HomeMy WebLinkAboutRE_ Canyon Loop Trail Improvement Project Additional WorkHi Ryan, Thank you for your work on this. As a City, we are comfortable with your proposed response and can proceed. Please note my answers below in red. In addition, the project team walked the trail this morning and made some decisions based on nesting season and the best interests of the surrounding habitat. Due to the instability of recent and upcoming weather/trail conditions, the project team has eliminated a portion of the stairs that are in the original plans (Steps 4-6 and 17-26). This location will still be graded and compacted in order to provide an improved trail experience when compared to pre-constructions conditions. The team has reprioritized several project tasks and focused primarily on water erosions devices, gabion walls, and overall trail conditions based on the limited time remaining between now and February 15. Thank You, Ryan Wright From: Winkleman, Ryan <Ryan.Winkleman@mbakerintl.com> Sent: Monday, January 16, 2023 7:29 AM To: Ryan Wright <RWright@DiamondBarCA.Gov>; Greg Gubman <GGubman@DiamondBarCA.Gov> Cc: Ashimine, Alan <aashimine@mbakerintl.com> Subject: RE: Canyon Loop Trail Improvement Project Additional Work CAUTION: This message originated outside of our City of Diamond Bar network. **Please exercise caution when opening attachments or clicking links, especially from unknown senders.** Ryan, Here is my draft language for when I respond to USFWS, per our call on Friday. Let me know if you have any changes, thanks! A couple things I wanted to ask about/point out to you: 1. Does the project completion schedule (ideally by February 14th) account for the post-construction cleanup and regrading of the excess trail widths on the sides or is this just the date that you expect the main trail improvements to be completed? The ending date should be factoring in everything until Danny leaves. I assume the native grass mix will be hand broadcast, so that shouldn’t be an issue with timing if so but anything requiring equipment, grading, etc. needs to be completed. Yes, the City anticipates all work, including clean up, trail widths, and grass mix to be complete by February 14 2. If the City decides to postpone work until next fall after February 14th, will the incomplete areas be cleaned up or left undone? The reason I’m asking is because the City probably doesn’t want to leave trail portions left undone and visually incomplete for a year, especially with some of the local opposition, but also if you clean them up and reseed them you’re going to undo some of your local restoration work when you come back to those areas. . If for some reason we cannot complete portions of the project, the City will clean them up and restore to a situation that is safe for public use and as aesthetically pleasing as possible. 