Hi Ryan,
We are submitting shop orders for fabrication. Orders are queued in the order they were released for fabrication. Current estimated lead time is 12+ weeks. Lead times not guaranteed,
subject to change on short notice, and do not include holiday weeks. I will inform you when a tentative ship date has been scheduled (we are aggressively targeting early May delivery).
ACTION ITEM: DELIVERY CONTACT INFO
. Delivery address
. Delivery contact name
. Delivery contact phone number
. Delivery contact email
ACTION ITEM: ANCHOR BOLTS & TEMPLATES DELIVERY CONTACT INFO - at your convenience; approx. lead time is 4 weeks
. Delivery business name
. Delivery address
. Delivery contact name
. Delivery contact phone number
Ed Gribben, Jr.
RCP SHELTERS, INC.
2100 SE Rays Way | Stuart, FL 34994
772-291-2012 | ed@rcpshelters.com
https://linkprotect.cudasvc.com/url?a=https%3a%2f%2fwww.rcpshelters.com&c=E,1,EOCWAysOVZsHNVXxVj6xw8GGAwxkuQsuvT1g4F_ys0HPzovwwExCFoXDY03-4vajdl_wzoBLisbfl_cjsuQjPBNRX6UVCGz77bWgRtgQChos7nNI&typo=1
-----Original Message-----
From: Ryan Wright <RWright@DiamondBarCA.Gov>
Sent: Monday, March 6, 2023 10:25 AM
To: Ed Gribben <ed@rcpshelters.com>
Subject: Re: RCP Shelters Order #22-213; Canyon Loop Trail; Diamond Bar, CA
Good Morning Ed,
Just to follow up from our conversation this morning, please proceed with fabrication as we work through footing depths.
Thank you,
Ryan
________________________________
From: Ryan Wright <RWright@DiamondBarCA.Gov>
Sent: Monday, February 27, 2023, 9:04 AM
To: Ed Gribben <ed@rcpshelters.com>
Subject: RE: RCP Shelters Order #22-213; Canyon Loop Trail; Diamond Bar, CA
Thank you Ed
-----Original Message-----
From: Ed Gribben <ed@rcpshelters.com>
Sent: Monday, February 27, 2023 8:27 AM
To: Ryan Wright <RWright@DiamondBarCA.Gov>
Subject: RE: RCP Shelters Order #22-213; Canyon Loop Trail; Diamond Bar, CA
CAUTION: This message originated outside of our City of Diamond Bar network.
**Please exercise caution when opening attachments or clicking links, especially from unknown senders.**
Hi Ryan,
We are submitting to engineering to prepare drawings.
Ed Gribben, Jr.
RCP SHELTERS, INC.
2100 SE Rays Way | Stuart, FL 34994
772-291-2012 | ed@rcpshelters.com
https://linkprotect.cudasvc.com/url?a=https%3a%2f%2fwww.rcpshelters.com&c=E,1,n4gaKJdmjjuQl-XlO4v_41nz5cn4CNZEYBvTzBOnaU5kZK4HKHUEbiJpdqr-3C_0CNg6qhWOtJ4RQiu0V5eN4ryu0l1Xwc1pC6siqgg4&typo=1
-----Original Message-----
From: Ryan Wright <RWright@DiamondBarCA.Gov>
Sent: Friday, February 24, 2023 11:15 AM
To: Ed Gribben <ed@rcpshelters.com>
Subject: Re: RCP Shelters Order #22-213; Canyon Loop Trail; Diamond Bar, CA
Thank you Ed. I would be the best point of contact for drawings.
For slab: None proposed
Foundation Type: Cylindrical
No Geotechnical Report prepared
Best,
Ryan
________________________________
From: Ed Gribben <ed@rcpshelters.com>
Sent: Friday, February 24, 2023, 7:18 AM
To: rwright@diamondbarca.gov <rwright@diamondbarca.gov>
Cc: rfisher@rfaland.com <rfisher@rfaland.com>
Subject: RCP Shelters Order #22-213; Canyon Loop Trail; Diamond Bar, CA
CAUTION: This message originated outside of our City of Diamond Bar network.
**Please exercise caution when opening attachments or clicking links, especially from unknown senders.**
Ryan,
Thank you for your order! Before we can proceed with your order, the following information is required.
ACTION ITEMS: REQUIRED to PROCEED with ORDER . Concrete slab: new, existing, or none ° New allows for constrained, thus, shallower foundation ° Existing or none leaves foundations non-constrained,
thus deeper
. Foundation type: cylindrical or spread ° Cylindrical is standard and typical for use with sonotube ° Spread requires more concrete, but useful when water table or rock are issues
. Geotechnical report, if available - otherwise, assumed allowable soil values per code
Foundation Design Note: Initial foundation design is included. Each subsequent revision is subject to a minimum $350 engineering fee.
APPROXIMATE LEAD TIMES - lead times are not guaranteed, subject to change on short notice, and do not include holiday weeks . Engineering/drafting: 1+ weeks . Fabrication: 12+ weeks
upon receipt of drawing approval
DRAWING CONTACT - to whom should we send drawings?
. Name:
. Email:
ORDER CONFIRMATION DOCUMENTS - please review the attached documents . Order confirmation: please review for details of the project workflow and provide information not already disclosed
Please provide the following information at your convenience:
COLOR SELECTIONS - required with drawing approval for release to fabrication . Powder coat - color chart<https://linkprotect.cudasvc.com/url?a=https%3a%2f%2fwww.rcpshelters.com%2fcolor-charts%2fpowde
r-coat-colors%2f&c=E,1,Wel0hgRy8qy5Y2YePkrAiPaznreG11K8yIxONN5KM_mNhknoZq5nH8uxyOcTSF4NNpUizoA2CCKQROunZDsMD17Llbu78SLaVq517WfMESy3ou-B6Z6a&typo=1>
. Metal roof 24 ga. - color chart<https://linkprotect.cudasvc.com/url?a=https%3a%2f%2fwww.rcpshelters.com%2fcolor-charts%2fmetal-roof-colors-24-ga%2f&c=E,1,KJ68BNFbr1jN_PDhDB9S5dECbaCN2rDNeAHv0561jQw
EBZp5mbMufi9-c7cd_Nf78gTFfOjAG1j9X_eH9_wbU8NMOsxeJeZoPIHVpzoYgHL-2H2Ucr3JH3H3mA,,&typo=1>
I will be your contact, coordinating the order through delivery. Please let me know if you have any questions.
Ed Gribben, Jr.
RCP Shelters, Inc.
2100 SE Rays Way . Stuart, FL 34994
https://linkprotect.cudasvc.com/url?a=https%3a%2f%2fwww.rcpshelters.com&c=E,1,5Qq45xUdWFOEjm5dcF7n8YpokuNBDcj_yfmELT5Gkici4DyY72gHhgacIpYfg8kAGGs6UEC_GQd2WAmwbxlNY-S-mNpplqS9nop5oPu69Jf6bH124bgjaCpLX
A,,&typo=1<https://linkprotect.cudasvc.com/url?a=https%3a%2f%2fwww.rcpshelters.com&c=E,1,GlhpLEvnLZxGa4K5Dla4lksKKPSWcfjFLdVV-SRcY18l_cpeoPtwwbhz6POlMt9S7MYRhw-HfaUdigS4moCay2ioO4J_SrK47jyfUUDl&typo=
1>
P:800-525-0207 . 772-288-3600 x202
F:772-288-0207
ed@rcpshelters.com<mailto:%22ed@rcpshelters.com>