No. GE2202
* *
City of Diamond Bar
Community Development Department
APPROVED
Planning
Building
PW/Engineering
Description
Date
Date
Date
Planning Case #
This set of plans and specifications MUST be kept
on the job at all times and is unlawful to make any
changes or alterations on the same without
stamped/written permission from the Community
Development Department. The stamping of this
plan and specifications Shall NOT be held to
permit or to be an approval of the violation of any
provisions of any City ordinance or State law. All
conditions of approval shall be met without
change or alteration.
PERMIT # PR 2022-665 FOR THE CANYON LOOP TRAIL IMPROVEMENTS
Parks & Recreation Date
5/27/22
5/27/22
Canopy structures
under separate
submittal/permit.DRAFT6/1/22
RMRA Measure M R Local Return Gas Tax
eet Rehab.- Area 1a, 1b, 2 (Design)
n)
ntain Laurel)
anyon to Lemon)
to BCY)
82,779$ 82,779$
om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$
eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $
en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$
mp Project (Const.)177,855$
nt Projects 4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $
250-5510-46412)
Project Description Total FY Budget (109) Measure
M
(111)
Gas Tax
(112)
Prop A
(113)
Prop C
Sign and HSL Replacement (Design)50,000$ 50,000$
Sign and HSL Replacement (Construction)350,000$ 350,000$
al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0 $
780,000$ 350,000$ 140,000$ 100,000$ 190,0 $
ments (250-5510-46413)
Project Description Total FY Budget (113)
Prop C
Foothill Transit
Grant
60,000$ 60,000$
SD/Calbourne 40,000$ 40,000$
nfrastructure Improvements 100,000$ 60,000$ 40,000$
0-5510-46420)
Project Description Total FY Budget (107) Measure
W
(108)
RMRA
(109)
Measure M
(113)
Prop C
ovements-Phase 3 (Flapjack-Design)65,000$ 65,000$
6/1/2022
No. GE2202
* * DRAFTRMRA Measure M R Local Return Gas Tax
eet Rehab.- Area 1a, 1b, 2 (Design)
n)
ntain Laurel)
anyon to Lemon)
to BCY)
82,779$ 82,779$
om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$
eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $
en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$
mp Project (Const.)177,855$
nt Projects 4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $
250-5510-46412)
Project Description Total FY Budget (109) Measure
M
(111)
Gas Tax
(112)
Prop A
(113)
Prop C
Sign and HSL Replacement (Design)50,000$ 50,000$
Sign and HSL Replacement (Construction)350,000$ 350,000$
al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0 $
780,000$ 350,000$ 140,000$ 100,000$ 190,0 $
ments (250-5510-46413)
Project Description Total FY Budget (113)
Prop C
Foothill Transit
Grant
60,000$ 60,000$
SD/Calbourne 40,000$ 40,000$
nfrastructure Improvements 100,000$ 60,000$ 40,000$
0-5510-46420)
Project Description Total FY Budget (107) Measure
W
(108)
RMRA
(109)
Measure M
(113)
Prop C
ovements-Phase 3 (Flapjack-Design)65,000$ 65,000$
6/1/2022