3. Just some things to think about. Thanks! Hi Carol, I relayed these changes to the avoidance measures to the City and we discussed them internally. The City is fine with incorporating these changes into the project’s avoidance measures and very much appreciates USFWS’s responsiveness and willingness to find solutions to keep the project moving as we head into the later stages of the work. Even with the current schedule of rain days, the City is hopeful that the project can be 100% complete with the new change order by end of day on February 14th but will evaluate progress within the week prior to that date to determine how much longer the work will continue. They will work with the contractor to make every effort to complete everything by February 14th, but if the amount of work remaining does not justify the additional cost on the bio side they may end prematurely and try to come back at a later date to finish the remainder of the improvements. Regardless, I will follow-up with you at the end of the project, presumably next month, to let you know the final project completion status so that USFWS can respond accordingly to any public inquiries. Please let me know if you have any questions or concerns, otherwise the revised final measures are below for the record [insert measures with changes accepted]. Ryan Winkleman | Project Manager/Senior Biologist/Certified Senior Ecologist 5 Hutton Centre Drive, Suite 500 | Santa Ana, CA 92707 | [O] 949-330-4115 | [M] (949) 533-0918 ryan.winkleman@mbakerintl.com <mailto:ryan.winkleman@mbakerintl.com> | www.mbakerintl.com <https://linkprotect.cudasvc.com/url?a=https%3a%2f%2fwww.mbakerintl.com%2f&c=E,1,4zhFQZCnrdJONeDWgfIqcElhWNp -Ge5jY5f7vLtqUXvyKyQUJqUp0Qar2a9gaPZRmUduJ898a5dSxeBqoGBEhRZTdA7pYQvsrhuR2PmvHCRclLW56axYyiBJK78C&typo=1> <https://linkprotect.cudasvc.com/url?a=https%3a%2f%2fmbakerintl.com%2fmedia%2f5024%2fs21_ f_061907_icons.jpg&c=E,1,xBQldCi9vtk1GAkIlCyAKqeIfD1eFA_Y_h_BuwJx0G3TP77SkipvE_ib0VPfXQBrRuEJXrx2f0RQNbMvw9pwbUZqvZ82HzTwgtnD4R_f_A,,&typo=1> From: Winkleman, Ryan Sent: Wednesday, January 11, 2023 11:07 AM To: Ryan Wright <RWright@DiamondBarCA.Gov <mailto:RWright@DiamondBarCA.Gov> >; Greg Gubman <GGubman@DiamondBarCA.Gov <mailto:GGubman@DiamondBarCA.Gov> > Cc: Ashimine, Alan <aashimine@mbakerintl.com <mailto:aashimine@mbakerintl.com> > Subject: RE: Canyon Loop Trail Improvement Project Additional Work Ryan, I heard back from UFSWS privately with some modifications to the avoidance measures (see attached). They’re a little concerned that the last time protocol surveys were conducted was in 2020, so they wanted to take that into account with their revised language. I’ve copied two versions below, the first with additions and deletions shown so you can see what they changed and then again clean with all changes accepted so you can see their final proposed text. Keep in mind that these measures are specifically geared toward gnatcatchers and don’t relieve the project of complying with other relevant requirements from the MMRP (e.g., a non-gnatcatcher nest would still trigger restrictions). With edits * To minimize impacts to gnatcatchers as the nesting season begins, work within 500 feet of known territories based on the 2020 survey results will be prioritized outside the gnatcatcher breeding season over work outside of 500 feet. * If construction is to occur past February 14, beginning February 15, the biological monitor will perform a minimum of three focused surveys, on separate days, to determine the presence of