Loading...
HomeMy WebLinkAbout12/13/2022PLANNING COMMISSION AGENDA ______________________________________________ Tuesday, December 13, 2022 6:30 PM Diamond Bar City Hall – Windmill Community Room 21810 Copley Drive, Diamond Bar, CA 91765 PUBLIC ADVISORY: Consistent with State Assembly Bill 361, members of the Planning Commission may be present or participate telephonically. Members of the public are encouraged to participate and address the Planning Commission during the public comment portion of the meeti ng either in person or via teleconference. If you would like to attend the meeting in person, please note that face coverings are recommended. _______________________________________________________________________ ______________________________________________________________________ How to Observe the Meeting From Home: Members of the public can observe the meeting by calling +1 (631) 9 92-3221, Access Code: 836-269- 779 or visiting https://attendee.gotowebinar.com/register/4105641716891387995 . How to Submit Public Comment: The public may provide public comment by attending the meeting in person, by sending an email, or by logging into the teleconference. Please send email public comments to Planning@DiamondBarCA.gov by 5:00 p.m. on the day of the meeting and indicate in the Subject Line “FOR PUBLIC COMMENT.” Written comments will be distributed to the Planning Commission members and read into the record at the meeting, up to a maximum of five minutes. Alternatively, public comment may be submitted by logging onto the meeting through this link: https://attendee.gotowebinar.com/register/4105641716891387995 . Members of the public will be called upon one at a time during the Public Comment portion of the agenda. Speakers are limited to five minutes per agenda item, unless the Chairperson determines otherwise. American Disability Act Accommodations: Pursuant to the Executive Order, and in compliance with the Americans with Disabilities Act, if you need special assistance to participate in the Planning Commission Meeting, please contact the Community Development Office (909) 839-7030 within 72 hours of the meeting. Commission recordings will be available upon request the day following the Planning Commission Meeting. CHAIRPERSON RAYMOND WOLFE VICE CHAIRPERSON KENNETH MOK COMMISSIONER NAILA BARLAS COMMISSIONER MAHENDRA GARG COMMISSIONER WILLIAM RAWLINGS City of Diamond Bar Planning Commission MEETING RULES PUBLIC INPUT Members of the public may address the Planning Commission on any item of business on the agenda during the time the item is taken up by the Planning Commission. In addition, members of the public may, during the Public Comment period address the Planning Commission on any Consent Calendar item or any matter not on the agenda and within the Planning Commission’s subject matter jurisdiction. Any material to be submitted to the Planning Commission at the meeting should be submitted through the Minutes Secretary. Speakers are limited to five minutes per agenda item, unless the Chairperson determines otherwise. The Chairperson may adjust this time limit depending on the number of people wishing to speak, the complexity of the matter, the length of the agenda, the hour and any other relevant consideration. Speakers may address the Planning Commission only once on an agenda item, except during public hearings, when the applicant/appellant may be afforded a rebuttal. Public comments must be directed to the Planning Commission. Behavior that disrupts the orderly conduct of the meeting may result in the speaker being removed from the meeting. INFORMATION RELATING TO AGENDAS AND ACTIONS OF THE PLANNING COMMISSION Agendas for regular Planning Commission meetings are available 72 hours prior to the meeting and are posted in the City’s regular posting locations and on the City’s website at www.diamondbarca.gov. The Planning Commission may tak e action on any item listed on the agenda. Copies of staff reports or other written documentation relating to agenda items are on file in the Planning Division of the Community Development Department, located at 21810 Copley Drive, and are available for public inspection upon request. If you have questions regarding an agenda item, please call (909) 839-7030 during regular business hours. HELPFUL CONTACT INFORMATION Copies of Agenda, Rules of the Planning Commission, Recordings of Meetings (909) 839-7030 Email: info@diamondbarca.gov Website: www.diamondbarca.gov The City of Diamond Bar thanks you in advance for taking all precautions to prevent spreading the COVID-19 virus. CITY OF DIAMOND BAR PLANNING COMMISSION December 13, 2022 AGENDA Next Resolution No. 2022-21 CALL TO ORDER: 6:30 p.m. PLEDGE OF ALLEGIANCE: 1. ROLL CALL: COMMISSIONERS: Naila Barlas, Mahendra Garg, William Rawlings, Kenneth Mok, Vice Chairperson, Raymond Wolfe, Chairperson 2. APPROVAL OF AGENDA: Chairperson 3. PUBLIC COMMENTS: "Public Comments" is the time reserved on each regular meeting agenda to provide an opportunity for members of the public to directly address the Planning Commission on consent calendar items or other matters of interest not on the agenda that are within the subject matter jurisdiction of the Planning Commission. Although the Planning Commission values your comments, pursuant to the brown act, members of the Planning Commission or staff may briefly respond to public comments if necessary, but no extended d iscussion and no action on such matters may take place. There is a five -minute maximum time limit when addressing the Planning Commission. Please complete a speaker card and hand it to the Minutes Secretary (completion of this form is voluntary). The Planning Commission will call on in-person speakers first and then teleconference callers, one at a time to give their name and if there is an agenda item number they wish to speak on before providing their comment. If you wish to speak on a public hearing item or Planning Commission consideration item, you will then be called upon to speak at that point in the agenda. 4. CONSENT CALENDAR: The following items listed on the consent calendar are considered routine and are approved by a single motion. Consent calendar items may be removed from the agenda by request of the Planning Commission only: 4.1 Continued Use of Teleconferencing in accordance with Assembly Bill 361 for meetings of the Planning Commission subject to State Open Meeting Laws. 4.2 Minutes of the Planning Commission Regular Meeting – October 25, 2022. DECEMBER 13, 2022 PAGE 2 PLANNING COMMISSION 4.3 Minutes of the Planning Commission Regular Meeting – November 22, 2022. 5. OLD BUSINESS: None 6. NEW BUSINESS: None 7. PUBLIC HEARING(S): 7.1 Development Review - Planning Case No. PL2022-78 - : Under the authority of DBMC Section 22.48, the applicant and property owner is requesting Development Review approval to construct a new 2,743 square-foot, two-story single-family residence measuring approximately 27 feet high with 583 square-foot garage on an undeveloped 11,225 square- foot (0.26-acre) parcel on the north side of N. Diamond Bar Blvd., between Soltaire Street and Highland Valley Road. The subject property is zoned Low Density Residential (RL) with an underlying General Plan land use designation of Low Density Residential (RL). PROJECT ADDRESS: 1111 N. Diamond Bar Blvd. Diamond Bar, CA 91765 PROPERTY OWNER: James Chin Chou 1359 Bentley Court, West Covina, CA 91791 APPLICANT: Creative Design Associates 17528 Rowland Street, 2nd Floor City of Industry, CA 91748 ENVIRONMENAL DETERMINATION: The Project has been reviewed for compliance with the California Environmental Quality Act (CEQA). Ba sed on that assessment, the City has determined the project to be Categorically Exempt from the provisions of CEQA pursuant to Article 19 under Section 15303(a)(construction of a single-family residence) of the CEQA Guidelines. Therefore, no further environmental review is required. RECOMMENDATION: Staff recommends that the Planning Commission approve Development Review No. PL2022-78, based on the findings of Diamond Bar Municipal Code (DBMC) Section 22.48.040, subject to conditions of approval as listed within the draft resolution. 8. PLANNING COMMISSION COMMENTS / INFORMATIONAL ITEMS: 9. STAFF COMMENTS / INFORMATIONAL ITEMS: 10. SCHEDULE OF FUTURE EVENTS: CITY COUNCIL MEETING: Tuesday, December 20, 2022, 6:30 pm DECEMBER 13, 2022 PAGE 3 PLANNING COMMISSION South Coast Air Quality Management District 21865 Copley Drive Diamond Bar, CA CHRISTMAS HOLIDAY: Friday, December 23 and Monday December 26, 2022 In recognition of the holiday, City offices will be closed. City offices will re-open on Tuesday, December 27, 2022 PLANNING COMMISSION MEETING: Tuesday, December 27, 2022, 6:30 pm Windmill Community Room Diamond Bar City Hall 21810 Copley Drive Diamond Bar, CA NEW YEARS HOLIDAY: Monday, January 2, 2023 In recognition of the holiday, City offices will be closed. City offices will re-open on Tuesday, January 3, 2023 CITY COUNCIL MEETING: Tuesday, January 3, 2022, 6:30 pm South Coast Air Quality Management District 21865 Copley Drive Diamond Bar, CA PLANNING COMMISSION MEETING: Tuesday, January 10, 2023, 6:30 pm Windmill Community Room Diamond Bar City Hall 21810 Copley Drive Diamond Bar, CA CITY COUNCIL MEETING: Tuesday, January 17, 2023, 6:30 pm South Coast Air Quality Management District 21865 Copley Drive Diamond Bar, CA PLANNING COMMISSION AGENDA REPORT AGENDA ITEM NUMBER: 4.1 MEETING DATE: December 13, 2022 CASE/FILE NUMBER: Continued Use of Teleconferencing in Accordance with Assembly Bill 361 for Meetings of the Planning Commission Subject to State Open Meeting Laws. PROJECT LOCATION: Citywide SUBJECT: Continued use of teleconferencing in accordance with Assembly Bill 361 for meetings of the Planning Commission subject to State open meeting laws. BACKGROUND/ANALYSIS: The Ralph M. Brown Act (“Brown Act”) requires that all meetings of a legislative body of a local agency be open and public, that a physical location for such meetings be provided, and that the public be permitted to provide public comment during the meetings – with some exceptions as defined under the law. Due to the continued impact of the COVID-19 pandemic, the California Legislature passed Assembly Bill 361 (AB 361), which authorizes a local agency to use teleconferencing without complying with certain teleconferencing requirements impo sed by the Brown Act when: (1) the legislative body of a local agency holds a meeting during a declared state of emergency; (2) when state or local health officials have imposed or recommended measures to promote social distancing; and/or (3) when a local agency has determined that meeting in person would present imminent risks to the health or safety of attendees. The Planning Commission utilized the provisions of AB 361 on November 22, 2022. In order to continue to have the ability to use the modified teleconferencing options, AB 361 requires that the Planning Commission re-affirm its findings every 30 days. Conditions under which AB 361 may be utilized continue to exist as described in the CITY OF DIAMOND BAR ~ 21810 COPLEY DRIVE ~ DIAMOND BAR, CA 91765 ~ TEL. (909) 839-7030 ~ FAX (909) 861-3117 4.1 Packet Pg. 6 Continued Use of Teleconferencing in Accordance with Assembly Bill 361 for Meetings of the Planning Commissi on Subject to State Open Meeting Laws. Page 2 of 2 attached Resolution (Attachment A). The provisions of AB 3 61 allowing the modified teleconferencing will expire January 1, 2024. RECOMMENDATION: Adopt the attached Resolution (Attachment A), providing for continued use of teleconferencing and other formats as defined and in compliance with Assembly Bill 361 for meetings of the Planning Commission. PREPARED BY: REVIEWED BY: Attachments: A. Draft Resolution No. 2022-XX December 13, 2022 4.1 Packet Pg. 7 RESOLUTION NO. 2022-XX A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DIAMOND BAR, CALIFORNIA, MAKING SPECIFIED FINDINGS RELATING TO THE USE OF TELECONFERENCING IN ACCORDANCE WITH ASSEMBLY BILL 361 FOR MEETINGS OF THE PLANNING COMMISSION SUBJECT TO STATE OPEN MEETING LAWS. WHEREAS, on March 4, 2020, California Governor Newsom declared a State of Emergency in response to the COVID-19 pandemic; WHEREAS, on March 12, 2020, to address the impacts of COVID-19, Governor Newsom issued Executive Orders that required, among other things, residents of California to follow orders and guidance of local public health officials, including social distancing and masking requirements; WHEREAS, existing California law, the Ralph M. Brown Act (“Brown Act”) requires, with specified exceptions, that all meetings of a legislative body of a local agency, as those terms are defined, be open and public, that a physical location for such meetings be provided, and that the public be permitted to provide public comment during the meetings; WHEREAS, the Brown Act permits members of legislative bodies to teleconference into public meetings subject to certain conditions, including that the place from which the member teleconferences be open to the public , that an agenda be posted on the site, and that the teleconference location be noticed in the agenda; WHEREAS, in recognition that such public gatherings at such meetings could accelerate the spread of COVID-19, Governor Newsom’s Executive Orders suspended, among others, these Brown Act teleconferencing requirements to provide local agencies with greater flexibility to hold meetings via teleconferencing safely; WHEREAS, pursuant to the Emergency Services Act (Government Code sections 8550 et seq.), and Chapter 8.00 of Title 8 of the Diamond Bar Municipal Code, the City Council of the City of Diamond Bar has proclaimed the continued existence of a local emergency resulting from the COVID-19 pandemic; WHEREAS, as of September 30, 2021, the Governor’s Executive Order suspending the Brown Act’s teleconferencing requirements is set to expire; WHEREAS, on September 16, 2021, Governor Newsom signed Assembly Bill 361 (AB 361), which authorizes a local agency to continue to use teleconferencing without complying with certain teleconferencing requirements imposed by the Brown Act when: (1) the legislative body of a local agency holds a meeting during a declared state of emergency; (2) when state or local health officials have imposed or recommended measures to promote social distancing; and/or (3) when a local agency has determined that meeting in person would present imminent risks to the health or safety of attendees; 4.1.a Packet Pg. 8 2 PC Resolution No. 2022-XX WHEREAS, both Los Angeles County and state health officials continue to recommend social distancing due to a recent increase in COVID-19 cases believe to be caused by the so- call Omicron Variant; WHEREAS, the Planning Commission must approve a Resolution reaffirming that the requirements set forth in AB 361 exist every 30 days in order to allow members of its legislative bodies to utilize the provisions of AB 361 when attending public meetings via teleconferencing; and WHEREAS, notwithstanding that the City’s legislative bodies, as defined by the Brown Act, are now holding modified public meetings in person, there may be situations in which a member of one of these legislative bodies decides not to attend in person due to a particular health or safety risk posed by such attendance and as such, it is the Planning Commission’s desire to permit members of the Planning Commission to attend by way of teleconference pursuant to AB 361 due to health and safety concerns associated with COVID-19. NOW, THEREFORE, IT IS HEREBY RESOLVED by the Planning Commission of the City of Diamond Bar as follows: 1. That the above recitals are true and correct. and based thereon, that the spread and potential further spread of COVID-19 poses an imminent risk to the public health and safety. 2. That a state of emergency due to the COVID-19 pandemic continues to exist and at the time that this Resolution was adopted both Los Angeles County and State health officials are recommending social distancing to slow the spread of COVID-19. 3. That meeting in person may pose an imminent risk to the health and safety of some attendees, including members of the Planning Commission, who due to age, health conditions, or vaccination status, have a higher risk of contracting COVID-19 and are more likely to get severely ill and in some cases, die from COVID-19. 4. That during the effective period of this Resolution and any reaffirmation thereof, members of the Planning Commission may participate in meetings subject to the Brown Act by way of teleconference in accordance with AB 361. 5. That meetings shall be held in accordance with AB361 by, among other things, providing notice to the public how it can access the meeting and provide public comment, providing an opportunity for the public to attend via a call-in or an internet-based service option, conducing the meeting in a manner which protects the statutory and constitutional rights of the public, and stopping the meeting until public access is restored in the event of a service disruption. 4.1.a Packet Pg. 9 3 PC Resolution No. 2022-XX IT IS FURTHER RESOLVED that this Resolution is effective for 30 days from its adoption date and must be affirmed/acknowledged every 30 days by the Planning Commission of the City of Diamond Bar in order for the provisions of Assembly Bill 361 to continue to apply to teleconferencing by members of the Planning Commission. APPROVED AND ADOPTED THIS _____________, 2022, BY THE PLANNING COMMISSION OF THE CITY OF DIAMOND BAR. By: ______________________________________ Raymond Wolfe, Chairperson I, Greg Gubman, Planning Commission Secretary, do hereby certify that the foregoing Resolution was duly introduced, passed, and adopted, at a regular meeting of the Planning Commission held on the __________, 2022, by the following vote: AYES: Commissioners: NOES: Commissioners: ABSENT: Commissioners: ABSTAIN: Commissioners: ATTEST: ______________________________________ Greg Gubman, Secretary 4.1.a Packet Pg. 10 MINUTES OF THE CITY OF DIAMOND BAR REGULAR MEETING OF THE PLANNING COMMISSION OCTOBER 25, 2022 Consistent with State Assembly Bill 361, members of the Planning Commission participated in person and telephonically and Members of the public were encouraged to participate and address the Planning Commission during the public comment portion of the meet ing via teleconference. For those attending the meeting in person, face coverings were recommended. CALL TO ORDER: Chair/Wolfe called the meeting to order at 6:30 p.m. PLEDGE OF ALLEGIANCE: Vice Chairman Mok led the Pledge of Allegiance. ROLL CALL: Commissioners present: Naila Barlas, Vice-Chair Kenneth Mok and Chair Raymond Wolfe Absent: Commissioners Mahendra Garg and William Rawlings were excused. Staff Present : Greg Gubman, Community Development Director; James Eggart, Assistant City Attorney; Grace Lee, Senior Planner; Mayuko Nakajima, Associate Planner; and Stella Marquez, Administrative Coordinator. 