No. GE2202 * * 16755 Von Karman, Suite 150, Irvine, CA 92606 | 949.474.2330 | adams-streeter.comSTATIONDRAFTRMRAMeasure MR Local ReturnGas Tax eet Rehab.- Area 1a, 1b, 2 (Design)n)ntain Laurel) anyon to Lemon) to BCY)82,779$ 82,779$ om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$ eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $ en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$ mp Project (Const.)177,855$ nt Projects4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $ 250-5510-46412)Project DescriptionTotal FY Budget(109) Measure M(111)Gas Tax (112) Prop A(113) Prop C Sign and HSL Replacement (Design)50,000$ 50,000$ Sign and HSL Replacement (Construction)350,000$ 350,000$ al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0 $ 780,000$ 350,000$ 140,000$ 100,000$ 190,0 $ ments (250-5510-46413) Project DescriptionTotal FY Budget(113) Prop CFoothill Transit Grant60,000$ 60,000$ SD/Calbourne 40,000$ 40,000$ nfrastructure Improvements100,000$ 60,000$ 40,000$ 0-5510-46420) Project DescriptionTotal FY Budget(107) Measure W(108)RMRA(109) Measure M (113) Prop Covements-Phase 3 (Flapjack-Design)65,000$ 65,000$ 6/1/2022
No. GE2202 * * 16755 Von Karman, Suite 150, Irvine, CA 92606 | 949.474.2330 | adams-streeter.comSTATIONSTATIONDRAFTRMRAMeasure MR Local ReturnGas Tax eet Rehab.- Area 1a, 1b, 2 (Design)n)ntain Laurel) anyon to Lemon) to BCY)82,779$ 82,779$ om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$ eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $ en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$ mp Project (Const.)177,855$ nt Projects4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $ 250-5510-46412)Project DescriptionTotal FY Budget(109) Measure M(111)Gas Tax (112) Prop A(113) Prop C Sign and HSL Replacement (Design)50,000$ 50,000$ Sign and HSL Replacement (Construction)350,000$ 350,000$ al 11 Locations (Design and Construct
ion)380,000$ 90,000$ 100,000$ 190,0 $ 780,000$ 350,000$ 140,000$ 100,000$ 190,0 $ ments (250-5510-46413) Project DescriptionTotal FY Budget(113) Prop CFoothill Transit Grant60,000$ 60,000$ SD/Calbourne 40,000$ 40,000$ nfrastructure Improvements100,000$ 60,000$ 40,000$ 0-5510-46420) Project DescriptionTotal FY Budget(107) Measure W(108)RMRA(109) Measure M (113) Prop Covements-Phase 3 (Flapjack-Design)65,000$ 65,000$ 6/1/2022
No. GE2202 * * 16755 Von Karman, Suite 150, Irvine, CA 92606 | 949.474.2330 | adams-streeter.comDRAFTRMRAMeasure MR Local ReturnGas Tax eet Rehab.- Area 1a, 1b, 2 (Design)n)ntain Laurel) anyon to Lemon) to BCY)82,779$ 82,779$ om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$ eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $ en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$ mp Project (Const.)177,855$ nt Projects4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $ 250-5510-46412)Project DescriptionTotal FY Budget(109) Measure M(111)Gas Tax (112) Prop A(113) Prop C Sign and HSL Replacement (Design)50,000$ 50,000$ Sign and HSL Replacement (Construction)350,000$ 350,000$ al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0 $ 780,000$ 350,000$ 140,000$ 100,000$ 190,0 $ ments (250-5510-46413) Project DescriptionTotal FY Budget(113) Prop CFoothill Transit Grant60,000$ 60,000$ SD/Calbourne 40,000$ 40,000$ nfrastructure Improvements100,000$ 60,000$ 40,000$ 0-5510-46420) Project DescriptionTotal FY Budget(107) Measure W(108)RMRA(109) Measure M (113) Prop Covements-Phase 3 (Flapjack-Design)65,000$ 65,000$ 6/1/2022
No. GE2202
* *
4"±
LEGEND
1 COMPACTED NATIVE SOIL
2
3
90% COMPACTED NATIVE SUB GRADE.
FINISH GRADE.
SLOPE
2% MIN.