gnatcatcher nest building activities, egg incubation activities, or brood rearing activities within 500 feet of any project construction proposed during the breeding season. If construction is to occur past February 14, a A full-time biological monitor will be required for all work occurring within 500 feet of a known California Gnatcatcher territory, based on territories mapped during 2020 protocol surveys until territory locations have been updated based on current survey results and/or incidental detections. and/or any updated territory locations/extents incidentally observed during current updated surveys and/or biological monitoring. To minimize impacts to gnatcatchers as the nesting season begins, work within 500 feet of known territories will be prioritized over work outside of 500 feet. Work outside of 500 feet from a known territory will not require a full-time monitor and will proceed with the current weekly check-in schedule for biomonitoring. Additional surveys will be done once a week during project construction in the breeding season. These additional surveys may be suspended as approved by the CFWO. * Because the project does not possess an incidental take permit, if the biological monitor detects gnatcatcher breeding activity/nesting within 500 feet of construction, all work within a 500-foot buffer of the gnatcatcher’s territory will be required to cease for the duration of the nesting season, or until authorization is otherwise granted by the USFWS to proceed again at an earlier date. The USFWS will be notified of any gnatcatcher breeding activity within 24 hours of detection. Work outside of a 500-foot buffer from established gnatcatcher territories/nesting may continue to proceed unless weekly surveys and/or biological monitoring detect gnatcatcher nesting activity within 500 feet. but consistent with MMRP Measure BIO-3 if more than 7 days have elapsed since the last time work occurred in that area, a nesting bird survey with negative results will be required prior to work re-initiating. Clean * To minimize impacts to gnatcatchers as the nesting season begins, work within 500 feet of known territories based on the 2020 survey results will be prioritized outside the gnatcatcher breeding season over work outside of 500 feet. * If construction is to occur past February 14, beginning February 15, the biological monitor will perform a minimum of three focused surveys, on separate days, to determine the presence of gnatcatcher nest building activities, egg incubation activities, or brood rearing activities within 500 feet of any project construction proposed during the breeding season. A full-time biological monitor will be required for all work occurring within 500 feet of territories mapped during 2020 protocol surveys until territory locations have been updated based on current survey results and/or incidental detections. Additional surveys will be done once a week during project construction in the breeding season. These additional surveys may be suspended as approved by the CFWO. * Because the project does not possess an incidental take permit, if the biological monitor detects gnatcatcher breeding activity/nesting