HomeMy WebLinkAbout30578 (381)Final As-Graded Geologic Report
Rough Grading Completed, Tract 30578,
Diamond Bar, California
We. ahe /-13,-?/ 4oidel,,Jo ---
Robert Sloneve Associates
1) e r t S f as if e & A s s c i art e , I n c
ara aaau
19720 %Tntura Boulevard - VVoodhnd INN, ClOomia 9-1364
213) 346-0565 - (213) 873-TiH2
November 5, 1970
1-68-301-0)
E. L. Pearson and Associates
1551 West Redondo Beach Boulevard
Gardena, California 90247
Attention: Mr. Garry Vander Wende
Subject: Final As -Graded Geologic Report,
Rough Grading Completed, Tract 30578,
Diamond Bar, California
Gentlemen:
rJARA
We have made t.&AAM4.0 02"Y jan?"110 inarl7tior. q Ot t4c 7-1,-,.-
ject tract during grading, as required by the County of Los
hngeles. Rough grading of the tvact is now completed. This
report presents our opinions resulting from Lhese inspections
and supplements our prior reports.
Enclosed is the final As-Gxaded Geologic Map and selected cross-
sections. Cross-sections have been revised in those areas wher("
major design changes have occurred during the progress of the
grading. The revised sections ref3ect both the original design.
and the final grading configuration. The final compaction report
will be forwarded under separate cover.
Boring Logs A through X, drilled during construction of the tra&:,
have been included with this report.
Ule following reports have been submitted in conjunction with the
developnnnt of this tract:
io
E. L. Pearson and AssociaLas 1-68-303-09
Novembar 5, 1970 Page 2
30B NUMBdid I-,' SUBJEC'1'
1/13/69 68-311, Gyading Plans
2/3/6(,,) 68-301A Addendum Geologic Report, Grading Plans
3/21/69 68-301B Grading Plans Addendum
3/21/69 68-301C Supervised Compaction Sport, Pavilion
Axna
3/24/69 68-301D Geologic Report, As -Graded Pavilion and,
Parking Area Sites
f/2 d. 68-301H Geologic ReporL, As -Graded Sales Office
Site
3/25/69 68-301F Geologic Report Pavilion Area and Sales
Office Site
3/26/69 68-30IG Additional Data
3/27/69 68-301H Graded Slopes South and East of Pavilion
Site
3/31/69 68-3011 Addendum ConTaction Rnport, Tract 30577
Pavilion Riding Area and Dike Section
1/33/69 68-3013 Addendum Supervised Compaction Report,
Sales Office
3/31/69 60-301K As -Built" Geologic Report, 3:1 and 5:1
Slopes and Channel North of Pavilion Site
Tract 30577
4/4:/69 68-301L Addendum Geologic and Soils Report Lots
130 and 131.
4/5/69 68-3011 Addendum Report, Fill Slopes
4/10/69 68-301M Addendum Geologic and Soils Report
Proposed Model Lots 127 and 135
4/10/69 68-3011 Filled Ground Peport - State of California
Division of Real Estate Report
5/1/69 68-3010 Design of Fill Slopes
5/8/69 68-301MR-1 Monthly Report #1
5/12/69 68-301P Alternate Design of Shear Keys
5/ 23/69 68- 30 1Q Addendum Report
5/27/69 68-301R Redesign of Proposed Grading
5/28/69 68-301S Additional Soils Engineering Information,
68-3011"° R-2
Lots 170-176
Monthly Rcport #26/17/69
Robert Wone Asso"ciales
E. L. Pearson and Associates 1-68-301-09
Novomber 5, 1970 Pago 3
JOB NUMBHF SUBOECT
7/8/69 68-301MR-3 Monthly Report No. 3 Geologic
7/11/69 68-301T Lot 135
7/15/0) 68-301U Addcndum Report lot 135
S/28/69 68-301V Redesign of Proposed Grading, Lots 46-49
7/28/69 68-30IN Lot 135
8/15/69 68-301MR-4 Monthly Papaxt #4
8/25/69 68-30ISMR-5 Semi -Monthly Report 5
9/10/69 68-301. Redesign of Proposed Grading Lots 68-69
9/11/69 6B-Y0MR- Semi -Monthly Report H
9/22/699 6B -301Y Review of 5:1 Cut Slope North of Pavilioi:i
Site Tract 30091 (30578)
9/23/69 68-301 00
SMR --'7 Semi -Monthly Report 7
10/8/69 68-301-00 Semi -Monthly Report 8
SMR -8
10/13/69 68-301-002 Supplementary Report, Lots and 69
1-/20/69 G8-30 00A. Redesign of Proposed
IC
Grading Lots 59-62,
10/22/69 Semi-MonthlyReport
R-9
68-301_-00
10/30/69 68-301-00 Semi -Monthly Report 10
SMR -10
11/5/69 68-301-00AB Redesign of Proposed Grading Lots 50-55
11/7/69 68-30ISMR-11 Semi -Monthly Report 11.