2. APPROVAL OF AGENDA: Chair/Wolfe 3. PUBLIC COMMENTS: Willie Wang, Mt. SAC Journalism staff member, was present to gather information to write a paper about what is happening in the City of Diamond Bar. 4. CONSENT CALENDAR: 4.1 Continued Use of Teleconferencing in accordance with Assembly Bill 361 for meetings of the Planning Commission subject to State Open Meeting Laws. 4.2 Minutes of the Planning Commission Regular Meeting of September 13, 2022. 4.3 Minutes of the Planning Commission Regular Meeting of October 11, 2022. C/Barlas moved, VC/Mok seconded, to approve the Consent Calendar as presented with VC/Mok abstaining on Item 4.3. Motion carried by the following Roll Call vote 4.2 Packet Pg. 11 ________________________________________________________________________ OCTOBER 25, 2022 2 PLANNING COMMISSION ________________________________________________________________________ AYES: COMMISSIONERS: Barlas, VC/Mok, Chair/Wolfe NOES: COMMISSIONERS: None ABSENT: COMMISSIONERS: Garg, Rawlings 5. OLD BUSINESS: None 6. NEW BUSINESS: None 7. PUBLIC HEARING(S): 7.1 Municipal Code Amendment No. PL 2022-83: Amendment to the Diamond Bar Municipal Code by adding a new Section 5.08.050 (Short Term Rentals) to Title 5, and amending Section 22.80.020 (Definitions of Specialized Terms and Phrases) of Title 22 to clarify the existing prohibition on short-term rentals in residential neighborhoods. PROJECT ADDRESS: Citywide APPLICANT: Community Development Department AP/Nakajima presented staff’s report and recommended Planning Commission adoption of a Resolution recommending City Council approval of Municipal Code Amendment No. PL2022-83, based on the findings of Fact as listed within the Resolution. Chair/Wolfe opened the public hearing. With no one present who wished to speak on this item, Chair/Wolfe closed the public hearing. VC/Mok moved, C/Barlas seconded, to adopt a Resolution recommending City Council approval of Municipal Code Amendment No. PL2022-83, based on the Findings of Fact as listed within the Resolution. Motion carried by the following Roll Call vote: AYES: COMMISSIONERS: Barlas, VC/Mok, Chair/Wolfe NOES: COMMISSIONERS: None ABSENT: COMMISSIONERS: Garg, Rawlings 8. PLANNING COMMISSION COMMENTS/INFORMATION ITEMS: C/Barlas asked if City permits were required for ADU rentals and CDD/Gubman responded that once the permit has been issued for construction of an ADU and the unit has passed final inspection, homeowners are free to rent out the unit. 4.2 Packet Pg. 12 ________________________________________________________________________ OCTOBER 25, 2022 3 PLANNING COMMISSION ________________________________________________________________________ 9. STAFF COMMENTS/INFORMATIONAL ITEMS: CDD/Gubman announced that because there were no agenda items scheduled for November 8th, the meeting would be canceled. While there are agenda items scheduled for the November 22nd meeting, it falls during the holiday week, so he asked the Commissioners if they will be attending that meeting. Chair/Wolfe responded that he would be out of town that week. 10. SCHEDULE OF FUTURE EVENTS: As listed in the agenda. ADJOURNMENT: With no further business before the Planning Commission, Chair/Wolfe adjourned the Regular Planning Commission meeting at 6:43 p.m. The foregoing minutes are hereby approved this ____________________________, 2022. Attest: Respectfully Submitted, _______________________________________ Greg Gubman, Community Development Director _____________________________ Raymond Wolfe, Chairperson 4.2 Packet Pg. 13 MINUTES OF THE CITY OF DIAMOND BAR REGULAR MEETING OF THE PLANNING COMMISSION NOVEMBER 22, 2022 This meeting was conducted telephonically and members of the Planning Commission and City Staff participated via teleconference only. CALL TO ORDER: Chair/Wolfe called the meeting to order at 6:30 p.m. PLEDGE OF ALLEGIANCE: Vice Chairman Mok led the Pledge of Allegiance. ROLL CALL: Commissioners present: Naila Barlas, Mahendra Garg, Vice Chair Kenneth Mok and Chair Raymond Wolfe Absent: Commissioner William Rawlings was excused. Staff Present : Greg Gubman, Community Development Director; Grace Lee, Senior Planner; Stella Marquez, Administrative Coordinator. 2. APPROVAL OF AGENDA: Chair/Wolfe 3. PUBLIC COMMENTS: None 4. CONSENT CALENDAR: 4.1 Continued Use of Teleconferencing in accordance with Assembly Bill 361 for meetings of the Planning Commission subject to State Open Meeting Laws. VC/Mok moved, C/Barlas seconded, to approve the Consent Calendar as presented. Motion carried by the following Roll Call vote AYES: COMMISSIONERS: Barlas, Garg, VC/Mok, Chair/Wolfe NOES: COMMISSIONERS: None ABSENT: COMMISSIONERS: Rawlings 5. OLD BUSINESS: None 6. NEW BUSINESS: None 7. PUBLIC HEARING(S): None 8. PLANNING COMMISSION COMMENTS/INFORMATION ITEMS: VC/Mok said that while he was unable to attend the Veterans Day Celebration he heard that it was a well-attended and stellar event, wished everyone Happy Holidays 4.3 Packet Pg. 14 ________________________________________________________________________ NOVEMBER 22, 2022 2 PLANNING COMMISSION _______________________________________________________________________ and hoped to see everyone at the Windmill Lighting Ceremony on Sunday, December 4th at the Diamond Bar Towne Center. C/Garg said he looked forward to the Windmill Lighting Ceremony and reminded everyone they should arrive by 5:15 pm to witness the event. C/Barlas said she looked forward to the Windmill Lighting Ceremony and wished everyone a Happy Thanksgiving. Chair/Wolfe wished everyone a Happy Thanksgiving and looked forward to the Windmill Lighting event. 9. STAFF COMMENTS/INFORMATIONAL ITEMS: SP/Lee stated that the agenda item for the December 13th meeting is a Development Review for a new single family home at 1111 N. Diamond Bar Boulevard. CDD/Gubman wished everyone a Happy Thanksgiving on behalf of staff. 10. SCHEDULE OF FUTURE EVENTS: As listed in the agenda. ADJOURNMENT: With no further business before the Planning Commission, Chair/Wolfe adjourned the Regular Planning Commission meeting at 6:36 p.m. The foregoing minutes are hereby approved this ____________________________, 2022. Attest: Respectfully Submitted, _______________________________________ Greg Gubman, Community Development Director _____________________________ Raymond Wolfe, Chairperson 4.3 Packet Pg. 15 PLANNING COMMISSION AGENDA REPORT AGENDA ITEM NUMBER: 7.1 MEETING DATE: December 13, 2022 CASE/FILE NUMBER: Development Review (Planning Case No. PL2022-78) PROJECT LOCATION: 1111 N. Diamond Bar Blvd. GENERAL PLAN DESIGNATION: Low Density Residential (RL) ZONING DISTRICT: Low Density Residential (RL) PROPERTY OWNER: James Chin Chou, Trustee 1359 Bentley Court, West Covina, CA 91791 APPLICANT: Creative Design Associates, 17528 Rowland Street, 2nd Floor, City of Industry, CA 91748 SUMMARY: The applicant is proposing to construct a new 2,743 square -foot, two-story, single-family residence measuring approximately 27 feet high with a 583 square -foot two-car garage on an undeveloped 11,225 square-foot (0.26 acres) parcel located on the north side of N. Diamond Bar Boulevard, between Soltaire Street and Highland Valley Road. BACKGROUND: On September 15, 2020, the City Council approved the Zone Change to modify the previous zoning designation from Neighborhood Commercial (C-1) to Low Density Residential (RL). However, a concurrent Development Review application to construct a new 4,333 square-foot, two-story single-family residence was deemed disapproved because a motion to deny the application failed by a split 2 -2 vote (with one abstention). The stated reasons for the motion to deny were as follows: CITY OF DIAMOND BAR ~ 21810 COPLEY DRIVE ~ DIAMOND BAR, CA 91765 ~ TEL. (909) 839-7030 ~ FAX (909) 861-3117 7.1 Packet Pg. 16 Development Review (Planning Case No. PL2022-78) Page 2 of 13 • The design of the proposed single-family residence was not compatible with the surrounding neighborhood in terms of building scale, density and massing in that it was twice the size of the single -family homes across Diamond Bar Blvd. and even larger when compared to the townhomes lying to the north. • The design was not compatible in that the proposed contemporary architectural style is not utilized in the single -family neighborhood across Diamond Bar Blvd. or the townhomes just to the north, which architecture can be described as traditional, incorporating gabled and hipped roof forms. The meeting minutes of the City Council hearings are included as Attachments B and C. Previously Submitted Two-Story Residence (Facing Diamond Bar Blvd.) 7.1 Packet Pg. 17 Development Review (Planning Case No. PL2022-78) Page 3 of 13 Rendering of Previously Submitted Design (Rear Elevation) On August 23, 2022, the applicant submitted a new application and reduced the size and massing of the two-story single-family residence, and redesigned the architecture from a contemporary style with a shed roof to a more traditional Craftsman style with gable roofs. Site Characteristics The project site is on an 11,225 square -foot (0.26 acre) vacant and unimproved parcel located along the north side of N. Diamond Bar Boulevard, between Soltaire Street and Highland Valley Road, and adjacent to the State Route 57 (SR 57) freeway . The subject property is a trapezoidal parcel, within non-parallel front and rear property lines. The angled rear property line results in a lot depth that tapers along the westerly portion of the site. Furthermore, the topography of the site slopes from its highest point along the northeasterly boundary to the southwesterly boundary, resulting in a grade differential of approximately 10 feet, with the low point sitting slightly below the adjacent grade of north Diamond Bar Boulevard. Currently, the project site contains wild brush. There are no protected trees on site. 7.1 Packet Pg. 18 Development Review (Planning Case No. PL2022-78) Page 4 of 13 PROJECT DESCRIPTION As mentioned, the site has been redesigned with a new two-story, 2,743 square-foot, single-family residence, measuring approximately 27 feet high. Site entry will be located towards the northeasterly boundary of the property along N. Diamond Bar Boulevard by a new circular driveway with the entrance only accessible to westbound traffic due to a landscaped road median that inhibits direct access for eastbound traffic and the exit towards the middle of the property with right turn out only. The floor plan is comprised of the following components: PROJECT SUMMARY (square footage) Living Area o First Floor o Existing Second Floor 1,789 954 2,743 Two-Car Garage 583 Porch/Patio Areas o Front Porch 100 o Rear Patio 150 250 TOTAL FLOOR AREA 3,325 • The first level consists of a living room, kitchen, wok kitchen, pantry, dining room, powder room, two bedroom with bathroom, and an attached two-car garage. • The second level consists of a master bedroom and bedroom each with a bathroom. The two-story residence is accessed by one internal staircase. The height of the building is 26’-6”, measured from the finished grade to the highest point of the roofline. The building’s architectural design is a more traditional Craftsman style with gable roofs. The floor plan was designed in a long linear fashion to fit the trapezoidal parcel with windows facing the hills to the north. The architectural features utilize a variety of building materials such as stucco, fiber cement siding, and wood brackets to complement the surrounding neighborhood, different window surfaces, variable roof heights with asphalt shingle roofing, elongated eaves, and the incorporation of wood railing. The architectural design theme will be expressed on all sides of the building to provide a pleasing visual appearance from multiple vantage points. 7.1 Packet Pg. 19 Development Review (Planning Case No. PL2022-78) Page 5 of 13 Site and Surrounding General Plan, Zoning and Land Uses The following table provides the surrounding land uses located adjacent to the subject property. General Plan Designation Zoning District Land Use Site Low Density Residential (RL) Low Density Residential (RL) Vacant/Undeveloped North N/A N/A SR-57 (Freeway) South Low Density Residential (RL) RL Single-Family Residential (Across Diamond Bar Blvd.) East N/A N/A Drainage Easement Within Caltrans Right-of-Way West N/A N/A Caltrans Right-of-Way Site Aerial N PROJECT LOCATION RL Drainage Easement Caltrans R-O-W N. Diamond Bar Boulevard 7.1 Packet Pg. 20 Development Review (Planning Case No. PL2022-78) Page 6 of 13 Project Site – Facing Southeast on N. Diamond Bar Blvd. ANALYSIS: Review Authority (Diamond Bar Municipal Code (DBMC) Section 22.48) The proposed project requires Planning Commission review and approval of a Development Review (DR) application. The analysis that follows provides the basis for staff’s recommendation to approve the application. Development Review New construction of a single-family home requires Planning Commission approval of a Development Review application. The purpose of Development Review (DR) is to establish consistency with the General Plan through the promotion of high aesthetic and functional standards to complement and add to the economic, physical, and social character of the City. The process ensures that new development and intensification of existing development yields a pleasant living environment, and attracts the interest of residents and visitors as the result of consistent exemplary design. Development Standards: The following table compares the proposed project with the City’s development standards for residential development in the proposed RL zone. 7.1 Packet Pg. 21 Development Review (Planning Case No. PL2022-78) Page 7 of 13 * The rear setback is measured from the rear of the building to the edge of the graded pad when the pad abuts a descending slope. • Site and Grading Configuration: The site is an irregular, triangular shaped lot with a tapering lot depth that results from an angled rear property line. The existing site topography descends approximately 10 feet from the northeasterly to southwesterly property lines requiring approximately 28 cubic yards of cut, 181 cubic yards of fill, and 153 cubic yards of import to accommodate a leveled building pad. • Architectural Features, Colors, and Materials: The City’s Design Guidelines have been established to encourage a better compatible building and site design that improves the vital quality of the surro unding area through aesthetically pleasing site planning, building design, and architecture. In addition, a primary objective is to promote compatibility with adjacent uses to minimize any potential negative impacts. The project incorporates the principles of the City’s Residential Design Guidelines as follows: ➢ The architectural design accentuates simplicity of line and form as opposed to overly ornate or monumental features; Development Feature Development Standards Proposed Meets Requirements Minimum Lot Size 10,000 sq. ft. 11,225 sq. ft. Yes Building Front Setback 20 ft. 20 ft. Yes Side Setbacks 5 feet on one side and 10 feet on the other side 5’-11”– east side 75’-6”’– west side Yes Side Yard Minimum Between Adjoining Structures 15 feet 323’-10”– east side N/A – west side Yes Rear Setback* 20 feet 20 feet Yes Lot Coverage Maximum of 40% 23% Yes Maximum Building Height 35’-0” 26’-6” Yes Parking 2-car garage 2-car garage Yes 7.1 Packet Pg. 22 Development Review (Planning Case No. PL2022-78) Page 8 of 13 ➢ All elevations are architecturally treated and dwelling entries are articulate d through proper massing and detailed design elements; ➢ Fence and wall designs integrate with structures and setting, utilizing complementary styles, materials and colors; ➢ Landscaping is utilized to soften building lines and blend the structure with its environment, creating a transition between the hard vertical edges of the structure and the softer horizontal lines of the site; and ➢ Plant materials and arrangements emphasize the positive features of a site. Plant groupings are designed to highlight significant site features or man- made focal points such as gardens, patios and walkways. The scale and proportions of the proposed home are well balanced and appropriate for the site. The project massing has been reduced substantially from the previous design, and incorporates varied gable roof heights, movement along the street facing elevation, and elongated eaves. In addition, the building materials and color palette is more compatible with the character of the surrounding neighborhood. Proposed Two-Story Residence (Facing Diamond Bar Blvd.) 7.1 Packet Pg. 23 Development Review (Planning Case No. PL2022-78) Page 9 of 13 Landscaping: Effective landscape design should serve the dual purpose of intrinsically enhancing a project setting, as well as integrating the landscaping into the overall architectural design. A conceptua l landscape plan was submitted with the project plans. Enhanced landscaping will be installed throughout the site with trees, shrubs, and ground cover around the north, south, east, and west edges of the property. To soften the building’s edges, four 24-inch box Desert Museum palo verde trees, four 24-inch box crape myrtle trees, and four 36-box Emerald Wave sweet bay trees will be planted along N. Diamond Bar Boulevard , and four 36-box Emerald Wave sweet bay trees, and two 48 -inch box olive tree will be planted along the north (SR57 freeway side) rear property line. The site will be enclosed with a combination block wall and wood slat fencing above retaining wall, measuring up to six feet along the north (rear), east and west (side), and a portion of the south (front) property lines. Ornamental landscaping such as ground cover, shrubs, and trees will be installed along the periphery of the project site. The proposed plant