within 500 feet of construction, all work within a 500-foot buffer of the gnatcatcher’s territory will be required to cease for the duration of the nesting season, or until authorization is otherwise granted by the USFWS to proceed again at an earlier date. The USFWS will be notified of any gnatcatcher breeding activity within 24 hours of detection. Work outside of a 500-foot buffer from established gnatcatcher territories/nesting may continue to proceed unless weekly surveys and/or biological monitoring detect gnatcatcher nesting activity within 500 feet. Regarding the biologist who will conduct the gnatcatcher surveys, Carol clarified with the following language, “The gnatcatcher biologist will be a trained ornithologist with at least 40 hours of independent gnatcatcher observation in the field and documented experience of at least 20 hours of locating and monitoring gnatcatcher nests. If necessary, more than one biologist may be used.” She also stated that due to workload they don’t have a lot of time to vet biologists for this requirement but if needed the City could send resumes to them. This would be a different process than the CDFW approval, which as we saw was focused more on monitoring experience and less so on having extensive gnatcatcher experience. For this reason I’m thinking that probably two biologists would be required any time the gnatcatcher nesting survey is occurring. This is because one biologist meeting CDFW’s less stringent requirements would need to be present with the crew at all times, while the other meeting the more stringent requirements above would be surveying up to 500 feet away for gnatcatcher breeding activity and may be away from the crew for several hours. The MMRP requires a nesting bird survey at the beginning of construction during the nesting season or whenever construction is stalled for longer than 7 days. The revised second measure above would require three nesting bird surveys focused specifically on gnatcatchers on three separate days beginning February 15, and then once per week after that until construction is completed, regardless of when the project starts or any gaps in construction. These surveys would need to occur within 500 feet of the entire project until such time that contemporary territory locations can be mapped. On the plus side because they’re focused on gnatcatchers they would only need to be in gnatcatcher habitat, which largely restricts them to the areas south of the trail, with only a few isolated areas north of the trail. Although this is more restrictive than what we had proposed, I think this is still a win for the project if it allows work to just get done now rather than waiting another year with an incomplete project. Should this measure be triggered by the project going past February 14, the City currently does not have anybody under contract to conduct nesting bird surveys. We expected construction to be completed prior to the nesting season so conducting nesting bird surveys is not a part of Endemic’s scope of work, they’re only scoped to monitor the construction and provide daily reports. With that in mind, I’d be happy to conduct the surveys myself, although