Loading...
HomeMy WebLinkAboutCanyon Loop Trail Grading Plans - Final 6.1.2022 (2).pdf No. GE2202 * * City of Diamond Bar Community Development Department APPROVED Planning Building PW/Engineering Description Date Date Date Planning Case # This set of plans and specifications MUST be kept on the job at all times and is unlawful to make any changes or alterations on the same without stamped/written permission from the Community Development Department. The stamping of this plan and specifications Shall NOT be held to permit or to be an approval of the violation of any provisions of any City ordinance or State law. All conditions of approval shall be met without change or alteration. PERMIT # PR 2022-665 FOR THE CANYON LOOP TRAIL IMPROVEMENTS Parks & Recreation Date 5/27/22 5/27/22 Canopy structures under separate submittal/permit.DRAFT6/1/22 RMRA Measure M R Local Return Gas Tax eet Rehab.- Area 1a, 1b, 2 (Design) n) ntain Laurel) anyon to Lemon) to BCY) 82,779$ 82,779$ om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$ eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $ en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$ mp Project (Const.)177,855$ nt Projects 4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $ 250-5510-46412) Project Description Total FY Budget (109) Measure M (111) Gas Tax (112) Prop A (113) Prop C Sign and HSL Replacement (Design)50,000$ 50,000$ Sign and HSL Replacement (Construction)350,000$ 350,000$ al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0 $ 780,000$ 350,000$ 140,000$ 100,000$ 190,0 $ ments (250-5510-46413) Project Description Total FY Budget (113) Prop C Foothill Transit Grant 60,000$ 60,000$ SD/Calbourne 40,000$ 40,000$ nfrastructure Improvements 100,000$ 60,000$ 40,000$ 0-5510-46420) Project Description Total FY Budget (107) Measure W (108) RMRA (109) Measure M (113) Prop C ovements-Phase 3 (Flapjack-Design)65,000$ 65,000$ 6/1/2022 No. GE2202 * * DRAFTRMRA Measure M R Local Return Gas Tax eet Rehab.- Area 1a, 1b, 2 (Design) n) ntain Laurel) anyon to Lemon) to BCY) 82,779$ 82,779$ om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$ eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $ en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$ mp Project (Const.)177,855$ nt Projects 4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $ 250-5510-46412) Project Description Total FY Budget (109) Measure M (111) Gas Tax (112) Prop A (113) Prop C Sign and HSL Replacement (Design)50,000$ 50,000$ Sign and HSL Replacement (Construction)350,000$ 350,000$ al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0 $ 780,000$ 350,000$ 140,000$ 100,000$ 190,0 $ ments (250-5510-46413) Project Description Total FY Budget (113) Prop C Foothill Transit Grant 60,000$ 60,000$ SD/Calbourne 40,000$ 40,000$ nfrastructure Improvements 100,000$ 60,000$ 40,000$ 0-5510-46420) Project Description Total FY Budget (107) Measure W (108) RMRA (109) Measure M (113) Prop C ovements-Phase 3 (Flapjack-Design)65,000$ 65,000$ 6/1/2022 No. GE2202 * * 16755 Von Karman, Suite 150, Irvine, CA 92606 | 949.474.2330 | adams-streeter.comSTATIONDRAFTRMRAMeasure MR Local ReturnGas Tax eet Rehab.