palette is diverse, and the plant selections are compatible with the Southern Ca lifornia native landscapes. Overall, landscaping will be composed of drought tolerant and non - invasive species to minimize irrigation and reduce the area of turf and sod Rendering of Rear Elevation 7.1 Packet Pg. 24 Development Review (Planning Case No. PL2022-78) Page 10 of 13 ground cover planting. The project is required to comply with the City’s Water Efficient Landscaping Ordinance, and compliance will be verified during building plan check and final inspections. Compliance with Hillside Management Ordinance (DBMC Section 22.22) The proposed project was reviewed for compliance with the City’s Hillside Management Design Guidelines and regulations. The project complies with all of the regulations and guidelines to ensure that development will complement the character and topography of hillside areas set forth in the Development Code, and incorporates the following features: • Width of the building is oriented in the direction of the slope; • All proposed retaining walls are lower than the maximum exposed height of four feet; • Retaining wall heights will be visually mitigated with proposed landscaping and decorative block; • Architectural treatment is provided on all sides of the building with varying setbacks; • The maximum building height is 26’-6”, where 35 feet is allowed; and Conceptual Landscape Plan N 7.1 Packet Pg. 25 Development Review (Planning Case No. PL2022-78) Page 11 of 13 • Earth tone building materials and color schemes are used that blend in with the natural landscape. The project complies with all of the regulations and guidelines to ensure that development will complement the character and topography of hillside areas set forth in the Development Code. Compatibility With Neighborhood The proposed project will not negatively affect the existing surrounding land uses, and the design and appearance of the proposed redesign is more compatible with the surrounding community. The project has been redesigned to a more traditional Craftsman style of arch itecture with gable asphalt shingle roofs, vertical wood siding and warmer color palette compared to the previous contemporary California modern style with flat metal roofs and white stucco with dark horizontal siding. The massing of the building has been substantially reduced from the previous design. The previous design was 4,333 square feet with a three-car garage, whereas the proposed design is 2,743 square feet with two car garage. This is more compatible with the average size of the homes in the surrounding neighborhood of 2,078 square feet. In addition, the proposed structure will not have a negative impact to neighboring residents’ viewsheds since the property is located on a much lower pad level than surrounding properties. The existing single -family residences to the southeast are approximately 190 feet away and located on a higher building pad than the proposed building. The existing residences sit on a much higher-grade elevation. Therefore, the building will not significantly impact any private viewsheds enjoyed by these properties. The existing multi-family residences to the northeast are more than 320 feet away and located on a higher-grade elevation than the proposed building. The building pad of these residences sit slightly lower than the rooftop of the proposed building, but factoring the proposed building’s setback and lower pad elevation, the building is not anticipated to compromise the viewsheds enjoyed by surrounding properties. Overall, the proposed single-family residence is anticipated to be a more compatible addition to the surrounding area. Access and On-Site Circulation A traffic access study was submitted to analyze the reaction times and distances needed for motorists to safely exit the subject property, as well as for southbound motorists to react to vehicles entering and exiting the site; and evaluate on -site maneuverability for a variety of vehicle types to enter and exit the subject property in a safe manner. There are adequate stopping sight distances from the project driveway as well as for southbound motorists to react to vehicles accessing the site. 7.1 Packet Pg. 26 Development Review (Planning Case No. PL2022-78) Page 12 of 13 The circular driveway also allows vehicles to enter and exit the property in a more efficient manner. This design allows a variety of vehicle types such as waste h aulers and delivery trucks to access the property with greater ease by entering and exiting the site in a continuous forward maneuver, instead of reversing or making multiple point turns. Additional Review The Public Works/Engineering Department and Building and Safety Division reviewed this project and included their comments in the attached resolution as conditions of approval. NOTICE OF PUBLIC HEARING: Public hearing notices were mailed to property owners within a 1,000-foot radius of the project site, and the notice was published in the San Gabriel Valley Tribune newspaper on December 2, 2022. The project site was posted with a notice display board, and a copy of the public notice was posted at the City’s designated community posting sites. Public Comments Received At the time the staff report was published, staff had not received any comments from the public. ENVIRONMENTAL ASSESSMENT: This Project has been reviewed for compliance with the California Environmental Quality Act (CEQA). Based on that assessment, the City has determined the Project to be exempt from the CEQA under the CEQA Guidelines Section 15303(a)(construction of a new single-family residence). Therefore no further environmental review is required. PREPARED BY: REVIEWED BY: 7.1 Packet Pg. 27 Development Review (Planning Case No. PL2022-78) Page 13 of 13 Attachments: A. Draft Resolution No. 2022-XX B. CC Meeting Minutes of September 15, 2020 C. CC Meeting Minutes of October 6, 2020 D. Architectural, Conceptual Grading, and Landscape Plans Submitted October 27, 2022 E. Previous Architectural, Conceptual Grading, and L andscape Plans Submitted 2020 7.1 Packet Pg. 28 PLANNING COMMISSION RESOLUTION NO. 2022-XX A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DIAMOND BAR, CALIFORNIA, APPROVING DEVELOPMENT REVIEW NO. PL2022-78 TO CONSTRUCT A NEW 2,743 SQUARE-FOOT, TWO-STORY SINGLE-FAMILY RESIDENCE WITH AN ATTACHED 583 SQUARE-FOOT TWO-CAR GARAGE ON A 0.26 ACRE LOT LOCATED AT 1111 N. DIAMOND BAR BLVD., DIAMOND BAR, CA 91765 (APN 8706-008-013). A. RECITALS 1. The property owner, James Chin Chou (Trustee), and applicant, Creative Design Associates, have filed an application for Development Review to construct a new 2,743 square-foot, two-story single-family residence with an attached 583 square-foot two-car garage located at 1111 N. Diamond Bar Boulevard, Diamond Bar, County of Los Angeles, California (“Project Site”). 2. On December 1, 2022, public hearing notices were mailed to property owners within a 1,000-foot radius of the project site. On December 2, 2022, notification of the public hearing for this project was published in the San Gabriel Valley Tribune newspaper. A notice display board was posted at the site, and a copy of the notice was posted at the City's designated community posting sites. 3. On December 13, 2022, the Planning Commission of the City of Diamond Bar conducted a duly noticed public hearing, solicited testimony from all interested individuals, and concluded said hearing on that date. 4. The documents and materials constituting the administrative record of t he proceedings upon which the City’s decision is based are located at the City of Diamond Bar, Community Development Department, Planning Division, 21810 Copley Drive, Diamond Bar, CA 91765. B. RESOLUTION NOW, THEREFORE, it is found, determined and resolved by the Planning Commission of the City of Diamond Bar as follows: 1. The Planning Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct; and 2. The proposed Development Review on the Subject Property is categorically exempt from the California Environmental Quality Act (CEQA), as prescribed under CEQA Guidelines Section 15303(a) (construction of a new single-family residence). Therefore, no further environmental review is required. 7.1.a Packet Pg. 29 2 3. The Planning Commission hereby specifically finds and determines that, having considered the record as a whole including the findings set forth below, there is no evidence before this Planning Commission that the Proposed Project herein will have the potential of an adverse effect on wildlife resources or the habitat upon which the wildlife depends. Based upon substantial evidence, this Planning Commission hereby rebuts the presumption of adverse effects contained in Section 753.5(d) of Title 14 of the California Code of Regulations. C. FINDINGS OF FACT Based on the findings and conclusions set forth herein and as prescribed under Diamond Bar Municipal Code (DBMC) Section 22.48, this Planning Commission hereby recommends that the City Council make the following findings: Development Review Findings (DBMC Section 22.48.040) 1. The design and layout of the proposed development is consistent with the applicable elements of the City's General Plan, City Design Guidelines, and development standards of the applicable district, design guidelines, and architectural criteria for special areas (e.g., theme areas, specific plans, community plans, boulevards or planned developments). The design and layout of the proposed single-family residence consisting of 2,743 square feet of floor area and 583 square-foot, two-car garage area is consistent with the City’s General Plan, City Design Guidelines and development standards. The City’s General Plan Policy LU-P-56 requires that development on privately- owned, residentially designated land in hillside areas shall be compatible with the surrounding natural areas promoting design principles such as minimizing grading, preserving existing vistas, and incorporate site and architectural design that is sensitive to the hillsides. The design and layout of the building will be integrated within the existing topography of the site and will not visually impact the views of nearby properties. The proposed home will not have a negative impact to neighboring residences viewsheds since the property is located on a much lower pad level than nearby properties. The Project has been revised from the previous design by substantially reducing the size and massing of the two-story structure, and redesigning the architectural from a contemporary modern style with shed roof to a more traditional Craftsman style with gable roofs. The building’s architectural design accentuates simplicity of line and form, articulated through massing treatment and incorporates detailed design elements that complies with the City’s Design Guidelines where architectural design should accentuate simplicity of line and form, restrained and understated elegance, as opposed to the overly ornate or monumental [City’s Design Guidelines A. Site Planning (2) and B. Architecture (2)]. All elevations are architecturally treated and strongly articulated along the visible façade [City’s Design Guidelines B. Architecture (3)]. In addition, appropriate screening and integration of the home to the natural environment is accomplished by providing a variety of groundcover, shrubs, and trees throughout the site. 7.1.a Packet Pg. 30 3 The Project complies with all development standards of the Low Density Residential zoning district by meeting all development standards such as required setbacks, building height, and lot coverage. The project site is not part of any theme area, specific plan, community plan, boulevard or planned development. 2. The design and layout of the proposed development will not interfere with the use and enjoyment of neighboring existing or future development s, and will not create traffic or pedestrian hazards. The proposed single-family house will not interfere with the use and enjoyment of neighboring existing or future developments because the use will not significantly generate any traffic, parking, noise, lighting, view or other impacts onto surrounding residences and adjacent right-of-ways. In addition, no protected trees exist on site. The proposed single-family house will not interfere with vehicular or pedestrian movements, such as access or other functional requirements of a single -family home because it complies with the requirements for driveway widths and grades, exceeds the minimum number of off-street parking spaces, and the circular driveway design allows vehicles to enter and exit the property in a more efficient manner. 3. The architectural design of the proposed development is compatible with the character of the surrounding neighborhood and will maintain and enhance the harmonious, orderly and attractive development contemplated by Chapter 22.48: Development Review Standards, the City’s Design Guidelines, the City's General Plan, or any applicable specific plan. The proposed single family residence was redesigned and substantially reduced the size and massing of the two-story structure in a more traditional Craftsman style with gable roofs to be more compatible with the character of the surrounding neighborhood. The City’s General Plan Policy LU-P-56 requires that residential development be compatible with the prevailing character of the surrounding neighborhood in terms of building scale, density, massing, and design. The City’s General Plan Goal CC-G-4 also requires the preservation of the scale and character of existing residential neighborhoods and ensure sensitive transitions between densities and uses. The City’s Design Guidelines Architecture (1) requires compatibility with the surrounding character including harmonious building style, form, size, color, material and roofline. The proposed two story single family residence is comparable in mass and scale to the surrounding neighborhood. The building’s design theme is simple with incorporation of variable roof heights, movement along the street facing elevation, and utilization of different window surfaces, variable roof heights with asphalt shingle roofing, elongated eaves, and wood railing. The architectural design theme will be duplicated on all of the building’s elevations to provide a pleasing visual appearance form multiple vantage points. The Project minimizes negative impacts on nearby uses since the house will not block existing viewsheds from 7.1.a Packet Pg. 31 4 nearby properties. In sum, the Project fits the character of the neighborhood on which it is proposed. 4. The design of the proposed development will provide a desirable environment fo r its occupants and visiting public as well as its neighbors through good aesthetic use of materials, texture, color, and will remain aesthetically appealing. The design of the new single-family home is a more traditional Craftsman style of architecture. Variation in the building elements are achieved through the utilization of varying enhanced architectural features and building materials as discussed in the previous findings. The architectural features utilize a variety of building materials such as stucco, ledgestone and wood siding, metal roof, and cable railing. Also, landscaping is integrated into the site to complement the massing of the house and blend in with neighboring homes and the natural environment of the site in order to maintain a desirable environment. The scale and proportions of the proposed home are well balances and appropriate for the site. 5. The proposed development will not be detrimental to public health, safety or welfare or materially injurious (e.g., negative effect on property values or resale(s) of property) to the properties or improvements in the vicinity. Before the issuance of any City permits, the proposed project is required to comply with all conditions within the approved resolution, and the Building and Safety Division and Public Works Departments requirements. Through the permit and inspection process, the referenced agencies will ensure that the proposed project is not detrimental to the public health, safety or welfare or materially injurious to the properties or improvements in the vicinity. 6. The proposed project has been reviewed in compliance with th e provisions of the California Environmental Quality Act (CEQA). The proposed single family residence is categorially exempt from the California Environmental Quality Act (CEQA), as prescribed under CEQA Guidelines Section 15303(a) (construction of a new single-family residence). Therefore, no further environmental review is required. Based upon the findings and conclusion set forth above, the Planning Commission hereby recommends that the City Council approve Development Review, subject to the following conditions and the attached Standard Conditions of Approval: 1. Development shall substantially comply with the plans and documents presented to the Planning Commission at the public hearing. 2. Prior to building permit issuance, landscape and irrigation plans shall be reviewed and approved by the City’s Consulting Landscape Architect and shall comply with the updated Water Efficient Landscaping Ordinance. 7.1.a Packet Pg. 32 5 3. The property owner shall record a deed disclosure with the Los Angeles County Recorder’s Office informing future purchasers that the subject property is potentially located within an air quality sensitive receptor area due to its proximity to the SR 57 Freeway. The property owner shall submit a conformed copy of the recorded deed disclosure to the City prior to the issuance of building permits. 