I’m guessing we won’t have a really accurate idea of how the scheduling will proceed until we get to late January/early February. Rather than processing another change order for additional budget, it may be preferable to just reallocate some of the funds that are currently set aside for Endemic for us to use instead, particularly since we did that big overestimate of full-time monitoring days in early November that didn’t pan out. Please let me know if you’d like to schedule a call between the four of us to discuss, thanks! Ryan Winkleman | Project Manager/Senior Biologist/Certified Senior Ecologist 5 Hutton Centre Drive, Suite 500 | Santa Ana, CA 92707 | [O] 949-330-4115 | [M] (949) 533-0918 ryan.winkleman@mbakerintl.com <mailto:ryan.winkleman@mbakerintl.com> | www.mbakerintl.com <https://linkprotect.cudasvc.com/url?a=https%3a%2f%2fwww.mbakerintl.com%2f&c=E,1,TRFwjeYj_gyfFCFEYxmsgJSBNI2 oTmoBOxOkO_LPk9PktU3YGTYmiCW2Db8Ob0nSVjpAcEcpj5S1WX-KrA0B2NT3UqbKJJQfLHTfMnV2UA,,&typo=1> <https://linkprotect.cudasvc.com/url?a=https%3a%2f%2fmbakerintl.com%2fmedia%2f5024%2fs21_f_061907_icons.j pg&c=E,1,0n9EVhjzMsqxPreO2aHx1nhP_p7uD6UKZvu3Ya6VwOOeRx9q89atI9PqaBxArqwl9ipqpSj-m2sjnCW7FkflZ2WSk18FDSS31Nw4x3xzILMStTvLkhd3BfOrE9c,&typo=1> From: Winkleman, Ryan Sent: Wednesday, January 4, 2023 2:52 PM To: Roberts, Carol <carol_a_roberts@fws.gov <mailto:carol_a_roberts@fws.gov> > Cc: Kershek, Lauren <lauren_kershek@fws.gov <mailto:lauren_kershek@fws.gov> >; Ryan Wright <RWright@DiamondBarCA.Gov <mailto:RWright@DiamondBarCA.Gov> >; Greg Gubman <GGubman@DiamondBarCA.Gov <mailto:GGubman@DiamondBarCA.Gov> >; Ashimine, Alan <aashimine@mbakerintl.com <mailto:aashimine@mbakerintl.com> > Subject: Canyon Loop Trail Improvement Project Additional Work Hello Carol, Happy New Year and I hope you had a good holiday season! As we previously discussed last month, the City of Diamond Bar has been considering conducting additional improvements to the Canyon Loop Trail in response to trail performance with rainfall this season. These additional improvements are primarily focused on containing erosion and controlling run-off to the extent possible in areas that have been observed thus far to be more susceptible to rainfall damage even with existing work, and would still occur within the existing approved footprint of the project. I have been notified by the City that they have approved the additional cost for the construction contractor to implement these additional improvements, which would occur after the current construction finishes. Based on the conversation that you and I had, the City has agreed to implement the following avoidance and minimization measures for this additional work: * If construction is to occur past February 14, a full-time biological monitor will be required for all work occurring within 500 feet of a known California Gnatcatcher territory, based on the territories mapped during my 2020 protocol surveys and/or any updated territory locations/extents incidentally observed during current biological monitoring. To minimize impacts to gnatcatchers as the nesting season begins, work within 500 feet of known territories will be prioritized over work outside