He still has a significant amount of steps to construct, as well as build/install all of the trail water diverters. I’m most concerned about the massive construction area/impact to
on-going trail uses, should he run out of time to complete the steps.
Not having a meaningful construction schedule to review, we have no idea how much time he thinks it will take to do the above. I recommend requiring that he create such a spreadsheet/schedule
to inform us of what time he needs to finish his work ASAP.
Dick Fisher
Richard Fisher Associates
4902 Kron Street, Irvine CA 92604
(714) 342-5467
rfisher@rfaland.com <mailto:rfisher@rfaland.com>
From: Ryan Wright <RWright@DiamondBarCA.Gov>
Sent: Tuesday, January 3, 2023 1:55 PM
To: Richard Fisher <rfisher@rfaland.com>
Subject: RE: Canyon Loop Schedule
Hi Dick,
Thanks for the email, these have been items on my mind as well.
I would agree this Thursday we discuss the need for additional manpower. Currently, Ryan Winkelman is updating FWS about the latest change order in case they have any questions or feedback.
We might have feedback from them by Thursday, but that may be too soon. I would anticipate they appreciate the efforts and will reiterate the upcoming mating season.
Although it’s a 60-day project, we currently sit at a January 31 completion deadline. That assumes all rain dates this week, although I realize we could receive more rain moving forward
extending that date into February.
Despite the 60 day’s DD Systems has to complete the project, FWS allows the City to construct until Feb 15. At that point, we must have a biologist on site every day (at City’s cost)
to monitor for any cactus wren or CA gnatcatchers. If and when they observe those birds nesting withing 500 ft of the project, the project must end which would be worst case scenario.
At a minimum, I think a good conversation for this Thursday is the number of anticipated days needed to complete the remaining work to see if adjustments need to be made. I’d appreciate
your thoughts on how we prioritize in case we do hit the deadline and must remove items.
Thanks,
Ryan
From: Richard Fisher <rfisher@rfaland.com <mailto:rfisher@rfaland.com> >
Sent: Tuesday, January 3, 2023 1:20 PM
To: Ryan Wright <RWright@DiamondBarCA.Gov <mailto:RWright@DiamondBarCA.Gov> >
Subject: RE: Canyon Loop BMPs
CAUTION: This message originated outside of our City of Diamond Bar network.
**Please exercise caution when opening attachments or clicking links, especially from unknown senders.**
Hi Ryan. Just some thoughts about our rain impacts to an already-limited completion schedule…
Would it be appropriate to alert Danny that without more manpower brought to the project (as soon as it can resume), the project could very likely be shut down prior to completion due
to the gnatcatcher nesting season? Is this a possibility??
If not, what will be our strategy to deal with uncompleted work areas? I’m concerned about disturbed construction areas being under construction, but not being completed (steps from
Gabion Wall #2, up the hill along Gabion Wall #3, and up to the rest/view area).
Is there a possibility for continued work, if a biologist were on-site watching for gnatcatcher presence; and completion work being able to continue until such sightings?
It sounds like we could loose most of 2 weeks of construction days due to rain and muddy conditions…
Dick Fisher
Richard Fisher Associates
4902 Kron Street, Irvine CA 92604
(714) 342-5467
rfisher@rfaland.com <mailto:rfisher@rfaland.com>
From: Ryan Wright <RWright@DiamondBarCA.Gov <mailto:RWright@DiamondBarCA.Gov> >
Sent: Tuesday, January 3, 2023 11:30 AM
To: Danny Daher <acecd99@gmail.com <mailto:acecd99@gmail.com> >
Cc: Anthony Jordan <AJordan@DiamondBarCA.Gov <mailto:AJordan@DiamondBarCA.Gov> >; Richard Fisher <rfisher@rfaland.com <mailto:rfisher@rfaland.com> >
Subject: RE: Canyon Loop BMPs
Danny,
It is expected you request rain days prior to the work day and without me reaching out about a similar topic which then initiated your request. Today will be approved, but future dates
will not be approved unless requested in the appropriate fashion.
Although you did not respond to the sand bag portion of my original email below, I look forward to receiving those photos by the end of today.
Thanks,
Ryan
From: Danny Daher <acecd99@gmail.com <mailto:acecd99@gmail.com> >
Sent: Tuesday, January 3, 2023 11:19 AM
To: Ryan Wright <RWright@DiamondBarCA.Gov <mailto:RWright@DiamondBarCA.Gov> >
Cc: Anthony Jordan <AJordan@DiamondBarCA.Gov <mailto:AJordan@DiamondBarCA.Gov> >; Richard Fisher (rfisher@rfaland.com <mailto:rfisher@rfaland.com> ) <rfisher@rfaland.com <mailto:rfisher@rfaland.com>
>
Subject: Re: Canyon Loop BMPs
CAUTION: This message originated outside of our City of Diamond Bar network.