- Area 1a, 1b, 2 (Design)n)ntain Laurel) anyon to Lemon) to BCY)82,779$ 82,779$ om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$ eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $ en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$ mp Project (Const.)177,855$ nt Projects4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $ 250-5510-46412)Project DescriptionTotal FY Budget(109) Measure M(111)Gas Tax (112) Prop A(113) Prop C Sign and HSL Replacement (Design)50,000$ 50,000$ Sign and HSL Replacement (Construction)350,000$ 350,000$ al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0 $ 780,000$ 350,000$ 140,000$ 100,000$ 190,0 $ ments (250-5510-46413) Project DescriptionTotal FY Budget(113) Prop CFoothill Transit Grant60,000$ 60,000$ SD/Calbourne 40,000$ 40,000$ nfrastructure Improvements100,000$ 60,000$ 40,000$ 0-5510-46420) Project DescriptionTotal FY Budget(107) Measure W(108)RMRA(109) Measure M (113) Prop Covements-Phase 3 (Flapjack-Design)65,000$ 65,000$ 6/1/2022 No. GE2202 * * 16755 Von Karman, Suite 150, Irvine, CA 92606 | 949.474.2330 | adams-streeter.comSTATIONSTATIONDRAFTRMRAMeasure MR Local ReturnGas Tax eet Rehab.- Area 1a, 1b, 2 (Design)n)ntain Laurel) anyon to Lemon) to BCY)82,779$ 82,779$ om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$ eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $ en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$ mp Project (Const.)177,855$ nt Projects4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $ 250-5510-46412)Project DescriptionTotal FY Budget(109) Measure M(111)Gas Tax (112) Prop A(113) Prop C Sign and HSL Replacement (Design)50,000$ 50,000$ Sign and HSL Replacement (Construction)350,000$ 350,000$ al 11 Locations (Design and Construct ion)380,000$ 90,000$ 100,000$ 190,0 $ 780,000$ 350,000$ 140,000$ 100,000$ 190,0 $ ments (250-5510-46413) Project DescriptionTotal FY Budget(113) Prop CFoothill Transit Grant60,000$ 60,000$ SD/Calbourne 40,000$ 40,000$ nfrastructure Improvements100,000$ 60,000$ 40,000$ 0-5510-46420) Project DescriptionTotal FY Budget(107) Measure W(108)RMRA(109) Measure M (113) Prop Covements-Phase 3 (Flapjack-Design)65,000$ 65,000$ 6/1/2022 No. GE2202 * * 16755 Von Karman, Suite 150, Irvine, CA 92606 | 949.474.2330 | adams-streeter.comDRAFTRMRAMeasure MR Local ReturnGas Tax eet Rehab.- Area 1a, 1b, 2 (Design)n)ntain Laurel) anyon to Lemon) to BCY)82,779$ 82,779$ om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$ eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $ en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$ mp Project (Const.)177,855$ nt Projects4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $ 250-5510-46412)Project DescriptionTotal FY Budget(109) Measure M(111)Gas Tax (112) Prop A(113) Prop C Sign and HSL Replacement (Design)50,000$ 50,000$ Sign and HSL Replacement (Construction)350,000$ 350,000$ al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0 $ 780,000$ 350,000$ 140,000$ 100,000$ 190,0 $ ments (250-5510-46413) Project DescriptionTotal FY Budget(113) Prop CFoothill Transit Grant60,000$ 60,000$ SD/Calbourne 40,000$ 40,000$ nfrastructure Improvements100,000$ 60,000$ 40,000$ 0-5510-46420) Project DescriptionTotal FY Budget(107) Measure W(108)RMRA(109) Measure M (113) Prop Covements-Phase 3 (Flapjack-Design)65,000$ 65,000$ 6/1/2022 No. GE2202 * * 4"± LEGEND 1 COMPACTED NATIVE SOIL 2 3 90% COMPACTED NATIVE SUB GRADE. FINISH GRADE. SLOPE 2% MIN. 1 2 3 NATIVE SOIL PAVING8 NTS FAX:(714) 245-9275 PHONE: (714) 245-9270 SANTA ANA, CA 92705 2001 EAST FIRST STREET, SUITE 160 1 TREAD WIDTH 36"33"3"12" 7"33"3"12"36"LEGEND 1 1 1/4" DIA. SCHEDULE 40 GALV.STEEL PIPE HANDRAIL. ANY FIELD WELDS SHALL BE SPRAYED WITH COLD GALV. SPRAY. ALL HANDRAILS TO HAVE A GALV FINISH. ANY WELD OR SCARS SHALL BE SPRAYED WITH COLD GALV. SPRAY 2 3 4 CONCRETE FOOTING 6"X8" TIMBER STEP - REFER TO DETAIL 3, THIS SHEET 1 1/4" DIA SCHEDULE 40 GALV. STEEL VERTICAL SUPPORT WELDED TO HANDRAIL. VERTICAL SUPPORT TO BE PROVIDED AT EVERY FIFTH STEP. ALL WELDS OR SCARS SHALL BE SPRAYED WITH COLD GALV. SPRAY. 