of 500 feet. Work outside of 500 feet from a known territory will not require a full-time monitor and will proceed with the current weekly check-in schedule for biomonitoring. * Because the project does not possess an incidental take permit, if the biological monitor detects gnatcatcher breeding activity/nesting within 500 feet of construction, all work within a 500-foot buffer of the gnatcatcher’s territory will be required to cease for the duration of the nesting season, or until authorization is otherwise granted by the USFWS to proceed again at an earlier date. The USFWS will be notified of any gnatcatcher breeding activity within 24 hours of detection. Work outside of a 500-foot buffer from established gnatcatcher territories/nesting may continue to proceed but consistent with MMRP Measure BIO-3 if more than 7 days have elapsed since the last time work occurred in that area, a nesting bird survey with negative results will be required prior to work re-initiating. Please let me know if you have any modifications to these measures or any concerns with moving forward in this direction. Thank you! Ryan Winkleman | Project Manager/Senior Biologist/Certified Senior Ecologist 5 Hutton Centre Drive, Suite 500 | Santa Ana, CA 92707 | [O] 949-330-4115 | [M] (949) 533-0918 ryan.winkleman@mbakerintl.com <mailto:ryan.winkleman@mbakerintl.com> | www.mbakerintl.com <https://linkprotect.cudasvc.com/url?a=https%3a%2f%2fwww.mbakerintl.com%2f&c=E,1,_EyFEjcyfYRY7uigAf2VWrjaNJR 0U16iCo8FNyJ_M3V_mR9qw2gWg1409v_PpddG3xIZf_t-UujOXc1tp3-WjXE1fggGIKqXOZtMbZ_luVJvfVIsM_ky-geT&typo=1> <https://linkprotect.cudasvc.com/url?a=https%3a%2f%2fmbakerintl.com%2fmedia%2f5024%2fs21_f_06 1907_icons.jpg&c=E,1,l8k1JE0cS3QIOHvHMbOVUxTmJN_TDkD6eRT2u1KUEM0P3HYCsLrgswEl2QmTcG2Frf_LhEAu-hQreoRLt1EybVBxIF-NVEijAOlLZXz45eY,&typo=1> 絨施퐥ࣕ듪덼ц隣僬冚ꤾ篧쩋鋧鈽륍礄垡崔ǩ阘ͣ꽙뇐⿶댮髶먌ꀲšᛃ辰䙀』⿌岊֓�䑧뚨欣磧摚ꫭ뾩뛤≋瘲⫨蔛떶់䇕픬⿘撪㕋໶薶ꛥ㬎띍կႴꌌ飗頕﫺掣Ά髛᪖᭓윷竄愱것秥ᙎᬜ硾臤ṷ㍟򏢟㹟灔㚰�㋮煫)缃㴽ᗮ쮲㭄胴ꇅ䳴麡ᅵ囋㮮晵㰟얱ᣉ媌쫜ڰ௤桙⣭璒䝣�靚鰛ᅖﯳ뵓棹⒪੢겓聼聯ﱕ﹩幉ﰬ히볰쩔됛꺼너噰㭴벣䉋壙䡤㜰⏍밼悷댂캭∜풢淪掵ⅿ嫦つ﹭ꀲ篥长䇪ᓊ췮䄫钮ᓢ⺿꣘鸪⍊펠跱큦㎀䟯㏻䅞⑰இ ᆳᩙ펊ꢢ痵䂗ᖠ韯堡犼᱿႗Ҕ闁쨙᫼╉✊僳ᰪ欖㢚⌫ꃪ눇톙代쿦㡰ⶏ徍碢⻹䧬�唳ϻ闦�㟥岐ҵ⽞㥕鋯♅轑ϡề⿙碠氖ᚽ➫뻛뿋럄�놖퍄ӄ颢䱖녇⼴�쥾෫둟炡鞓忕�梺ཻ敝ィ厞䖫�女姲诛⽕ᩉ躍ェ섊쵝䘋�덁ꭶఌ傆ң䙾ﵳꡔ꾿쮗撎鍙줷慛ꇐ廬悫짱ヵ䄮ꥩξ譊ļ磏爐釡䇁ڬ،㍐೨껙뎚惋ꫬ惕ꙮ캀퍈茞⃑Ṳ瀱ꭖᣑ队磅퐾觅깱푋Ɓ켹ۧ条钛滇蚴鹄眎Ԡ똓꠶櫲בּ䠲捁组剰票는䃍䬗丗懪䛚㧞ꆋ茸㔲젴ぴꢸᮣѥ⢿ࣸ퐧⁖೨雪⃈⦛ퟕ Ļᨆ➻⹫ᯅ㗡Ꜧ祅ፕꠘ愫墤압◯燫ꀇ䆍竴쐵Ȼ횻迕缪㠵㔑ꈒ럨ⷨ᜶㘍㼫稖걒﨨㸀祤ぁ窆쨋芣撂�萍쇐⡭メ橖໒滚諷왁혛�蘠マ\�ㄨμ槊疾䕁歆ﷁᗎᢱ衕飼ᮊݺ媃刜鿨趲燑屉拢ﹿ㢑Ⓝ揖郮ꃓ궋咛៞륹进萏敺㵎セᅯ뾱쓛ށ렀䘕⼎ࡇᨙ贀곓㒕Ẉ斜얓⑜ሙশ⯻ᰌ㻁揗ၠ욛교ᚒ⌆녧ⶤ➉瘣삫廓觀立걲䏇磦ᶼⅫ怨䔬웟寬姹◛屵Ꙥ澕�염香者ꀔ뇓顝蕁烿⹋쁫숿ࣩ縀䖯�錄ॻ隌ﱻ贺랯闉␼벩刘⑞텭噦夹萴ꞷ뱊䫓濡븉僼 텏벁ᑏ镃焕ﵼ垥弉鯫ꛅ艠절㡔僙৵鎁䂏䗹⾱眷갘⟙瀰瘻쌊户䘠调펶쀢œ㷓䀊ံ处@轠륇홐Ǧ꬞Ⳮ篇ﯨ닛禷䨨ᯇ݂⟬㭦딘ꪃ�㰣偦볖ꈪ찼᯵셯鑅ϴ藌횙畅ʨ뱮뉸祃晦ᛘ잢ૠმ㒮᠛䫩쁀梿㜎끐愜嚄ᣅ⯮༩策摼ᬨ箏炡悪䫾틦蓛㐓;濃⑮ሕ鴮ꦀ⩯◾腙魑릁ꇸ岦賉ᣑ욨址㑰垈ᆸ��샧��痱㷦ꗨ믃脀⡓펆梘茓⏪뿁樭녅苠콫繢櫉䩌锚ꨈ㞏뾚K馝ⱱ딎㲨겞쎴蝷壟ᗈ뮟ﯹ囇翞蛮釼篃쥗␿楨샰쓄ↁ⚉츴톞᷾⥃Əﲽ螪箿ꝫ㍖ 㖹纷덽䏾뮛㞻�漌믟畻ㄾ댺罷↛㜓⑃邈귇ռ쇓࡮㤶㊯䥖௴徬䡊鍖좩벰ꪋ└奡�涚뤓贎낻沐຃卩�딉慖䶮឵᫹앸봽콳앵귞䩇鶍荙퐰櫓䜲ޅ恫㺝䤐錺ਫ棾壯ᩘቱჯꅖ玱瑤Ὧ㕯Ἢ㵊ٱ꧝濫䲱�⠡鉉毒�륓�ꌼ⇓䛽䮕ၤ㟪뽢蹩풏检갉腈줃䤓睼雴㸨Ԝ⢥ਘ䪀가쇧ᾈ嶔峫�혎篑揨儴䆢볕병糟䳜䳖ꍠ㰖쎈칔钉쥟㜃샻὎紃逾ǵ쾭该裸ӓבֿ⍮ὰ⏡忂뻋얐�ⳑ춑숶壨矧Լ䪾䎁�槔ꂊሪﰌ鿯䮍숾옮誂萝㚖람㹷豨�낋⌨袌賑뒦阴쌇ີ⌆ᕰ죄珠流 뙇㷜熝왩㠟썷寯纱⯔祼꛻ꥵkǐ⟜쁔턱֡⧀홤㻬玴㺜�ᎃṫ淀ྯʱᣇ固ᡧ2쟑࿣²垒綠ꛙꇳ砚ન킒襅ꓩ鴳艎袂␤ꕏ뇁�ڞ楽캐嵦瑁噲ꅧ씤ₒ֩㳀⿔祹᪟폌�뉬飲ᶹ淌喿ℹ岍쳳戒욱呈䨴诀ȓ浚쀇䕗盫΢丑䎶瀻쪹日摗鼉៲ܖロ짱䎜ញℚᔣᑪ돁见匵걒ꗄ旊˙㮀첑寺뙄㺓뾋ℼ쫻戦쩂꯯뽵ᑆꦝⳁ锞劇䂌͚羜睋롦눨刖ꇹ줯딻鈐譣髅听ꤼ䫱Ꝁ㪎쁌蠭燸틎휦ࡊ᝕⹺떇⭪謆노齘䦌꣑괉꺛୿ൻ㻂냛ᡃ솞ᖀꀋ࣡睚ട騑툨 ゃ쪴샄ᣪ씈ᘀ얳声⪬ꪟ馂꺮乕ധ辌ຏࠠዋ褗㤄懄碐堗ሌ�ꏩ당ೖ迴킐꧌窜ↇ∐薑粋㋨企尬叺㫉磤暼ꟁ㍄˄헠粲돼ᔢࡉቛ糡ᚘ뛺䍍愉�ꑔ䮯�됽ᒑ欄횾遝ㅐꠘᕎ㯳댦탂쇞㵘ꄛ곝舱霿峜왈ℙ解欶Ⴕ峗궵딻뫳춊㍮楚᠝頟৩࡙ꑇḻ֮㎕尿醙薄낶퐌ಇდǫ孬㮳翀࿕痣꓿༟旸慷돠㠸羌윒硳踟踠団梽女࣐ᾇ�뛹�퍭஁஭⇯춹淥劣씒⊿僓哅븡ᅠ粴㮦秼끣⬦䋩꼷峿⾡ፆ馢锷텾᪒轩稨ි缉闓쑬Ϳ廏ᷣ�暎磩氊梧郰�ɯ勷ꮠ鯋 듇뻙뀼菥泹좞�좠㧚琖嗱㰯惄䐰偡ꩍ鬑쓨酼盆ꔒ뜶岈燍퓚崖樥쪧푷ƚ���罏⅄偆宏�ޛണ䈲婏싋飬෋铄�釕뎕ᯠ䦀䫦僿㉕ꥳ圠咮惩獒ਦ鿶㍔ﯢ쎚ต㥨᜗࣡뺷螢ꉆ칅ᓴ࿧ﲅ칾퍋詺咽夺蟸鰦넏ⵎ梠퇞⣉䘗ᮆṐ﨎锟ꁚ΂ふ嵘礉명╆ꨕ⊈ᅪ쎌鲁ꑎᴣ杔彅擊䘬뿥ᙒ餽Œ塛ࢎ▿该⒌뒢H꼎뵮펌墾㖀塺ힻ宖扎킸釅斈⽹勿팋걋ﶎ禨淯遦шฝ㑞㓑䩦闓⮗磸吅ꀫ벻貲쯫Ǡ�Ōԭ犨멺狸缑ࢢᑎ諁航藽藣ઇ睄 