4. Standard Conditions. The applicant shall comply with the standard development conditions attached hereto. The Planning Commission shall: a. Certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 13th DAY OF DECEMBER 2022, BY THE PLANNING COMMISSION OF THE CITY OF DIAMOND BAR. By: ______________________________________ Raymond Wolfe, Chairman I, Greg Gubman, Planning Commission Secretary, do hereby certify that the foregoing Resolution was duly introduced, passed, and adopted, at a regular meeting of the Planning Commission held on the 13th day of December 2022, by the following vote: AYES: Commissioners: NOES: Commissioners: ABSENT: Commissioners: ABSTAIN: Commissioners: ATTEST: ___________________________ Greg Gubman, Secretary 7.1.a Packet Pg. 33 6 COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS RESIDENTIAL NEW STRUCTURE PROJECT #: Development Review No. PL2022-78 SUBJECT: To construct a new 2,743 square-foot, two-story single-family residence with an attached 573 square-foot two-car garage PROPERTY James Chin Chou (Trustee) OWNER: 1359 Bentley Court West Covina, CA 91791 APPLICANT: Creative Design Associates 17528 Rowland Street, 2nd Floor City of Industry, CA 91748 LOCATION: 1111 N. Diamond Bar Blvd., Diamond Bar, CA 91765 ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DIVISION AT (909) 839-7030, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. GENERAL REQUIREMENTS 1. The applicant shall defend, indemnify, and hold harmless the City, and its officers, agents and employees, from any claim, action, or proceeding to attack, set-aside, void or annul, the approval of Development Review No. PL2022-78 brought within the time period provided by Government Code Section 66499.37. In the event the city and/or its officers, agents and employees are made a party of any such action: (a) Applicant shall provide a defense to the City defendants or at the City's option reimburse the City its costs of defense, including reasonable attorneys fees, incurred in defense of such claims. 7.1.a Packet Pg. 34 7 (b) Applicant shall promptly pay any final judgment rendered against the City defendants. The City shall promptly notify the applicant of any claim, action of proceeding, and shall cooperate fully in the defense thereof. 2. This approval shall not be effective for any purpose until the applicant and owner of the property involved have filed, within twenty-one (21) days of approval of this Development Review No. PL2022-78, at the City of Diamond Bar Community Development Department, their affidavit stating that they are aware of and agree to accept all the conditions of this approval. Further, this approval shall not be effective until the applicants pay remaining City processing fees, school fees and fees for the review of submitted reports. 3. All designers, architects, engineers, and contractors associated with this project shall obtain a Diamond Bar Business License; and a zoning approval for those businesses located in Diamond Bar. 4. Signed copies of Planning Commission Resolution No. 2022-XX, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 5. Prior to the plan check, revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for Planning Division review and approval. 6. Prior to any use of the project site or business activity being commenced thereon, all conditions of approval shall be completed. 7. The project site shall be maintained and operated in full compliance with the conditions of approval and all laws, or other applicable regulations. 8. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and any applicable Specific Plan in effect at the time of building permit issuance. 9. All site, grading, landscape/irrigation, and roof plans, and elevation plans shall be coordinated for consistency prior to issuance of City permits (such as grading, tree removal, encroachment, building, etc.,) or approved use has commenced, whichever comes first. 10. The property owner/applicant shall remove the public hearing notice board within three days of this project's approval. 7.1.a Packet Pg. 35 8 11. The applicant shall comply with the requirements of City Planning, Building and Safety Divisions, Public Works Department, and the Fire Department. 12. Prior to issuance of building permits, the applicant shall record, and provide the City with a conformed recorded copy of, a Covenant and Agreement or similar document in a form approved by the City Attorney, which restricts the rental of rooms or other portions of the property under t wo or more separate agreements and prohibits use of the property as a boarding or rooming house, except to the extent otherwise permitted by the Diamond Bar Municipal Code or applicable state or federal law. B. FEES/DEPOSITS 1. Applicant shall pay development fees (including but not limited to Planning, Building and Safety Divisions, Public Works Department and Mitigation Monitoring) at the established rates, prior to issuance of building or grading permit (whichever comes first), as required by the City. School fees as required shall be paid prior to the issuance of building permit. In addition, the applicant shall pay all remaining prorated City project review and processing fees prior to issuance of grading or building permit, whichever comes first. 2. Prior to any plan check, all deposit accounts for the processing of this project shall have no deficits. C. TIME LIMITS 1. The approval of Development Review No. PL2022-78 expires within two years from the date of approval if the use has not been exercised as def ined per Diamond Bar Municipal Code (DBMC) Section 22.66.050 (b)(1). In accordance with DBMC Section 22.60.050(c), the applicant may request, in writing, a one-year time extension for Planning Commission consideration. Such a request must be submitted to the Planning Division prior to the expiration date and be accompanied by the review fee in accordance with the fee schedule in effect at the time of submittal. D. SITE DEVELOPMENT 1. This approval is to construct a new 2,743 square-foot, two-story single-family residence with an attached 583 square-foot two-car garage at 1111 N. Diamond Bar Blvd., as described in the staff report and depicted on the approved plans on file with the Planning Division, subject to the conditions listed herein, and the development code regulations. 2. The construction documents submitted for plan check shall be in substantial compliance with the architectural plans approved by the Planning Commission, as modified pursuant to the conditions below. If the plan check 7.1.a Packet Pg. 36 9 submittal is not in substantial compliance with the approved Development Review submittal, the plans may require further staff review and re-notification of the surrounding property owners, which may delay the project and entail additional fees. 3. To ensure compliance with the provisions of the Planning Commission approval, a final inspection is required from the Planning Division when work for any phase of the project has been completed. The applicant shall inform the Planning Division and schedule an appointment for such an inspection. 4. The above conditions shall run with the land a nd shall be binding upon all future owners, operators, or successors thereto of the property. Non - compliance with any condition of approval or mitigation measure imposed as a condition of the approval shall constitute a violation of the City’s Development Code. Violations may be enforced in accordance with the provisions of the Development Code. 5. Failure to comply with any of the conditions set forth above or as subsequently amended in writing by the City, may result in failure to obtain a building final and/or a certificate of occupancy until full compliance is reached. The City’s requirement for full compliance may require minor corrections and/or complete demolition of a non-compliant improvement, regardless of costs incurred where the project does not comply with design requirements and approvals that the applicant agreed to when permits were pulled to construct the project. 6. The project site shall be developed and maintained in substantial conformance with the approved plans submitted to, approved, and amended herein by the Planning Commission, on file with the Planning Division, the conditions contained herein, and the Development Code regulations. 7. All ground-mounted utility appurtenances such as transformers, air conditioning condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berms, and/or landscaping to the satisfaction of the Planning Division. 8. All roof-mounted equipment shall be screened from public view. 9. All structures, including walls, trash enclosures, canopies, etc., shall be maintained in a structurally sound, safe manner with a clean, orderly appearance. All graffiti shall be removed within 72 hours by the property owners/occupant. 10. No occupancy permit shall be granted until all improvements required by this approval have been properly constructed, inspected, and approved. 7.1.a Packet Pg. 37 10 11. Prior to issuance of a building permit, the location, size and screening of all building utility service connections, including water, gas, and electric service, fire service, and irrigation connections shall be approved by the Community Development Director. All changes to building utility connections shall be approved by the Community Development Director prior to construction. Building utility connections shall be located, sized and screened in such a manner that they have the least possible impact on the design of the building and site. The architect of record shall be directly involved in the design and placement of all site and building service connections and shall sign all plans submitted to the City which located, size and/or screen utility connections. 12. Additional plant materials may be required by the Community Development Director and shall be planted proper to final occupancy in order to screen utility connections, valves, backflow devices, and all above ground appurtenances, etc., to the satisfaction of the Community Development Director. This determination shall be made in the field after all screen utility connections, valves, backflow devices, and all above ground appurtenances, etc. have been installed and inspected. E. SOLID WASTE 1. The site shall be maintained in a condition, which is free of debris both during and after the construction, addition, or implementation of the entitlement approved herein. The removal of all trash, debris, and refuse, whether during or subsequent to construction shall be done only by the property owner, applicant or by a duly permitted waste contractor, who has been authorized by the City to provide collection, transportation, and disposal of solid waste from residential, commercial, construction, and industrial areas within the City. It shall be the applicant's obligation to ensure that the waste contractor used has obtained permits from the City of Diamond Bar to provide such services. 2. Mandatory solid waste disposal services shall be provided by the City franchised waste hauler to all parcels/lots or uses affected by approval of this project. APPLICANT SHALL CONTACT THE PUBLIC WORKS DEPARTMENT, (909) 839-7040, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. GENERAL 1. The mailbox shall be installed on the property so that daily mail trucks must enter the driveway to deliver mail. 2. The driveway shall be kept clear to allow daily mail delivery and any other scheduled delivery to access the property and maneuver appropriately to exit the property front-end first onto Diamond Bar Blvd. 7.1.a Packet Pg. 38 11 3. An Erosion Control Plan shall be submitted concurrently with the grading plan clearly detailing erosion control measures. These measures shall be implemented during construction. The erosion control plan shall conform to national Pollutant Discharge Elimination System (NPDES) standards and incorporate the appropriate Best Management Practices (BMP’s) as specified in the Storm Water BMP Certification. For construction activity which disturbs one acre or greater, a Storm Water Pollution Prevention Plan (SWPPP) will be needed. 4. Pursuant to NPDES Permit (CAS004001) for MS4 Discharges within the Coastal Watershed of Los Angeles County (Order No. R4-2012-0175), a new single-family hillside home development project shall include mitigation measures to: (i) Conserve natural areas; (ii) Protect slopes and channels; (iii) Provide storm drain system stenciling and signage; (iv) Divert roof runoff to vegetated areas before discharge unless the diversion would result in slope instability; and (v) Direct surface flow to vegetated areas before discharge, unless the diversion would result in slope instability. These mitigation measures shall be shown on the grading plan and implemented during construction. 5. Grading and construction activities and the transportation of equipment and materials and operation of heavy grading equipment shall be limited to between the hours of 7:00 a.m. and 5:00 p.m., Monday through Saturday. Dust generated by grading and construction activities shall be reduced by watering the soil prior to and during the activities and in accordance with South Coast Air Quality Management District Rule 402 and Rule 403. Reclaimed water shall be used whenever possible. Additionally, all construction equipment shall be properly muffled to reduce noise levels. B. SOILS REPORT/GRADING/RETAINING WALLS 1. Prior to or concurrent with grading plan submittal, a geotechnical report prepared by a Geotechnical Engineer, licensed by the State of California, shall be submitted by the applicant for approval by the City. 2. The applicant shall submit grading plans prepared by a Civil Engineer, licensed by the State of California, prepared in accordance with the City’s requirements for the City’s review and approval. A list of requirements for 7.1.a Packet Pg. 39 12 grading plan check is available from the Public Works Department. All grading (cut and fill) calculations shall be submitted to the City concurrently with the grading plan. 3. Finished slopes shall conform to City Code Section 22.22.080-Grading. 4. All easements and flood hazard areas shall be clearly identified on the grading plan. 5. The grading plan shall show the location of any retaining walls and the elevations of the top of wall/footing/retaining and the finished grade on both sides of the retaining wall. Construction details for retaining walls shall be shown on the grading plan. Calculations and details of retaining walls shall be submitted to the Building and Safety Division for review and approval. 6. All equipment staging areas shall be located on the project site. Staging area, including material stockpile and equipment storage area, shall be enclosed within a six foot-high chain link fence. All access points in the defense shall be locked whenever the construction site is not supervised. 7. Grading of the subject property shall be in accordance with the California Building Code, City Grading Ordinance, Hillside Management Ordinance and acceptable grading practices. 8. The maximum grade of driveways serving building pad areas shall be 15 percent. Driveways with a slope of 15 percent shall incorporate grooves for traction into the construction as required by the City Engineer. 9. All slopes shall be seeded per landscape plan and/or fuel modification plan with native grasses or planted with ground cover, shrubs, and trees for erosion control upon completion of grading or some other alternative method of erosion control shall be completed to the satisfaction of the City Engineer and a permanent irrigation system shall be installed. 10. A pre-construction meeting shall be held at the project site with the grading contractor, applicant, and city grading inspector at least 48 hours prior to commencing grading operations. 11. Rough grade certification by project soils and civil engineers and the as- graded geotechnical report shall be submitted for review and approval prior to issuance of building permits for the foundation of the residential structure. Retaining wall permits may be issued without a rough grade certificate. 12. Final grade certifications by project soils and civil engineers shall be submitted to the Public Works Department prior to the issuance of any project final inspections/certificate of occupancy, respectively. 7.1.a Packet Pg. 40 13 C. DRAINAGE 1. Detailed drainage system information of the lot with careful attention to any flood hazard area shall be submitted. All drainage/runoff from the development shall be conveyed from the site to the natural drainage course. No on-site drainage shall be conveyed to adjacent parcels, unless that is the natural drainage course. 2. Prior to the issuance of a grading permit, a complete hydrology and hydraulic study shall be prepared by a Civil Engineer registered in the State of California to the satisfaction of the City Engineer and Los Angeles Public Works Department. D. OFF-SITE STREET IMPROVEMENTS 1. All public improvements shall be approved by the City Engineer, constructed with an encroachment permit issued by the Public Works Department, and completed prior to final inspection/certificate of occupancy issuance. 2. All driveway approaches shall be constructed in accordance with current American Public Works Association (APWA) standard plan 110-2 Type C. 3. All public drive approaches and sidewalks shall be constructed with a minimum of 2500 PSI concrete. 4. The applicant shall replace and record any centerline ties and monuments that are removed as part of this construction with the Los Angeles County Public Works Survey Division. E. UTILITIES 1. Easements, satisfactory to the City Engineer and the utility companies, for public utility and public service purposes shall be offered and shown on the detailed site plan for dedication to the City or affected utility company. 2. Will Serve Letters from all utilities such as, but not limited to, phone, gas, water, electric, and cable, shall be submitted to the City stating that adequate facilities are or will be available to serve the proposed project. 3. Applicant shall relocate and underground any existing onsite utilities to the satisfaction of the City Engineer and the respective utility owner. 4. Underground utilities shall not be constructed within the drop line of any mature tree except as approved by a registered arborist. 7.1.a Packet Pg. 41 14 F. SEWERS/SEPTIC TANK 1. Applicant shall obtain connection permit(s) from the City and County Sanitation District prior to issuance of building permits. 2. Applicant, at applicant’s sole cost and expense, shall construct the sewer system in accordance with the City, Los Angeles Coun ty Public Works Division. Sewer plans shall be submitted to the Building and Safety Division for review and approval by the City. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION, (909) 839-7020, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. GENERAL CONDITIONS 1. At the time of plan check submittal, plans and construction shall conform to current State and Local Building Code requirements and all other applicable construction codes, ordinances and regulations in effect. 