1
2
3
NATIVE SOIL PAVING8 NTS
FAX:(714) 245-9275
PHONE: (714) 245-9270
SANTA ANA, CA 92705
2001 EAST FIRST STREET, SUITE 160
1
TREAD
WIDTH
36"33"3"12"
7"33"3"12"36"LEGEND
1 1 1/4" DIA. SCHEDULE 40 GALV.STEEL PIPE HANDRAIL. ANY FIELD
WELDS SHALL BE SPRAYED WITH COLD GALV. SPRAY. ALL HANDRAILS
TO HAVE A GALV FINISH. ANY WELD OR SCARS SHALL BE SPRAYED
WITH COLD GALV. SPRAY
2
3
4
CONCRETE FOOTING
6"X8" TIMBER STEP - REFER TO DETAIL 3, THIS SHEET
1 1/4" DIA SCHEDULE 40 GALV. STEEL VERTICAL SUPPORT
WELDED TO HANDRAIL. VERTICAL SUPPORT TO BE
PROVIDED AT EVERY FIFTH STEP. ALL WELDS OR SCARS
SHALL BE SPRAYED WITH COLD GALV. SPRAY.
1
2
4
3
2 3'-0"8"6"6"LEGEND
1 6"x 8" PRESSURE TREATED LANDSCAPE TIE.
WIDTH AS SHOWN ON PLAN
6"x 8" PRESSURE TREATED LANDSCAPE TIE.
WIDTH AS SHOWN ON PLAN
2
3
4
#4 REBAR.
STEP TREAD TO BE 4" DEPTH, 90% COMPACTED
D.G. WITH TECHNISOIL BINDER.
90% COMPACTED SUBGRADE.
1
3
42
2
HANDRAIL AT TIMBER STEPS 2 3 LANDSCAPE TIE STEPS4NTS NTS
NTS5
TRAIL
DISTANCE 1.6 MILES
ELEVATION 1216
2' SQ3"18"2'-6"16 12"18 34"1'-6"
11 1
4"
R21-1
2"
LEGEND
1 2" SQ. X .125 MILD STL. POST
2
3
4
3/8" THK. MILD STL. PLATE CENTERED ON 2" SQ. POST
2" SQ. X .125 MILD STL. CAP
MILD STL. PANEL
5 IMAGE CUT THRU & THRU
6 CONTINUES WELDED JOINT ALL 4 EDGES
1
1
2
3
4
5
6
7
8
3-3/4" LETTERING CUT THRU & THRU
1" LETTERING CUT THRU & THRU
9 FINISH GRADE
10 CONCRETE FOOTING
10
9
8
7
ELEVATION
PLAN VIEW
1. CUSTOM DECORATIVE PANEL TO
BE FABRICATED FROM (3/8" THK.)
MILD STL. PLATE, CUT BY LASER
OR WATER JET. CONTACT MR.
FRANK FIORE WITH BRAVO SIGN &
DESIGN AT (714) 284-0500 FOR
AVAILABILITY.
NOTE:
TRAIL MARKER SIGN
24 3/16"15 15/16"17 1/2"30"24"12"
DIA.
48"
LEGEND
1 3"x4" RECYCLED PLASTIC (NOM.) & PROFILED
SLATS. REDWOOD COLOR
2
3
3" SQ. x 14" W. STL. TUBE SUPPORT POST.
FINISHED GRADE
DUMOR, INC.
MODEL #88-40PL
ISO
SECTION
1
1
2
3
2
BENCH7 NTS
KEY NOTES
CLEAR PLANT MATERIAL TO 2' SET BACK FROM TRAIL EDGE.
COMPACTED NATIVE SUBGRADE.
90% COMPACTED NATIVE SOIL. (TRAIL FINISH)
FINISH GRADE @ ADJACENT PLANTING AREA.
TRIM ALL OVER HANGING TREE LIMBS UP TO A 9' MINIMUM CANOPY
OVER TRAIL.
FINISH GRADE.9'5'-0"
4' TO 6' VARIES
5'-0"
4
3
2
1
5
6
1
3
4
2
5
6
NTS6TRAIL CLEARING
MIDPOINT
TYP.@ 6'
STEPS
15" TYP.6"15"
4 'OR 6' SEE PLAN
TYP.
TYP.
