Loading...
HomeMy WebLinkAbout110422 DD Daily Field ReportMonday CONTRACTOR DD Systems Inc.DATE WEATHER Time Work Started SUPT./FOREMAN Time Work Ended Foreman Laborer Groupe 1 Apprentice Period 1 Landscape operator Owner Other Danny Daher 8 Raul Jesus Barrera 8 Leonardo Barrera 8 TOTAL 24 WORK DONE and MATERIALS DELIVERED Installing Temp. Water Pipe down to Gabion #2 Biologyst Alex Native Monitor Armando 10/31/2022 WORK FORCE WORKERS NAME 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. Tuesday CONTRACTOR DD Systems Inc.DATE WEATHER Time Work Started SUPT./FOREMAN Time Work Ended Foreman Laborer Groupe 1 Apprentice Period 1 Landscape operator Owner Other Danny Daher 4 Raul Jesus Barrera 4 Leonardo Barrera 4 TOTAL 12 WORK DONE and MATERIALS DELIVERED Securing with stakes Temp. Water Pipe down to Gabion #2 Biologyst Chris Native Monitor Armando 11/1/2022 WORK FORCE WORKERS NAME 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. Wednesday CONTRACTOR DD Systems Inc.DATE WEATHER Time Work Started SUPT./FOREMAN Time Work Ended Foreman Laborer Groupe 1 Apprentice Period 1 Landscape operator Owner Other 0 0 0 TOTAL 0 WORK DONE and MATERIALS DELIVERED RAIN DAY NO WORK. 11/2/2022 WORK FORCE WORKERS NAME 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. THURSDAY CONTRACTOR DD Systems Inc.DATE WEATHER Time Work Started SUPT./FOREMAN Time Work Ended Foreman Laborer Groupe 1 Apprentice Period 1 Landscape operator Owner Other Danny Daher 4 RauL Barrera 4 Raul Jesus Barrera 4 Leonardo Barrera 4 TOTAL 16 WORK DONE and MATERIALS DELIVERED Bracking Rock at Gabion #2 Racking Trail and checking cross slopes. Biologyst Alex Native Monitor 11/3/2022 WORK FORCE WORKERS NAME 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. FRIDAY CONTRACTOR DD Systems Inc.DATE WEATHER Time Work Started SUPT./FOREMAN Time Work Ended Foreman Laborer Groupe 1 Apprentice Period 1 Landscape operator Owner Other Danny Daher 7 RauL Barrera 7 Raul Jesus Barrera 7 Leonardo Barrera 7 TOTAL 28 WORK DONE and MATERIALS DELIVERED Locating timber stairs start points for stair #1. Did not confirm to plans so we stopped and moved to Gabion #1 Started digging for baskets at Gabion #1 than got stopped by City staff due to the none presence of the Native Monitor.Area of digging was a fill and have been disturbed when widening the trail. DD Systems is under the impression that disturbed areas are ok to redisturb without having the monitor present. Any way we left at 2:00PM. Biologyst Alex Native Monitor 11/4/2022 WORK FORCE WORKERS NAME 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15.