11/10/69 68-301-OOAC Supple"ontal Geologic and Soils Report,
Lots 59-62
11/21/69 68-301SMR-12 Semi -Monthly Report 12
12/1B/69 68-301-00 Semi -Monthly Report 13
SMR -13
12/23/69 68-301-00 Semi -Monthly Report 14
SMR -14
1/7/0) 68-301-00 Semi -Monthly Report 15
SMR -15
1/9/70 68-301-02Z Supplementary Report an Corrective Grading
Lots 23-30 and 170-176
1/12/70 68-301-01 Geologic Report Lot 81
Robert Stop"ic & Ass,.)ckltes,
E. L. Pearson and Associates
Novenber 5, 1970
DAW
170
2/2/70
2/2/70
2/S/70
2/27/70
2/5/70
2/24/70
3/6/70
3/26/70
4/7/70
5/4/70
5/11/.70
5/12/70
7/22/70
8/17/70
8/20/70
JOB NUMBEP,
68-301-00
SMR -16
68-301-04
68-301-04
68-301-04A
68-001.02 .D
68-301-04B
68-301-03
SMR -17
68-301-03
SMR- 18
68-301-03
SMB -19
68-301-03
6B-301-07
0-0153-00
0 -0153 -DOA
68-301-12
68-301-12
68-301-12
1-68-301-09
P a go 1'k
SUBJECT'
Semi -Monthly Report f 16
Compaction Report, Lot 1..35
Geologic Report (Rough Wading Completed)
Lot 135
Addandum Report, Lot 135
Additional information Steeplechasc.
Shear Keys, Lots 23-30 and 370-176
Addendum Compaction Report Lot 135
Semi -Monthly Report #17
Semi -Monthly Report #18
Semi -Monthly Report #19
Final Semi -Monthly Report
Study of Soil Coment Mixtures
Final Geologic Report Lot 148
Foundation Engineering Report Lot 148
Addendum Geologic Report (Rough Grading
Completed) Lot 81
Lot 81 Mayes
Geologic Inspection F
Robert S
Robert S" "'
ion of landslV
usewers. With the exception of the
i between Lots 155 and 156, sewer alignmer
ements were mapped and inspected by an
prior to backfilling. The force main
en made as of this date. The informatior
ctions is shown on the attached Geologic
89.
etween
ba,se map
Very
ROBEIR
And B
Safetym
fl
m
IN
PRORC F Ujimond.Bar
WAY of DrHkr,,):B,t.;(,:kat Augur AC!Xpd by P L /M PNo..,.... 68,r, 3-,') 'j,
J)We obsa:vc(L,
011 0
lsoi I'eo
Tan SANDSTONE and occasiona]
siltstone and shalc interbeds
slightly moisL, fractuxud)"
115' E -W, 14N un SILTSTONE bndi.
SANEWICYNEP' Via Y
hear Plane in MUM=
Tar in SILTSTONE bed
Shear planc, Win 1120W, noarly
horizontal (curvod slicks strike iorlh)
ToWl Depth 36'
No walar - No cavin(j
I'll, gm 1 1 Y0ni"""" " ' " , " "' +": = 2 a z I tC14 know 2 . to to A , ="""I
SUR -SURFACE
DATo
A Log
PRORCP . .............. ...... ----
IV BuckotNWTudof
Gmuml ERva6mJAR--------AocuWnv ....... NSA. 0011- ........ .... --Date
S51 TestDescription
Tan to brown
SANw
DSTONE with occaN.Ional.' 1 Pon"
1. a "W A siltstone interbods
31-JgO north dip
00 MY
Now,- z'
Room: A'
mmoub"'I"wj :'. Y' -c 1.-] ack
GILTSTONE mud SANDSTONI.,`
S, 17 2 on shear plam! 131 N
Total Depth 16'
No water -,- No caving
I
25
m
m
IM
Log No.— v—, — -1
of , 1. 1; ,, /M. E. F" 'j"")' No.. Lolque! Q
Am Mn.— - . . .. ..... .... . . . . . . Dal Ohem"h
Predominantly tan SANDSTONE wiM
SILTSTONE intorhadsHIM,
3' - IN20M, ODD NW on 6" siltstone
some openinsandstone, fractured
MAN': I
Open fractures to 1/2", roots ba
SANDS TOM[,,'
VMS
Crushed, Macturod
i-',''-'Wxy na-- — -
Shleqqr P r w r, with some roots
N A 0
Black unoxidized SILTSTONE withy,
SANDSTONE Anterbods (slightly moist,
firs continuous, tight bedding
P65 W. 17Nn
Total Depth 26'
SKI Test
K"
G':10n:14 Shymy A AnnOWAY Lot
Sm 13 - 1110 FwAS: E DATI 1.00 i;,"
Ilk")",
ACJ
Alf-pynd 3r
P ROJECT:
DAMP hYP. M M. E - R Jolt No—W 301.... Wood OF 10mad
d Or"'Vcaiow 070--mms"M TrYan ........
