HomeMy WebLinkAbout110422 DD Daily Field ReportMonday
CONTRACTOR DD Systems Inc.DATE
WEATHER Time Work Started
SUPT./FOREMAN Time Work Ended
Foreman
Laborer
Groupe 1
Apprentice
Period 1
Landscape
operator Owner Other
Danny Daher 8
Raul Jesus Barrera 8
Leonardo Barrera 8
TOTAL
24
WORK DONE and MATERIALS DELIVERED
Installing Temp. Water Pipe down to Gabion #2
Biologyst Alex
Native Monitor Armando
10/31/2022
WORK FORCE
WORKERS NAME
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
Tuesday
CONTRACTOR DD Systems Inc.DATE
WEATHER Time Work Started
SUPT./FOREMAN Time Work Ended
Foreman
Laborer
Groupe 1
Apprentice
Period 1
Landscape
operator Owner Other
Danny Daher 4
Raul Jesus Barrera 4
Leonardo Barrera 4
TOTAL
12
WORK DONE and MATERIALS DELIVERED
Securing with stakes Temp. Water Pipe down to Gabion #2
Biologyst Chris
Native Monitor Armando
11/1/2022
WORK FORCE
WORKERS NAME
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
Wednesday
CONTRACTOR DD Systems Inc.DATE
WEATHER Time Work Started
SUPT./FOREMAN Time Work Ended
Foreman
Laborer
Groupe 1
Apprentice
Period 1
Landscape
operator Owner Other
0
0
0
TOTAL
0
WORK DONE and MATERIALS DELIVERED
RAIN DAY NO WORK.
11/2/2022
WORK FORCE
WORKERS NAME
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
THURSDAY
CONTRACTOR DD Systems Inc.DATE
WEATHER Time Work Started
SUPT./FOREMAN Time Work Ended
Foreman
Laborer
Groupe 1
Apprentice
Period 1
Landscape
operator Owner Other
Danny Daher 4
RauL Barrera 4
Raul Jesus Barrera 4
Leonardo Barrera 4
TOTAL
16
WORK DONE and MATERIALS DELIVERED
Bracking Rock at Gabion #2
Racking Trail and checking cross slopes.
Biologyst Alex
Native Monitor
11/3/2022
WORK FORCE
WORKERS NAME
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
FRIDAY
CONTRACTOR DD Systems Inc.DATE
WEATHER Time Work Started
SUPT./FOREMAN Time Work Ended
Foreman
Laborer
Groupe 1
Apprentice
Period 1
Landscape
operator Owner Other
Danny Daher 7
RauL Barrera 7
Raul Jesus Barrera 7
Leonardo Barrera 7
TOTAL
28
WORK DONE and MATERIALS DELIVERED
Locating timber stairs start points for stair #1. Did not confirm to plans so we stopped and moved to Gabion #1
Started digging for baskets at Gabion #1 than got stopped by City staff due to the none presence of the Native Monitor.Area of digging was a fill and have been disturbed when widening the trail. DD Systems is under the impression that
disturbed areas are ok to redisturb without having the monitor present. Any way we left at 2:00PM.
Biologyst Alex
Native Monitor
11/4/2022
WORK FORCE
WORKERS NAME
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.