Loading...
HomeMy WebLinkAboutNoodoe Diamond Bar BidName Diamond Bar City Hall Company Noodoe EV LLC. Address 21810 Copley Dr Name Samuel Yuan City, State ZIP Diamond Bar, CA 91765 Address 829 S Lemon Ave Phone 909) 839-7000 *Jason Williams, 909.839.7059* Maintenance Supervisor City, State ZIP Walnut, CA 91789 Email JWilliams@diamondbarca.gov Phone (909) 468-1118 Email samyuan@noodoe.com Completion date Anytime no later than 6/30/2020 Scope of Work Not Included Company Proposal Construction Bid Form Trees to be removed and re-planted by Diamond Bar Public Works. Diamond Bar Public Works to provide permits needed to install EV units and begin scope of work. Owner Information Contractor Information Project name Diamond Bar City Hall EV install To install 5 new level-2 UL Certified Noodoe charging stations ( 1 single pedestal and 2 double pedestals) in the parking lot as designated by the City of Diamond Bar. Item A. To run approximately 100 feet conduit from panel ''GLA'' to the outside of building in designated location next to ATS switch. Item B. To trench approximately 90 feet to the furthest charging station and install PVC conduits to feed power to the new charging stations. Item C. Fame and poor 3 pedestal pads. Item D. Run power conductors from panel ''GLA'' to new charging stations. As well as communications. Design and engineering to be done prior to the start of the project. This estimate includes labor, materials. Owner Acceptance 10/29/2019 Submitted by (home owner or authorized representative) Date We, Noodoe Ev LLC, propose the above scope of work, to be completed by no later than June,30, 2020 or anytime upon city approval to start project installation prior to June 2020 for the amount of $45,622.75. Upon approval from Diamond Bar Public Works and after receiving all permits we will begin install and be complete in 20 calender days. We, City of Diamond Bar, do accept the above scope of work, proposed to be completed by June 2020 for the amount of 45,622.75. Samuel Yuan Submitted by (Company Representative) Date Page 2 of 6 Qty. Description Cost Total 5 Noodoe S1000/S2000 charger with pedestal $800.00 $4,000.00 1 Conduit $1,500.00 $1,500.00 1 Hardware $1,500.00 $1,500.00 1 Breakers $1,500.00 $1,500.00 1 Wire $1,500.00 $1,500.00 3 concrete footing/foundation 6'' thick $465.00 $1,395.00 106 Building wire specialist $110.00 $11,660.00 1 Engineering and Designs $3,472.95 $3,472.95 112 Journeyman Electrician $136.00 $15,232.00 Subtotal $41,759.95 Tax rate 9.25% Tax $3,862.80 Grand total $45,622.75 Cost Breakdown List of Materials and Costs Page 3 of 6