S
SMI TM
Ekmip lon
e3:'/
el"
Ent(.rbodded SILTSTONE & SANDSTONE
slightly moist to dry, fractured
to fairly tight)
udding NGO
0
E,15 0 SE in Siltstone
ANDSTONI],
ntarbedded SHNSTONE and SaNDSTONE
1' led clay , shear pl-Y, 16 - a IS1011S -1 C
1435 W, 17 NE slicks strike N20 . ,
Inarbedded tand and brown SANDSTONE
and SILTSTONE (slightly moist, Light,
continuous bedding)
Bedding N30
0
W, 18
0
NE
40' Total Dupth
391
SUBSURFACE WMA Log
mcau"
wa
71
NWbod of DAMW ... .... by Job 1"40,
Gmund ......
Ile ?A y H,
53 WS1 "W/Iwn
snu Test
DoWpHor,
TOPSOIL: Dark brown silty CLAY
W-011-0- firm) becomes sandy withF
depth. Some opon pores below 61.
SUBSOIL: Silty clay soil with blocks
WIND and sandstonE
SLIDE DEBRIS: Discontinuous badding.
ti
MUNTAU-51ocks with streaks of
1 1,50
13' NWE, I 301
Some SANDSTONE beds Marting at 131
11': Thin bedded SILT STONE (clayey,
U "11 I I I moist) N100,9%
Bedding discontinuous for the most',
part.
t CI n cm s to c a 12 SS
44'
LJ B,-'S FACE DATIA
SMI Test
WE; I'%,"!b.
D:i, FIROJEC7'e
DHM%U
sn GI i
Nk6od of a y
9441
See mm) 1 6 9
ObscmVe&', Uk,,vfstioru .... .. . ... Ao"dhml I
e"/
45"
4 is
4,
I
BEDPOCK: PUENTF wnpMATION (Continued)
1i AW t:: wb k)"?J'u`_6K t "I'Tt" _o"T-'_th_' c h o I e
below 32'. Thin bedded gray to
black siltstone and gray medimc
sandsLune.
Total Depth 51'.
Near refusal, no caving.
L n ab ..c to I og bo A cw 3 9 ' due to wa to,"'-
lovel and activity of the slide plane
44'
SMI Testo
e
BEDPOCK: PUENTF wnpMATION (Continued)
1i AW t:: wb k)"?J'u`_6K t "I'Tt" _o"T-'_th_' c h o I e
below 32'. Thin bedded gray to
black siltstone and gray medimc
sandsLune.
Total Depth 51'.
Near refusal, no caving.
L n ab ..c to I og bo A cw 3 9 ' due to wa to,"'-
lovel and activity of the slide plane
L 91 WK 6A2L.Off
Mill -5 URFAC E D1A,,'T',r% Lay;
m.. .... ..........
Wwd of DMAW AAn,Buqket- ,AoMpd by G H Job ......
980,
SY
50H Test
TOPROIL: Dark brown silty CLAY
ix-TtO
SLIDE DEBRIS-,
10':N55
0
E,12
0
N
Hole tight, well-bodMI
Bodding disconLinuous, blocky,
fracturew],
Sheared SILTSTONE with slicks
Slide Wane U 211. N50
0
E,12
0
N,
irregular.
BEDROCH
tan to gray medium SANDSTONE
0 0
28' W&W, 30"Nh,
Near refusa].
Total Dopth 311.
No groundwaLer, no caving.
i
f1c"bert Storm
DAL'% Lop
D O M W Bar
PROJECT: ........... ..... ............. ...... .. .......... .......
Wthod of DtUrvj WAj,Buqkq L—aqggK__ Job PO—WRI . . ... . ..
Gmund 10maom WIS.—
w 4546a y XV VMS
Soil Test
E A ,Q( TOPSOTL: Dark brown silty CLAY
ti E f some dessication
21"Us to 1
SLIDE DEBRIS
110-tcInt brown medium
SANDSTONE anl gray clayey SILTSTOKE
A4 a
00 11 4' : Highly fractured with opel'-1Q
voids Lo 3/4" wide E -W44
T Possible slide plane. Brecciated
0 0
V085 W,22 HE
0 0
10' 085 W,25 Nj"lry
z!' j
I WWQI' 14y':N75 W,25 NA Tight hole
411
Clayey SILTSTONE with slicks,
some shearing, no ,
NWE,25 'N.1 probablo AM plane.
24
J31,.',DP,,0CK 1"'U NT FORMATION: lntor-- Jr
T '-i Ca coo U °:
SILTSTUIE and qray SANDSTONE.