1 2 4 3 2 3'-0"8"6"6"LEGEND 1 6"x 8" PRESSURE TREATED LANDSCAPE TIE. WIDTH AS SHOWN ON PLAN 6"x 8" PRESSURE TREATED LANDSCAPE TIE. WIDTH AS SHOWN ON PLAN 2 3 4 #4 REBAR. STEP TREAD TO BE 4" DEPTH, 90% COMPACTED D.G. WITH TECHNISOIL BINDER. 90% COMPACTED SUBGRADE. 1 3 42 2 HANDRAIL AT TIMBER STEPS 2 3 LANDSCAPE TIE STEPS4NTS NTS NTS5 TRAIL DISTANCE 1.6 MILES ELEVATION 1216 2' SQ3"18"2'-6"16 12"18 34"1'-6" 11 1 4" R21-1 2" LEGEND 1 2" SQ. X .125 MILD STL. POST 2 3 4 3/8" THK. MILD STL. PLATE CENTERED ON 2" SQ. POST 2" SQ. X .125 MILD STL. CAP MILD STL. PANEL 5 IMAGE CUT THRU & THRU 6 CONTINUES WELDED JOINT ALL 4 EDGES 1 1 2 3 4 5 6 7 8 3-3/4" LETTERING CUT THRU & THRU 1" LETTERING CUT THRU & THRU 9 FINISH GRADE 10 CONCRETE FOOTING 10 9 8 7 ELEVATION PLAN VIEW 1. CUSTOM DECORATIVE PANEL TO BE FABRICATED FROM (3/8" THK.) MILD STL. PLATE, CUT BY LASER OR WATER JET. CONTACT MR. FRANK FIORE WITH BRAVO SIGN & DESIGN AT (714) 284-0500 FOR AVAILABILITY. NOTE: TRAIL MARKER SIGN 24 3/16"15 15/16"17 1/2"30"24"12" DIA. 48" LEGEND 1 3"x4" RECYCLED PLASTIC (NOM.) & PROFILED SLATS. REDWOOD COLOR 2 3 3" SQ. x 14" W. STL. TUBE SUPPORT POST. FINISHED GRADE DUMOR, INC. MODEL #88-40PL ISO SECTION 1 1 2 3 2 BENCH7 NTS KEY NOTES CLEAR PLANT MATERIAL TO 2' SET BACK FROM TRAIL EDGE. COMPACTED NATIVE SUBGRADE. 90% COMPACTED NATIVE SOIL. (TRAIL FINISH) FINISH GRADE @ ADJACENT PLANTING AREA. TRIM ALL OVER HANGING TREE LIMBS UP TO A 9' MINIMUM CANOPY OVER TRAIL. FINISH GRADE.9'5'-0" 4' TO 6' VARIES 5'-0" 4 3 2 1 5 6 1 3 4 2 5 6 NTS6TRAIL CLEARING MIDPOINT TYP.@ 6' STEPS 15" TYP.6"15" 4 'OR 6' SEE PLAN TYP. TYP. TYP. EACH RISER 4'-0" AND 6'-0"15"TYP.TOP 12"TREADWIDTH+ 12"12' MAX. VERTICAL RISELEGEND 1 NATIVE BACKFILL COMPACTED TO 90% MIN. 2 3 4 4" DEPTH 90% COMPACTED D.G. WITH TECHNISOIL BINDER.AT TREADS 24" MIN. #4 REBAR IN PRE-DRILLED HOLES FINISH GRADE. 5 NATIVE SUBGRADE. 6 7 8 6"x8" TREATED TIMBER STEPS. 6"x8" TREATED TIMBER EDGE. 1/2" DIA. X 12" LONG LAG BOLT FOR A HORIZONTAL ATTACHMENT FROM THE STAIR RISER TO THE RETURN. EACH END EACH RISER. 1 6 5 4 1 2 3 SECTION ISOMETRIC LEGEND 1 6" x 8" TIMBER STEPS. SEE DETAIL 1 THIS SHEET 2 3 4 90% COMPACTED NATIVE SOIL. 1 1/4" DIA. STEEL HANDRAIL, HANDRAIL TO BE INSTALLED AT STAIRS GREATER THAN 5 RISERS. - REFER TO DETAIL 1, THIS SHEET TRAIL EDGE. REFER TO CONSTRUCTION PLAN FOR WIDTHS OF TRAIL AT VARIOUS LOCATIONS. 5 6" x 8" TIMBER STEPS. DETAIL 1 SHEET THIS SHEET 7 8 5 7 5 4 1 2 3 NTSTIMBER STEPS NTSTIMBER STEPS PLAN VIEW DRAFTRMRA Measure M R Local Return Gas Tax eet Rehab.- Area 1a, 1b, 2 (Design) n) ntain Laurel) anyon to Lemon) to BCY) 82,779$ 82,779$ om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$ eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $ en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$ mp Project (Const.)177,855$ nt Projects 4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $ 250-5510-46412) Project Description Total FY Budget (109) Measure M (111) Gas Tax (112) Prop A (113) Prop C Sign and HSL Replacement (Design)50,000$ 50,000$ Sign and HSL Replacement (Construction)350,000$ 350,000$ al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0 $ 780,000$ 350,000$ 140,000$ 100,000$ 190,0 $ ments (250-5510-46413) Project Description Total FY Budget (113) Prop C Foothill Transit Grant 60,000$ 