HomeMy WebLinkAboutRFI #11AREQUEST FOR INFORMATION RFI #3 TO: Mr. Ryan Wright (Via Email) RFI #: 11A FROM: Danny Daher BID PACK #: FP17500 Prime Contractor PROJECT NAME: Canyon Loop Trail Drawing Ref.: Quantity Changes per field conditions. Specification Ref.: DESCRIPTION OF CLARIFICATION / INFORMATION REQUIRED: Steps 1 &2 constructed and completed per as directed 3 risers runs and 30” landings for a total length of 90’ Steps 4 -6 to be constructed for a total length of 36' (30' run +6' landing) Steps 17-26 to be constructed for a total length of 74’ (70' run +4' landing) Total length of steps when completed will be 200’ Bid item #9 shows estimated quantity of 153’ Wanted to make sure that Bid item #9 is going to change and reflect 200’ as quantity prior to purchasing more timber. Please review and comment. PROPOSED SOLUTION: SCHEDULE IMPACT (x ) YES ( ) NO COST IMPACT (x ) YES ( ) NO RESPONSE REQUIRED BY: _01/18/2023_______________________ RFI by: Danny Daher Date: 01/11/2023 Contractor certifies this RFI is required, sketches are attached and RFI is complete. RESPONSE: ________________________________ __________________________________________________________________________________________ ___________________________________________________________________________________________ This document is to provide additional information or clarification only. This is not a request for, nor an authorization or direction to proceed with additional work, nor a time extension of the Contract period. Response by: Date: (Architect) (initial) Title: Received by: Date: