Loading...
HomeMy WebLinkAboutTract 341601 1115 1-1 1 r CONVERSE_ = Jam,_= WCONSULTANTS OrhAnnioersary 222 East Huntington Drive, Suite 211-A Monrovia, California 91016-3500 S (818) 930-1200 FAx (818) 930-1212 http://www,converseconsultants.com/ ICelebrating 50 Years of Dedication in Engineering and Environmental Sciences May 14, 1996 Department of Public Works City of Diamond Bar 21660 East Copley Drive Suite 190 Diamond Bar, California 91765-4177 Attention: Mr. David G. Liu Deputy Director of Public Works Subject: GROUNDWATER SEEPAGE INVESTIGATION South Side of Ambushers Street Portion of Tract No. 34160 Diamond Bar, California CCW Project No. 95-31-281-01 Gentlemen: This report presents, results of a geotechnical investigation performed by Converse Consultants West (Converse) concerning water seepage on the south side of Ambush- ers Street between Woodhill Circle and 20914Ambushers Street (approximately 1200 L.F.). This study investigated the groundwater infiltration and seepage conditions at the subject location and provides remediation measures to mitigate distress conditions. Geotechnical services for this project were performed in accordance with our revised proposal dated December 1, 1995, as authorized by Mr. George Wentz on January 15, 1996, with the City of Diamond Bar Purchase Order No. P-3906. Water was not encountered in the two borings drilled on Ambushers Street to a depth of 21 feet, No evidence of significant pavement distress was observed on the street. Fill soils were encountered in the borings to depths of 3 to 7.5 feet below the street surface. Natural soils, siltstone and sandstone bedrock of the Puente formation were encountered beneath the overlying fill soils. The problem consists primarily of nuisance groundwater discharge from private hillside properties running down the gutters to storm drains located near the bottom of the street. Most of the water discharge is from surface runoff and an extensive series of buried subdrains beneath the graded slopes which convey groundwater to the surface throughout the year. A Wholly Owned Sultsidary of The Converse Professional Group City of Diamond Bar CCW Project No. 95-31-281-01 May 14, 1996 Page 2 Many of the surface drainage devices on private properties along Ambushers Street appeared to be poorly maintained and neglected. The.drains were blocked with weeds and slope debris, causing ponding and poor drainage conditions. Remediation measures to mitigate the observed distress conditions are presented in this report. Thank you for the opportunity to be of service on this project. If you should have any t questions or if we can be of additional service, please do not hesitate to contact us. We look forward to our continued involvement on this project. 1 Respectfully submitted, CONVERSE CO ANTS WEST { ark B. c luter, CE 1 15 Leonard T. Evans, Jr.,tPh.D., GE 302 Senior Geologist Vice President/Chief Engineer Do Mar, RCE 35064 Project Engineer Dist: 6/Addressee 1 ,\BRED GEOe %OFESSfp s Q No. 1415 p: No. 35064 m c—ya No. 302 CERTIFIED * Exp. 9-30.99 UP >_ ENGINEEnINO % * .t rL` GEOLOGIST r9lF VII C\ P \Jl cFOTECo\" OF q'Eeo CAUFO CA .\ a %LC17.... AV F(\'-X/ I@ Prins .. Rec,, E P", Converse Consultants West TABLE OF CONTENTS GROUNDWATER SEEPAGE INVESTIGATION SOUTH SIDE OF AMBUSHERS STREET PORTION OF TRACT NO. 34160 DIAMOND BAR, CALIFORNIA CCW Project No. 95-31-281-01 Page 1.0 INTRODUCTION ........................................ 1 2.0 SCOPE OF WORK ...................................... 2 3.0 SITE OBSERVATIONS .................................... 3 4.0 SUBSURFACE EXPLORATION .............................. 5 5.0 MITIGATION AND MAINTENANCE RECOMMENDATIONS ........... 6 5.1 Mitigation Alternatives ............................... 6 5.2 Pavements ....................................... 7 5.3 Slope Protection and Maintenance ....................... 8 6.0 CLOSURE ........................................... 10 DRAWING 1, "APPROXIMATE LOCATION OF TEST BORINGS 9 & 10" SITE PHOTOGRAPHS 1 THROUGH 6 APPENDIX A, "FIELD EXPLORATION" APPENDIX B, "LABORATORY TEST PROGRAM" Pnn,e . X.... 1W Py converse consultants West 1.0 INTRODUCTION This report presents results of a geotechnical investigation performed by Converse Consultants West (Converse) concerning water seepage on Ambushers Street in Diamond Bar, California. The purposes of this investigation were to evaluate existing groundwater infiltration and seepage conditions at the subject location and provide remediation measures to mitigate distress conditions. This report was written specifically for Ambushers Street described in the following section, and is intended for use by the City of Diamond Bar and its design professionals. Since this report is intended for use by the designer(s), it should be recognized that it is impossible to include all construction details in this report at this phase in the project. Additional consultation may be prudent to interpret these findings for contractors, or possibly refine these recommendations based upon the final design and actual conditions encountered during construction. 