Loading...
HomeMy WebLinkAboutPunch List #1 and #2 2.6PUNCH LIST #2  1. Remove trash and debris at “T intersection”    2. Cut V swale at “T intersection” by at least 3 inches to achieve adequate water runoff   from connecting water diverter.    3. Pull back soil at a 2:1 ratio at the bend next to the oak tree    4. Repair two timber fence brackets near the cut through path    5. Pull back soil at a 2:1 ratio across from gabion wall #2    6. Add rock at velocity reducer at the end of gabion wall #3    7. Repair ALL damaged and incomplete sections of gabion wall #3.      8. Install timber edging at the top of gabion wall #3 and clear adjacent spoils & large  rocks    9. Clear tire tracks above gabion wall #3.    10. Replace bottom cage on the end of gabion wall #4.    11. Pull back soil at a 2:1 ratio across from gabion wall #4.    12. Install timber fence near gabion wall #4.    13. Remove all PVC from site, including underground PVC.  Remove any cones, caution  tape, or water hoses at Peak Court related to the project.  Replace fence & post at  Peak Court entrance.     14. All spoils and rocks should be removed from the bend just east of gabion wall #4 and  trail grade should be returned to original grade.       15. All spoils and rocks should be removed from the bend just east of gabion wall #4 on  the “straightaway” and trail grade should be returned to original grade.     16. Install two more water diverters east of gabion wall #4.            PUNCH LIST #1  1. Splice behind the trail diverter #2 (near oak tree)‐INCOMPLETE     2. Remove rebar in large velocity reducer‐INCOMPLETE     3. Add rebar to 15th step at Steps #1‐INCOMPLETE    4. Remove rebar in V swale next to Steps #1‐INCOMPLETE    5. Return rocks & dirt spoils to trail above Steps #1‐COMPLETE    6. Achieve 5 ft width of trail above Step #1‐COMPLETE WITH HYDROSEED ON FRIDAY     7. Return rocks & dirt spoils to trail above water diverter #3‐INCOMPLETE.  BRING LARGE  ROCKS FROM SPOILS AND COMPACT SOIL ABOVE WATER DIVERTER #3.    8. Clean up and remove access filter fabric above diverter at gabion wall‐INCOMPLETE    9. Rake along trail above diverter #4‐COMPLETE    10. Remove dirt spoils under prickly pear cactus at the bend‐INCOMPLETE    11. Pull back dirt spoils at a 2:1 ratio near prickly pear cactus‐INCOMPLETE    12. Pull back dirt spoils area just west of T intersection ‐INCOMPLETE    13. Compact behind bench (between V swale) at T intersection  INCOMPLETE.  COMPACTION NEEDED    14. Bury fins at base of timber rails at T intersection‐COMPLETE    15. Rake and dress spoils around large velocity reducer and very west end.‐ADDED TO LIST  ON 2.1.23