2. Provisions for CAL Green shall be implemented onto plans and certification shall be provided by a third party as required by the Building Division. Specific water, waste, low VOC, and related conservation measures shall be shown on plans. Construction shall conform to the current CAL Green Code. B. PLAN CHECK – ITEMS TO BE ADDRESSED PRIOR TO PLAN APPROVAL 1. The minimum design load for wind in this area is 110 M.P.H. exposures “C” and the site is within seismic zone D or E. The applicant shall submit drawings and calculations prepared by a California State licensed Architect/Engineer with wet stamp and signature. 2. This project shall comply with the energy conservation requirements of the State of California Energy Commission. All lighting shall be high efficacy or equivalent per the current California Energy Code 119 and 150(k). 3. Indoor air quality shall be provided consistent with ASHRAE 62.2 as required per California Energy Code 150(o). 4. Public Works/Engineering Department is required to review and approve grading plans that clearly show all finish elevations, drainage, and retaining wall(s) locations. These plans shall be consistent with the site plan submitted to the Building and Safety Division. 5. “Separate permits are required for BBQ area, retaining walls, fences over six feet in height, and fireplace” and shall be noted on plans. 7.1.a Packet Pg. 42 15 6. All easements shall be shown on the site plan. 7. All retaining walls shall be separately submitted to the Building and Safety and Public Works/Engineering Departments for review and approval. 8. A soils report is required per CBC 1803 and all recommendations of the soils report shall be adhered to. 9. Slope setbacks shall be consistent with California Building Code Figure 1805.3.1 and California Residential Code R403.1.7. Foundations sha ll provide a minimum distance to daylight. 10. Design for future electric vehicle charging shall be provided consistent with CALGreen 4.106.4. 11. New single family dwellings shall have solar panels installed in conformance with CA Energy Code 150.1(c)14. C. PERMIT – ITEMS REQUIRED PRIOR TO BUILDING PERMIT ISSUANCE 1. Solid waste management of construction material shall incorporate recycling material collection per Diamond Bar Municipal Code 8.16 of Title 8. The contractor shall complete all required forms and pay applicable deposits prior to permit. 2. Prior to building permit issuance, all school district fees shall be paid. Please obtain a form from the Building and Safety Division to take directly to the school district. 3. Submit grading plans clearly showing all finish elevations, drainage, and retaining wall locations. No building permits shall be issued prior to submitting a pad certification. 4. Sewer connections require sewer connection fees and approval from the County Sanitation District. 5. All workers on the job shall be covered by workman’s compensation insurance under a licensed general contractor. Any changes to the contractor shall be updated on the building permit. D. CONSTRUCTION – CONDITIONS REQUIRED DURING CONSTRUCTION 1. Fire sprinklers are required for new single family dwellings (CRC R313.2). Sprinklers shall be approved by LA County Fire Department prior to installation and shall be inspected at framing stage and finalization of construction. 7.1.a Packet Pg. 43 16 2. Occupancy of the facilities shall not commence until all California Building Code and State Fire Marshal regulations have been met. The buildings shall be inspected for compliance prior to occupancy. 3. Every permit issued by the building official under the provisions of this Code shall expire and become null and void unless the work authorized by such permit is commenced within one-hundred-eighty (180) days after permit issuance, and if a successful inspection has not been obtained from the building official within one-hundred-eighty (180) days from the date of permit issuance or the last successful inspection. A successful inspection shall mean a documented passed inspection by the city building inspector as outlined in Section 110.6. 4. All structures and property shall be maintained in a safe and clean manner during construction. The property shall be free of debris, trash, and weeds. 5. All equipment staging areas shall be maintained in an orderly manne r and screened behind a minimum 6-foot high fence. 6. A height and setback survey may be required at completion of framing and foundation construction phases respectively. 7. The project shall be protected by a construction fence to the satisfaction of the Building Official, and shall comply with the NPDES & BMP requirements (sand bags, etc.). All fencing shall be view obstructing with opaque surfaces. 8. The applicant shall contact Dig Alert and have underground utility locations marked by the utility companies prior to any excavation. Contact Dig Alert by dialing 811 or their website at www.digalert.org. 9. The applicant shall first request and secure approval from the City for any changes or deviations from approved plans prior to proceeding with any work in accordance with such changes or deviations. 10. All glazing in hazardous locations shall be labeled as safety glass. The labeling shall be visible for inspection. 11. Pursuant to California Residential Code (CRC) Section R315, carbon monoxide detectors are required in halls leading to sleeping rooms. 12. Drainage patterns shall match the approved grading/drainage plan from the Public Works/Engineering Department. Surface water shall drain away from the building at a 2% minimum slope. The final as -built conditions shall match the grading/drainage plan or otherwise approved as -built grading/drainage plan. 7.1.a Packet Pg. 44 17 13. Special inspections and structural observation will be required in conformance with CBC 1704 to 1709. County of Los Angeles Fire Department (909) 620-2402 – 1. Submit two sets of Architectural Drawings when ready for plan check with the following information: • Show all existing public fire hydrants on the site plan. Include the location of all public fire hydrants within 600 feet of the lot frontage on both sides of the street. Specify size of fire hydrant(s) and dimension(s) to property lines. Additional fire hydrant requirements may be necessary after this information is provided. • A minimum five-foot wide approved firefighter access walkway leading from the fire department access road to all required openings in the building’s exterior walls shall be provided for firefighting and rescue purposes. Fire Code 504.1. 2. The applicant is required to have the Information of Fire Flow Availability for Building Permit (Form 195) completed by the Water Purveyor. 3. All development shall be constructed with adequate water supply and pressure for all proposed development in compliance with standards established by the fire marshal. END 7.1.a Packet Pg. 45 CITY OF DIAMOND BAR MINUTES OF THE CITY COUNCIL REGULAR MEETING SEPTEMBER 15, 2020 CALL TO ORDER: Mayor Tye called the Regular City Council meeting to order at 6:45 p.m. Mayor Tye stated that consistent with COVID-19 regulations, all Council Members and staff are participating via teleconference and there is no physical location for public attendance. The Public has been invited to join the meeting online or by phone at the numbers printed on the agenda. PLEDGE OF ALLEGIANCE: Mayor Tye led the Pledge of Allegiance. ROLL CALL: Council Members Ruth Low, Jennifer "Fred" Mahlke, Mayor Pro Tern Nancy Lyons, and Mayor Steve Tye Absent: Council Member Andrew Chou Staff participating telephonically: Dan Fox, City Manager; Dave DeBerry, City Manager; Ryan McLean, Assistant City Manager; Anthony Santos, Assistant to the City Manager; Ryan Wright, Parks and Recreation Manager; David Liu, Public Works Director; Hal Ghafari, Public Works Manager/Assistant City Engineer; Fabian Aoun, Assistant Engineer; Greg Gubman, Community Development Director; Grace Lee, Senior Planner; Dianna Honeywell, Director of Finance, Amy Haug, Human Resources and Risk Manager; Ken Desforges, Director of Information Services; Marsha Roa, Public Information Manager; Cecilia Arellano, Public Information Coordinator; Christy Murphey, Recreation Superintendent; Raymond Tao, Building Official; Robin Crawford, Administrative Assistant; Kristina Santana, City Clerk APPROVAL OF AGENDA: As submitted. 1. SPECIAL PRESENTATIONS, CERTIFICATES, PROCLAMATIONS: 1.1 Regional Chamber of Commerce — San Gabriel Valley Annual Report — Continued to the Council Meeting of October 6, 2020. 2. CITY MANAGER REPORTS AND RECOMMENDATIONS: CM/Fox invited residents to participate in one of two virtual information meetings regarding the November 3, 2020 sales tax Measure DB. 3. PUBLIC COMMENTS: CC/Santana read the following comments submitted via email: Raphael Plunkett thanked those who participated in the anti -hate caravan event. Beth Pelaez commented on and expressed opposition to Proposition 16. 7.1.b Packet Pg. 46 SEPTEMBER 15, 2020 PAGE 2 CITY COUNCIL Public Comments provided during the meeting: Jacob Wolak, Field Representative/Staff Assistant for Congressman Cisneros, updated Council on the Congressman's legislative activities. 4. CONSENT CALENDAR: MPT/Lyons moved, C/Low seconded, to approve the Consent Calendar with the exception of Item 4.5 pulled by Mayor Tye. Motion carried by the following Roll Call vote: AYES: COUNCIL MEMBERS: Low, Mahlke, MPT/Lyons, M/Tye NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: Chou 4.1 APPROVED UPDATED REDLINED CITY COUNCIL MINUTES: 3.1a SEPTEMBER 1, 2020 REGULAR MEETING. 4.2 RATIFIED CHECK REGISTER DATED AUGUST 27, 2020 THROUGH SEPTEMBER 9, 2020 TOTALING $507,197.62. 4.3 APPROVED AGREEMENT WITH THE REGIONAL CHAMBER OF COMMERCE-SAN GABRIEL VALLEY FOR BUSINESS SUPPORT SERVICES THROUGH JUNE, 2021. 4.4 ADOPTED RESOLUTION NO. 2020-39 AMENDING THE CITY'S CONFLICT OF INTEREST CODE FOR DESIGNATED CITY PERSONNEL. ITEMS WITHDRAWN FROM CONSENT CALENDAR: 4.5 AUTHORIZED SUPPORT FOR LEAGUE OF CALIFORNIA CITIES RESOLUTION AT THE 2020 ANNUAL CONFERENCE. M/Tye asked what this resolution means. CM/Fox responded that the resolution is asking Congress to make amendments to regulations related to the Communications Decency Act that would require social media companies to remove materials which promote criminal activities. M/Tye moved, C/Low seconded, to authorize support for League of California Cities Resolution at the 2020 annual conference. AYES: COUNCIL MEMBERS: Low, Mahlke, MPT/Lyons, M/Tye NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: Chou 7.1.b Packet Pg. 47 SEPTEMBER 15, 2020 PAGE 3 CITY COUNCIL 5. PUBLIC HEARING(S): 5.1 ZONE CHANGE AND DEVELOPMENT REVIEW FOR NEW SINGLE FAMILY RESIDENCE LOCATED AT 1111 N. DIAMOND BAR BOULEVARD, DIAMOND BAR (PLANNING CASE NO. PL2015-253.) SP/Lee presented staffs report. M/Tye opened the Public Hearing. Douglas Barcon suggested Council read the public comment he submitted by email and expressed opposition to this project. CC/Santana read email comments from the following: Adrienne Cotterell opposed the project and rezoning of the property. Her concerns included property access, poor air quality, and how the property will be used and maintained. Susan Mullins opposed the project due to adverse impacts to the residents based on a flawed traffic report and disregard for safety, the loss of natural habitat, improper use of the property, and health hazards during construction. Gerardo Ramirez was concerned about delivery and service companies parking on the street or backing out onto Diamond Bar Boulevard if the driveway is blocked. Robin Smith commented on land speculation and expressed opposition to this project. Chieh Hsu opposed the project due to traffic concerns as well as, noise and air pollution, health concerns, and concerns that this property will be developed for uses other than residential purposes such as a party house rental or short term rental property. Ken Lee, property owner's representative, reiterated that this has been a long journey for the owner and applicant who have been responsive to community concerns by twice redesigning the project. The Planning Commission did its due diligence with regard to traffic and safety and held to its 4-1 approval. Mr. Lee urged the City Council to please support and approve the project tonight. M/Tye closed the Public Hearing. MPT/Lyons asked staff to address comments that the traffic study should have been done at 60 mph and not 50 mph. SP/Lee responded that the Planning Commission requested a traffic access study and the study 7.1.b Packet Pg. 48 SEPTEMBER 15, 2020 PAGE 4 CITY COUNCIL evaluated the speed at 50 mph for a vehicle traveling southbound on Diamond Bar Boulevard in accordance with industry standards. There were comments that the study should consider speeds as high as 65 and 70 mph. In this case, the applicant's traffic engineer has reviewed the study and stated there will be adequate sight distance for vehicles traveling at 75 mph to react to a vehicle exiting the project driveway. MPT/Lyons commented that according to the Development Review, in every category the application has met the requirements and she agrees that the proposed project is a much better design and idea than a commercial project. C/Low asked staff to comment on the zoning according to the maps. SP/Lee responded that the current adopted General Plan land use designation is RL which is Low Density Residential. The previous designation was multi -family medium density residential and as part of the General Plan update, the intensity was lowered to Low Density Residential RL), the current General Plan use designation. The current zoning designation is Neighborhood Commercial (C-1) and the proposal proposes to change that to match the current RL designation by changing the zoning to RL for consistency between the General Plan and the Zoning Map. C/Low asked if there was a crosswalk or signal at the Soltaire/Diamond Bar Boulevard intersection and SP/Lee responded that the intersection is not signalized and there is no crosswalk. M/Tye stated that Soltaire is an access only into the neighborhood south of Temple Avenue and east of Diamond Bar Boulevard. C/Low suggested that a "no pedestrian traffic" sign be placed at the Soltaire/Diamond Bar Boulevard intersection. PWD/Liu responded to C/Low that if requested, staff would conduct a field investigation to determine an appropriate recommendation specific to a "no pedestrian crossing" at this un-signalized intersection. C/Low asked for confirmation that this project meets all of the development standards and that proper notices were provided. SP/Lee responded that the project met all development standards and that notices were mailed to all property owners within 1,000 feet of the project site. M/Tye said he expressed his concerns prior to returning this to the Planning Commission for further consideration and still believes the project is too close to Diamond Bar Boulevard and that due to its scale and character, does not fit in the neighborhood of smaller residential dwellings and condos. To C/Low's point, there is parking on both sides of Soltaire and he can see people parking on Soltaire and jaywalking across Diamond Bar Boulevard because there is no parking on Diamond Bar Boulevard. 7.1.b Packet Pg. 49 SEPTEMBER 15, 2020 PAGE 5 CITY COUNCIL MPT/Lyons said she believes in the rights of the property owner who has met all of the development standards. C/Mahlke felt the project was consistent with the land use designation and while certain things are afforded the property owner, to M/Tye's point, scale and character can and should be considered. CA/DeBerry agreed with C/Mahlke's comments. Under state law, the City is required to make the General Plan designation and the zoning designation consistent. If there was any thought of not approving the zone change, the Council would need to direct staff to come back with a different General Plan or zoning designation. As SP/Lee mentioned, the General Plan was reviewed on this property in December when the density was lowered to the lower residential density and Council has discretion on the design review based on the findings needed to determine whether or not the project meets those standards. The property meets the objective development standards and while scale and character can be considered, what is not proper for consideration is who will live in the house, whether someone will buy it or whether the property should have been sold or not, or whether the City should buy the property. MPT/Lyons moved, C/Mahlke seconded, to approve for First Reading by title only, waive full reading of Ordinance No. 01 (2020) adopting Zone Change to modify the existing zoning from Neighborhood Commercial (C- 1) to Low Density Residential (RL), and schedule the Second Reading for the October 6, 2020 City Council meeting. Motion carried by the following Roll Call vote: AYES: COUNCIL MEMBERS NOES: COUNCIL MEMBERS ABSENT: COUNCIL MEMBERS Low, Mahlke, MPT/Lyons, M/Tye None Chou M/Tye moved to deny the Development Review application. Motion died for lack of a second. MPT/Lyons moved, C/Low seconded, to adopt Resolution 2020-40 approving the Development Review application based on the Findings of Fact, and subject to the Conditions of Approval contained therein. Motion failed by the following Roll Call vote: AYES: COUNCIL MEMBERS: Low, MPT/Lyons NOES: COUNCIL MEMBERS: Mahlke, M/Tye ABSENT: COUNCIL MEMBERS: Chou C/Mahlke based her no vote on "scale and character", and M/Tye based his no vote on "out of character with the neighborhood". 