95-31-281-01 1 Primed . Rccy.1M P,pm Converse Consultants West 1 2.0 SCOPE OF WORK The scope of geotechnical services performed for this project included a review of existing reports, obtaining Los Angeles County well permits, geologic mapping, exploratory borings, geotechnical laboratory testing, geotechnical engineering t analyses, and preparation of this report. This report does not include an evaluation of slope stability or the potential for soil and/or groundwater contamination at this site. More specifically, the scope of work included the following tasks: A review was made of the City of Diamond Bar Building Department files for information and reports on the subject site. Los Angeles County well permits were obtained for the proposed monitoring wells. Geologic reconnaissance mapping was performed at the site to visually identify potential sources of water, identify all affected property frontages in the study areas, estimate the quantity of water, and map the underlying geologic materials. Two borings were drilled to depths ranging from 11 to 21 feet below the existing ground surface at the locations shown on Drawing 1. Sub- surface conditions encountered in the borings were continuously logged at the time of drilling. A more detailed description of the field exploration procedures and exploration logs are presented in Appendix A, "Field Exploration." Geotechnical laboratory tests were performed on selected earth material samples. Tests include in -situ moisture and density, sieve and R-value testing. Descriptions of the individual tests and test results are presented in Appendix B, "Laboratory Test Program." Analyses were performed and geotechnical recommendations were developed as presented. Our findings and remedial recommendations developed during this investigation are documented in this report. 95-31-281-01 2 @ Nnmw .n R.11 Piper Converse Consultants West 3.0 SITE OBSERVATIONS Ambushers Street is located at the southern edge of the City of Diamond Bar. Review of City grading files for Ambushers Street indicated that the street was originally graded as part of Tract 34160 in 1978. The project site consisted of hillside terrain which was graded into terraced building pads by cutting the hillside ridges and filling the side canyons, as shown on Drawing 1. Slope areas between the building pads were constructed at gradients of 1.5:1 (horizontal:vertical). Concrete terrace drains were constructed on the slopes and convey water to the street gutters through side yard drains. A fill canyon with a mapped canyon bottom subdrain extends northward across the project study area. Subdrain systems were also installed behind the buttressed fill slopes to relieve potential hydrostatic pressures from groundwater seepage. Review of the Grading Plan for Tract 34160 dated November 30, 1978 (Drawing 1) and the Rough Grade Soils Engineering and Geologic Report for Tract 34160 dated November 30, 1978, prepared by S. E. Medall and Associates, Inc., indicated that at least ten separate subdrain systems were installed behind buttress fill slopes and in the canyon bottoms during original tract grading in 1978. The subdrains were designed to collect subsurface groundwater and seeps and prevent hydrostatic water pressure build-up within the fill soils. The subdrains were reported to have consisted of 4-inch-diameter perforated pipe buried in filter material. The subdrains were installed at the heels of stabilization buttresses and at vertical intervals of 15 feet. Locations of the subdrains are shown on Drawing 1. Canyon subdrains were reported to have consisted of 8-inch-diameter perforated pipes embedded in filter material. The grading plan shows that some of the subdrain outlets were located on mid -slope areas or at building -pad grades. Some of these drains do not appear to flow into non - erosive drainage devices such as a terrace drain or street gutter. Only two subdrain outlets could be located during our field observations. One subdrain outlet was observed along Pasado Drive beneath the rear yard of 21015 Ambushers Street. This drain was observed to be producing water which ran across the sidewalk into the street gutter. Green algae has grown in the street gutter downslope the subdrain outlet. The second subdrain outlet was observed on the rear yard slope of 21130 Ambushers Street. Water was seeping out of the drain and running down the slope surface to the lower terrace drain. The drainpipe outlet was partially obstructed with weeds and debris. Other subdrain pipe outlets could not be located on the overgrown slope areas or within fenced yard areas. Groundwater discharge flow from these subdrain systems is directed towards the street gutters along Ambushers Street. We observed groundwater discharge running down the concrete gutter on the south side of the street, although minor surface flow was observed along the north side of the street on and below Pasado Drive. Most of 95-31-281-01 3 Nm' on A..Ycw P", Converse Consultants West this water discharge on the north side of the street is from the drain outlets which convey surface runoff and subdrain discharge from the rear yard slope drains to the front yard street gutter (Photo 1). The cumulative surface -flow discharges down the gutter and into the storm drain located at the bottom of the street near 20914 Ambushers Street. This discharge was estimated to be about five to six gallons per minute (gpm). A dark green algae growth had established itself in the street gutter and along the seepage areas. Fallen leaves and debris had washed down with the water and created a small blockage near the storm drain grate. Homeowners along the lower portion of Ambushers Street report that surface flows are nearly constant throughout the year with peak flows occurring during and immediately following the wet winter months. Terrace drain systems located on the rear yard slopes of 21020, 21040, 21060, 21080, 21112 and 21130 Ambushers Street appeared to be poorly maintained. These concrete terrace drains, down drains, and buried side yard drain systems were