Hole firm and well bedded to bottom.
LroIM
3
Z 2-
28 : N73 W,23 11 L
Near refus"i
Total WpLh 31'.
No groundwater, n6 caving,
Storms d
SUESSURFANCE Dark TIA
SLIDE DEBRES: Tan to gray clayey,
0bg ' ;'T
Wo 6
1) i a m a n d 13 a x" PROJECh.......
VITIMPARd tan SANDSTONE, dry,
w
VB
NW%od of WWI
pp
toggod by G H Job
04':N75 W,100NE, clayey SILTSTONE withc
Xi
3 V w md [""' k""""afionk ..Localmm
Dascdpllm
i, T " j7
ri
1A 1 q i", SLIDE DEBRES: Tan to gray clayey,
0bg ' ;'T
Wo 6 VITIMPARd tan SANDSTONE, dry,
IrF moderatV -) W-Wlthered, fractured
04':N75 W,100NE, clayey SILTSTONE withc
Xi
ah ro ...........
C&
Shears on SILTSTONE E -W48 N
sandstone, loose, tan
Highly brecciatrad gray SILTSTONE,
bedding indistinct,
m
m
mjynd qrm"Tmv pro SAN"Wnm ,
No bedding, fractured, brecciated
Possible slide plane at 191
Thin bedded gray SILTSTONE with
som gray SANDSTONE'
SHEARED ZONE: No continuous bedding
rT' a,TONE, no plastic goug(,..
26': Bedding highly contorted, frac
t ured
26y': Crushed, sheared clayey SILT-
113TONE. Sme slicks - probable slide
BEDROCK - 1MVINT FORMATION: Wall
b I a cl,
SILTSTONE N55
0 W,15 00
Near mfunalt.
Total Depth 28'.
No groundwater, no caving.
Soil Tem
A
7
SUB -SURFACE WMA Log
L 1 c I, J"?, a 1-
P Cy 1' 1, ...... ...... 111.1-1-11--"- . ......... ........ .........
Whod u4 Job
uu'q'cl rCorr, 874 ......
44
SO Test
a S C r ji c"Y' rk
I MIT: MAxturc of SILTRTONE and
ANSTONE fragments (moist, firm)
CompaMed shoar-key backf ill.
hf I... .!.,d - PUENTE FORMTION: Intor-,
tight, WC11 heddwa
0
Approximate: N20 W,10"NE2V1'
7:
Unable to pnnaLruLe resistant bedding
To Lal Depth 28' ,,
No gioundwater, no caving.
SUEPSURFACE DATIA WE;
Di,aniond 13,ar
NWAod oF DMIMW At 7 -hu. clkle"t, -,gulyllyr, by
GH Job 13.
A'oc,
E
M
310
DMWPHOrl
TOPSDJL: Dark brown silty CLAY
firm)
SUBSOIL: Brown silty SAND (moist,
E TTET-
SLIDE DEBRIS: SANDSTONE and SILTSTONE
T 'E-iT_T,[th some soil intermixed
12': Sheared SILTSTONE, continuous
around the hole
381: OponjracLuras to 1/4" wide Lr
19': Shear plane. Dqrk brown,
sheared, CLAY slicks, gouge IN to 2''
t h i C lez N65
0
W,33
0
E
Shear plane - 1/
1
2" thick. Gray
clayey SILTSTONE - N40%400E
251: Bedding continuous but sheared
N35
C )
W,39
r)
h
281: 8" thick loose brown SANDSTQNP
34': I/d" thick moist silty CLAY be(,,k
over unweathered dark brown SILTSTONE
1 0 1
N65 -W, 17- 1] ProhnhJe slide plane.,
V1
BEDP,0(,'X ]ATNTE FORMATION: Thin-,
QW h e
I
d
I
d - e . d
1-11
6 5_1161 h I LTS T 0 N h
Wnabla to penetrate rusisQnL heddinq
Total Depth 35'
No groundwatny, no caving,,
An
V1
SLIDE VLAYE,: 3- yougo zone with dark
01157145, plastic CLAY, sheared,
S] icke(J
NGO
0 W,16 03-
BEDROCK - PUENTE PORMATION: aDrR
1 f WAT60-
as Neor ryfully-)
a3
yy
Total Depth 29'.
No groundwator, no caving.
DA"' A
333
ii o n, d 1,1„a' .”
F i"I'
ll ("),
J, L"'T cl"' ........... ........... ....... ........
24" Bucket-augey
by Job
G
No. Ab5ad of .......
Date
4,
OW" D e, Sea Tea
vial;; SANDSTONE' FILL: Mixturo SILTSTONE,
S o'T L'
NT
SLIDE DEBRIS: DisconLinuous hodding.
