HomeMy WebLinkAboutFW_ RCP Shelters Proposal #35241_ Canyon Loop Trail_ Diamond Bar_ CAJust FYI
From: Bryce Cooper <bryce@rcpshelters.com>
Sent: Thursday, January 19, 2023 11:45 AM
To: Ryan Wright <RWright@DiamondBarCA.Gov>
Subject: RCP Shelters Proposal #35241; Canyon Loop Trail; Diamond Bar, CA
CAUTION: This message originated outside of our City of Diamond Bar network.
**Please exercise caution when opening attachments or clicking links, especially from unknown senders.**
Hi Ryan,
Thank you for contacting RCP Shelters. Per your request, attached are the proposal, specs, photo and preliminary drawing. Note that pricing is for all 3 structures, not each.
APPROXIMATE LEAD TIMES - lead times are not guaranteed, subject to change on short notice, and do not include holiday weeks
• Engineering/drafting: 1-2+ weeks for standard designs
• Steel Fabrication: 12+ weeks after drawing approval
To place an order, please sign and return the order form (or send a simple PO). Please include the following information with your order so that we can begin promptly:
• Site address: cross streets or lat/lon coordinates are ok
• Slab: new, existing, or none
• Geotechnical report, if available
Please let me know if you have any questions.
Best,
Bryce Cooper
RCP Shelters, Inc. <https://linkprotect.cudasvc.com/url?a=https%3a%2f%2frcpshelters.com%2f&c=E,1,MblWzyL3RtwD7ttvi96cNb898V-4DjyoyzRmCJapdCwItZ1wTJnXjzEWjMbUaAy--bn2OcsNmpyfEsqp0hn58bXefIr5PVyF2TzoaG
6IJ2hscrCMQgHYrkz8Y0E,&typo=1>
2100 SE Rays Way • Stuart, FL 34994
P:772-291-2010
F:772-288-0207
bryce@rcpshelters.com <mailto:%22bryce@rcpshelters.com>
<https://www.facebook.com/RCPShelters> <https://linkedin.com/in/bryceacooper> <https://twitter.com/RCPShelters>