HomeMy WebLinkAboutRe_ Change Order #2 Update (2)CAUTION: This message originated outside of our City of Diamond Bar network.
**Please exercise caution when opening attachments or clicking links, especially from unknown senders.**
Hi Ryan,
Please see attached.
Thank you
Danny Daher
DD Systems Inc.
Tel: 626 852-0257
Fax: 626 852-0258
On Wed, Dec 28, 2022 at 9:55 AM Ryan Wright <RWright@diamondbarca.gov <mailto:RWright@diamondbarca.gov> > wrote:
Danny,
Please review and sign the updated change order dated 12.28.22. I will then route to City Manager for final approval.
Thank You
From: Danny Daher <acecd99@gmail.com <mailto:acecd99@gmail.com> >
Sent: Wednesday, December 28, 2022 9:05 AM
To: Ryan Wright <RWright@DiamondBarCA.Gov>
Cc: Richard Fisher (rfisher@rfaland.com <mailto:rfisher@rfaland.com> ) <rfisher@rfaland.com <mailto:rfisher@rfaland.com> >
Subject: Re: Change Order #2 Update
CAUTION: This message originated outside of our City of Diamond Bar network.
**Please exercise caution when opening attachments or clicking links, especially from unknown senders.**
GM Ryan,
Got the change order and have a thought I wanted to share with you.
The V swale is per linear foot and we will measure installed quantities in the field and bill accordingly. therefore there is no need to include it in the change order.
That way we reduce the chances of confusion.
As to the rest of the change order we should be good to go with the exception of the construction duration. As you know we need to Form the shape of the swale and we need to get water
lines
down to that spot along with the concrete bags and concrete mixer, also power generator. Please consider adding 5 working days to accomplish the build out of this item.
Thank you
Danny Daher
DD Systems Inc.
Tel: 626 852-0257
Fax: 626 852-0258
On Wed, Dec 28, 2022 at 8:34 AM Ryan Wright <RWright@diamondbarca.gov <mailto:RWright@diamondbarca.gov> > wrote:
Danny,
Please see the attached revised Change Order #2. This has been updated to include your previous feedback and a thorough review by Dick and I. This now includes actual unit costs
per the bid schedule, therefore removing any need to “bill accordingly.” If the change order is approved, these amounts are non-negotiable. If agreeable, please sign and return ASAP.
I will still need to receive the City Manager’s signature before the Change Order is approved.
Thanks,
<https://linkprotect.cudasvc.com/url?a=http%3a%2f%2fwww.diamondbarca.gov%2f&c=E,1,OxyZPYIQUxRri_eBeSmbV8Ghh7kJCG9ZNPcnl2cW6RMdxEvtWJg1t-UduXSqbbhm_THYlIY2yLDeU2uEiGtDF4jWF--xqu8JQuusuGelq_WepkC9wzE6
ZRbW&typo=1>
Ryan Wright | Parks and Recreation Director
City of Diamond Bar | Parks and Recreation Department
21810 Copley Drive, Diamond Bar, CA 91765
909.839.7061 | 909.839.7000 main | f 909.348.8316
rwright@diamondbarca.gov <mailto:rwright@diamondbarca.gov> | www.DiamondBarCA.gov <https://linkprotect.cudasvc.com/url?a=http%3a%2f%2fwww.diamondbarca.gov%2f&c=E,1,MAUG2mQCJx9DASCLt0B9ie_1x-wS93WfPb
TryFI3wI-3YBJeOHdp3dYVcIWk3lz2W7jA8McoTk0LXGN2YO0G34k9joTPbhS0OprXvS_aJhpfIhx-&typo=1> |Recreation Registration <https://linkprotect.cudasvc.com/url?a=https%3a%2f%2fwebtrac.diamondbarca.gov%2fwbwsc%2
fwebtrac.wsc%2fSPLASH.html&c=E,1,Z4sNUBrDZzBqrkKvmv8S59VDfy8eP5g_gsbsH4g_vSDM6040S8ilx5A1fWsaTejgvpGovcb0GH1GjRXfEaEJniNG8ykAxqCM9P00NrnB-HUDYtBExw,,&typo=1>
Connect with Us... Facebook <http://www.facebook.com/cityofdiamondbarca> |Twitter <http://www.twitter.com/diamondbarcity> |YouTube <http://www.youtube.com/diamondbarca> |Instagram <http://www.instagr
am.com/cityofdiamondbar>
<https://linkprotect.cudasvc.com/url?a=https%3a%2f%2fwww.diamondbarca.gov%2f1019%2fMake-An-Appointment&c=E,1,8AkeHXLwMWtfDs91OGz9WTxKatlRACviOkk6L1K6xypwD_cnuINTqdSvcpEAuXcS87gveTG2xnwwEemRX3w4vIM7q
VVrthFiI6nT2EmqObx5yIb9VM8UnpkUxQ,,&typo=1>