TYP. EACH RISER
4'-0" AND 6'-0"15"TYP.TOP
12"TREADWIDTH+ 12"12' MAX. VERTICAL RISELEGEND
1 NATIVE BACKFILL COMPACTED TO 90% MIN.
2
3
4
4" DEPTH 90% COMPACTED D.G. WITH TECHNISOIL
BINDER.AT TREADS
24" MIN. #4 REBAR IN PRE-DRILLED HOLES
FINISH GRADE.
5 NATIVE SUBGRADE.
6
7
8
6"x8" TREATED TIMBER STEPS.
6"x8" TREATED TIMBER EDGE.
1/2" DIA. X 12" LONG LAG BOLT FOR A
HORIZONTAL ATTACHMENT FROM THE STAIR
RISER TO THE RETURN. EACH END EACH RISER.
1
6
5
4
1
2
3
SECTION
ISOMETRIC
LEGEND
1 6" x 8" TIMBER STEPS. SEE
DETAIL 1 THIS SHEET
2
3
4
90% COMPACTED NATIVE SOIL.
1 1/4" DIA. STEEL HANDRAIL,
HANDRAIL TO BE INSTALLED AT
STAIRS GREATER THAN 5
RISERS. - REFER TO DETAIL 1,
THIS SHEET
TRAIL EDGE. REFER TO
CONSTRUCTION PLAN FOR
WIDTHS OF TRAIL AT VARIOUS
LOCATIONS.
5 6" x 8" TIMBER STEPS. DETAIL
1 SHEET THIS SHEET
7
8
5
7
5
4
1
2
3
NTSTIMBER STEPS NTSTIMBER STEPS PLAN VIEW
DRAFTRMRA Measure M R Local Return Gas Tax
eet Rehab.- Area 1a, 1b, 2 (Design)
n)
ntain Laurel)
anyon to Lemon)
to BCY)
82,779$ 82,779$
om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$
eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $
en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$
mp Project (Const.)177,855$
nt Projects 4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $
250-5510-46412)
Project Description Total FY Budget (109) Measure
M
(111)
Gas Tax
(112)
Prop A
(113)
Prop C
Sign and HSL Replacement (Design)50,000$ 50,000$
Sign and HSL Replacement (Construction)350,000$ 350,000$
al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0 $
780,000$ 350,000$ 140,000$ 100,000$ 190,0 $
ments (250-5510-46413)
Project Description Total FY Budget (113)
Prop C
Foothill Transit
Grant
60,000$ 60,000$
SD/Calbourne 40,000$ 40,000$
nfrastructure Improvements 100,000$ 60,000$ 40,000$
0-5510-46420)
Project Description Total FY Budget (107) Measure
W
(108)
RMRA
(109)
Measure M
(113)
Prop C
ovements-Phase 3 (Flapjack-Design)65,000$ 65,000$
6/1/2022
No. GE2202
* *
FAX:(714) 245-9275
PHONE: (714) 245-9270
SANTA ANA, CA 92705
2001 EAST FIRST STREET, SUITE 160
NTSTRAIL EDUCATIONAL SIGN1
NTSSTEEL FENCE POST / WOOD RAIL FENCE2
5'-0"
NATURAL
SOILT RAIL
2'-0"3'-6"2'3'-6"2'1"ELEVATION
SECTION12"18"8'-0"
MAXIMUM SPACING
LEGEND
1 5 1
2" STEEL FENCE STUDDED T-POST
2
3
2" X 6" PRESSURE TREATED DOUGLAS FIR RAILS (2)
DRIVE POST INTO NATIVE SOIL
4 USE 3 INCH DECK SCREWS (TYPICAL)
1
1
1
1
2
2
2
2
2
3
3
4
SECTION
DRIVE POST INTO NATIVE SOIL
DRAFTRMRA Measure M R Local Return Gas Tax
eet Rehab.- Area 1a, 1b, 2 (Design)
n)
ntain Laurel)
anyon to Lemon)
to BCY)
82,779$ 82,779$
om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$
eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $
en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$
mp Project (Const.)177,855$
nt Projects 4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $
250-5510-46412)
Project Description Total FY Budget (109) Measure
M
(111)
Gas Tax
(112)
Prop A
(113)
Prop C
Sign and HSL Replacement (Design)50,000$ 50,000$
Sign and HSL Replacement (Construction)350,000$ 350,000$
al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0 $
780,000$ 350,000$ 140,000$ 100,000$ 190,0 $
ments (250-5510-46413)
Project Description Total FY Budget (113)
Prop C
Foothill Transit
Grant
60,000$ 60,000$
SD/Calbourne 40,000$ 40,000$
nfrastructure Improvements 100,000$ 60,000$ 40,000$
0-5510-46420)
Project Description Total FY Budget (107) Measure
W
(108)
RMRA
(109)
Measure M
(113)
Prop C
ovements-Phase 3 (Flapjack-Design)65,000$ 65,000$
6/1/2022
No. GE2202
* *
FAX:(714) 245-9275
PHONE: (714) 245-9270
SANTA ANA, CA 92705
2001 EAST FIRST STREET, SUITE 160
HORIZONTAL TIES TYPICALLY 3'-6" TO 4'-6"±2'-0"ØFTG. & COLUMNFTG. & COLUMN
3/4"Ø A.B.'S
VERTICAL REINFORCING
TOP OF SURFACE
TYPICALLY
8" (MIN.)
EDGE OF PIER
TO EDGE OF SLAB
ACTUAL DESIGN WILL VARY DUE TO
BUILDING CODE REQUIREMENTS AND
MAY BE SUBSTANTIALLY LARGER
8'-0" OUT/OUT OF ROOF8'-0" OUTSIDE OF ROOF 14" IN/IN OF COLUMNS12
4
18.434
9
5
°6'-514" CTR./CTR. OF FRAMES & PIERS6'-0" (MIN.) OUTSIDE OF DG PAD
2'-0"4'-0"9 12"9 12"LIMITS OF DG PAD - VARIES, SEE
CONSTRUCTION PLAN FOR SIZE
6'-0"EQBENCH FACING
FORWARD EQ8'-6"DRAFTRMRA Measure M R Local Return Gas Tax
eet Rehab.- Area 1a, 1b, 2 (Design)
n)
ntain Laurel)
anyon to Lemon)
to BCY)
82,779$ 82,779$
om Pathfinder to Mountain Laurel Way) (Const.)1,200,000$ 1,200,000$
eet Rehab - Area 1 (Const.)2,000,000$ 925,000$ 850,000$ 89,0 $
en Springs from Brea Canyon to Lemon Ave.) (Const.)900,000$ 500,000$
mp Project (Const.)177,855$
nt Projects 4,360,634$ 1,700,000$ 1,007,779$ 850,000$ 89,0 $
250-5510-46412)
Project Description Total FY Budget (109) Measure
M
(111)
Gas Tax
(112)
Prop A
(113)
Prop C
Sign and HSL Replacement (Design)50,000$ 50,000$
Sign and HSL Replacement (Construction)350,000$ 350,000$
al 11 Locations (Design and Construction)380,000$ 90,000$ 100,000$ 190,0 $
780,000$ 350,000$ 140,000$ 100,000$ 190,0 $
ments (250-5510-46413)
Project Description Total FY Budget (113)
Prop C
Foothill Transit
Grant
60,000$ 60,000$
SD/Calbourne 40,000$ 40,000$
nfrastructure Improvements 100,000$ 60,000$ 40,000$
0-5510-46420)
Project Description Total FY Budget (107) Measure
W
(108)
RMRA
(109)
Measure M
(113)
Prop C
ovements-Phase 3 (Flapjack-Design)65,000$ 65,000$
6/1/2022