**Please exercise caution when opening attachments or clicking links, especially from unknown senders.**
Hi Ryan,
We could not work today it’s too muddy
So please add today as a rain day.
Thank you
Danny Daher
Ace Cd Inc.
acecd99@gmail.com <mailto:acecd99@gmail.com>
Sent from my iPhone
On Jan 3, 2023, at 11:02 AM, Ryan Wright <RWright@diamondbarca.gov <mailto:RWright@diamondbarca.gov> > wrote:
Hi Danny,
Based on the heavy rain and wind expected starting tomorrow, January 4th please keep in mind all soil stockpiles must be properly covered and evaluated each day to ensure they remain
covered by the protective tarp. The on-site biologist has documented in recent reports the rocks used to weigh down the tarps previously are insufficient and allow for the tarp to
move.
Please utilize heavier devices such as sand bags and in a higher quantity. You may be able to fill some sand bags at the local LA County Fire Department (Station 121) at 346 Armitos
Place in Diamond Bar, but I am not positive. Either way, please take photos later today when all soil piles are covered and email to me.
As always, please email me tomorrow morning if the rain commences and you are requesting a rain day.
Thank You,
<https://linkprotect.cudasvc.com/url?a=http%3a%2f%2fwww.diamondbarca.gov%2f&c=E,1,Iz0zoS54Nuvrt3EA1F7QZJApcWpMvO8eg33nLFN-bx7Bc4zMbNJvtuOGoyRYkkJ3UTAa8PVgVYAN58jgLOF4cb_01RiALDhj1Ufj2USld1ptGEH-3Us,
&typo=1>
Ryan Wright | Parks and Recreation Director
City of Diamond Bar | Parks and Recreation Department
21810 Copley Drive, Diamond Bar, CA 91765
909.839.7061 | 909.839.7000 main | f 909.348.8316
rwright@diamondbarca.gov <mailto:rwright@diamondbarca.gov> | www.DiamondBarCA.gov <https://linkprotect.cudasvc.com/url?a=http%3a%2f%2fwww.diamondbarca.gov%2f&c=E,1,PBdkpAO1-GR8hcEVPSyjpMukLTtDal_cpl
ccOX0rh5djWwD6tN94-FiOQHs7OoijC2DbWZb8x9fFtTXQxXyfud3aKDNVc-FPM7hlreh0VYobBOEZOiw,&typo=1> |Recreation Registration <https://linkprotect.cudasvc.com/url?a=https%3a%2f%2fwebtrac.diamondbarca.gov%2fwbw
sc%2fwebtrac.wsc%2fSPLASH.html&c=E,1,0jCUvf-TKauIrLgJEuKCgjqIQPfZYVcS6CeU4eqSSx2JyiFbSId4Y0ZGe6AABbrfHipyXPpAylFIs70R8XtC6Ni4Wl6WuvTY2WI2lkQYHeEjcg,,&typo=1>
Connect with Us... Facebook <http://www.facebook.com/cityofdiamondbarca> |Twitter <http://www.twitter.com/diamondbarcity> |YouTube <http://www.youtube.com/diamondbarca> |Instagram <http://www.instagr
am.com/cityofdiamondbar>
<https://linkprotect.cudasvc.com/url?a=https%3a%2f%2fwww.diamondbarca.gov%2f1019%2fMake-An-Appointment&c=E,1,V6guwl1TLcqcndDt5dOCuez1-kLbLve7M4Mx3PlWI79dv3tqAPIIR1aq-HPFNxPorXKCBQAPfx-_17UyqLwpi8zyB
3V4I_2ivR_v8s7jjwf8&typo=1>
ꔨ쀴呵넥ዿጟ̯⽿ゟ֯ٯソ༲㼩⼗㼘伙.༐ᇿ㐟㕟㙯㝿㢏㦟㪯켻꼚���숣ꊢ淾Ὴɯ⼢㼣伤Ὅ⹎➿⡏䉟⫏䥿唏䦈癒㿿䂯ㆿ小巏㋟㓿嬏ᆵ㽟徎澏羐쾒�뽣ユ韯頏餟騯永恒䆞뎥鬻抠╀�꽋獰짳漡殡ꁰpꛠ劐擰摵の捶끆愿猽▣愳ᰥ昲腶勉樠朮䉯癶ㆁ瘹䶁愔鹫䅀ₛ灁깰副桠䛐⚁끅㵰