constructed during original tract grading_ in 1978. Three levels of terrace drains Terrace Drains 1, 2 and 3) were constructed on most of the subject lots, as shown on Drawing 1. Additional terrace drain systems were located on the upslope prop- erties along Woodhill Circle and Running Branch Road. These drainage -control devices concrete terrace drains, interceptor drains, down drains, bench drains, catch basins, drain pipes, and other drainage devices) are an integral part of the graded slopes and play an important role in minimizing the potential for slope erosion and instability. The terrace drain located above 21130 Ambushers Street was cracked near the catch basin at the end of the slope (Photo 2). Surface runoff was observed entering the cracked section of terrace drain, which could permit water to infiltrate into the slopes. Weeds and plants have started to grow within the crack. The terrace drains were also blocked with weeds, fallen trees, organic debris and slope debris which had washed down from the slopes (Photos 2, 3, 4 and 5). Water flow in the drains was slowed and in many cases partially blocked, causing ponding in the channels. The ponded water was providing a habitat for breeding of bugs and mosquitoes. One section of Terrace Drain 1 had been converted into a garden with raised planters by the homeowner whose property the terrace drain crossed (Photo 6). No evidence of significant pavement distress was observed on Ambushers Street. 95-31-281-01 4 P mlm . K.,..e P.P Converse Consultants West 4.0 SUBSURFACE EXPLORATION Two 8-inch-diameter, hollow -stem auger soil borings were drilled on Ambushers Street to evaluate subsurface conditions. The borings were drilled to depths ranging from 11 to 21 feet below street grade at the locations shown on Drawing 1. Boring 9 was converted to a monitoring well. Boring 10 was logged, sampled, and checked for groundwater, then backfilled and tamped. Soil boring logs are presented in Appendix A. The pavement at the boring locations was two inches thick. Beneath the pavement was a five -inch layer of base. Fill soils were encountered in the two borings to depths ranging from 3 to 7.5 feet below existing grade, as tabulated below. TABLE 4-1 W ENCOUNTERED FILL DEPTHS Encountered fill soils consisted of clay with some silt and sand. The clay soils are estimated to have a medium potential for expansion. The natural soils consist of clays and are moderately stiff to stiff. Underlying the clays are siltstone and sandstone at depths of 10.5 and 13 feet. Groundwater was not encountered to a depth of 21 feet on March 25, 1996. A 2- inch-diameter monitoring well was installed to check for groundwater. No ground- water was observed in the well on May 3, 1996, when the water level was rechecked. Based on results of subsurface exploration and experience, variations in the continuity and depth of subsurface conditions should be anticipated. Care should be exercised in interpolating or extrapolating subsurface conditions -between or beyond borings. Fill depths are expected to vary between borings. Seasonal groundwater variations may occur. 95-31-281-01 5 pnmw .n Pip ' converse Consukants West 1 5.0 MITIGATION AND MAINTENANCE RECOMMENDATIONS Remedial repairs and maintenance are recommended to mitigate the observed nuisance -water flow along Ambushers Street. Subdrain systems and terrace drains located on upslope private hillside properties along Ambushers Street appear to be doing their job in conveying drainage water to the street gutters, in spite of their poorly maintained condition. The problem consists primarily of a constant flow of nuisance -water discharge running down the street gutters to the storm drain catch basins near the bottom of the street and the growth of algae and scum which forms along the gutters. Most of the year -around nuisance -water flow is from the extensive series of buried subdrains beneath the graded slopes. These subdrains and terrace drain systems play an important role in conveying water seepage and runoff to the street and in minimizing the potential for slope erosion and instability. Possible alternative solutions to mitigate the algae and scum buildup in the street gutters could include the following: 1. Street -sweeping the gutters weekly to control algae and scum growth. 2. Constructing additional storm drain catch basins farther up the street to intercept nuisance -water discharge in the street gutters. 5.1 Mitigation Alternatives Alternative 1 — Street Sweeoing: Street -sweeping the gutters along Ambushers Street on a weekly basis could be performed to control algae and scum growth. The street sweeper would have to thoroughly brush the gutter area to remove the algae and scum. Parking restrictions may be required along the street so that vehicles would not block the gutter during sweeping. The street -sweeping alternative would be a long-term maintenance solution and could prove to be less cost-effective in the long run. Alternative 2 — Additional Catch Basins: Additional storm drain catch basins could be installed on Ambushers Street to intercept the nuisance -water discharge in the street gutters. These catch basins should be located farther up the street in the gutters near the terrace drain outlets which are producing most of the year -around nuisance -water flow. One recommended location is in front of 21020 Ambushers Street as shown on Drawing 1. Intercepting the nuisance water discharge closer to the upslope sources would relieve the homeowners along the lower sections of Ambushers Street from the constant nuisance -water flow along the street gutters and associated problems of green algae growth, smell, slip hazard, and exposure associated with the water flow. 95-31-281-01 6 Anna Mn"Cw Fro., Converse Consukants West Storm drain catch basins are presently located in the street gutters in front of 20914 (west side) and 20917 (east side) Ambushers Street, and 3411 Woodhill Circle. It could not be determined if the storm drain catch basin on Woodhill Circle was connected to the catch basins on Ambushers Street. A new section of buried storm drain pipe may be required to extend the storm drain farther up Ambushers Street. 