7.1.b Packet Pg. 50 SEPTEMBER 15, 2020 PAGE 6 CITY COUNCIL CA/DeBerry stated that if this item did not have a zone change it could have been approved by the Planning Commission. However, the zoning code says that when there is an application that seeks a change that must be approved by the City Council, both must be approved by the City Council. In this case, the zone change is approved and with a 2-2 vote, the permit development review is not approved. CA/DeBerry responded to M/Tye that if the applicant wished to submit a design that fits with the neighborhood, they would have to go back and redesign the project and resubmit it to the Planning Commission. Under the code, a project that is substantially similar to the previous project has to wait a year for submission and it would be for staff to determine whether the new project was substantially similar to the old project. Certainly, the City Council could give direction to the applicant accordingly. M/Tye said he would not be in favor of requiring the applicant to wait a year. CDD/Gubman stated that the Development Code gives the Community Development Director the authority to make the determination whether or not a resubmitted project is substantially similar. When reviewing what is resubmitted and hearing tonight's findings the City Council indicating it based its denial on the project being out of character with the surrounding neighborhood due to scale, meaning a project that is smaller with reduced mass, bulk and scale, he believes that with Council's deliberations, he has sufficient direction to make that determination. COUNCIL CONSIDERATION: 6.1 FIRST READING OF ORDINANCE NO. 02-(2020) AMENDING TITLE 15 OF THE DIAMOND BAR MUNICIPAL CODE TO ADOPT, BY REFERENCE, TITLE 32 FIRE CODE OF THE LOS ANGELES COUNTY CODE, AS AMENDED, WHICH CONSTITUTES AN AMENDED VERSION OF THE CALIFORNIA FIRE CODE, 2019 EDITION. Contract BO/Tao presented staff's report. C/Mahlke moved, C/Low seconded to adopt for First Reading Ordinance No. 02-(2020) amending Title 15 of the Diamond Bar Municipal Code to adopt, by reference, Title 32 Fire Code of the Los Angeles County Code, as amended, which constitutes an amended version of the California Fire Code, 2019 Edition. Motion carried by the following Roll Call vote: AYES: COUNCIL MEMBERS NOES: COUNCIL MEMBERS ABSENT: COUNCIL MEMBERS Low, Mahlke, MPT/Lyons, M/Tye None Chou 6. COUNCIL SUBCOMMITTEE REPORTS AND MEETING ATTENDANCE 7.1.b Packet Pg. 51 SEPTEMBER 15, 2020 PAGE 7 CITY COUNCIL REPORTS/COUNCIL MEMBER COMMENTS: C/Mahlke was proud to participate in the Anti -Hate caravan and thanked the community for their participation. She invited everyone to Rainbow Donuts in the Albertson's Center on Saturday morning at 10:00 a.m. to write well -wishes to the deputies who were shot in Compton. C/Low concurred with C/Mahlke's comments and added that the LA County Board of Supervisors introduced a motion to offer a $100,000 reward for apprehension of the perpetrator(s). She thanked staff for their work on Item 5.1 and reminded everyone that the final Council Women's class on proposed propositions would be held on Wednesday, September 30tn MPT/Lyons agreed that all residents were repulsed by the shooting of the LA Deputies and is pleased about the reward being offered. She is also pleased that the recovery grant program is moving forward with staffs' assistance and that the Parks and Rec staff is working hard to provide fun activities for the community. Restaurant Week 2020 is October 2"d through the 18t" and all 100 community restaurants will participate. M/Tye spoke about the LA Deputy shooting, said he was proud of California Contract Cities for reaching out to every City to contribute to the reward for capture of those involved in the assault and hoped Diamond Bar would participate. M/Tye spoke about the life and service of Daniel Holloway. ADJOURNMENT: With no further business to conduct, M/Tye adjourned the Regular City Council Meeting at 8:27 p.m. in memory of La Puente Council Member Daniel Holloway. Respectfully submitted: Kristina Santana, City Clerk The foregoing minutes are hereby approved this 6t" day of October, 2020. tr1j) L Steve Tye, May r 7.1.b Packet Pg. 52 CITY OF DIAMOND BAR MINUTES OF THE CITY COUNCIL REGULAR MEETING OCTOBER 6, 2020 CALL TO ORDER: Mayor Tye called the Regular City Council meeting to order at 6:30 p.m. Mayor Tye stated that consistent with COVID-19 regulations, all Council Members and staff were participating via teleconference and there was no physical location for public attendance. The Public was invited to join the meeting online or by phone at the numbers printed on the agenda. PLEDGE OF ALLEGIANCE: Mayor Tye led the Pledge of Allegiance. ROLL CALL: Council Members Andrew Chou, Ruth Low, Jennifer Fred" Mahlke, Mayor Pro Tern Nancy Lyons, and Mayor Steve Tye Staff participating telephonically: Dan Fox, City Manager; Dave DeBerry, City Attorney; Ryan McLean, Assistant City Manager; Anthony Santos, Assistant to the City Manager; Dannette Allen, Senior Management Analyst; Ryan Wright, Parks and Recreation Manager; David Liu, Public Works Director; Hal Ghafari, Public Works Manager/Assistant City Engineer; Greg Gubman, Community Development Director; Grace Lee, Senior Planner; Dianna Honeywell, Finance Director; Amy Haug, Human Resources and Risk Manager; Ken Desforges, Information Systems Director; Marsha Roa, Public Information Manager; Cecilia Arellano, Public Information Coordinator; Raymond Tao, Building Official; and, Kristina Santana, City Clerk APPROVAL OF AGENDA: As submitted. 1. SPECIAL PRESENTATIONS, CERTIFICATES, PROCLAMATIONS: 1.1 Regional Chamber of Commerce — San Gabriel Valley Annual Report — Canceled — future date to be determined 1.2 Diamond Bar Restaurant Week Video Presentation 2. CITY MANAGER REPORTS AND RECOMMENDATIONS: CM/Fox invited residents to participate in one of two virtual information meetings regarding the November 3, 2020 sales tax Measure DB. 3. PUBLIC COMMENTS: CC/Santana read the following comments submitted via emails: Raphael Plunkett thanked Allison Santogrossi and Diego Tamayo for hosting the candidate forum, C/Chou for sharing voting information and the City for hosting the Measure DB sessions. 7.1.c Packet Pg. 53 OCTOBER 6, 2020 PAGE 2 CITY COUNCIL Teame Ozeqbe commented on and expressed opposition to Proposition 16. 4. CONSENT CALENDAR: MPT/Lyons moved, C/Low seconded, to approve the Consent Calendar as presented with C/Chou abstaining on Item 4.1. Motion carried by the following Roll Call vote: AYES: COUNCIL MEMBERS: Chou, Low, Mahlke, MPT/Lyons, M/Tye NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: None 4.1 APPROVED CITY COUNCIL MINUTES: 4.1a SEPTEMBER 15, 2020 REGULAR MEETING. 4.2 RATIFIED CHECK REGISTER DATED SEPTEMBER 10, 2020 THROUGH SEPTEMBER 29, 2020 TOTALING $1,053,984.66. 4.3 ADOPTED RESOLUTION NO. 2020-40 APPROVING THE INVESTMENT POLICY FOR FISCAL YEAR 2020/2021. 5. PUBLIC HEARING(S): 5.1 SECOND READING OF ORDINANCE NO. 02(2020) AMENDING TITLE 15 OF THE DIAMOND BAR MUNICIPAL CODE TO ADOPT BY REFERENCE, TITLE 32, FIRE CODE, OF THE LOS ANGELES COUNTY CODE, AS AMENDED, WHICH CONSTITUTES AN AMENDED VERSION OF THE CALIFORNIA FIRE CODE, 2019 EDITION. Building Official Tao presented the staff report. M/Tye opened the Public Hearing. With no one wishing to speak on this matter, M/Tye closed the Public Hearing. C/Mahlke moved, MPT/Lyons seconded, to approve Second Reading of Ordinance No. 02(2020) amending Title 15 of the Diamond Bar Municipal Code to Adopt by reference, Title 32, Fire Code, of the Los Angeles County Code, as amended, which constitutes an amended version of the California Fire Code, 2019 edition. Motion carried by the following Roll Call vote: AYES: COUNCIL MEMBERS: Chou, Low, Mahlke, MPT/Lyons, M/Tye NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: None 7.1.c Packet Pg. 54 OCTOBER 6, 2020 PAGE 3 CITY COUNCIL 6. COUNCIL CONSIDERATION: 6.1 ZONE CHANGE AND DEVELOPMENT REVIEW FOR A NEW SINGLE FAMILY RESIDENCE LOCATED AT 1111 N. DIAMOND BAR BOULEVARD [PLANNING CASE NO. PL2015-253]. CM/Fox presented a brief report. M/Tye opened Public Comments. Douglas Barcon questioned the authenticity of the land use map and zoning in the updated General Plan, and requested Council verification that the information presented for their vote is correct. Paul Diebold questioned the rationale for the zone change and suggested a condition for future development of the site. M/Tye closed Public Comments. CDD/Gubman responded to public comments that the property has always had a residential designation with a commercial zoning designation. The landowner presented a conceptual plan for a commercial office building which met with negative response primarily due to site capacity restrictions, and the residential General Plan designation was determined to be consistent with the residential properties to the north and across the Boulevard and rezoning it to be consistent with the General Plan was determined to be the more appropriate solution. CDD/Gubman responded to Mr. Barcon that the General Plan Map on the City's website is correct and asked Mr. Barcon to please contact SP/Lee for additional information to help resolve his concerns. C/Mahlke moved, MPT/Lyons seconded, to approve for Second Reading by title only, waive full reading, and adopt Ordinance No. 01(2020) approving the Zone Change application. Motion carried by the following Roll Call vote: AYES: COUNCIL MEMBERS: NOES: COUNCIL MEMBERS: ABSTAIN: COUNCIL MEMBERS: ABSENT: COUNCIL MEMBERS Low, Mahlke, MPT/Lyons, M/Tye None Chou None C/Mahlke moved, M/Tye seconded, to adopt Resolution No. 2020-41 denying the Development Review application based on the Findings of Fact contained therein. Motion failed by the following Roll Call vote: AYES: COUNCIL MEMBERS: Mahlke, M/Tye NOES: COUNCIL MEMBERS: Low, MPT/Lyons 7.1.c Packet Pg. 55 OCTOBER 6, 2020 PAGE 4 CITY COUNCIL ABSTAIN: COUNCIL MEMBERS: Chou ABSENT: COUNCIL MEMBERS None 6.2 FISCAL YEAR 2020-21 APPROPRIATION ADJUSTMENTS FOR GENERAL FUND, SPECIAL REVENUE FUNDS AND CAPITAL PROJECT CARRYOVERS AND FISCAL YEAR 2019-20 FINAL ADJUSTMENTS. FD/Honeywell presented the staff report. MPT/Lyons asked if other sources were contacted regarding exchange of Prop A funds (Item F) and CM/Fox responded that staff is not aware of any agencies soliciting Prop A funds at this time. MPT/Lyons asked where the excess money from the design phase of Sunset Crossing and Heritage parks would go and FD/Honeywell responded that in general, leftover monies are re -programmed into other phases of those or other park projects. C/Low asked if there was a market rate for the exchange of Prop A Funds and FD/Honeywell said that at this time, cities were not generally in a position to offer money. C/Low asked if Foothill was offering discounted rates to their riders and M/Tye said that while it may be addressed at some point, Foothill is not currently making an issue of non-paying riders. C/Low asked how the City could use the Prop A funds in lieu of proceeding with the exchange and FD/Honeywell responded that funds could be used for bus shelter renovations. C/Low asked if the $300,000 CDBG funding for COVID-19 relief was reflected in the revenue or expenditure categories presented this evening. FD/Honeywell explained that those funds were spent during July/August of Fiscal Year 2020-21 and are not reflected in the numbers presented this evening. FD/Honeywell explained that some of the budget savings was due to deferred maintenance, law enforcement, Building and Safety, etc. but a good portion was a result of Parks and Rec programming that did not happen ($750,000) which allowed for a balanced budget without having to dip into rainy day funds. Approximately $150,000 in General Fund monies was used for COVID related expenses, money that will be reimbursed to the General Fund when federal and state reimbursement monies are received. C/Chou asked for staff recommendation to Council for possible uses of the 800,000 or portion thereof as well as, discussions with other agencies about getting a higher exchange rate. C/Mahlke said that the June report for monies coming in for Prop A 7.1.c Packet Pg. 56 OCTOBER 6, 2020 PAGE 5 CITY COUNCIL indicates numbers are down more than 20 percent which means Diamond Bar will receive a smaller amount going forward. She asked if the City ever spent all of its Prop A money and FD/Honeywell responded no, that the City always has an excess of funds and has been able to exchange the funds and not lose them. C/Mahlke said she favored Foothill Transit's purchase because they provide transportation for the City and asked if other agencies wanted to engage in the exchange. FD/Honeywell said it has grown increasingly to engage other cities because they are stretching to meet expenses and preserve their general funds. C/Mahlke asked how staff arrived at the $800,000 figure. FD/Honeywell said she chose 800,000 because she likes to keep a $100,000 cushion in the fund in case expenditures are higher than anticipated. She said she would ask Foothill if they have a minimum dollar amount they would accept at Council's request. MPT/Lyons said she understands not wanting to give the money away but believes the $600,000 could serve the City well if it could be used for parks. C/Chou suggested staff come back to the Council with recommendations for refurbishing a number of bus shelters, research the expiring franchise agreement with the bus shelter operators, consider adding advertising space to the shelters for income generation to the City and identify how to get the highest dollar exchange for remaining funds. Following Council's discussion on Item F, CM/Fox offered that many of the bus shelters are in need of repair and should the Council decide to move forward, staff would implement a plan that would identify this as a Capital Improvement project for the next Fiscal Year when the City would have an accumulation of Prop A Funds that would need to be used or exchanged. Since the franchise agreement expires June 2021, it would be a good time to research that item as well. In the meantime, the Council may wish to pursue the exchange to shore up the City's General Fund this Fiscal Year and avoid having to dip into the emergency contingency funds. MPT/Lyons felt Council should move forward with at least half of Item F. M/Tye asked if Item F could be brought back for consideration with a full report and recommendation and CM/Fox suggested that staff be given time to prepare a report for presentation to the City Council at a later date whether to implement a Capital Improvement project and/or to move forward with the $800,000 sale of Prop A Funds or a portion thereof, and that Council move forward with action on Items A through E at this time. C/Low moved, MPT/Lyons seconded, to approve an appropriation from General Fund reserves of $187,030.40 to carry forward appropriations from FY 2019-20 to FY 2020-21 for previously encumbered goods and services. Motion carried by the following Roll Call vote: 7.1.c Packet Pg. 57 OCTOBER 6, 2020 PAGE 6 CITY COUNCIL AYES: COUNCIL MEMBERS: Chou, Low, Mahlke, MPT/Lyons, M/Tye NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: None C/Mahlke moved, C/Low seconded, to approve an appropriation from various Special Revenue Funds reserves of $805,212.26 to carry forward appropriations from FY 2019-20 to FY 2020-21 for previously encumbered goods and services. Motion carried by the following Roll Call vote: AYES: COUNCIL MEMBERS: Chou, Low, Mahlke, MPT/Lyons, M/Tye NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: None C/Chou moved, C/Mahlke seconded, to approve an appropriation from Capital Improvement Project Fund reserves in the amount of $498,488.78 to carry forward appropriations from FY 2019-20 to FY 2020-21 for previously encumbered goods and services. Motion carried by the following Roll Call vote: AYES: COUNCIL MEMBERS: Chou, Low, Mahlke, MPT/Lyons, M/Tye NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: None C/Mahlke moved, C/Chou seconded, to carry over the related purchase orders encumbered in FY 2019-20 in the amount of $1,131,053.96 to FY 2020-21. Motion carried by the following Roll Call vote: AYES: COUNCIL MEMBERS: Chou, Low, Mahlke, MPT/Lyons, M/Tye NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: None C/Low moved, MPT/Lyons seconded, to approve various final budget adjustments to FY 2019-20 for additional appropriations in various accounts including $1,586.43 for the General Fund and $235,467.41 in Special Revenue, Capital Improvement and Internal Service Funds. Motion carried by the following Roll Call vote: AYES: COUNCIL MEMBERS: Chou, Low, Mahlke, MPT/Lyons, M/Tye NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: None Council concurred to continue Item F., Authorization for staff to pursue a Prop A Exchange with Foothill Transit in an amount up to $800,000, for 7.1.c Packet Pg. 58 OCTOBER 6, 2020 PAGE 7 CITY COUNCIL further consideration by the City Council to a future date uncertain. 