ARM-SILTSTONE and massive
0C SANDSTONE
A random and disorientedttitudes
SLIDE VLAYE,: 3- yougo zone with dark
01157145, plastic CLAY, sheared,
S] icke(J
NGO
0 W,16 03-
BEDROCK - PUENTE PORMATION: a DrR
1 f WAT60-
as Neor ryfully-)
a3
yy
Total Depth 29'.
No groundwator, no caving.
4,
SLIDE VLAYE,: 3- yougo zone with dark
01157145, plastic CLAY, sheared,
S] icke(J
NGO
0 W,16 03-
BEDROCK - PUENTE PORMATION: aDrR
1 f WAT60-
as Neor ryfully-)
a3
yy
Total Depth 29'.
No groundwator, no caving.
1.------------- . .. ........ . ..... . ....... . ... ..... . . . .. ...... . ..... ............ . . . . . ..
Stovic"""',
Log No..0111
Diamona Bar
PROXCh ......
Mabod
Buck c t- a b, Job W ..........
nG
Wound ....... crycd:
W,a I
WY
SAW
muw rorty raven u.0
JIM
SLIDE DEBRIS: Tntorbedded clayey
tom SIMSTCMEa
Randan Es:Itudcs, disoriented blocks
II
CS ,
1: Severely hrocclated
1-3"" thick. SheaYed,
6 Q
PUENTE POPMATTON: Thh'.
Sun -
1 3 j , "
1er, no caving.
SAW b t
V,,1,,,) ........
DIAMOND BAR TXact 30578
PROJECTn- — . ..... ---- ....... ........ ....... .......
lZinch ........... blkwad DAWMm -- - -111.111-1 ....
Grvurr(l .......... ........
p,
DESCRUMN som IHTS
ly, 01LIDE DEBRIS: Brecciated SILTSTONE an
S 117,
PILL: Loose Ml material from site
SlINSTONE and SHALE; tirm, bodding
ti, o n
continucus around hole; only slightly
V, ON
19' BMW ng NSE WE
TOPSOIL: Sandy, silty CLAY, AN,.
WIT
51 near top, Wightly moi&:
near base; contains dossication
cracks)
ly, 01LIDE DEBRIS: Brecciated SILTSTONE an
S 117,
4!,(
Total Depth = 42 ft
No GroundwaLer
Nb Caving
591'J -111,111, - .......... ...... .... .... . ..... .. . . . .. .. .. ..... . ..... . a.. ,
BEDROCK: PUENTE FORMATION
ATE" AtcrboOOM
SlINSTONE and SHALE; tirm, bodding
continucus around hole; only slightly
moist; yellow bro%n,,
19' BMW ng NSE WE
WIT
211 Fault oriantod N30qua 2BNE cuts
hedding; caliche along fault.
@ 22-24' Hard, cemented SANDSTONE bad
@ 26-295' SANDSTONE be(d
30-311 Hard, cemantod, SKNDSTONE
32' Bodaing N25W 11NEo.
II x
1 it 0% @ 37' Bedding 9W,',
a.
fl
SiltsLonc becoming black and hard at
bottom.
4!,(
Total Depth = 42 ft
No GroundwaLer
Nb Caving
591'J -111,111, - .......... ...... .... .... . ..... .. . . . .. .. .. ..... . ..... . a.. ,
SUESSURFACE DAVA Log
bY PH Job t4" 0.
Grcm,ncl Ek,'atiom Jow Now, Date 0WemeW7z??zG2---
A,
got WQAon I Test
1 4
TOPSOIL: Sandy, Silty CLAY. DnW,,,
EAR T -Ary)
as WAST-000 —STRAW
SHAIT fragments in
sand ail atxix
Dominantly SANDSTONE with inter bed,,..;
of micaccons SILTEWNE and SHALE,
moist, yellow brown.
@ 9' iso: ding N20W 23NE
@ 1Q' opun joints to V
@ 115 141 - SANDSTONE bcd
@ 14' Twoh sheared BILTSTONE becl
orientod NBOW 16N, probable slidc
plane
BEDROCN: PUENTE FORMATION: Thinly
and SUALE; firm, mottled orange -
brown W gray-blndk
@ 16' N85B 13N'V
@ 201 N80E 14N'v,,7
@ 22' Tuxwinated on hard -camanted
ShNDSTON1`'
Total Dopth = 22 fL
No GrnundwaLur
No Caving
1 4
TOPSOIL: Sandy, Silty CLAY. DnW,,,
EAR T -Ary)
as WAST-000 —STRAW
SHAIT fragments in
sand ail atxix
Dominantly SANDSTONE with inter bed,,..;
of micaccons SILTEWNE and SHALE,
moist, yellow brown.
