GENERAL NOTES
1 ALL MATERIAL AND WORK SHALL CONFORM TO MAY 2006 STANDARD PLANS AND
SPECIFICATIONS OF THE CALIFORNIA DEPARTMENT OF TRANSPORTATION.
2. ALL CONDUIT SHALL BE 2-INCH SCHEDULE 80 PVC CONDUIT USING 45-DEGREE
SWEEP ELLS INTO INTERCONNECT PULL BOXES. EACH CONDUIT RUN SHALL
INCLUDE A NYLON PULL TAPE.
3. ALL PULL BOXES SHALL BE NO. 6 OR NO.6E AS NOTED. MAXIMUM PULL BOX
SPACING IS 1,300 FEET FOR FIBER-OPTIC CABLE, AND 325 FEET MAXIMUM
SPACING FOR COPPER CABLE, UNLESS OTHERWISE SHOWN.
♦
W
tii '
w
_Z
J
i
WATER
CONSTRUCTION NOTES
INSTALL 2" INTERCONNECT CONDUIT AS SHOWN, UNLESS OTHERWISE NOTED.
OINSTALL NO. 6 PULL BOX, UNLESS OTHERWISE NOTED.
OREPLACE EXISTING PULL BOX WITH N0. 6 OR NO. 6E PULL BOX AS SHOWN.
INSTALL 12 SMFO CABLE BETWEEN SPLICE CLOSURE AND CONTROLLER CABINET
OR MODEL 334-TV CABINET.
OINSTALL 24 SMFO CABLE.
OINSTALL 1-12 PAIR INTERCONNECT CABLE.
INSTALL 1 DLC CABLE CONTINUOUS BETWEEN CONTROLLER AND LOOPS.
OINTERCEPT, REWORK AND EXTEND EXISTING INTERCONNECT CONDUIT(S) AS SHOWN.
REMOVE EXISTING PULL BOX AND JOIN CONDUITS AS SHOWN.
10 REMOVE EXISTING PULL BOX AND EXISTING 90-DEGREE CONDUIT ELL(S).
REWORK CONDUITS) AND INSTALL 45-DEGREE SWEEP ELL(S) AND SET NO.
6 PULL BOX AS SHOWN. REINSTALL DETECTOR CABLE(S) WHERE
REQUIRED. SEE DETAILS PER SHEET 16.
-A
BASED ON INFORMATION PROVIDED BY
CONTRACTOR AND CITY INSPECTOR ,
WARREN C. SIECKE, R.C.E.18TOT DATE
22
x `10.
p R
EXISTING 2" CONDUIT
_ ` WITH 1-48 SMFO CABLE.
N
2
0
s � ,
20
ALE: 1" = 40'
_ 6 -
t5
x
x
x
x
E
11 INSTALL NO.6E PULL BOX INCLUDING 2-INCH CONDUIT TO ADJACENT
PULL BOX AS SHOWN. REINSTALL DETECTOR CABLE(S) WHERE REQUIRED.
12 INSTALL FIBER OPTIC SPLICE ENCLOSURE AS DETAILED ON SHEET 16.
13 INSTALL CABINET MOUNT INTERFACE CENTER AND RACK MOUNT POWER
DISTRIBUTION UNIT. TERMINATE 12 SMFO AS REQUIRED.
14 INSTALL NO. 6 PULL BOX FOR FUTURE LOOP DETECTORS, INCLUDING 1.5-
INCH DETECTOR STUB -OUT, UNLESS OTHERWISE NOTED.
15 ENTER EXISTING PULL BOX WITH NEW CONDUIT(S) AS SHOWN.
16 INSTALL NEW TYPE M160-50 INTERCONNECT TERMINATION ASSEMBLY COMPLETE
INCLUDING RS232 CABLE ASSEMBLY AS REQUIRED PER CABLE TERMINATION
DETAIL ON SHEET 17.
17 TERMINATE INTERCONNECT CABLE(S) AS REQUIRED. SEE DETAILS SHEET 17.
18 ENTER EXISTING PULL BOX WITH CONDUIT AS SHOWN, REQUIRED DLC
IS COILED IN PULL BOX. INSTALL DLC IN NEW CONDUIT AND SPLICE
TO EXISTING (OR NEW) LOOPS.
17
- G R(a U P S-6 -
P R E P A R E D B Y
✓�GP,G,'
SDBMITTED
DATE
CITY OF DIAMOND BAR
QypFESSIpy�%t
Ci•
C�
TRANSPORTATION 8,
RECOMMENDED
r,
TRAFFIC ENGINEERING
TRAFFIC SIGNAL INTERCONNECT LINKS - PHASE 2
No.18707 =
20142 CANYON DRIVE
DATE
YORBA LINDA, CALIFORNIA 92886
GATEWAY CENTER DRIVE
ClVll ��
(714 ) 970-6247
FCI cp`\E���
���� / ,�i�.� 3���
(ice `� �'�
APPROVED
DATE
BRIDGE GATE DR - GOLDEN SPRINGS DR
WARREN C. SIECKE R.C.E. N0. 18707
BY
CAC. SH. v QF • SCALE 1" - 4G` AS BUILT