5.2 Pavements No evidence of significant pavement distress was observed on Ambushers Street within the study area. A pavement section of two inches of asphaltic concrete over five inches of base material, as indicatead on the boring logs, is not of sufficient thickness when overlying a subgrade with an R-value of 6. Should work be required for installation of new storm drain pipes and catch basins, we have included the following pavement design recommendations. In the proposed pavement areas, the upper six to eight inches of subgrade soils should be scarified, moisture -conditioned, and properly compacted. Soils should be com- pacted to a minimum of 90% of the ASTM D1557-91 laboratory maximum density at 2% above optimum moisture content. The clayey subgrades should not be allowed to desiccate prior to placing paving. The minimum asphalt pavement sections are presented below in Table 5-1, "Asphalt Pavement Sections - Ambushers Street." The pavement sections are based on Traffic Index (TI) values of 4.0, 5.0, 6.0 and 7.0; and a subgrade R-value of 6 from laboratory tests. TABLE 5-1 ASPHALT PAVEMENT SECTIONS - AMBUSHERS STREET MINIMUM ASPHALT MINIMUM AGGREGATE bAsL: TRAFFIC INDEX:: THICKNESS THICKNESS inches) ' inchiis 4.0 3.5 6 5.0 4 8 6.0 5 10 7.0 " 7 11 Aggregate base should be compacted to at least 95% of the ASTM D1557-91 laboratory maximum density. Base materials should conform with Sections 200-2.2 or 200-2.4 of the "Standard Specifications for Public Works Construction" (Green - book), 1994 Edition. To reduce the potential for premature pavement distress, it is 95-31-281-01 7 Rimed . Recycled P' " Converse Consultants West Nimportant that final pavement grade be designed such that ponding on or adjacent to the pavements is avoided. Pavement runoff should be directed to a suitable non - erosion drainage device. Where asphalt pavements meet concrete or existing pavements, the concrete and/or asphalt should be sprayed with an SS-1 or CSS-1 emulsion. Proper asphalt compac- tion next to concrete pavements, curbs and existing pavements is important to provide a relatively impermeable contact between the two materials. 5.3 Slope Protection and Maintenance Slope maintenance will be required to ensure satisfactory performance of the hillside slopes through time. Drainage and erosion control are important aspects of slope maintenance and play an important role in minimizing the potential for slope erosion and instability. Many of the surface drainage devices observed on the hillside slopes were poorly maintained and neglected (Photos 1 through 6). These hillside slopes are owned by individual private property owners who are responsible for maintenance. The less accessible slope areas of the properties are often forgotten or neglected. Homeowners should perform periodic inspections and maintenance of drainage devices on their properties. Maintenance needs to be performed on the entire slope area. The same slope terrace drain runs through as many as six different properties. Slope maintenance associations could be set up to pool the resources of a group of homeowners. In any event, periodic inspections and maintenance need to be performed several times a year and at least once before the wet winter months. Drainage -related items requiring continuing periodic maintenance throughout the year include the following: All drainage devices (terrace drains, interceptor drains, down drains, side yard drains, subdrains, canyon drains, debris fences, catch basins, drain pipes and drainage devices) should be kept clean of debris, obstructions and maintained in good working order to provide adequate drainage for rear yards and slope areas. Homeowners should be advised of the importance of maintaining drainage devices on their property and adjoining parcels. 0 Overgrown trees, shrubs and vegetation should be periodically cut back -to permit unobstructed flow and access along drainage devices. Accumulated slope debris, soils, weeds, etc., should be removed from drainage devices to permit positive flow and prevent ponding. These debris materials should be completely removed from the slopes, not just dumped down the slope. Cracks and separations in the drainage devices should be cleaned, sealed, repaired and/or replaced to prevent infiltration of water. The drains should be watertight and not leak., The terrace drains and other drainage devices should not be used 95-31-281-01 8 NmW . R... d P", Converse Consultants West for gardens or other purposes, but should be kept free and unobstructed for surface drainage. Subdrain pipe outlets should be located, cleaned and checked for proper operation and drainage. We were unable to locate many of the subdrain pipe outlets shown on Drawing 1. Subdrain pipe outlets located on mid -slope areas or yard areas at the toes of slopes should not be permitted to discharge on the slopes but should be connected by pipes or non -erosive devices to nearby drainage devices. Rodent guards should be installed