ᰁ耋ꅀ㉘艪؏稁ᚎ੮芚䵝㌌嶈竵ᔗᤨ杉沱䷬栧갘颒ⶽ얮쿫륪礦돢䵝햵닏컅涞떐ꗱཊ趍遶�孊킜ꢅ⚃鱈ላ鉽믶⛌꿓ើ⛳턤父䶬뙯�篻ꘂ㒾됗㲀輩돲鈟緲∶㵅�즄睥簊믫ߠ鬻䇃₍铠ㆋ숆䭡→隀៎嬊繜胚舋了㑌딯ᯰ轚褑臮ຐ쉩ꌇᡤ扪供拄站捶憖惋㑶៏ꎳ빁ꘘĊ좾餏茭錖づ�뱒䢿䍌寙ᅀ춮䗲켧㴗鸞҇᪊旉덇僆ઘ鐿뜅酧滪삡ਞꥤ┰暎ꎝ妣뫨⃃Ḝ㕜ㄱ㨺泘ݦ덠ᯘ撎糣京躍廳堊㳜ൻ톘搒Ꙇ﭂䚊でۂ쵒쭉곬ꄺ壛鞧띯洮媶㒭ᑤ뗪唑悇救쫮쪒 ঐ᳨긝망Ȫࡽ碳륡⅒浔�ꐝ馈⸬ԏ볆ꎽ屷賌더劬藖Ṃ叉�ꙡ꽙論뙫〼﹝곒�頽㑀彩ퟥ㸝펷땨䤛ࠠ싎ꆆ铧䜷⌦ᰆ兝佁ࣾᄒ匃ᰰ妶ᓭ溉㛏Ꝅ빖鈍僂谥说厮헩暞쎟艡퇚♓❽쨇鏧剉꼦늙὞捻蘾૱儾♊๽착る鷠歗ꔂ嗨헕炯갮몌�㕱׋沋岣㙞Ꙙ阣辏�煆ખ㶇៍㻼➫ݤ沽鄬︍氪⺮钘맟섃X᰹펃軮閹耷崫ﲂ⊑┐⾔䫾쯨ꋳ佨ᔌÞᕟ鰲롑를∽禦輀㾘ↅﺊ帿삚䶜쀃肤榞頂缸䆀齇ꄬ਺꽸燦෌容즡ᣆ딐掾ꏅ⁐䓷ԢỶ猘ퟕ注ㅸ톩赠 䮹猳ṭꛖᵡ藾ଘ劉斊௼ឥ뮤뫫ᅭ庮ꚯﺼ굌後뚿ࣺ�爂鐸�쁴⯠殮ᾤ諶쳾㣆甭�밸櫩ዘ䇘獻뉼䬙귴党ᜳ�ွ༬᢭骅踿ܿ㿾�혁맔簆ᢲ፡邖懀邯ሜ▐聠儀쉦慴Ɉ䉄錒戠ᕫ躴햪睚䕫떭뫖땭몎꩛嫖횵嫖ꫫ핵굑誣❽섉燚뿴ﻷ븿粒�곣윤㓠쟀韗冀�奼ᐾ♻䃦q漼 ᾖ㴏ᾳ鐾ᄿ瘜∿쏠ⲋ黂ꙇ鄫ﲔ靰ᄾ巾茛ﶢᴜ䅼챢㉻᎙䛬਋硢ﻠ추Ҽ䜧ꀶ䧮䭝잨荢篻㏚�嵜쓻㣅墨ߓ⯨獧豠ﰝ�ﺜ⎞⤜踩윒䝪鎚씣댑𹹃ᄂỜ坤䰁㨹킾搁狓셟硲༌졄䀧 ǐ㞴晥輔컭柤ㅵ婟ᙘⰐ읣ᱍ⾔騚뛆뒕펖ಘ἗㧷�裲ꄾ⺑禾䓙婔�⸫ꜩ䦲蝌㪵⾃⮐ᬝ㿔鶊�ࣆ䭮李✤툳놙溱铩㙴Ɔ墄┄᭢થ剣㙲͸溉܀�杼䏍㧸⠸숕䗼舾빭쥉ᆲ툧踢⥱쑺﮷힁淐탰㟒찗豶鐤௴䯏괎鯯쀚Ⲉᔴ柅멅禇燹롣Ǿ顄汏祎鴌伍悊ۇ窸І窹♸쌋ꎽ썒誋튼࣒戇湐뎌龗꾓ޏ쏋㰻ᶞᖟǥ쇢�µ쿈峄벱ᠮ頰錽ꍎ릴�㦡峝鴝㸰錥蕂떟辄囍쁭텃꜓鏤䋽䧝懨潍ಐ⤒ꇶ悴᧊溝흜쩚壘᝺쪅힘㔕⇦厔먋䍶ꐋଁ᧰녓䱰뿔 㠏烱≰㓮᎐呩ᾖ䋦腱Ꜫ锂�삃ɏ䝺Ў쟽퐾횪麈ꕚ뉇粨�핑꤉嫃䔳縞ᅑ㺑榁฼蟃㱛ꊺㆃ졵✰剂骓邢웄碄磻祸엸௴辳␐菱ᒩུᠲ鯰㐈蠖넉ﺔᢾ틦ئ䈱糚น‎礝㱒ɡˁ্鸄繈漎਱ꐄί셎茡凥ᤓⅴ糅빛鋻㔇ꬴ⪩进ᘣ䭲쏓犣鉫铒퇹铬쌊諌馮蘴䡛둊汗꾨偳汒੸馣᷊郘󈖇Ⓑ焱幘弌ᠯꪡ軎髨Ửΰ奚鄑휑䁧ᄎ麀ȭⓒ脻ꅊ更風鎋錣䣩똃蓟玁滋ꍻ彇隅彇ꖡꄩ투鎫䦨睝ﶆ鏺偳鑘瑏按鏪퐾㑩ㇷ訚า姐阤ඌ䫄蟻冻ꍲኼ솁ᡓ릹薡ᒉ⌆ኃ芚ਅ庘 챑ⱬነई儳胒蘁켾亀滹羘࡟컞较膝贾浫譃︼锧謉릕ை៍뿘俶۠ও斅ℙ슡ὤ潸∮㊫愾噐宄왘䇫㻑Ǝ㆑絮짅鞄⁓鈞鄘逐䜘蚧撅珆볘䃔⾼쐷⎙鯬ሚ➓ݤ눊秀鄑ᤝ씑돳襋켋寂ﰝጣ﭂펲⺅酁悂齛荢钪�웛燀䱡஛⻰Ἆ唺➸놆氩ከ剏띖⼢㞅⢄ⓕ�㎾៻峅궠횏ᗷ㕦͕쪷ﵖꍩҌᕎ沚哣緔�Ꝯ즪↋厀對넲튌ᛪΎ啒導忊専吊�⯔笴臗虄渹悢瀬霦࢘ᮟծ甞촜ꀖﭙ颍ጃ쉌伹䊌耝૦㝿җ練릢쬢葜禓᧎⯬獀囅礑抒�Ꟊݾ䭦㬬ⱝ茻峁�橙 ᐵ⛌鶡쭒꩎ඓ᰿厴㚜⥓⁘﫚⬲㙦ᦉ䫾蘱㿙豢⫅﷾䭊⩝ጓ诓莃싲̪ԫ愱闩밀㦪氁ᜯႻ꼷䓒鮁关艠ो⼳ᮛ渜᝭蠚臣ⱔ᠓짿쏾뛨韓ᘝ㧴砀゚ᇉꄏᏻ嬩뜐័浂縜Ҳ걾컐鐾鰕鯨﷔ȃ鏤멄揻ଷ�땼細澭늚︒㶓䕄쾘ꇲऱ�緩≴螺꜃㜌౶闞跡닇᧝眴Ჷ埛擂�嵹ᦩ�칎䳴湡힬睯ۇ蓅➇ᤄ컩겮ꇆ貔⟸훆탐ꇲꮙ皻є댻싃Ⲙ଎﫾苩舸�ễᘖ狆怊ꁗ뢏㐌蟃璔頛㥂脆ꏊꢪꤋ틟툦౩ᶪ滓ﶕ蜤ແ颗❙펡�신�뛯緘잔콴걩廕뱗ﮧէ ఌ슸熡྾获蘷ਜᐹ㑶棬㾄熀⸀居璊璉躉ꦍ嶉ᜑ팑亅�䛺픥沤絈鴿羰梦梧홧녥糭臃譏얌ᅲꁗ逜傐꛺ן糙ᰫ藮庅᯸Ŀ塥翂▗ᖔ䋵⽂䋴⽂䋴⽂싴臟櫲�௓嗿姰⽂䍴穅宊༕蔫ﶕ猪�弫粩쪍⮷꿟峜ꎹ署Ꮚ�幕벬땞窭ꃽ荅蝳ఔ㶹홴ꂰ潡䳗簳磻��詓앚ꔙ암ᵑ箪뵎ﺡ썚畺裇リ￿ᘘㆮ놿醨㩫뼵䴵멫얭꺴뙚䘶ꊛ폍桖媕皓皂⺂ឩꅺ稗ឡꅺ︗ǟ쌌ꥒ挟ᯰ栗ꏺ閧䦻儃蚏垾闓ힺꛜ啡委㛦曝̍ꏳ擾�Ⅱ଴笞鑬赵䘃࣐� 鬑湯뢻᧒墟Ꮎ㫂湨こ꼷춯⩭欝퍮기ꞷ䶹妷샃붜찳㭭쏌聻涹ꖏ흙怸걾촯䝭�끻佢绵怋킦폡캧໬曔뚀笻樽ꇛ�涨욏ꌏζ罪�肎䃑衚䶹郪鍬␺ꓛ줎�൦䎩䶲郪鍬␺ꓛ줎ꤶ뉃엪躾䳚︛₝녯Ḥ魧坱軘䝵丕놮樸䂳㏛螖廚醽撌쟛뱦�耐酨㤸欶沂懚絨樑ꃇჶ軔뀑惭뿃ඃ札熛譧ꬬᰰ怓ᘄ▏嚁혙ꦀ節꘡듃쿠떄穢鈴稍퀆꾆ひ䚮砫䙠榄ᒘ햌ﶃ찦窈ʮ䞫垁娥˩ἠ櫴ꣁ權⌁ࣅᚻ뗐⧐�ś曮ހ砇uᪧ聓ʶ칠ꕠ它➹ℰ䕨筘ᡉܠⵠNJ蠝腃騵໗봀〆朊ƛ䚏 䲫ཐ⑪羅䎩삺ⲱ꿐㌅呰㒎发ቆ캏⤬ꢎ茴ՙធ뀖胗驆⫁툥ผⷆ郶鸀皠棔᚟㛩ꅗ⨕ব蓐嚚垢쳜斑踭跆Ѡ俪땯띠瀜Ӟ傸鶃ꁆ㊅櫐筂쁭䠭㪣☰קּ륈裤䨓τꊔ중說돓匫鋿歀䐚윛¢㔎厒핧㑮腖樴䪴ҝ䅨仆峆즂ꘀᄇᇋ䓂뵿኿뼥菷⭮⃥桏欁䂵퀟疎퐀饦샢ಟ틡専뀪̪גૄ厭횁첛௔ﲐ쑊퐯㱴ʖ⩬蹸䏇鮙ἁ⑺⤡ᵫ櫂뙂䚫엺꾑⊷鉽鯲㚬겵ᇆᱵ埡켡⅖铎鵨泞⹻׊䑚轇⁤⫷壌ᰬᇋ㵮岲堓䉥灳ⵗ쏢쭢㉢⃯쒽믰㪑ಫ歜�縯ᶯ섫ꠞ깝䟙Ⱡ璒嚹켺ꁊ﹆苐ꓴ 兀㳳떝▘ꍕ퉸좠䒱돹ힺ༡䕨䮹爍궕㺟㬟쏉ꮿ�뀨꛸更ঽ乙恉ﺡ빻泒|䉊拊礬胑Ꜣ洛ﰏᘕ쨭鐿礽꼏ꌢ杞╾⊥ホ姍爈쨻洚Ḥኸ뫦㉑正雍웩襮딐쭙鐆愗卖䏌㡇ખ攁⃐뫩䀳꽏⋦죋孑�덧⍧ਡ略木옪ꀇ�툘䑨䬹겅ܪ偣蕠蹥왯虌㚌潇뙷娰昵꥟罁灧堔꬜輷挀鶤帬䊣勵깣�﷞畧羕쭜걊掑㦴⁒䷭腺䳊ẫ당泖⹷�깠搱臮䆙�꓇䟍␣ᴅ䫀ᓖ햭睘缭鼶Ͻ낶䡪撎窇魓뵳᳒ફ부᳉�㟇꨸ᩨ쾳奄ﱸ�끢�㛑刺⪢枑⽾鿣䏠埙噙㼿 熻즟᙮㿝宻躃픑죏ﮫꭈ樻⮺양岆衵鵊꾵預䢷ᤋ똁૮牋譝典⮙덕雕릶뒄�煬訣贒ޕ屋뾥喯૛䩏孩穩瓺⚷遚鬞䷾娻ƪሼ體ꌵ襀⅞滍貽⬀㘔쎵⟴飹ﳌ⑊ꖁꗢ죶狢冀㊇궏揉䬿迖銥㛈旜륄뒂굕ퟧ樂堟惔�㹨㒢⃕涼e㵷勀ㄱ⶚狆꽁紒㠿鄜ㆀ搜⥑ꦘ봀〜Κ≆ુ禙ሾ꩙픒粡꺰픜ሸᒇᚼ纁쨵륱踘냺့⾬렂廠嘱梅ƈᤶ⥚롅섋Ũ᝸힛᷁惙Ფ懴༻䅥庒�鹅䠩㗌಴ॖ牻䄥ⴔᖜ麂㟏諏渀숉龜关좻柊馮ᅓᇒೄ晱踃倊踏莖ዷ亰邋Ⓦ䖷虈ぜ쩏䘢䀜 㳊겳㫤龨됌¯띀≔莤쑼띍닾篁Ϗ斳䊨茔㦝剈툙�㎬洨䭵婅ᬪ͉વ遵�켯㮪稩礥�뮩㑊뷟钊摏쵾驆䘫툽�垨沆朅暹䩛Ბ勏䒭⢞ꭆ䡄饢䏕酲鋷寜鎼冤썬䤉�雖謗ቿ␣쬖를틙ힿ퐋ࢺө◲劳⏾볌롕袀쉏᫋硔亡㎫硕캶힠딦쭎䗃ച售㟗貘咸呥䘙钩�◅啟偫竅뚕逩䶚䚸꽗鴊햾რℽ⏄寠ᜒ쪗卑㰆깟贔瑠꺀譁㟧贫劐荙裚汫퓱೩陸嚺嚣㗈馸堢Σ煄꺣ꃙ腐㪷譓ꃜ鯂䪵ƕ䄷␹硥媁튡唚롩ꕑ嗂땍ꔪꕒ㗄⣤咮ᔙ딆ਞ梈唨뤦捚闤鮩䙔ࢼ酐髪嫤䭈鮎 爌ꪥ湉쑨畵걿쬧㢳ꪤ曺�䞀ꨕؕ搝먷敂䈰䧒舼쭀櫁뢴噄晘軅體遣ꢷ煸ᵝᷠ쎏♥嚹檣䰅퐘歀뱜굂İ਑ۤ䪥쉫口ʄ┫�힬푫鴺쓖ꯃ쵵鍸ᖼٯ〺流懃ꓜᗃ锆ꓜ땊ད쀬╚㞮솨ʬ脬屆㊯ꤴ♍꺀ᖶ�侢頓昀報甚ʐ븗笣�ᯑ쩴蕦讉㽃笂点薏媀랋꠴ക鰶µ檢䊭곓亄Ꝟ듕凢棪껒쬶蘁璖ꠃ荍棊2ƽ琣耓귛트ڐ풢誀핉괄偬ꨃ嵊嚋鎣笫佪꩎렊ဟ݇腈曗ẓ놸Ւ蓅ᩫᩔ佽芍틐骶䎗ƒ䂄ി嫪ˢ굝Ꝏΐ喘엍쁆享畫譵ꈑ䰚紦鼪튯嫲跔뵪ꥊ虴㹺쫁猚䑐뜢䈰 ⃆ꋳ飯䕹封ᱱ禪ຄӈꍕꔚ胒䓈镐∽엝ҥ윚ꊈ저名ʠ爍ᦠᜥ㎯ꢀ�梣ᮐ自僌䃇쁗悢긻֫꫑䪅ꎑ捌돱⾿搅湈樔ꔏ텎Ӝ∬ጧ媂㐃ԓᚐ馗쵓棱釄Ւꨐ㭉眼�㚢쀵᭡�爍饯꣖龁뒒⸡餃Ŭᐅ偄⹂ꓞ꩓઻䐩೟㈄ꀶր殨憛᫰ꃡ䯙蒀⁼冸눅쀷洀홭珒╙ḃ⒐욃榬䓄荋摏憄泐ː呦脈ݒ㉒既䪄뉡堸ᾷ꩗銥⸮햯劍哙逌惽⃈恾㶻㳅汥ΐ檩㵕圢⍮ƨ㞒䒂剩ጃ̥쿽ⷣ豟請쭳䔪ㅒ鄮◡䤊㢎輇줔㽀讒䩗쮋烋䊰⨪ꬪ识煳兑㸵剐쎔업╕녒虌䬗䥱䥡䒁옌䔤 י㧥ꊒ㰼⨫蔆ɉᄢⴠ옫䄡⨳墉鄆訕�ꃹ쨫ᒒ쩈릪깸겤׌䕈襸婈줦⼮䤐鋱楲녉ౌ됀鉅岢ꀩ⸢᜔唀蘰⮋݀ઋည儩詞쯸⸮隩쯲ﳰ苢ㄜ찘̒䓎ՙ鉢န묪⑀㧢䊢鹑تꑘ饨뮙糊ᨱ癿꒙ࢸ醊屝♔崅逮婒�⥚覑뢹⩈䆑譊稁亨ꎰ℘fi쒊ᘤ檨螼쁅�霯뮉쥹謑 ᤮泜颻踇瑹ﳨ鸉棋科ⵊ䫖ű⍧䀣૿錺첲깛⮦ꯉ들둅됍뒝⏯㛚ﯚ垽築銯௿䪽쿾╝⥞�劼婎祪헯�垽鿋垽篌ㅞ梷禪嗯�旿쵗칭䚨縉탧꛹잪ꟹ잪☙윺ޤϩ秩瓴髰嘂䇋菦빤ꁪꞬꔬ⡡詿竀稃൮モ⼿憎荏￧颣ꏟ폠䫛뚍�ㇶ∗㐲륩癸䆫엃ೳ䚪帮㜠䕩礆㠭e᳝溼깆蠩볣�䢽鱲䑹朻鶶챣ﲤ⡝퓶皎ӎ㐰䪎쒡ᄻ皎墌ᩗ鿕ᆁ㭲걦蔝楎ꉏ㈝钢�낌֗枎ﵣᐐ䒣䎫葊㦅ȃ民貃엮竟뎕칭흻�糛羊螡퐥ᴾ续䑥紻턯筎莯ꕆꥐℬ煠蟻愭ܣ샠盟엂 ⷊƅ櫸汁쫒盩樬ⲹ䖞쁸Ύ妋㜩꠶鴦�炝莅⳶ꥻ�펤ःᰶ뉡뮼琯�蠙☏贼ퟥ༽絛짇㴦鉞∭紂ዻ䐩籒扒䉲⃒䷐洒;츑জ鰦扷䓑�釱㡄௙曔꫰蹴豌斋ꥅ蹄㤸過鶓✘ᛌ쒥ᎇ꒡૧⌤႔՛ᡓ괘膆♱鶵셂ﺶ⥲컩�俽䣯ꆾ鱟᝙쏦ឧ갎篭궥�⵷灹坨뎰挼쇜廩⾇翎⛤㨹헧Ǡ௜彫酚暶쏄ꢚࢺ䦿ỉ鞧仄䟘�䕴硹俀♗祼f䃡쇻皕⮧᎘ﰖ꿄钓瞔鹂㼰㋜鏲힔涮㶞헬꾱찵缜壠ꎜ咸꡺舏㞾餍襲᝖ꡕ䳧꽎鵋埍挅導徨뗕ᄋ䉏뻯碧⟡䭙 