@ 9' iso: ding N20W 23NE
@ 1Q' opun joints to V
@ 115 141 - SANDSTONE bcd
@ 14' Twoh sheared BILTSTONE becl
orientod NBOW 16N, probable slidc
plane
BEDROCN: PUENTE FORMATION: Thinly
and SUALE; firm, mottled orange -
brown W gray-blndk
@ 16' N85B 13N'V
@ 201 N80E 14N'v,,7
@ 22' Tuxwinated on hard -camanted
ShNDSTON1`'
Total Dopth = 22 fL
No GrnundwaLur
No Caving
j
M
M
a
SLIDE DEBRIS: SILTSTONE, SHALE, and
S L I D H P L A N E 0 r A a n te d N 85W
I _' n SILTSTONE ; Slicks trend
N20W
ly
SNIDSTONE, firm, MUM.
@ 14' Bedding H70W MUF,'
@ 14k-16" SANDSTONE bQ]
@ 19' Bedding NG5W 11 NE
@ 26' Bedding N7UW 16 NE, SILTSTONE'
becoming black and har(,1
@ 311 Uole terminated on hard
SANDSTONE
Ubtal Depth = 31 ft
No GraundwaLvt'
No Caving
QamyndjRy,jjqFt 30578PROJECT:
Mobod DAM, nch Buckof ..147j
8121A Sn e M Pa , DaN 0 home&
DHCRWUW'4 SCM, 11 STS
a
SLIDE DEBRIS: SILTSTONE, SHALE, and
S L I D H P L A N E 0 r A a n te d N 85W
I _' n SILTSTONE ; Slicks trend
N20W
ly
SNIDSTONE, firm, MUM.
@ 14' Bedding H70W MUF,'
@ 14k-16" SANDSTONE bQ]
@ 19' Bedding NG5W 11 NE
@ 26' Bedding N7UW 16 NE, SILTSTONE'
becoming black and har(,1
@ 311 Uole terminated on hard
SANDSTONE
Ubtal Depth = 31 ft
No GraundwaLvt'
No Caving
e r S t c) ri S a t e
L o9 N
PROMM ROW.W.M act. ........... ..... .......
MeMod of DAM Bucket by NE/GM.- ... 0,
Wound.... . 52, 02=0 rain Lane . . ...... Observe&MMIL"
v
so L UpsVDUCRWMN,
2 ,..,,.,.,».,. ..... . . .. .......
TOPSOIL: Dark brown, silty CLAY,
YAQ—Mightly Moist
SLIDE DEBRIS: Interbedded light gray
tSTONE with some ta.n
SANDSTONE. Root fractured open to
k". Bedding discontinuous to 41Q1,
Dry to slightly noist, fracturv.1
M
M
M
Total depth 43'
No .aria.. "U no groundwater
Highly fractured, continuous frac-
ires can be traced to 41Y feeL
35
ov
41V EPIPEPLANE:
Frab cturing
ZLb:rup'L.J.y 't, Natas on thin sheared
clay bad. Approximate altitude,
N 4 0 E 8 N W
41-
BEDROCK: o w10N
Ain
T C I a 1 t g c, S
to dark brown, micaceous SILTSTONE
with some SANDSTONE . Unable to
penetrate resiskant bra drM,,'
Total depth 43'
No .aria.. "U no groundwater
a.
SUEPSURFACE DARPA L o g
Diamond Bar, Tract 30578
PRORCT................. 11-1-1-1 111-11-1111111- ... - ......................... ........ - ... .... .........
I'" woket Awr
Train 1,19--Dwe 7-15-69
61
TOPSOI'),: Dark brown, silty CLhY,
J, j gh t ly Mo j
VIIIIE'
ll,,('
Jill",p",p) BEDROCK Thinly bedded
M-Khe tan SANDSTONE,
bedrock loo2c, buL continuous tto- 15
Attitudes near horizontal.
0 15' pQjPqQWght, well bedded.
Wtituden continue near horizontal
n bottom of h0p, Unnbin to ppne-
trate resistant bNomUCK.
rp
Total Depth 45'
No caving, no groundwnter
41-
45
I
rnwi
o'
SUMSURFACE WMA
Diannnd Bar TR MY,`,' ........... ..............
PROJECTn___--------- ------
of M 4Wng
CJI
ky Jcp[:w NmI=6S=aOl=5U._
Wh__ Loco I h3wMat,52, We CAswv"nIJI3AIU._
Ile
DESTI ION Sou n, ax's S
BEDRDCK: Monte Faymation, Tan U`.
GrUSTAltstnno and sandstone
2' N55E 3NW. thinly bedded to silt -
stone (moist, hard)
5'-7' N85W 5NE tan medium sandstone
Mcl
V -9y' Lterbaddod siltstonere„ slightly
f o I d e,,],
W-101' hamd, well -cemented sandstone
L C(.
Below 101' bedrock dry to `kb lightl,,,r
moist, very hart:l
13' N65E 4NII
14' WAL direction N85E, vertical.
