HomeMy WebLinkAboutDD Daily Field Report 10212022CONTRACTOR DD Systems Inc.DATE
WEATHER Time Work Started
SUPT./FOREMAN Time Work Ended
Foreman
Laborer
Groupe 1
Apprentice
Period 1
Landscape
operator Owner Other
TOTAL
0
WORK DONE and MATERIALS DELIVERED
Got Keys to Gate at 5:00 PM
No Work
10.
11.
12.
13.
14.
15.
4.
5.
6.
7.
8.
9.
10/19/2022
WORK FORCE
WORKERS NAME
1.
2.
3.
Glendora Curb/Gutter
Sidewalk Improvement
FY 2009-10, Plan No. 1041
DAILY FIELD REPORT
Ace Cd Inc.2 of 3
CONTRACTOR DD Systems Inc.DATE
WEATHER Time Work Started
SUPT./FOREMAN Time Work Ended
Foreman LaborerGroupe 1 ApprenticePeriod 1 Landscapeoperator Owner Other
Danny Daher 8
Raul Barrera 3
Raul Barrera Jr.3
TOTAL
14
WORK DONE and MATERIALS DELIVERED
Moved Skid Steer and Mini Excavator onto job site
Placed Markings at Center line of Trail.
10/20/2022
10.
3.
4.
5.
6.
1.
2.
8.
9.
15.
HOURS
WORKERS NAME
NUMBER OF HOURSWORK FORCE
11.
12.
13.
14.
7.
CONTRACTOR DD Systems Inc.DATE
WEATHER Time Work Started
SUPT./FOREMAN Time Work Ended
Foreman
Laborer
Groupe 1
Apprentice
Period 1
Landscape
operator Owner Other
Danny Daher 8
Raul Barrera 2
Raul Barrera Jr.2
TOTAL
12
WORK DONE and MATERIALS DELIVERED
Delivery of Gravel to be placed at Entry Gate.
Spread Gravel at Entry Gate.Drop off F550 at Staging Area
14.
15.
9.
10.
11.
12.
13.HOURS
3.
4.
5.
6.
7.
8.
10/21/2022
WORK FORCE NUMBER OF HOURS
WORKERS NAME
1.
2.