60,000$ SD/Calbourne 40,000$ 40,000$ nfrastructure Improvements 100,000$ 60,000$ 40,000$ 0-5510-46420) Project Description Total FY Budget (107) Measure W (108) RMRA (109) Measure M (113) Prop C ovements-Phase 3 (Flapjack-Design)65,000$ 65,000$ 6/1/2022 No. GE2202 * * FAX:(714) 245-9275 PHONE: (714) 245-9270 SANTA ANA, CA 92705 2001 EAST FIRST STREET, SUITE 160 NTSTRAIL EDUCATIONAL SIGN1 NTSSTEEL FENCE POST / WOOD RAIL FENCE2 5'-0" NATURAL SOILT RAIL 2'-0"3'-6"2'3'-6"2'1"ELEVATION SECTION12"18"8'-0" MAXIMUM SPACING LEGEND 1 5 1 2" STEEL FENCE STUDDED T-POST 2 3 2" X 6" PRESSURE TREATED DOUGLAS FIR RAILS (2) DRIVE POST INTO NATIVE SOIL 4 USE 3 INCH DECK SCREWS (TYPICAL) 1 1 1 1 2 2 2 2 2 3 3 4 SECTION DRIVE POST INTO NATIVE SOIL DRAFTRMRA Measure M R Local Return Gas Tax eet Rehab.- Area 1a, 1b, 2 (Design) n) ntain Laurel) anyon to Lemon) to BCY) 82,779$ 82,779$ om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$ eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $ en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$ mp Project (Const.)177,855$ nt Projects 4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $ 250-5510-46412) Project Description Total FY Budget (109) Measure M (111) Gas Tax (112) Prop A (113) Prop C Sign and HSL Replacement (Design)50,000$ 50,000$ Sign and HSL Replacement (Construction)350,000$ 350,000$ al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0 $ 780,000$ 350,000$ 140,000$ 100,000$ 190,0 $ ments (250-5510-46413) Project Description Total FY Budget (113) Prop C Foothill Transit Grant 60,000$ 60,000$ SD/Calbourne 40,000$ 40,000$ nfrastructure Improvements 100,000$ 60,000$ 40,000$ 0-5510-46420) Project Description Total FY Budget (107) Measure W (108) RMRA (109) Measure M (113) Prop C ovements-Phase 3 (Flapjack-Design)65,000$ 65,000$ 6/1/2022 No. GE2202 * * FAX:(714) 245-9275 PHONE: (714) 245-9270 SANTA ANA, CA 92705 2001 EAST FIRST STREET, SUITE 160 HORIZONTAL TIES TYPICALLY 3'-6" TO 4'-6"±2'-0"ØFTG. & COLUMNFTG. & COLUMN 3/4"Ø A.B.'S VERTICAL REINFORCING TOP OF SURFACE TYPICALLY 8" (MIN.) EDGE OF PIER TO EDGE OF SLAB ACTUAL DESIGN WILL VARY DUE TO BUILDING CODE REQUIREMENTS AND MAY BE SUBSTANTIALLY LARGER 8'-0" OUT/OUT OF ROOF8'-0" OUTSIDE OF ROOF 14" IN/IN OF COLUMNS12 4 18.434 9 5 °6'-514" CTR./CTR. OF FRAMES & PIERS6'-0" (MIN.) OUTSIDE OF DG PAD 2'-0"4'-0"9 12"9 12"LIMITS OF DG PAD - VARIES, SEE CONSTRUCTION PLAN FOR SIZE 6'-0"EQBENCH FACING FORWARD EQ8'-6"DRAFTRMRA Measure M R Local Return Gas Tax eet Rehab.- Area 1a, 1b, 2 (Design) n) ntain Laurel) anyon to Lemon) to BCY) 82,779$ 82,779$ om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$ eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $ en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$ mp Project (Const.)177,855$ nt Projects 4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $ 250-5510-46412) Project Description Total FY Budget (109) Measure M (111) Gas Tax (112) Prop A (113) Prop C Sign and HSL Replacement (Design)50,000$ 50,000$ Sign and HSL Replacement (Construction)350,000$ 350,000$ al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0 $ 780,000$ 350,000$ 140,000$ 100,000$ 190,0 $ ments (250-5510-46413) Project Description Total FY Budget (113) Prop C Foothill Transit Grant 60,000$ 60,000$ SD/Calbourne 40,000$ 40,000$ nfrastructure Improvements 100,000$ 60,000$ 40,000$ 0-5510-46420) Project Description Total FY Budget (107) Measure W (108) RMRA (109) Measure M (113) Prop C ovements-Phase 3 (Flapjack-Design)65,000$ 65,000$ 6/1/2022