to prevent nesting, clogging or damage to drain lines. It is important that these subdrain pipes be maintained and free of obstructions. All drainage devices should be constructed in accordance with all City Building and Grading Codes. Some erosion of the steep natural slope areas should be anticipated through time. Periodic inspection and maintenance will be required. Irrigation lines should be checked periodically for proper operation and the presence of possible leaks. Irrigation of the slope surface should be carefully controlled or discontinued during the wet winter months. Any erosion damage should be repaired immediately in order that more serious problems may be averted. Repairs should be made in accordance'with City of Diamond Bar guidelines. Periodic inspections of the slope areas, terrace drains, and down drains should be performed to check for cracking or distress due to the shrink -swell characteristics of the clayey slope soils. Rodent activity should be controlled to prevent water penetration and loosening of the soil. Care should be exercised to prevent loose fill from being placed on the slopes or on the drainage devices. 95-31-281-01 9 Nimad.s."r Paw Converse ConsuNants West 6.0 CLOSURE The findings and recommendations of this report were prepared in accordance with generally accepted professional geotechnical engineering principles and practice for Southern California at this time. We make no other warranty, either express or implied. Conclusions and recommendations presented are based on results of the field investigation, combined with an interpolation and extrapolation -of subsurface conditions between and beyond borings. If site conditions or the assumed project description appear to be different from those described in this report, this office should be notified immediately. 95-31-281-01 10 Ninm.{4CY Py Converse Consultants West T _.._ _.. 1 ._.... A r yp 'NAMIwoqq A"Er. V 0*11 L 1 IS APPENDIX A FIELD EXPLORATION 1 95-31-281-01 Panted on Fecvcled Paper Converse Consultants West APPENDIX A FIELD EXPLORATION Field exploration included a site reconnaissance and subsurface drilling. During the site reconnaissance, surface conditions were noted, and the locations of the test borings were determined. Borings were approximately located using existing features as a guide. Test borings were advanced using a truck -mounted, eight -inch -diameter, hollow -stem auger drilling rig equipped for soil sampling. Soils were continuously logged and classified in the field by visual/manual examination, in accordance with the Unified Soil Classification System. Field descriptions have been modified, where appropriate, to reflect laboratory test results. Ring samples of the subsurface soils were obtained at frequent intervals in the borings using a drive sampler (2.4-inch inside diameter, 3-inch outside diameter) lined with sample rings. The steel samplers were driven with a 140-pound hammer falling 30 inches. Blows required to drive the ring sampler one foot are also shown on the logs in the "blows/foot" column. For the relatively undisturbed ring samples, soils were retained in brass rings (2.4 inches in diameter, 1.0 inch in height) and carefully sealed in waterproof plastic containers for shipment to the Converse geotechnical laboratory. Bulk samples were also collected during the field exploration. One of the two exploratory borings was converted to a monitoring well. A two -inch - diameter, slotted polyvinyl chloride (PVC) pipe, with a three-foot blank section at the top of the pipe, was installed. The pipe was surrounded with fine filter sand at the slotted portion, and bentonite and concrete at the blank section. Locking wellheads were provided at the well. The well was purged on the day installed and allowed to recharge. Logs of the borings are presented on Drawings A-1 and A-2, which also include descriptions of the soils encountered, pertinent field data, and supplemental laboratory results. Drawing A-3, "Exploration Log Key," describes the various symbols and nomenclature shown on the logs. 95-31-281-01 P.Mtl on R.Cycw Pp Converse consultants West Log of Boring No. BH-9 Date Drilled: 3/25/96 Logged by: DSS Checked by: MBS Equipment: 8" Hollow Stem Aueer Driving Weight and Drop: 140 pounds/30 inches Ground Surface Elevation: 730 feet Depth to Water: none encountered 2 CL(1 WLDJ M SUMMARY OF SUBSURFACE CONDITIONS This log is part of the report prepared by Converse for this project and should be read together with the report. This summary applies only at the glocationoftheboring and at the time of drilling. Subsurface conditions' may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered. SAMGLES O LL to O WW M F Z T V n 0. y 2 O W H ammEOp J 2 inches of ASPHALT over 5 inches of SAND/GRAVEL BASE ARTIFICIAL FILL: CLAY (CL); silty, with fine sand, brown mottled tan Encountered concrete utility vault -moved to new 5 location and redrilled) 21 24 98 R ma 7---------------------------- ?