7. COUNCIL SUBCOMMITTEE REPORTS AND MEETING ATTENDANCE REPORTS/COUNCIL MEMBER COMMENTS: C/Chou thanked staff for the financial update and was pleased that the City did not have to dip into its emergency fund. He spoke about Restaurant Week, Round 5 of business grants from LA Regional Fund, and election season. C/Low thanked FD/Honeywell and City staff for an excellent report on the City's financial condition, talked about Restaurant Week as well as, the Halloween costume contest and pumpkin decorating contest, and thanked MPT/Lyons and C/Mahlke for hosting zoom classes with her over the past three months. C/Mahlke thanked staff for their hard work and knowledge -sharing, the community for their support of LA Sheriff's Deputies and hardworking firefighters, community organizers and students for hosting the Council Candidate Forum, and residents for participating in the Council Women Learning and Sharing Session on the California Proposition. October is Breast Cancer Awareness and Domestic Violence Awareness month. She asked everyone to participate in Restaurant Week and stay safe. MPT/Lyons spoke about Restaurant Week, updated the Council on the San Gabriel Valley Council of Governments meeting and SB1120. She thanked FD/Honeywell for a successful budget and asked for an overview of the first quarter budget in a study session (councilmembers concurred). M/Tye spoke about the community honoring deputies and firefighters. He expressed his appreciation for the outstanding job staff has done keeping the City running during the pandemic and encouraged residents to participate in Restaurant Week. He thanked the Diamond Bar/Walnut Sheriff's for apprehending vandals and reminded residents that parks are open to the public and that they should continue to be careful and stay safe. ADJOURNMENT: With no further business to conduct, M/Tye adjourned the Regular City Council Meeting at 8:24 p.m. Respectfully submitted: Kristina Santana, City Clerk The foregoing minutes are hereby approved this 20t" day of October, 2020. L Steve Tye, May, r 7.1.c Packet Pg. 59 A2011A201A20123A2014MAX WOOD SLAT FENCE PLUS RETAINING WALL FOR A TOTAL OF 42"(SEE AS-101, DETAIL 3)3'-0" MAX RETAINING WALL PLUS FENCE WALLCMU FOR A TOTAL 6'-0" MAX HIGH BLOCK WALL FINISHED WITH STUCCO (SEE CIVIL)3'-0" MAX RETAINING WALL PLUS FENCE WALLCMU FOR A TOTAL 6'-0" MAX HIGH BLOCK WALL FINISHED WITH STUCCO(SEE CIVIL)3'-0" MAX RETAINING WALL PLUS FENCE WALLCMU FOR A TOTAL 6'-0" MAX HIGH BLOCK WALL FINISHED WITH STUCCO (SEE CIVIL)DRIVEWAY42" WOOD GATEAS-1013CONCRETE DECK BUILDING WALL BELOW1 0 ' - 1 1 " 1 0 ' - 8 "3' - 0"2 ' - 6 "3 ' - 0 "3' - 0"6' - 6" EAST SIDE YARD20' - 0" FRONT YARD R E A R S E TB A C K T O B L DG. 2 0 ' - 0 " RE A R Y A R D 75' - 6" WEST SIDE YARD42" WOOD GATE3' - 0"REQUIRED SETBACK LINEREQUIRED SETBACK LINEREQUIRED SETBACK LINEBUILDING WALL BELOW836' - 10"835' - 11"839' - 3"843' - 0"844' - 0"SIDE SETBACK5' - 0"WOOD GATEWOOD DECK BBQ & COUNTER TOPFLAGSTONE DECK --2' - 6 "C O V E R E D P O R C H S E TB A C K14' - 0 "6' - 11"WALKWAY TO DECKS6' - 0"WALKWAY TO BACKYARD4' - 0"12' - 6"11' - 0"12' - 8"24' - 11"1' - 0"1' - 0"DIAMOND BAR BLVD.5 ' - 1 1 "3' - 11"5' - 11"4' - 0"D IS T A N C E T O 5 7 F RE E W A Y 1 8 5 ' - 1 "57 FREEWAYDIAMOND BAR BLVD.MAX WOOD SLAT FENCE PLUS RETAINING WALL FOR A TOTAL OF 42" KNOTWOOD "WHITE ASH" OR APPROVED EQUALPrinted Date:Copyright ® By Creative Design Associates, Inc.C h e c k e d B y D a t e :R e f e r e n c e :C D A P r o j e c t N o.S t a m p :R e v i s i o n s :C l i e n t :P r o j e c t :D r a w i n g T i t l e :D r a w i n g N o. :P r o j e c t N o. :YU-WUCH E NNo. C-25837REN .07-31-21S TATE OFCALIFORNIALICENSEDARCHITE C T P h a s e :D r a w n B y :10/27/2022 10:11:26 AMAS-1011111 RESIDENCESITE PLAN &PROJECT DATAKPANGCDA1907SDJames Chou1111 N. Diamond Bar Blvd, Diamond Bar, CA 91765PROJECT DATAOWNER: JAMES CHOU1359 BENTLEY CT.WEST COVINA, CA 91791626-863-6660ARCHITECT:CREATIVE DESIGN ASSOCIATES17528 ROWLAND ST.CITY OF INDUSTRY, CA 91748626-913-8101CIVIL ENGINEER:CAL LAND ENGINEERING, INC.DBA QUARTECH CONSULTANTS576 E. LAMBERT ROADBREA, CA 92821714-671-1050 Ex.118LANDSCAPE: EMERALD DESIGNARCHITECT305 N HARBOR #222FULLERTON, CA 92832714-680-0417SOIL ENGINEER:QUARTECH CONSULTANTS 576 E. LAMBERT ROAD,BREA, CA 92821 714-671-1050TRAFFIC ENGINEER: GANDDINI GROUP INC550 PARKCENTER DR., #202SANTA ANA, CA 92705 714-795-3100PROJECT TEAMAPPLICABLE CODES:2019 CALIFORNIA RESIDENTIAL BUILDING CODE2019 CALIFORNIA MECHANICAL CODE2019 CALIFORNIA ELECTRICAL CODE2019 CALIFORNIA PLUMBING CODE2019 CALIFORNIA GREEN BUILDINGCODE2019 CALIFORNIA TITLE 24 ENERGY CODE2019 CALIFORNIA FIRE CODESITE VICINITY SHEET INDEXSheetNumberSheet NameAS-101 SITE PLAN & PROJECT DATAT-1 TOPO SURVEYC-1 CONCEPTUAL GRADING PLANL1 LANDSCAPE CONCEPTUAL PLANL2 LANDSCAPE CONCEPTUAL PLANA101 1ST FLOORA102 2ND FLOORA103 ROOF PLANA201 EXTERIOR ELEVATIONSA202 3D VIEWSA203 3D VIEWS WITH CONTEXTA204 3D VIEWS WITH CONTEXTA205 3D VIEWS WITH ADDED CONTEXTA206 3D VIEWS WITH ADDED CONTEXT1" = 10'-0"1SiteNo. Description Date1" = 60'-0"2Site Distance to Freeway1/2" = 1'-0"3FRONT FENCE ELEVATION DETAIL7.1.dPacket Pg. 60 7.1.dPacket Pg. 61 7.1.dPacket Pg. 62 NOTE: DISTANCE TO 57 FWY ±160'.PER GOOGLE EARTH12'-6"3'-2"6'-7"WOODDECK42" MAX RETAINING WALL PLUS WOOD FENCE(SEE AS-101, DETAIL 3)3'-0" MAX RETAINING WALL PLUS FENCE WALLCMU FOR A TOTAL 6'-0" MAX HIGH BLOCKWALL FINISHED WITH STUCCO (SEE CIVIL)3'-0" MAX RETAINING WALL PLUS FENCE WALLCMU FOR A TOTAL 6'-0" MAX HIGH BLOCK WALLFINISHED WITH STUCCO (SEE CIVIL)3'-0" MAX RETAINING WALL PLUS FENCE WALLCMU FOR A TOTAL 6'-0" MAX HIGH BLOCK WALLFINISHED WITH STUCCO (SEE CIVIL)WOOD GATEWOODDECK10' - 11"10' - 8"75' - 5 " WEST S IDE YARD3'-0" MAX RETAINING WALL PLUS FENCE WALLCMU FOR A TOTAL 6'-0" MAX HIGH BLOCK WALLFINISHED WITH STUCCO (SEE CIVIL)3'-6" RAILING3'-6" RAILING3'-0" MAX RETAINING WALL PLUS FENCE WALLCMU FOR A TOTAL 6'-0" MAX HIGH BLOCK WALLFINISHED WITH STUCCO (SEE CIVIL)42" MAX RETAINING WALL PLUS WOOD FENCE(SEE AS-101, DETAIL 3)A/C UNITROOF L INE ABOVEROOF L INE ABOVEROOF LINE ABOVEROOF LINE ABOVEN27°34'11"W 99.17'20' REAR SETBACK10' FRONT SETBACKREAR PROPERTY L INEN40°29 '20 "E 193 .86 ' S27°34'11"W 30.00'L=180.00'8' -7 "27'-0"10'-0"38' -0 "10'-0"103121258214174662653426261199112627 27 1'-7"27'-0"2122275'-8"20241028191992313105'-0"6' -11 "1'-0"1'-0"JUNIPERUSSCOPULORUM'SKYROCKET'SKYROCKETJUNIPERBOTANICAL NAME COMMON NAMETREE LEGENDCERCIDIUM'DESERT MUSEUM'STANDARD TRUNKDESERT MUSEUMPALO VERDELAGERSTROEMIA'NATCHEZ'MULTI TRUNKNATCHEZ WHITECRAPE MYRTLELAURUS NOBILIS'MONEM'STANDARD TRUNKEMERALD WAVESWEET BAYNOLINARECURVATABOTTLEPALMOLEA 'WILSONII'LOW BRANCHINGWILSONSFRUITLESS OLIVE1624" BOXLOWWATER USESIZEQUANTITYSYMBOL424" BOXLOW524" BOXLOW836" BOXLOW236" BOXLOW248" BOXLOWALOEFEROXCAPE ALOEZOYSIATENUIFOLIAZOYSIA GRASSBOTANICAL NAME COMMON NAMESHRUB AND GROUNDCOVER LEGENDAEONIUMARBOREUM'ATROPURPUREUM'PURPLE AEONIUMAGAVEAMERICANACENTURY PLANTALOEARBORESCENSTORCH ALOEAGAVEATTENUATAFOXTAIL AGAVECALISTEMON'LITTLE JOHN'DWARFBOTTLE BRUSHDASYLIRIONWHEELERISPOON YUCCAECHIUMCANDICANSPRIDE OFMADERAMUHLENBERGIARIGENSDEER GRASSNANDINA'COMPACTA'COMPACTHEAVENLY BAMBOOSENECIOSERPENSBLUECHALKSTICKSEUPHORBIA'STICKS ON FIRE'FIRESTICKPLANTARBUTUS UNEDOSHRUB FORMSTRAWBERRYSHRUB*IN POTVITIS'ROGERS RED'ROGERS CALIFORNIAGRAPE324" BOXLOW707 SFSODMODWATER USESIZEQUANTITYSYMBOL245 GALLOW515 GALLOW405 GALLOW225 GALLOW665 GALLOW95 GALLOW175 GALLOW3045 GALLOW185 GALLOW@ 18" OC1 GALLOW815 GALLOW315 GALLOW145 GALLOWNOTE: ALL SHRUBS/GROUNDCOVER IN FRONT YARD SETBACK TO BE NO TALLER THAN 42"CALLOUT LEGENDPERIMITER WALL 6'PERIMETER WALL WITH PANEL FENCING 6'DECORATIVE GATECONCRETE PAVINGENHANCED CONCRETE PAVINGCONCRETE DRIVEWAYCONCRETE MOW STRIPEXPOSED AGGREGATE PAVINGDECORATIVE AGGREGATESTEPSWOOD OR WOOD TYPE TILE PATIODECK ON GRADE, STEPS DOWN SLOPE42" TALL DECORATIVE WALLTALL CURBBBQ AND COUNTER TOP-------INTENTIONALLY LEFT BLANK----------------INTENTIONALLY LEFT BLANK----------------INTENTIONALLY LEFT BLANK----------------INTENTIONALLY LEFT BLANK---------OUTDOOR FURNITURERAISED GAS BURNING FIREPLACE-------INTENTIONALLY LEFT BLANK---------LARGE BOULDER FOR SEATINGFLAGSTONE PAVINGFLAGSTONE WITH PLANTING JOINTS------INTENTIONALLY LEFT BLANK------ROOF OVERHANGPOTS123456789101112131415161718192021222324252627DECORATIVE LARGE POT28NOTE:SEPARATE PERMITS ARE REQUIRED FOR BBQ AREA, RETAININGWALLS, FENCES OVER 6' IN HEIGHT, AND FIREPLACE.QUANTITY %PLANT SIZE PERCENTAGES25%1027%2567%37163%50896%527100%COVER IN2 YEARS31%TYPESIZETREES 48" BOX36" BOX24" BOXTOTAL15 GAL5 GALTOTALGROUNDCOVERSHRUBS24" BOXLANDSCAPE NOTESALL IRRIGATED LANDSCAPE WILL COMPLY WITH THE WATERCONSERVATION LANDSCAPE ORDINANCE. MAXIMUM WATER ALLOWANCEFOR THE SITE IS NO GREATER THAN IS 69957 GALLONS PER YEAR (4319 SFLANDSACAPE AREA)SEPARATE PERMITS ARE REQUIRED FOR RETAINING WALLS, BBQ,OUTDOOR FIREPLACE, AND FENCES OVER 6' IN HEIGHT.7-11-22Prepared by:1"=10'-0"EMERALDD E S I G N 305 N. Harbor Blvd, Suite 222Fullerton, California 92832Tel: (714) 680-0417California License #3098Email: charles@emeraldladesign.comCD/ACreative Design Associates17528 E Rowland St.City of Industry, CA 91748DIAMOND BAR SINGLE FAMILY1111 N DIAMOND BAR BLVDDIAMOND BAR, CALIFORNIA 91765SITE REFERENCE PLAN60 FWY 57 F W Y SITE*LC1 - Landscape Concept7.1.dPacket Pg. 63 7-11-22Prepared by:1"=10'-0"EMERALDD E S I G N 305 N. Harbor Blvd, Suite 222Fullerton, California 92832Tel: (714) 680-0417California License #3098Email: charles@emeraldladesign.comCD/ACreative Design Associates17528 E Rowland St.City of Industry, CA 91748DIAMOND BAR SINGLE FAMILY1111 N DIAMOND BAR BLVDDIAMOND BAR, CALIFORNIA 91765JUNIPERUSSCOPULORUM'SKYROCKET'CERCIDIUM'DESERT MUSEUM'LAGERSTROEMIA'NATCHEZ'LAURUS NOBILIS'MONEM'NOLINARECURVATAOLEA'WILSONII'ALOEFEROXZOYSIATENUIFOLIAAEONIUM ARBOREUM'ATROPURPUREUM'AGAVEAMERICANAALOEARBORESCENSAGAVEATTENUATAVITIS'ROGERS RED'DASYLIRIONWHEELERIECHIUMCANDICANSMUHLENBERGIARIGENSNANDINA'COMPACTA'SENECIOSERPENSEUPHORBIA'STICKS ON FIRE'ARBUTUSUNEDOCALISTEMON'LITTLE JOHN'LC2 - Plant Images7.1.dPacket Pg. 64 R e frig e ra to rR a n g e BEDROOM 4BEDROOM 3KITCHENDININGLIVING ROOMPANTRYENTRYBATHROOMCLOSETCOATS837' - 0"839' - 6"837' - 0"837' - 0"839' - 0"1 0 ' - 0 "1' - 8"POWDERCLOSET5' - 0"3 ' - 0 "6' - 0 "20'-0" REAR SETBACK LINE20'-0" FRONT SETBACK LINE2' - 6"3' - 0"2' - 0"2' - 6"ROOF LINE ABOVEROOF LINE ABOVEROOF LINE ABOVER O O F L IN E A B O V E 16' - 1"42' - 1"112.00°111.94°9 ' - 7 "6' - 7"9' - 6"6' - 10"9' - 9"2 ' - 6 "11' - 10"13' - 10"7' - 11"21' - 9"1' - 9"7' - 0"7' - 11"21' - 9"1' - 0"2 5 ' - 4 "58' - 2"1 1 ' - 0 "5 ' - 1 "2 ' - 4 "6 ' - 1 1 "55' - 4"32' - 8"38' - 5"27' - 5"R O O F L IN E A B O V EA/C UNITLIVING SPACE1,789 SFGARAGE583 SFREAR PORCH150 SFFRONT PORCH100 SFPrinted Date:Copyright ® By Creative Design Associates, Inc.C h e c k e d B y D a t e :R e f e r e n c e :C D A P r o j e c t N o.S t a m p :R e v i s i o n s :C l i e n t :P r o j e c t :D r a w i n g T i t l e :D r a w i n g N o. :P r o j e c t N o. :YU-WUCH E NNo. C-25837REN .07-31-21S TATE OFCALIFORNIALICENSEDARCHITE C T P h a s e :D r a w n B y :10/27/2022 9:53:22 AMA1011111 RESIDENCE1ST FLOORKPCDA1907SDJames Chou1111 N. Diamond Bar Blvd, Diamond Bar, CA 91765No. Description Date1/4" = 1'-0"1Level 17.1.dPacket Pg. 65 DNMASTERBEDROOMMASTER BATH849' - 0"849' - 0"4 ' - 0 "MASTER CLOSETBEDROOM 1BATHROOMROOF LINE ABOVEROOF LINE ABOVE20'-0" REAR SETBACK LINE20'-0" FRONT SETBACK LINE20'-0" FRONT SETBACK LINE3' - 0"2' - 6"3 ' - 0 "2' - 6"3 ' - 0 "2' - 6"3' - 0"2 ' - 6 "OPEN TO BELOW2 ' - 6 "4" / 1 '-0 "4" / 1 '-0 "4" / 1'-0"4" / 1'-0"4" / 1'-0"4" / 1'-0"3' - 6"11' - 8"7' - 3"16' - 9"6 ' - 1 1 "1 8 ' - 5 "12' - 5"13' - 2"9' - 9"16' - 10"1 5 ' - 2 "7 ' - 7 "4 ' - 0 "2 5 ' - 4 "LIVING SPACE954 SFPrinted Date:Copyright ® By Creative Design Associates, Inc.C h e c k e d B y D a t e :R e f e r e n c e :C D A P r o j e c t N o.S t a m p :R e v i s i o n s :C l i e n t :P r o j e c t :D r a w i n g T i t l e :D r a w i n g N o. :P r o j e c t N o. :YU-WUCHE NNo. C-25837REN .07-31-21S TATE OFCALIFORNIALICENSEDARCHITEC T P h a s e :D r a w n B y :10/26/2022 10:55:18 PMA1021111 RESIDENCE2ND FLOORKPCDA1907SDJames Chou1111 N. Diamond Bar Blvd, Diamond Bar, CA 91765No. Description Date1/4" = 1'-0"1Level 27.1.dPacket Pg. 66 4 " / 1 '-0 "4 " / 1 '-0 "4" / 1'-0"4" / 1'-0"4 " / 1 '-0 "4" / 1'-0"4" / 1'-0"4" / 1'-0"4" / 1'-0"4" / 1 '-0 "4" / 1 '-0 "1 1 ' - 8 "1 1 ' - 8 "58' - 1"17' - 4"9' - 9"9' - 1"9' - 1"12' - 11"15 ' - 4 "15 ' - 4 "23' - 5"1 3 ' - 1 1 "1 3 ' - 1 1 "32' - 11"31' - 1"14' - 1"14' - 2"46' - 7"3' - 0"2 ' - 6 "3 ' - 0 "2 ' - 6 "WALL OUTLINE BELOWWALL OUTLINE BELOWWALL OUTLINE BELOWWALL OUTLINE BELOW3' - 0"3' - 0"2' - 6"2' - 6"2' - 6"3' - 0"2' - 6 "3' - 0"Printed Date:Copyright ® By Creative Design Associates, Inc.C h e c k e d B y D a t e :R e f e r e n c e :C D A P r o j e c t N o.S t a m p :R e v i s i o n s :C l i e n t :P r o j e c t :D r a w i n g T i t l e :D r a w i n g N o. :P r o j e c t N o. :YU-WUCHE NNo. C-25837REN .07-31-21S TATE OFCALIFORNIALICENSEDARCHITEC T P h a s e :D r a w n B y :10/26/2022 10:55:22 PMA1031111 RESIDENCEROOF PLANKPANGCDA1907SDJames Chou1111 N. Diamond Bar Blvd, Diamond Bar, CA 91765No. Description Date1/4" = 1'-0"1Roof Plan7.1.dPacket Pg. 67 Level 1837' -0"Level 2849' -0"T.O. PLATE859' -0"GARAGE LEVEL839' -0"T.O. PITCHEDROOF863' -6"9' - 0"1' - 0"10' - 0"2' - 0"26' - 6"WOOD DECKLEVEL 1836' -6"WOOD DECKLEVEL 2835' -6"CONCRETELOWER DECK834' -0"LEVEL 2 BEDRM 3850' -0"EL015EL002EL004EL006EL009EL017EL013EL014EL013Level 1837' -0"Level 2849' -0"T.O. PLATE859' -0"GARAGE LEVEL839' -0"T.O. PITCHEDROOF863' -6"9' - 0"1' - 0"10' - 0"2' - 0"26' - 6"WOOD DECKLEVEL 1836' -6"WOOD DECKLEVEL 2835' -6"CONCRETELOWER DECK834' -0"LEVEL 2 BEDRM 3850' -0"EL002EL017EL006EL007EL009EL015EL014EL013EL016Level 1837' -0"Level 2849' -0"T.O. PLATE859' -0"GARAGE LEVEL839' -0"9' - 0"1' - 0"10' - 0"2' - 0"T.O. PITCHEDROOF863' -6"26' - 6"WOOD DECKLEVEL 1836' -6"WOOD DECKLEVEL 2835' -6"CONCRETELOWER DECK834' -0"LEVEL 2 BEDRM 3850' -0"EL015EL008EL015EL009EL005EL002EL001EL003EL006EL007EL017EL010EL013EL014EL013EL016Level 1837' -0"Level 2849' -0"T.O. PLATE859' -0"GARAGE LEVEL839' -0"T.O. PITCHEDROOF863' -6"9' - 0"1' - 0"10' - 0"2' - 0"26' - 6"WOOD DECKLEVEL 1836' -6"WOOD DECKLEVEL 2835' -6"CONCRETELOWER DECK834' -0"LEVEL 2 BEDRM 3850' -0"EL011EL006EL007EL008EL009EL013EL017EL015EL014EL004EL002EL016Printed Date:Copyright ® By Creative Design Associates, Inc.C h e c k e d B y D a t e :R e f e r e n c e :C D A P r o j e c t N o.S t a m p :R e v i s i o n s :C l i e n t :P r o j e c t :D r a w i n g T i t l e :D r a w i n g N o. :P r o j e c t N o. :YU-WUCHE NNo. C-25837REN .07-31-21S TATE OFCALIFORNIALICENSEDARCHITEC T P h a s e :D r a w n B y :10/26/2022 11:20:18 PMA2011111 RESIDENCEEXTERIORELEVATIONSKPCDA1907SDJames Chou1111 N. Diamond Bar Blvd, Diamond Bar, CA 917651/8" = 1'-0"1East1/8" = 1'-0"2West1/8" = 1'-0"3South1/8" = 1'-0"4NorthNo. Description DateEXTERIOR LEGENDKey ValueKeynote TextEL001 GARAGE DOOR - CLOPAY - MODEL GRAND HARBOR - DESIGN13 - TOP12 -SQ22-GH- PAINTED TO MATCH DUNNEDWARDS DEA6204 TRITE WHITE OR APPROVED EQUALEL002 FIBER CEMENT SIDING - JAMES HARDIE™ PANEL VERTICAL SIDING - LIGHT MIST OR APPOVED EQUALEL003 DOOR - SIMPSON DOOR COMPANY - 6863 CRAFTSMAN - 48" X 102" - PAINTED TO MATCH DUNN EDWARDSDEA6204 TRITE WHITE OR APPROVED EQUALEL004 PATIO DOOR - SIMPSON DOOR COMPANY - 7081 THERMAL SASH - 42" X 102" - PAINTED TO MATCH DUNNEDWARDS DEA6204 TRITE WHITE OR APPROVED EQUALEL005 WINDOW: JELD WEN: PREMIUM VINYL (V-4500) PICTURE FIXED, WHITE FRAME, LOW-E CLEAR GLASS, TOPDOWN GRILLE OR APPROVED EQUALEL006 WINDOW: JELD WEN: PREMIUM VINYL (V-4500) CASEMENT, WHITE FRAME, LOW-E CLEAR GLASS, TOP DOWNGRILLE OR APPROVED EQUALEL007 RAILING: INTEX MILLWORK: LIBERTY SERIES 3-1/2" RAIL KIT W/5", SLEEVE FLAT CAP, STANDARD BASE.PAINTED TO MATCH DUNN EDWARDS DE6204 TRITE WHITE OR EQUALEL008 ROOF - OWENS CORNING - TRUE DEFINITION DURATION COOL SHINGLES - MOUNTAINSIDE OR APPROVEDEQUALEL009 LIGHTING - MILLENNIUM LIGHTING -RWHS17-RGN15-SB- GOOSENECK STEM 17" - SATIN BLACK- ORAPPROVED EQUALEL010 UNIT ADDRESS SIGN: DEFERRED PERMIT - SHALL BE DESIGNED PER CITY STANDARDS OR APPROVEDEQUALEL011 DOOR - NANAWALL CLIMA CLEAR - FOLDING - CLEAR ANODIZED FINISH OR APPROVED EQUALEL013 TRIM - PAINTED TO MATCH DUNN EDWARDS DEW383 COOL DECEMBER OR APPROVED EQUALEL014 PERIMETER WALL FINISH - LAHABRA - SANTA BARBARA MISSION FINISH - SANDSTONE OR APPROVED EQUALEL015 WALL FINISH - LAHABRA - SANTA BARBARA MISSION FINISH - SANDSTONE OR APPROVED EQUALEL016 FENCE - KNOTWOOD WHITE ASH OR APPROVED EQUALEL017 BRACKET - EKENA MILLWORK - TRADITIONAL CRAFTSMAN SMOOTH BRACKET 3 1/2" W X 24"D X 36"H -PAINTED TO MATCH DUNN EDWARDS DE6204 TRITE WHITE OR APPROVED EQUAL7.1.dPacket Pg. 68 Printed Date:Copyright ® By Creative Design Associates, Inc.C h e c k e d B y D a t e :R e f e r e n c e :C D A P r o j e c t N o.S t a m p :R e v i s i o n s :C l i e n t :P r o j e c t :D r a w i n g T i t l e :D r a w i n g N o. :P r o j e c t N o. :YU-WUCHE NNo. C-25837REN .07-31-21S TATE OFCALIFORNIALICENSEDARCHITEC T P h a s e :D r a w n B y :10/26/2022 11:22:29 PMA2021111 RESIDENCE3D VIEWSCheckerAuthor1907SDJames Chou1111 N. Diamond Bar Blvd, Diamond Bar, CA 917651Street View2North ElevationNo. Description Date7.1.dPacket Pg. 69 Printed Date:Copyright ® By Creative Design Associates, Inc.C h e c k e d B y D a t e :R e f e r e n c e :C D A P r o j e c t N o.S t a m p :R e v i s i o n s :C l i e n t :P r o j e c t :D r a w i n g T i t l e :D r a w i n g N o. :P r o j e c t N o. :YU-WUCHE NNo. C-25837REN .07-31-21S TATE OFCALIFORNIALICENSEDARCHITEC T P h a s e :D r a w n B y :10/26/2022 11:02:05 PMA2031111 RESIDENCE3D VIEWS WITHCONTEXTCheckerAuthor1907SDJames Chou1111 N. Diamond Bar Blvd, Diamond Bar, CA 91765No. Description DateNTS1VIEW FROM DIAMOND BAR BLVD7.1.dPacket Pg. 70 Printed Date:Copyright ® By Creative Design Associates, Inc.C h e c k e d B y D a t e :R e f e r e n c e :C D A P r o j e c t N o.S t a m p :R e v i s i o n s :C l i e n t :P r o j e c t :D r a w i n g T i t l e :D r a w i n g N o. :P r o j e c t N o. :YU-WUCHE NNo. C-25837REN .07-31-21S TATE OFCALIFORNIALICENSEDARCHITEC T P h a s e :D r a w n B y :10/26/2022 11:02:11 PMA2041111 RESIDENCE3D VIEWS WITHCONTEXTCheckerAuthor1907SDJames Chou1111 N. Diamond Bar Blvd, Diamond Bar, CA 91765No. Description DateN.T.S1BIRDSEYE VIEW OF SITEN.T.S.2BIRDSEYE VIEW OF SITE ZOOMED IN7.1.dPacket Pg. 71 Printed Date:Copyright ® By Creative Design Associates, Inc.C h e c k e d B y D a t e :R e f e r e n c e :C D A P r o j e c t N o.S t a m p :R e v i s i o n s :C l i e n t :P r o j e c t :D r a w i n g T i t l e :D r a w i n g N o. :P r o j e c t N o. :YU-WUCHE NNo. C-25837REN .07-31-21S TATE OFCALIFORNIALICENSEDARCHITEC T P h a s e :D r a w n B y :10/26/2022 11:02:12 PMA2051111 RESIDENCE3D VIEWS WITHADDED CONTEXTKPANGCDA1907SDJames Chou1111 N. Diamond Bar Blvd, Diamond Bar, CA 91765No. Description DateN.T.S1N DIAMOND BAR BLVD SOUTHBOUNDN.T.S2EAST VIEW7.1.dPacket Pg. 72 Printed Date:Copyright ® By Creative Design Associates, Inc.C h e c k e d B y D a t e :R e f e r e n c e :C D A P r o j e c t N o.S t a m p :R e v i s i o n s :C l i e n t :P r o j e c t :D r a w i n g T i t l e :D r a w i n g N o. :P r o j e c t N o. :YU-WUCHE NNo. C-25837REN .07-31-21S TATE OFCALIFORNIALICENSEDARCHITEC T P h a s e :D r a w n B y :10/26/2022 11:02:12 PMA2061111 RESIDENCE3D VIEWS WITHADDED CONTEXTCheckerAuthor1907SDJames Chou1111 N. Diamond Bar Blvd, Diamond Bar, CA 91765No. Description DateN.T.S1VIEW FROM FLINTLOCK RD7.1.dPacket Pg. 73 A2011A201A20123A2014SIDE SETBACK5' - 4"SIDE SETBACK84' - 7 3/4"R E A R S E T B A C K T O B L D G .2 0 ' - 0 "FRONT SETBACK20' - 0"POOLWOOD DECK 3'-0" MAX RETAINING WALL PLUS FENCE WALLCMU FOR A TOTAL 6'-0" MAX HIGH BLOCK WALL FINISHED WITH STUCCO WITH INTERVALS OF WOOD SLATS SEE FENCE WALL (SEE CIVIL)3'-0" MAX RETAINING WALL PLUS FENCE WALLCMU FOR A TOTAL 6'-0" MAX HIGH BLOCK WALL FINISHED WITH STUCCO (SEE CIVIL)3'-0" MAX RETAINING WALL PLUS FENCE WALLCMU FOR A TOTAL 6'-0" MAX HIGH BLOCK WALL FINISHED WITH STUCCO(SEE CIVIL)3'-0" MAX RETAINING WALL PLUS FENCE WALLCMU FOR A TOTAL 6'-0" MAX HIGH BLOCK WALL FINISHED WITH STUCCO (SEE CIVIL)CONC. STEPPING STONE2'-0" RAISED PLANTERDRIVEWAYWOOD GATEAS-1013RAISED GAS BURNING FIREPLACEWOOD DECK POOLSPACONCRETE DECK S E T B A C K T O R O O F E A V E17' - 0 "BUILDING WALL BELOWROOF EAVE (PROJECTS 3'-0" INTO REAR SETBACK)S E T B A C K T O B A L C O N Y B E L O W15' - 0 3 /4 "BALCONY BELOWON 2ND FLOORBBQ & COUNTER TOP1 0 ' - 1 0 1 /2 " 1 0 ' - 8 1/4 "13' - 2 1/4"836' - 10"839' - 3"843' - 0"835' - 10 3/4"844' - 