SliqhAy ayun j Yathar dry sandston8
and siltstone. Bedrock becoming dry
17' N50E 8 NW - Bedrock weathered to
mottloB colors of yellow -brown
20' NGOE 11
0
NW - thinly interbeddard
HIM= and sandstone. Moistur(,,,
contuni_ slightly increased. Minor
shear plane along budding.
211' 3/4" open joint oriented NBOW
65-70SW, in 12 thick, hard sandsLone
24' gid 85B IONW - minor shearing
parallel W bcdding
27' Bedding horizontal,
30, 'J<mw
1 0
35' N60E b"NNI bodrock continue:,;,
same as abav(,,
40' N45E 6NW bedding continuous to
bottom of hole
Total Depth 43 feet_
No Caving
No GroundwaLer
w
b c 1, L Stone 81 ASawl (sliates n c,
IA
Diamond Bar Tract 30578
PROJECO
Melad of
Mund n.Lanu.... Dour
SMI Ast, DpWwwnV
A . . .... . ..... ........ ....
1 1, " - 1,
Ely v - - i MAWAT SIAM: Wcathared bedrock with,
appcars disturbed,
brecciated. rotatcd.
Nato; This slump is alsoAM
expo.,wd in adjacent dozer
trench)
13' base of debris N70E
38' N25E 4 NW
22 ' N 8 5 E 3%,J
24' Joint surface N75E 80&E
25' N70H 6NW slightly moist
29' N45E MW
30'-31' Hard sandAono bed,
32' N55E 6NW bedding continuous U)
bottom of hoic
ToLal Depth 35'
No Caving
No Ground watw,:
E
101
L o cx,
Pjamond Bar Try ... ................................ ........... ............... __ ...... .... ............................
PROJECT n-- ''I 11-11-11'',__ __11111-11111"_ ...... ....
f DOM,, !,Buckut Auger,... ...Jono d kb W
Low Oc
Yo
SML IBIS
TOPSOIL: U-9' Dark brown siity ciqy
91-161 merges doWnward to mixture of
soil and bedrock debAs
16' NGOE 40SE fracturod weathered,
badroc]z
21' N75E Wl
29' N40E 13NW SHEAR PLANE: Developed
on fjym bed,('1ir'i11` 5 ides nearly
down dip of bed. Bedding firm and con-
tinuous around hole 1',c,.,]_c>w P1,h]NIE
ranqu siltstano and sandstone.
31'-329' modorately hard sandstone bed.
35' N60E 9NV1
Below 36' color changing to alternatin
a A oyanyo a,d block. Material becoming
vuore unoxidized with depth.
40' N35E 14 NW bedding continuous
to batLam of hole.
411 1 Total Depth 441
X
No Gr(:)undwahvr'
Qj--r; Stone to Assm ' I
DATA
PROMW
A", —,Ao2qy1 by-PGAM .. ..... Job Poo
MY ...Am ohow QW. lot. 11, Wam. Train
10
2
3
1UPSOIL: W&C C'Mcolate MI)W31,
6111hi-SI1nT, gradu5 downward into
brucciatud sandstone and siltsLone,
shaJe encaynd in crange-brown clayey
sand matrix.
of broken, discbn-
tinuous sandstone and siltstone.
15-16' MUM caliche zone (dry)
Bedrock brucciatu'
SLIDE PLM'L,
slicks oriented N50W,
slicks well defined,,
t,laterial abovo slide plane and myy
in part be derjvaa from soil.
BEDROCK: PUENTE FORKATIO'Sap
around
hole
22Y-25' Massivu tan SANDSTONE
25' N45E 9
0
N.W.
Below 25' - Interbeddad SANDSTONE and
uYunge-brown SELTSTONE, firm, unfrac-
tured.,
28' Struals W black. anoxidized
ana bods
34' N30E 9
0
N.W. Bedding continuous
to Wtom of haW
Total DQpth - 36'
No Cavinj
No Groundwater
SAI Tw,f
j I
Sin '
nrwan
10
2
3
1UPSOIL: W&C C'Mcolate MI)W31,
6111hi-SI1nT, gradu5 downward into
brucciatud sandstone and siltsLone,
shaJe encaynd in crange-brown clayey
sand matrix.
of broken, discbn-
tinuous sandstone and siltstone.
15-16' MUM caliche zone (dry)
Bedrock brucciatu'
SLIDE PLM'L,
slicks oriented N50W,
slicks well defined,,
t,laterial abovo slide plane and myy
in part be derjvaa from soil.
BEDROCK: PUENTE FORKATIO'Sap
around
hole
22Y-25' Massivu tan SANDSTONE
25' N45E 9
0
N.W.