------ ALLUVIUM: CLAY (CL); silty, with fine sand, trace carbonate filaments, dark brown to brown 10 26/ 20 107 10" BEDROCK: SILTSTONE AND SANDSTONE; siltstone 15 is massive, weathered and oxidized, yellow brown 37 15 100 20 72/ 10" 26 93 End of boring at 21 feet No groundwater encountered Monitoring well installed Project No. Drawing No. V Converse Consultants West 95-31-281-01 A-1 Log of Boring No. BH-10 Date Drilled: 3/25/96 Logged by: DSS Checked by: MBS Equipment: 8" Hollow Stem Auger Driving Weight and Drop: 140 pounds/30 inches Ground Surface Elevation: 722 feet Depth to Water: none encountered SUMMARY OF SUBSURFACE CONDITIONS SAMPLES This log is part of the report prepared by Converse for this project and N 3 should be read together with the report. This summary applies only at the O W r v H location of the boring and at the time of drilling. Subsurface conditions U. M FiZ S 2 may differ at other locations and may change at this location with the nl to F- n wtr L Qt9 passage of time. The data presented is a simplification of actual conditions H J o H u JLD- encountered. OmtEpoOo 2 inches of ASPHALT over 5 inches of SAND/GRAVEL BASE ARTIFICIAL FILL: CLAY (CL); silty, with fine sand, brown- I--- ------ - ----?------- ALLUVIUM: CLAY (CL); silty, with fine sand, trace 5 carbonate filaments, brown 14/ 23 98 8" ma 10 44/ 10" 29 94 BEDROCK: INTERBEDDED SILTSTONE AND SANDSTONE; laminated, weathered and oxidized, yellow brown to brown End of boring at I I feet No groundwater encountered Hole backfilled and asphalt patch placed on top Project No. Drawing No. wConverse Consultants West 95-31-281-01 A-2 MAJOR DIVISIONS SYMBOLS TYPICAL NAMES GW, Wall graced grMh, grTll-eand mi.no s gravels wiClean th iGRAVELS little or no fines GP Poorly graded graet<. gray.l-stand rtvatuns G More then half o coarse legation m Is larger the. GM I Silty grovels, poorly graded grave{ -sand silt mi.nln> oozIn No. 4 sieve Grovels over e fin12% floes GC cagey grMh. paadr graded grovel-sand-uey misrures P0.2 Sty Well gredea sand>, grarelq sands w ^ es — Clean seacs with 4rSANDS little or no lines SP Poorly graded acnaa, grMfy &ends u e0 More than half' coarse ,melon a Is smatter than SM soy lands. poorly graded land-siltmu urea 2 No. 4 sieve Sands with mar I' 12% fines SC Clayey sends. poorly graded sand-r_ry mixtures ML ii 11 Inorganic silh and •mry fine stands, real flour, ally or clayey fine sands, or atom slits with slight pmshety' a SILTS AND CLAYS Inorganic of for to medium picstlnry, grLallyCLNoclays. sandy clays,sitry nays, lean c'rys w L:cuid limit Ices roan 50 tonon at a Z OL j I Organic clays and organic silly clays of low Plasticity W e I Z{ a_ - MH Inorganic sllh. mit:Ceaus of d1al4maaeaus fine, candy Cr. or oily soils, elastic silts a SILTS AND CLAYS w CH Inorganic c aye of high plasticity. fc; drys 0 Liewd limit greater than 60 2 OH Organist ef:ys of medium to high plcstic:y, oryenle silts HIGHLY ORGANIC SOILS Pt Pool gnu other highly organic sods SAMPLE TYPE TEST TYPE Results shown in Appendix 8) CLASSIFICATION piPlasticity Grain Size Analysis ma Sand Equivalent SE DRIVE SAMPLE 2.42-inch inside diameter Specific Gravity Expansion Index sg EI driven with 140-pound weight, 30-inch drop Compaction Curve max ASTM D 3550-847 STRENGTH SAMPLE, loose cuttings from Packet Penetrometer pBULK exploration Direct Shear ds Unconfined Compression uc Triaxial Compression tx R-value R CONSOLIDATION c Collapse cal EXPLORATION LOG KEY CONVERSE ID' _- = Project No. D,.wN No. CONSULTANTS -_ 95-31-281-07 A-3, APPENDIX B LABORATORY TEST PROGRAM 95-31-281-01 SNmnw.n R.,da P." Converse Consultants West APPENDIX B LABORATORY TEST PROGRAM Laboratory tests were conducted in the Converse Consultants West (Converse) geotechnical laboratory on representative soils samples for the purpose of evaluating the physical properties and engineering characteristics of the sampled materials. A summary of the various laboratory tests conducted is presented below. In -Situ Moisture Content and Dry Densit Data obtained .from these tests, performed on relatively undisturbed ring samples obtained from the field, were used to aid in the clarification and correlation of the earth materials and to provide qualitative information regarding soil strength and compressibility. The percent of moisture as a function of dry weight, and the encountered dry density in units of pounds -per -cubic -foot (pcf) are provided in the right-hand columns on the exploration logs. Grain -Size Distribution Sieve analyses were performed on representative bulk samples to assist in soil classification and to determine the distribution of soil particle sizes. The sieve analyses were performed in general accordance with the ASTM D442-63 Standard Test Method. Results are plotted on Drawing B-1, "Grain Size Distribution." R-value An R-value test was performed on a bulk soil sample for design of asphaltic pavement over the subgrade soils. The test was performed by LaBelle -Marvin, and the test results are enclosed at the end of this appendix. Sample Storage Samples presently stored in the Converse geotechnical laboratory will be discarded 30 days after the date of this report, unless this office receives a specific request to retain samples for a longer period, at additional cost. 95-31-281-01 Primed on Rerycled Paper Converse Consultants West UNIFIED SOIL CLASSIFICATION W COBBLES GRAVEL I SAND SILT OR CLAY COARSE I FINE 10aARSE1 MEDIUM I FINE U.S. SME SIZE IN INCHES I U.S. STANDARD SIEVE No. HYDROMETER o J/1 1 lu zu w au aw zw 100 WE 20 10' 102 DEPTH SYMBOL EXPLORATION ft m) O SH-9 5-7 BH-10 7-9 1 f1 = 0.3048 m M 10 1 1 CT' 162 16' GRAIN SIZE (mm) DESCRIPTION CLAY (CL), silty, some sand CLAY (CL), silty GRAIN SIZE DISTRIBUTION CONVERSE U LTANTS V 1 l L S U 95-31 281-01 M. B N. kv CO S B-1 ANALYSIS LaBelle ® Alar DESIGNo-- PROFESSIONAL PAVEMENT ENGINEERIN A CALIFORNIA CORPORATION April 5, 1996 Mr. Hanna Kakish Canry-- T 1t (C®ns1a91anis 222 E. Huntington Drive, Suite 211A Monrovia, California 91016-3500 Project No. 23506 Dear Mr. Kakish: Enclosed herewith, please find the data sheets for the one (1) sample of soil, identified-as`#95-31=281-01 / Diamond Bar Ambushers - BH-9 ,'Bag #1 @ 5'-7', which