
䁞㠲づ놫넂끟斪づ镩睠ͷﵐ膲ꝯ꣯컲ꡇ鯀Ⴉ畳浢⁞셥腄盼᥀뫠ϑȡꬰ¢づ憻吂햮胓汬ᨯ쁇扆䁞뢹R羳辴㱝㿅俆꾕뾖쾗飿駟髯쫿鶯鸟鼯ꀿo御澢羣辤龥꾦뾧㿓죿짏쫟쯯췿츏켟퀯_俑忒鿝翔迕鿖꿗뿘���꣯呜톯큟畯ῧ㿩俪快濬翭ꢿ剺쁹1⿴㿵俶忷濸翹迺鿻ﳿﶯﺿᅬßǯϹӏ῞켌�)་Ἄฯ༿၏ᅟቯᒏ゚꼕뼖켗�:༜ἝḿἯⴿ≟㤖זּ〰삶⥶㌟㕿㛟◪�뀁䊰눺朐㮐ᐼ舦㪎ª耪ၟ䔣㴱쇲킭〮
瑰뛠춱肫耺㺐₁䐰㾑ᆬ༩꼸뼹鼣꼤뼥켦�⢧⧯⯿㰌䥢戋䛲灤㩭尺∰砱捻溠䁞灐醺콊묦倮㤬䄼䬯쉈械놺䔟겱䘡䚀쓰挐㥤㧈杀剕挮䁅⻏䙠갰䔀徰ꭢힰﱈ탂聥ⵤ曢䔁筠奈䕐䱒䤰䭎唠噏屘顜絮塽墑狠쁐捜ㅦ畜ၧ⡓媿俯䨯弲ⴿ亭憣ᴯ⯵枲婒愾및뵿ⶏﳋㄱ䄷킹ॉ慊ꀼ༳�䫟䯯櫿厖邯倃꽡亳俯哶끵쇰祐傭쐅㝷傭〲㌲㼵〰倠桍椟樯佫彬潭硶⹔濠灯꽗材怬뽓㽒瘗咟婟劄㑾䑀⑩浡·䉤䅃썇坰壟姯菽萿f作婝쾇䖄齼㽠�形揿摯瑿生瘯眿遏
祯筯祮낿륪漀籏伿䏘禠·䰠䙯熐肪遛䔠ꀻ삪懁冺ㇾIJN༰ἱ⼲羕㓗䉏錏「Ơ㜯蹼ソ쾦�ᄅྫ潃罄轅䛿䞟䢯䦿郏⭿ⷿ鼏ッ羠辡龢꾣Ὰ쾥ᆴධ뗿뛏韟㮪䶠㾐預뽿秿鎓㠴ꀆ쀿ꔻŦ楳敺㘺㸹쩳曣킃遛㩹⛈畱쀁䄻䁾챩Ⲥ玠ွ呩㭦쁛녬㪰腗噣㱫컀柱遍葵㨀⎤콆䋱萳㖽姈蒁啐䥔乏焺楨牭촠埀縠넠纰䁐鸰㶑瓰쬿㴰팀륐싰䏠坩ゲ苔䖈萠‡ꀼ剴녷殰錮㔌䄷O⋊⾭뿈䒛ῇ�볿뻿뼏�섯숿㙏쒯㿢鿤꿃뿄싅⨪Ꝑ傲₱䃓硥ွ퉣햰䃓ɣ楡憝偷㿰
뿀傳Ŀ^ၞ퉨は샒낱콩锢ﰁ獫灲샬烌⁔䵦ₑꃏ㱫瞀쫧潑㴠猁��マ鿞꿟뿠쿡��¦뀿넏눟댯됿땏뭟쿪僜蕈캰綐ⳓྖ替ﶟッ翹翾鿻伅弑漒�ǟϿЏᐟ씟䥷胭ꁗ펧帀瘀㵯璱ꃭ₾㋏^퇕䀍Ὠ떠凖疱샒炂ࡧ呂儠큲はვꂅ샒⃭栂Ġƕ띧뢟릯�爟=မ틓ვᩥ័ᄚ炂聾Ƞ⋯ᅗ볖⓿뤿潾܀Ḁ荐⍕_鼩弥䃓䚞感邞샒埯㰠鶠폰拒s燯㳽濐ჰ缇輈�耳픂✐샒‡됞湾℟ヲ뼬켭�멅㵶礐憞䃓傝幵ﰀ歳脻
䄨ဿ砷狿Ṱ≐㛠ἀẳῡȠ炂헒㠐㬟⼹찪坌㘰䁑攒キ^戟炝༷吰퀠^烏灀볖�,༏ဟᄯᘿ갿�使マ缒輓鼔뼖켗�ᴏ씟㳑攐큙聝틟巐ᾀげᾁ灲ቀ郏觝秐뽀콁몹蝢孰﵀敷ⁱ屐黁獰돰ò畤傚ϱヲ쁜탔缷轈齉꽊뽋콌埿丯埯凿刏漟焟啿o~콴�轙齚꽛뽜콝矿얏扯擿砏橿欿汏⦅潭置软齰꽹뽲콳ྌ跿瘟磿透穯笯簿絏뽟潾罿辀ᐞ瀟郏荧꽐�廙㌶㹡潁ꀀỐ䓡ㄏ楀蕯蚿ᅬ�ノྋᾔ⾍㾎侏醟鉯굿껯闿隯鞿忏�レྜ휱抱
爰䂶뇰誹‷ꣿ㉏ꎮꐏꔟꜿ빏ソ澩羲龯꾰�㿈俉忊쯿챯쵿캏쾟킯톿틏뾳쾴�ᄋྐྵᾺ믱ㄯ㠴킞耞ᛛ Ṁⶐ楳敺怺⸹瀵�ힿ吤⊯ῡ㯠ꮱ㖬쇕ᄇྭ㿗㿁係心濄翅迆쟿�걯햟횿ᅬ㿞俟䑒耞ㅮᾐ。忨濩翪迫鿬뿮쿷ۯযൟ罯忹濺翻迼鿽꿾뷿资逫ᑹ✰䤢据ᄁ˿͏џկٿޏ႟য켊�⼢-༏缥輦㼒ᑏᕟᙯᢏί뿢缱敔㩬㘠㉊
ⷠᰰ㟐╿ᩏᴏḟἯ_켺弡漪缣輤뽀ὃ뼧㛿䘟䝯⭿ⷿ⸏⼟〯ꌿ⽉堲慆㝸㡫Ἳ㳿㴯㸿㽏䁟䅯䩿䎏゚꽄뽅⽜�罟轠Ὄ䷿丯伿偏兟ㅯ鷿麿ᅬ྄uབྷ⽙罯佛擿嵟幯畿睯磏租端ོώ⽾㽿侀征澂羃蓿薏蚟螯袿觏諟误ྍᾎ⾏㾐侑徒澓羔闿随鞟颯馿髏鯟鳯ǿ䁲汢捯煫ﵵ鹥齟ꁯ鵿ꍿꐏ?⾥㾦侧徨澩羪辫龬굿꺯꾿냏濟哸ꉠ漂擜煹딞灟㝢ㅲ扮焕㌝▸뭽p