0"1 0 ' - 0 1 /4 "36' - 7 1/2"11' - 0"D IS T A N C E T O 5 7 F R E E W A Y 1 8 5 ' - 0 "57 FREEWAYTYP. MAX6' - 0"TYP.3' - 4"TYP.2' - 8"WOOD SLATS OR SIMILAR TYP.TYP.0' - 3 1/2"TYP.0' - 0 1/2"BLOCK WALL FINISHED MERLEX STUCCO -P-100 GLACIER WHITE (A BASE) -SEMI-SMOOTH SANTA BARBARA FINISH OR APPROVED EQUAL TO MATCH BLDGPrinted Date:Copyright ® By Creative Design Associates, Inc.C h e c k e d B y D a t e :R e f e r e n c e :C D A P r o j e c t N o.S t a m p :R e v i s i o n s :C l i e n t :P r o j e c t :D r a w i n g T i t l e :D r a w i n g N o. :P r o j e c t N o. :YU-WUCH E NNo. C-25837REN .07-31-21S TATE OFCALIFORNIALICENSEDARCHITE C T P h a s e :D r a w n B y :1/28/2020 10:35:00 AMAS-1011111 RESIDENCESITE PLAN &PROJECT DATACheckerAuthor1907SDJames Chou1111 N. Diamond Bar Blvd, Diamond Bar, CA 91765PROJECT DATAOWNER: JAMES CHOU1359 BENTLEY CT.WEST COVINA, CA 91791626-863-6660ARCHITECT:CREATIVE DESIGN ASSOCIATES17528 ROWLAND ST.CITY OF INDUSTRY, CA 91748626-913-8101CIVIL ENGINEER:CAL LAND ENGINEERING, INC.DBA QUARTECH CONSULTANTS576 E. LAMBERT ROADBREA, CA 92821714-671-1050 Ex.118LANDSCAPE: EMERALD DESIGNARCHITECT305 N HARBOR #222FULLERTON, CA 92832714-680-0417SOIL ENGINEER:QUARTECH CONSULTANTS 576 E. LAMBERT ROAD,BREA, CA 92821 714-671-1050TRAFFIC ENGINEER: GANDDINI GROUP INC550 PARKCENTER DR., #202SANTA ANA, CA 92705 714-795-3100PROJECT TEAMAPPLICABLE CODES:2019 CALIFORNIA RESIDENTIAL BUILDING CODE2019 CALIFORNIA MECHANICAL CODE2019 CALIFORNIA ELECTRICAL CODE2019 CALIFORNIA PLUMBING CODE2019 CALIFORNIA GREEN BUILDINGCODE2019 CALIFORNIA TITLE 24 ENERGY CODE2019 CALIFORNIA FIRE CODESITE VICINITY SHEET INDEXSheetNumberSheet NameAS-101 SITE PLAN & PROJECT DATAT-1 TOPO SURVEYC-1 PRECISE GRADING PLANC-2 PRECISE GRADING PLANC-3 EROSION CONTROL PLANL1 LANDSCAPE CONCEPTUAL PLANL2 LANDSCAPE CONCEPTUAL PLANA101 1ST FLOORA102 2ND FLOORA103 ROOF PLANA201 EXTERIOR ELEVATIONSA202 3D VIEWSA203 3D VIEWS WITH CONTEXTA204 3D VIEWS WITH CONTEXT1" = 10'-0"1SiteNo. Description Date1" = 60'-0"2Site Distance to Freeway1/2" = 1'-0"3FENCE WALL ELEVATION DETAIL7.1.ePacket Pg. 74 7.1.ePacket Pg. 75 7.1.ePacket Pg. 76 7.1.ePacket Pg. 77 7.1.ePacket Pg. 78 20' RE A R S E T B A C K 10' FRONT SETBACK REAR P R O P E R T Y L I N E 11'-0"11'-0"1'-0" 10'-0"10'-0" 30'-0" 6'-0"10'-0" 6'-0" 10'-0"3'-0" 6'-0" 5'-0" 5'-0"27'-0"10'-0" 12'-0" NOTE: DISTANCE TO 57 FWY ±160'. PER GOOGLE EARTH 14'-9"15'-3"13'-2" 3'-2"6'-7"41'-0" 5'-8" 10'-0" 17 16 11 18 19 2 1 22 7 15 11 3 1 20 2 21 10 5 9 8 5 13 12 2 14 1 7 4 6 21 3 6 4 23 24 11 25 26 25 26 26 JUNIPERUS SCOPULORUM 'SKYROCKET' SKYROCKET JUNIPER BOTANICAL NAME COMMON NAME TREE LEGEND CERCIDIUM 'DESERT MUSEUM' STANDARD TRUNK DESERT MUSEUM PALO VERDE LAGERSTROEMIA 'NATCHEZ' MULTI TRUNK NATCHEZ WHITE CRAPE MYRTLE LAURUS NOBILIS 'MONEM' STANDARD TRUNK EMERALD WAVE SWEET BAY NOLINA RECURVATA BOTTLE PALM OLEA 'WILSONII' LOW BRANCHING WILSONS FRUITLESS OLIVE 1524" BOX LOW WATER USESIZEQUANTITYSYMBOL 224" BOX LOW 524" BOX LOW 836" BOX LOW 336" BOX LOW 248" BOX LOW ALOE FEROX CAPE ALOE ZOYSIA TENUIFOLIA ZOYSIA GRASS BOTANICAL NAME COMMON NAME SHRUB AND GROUNDCOVER LEGEND AEONIUM ARBOREUM 'ATROPURPUREUM' PURPLE AEONIUM AGAVE AMERICANA CENTURY PLANT ALOE ARBORESCENS TORCH ALOE AGAVE ATTENUATA FOXTAIL AGAVE CALISTEMON 'LITTLE JOHN' DWARF BOTTLE BRUSH DASYLIRION WHEELERI SPOON YUCCA ECHIUM CANDICANS PRIDE OF MADERA MUHLENBERGIA RIGENS DEER GRASS NANDINA 'COMPACTA' COMPACT HEAVENLY BAMBOO SENECIO SERPENS BLUE CHALKSTICKS EUPHORBIA 'STICKS ON FIRE' FIRESTICK PLANT ARBUTUS UNEDO SHRUB FORM STRAWBERRY SHRUB *IN POT *IN POT VITIS 'ROGERS RED' ROGERS CALIFORNIA GRAPE 324" BOX LOW 524 SFSOD MOD WATER USESIZEQUANTITYSYMBOL 275 GAL LOW 815 GAL LOW 295 GAL LOW 405 GAL LOW 325 GAL LOW 75 GAL LOW 145 GAL LOW 2325 GAL LOW 205 GAL LOW @ 18" OC1 GAL LOW 215 GAL LOW 115 GAL LOW 115 GAL LOW CALLOUT LEGEND PERIMITER WALL PERIMETER WALL WITH PANEL FENCING SOLID GLASS OR METAL GATE CONCRETE PAVING ENHANCED CONCRETE PAVING CONCRETE DRIVEWAY CONCRETE MOW STRIP EXPOSED AGGREGATE PAVING LOOSE AGGREGATE STEPS WOOD OR WOOD TYPE TILE PATIO DECK ON GRADE, STEPS DOWN SLOPE GARDEN WALL POOL EQUIPMENT BARBECUE AND COUNTER TOP RAISED POOL BOND BEAM. TO BE FLUSH WITH SPA AND DECK RAISED SPA, TO BE FLUSH WITH DECK POOL, TO BE LOWER THAN SPA AND FLUSH WITH LOWER CONCRETE DECK POOL INFINITY EDGE INFINITY EDGE SPILL BASIN RAISED GAS BURNING FIREPLACE, TO BE HIGHER THAN DECK RAISED PLANTER LARGE BOULDER FOR SEATING CONCRETE LOWER DECK AND POOL COPING. TO BE LOWER THAN DECK , SPA, AND FIREPLACE FLAGSTONE STEPPERS BALCONY ROOF LINE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 LANDSCAPE NOTES ALL IRRIGATED LANDSCAPE WILL COMPLY WITH THE WATER CONSERVATION LANDSCAPE ORDINANCE. MAXIMUM WATER ALLOWANCE FOR THE SITE IS NO GREATER THAN IS 69957 GALLONS PER YEAR (4319 SF LANDSACAPE AREA) SEPARATE PERMITS ARE REQUIRED FOR RETAINING WALLS, POOLS/SPA, BBQ, OUTDOOR FIREPLACE, AND FENCES OVER 6' IN HEIGHT. QUANTITY % PLANT SIZE PERCENTAGES 2 5% 11 29% 25 66% 37 12 3% 401 97% 413 100%COVER IN 2 YEARS TYPE SIZE TREES 48" BOX 36" BOX 24" BOX TOTAL SHRUBS 15 GAL 5 GAL TOTAL GROUNDCOVER 1/06/20 Prepared by: 1"=10'-0" EMERALD D E S I G N 305 N. Harbor Blvd, Suite 222 Fullerton, California 92832 Tel: (714) 680-0417 California License #3098 Email: charles@emeraldladesign.com CD/A Creative Design Associates 17528 E Rowland St. City of Industry, CA 91748 DIAMOND BAR SINGLE FAMILY 1111 N DIAMOND BAR BLVD DIAMOND BAR, CALIFORNIA 91765 Landscape Conceptual Plan SITE REFERENCE PLAN 60 FW Y57 FWYSITE * 7.1.e Packet Pg. 79 1/06/20 Prepared by: 1"=10'-0" EMERALD D E S I G N 305 N. Harbor Blvd, Suite 222 Fullerton, California 92832 Tel: (714) 680-0417 California License #3098 Email: charles@emeraldladesign.com CD/A Creative Design Associates 17528 E Rowland St. City of Industry, CA 91748 DIAMOND BAR SINGLE FAMILY 1111 N DIAMOND BAR BLVD DIAMOND BAR, CALIFORNIA 91765 Landscape Conceptual Plan JUNIPERUS SCOPULORUM 'SKYROCKET' CERCIDIUM 'DESERT MUSEUM' LAGERSTROEMIA 'NATCHEZ' LAURUS NOBILIS 'MONEM' NOLINA RECURVATA OLEA 'WILSONII' ALOE FEROX ZOYSIA TENUIFOLIA AEONIUM ARBOREUM 'ATROPURPUREUM' AGAVE AMERICANA ALOE ARBORESCENS AGAVE ATTENUATA VITIS 'ROGERS RED' DASYLIRION WHEELERI ECHIUM CANDICANS MUHLENBERGIA RIGENS NANDINA 'COMPACTA' SENECIO SERPENS EUPHORBIA 'STICKS ON FIRE' ARBUTUS UNEDOCALISTEMON 'LITTLE JOHN' 7.1.e Packet Pg. 80 +838 FF+837 FF+838.5 FF+837 FFPANTRYPANTRYLINEN70' - 5 1/2"89' - 7"1 8 ' - 1 1 1 /4 "23' - 0 1/2"13' - 11 1/4"22' - 0"11' - 5 3/4"10' - 6 3/4"8' - 8 1/2"11' - 9 3/4"17' - 5 3/4"15' - 11"5' - 11 3/4"7' - 9 3/4"20' - 5 3/4"4' - 0 1/4"32' - 3 3/4"16' - 2 3/4"8' - 3 1/4"1 8 ' - 1 1 1 /4 "1 3 ' - 0 3 /4 "1 3 ' - 4 1 /2 " 5 ' - 6 3 /4 "4' - 2"1' - 6"89' - 7"6' - 8"21' - 7"13' - 4 1/2"6' - 0"12' - 5 1/2"18' - 11 1/2"10' - 6 3/4"FOYER1LIVING ROOM2STUDY3KITCHEN4BEDROOM 183 CAR GARAGE6POWDER RM7WOK RM5Printed Date:Copyright ® By Creative Design Associates, Inc.C h e c k e d B y D a t e :R e f e r e n c e :C D A P r o j e c t N o.S t a m p :R e v i s i o n s :C l i e n t :P r o j e c t :D r a w i n g T i t l e :D r a w i n g N o. :P r o j e c t N o. :YU-WUCH E NNo. C-25837REN .07-31-21S TATE OFCALIFORNIALICENSEDARCHITE C T P h a s e :D r a w n B y :1/28/2020 10:33:51 AMA1011111 RESIDENCE1ST FLOORKPKP1907SDJames Chou1111 N. Diamond Bar Blvd, Diamond Bar, CA 91765No. Description Date1/4" = 1'-0"1Level 17.1.ePacket Pg. 81 +851 FF+849 FF89' - 7"1 8 ' - 1 1 3 /4 "1 8 ' - 1 1 3 /4 "33' - 11 3/4"33' - 11 3/4"4' - 5 3/4"22' - 10"6' - 8"24' - 5 3/4"5' - 9 1/2"9' - 11 3/4"8' - 8 1/2"5 ' - 1 0 3 /4 "1 3 ' - 1 "24' - 0 1/4"25' - 4 1/4"49' - 4 1/2"7' - 6"35' - 0"4' - 2"2' - 8 1/2"9 ' - 9 1 /2 " 5 ' - 8 1 /4 "89' - 7"6' - 6"23' - 5"8' - 4 1/2"14' - 6 1/2"17' - 9"11' - 2 1/2"7' - 9 1/2"1 8 ' - 1 1 3 /4 "FAMILY/GAME RM9LAUNDRY10BEDROOM 211BEDROOM 312MASTERBEDROOM13Printed Date:Copyright ® By Creative Design Associates, Inc.C h e c k e d B y D a t e :R e f e r e n c e :C D A P r o j e c t N o.S t a m p :R e v i s i o n s :C l i e n t :P r o j e c t :D r a w i n g T i t l e :D r a w i n g N o. :P r o j e c t N o. :YU-WUCH E NNo. C-25837REN .07-31-21S TATE OFCALIFORNIALICENSEDARCHITE C T P h a s e :D r a w n B y :1/28/2020 10:34:23 AMA1021111 RESIDENCE2ND FLOORCheckerAuthor1907SDJames Chou1111 N. Diamond Bar Blvd, Diamond Bar, CA 91765No. Description Date1/4" = 1'-0"1Level 27.1.ePacket Pg. 82 2 :1 2 2%2%2%2%2 %2%2 % 2 %2%2%2%2%2 2 ' - 0 1 /4 "92' - 7"Printed Date:Copyright ® By Creative Design Associates, Inc.C h e c k e d B y D a t e :R e f e r e n c e :C D A P r o j e c t N o.S t a m p :R e v i s i o n s :C l i e n t :P r o j e c t :D r a w i n g T i t l e :D r a w i n g N o. :P r o j e c t N o. :YU-WUCH E NNo. C-25837REN .07-31-21S TATE OFCALIFORNIALICENSEDARCHITE C T P h a s e :D r a w n B y :1/28/2020 10:34:32 AMA1031111 RESIDENCEROOF PLANCheckerAuthor1907SDJames Chou1111 N. Diamond Bar Blvd, Diamond Bar, CA 91765No. Description Date1/4" = 1'-0"1Roof Plan7.1.ePacket Pg. 83 Level 1837' -0"Level 2851' -0"FAMILY GAME RMLEVEL849' -0"T.O. FLAT ROOF862' -0"T.O. LOWER ROOF860' -0"GARAGE LEVEL838' -0"T.O. PITCHEDROOF865' -8"3' - 8"2' - 0"9' - 0"2' - 0"11' - 0"1' - 0"28' - 8"EL005EL001EL009EL012EL007WOOD DECKLEVEL 1836' -6"WOOD DECKLEVEL 2835' -6"CONCRETELOWER DECK834' -6"Level 1837' -0"Level 2851' -0"FAMILY GAME RMLEVEL849' -0"T.O. FLAT ROOF862' -0"T.O. LOWER ROOF860' -0"GARAGE LEVEL838' -0"T.O. PITCHEDROOF865' -8"3' - 8"2' - 0"9' - 0"2' - 0"11' - 0"1' - 0"28' - 8"EL010EL001EL009EL006EL012EL007EL005EL004WOOD DECKLEVEL 1836' -6"WOOD DECKLEVEL 2835' -6"CONCRETELOWER DECK834' -6"Level 1837' -0"Level 2851' -0"FAMILY GAME RMLEVEL849' -0"T.O. FLAT ROOF862' -0"T.O. LOWER ROOF860' -0"GARAGE LEVEL838' -0"3' - 8"2' - 0"11' - 0"1' - 0"10' - 0"1' - 0"T.O. PITCHEDROOF865' -8"28' - 8"EL009EL001EL002EL005EL008EL012EL007EL003EL011WOOD DECKLEVEL 1836' -6"WOOD DECKLEVEL 2835' -6"CONCRETELOWER DECK834' -6"Level 1837' -0"Level 2851' -0"FAMILY GAME RMLEVEL849' -0"T.O. FLAT ROOF862' -0"T.O. LOWER ROOF860' -0"GARAGE LEVEL838' -0"T.O. PITCHEDROOF865' -8"3' - 8"2' - 0"9' - 0"2' - 0"11' - 0"1' - 0"27' - 8"EL010EL005EL007EL012EL001EL009EL004EL006WOOD DECKLEVEL 1836' -6"WOOD DECKLEVEL 2835' -6"CONCRETELOWER DECK834' -6"Printed Date:Copyright ® By Creative Design Associates, Inc.C h e c k e d B y D a t e :R e f e r e n c e :C D A P r o j e c t N o.S t a m p :R e v i s i o n s :C l i e n t :P r o j e c t :D r a w i n g T i t l e :D r a w i n g N o. :P r o j e c t N o. :YU-WUCH E NNo. C-25837REN .07-31-21S TATE OFCALIFORNIALICENSEDARCHITE C T P h a s e :D r a w n B y :1/28/2020 10:37:11 AMA2011111 RESIDENCEEXTERIORELEVATIONSCheckerAuthor1907SDJames Chou1111 N. Diamond Bar Blvd, Diamond Bar, CA 917651/8" = 1'-0"1East1/8" = 1'-0"2West1/8" = 1'-0"3South1/8" = 1'-0"4NorthEXTERIOR KEYNOTESKey Value Keynote TextEL001 WALL FINISH - MERLEX STUCCO - P-100 GLACIER WHITE (A BASE) - SEMI-SMOOTH SANTA BARBARAFINISH OR APPROVED EQUALEL002 STONE VENEER - CULTURED STONE - GRAY SOUTHERN LEDGESTONE OR APPROVED EQUALEL003 DOOR - PIVOT DOOR COMPANY - SYDNEY PRE-BUILT DOOR - 49 1/2" X 97 3/4" - WALNUT FINISH ORAPPROVED EQUALEL004 DOOR - NANAWALL CLIMA CLEAR - FOLDING - CLEAR ANODIZED FINISH OR APPROVED EQUALEL005 WINDOW: MILGARD: QUIETLINE SERIES SLIDING WINDOW WITH MIN. STC 40, WHITE FRAME, LOW-ECLEAR GLASS OR APPROVED EQUALEL006 PATIO DOOR: JELD-WEN: PREMIUM ATLANTIC VINYL SWINGING PATIO DOOR, WHITE FRAME, LOW-ECLEAR GLASS, NO GRILLES, OR APPROVED EQUALEL007 METAL CABLE RAILING: FEENEY DESIGNRAIL: STANDARD POSTS, SURFACE MOUNT, SILVER FRAMECOLORS W/ RECTAGULAR TOP RAIL, HORIZONTAL CABLES INFILL OR APPROVED EQUALEL008 GARAGE DOOR - OVERHEAD DOOR MODERN ALUMINUM - MODEL 511 - IMPACT FROSTEDPOLYCARBONATE - CLEAR ANODIZED FINISH OR APPROVED EQUALEL009 FIBER CEMENT SIDING - NICHIHA VINTAGEWOOD WOOD SERIES S OR APPROVED EQUALEL010 METAL WALL/ROOF PANEL: AEP SPAN SUPERSPANFINISH: DURA TECH MX COOL METALLIC SILVER OR APPROVED EQUALEL011 CONCRETE LOOK FINISH: WESTCOAT TEXTURE CRETETOPCOAT COLOR: LIQUID COLORANT TC40 SMOKE308 OR APPROVED EQUALEL012 LIGHTING - VISA LIGHTING - OW1464 -WRAP L30K-L - HTHR - OR APPROVED EQUALNo. Description Date7.1.ePacket Pg. 84 Printed Date:Copyright ® By Creative Design Associates, Inc.C h e c k e d B y D a t e :R e f e r e n c e :C D A P r o j e c t N o.S t a m p :R e v i s i o n s :C l i e n t :P r o j e c t :D r a w i n g T i t l e :D r a w i n g N o. :P r o j e c t N o. :YU-WUCH E NNo. C-25837REN .07-31-21S TATE OFCALIFORNIALICENSEDARCHITE C T P h a s e :D r a w n B y :1/28/2020 10:46:17 AMA2021111 RESIDENCE3D VIEWSCheckerAuthor1907SDJames Chou1111 N. Diamond Bar Blvd, Diamond Bar, CA 917651Street View2North ElevationNo. Description Date7.1.ePacket Pg. 85 Printed Date:Copyright ® By Creative Design Associates, Inc.C h e c k e d B y D a t e :R e f e r e n c e :C D A P r o j e c t N o.S t a m p :R e v i s i o n s :C l i e n t :P r o j e c t :D r a w i n g T i t l e :D r a w i n g N o. :P r o j e c t N o. :YU-WUCH E NNo. C-25837REN .07-31-21S TATE OFCALIFORNIALICENSEDARCHITE C T P h a s e :D r a w n B y :1/28/2020 10:41:57 AMA2031111 RESIDENCE3D VIEWS WITHCONTEXTCheckerAuthor1907SDJames Chou1111 N. Diamond Bar Blvd, Diamond Bar, CA 91765No. Description DateNTS1VIEW FROM DIAMOND BAR BLVD7.1.ePacket Pg. 86 Printed Date:Copyright ® By Creative Design Associates, Inc.C h e c k e d B y D a t e :R e f e r e n c e :C D A P r o j e c t N o.S t a m p :R e v i s i o n s :C l i e n t :P r o j e c t :D r a w i n g T i t l e :D r a w i n g N o. :P r o j e c t N o. :YU-WUCH E NNo. C-25837REN .07-31-21S TATE OFCALIFORNIALICENSEDARCHITE C T P h a s e :D r a w n B y :1/28/2020 10:42:13 AMA2041111 RESIDENCE3D VIEWS WITHCONTEXTCheckerAuthor1907SDJames Chou1111 N. Diamond Bar Blvd, Diamond Bar, CA 91765No. Description DateN.T.S1BIRDSEYE VIEW OF SITEN.T.S.2BIRDSEYE VIEW OF SITE ZOOMED IN7.1.ePacket Pg. 87 Printed Date:Copyright ® By Creative Design Associates, Inc.C h e c k e d B y D a t e :R e f e r e n c e :C D A P r o j e c t N o.S t a m p :R e v i s i o n s :C l i e n t :P r o j e c t :D r a w i n g T i t l e :D r a w i n g N o. :P r o j e c t N o. :YU-WUCH E NNo. C-25837REN .07-31-21S TATE OFCALIFORNIALICENSEDARCHITE C T P h a s e :D r a w n B y :6/17/2020 4:03:35 PMA2051111 RESIDENCE3D VIEWS WITHADDED CONTEXTCheckerAuthor1907SDJames Chou1111 N. Diamond Bar Blvd, Diamond Bar, CA 91765No. Description DateN.T.S1N DIAMOND BAR BLVD SOUTHBOUNDN.T.S2EAST VIEW7.1.ePacket Pg. 88 Project Status Report CITY OF DIAMOND BAR December 13, 2022 COMMUNITY DEVELOPMENT DEPARTMENT LEGEND PH = PUBLIC HEARING AP = ASSIGNED PLANNER PC = PLANNING COMMISSION CC = CITY COUNCIL PROPERTY LOCATION PLANNING COMMISSION REVIEW File # AP Applicant PC 12/13/22 CC 12/20/22 PC 12/28/22 CC 1/3/23 PC 1/10/23 CC 1/17/22 1111 N. Diamond Bar Blvd. (New single-family residence) DR PL2022-78 GL Creative Design Associates PH ADMINISTRATIVE REVIEW Property Location AP Applicant None PENDING ITEMS Property Location File # AP Applicant Status 1625 Bears Den Rd. (Addition to single family residence) DR PL2021-01 MN/DT Pete Volbeda Third incomplete letter sent 8/31/21 – waiting for additional information 1198 Chisolm Trail Dr. (New single-family residence) DR PL2021-51 JT/DT Michael Wu First incomplete letter sent 7/21/21 – waiting for additional information 2725 Clear Creek (New Single-Family Residence) PL2022-74 DT Diane Shi First incomplete letter sent 9/15/22 – waiting for additional information 1519 Derringer Lane (New Single-Family Residence) PL2022-112 DT David Senft Under review 2001 Derringer Ln. (2-lot subdivision) TPM 83036/DR PL2021-46 MN Gurbachan S. Juneja Third incomplete letter sent 10/26/22 – waiting for additional information Development Code Amendment (Code cleanup) DCA PL2022-59 MN/GL City of Diamond Bar Under review Gentle Springs Ln. and S. Prospectors Rd. GPA, ZC, VTTM, DR PL2021-23 GL Tranquil Garden LLC First incomplete letter sent 4/16/21 – waiting for additional information 2234 Indian Creek Rd. (New single-family residence) DR PL2020-159 MN Jeffrey Sun Second incomplete letter sent 9/30/21 – waiting for additional information 22909 Lazy Trail Rd. (Addition and remodel to single family residence) DR, MCUP PL2021-05 JT/DT Walt Patroske Fourth incomplete letter sent 7/6/22 – waiting for additional information 2235 Morning Canyon Rd. (20-unit condos) TTM 83836, DR, TP PL2022-89 MN Samir M. Khoury First incomplete letter sent 10/17/22 -waiting for additional information Municipal Code Amendment (SB9) MCA PL2021-92 MN City of Diamond Bar Under review 9.1 Packet Pg. 89 Project Status Report CITY OF DIAMOND BAR Page 2 December 13, 2022 COMMUNITY DEVELOPMENT DEPARTMENT PENDING ITEMS (continued) Property Location File # AP Applicant Status 23121 Ridge Line Rd. (New single-family residence) DR PL2020-31 MN Pete Volbeda Fourth incomplete letter sent 9/13/22 – waiting for additional information 2626 Wagon Train Ln. (New single-family residence) DR, TP PL2022-62 MN Pete Volbeda Second incomplete letter sent 10/4/22 – waiting for additional information Walnut Valley Unified School District (Billboard Ordinance) PL2021-43 GL/MN WVUSD Under review 9.1 Packet Pg. 90 CITY OF DIAMOND BAR NOTICE OF PUBLIC MEETING AND AFFIDAVIT OF POSTING STATE OF CALIFORNIA COUNTY OF LOS ANGELES CITY OF DIAMOND BAR I, Stella Marquez, Administrative Coordinator for the City of Diamond Bar, CA, declare as follows: I hereby certify, under penalty of perjury under the laws of the State of California that on December 8, 2022, 1 posted the December 13, 2022, Planning Commission Agenda, pursuant to Government Code Section 54950 et.seq, at the following locations: Diamond Bar City Hall, 21810 Copley Drive SCAQMD/Government Center, 21865 Copley Drive Heritage Park, 2900 Brea Canyon Road Diamond Bar Library, 21800 Copley Drive City website: www.diamondbarca.gov Executed on December 8, 2022, at Diamond Bar, California. Stella Marquez Community De' bu.�wmaT�n�o�u�k aoc VOLUNTARY REQUEST TO ADDRESS THE PLANNING COMMISSION AGENDA ITEM: �i 6 SUBJECT: TO: Planning Commission DATE:.( 3 oZ SPEAKER vouq kaRs ADDRESS: I would like to address the Planning Commission on the above sfated item. Please have. the Commission Minutes reflect my name and address as printed above Signature Note: This fsis intended to assist all persons wishing address r mision will haetheopportunity to do so, and to ensure correct spelling of names the Minutes. ease submit your form to the Planning Commission Secretary. Thank you. After completion, pl