was submitted to our laboratory for. R-Value determination. The opportunity` to be of service pis . sincerely 'appreciated and should you have any -questions, kin call-.,, j Very truly yours, i ifs tRIlarvinSRM: s Enclosures T S. GRAND AVENUE* SANTA ANA, CA 92705 0 (714) 546-3468 o FAX (714) 546-5841 1 PROJECT NUMBER R - VALUE 23506 DATA SHEET 95-21-281-01 Diamond Bar Ambush BORING NUMBER: BH-9; Bag1; @ 5'-7' SAMPLE DESCRIPTION: Light Brown Clayey Silt Item a SPECIMEN b c Mold Number 4 5 6 Water added, grams 180 225 275 Initial Test Water, % 17.9 21.8 26.1 Compact Gage Pressure, psi 100 50 30 Exudation Pressure, psi 677 388 241 Height Sample, Inches 2.44 2.57 2.68 Gross Weight Mold, grams 3118 3142 3139 Tare Weight Mold, grams 2076 2076 2074 Sample Wet Weight, grams 1042 1066 1065 Expansion, Inches x 10exp-4 44 26 12 Stability 2,000 Ibs (160psi) 45 / 118 61 / 139 71 / 152 Turns Displacement 3.30 3.48 4.17 R-Value Uncorrected 21 10 3 R-Value Corrected 20 10 3 Dry Density, pcf 1 109.7 1 103.2 1 95.5 DESIGN CALCULATION DATA Traffic Index Assumed: 4.0 4.0 1 4.0 G.E. by Stability 0.82 0.92 1 0.99 G.E. by Expansion 1.47 0.87 0.40 Equilibrium R-Value 6 by EXUDATION Examined & Checked: P. 4 / 2 / 96 REMARKS: Gf = 1.25 Ste arvi 0659 The data above is based upon processing and testing sampl a 0 —ren i field. Test procedures in accordance with latest revisions to ment Transportation, State of California, Materials & Research Test Method No. from the of 301. LaBelle • Marvin 2' R-VALUE GRAPHICAL PRESENTATION PROJECT NO. 400 95-31--281-01 Dta-"onA ;n".36i 350 BORING NO. 8 P - C) 300 DATE 200 TRAFFIC INDEX Acrwrned loo R- VALUE BY EXUDATION < 0 C) R- VALUE BY EXPANSION L.) 800 700 600 500 400 300 200 100 3 n==: X L: 4 HE Et rt T- EF, 5 7; iu TRm W- L—M 1. 0 2.0 3.0 COVER THICKNESS BY EXPANSION, Fr. 100 55 z 80 70 60 to 50 40 30 20 10 0 L) 0 4. 0 R- VALUE vs. EXUD. PRES. A EXUD. T vs. EXPA114. T REMARKS G-f-: ImEffiRmilmom mmmmmmmm ffimmm 18. 0 =0 =0 wo MOISTURE AT FABRICATION M IN moon@ mmmmmmmm mmmmmmmmmmm mmm mommoullm mmm HmommENRIHOrm NNSONomI mmga'- WKS-0 mmmommi' mom ilmmr. 0 18. 0 X--o o MOISTURE 1,: ilkqko, * Manin PROFES IONALPAVLMENT ENGINEERWO T by EXUDATION T by EXPANSION 4. 0 3. 0 2. 0 1. 0 in I 1 1 1 1 I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 CONVERSE g CONSULTANTS fff—Z .Q fil ANN Consulting Engineering and Applied Sciences 222 East Huntington Drive, Suite 211-A Monrovia, California 91016-3500 V (818) 930-1200 FAX (818) 930-1212 REVISED PROPOSAL GROUNDWATER SEEPAGE INVESTIGATION Meadowglen Drive and Ambushers Street Diamond Bar, California PREPARED FOR City of Diamond Bar 21660 East Copley Drive Suite 190 Diamond Bar, California 91765-4177 CCW Project No. 95-31-281-00 December 1, 1995 A Wholly Owned Subsidiary of rdmed m.yolsd paper The Converse Professional Group CONVERSE e = Consulting Engineering and CONSULTANTS — Applied Sciences 222 East Huntington Drive, Suite 211-A Monrovia, California 91016-3500 818) 930.1200 FAX.(818) 930.1212 December 1, 1995 w 1 v Department of Public Works City of Diamond Bar 21660 East Copley Drive, Suite 190 Diamond Bar, California 91765-4177 Attention: Mr. David G. Liu tDeputy Director of Public Works Subject: REVISED PROPOSAL - GROUNDWATER SEEPAGE INVESTIGATION Meadowglen Drive and Ambushers Street Diamond Bar, California CCW Project No. 95-31-281-00 Gentlemen: t Converse Consultants West (Converse) is pleased to respond to your November 3, 1995 Request for Proposal (RFP) for geotechnical investigation of water seepage on Meadowglen Drive and Ambushers Street. This revised proposal replaces our November 20, 1995 proposal for this project, based upon our telephone discussion with Mr. George Wentz, Director of Public Works. The purpose of this study is to determine the probable source and quantity of groundwater percolating to the surface at the streets, formulate a method of remediation, and estimate the cost of remediation. t 1 1 We are fully prepared and committed to respond to the needs of the project as well as the schedule for completion. We believe that Converse is uniquely qualified to provide this study, since Converse has performed a groundwater seepage evaluation for the Diamond Bar, Village Apartments, and other numerous studies throughout Southern California. The following proposal demonstrates Converse's experience with similar projects, and we have demonstrated that we meet all of the requirements of your "selection procedures" listed in the RFP. We appreciate the opportunity to propose on this project, and look forward to working with the City of Diamond Bar to achieve a satisfactory solution to this groundwater problem. If you should have any questions or require A Wholly Owned Subsidiary of NmreG an recyaaa pepx The Converse Professional Group I Department of Public Works City of Diamond Bar CCW Project No. 95-31-281-00 December 1, 1995 Page 2 1 1 1 t 1 I t I IJ additional information regarding our qualifications, scope and/or fees, please do not hesitate to contact either the undersigned Principal Engineer at (818) 930-1221, or Senior Geologist at (818) 930-1223. Respectfully submitted, CONVERSE CONSULTANTS WEST Thomas C. Benson, Jr.ZE E Senior Vice President/Managing Officer Dist: 5/Addressee !' 1/City of Diamond Bar, Department of Public Works Attn: Mr. George Wentz Director of Public Works/City Engineer 1 ® Printed On aecycled Paper Converse Consultants West rl REVISED PROPOSAL GROUNDWATER SEEPAGE INVESTIGATION Meadowglen Drive and Ambushers Street Diamond Bar, California CCW Project No. 95-31-281-00 TABLE OF CONTENTS Page 1.0 PROJECT TEAM ...................................... 