Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Traffic Signal Interconnect
rU) V Z n Z ' w Q r / r C) J r J O It Ex. 2 C (� " ," l Ex. 2"C - Ex. 2"C Ex. 2"C _ t #6 - N W Lu �I I ,-c #5 - U) r� _ - _ _ - - r #5 ui UJ/ l Ll / r 5 - 5 ��-�� A Ex. 2 C Q Ex. 2"C Ex. 2"C Ex. 2"C I"- --- LL O #5 LLI _--------- -- LLI LLJ v /^ W Ong DIAMOND BAR BOULEVARD --- --- --- ___ J U / \ Ex. 2"C I I I �1 #5 L�� / \ Ex. 2.5"C W \ / (� Ex.2-2"C / Ex. 2"C / W SCALE: 1 "=10' --- -- Z SCALE: 1 "=10' I.y Q C�I U) _ Ex. 1.5"C Imo- --- --- --- #5 \ / Ex. 1.5"C / - - - - Ex. 1.5"C / \ Ex. 2.5"C � � I Icy i \ / Ex. 1.5% SCALE: V=10' NEW INSTALLATION QUANTITIES ETHERNET SWITCH 3 FIBER PATCH PANEL 3 SPLICE ENCLOSURE 3 PULL BOX #6 1 PULL BOX #6E 2 --- --- Ex. 1.5"C Ex. 1.5"C CONDUCTOR SCHEDULE (THIS SHEET ONLY) CONDUCTOR TYPE FUNCTION RUN TOTAL A B C D E F 96 SMFO ETHERNET CIRCUIT 1N - 2N 1N 2N - - 12 SMFO ETHERNET CIRCUIT 1 E 1 N 1 E 1 N - 1 E 1 N - TWISTED PAIR CABLE INTERCONNECT 1 R 2R - 1 R 2R 2R - #10 GREEN WIRE TRACE WIRE 1 N 1 N 1 N 1 N 1 N 1 N - CONDUIT SIZE E E 3"(N) E E E CONDUIT TYPE PVC PVC PVC PVC PVC PVC - �Z< Z F�,O IO�� Ex. LJL 1.5"C 5 Ex. 1.5"C 11111111111AEx. 1.5"C Ex. 1.5"C Ex. 1.5"C 5 #5 _ --_ --- -- -- --- --- --- - -- - -- --- --- --- --- - -- --- _ f- LLJ W - I (n w w U) W Z Ex. 1.5"C DIAMOND BAR BOULEVARD �. CQ G CONSTRUCTION NOTES: 5 FURNISH AND INSTALL FIBER OPTIC CABLE IN CONDUIT PER CONDUCTOR SCHEDULE WITH (1) #10 TRACE WIRE. REMOVE EXISTING SIGNAL INTERCONNECT CABLE (SIC) FROM CONDUIT PER CONDUCTOR SCHEDULE. USE SIC AS PULL WIRE WHERE APPLICABLE. 53 FURNISH AND INSTALL 12-PORT FIBER PATCH PANEL (FPP). COMPLETE CONNECTIONS TO DROP CABLE, PIGTAILS AND FPP. ® CITY TO REMOVE EXISTING COMMUNICATION SWITCH FROM THE CABINET. �5 FURNISH AND INSTALL F.O. ETHERNET SWITCH PER SPECIFICATIONS. COMPLETE ALL CONNECTIONS FOR INTENDED OPERATION. © FURNISH AND INSTALL SPLICE CLOSURE. FUSION SPLICE MAINLINE SMFO CABLE TO DROP CABLE. COIL 150 FEET EACH OF MAINLINE AND DROP CABLE. SEE SHEETS 18 TO 24 FOR FIBER ASSIGNMENTS. �7 REMOVE EXISTING PULL BOX. ® FURNISH AND INSTALL NEW PULL BOX NUMBER 6 PER CALTRANS STANDARDS. PULL BOX COVER SHALL BE INSCRIBED "COMMUNICATION ". �g FURNISH AND INSTALL NEW PULL BOX NUMBER 6E PER CALTRANS STANDARDS. PULL BOX COVER SHALL BE INSCRIBED "COMMUNICATION". 11 COIL 15 FEET (4.6 METERS) OF SMFO CABLE IN PULL BOX FOR SLACK. 14 FURNISH AND INSTALL NEW CONDUIT IN SIDEWALK/PAVEMENT/SOIL. SEE CONDUCTOR SCHEDULE FOR CONDUIT SIZE. ALL CONDUITS AND CONDUCTORS ARE AS SPECIFIED: (E) DENOTES EXISTING, (N) DENOTES NEW, (R) DENOTES REMOVE