Below 25' - Interbeddad SANDSTONE and
uYunge-brown SELTSTONE, firm, unfrac-
tured.,
28' Struals W black. anoxidized
ana bods
34' N30E 9
0
N.W. Bedding continuous
to Wtom of haW
Total DQpth - 36'
No Cavinj
No Groundwater
SAI Tw,f
ccAss
DAlf'-A
i oi i, c 13 a r 3057"_'
PROJTC
f 2 4, 13 111 V 6 13 3 0 "1 3Lq—
0 "C', f 0 t la)
Soil 7"!st
11101) C), I, E D"ar]", C', E5 3 C- 1)t, 1,
J:Zl S
ri-tedOr'le
L 0 Ll C Wl (1, (3
fill -ed v,,J.
I
I
4 `
12' N.15ESil,t'-,
s to ca -i, n, A, c.,, I. I", J
1, r led
Or hcA-e naxa-ow :A,-) 18,".
LC
flc c t(: rmi. 11"'i Lion onllotal. 11,7 pt 'i
Szrrvlsta v. bcicl
N (,) C a vi rw. !3
a
o d Tract 30578 ,
b m .,aav
VO'r h . ........ .. ...... ......
ark,
40 ..,.., . a ... ,. ,.. , o .... ......... . ,
hngo-µa;;di ryy..,:"r. a h r.l;',........•. JobY r',. , b„w Ch °!, ,rl-p,,.. ..
afldan it ari,Jr
i,raddrfla
in. .120/70_
9
a ' fl way t fl „o-a;ePaZL an` a au
Al
d 'r
i iy
TOPSOIL:
P .
DarkwChroa C:e brown sandy
dta _1 a
T afl aka
e down to orange—brown -brown ,rV:YbSr4:p;@ l wi.'%°:oh,
h... ofragments.
aro,
v ftent
I SLIDE DEBRIS: te,,.,a.ted SANDSTONE,
PAY A
r
5.s, z4"PjOul M aw VV ($6ow! north side
continuous1f6...°
q;N
R.ie
south side o C hole.
rwost side of hole N701
Gentle dipsIps on cast
7
of hole, but i „., . 1 a G a i. e ” , Red
r
u. s.m ,! 1. cw a ..b e.+e. d.
g e'ni a,tly brokuncJa
a i
w r3, u.uaf}rau , except narrow .d.1dLd.;
I i t i, ; k 1,,. , dry).
4 5,
1' Sandstone bed with carbonized
E If1 nearwoodflbaYswBEDDING
horizontal,ssome br cck.tUonm
1t
4r% Ei
y3
y
b a 1/2" openn Ir rssnr a
P ' Orange -brownJrye) Jn 'ND NO NE (very
FF"
l
1
Y,..P.
p }V1A4N
ed E/, PLANE: J35'
L1. .
b i s o I Y u. t o b re c a_ a..L M.1. continuous
e.a n t ti h ea d. a ° d ahove plana. N Gslick,,
r
FZ11)s d„.,"r ad . W..+ a.GA Er7 .a extremelycSLIDEPLANE
m (
k ry
b
505561kddk 'r'uf 50 V J
6 a u 0 w SANDSTONE k;" 6° : d, firm , u f ' a b r. ":,'u ° <:"
I[rMY,
r,
3
d d
N.W. fi as
4 5,
r) [It, j- t (", I I L " t () 4 1i s,' () c i a t e s nsII
SLIDE DEBRIS: Sharp boundary betwev',,
WE UFACE W i11
ANyon.A.-VaIr Trac
PROJECU .1 -
t-01,5718-1,
19'-26' Soil gKades into shale broccia
Dam (ywome&L/2U`/"7a.—'
D s', c' r a n
Sol TUS1
1 Sol TOPSOIL: Dark choculato brown silty
EX CLAY grados to mixture of sailIDedruck and
MAUS
Wagments.
0
211
27' NGOE 40S.E. interbadJed SILTSTQNI-,.
anO Shale
2 31' open fracture filled with loose30-1 jvI
debris
341 open Fracture continov,,
In, ob SLIDE DEBRIS: Sharp boundary betwev',,
and cho, olaLe br=n
t
19'-26' Soil gKades into shale broccia
211
27' NGOE 40S.E. interbadJed SILTSTQNI-,.
anO Shale
2 31' open fracture filled with loose30-1 jvI
debris
341 open Fracture continov,,
Robe rt Stone & Assoc"Wites
SUG-SURFANCE DATA4,
Hucket j 0
SO I THTS
3 1-, f j I
NF1'
J""
1T11]
1'1 "--'T,nY_I' Wrminates abruptly o:r
shear plano NIOE ON.W. Material
immediately abovo plane highly
brecciated.
Plane parallul to under1fiqj
beddinq.
Plane highly polished no slicks
observed.
ah p and SAND -
0 STONE .
45' NAB 171.W. Massive tan SAND-—
STONE
Bedrock becomus unoxidized with
awl ep th
NQ lngqn6 helnw 451
end A ladde'r pg
501 _ 011'11%
111
1
Total Depth 60'
No CavW.'j
No Groundwater
G 4"