灮置척红Ꮊ늺ꕱ㎂玧㵧泒푍湸ᥬ瀖뾃멡鳑쬕컋怭亯Ꜽꢱဴ쭆⧛䂎ణ΂쩔ꕱ탻暽㝾賧㶼缋⋞䀘ㄣ鄃焋葾磏킯ބ䣟ᯌ翽ꛛዻ뤷攑䅰봐ᢐ䡈쐺늓럍ᐃആ즯❢䊞쓗㟗�㝼죆骷娑ᤑ㠑༥ℬ䀜ꉜ⿟ឧ̐粈齋亠柪퀦틒㳲⨂鿃㙠Ⱁ濈ᴸꂺ┙碙䆤턯鶗孽શ驒歰峆䟟଄繧괵焨⪹蝟牼龴ﲌ뺨㝳쵫὇�♆㥅糙돱Ⅻ�􀡷繷㐽菬㯭霛ᣲ䧴닺厅ᣭ姧⸹�熪ᗟ㝗텳뛉뼟윯祲禍왧㢤㺝�ﻫ�笉ᚃ굝ﯟ鹦隡婒哗쇐榋 ワ௤펻찙ψ흋᣾⿚腱탈ﶘெ㸙뺃妭혗砐欷ꔊ몡Ⅴ�ꛜ�읁褷஛屎爴죓Ɩ�喉묑᱇拹ﰙ쩌ច툲纮퉽�쎐㎍잰䓉ᶻ搅⮱夶ャꦕ옏閴祜늊绘굛脹㿒⮒袢㈈菨⪕Ꙝ䞮拷憀귡磤첔袒Ÿ 䲁�쉝迴柰Ꞟ쇽忼ꍦ꼩൬柛猿ᇇῃꘛὰ川缾볊ⷜ࿋䳕꟥礊꾁纍ꂪ쩶指癩ꃯ찝皽�鳨⼻鼳梆�侩ဿ矩⨩Ứ蹽煈싽㟩識뼒홏껒ᆯሻ㶒켟ᘤἺ緙峣隟ꜯ齭꧳쯃跸矀漓�菻ᬉ쫸뭞牶흴䞌虫䥏履큑�믹䰎ボ痉잱绋ﱋ뎑౿穼摽ꇣ๱䲣렿뢟疍៦ 뜬뱏㟅缻琜❻뤗봅컺觅箾Ṏ쉜粡⓺╿뙫繰빰쇠냞�迆ݥ栧ޣ�홌ホﭥ陵㗓㙋༚餢쉮멡ᚱ˦訇刵㙩짐觚౟륏듺掐�潗쟙䁚޴랢ࣳ뱱附稖煡㒉脾쀐茮⬕ሐ뱄嘠䲑퐤ꨦ燤⤉঵ॱ愂屲낲₯饎ᢜ❟ࠗጒᓪ刽빠祖蒩뱱㷽ꓟ邤騏㷞䳘ﮝ⧇맰䨙㞧Ⲣ�타歿䯠鄜䜔ꌤ⠔䦷㠄녘腉뿢怤苉䉿䓂䌸姆쨔㩓삕ঞ婧锻�ӹ꺝寜᧒뱚璬ퟴḷ祿뭗㽯ꠌ↸哫㇧�狀ே켇蹈췚댐塾㫔䝥�冯䏋꒷躇㔖維᭰㐛軃轳戮ყ嚫糸ⶺ�榄晋╖⯭꽢㤋ﻨ꧹襕 횷璆೎Ꝼ�䣙엶츺೔폞婊ỡ蓭섎춵ᔥ砶⣤ᢶ⾝Ნ㌖뱏げ挡䙞꒥琥흪彏巠⁺偶ᆔ�筽⢼毽ﬔ긞樭ꃻ㿌헯⬅皚⍫礿ᤐ秔弃듥꜑獅迎걘낞䷗흸忋�疷彾껇꽴ଽ嚼黭ﭦ햞懥给㲿퉺蟑ᛇ웹᧥ᩋꛂꐴ節籴쑑蝥ˠ鏅強⻷縔ㅐǫ┟謹瞔䍦�跙趟拾駆㐓ඓ巯鋛︳匧⬞欿烊蓢欍ⱶែ⫳Ở畓㏈쟍㯇⡧⑗蛩撗쥮喙韣纪듽뉾୛矶㽎쮤뜻㞛웧徆Ꮧ흍䡇뷞漲蝎巽᫖嘶텼쓧篶๳晎᧟舿ﱒ䁡熛⇁ꦙ繕ꝧ峼徿銲巿듸懴 꽇욼鮌俻ⷅ厥쵟硿ೳ௵㋚ѐ䇬렑ᙉꘁꟜġ绥돶끇⠵㊝朝䱇ﵽ圎䏣��㇭棨噵蛠撱ೞ컫力ຝ伤뫠㫪䊵剮ꋡ卦캃㚠습令ᄤ萉帰⢐判牀쐗꺣肐￝⇜忴䬥ᬵ黎鿎⍢쾯鶹⿧堜ᩘ뉚죦뼙ア龷岿旹᫁脓屻ᄈ沪랮乤홀뗬蘋ᄐ拟㾍낽﫳答﮷뜅Ầ㨎త벛컸竝௱ꞗ깰⹞빚佴賠ᰯຏ睛絴紖쏙㑷힯ᵿ巵沮ꓽ鞣犢酹俯⸪㪗ꑟ罱ㄛᙫ鶡䯼넵퇸❋濧⧺ﹸཋ놎煾⋘鉫᙮嫏辒젍貈箮ﹷ浶阃鰽트켣뇋쥽ᯄꏥ⢻㢋ล振䓮跮��土撶全쭼㟡ꛎ硍꥽煮윁썥ﯣ汯Ფ ᤉ⇴��鋉域贃⒬곜蜙큁鯀㹍◑�㜜ᴺ�숤컝峑밓瀩⌄ᛚ릐涹턖挶鞼ﯫ쏭埻칄ᒿ竎猜⦎宛ꗭ랊¥箸뮶꺷姱ꀺ앣ʚ핣筝伖鑅䖐䉁㪀釔⇝钚讏펭䀆ꘑ呲쨐੬㹂䮑�萔翤飥쨘䶑ﵢ잛䃃忳㟙隄闌母乚椟ⴭ沤駠ๆ牮굦௱뜳仲⹸�뭔銵꡺月ⲕ㌼ᆭ쫹ᚪ쾱⡱�㻟컺ꎴ폗㼨゚♸톓⌹ﳿ餭駷헢⾳鹞繻玜軇㋿쫭ㅫⅡ�絾煼䋴쮞ﭽ﫳縝譅浟ᩤ滦驝曲�劁ꯗ䎵紲䰖㏃�௻Ḟᾎ⨰㴾秔齕♥Ꙟ헼彛嚽洴臜�쭡嵷㇛⧖藫㈓쓏喣ك籓庙잮灚�畇魕 ᾗ㲾烩앩譏珵ᒧ疵篗捾ꍪ⹯⍻섺얮ꛀ乛犟羷붑틩㽣믶쒦䖭䘇窆豆鴧爾湐ힶ䶎횛혗⹷竉븺砵导䓞保鹙ﳃ�ऊ騾╽쫶믶蟹➹ॎំ쑄蟤ೕ媺⸗頾�ᛙ뉩呹껰�䓷綖憸梅ꗔ떛奋⽺雯⯉촂껆ꖳ펝㽃�颹�䥓轍坛猽엫䯠갟꠿㳘貺䉱⯄罹龜ꌕ潗飪췿짬븐巠洇㪻乮ᠼ恚柱纋ﲖ齰튢畍�凼畻ﳥ俑ཝḌꩲ怰ꧩﱇ㊷贾놟㾖�쟭媌⥋鵰豵棼돾Ƨ卭釾ⱔࠠ′ᆪ䁎齶쐑늃ⲑሠ졓톢甗ৣ﷘龏뒱罓㭟남偶㄀覆⏖㮃랛铦뷶蓂睭갾 帊ᖒ판數쥐孻鋭涒ܹ䦞ﱪ펔஽훭ꙷ䕼諱㫏픾喥魯㦥쏃鋞禼憥뇘澳㛈뤲훻덽瘪ᣭ症콟㺫�熟溥俔椂➄蝪⾒ᥬ橺輿볖䎗뽍຤㝳�줏쪵퇄瓯�転翷쇽巭᪾뫒ቂ�嘎쟋퉳﹯ⅶ遶偻䕡닔蘱㰟띓虈몝⍱뗻�낼藱ʼn擟顬ꦧᏅ彗閜뜖塖恵䙋⛸署趆曫뼧汴磱뷮誢苗쌓ꗷ镨擣�孴⟓뮡棛暓꿜疹메恵즜瘻鬇毂ꋼ㰾ᤜᲕ₾䁥⿟�笰㬭몪ᆠꋧ謤ꙫྜ稟砼虠エ锇憙宴蹟찙⫿苴꡾楛쭮ަ맘�乫듞籠쯀䬩껝䪄쵭兹煼㻏飃ట쎗巊廦 ৩긳䨗閈徫笽疒쾏꾬뼻繧௛丷ᣞ奸봒ᖒ컵뇊籿皥쵴﹆꿄�눜▫跶綦㍑㎹⟻칲﷔֎万좬鯦�㻗贘煗䍙쾇鑝ⱑ﫭븩뿟瑕�᷺ᶹ֚织㤸멥皵Þ珊忊䥹⼆�逹즉ැ沤푌꺳껾�ꥒ돱㾲拲鴔못폲⿸ꝃဦ좃ۢꂯ眖瘔鰌襤⺗胺ָ୑햂剺䍒欈Ȅ�㦔儩ᑂ铙겹垿ﻦ뼄梉ɛ잙淩觳㦶�噫䑨ӛ팢蹂︑槕劖ェ줂䷔䍲䊫頵袚图各™聐끳ం帟꾑죪뭻ꂭ㑧痟奖뷯烳쑎婌늇罖ꙓ郺鰷秦厜廌㖘嚱姧呻㰵왮綃⾆⚛絴列�벮쭕兿嚟૬屉缱 檨곢펱䭲俊켹リﴯꚲ轉羮磒쌡ឞ웽⬁籎槀鎙ﹲ鲳퇴䉣慿綍陧쉩뮌⊇릨笱煟ﻟ⫶㜛Ḛ盦擄㓆䥖䄔檎ꃭ丮뮸뤯�丿먻㚦疥㞑麎엹�ꣂ௹崊鷓㣮㵌됙ﹷ臖⎸�Ⳛ慉쉾ﯜ髉鞵縶�䩻뢩太㈰習蛜醻븏ꛧᬅꞫ栶⭵颷�䎽覉棊擏형哞쳜汱�닲ວ꥚ྋۇ딥阝㙍�カ鼟ᛄ勎硿௴拯ᶓ䜟쾳띩⭣뭧뛈咱摞扟훢眏䦎鱸뷝ﵔ팷⶿馌荶�띂醽ꞟ預⃙腿웨䯙巭轌婝梴啾튕輯羫⮻簷罣盶序嚗뵈敹댾쉒춵᧊쾥ᅱ폺髽ꙕ 﫵ؿ奯塚�촯鹍筨湱龘炆薥舕詆뤝�廿晱藁댝௃ﳃ尼㠏鲝ᙝ헍釠럽ﹲ뷁릹❙誃禅ʫᫎ넶ぬ扨썙죄큨甸⮠臃릈֑䞍蕀㐏猑ᬲ⃲뱏崀᭱᧲쬠᪊⌨눴Ș뚋欹緿頊ㇻ鲠뒢禩᫾₤ఱ࠳ꁙ胕⃭�۱탹㵅䖠镄픋吚郬苊쒢貂Պ몴ꖙ醉␡摁뱗㝧ﻷ⅀듓幟⯞뵮퍑쵩肋ﷄ퉧ꗍ䘌랏⳻묾喏╥龮퓗鴙瞬溹퓝欤︟牓׆�덷褎囚⾮㡏쬭協邷༃䲭�뗻ꧧꓮ쿘�ꈓ滔෻鿎걶មᚣ㊙�붦䷕捗燎攱쪇教ॿ濸鿳纃힊⑼襞糽磲癇嶆쳿睴伶¥ 㥶᤟ᆭ底⫮炠煌拕윎㌿㵙⻶멐眸�㝍᧻ፉ希䯎孠쭡핽燨�쫯歋빼�匹邻峭덱⾎儹㷄柙斧캗⛂ദՄ䜑虬䱍䂢䄡퉰ᯬ躰㚉㒤欙脠⒜ᆹ蘓䂌갲ﲆ臠䍣獃ୃጓ怓ᄳ䔽岊�㹖⎗䂹❙读琢곬갥梲♝婐𣏕謁썟㟽漯뽭ꆔ㨚ㆯ觳멢1괝氷볯ི봜嗴錄㦋❯룎ឯ엵蟭缄追來돮ⴽ粏ㆷ뷢먅䔹떻♿此Ἀ�⇰⿕品찯�癭⛝듇輩ᡋ㬿橻騝콗マ偹郋猢ꥼ䖖뛲軋덢阜䷏㴽頋応挷敵涉૫覽掖㎹浿鷀䫓뜪੺툅睚୮屡﹬都뽶鿐⽙뫾馈㩯眛赉洩鿅毪軧ࡉꢆ糬懈 퍝售�锡廨燎藇흷飵ꔵ㧿큞즿㑜헼⚻鹏믟등⒱̃言⍅෩攊摮瑳敲浡攍摮扯൪㔱㠱〠漠橢㰍⼼獁散瑮㠠ㄹ䄯杶楗瑤⁨〴⼱慃䡰楥桧⁴㤶⼳敄捳湥⁴㈭㘱䘯慬獧㌠⼲潆瑮䉂硯ⵛ㘵‸㈭㘱㈠㐰‶㤶崳䘯湯乴浡⽥楔敭乳睥潒慭偮䵓⽔潆瑮敗杩瑨㐠〰䤯慴楬䅣杮敬〠䰯慥楤杮㐠⼲慍坸摩桴㈠ㄶ⼴瑓浥⁖〴启灹⽥潆瑮敄捳楲瑰牯堯效杩瑨㈠〵㸾攍摮扯൪㔱㤱〠漠橢嬍㔲‰‰‰‰‰‰‰‰㌳″㌳″‰‰㔲‰㌳″㔲‰㜲‸〵‰〵‰〵‰〵‰〵‰〵‰〵‰〵‰ 〵‰〵‰㜲‸㜲‸‰‰‰‰‰㈷′㘶‷㘶‷㈷′ㄶ‱㔵‶㈷′㈷′㌳″㠳‹㈷′ㄶ‱㠸‹㈷′㈷′㔵‶㈷′㘶‷㔵‶ㄶ‱㈷′‰㐹‴‰㈷′‰㌳″‰㌳″‰〵‰‰㐴‴〵‰㐴‴〵‰㐴‴㌳″〵‰〵‰㜲‸㜲‸〵‰㜲‸㜷‸〵‰〵‰〵‰‰㌳″㠳‹㜲‸〵‰〵‰㈷′〵‰〵崰攍摮扯൪㔱〲〠漠橢㰍⼼䵂丯牯慭⽬祔数䔯瑸升慴整振⁡㸱ാ湥潤橢ㄍ㈵‱‰扯൪㰼䈯⽍潎浲污䌯⁁⼱祔数䔯瑸升慴整㸾攍摮扯൪㔱㈲〠漠橢㰍⼼㱁⼼⽓剕⽉祔数䄯瑣潩⽮剕⡉瑨灴 ⼺眯睷砮湥ⵯ慣瑮⹯牯⽧㸩⼾卂㰼圯〠㸾䘯㐠刯捥孴〱⸵㔷㘠⸸㜱‵㈲⸹㤳㤠⸴㈷崱匯牴捵側牡湥⁴㔳匯扵祴数䰯湩㹫ാ湥潤橢ㄍ㈵″‰扯൪㰼䄯㰼匯唯䥒启灹⽥捁楴湯唯䥒栨瑴獰⼺眯睷昮獷朮癯振牡獬慢⽤灓捥敩即慴畴䱳獩⽴夵⽒〲〱㤰㤲㕟剙䍟䝁⹎摰⥦㸾䈯㱓⼼⁗㸰⼾⁆⼴敒瑣ㅛ㔰㜮‵㌱⸵ㄸ㐠㘷㤮ㄠ㈶㌮崶匯牴捵側牡湥⁴㐳匯扵祴数䰯湩㹫ാ湥潤橢ㄍ㈵‴‰扯൪㰼䄯㰼匯唯䥒启灹⽥捁楴湯唯䥒栨瑴㩰⼯敷獢楯獬牵敶⹹牮獣甮摳⹡潧⽶灡⽰㸩⼾ 卂㰼圯〠㸾䘯㐠刯捥孴〱⸵㔷㈠㠸ㄮ‸㠲⸵ㄳ㌠㐱㜮崳匯牴捵側牡湥⁴㌳匯扵祴数䰯湩㹫ാ湥潤橢ㄍ㈵‵‰扯൪㰼䄯㰼匯唯䥒启灹⽥捁楴湯唯䥒栨瑴㩰⼯睷⹷扥物⹤牯⽧㸩⼾卂㰼圯〠㸾䘯㐠刯捥孴㘳⸹㘰㔠㌶㠮″㘴⸶㌴㔠〹㌮崸匯牴捵側牡湥⁴㈳匯扵祴数䰯湩㹫ാ湥潤橢ㄍ㐵‸‰扯൪㰼䐯捥摯健牡獭㰼䌯汯浵獮㔠倯敲楤瑣牯ㄠ㸲⼾楆瑬牥䘯慬整敄潣敤䤯孄㔼䕄䙁䄱䌳㔶䕁㑆㤴䘶〴䉃㜵㔱䄳䉃㸷䘼㜹㙄㜸䔶㠱䕅㐵㡁䌷㠵䅃㐲㌱ㄵ䔰㸱⽝湉潦ㄠ㌳′‰⽒ 敌杮桴ㄠ㤶⼱潒瑯ㄠ㌳‴‰⽒楓敺ㄠ㐵⼹祔数堯敒⽦字‱″崱㸾瑳敲浡਍�嫬汫䕔블眳뮷偽桚礕䄅큀吘胀傤悡횬戇ꁝ䭀ভ豪䡆䨐䅐樰ꃐ҈弅⁑耤␆檁ڋ⅃優䆂卹楫뮷鳣㛯廤뚷ꭈ῝빟獼鳦鱹붙썲혰鰙ㄛく谮榥㎂䅣霉叼ⰳ⾹䩤⁾␥⺕ꯉ㝶鹉�׍黫掫ἤ�礨䯩줞ힳ䠷憾垖鱗靉弤ⅶ螵�戰෢즉긲錐⇦屺Ⲝ뵁鲴㌰ꖢ�눢�る㧾ⲉ嗽矢륃᥯꣡萅릞㩔ᡶﯱ♿뷌ᒋ࿟도쁃刌Ⲧ熑딌盢싥粳䗮枩鍔랍沖뙲켓ث䣾﹊뾳㼆㡌䷕賊뚳衸㏥讉햄៹ 㺤寤鴪鉾Ꜭ䤿ᯨ쩍ꎣ컑샵ꐁ᰼鬃퇗˲⳸チ킅聟藢艢ᱣ일有ﻈ*ಸ稫ᜲ㴩꫊춤徽둤괁굃䍐悼稹ᠷ鍱췠ᆇ趸繸愶ℎ쪛㿀높뉬畢ꋣ㾧볮