Loading...
HomeMy WebLinkAboutMBE Cost BreakdownM. Brey Electric, Inc. 408 Elm Ave. Beaumont, CA 92223 CSLB #581224 DIR #1000005926 Design Build Cost Proposal To: City of Diamond Bar EV Charging Stations @ City Hall Scope of Work: Design Build installation of one (1) single -port and two (2) dual port EV Charging Stations. Work includes all labor, material, equipment and incidentals necessary to design, engineer, supervise and install all work as required to achieve Owner requirements Desrrptron Unit Cost Engineered Drawings LS 21,500.00 Project Management LS 2,500.00 Mobilization LS 6,200.00 Underground Distribution LS 12,885.00 Concrete Bases LS 2,400.00 Installation of Charging Stations LS 42,247.00 Installation of Bollards/Signage/Striping LS 6,000.00 Terminate/ Energize & Test LS 5,600.00 Site Clean-Up/Demobilization LS 9,830.00 Project As- Built Drawings LS 4,200.00 Total Cost: $ 113,362.00 Comments Subcontractor - Cal Boring, Inc. Subcontractor - Superior Pavement Markings