1 1.1 Project Managers ................................. 1 1.2 Geotechnical Engineer .............................. 1 1.3 Engineering Geologist/Hydrogeologist ................... 1 2.0 CONVERSE EXPERIENCE ................................. 3 3.0 PROJECT DESCRIPTION ................................. 4 3.1 Meadowglen Drive ................................ 4 3.2 Ambushers Street ................................. 4 4.0 PROJECT INVESTIGATION ............................... 6 4.1 Research and Review .............................. 6 4.2 Geologic Mapping ................................. 6 4.3 Subsurface Exploration ............................. 6 4.4 Geotechnical Laboratory Testing ....................... 4.5 Geotechnical Analyses and Report Preparation ............. 7 8 4.6 Subsequent Well Monitoring and Reporting ............... 9 5.0 PROJECT SCHEDULING ................................. 10 t 6.0 GEOTECHNICAL FEES .................................. 6.1 Fee Estimate . 12 12 6.2 Schedule of Fees ................................. 12 6.3 Agreement and Insurance ........................... 12 7.0 CLOSURE ........................................... 14 APPENDIX A, "RESUMtS" APPENDIX B, "SELECTED GROUNDWATER PROJECT EXPERIENCE" APPENDIX C, "REFERENCES" APPENDIX D, "FEE BREAKDOWN" APPENDIX E, "SCHEDULE OF FEES" 1 95-31-281-00 P,i ,w On R.c,Cw Py , Converse Consultants West I 1 1.0 PROJECT TEAM Our proposed project team organizational chart is shown on Figure 1, "Project 1 Organization Chart". Converse has assembled a skilled team of geotechnical engineers and engineering geologists to perform the work requested in the November 3, 1995 Request for Proposal (RFP). These team members have extensive experience 1 performing the required services on similar projects within the past five years. RLssum6s for key project personnel are included in Appendix A, "R6sumds," of this report. This team brings together the key elements necessary to successfully complete the project study. Our objective is to ensure that the required geological and geotechnical assignment goals are met and that the City of Diamond Bar is satisfied with the deliverables as outlined in this proposal. We emphasize our team's professional qualities, and we are confident that this team will be responsive to.your needs. 1.1 Project Managers Converse's Project Manager will be Thomas C. Benson, Jr., C.E., G.E. Mr. Benson has more than 15 years of geotechnical experience. He has been project manager for geotechnical investigations on groundwater and pavement distress. Mr. Benson has just completed a moisture infiltration and seepage study of a 130-unit apartment complex in Diamond Bar which has experienced similar moisture and seepage problems. 1.2 Geotechnical Engineer Leonard T. Evans, Jr., Ph.D., C.E., G.E., has been providing geotechnical services in Southern California for more than 40 years. He has extensive experience with earth- quake engineering, liquefaction evaluation and mitigation design. He has conducted groundwater investigations and testing of earth materials throughout Southern California and has extensive experience with slope stability investigations in unconsoli- dated materials and bedrock. 1.3 Engineering Geologist/Hvdrogeologist Mark B. Schluter, R.G, E.G., H.G., has over 16 years of experience in engineering geology, groundwater, hydrology, and moisture distress investigation. He has con- ducted hydrogeologic investigations for the Los Angeles Metro Rail Project and moisture distress investigations for residential tracts in Moorpark, California. Mr. Schluter just recently completed a large landslide stabilization evaluation for a Whittier hillside tract in similar soil and bedrock materials as encountered at the subject locations. 95-31-281-00 1 Rimed On R."Cw Pepe, Converse Consultants West 1 1 1 1 1 1 1 1 CITY OF DIAMOND BAR DEPARTMENT OF PUBLIC WORKS PROJECT DIRECTOR — CLIENT CONVERSE CONSULTANTS WEST Thomas C. Benson, C.E., G.E. PROJECT MANAGER PROJECT ENGINEERING GEOLOGIST, HYDROGEOLOGIST Mark B. Schluter R.G., E.G., H.G. FIELD EXPLORATION AND TESTING Daniel Arteaga DRILLING SERVICES Conwest Drilling PROJECT GEOTECHNICAL ENGINEER Leonard.T. Evans, Jr. Ph.D.. C.E.. G.E. LABORATORY SERVICES Hector Morin, Ph.D., C.E. PROJECT ORGANIZATION CHART CONVERSE _-_ project No. F'g.° No. CONSULTANTS = - = 95-31-281-00 I 2.0 CONVERSE EXPERIENCE Converse Consultants West (Converse) has been providing geotechnical engineering and geological services since 1946. Converse has a heritage of pioneering geotechnical work in Southern California, starting with Professor Frederick Converse at the California Institute of Technology. Converse is a wholly -owned subsidiary of The Converse Professional Group, which was ranked 158 out of the top 500 ENR domestic design firms for 1995. Our Monrovia office has a full -service geotechnical laboratory licensed by various organizations as an approved testing agency, including the City of Los Angeles, the Division of the State Architect, Army Corps of Engineers and Caltrans. Nationwide, Converse has over 300 employees consisting of Geotechnical Engineers, Civil Engineers, Certified Engineering Geologists, Certified Hydrogeologists, Environmental Scientists, technicians, drafting/CAD personnel, and other support personnel. Converse has experience on similar projects throughout Southern California. Enclosed as Appendix B is "Selected Groundwater Project Experience" for the Monrovia (Los Angeles County) office. Appendix C is a list of "References," including the reference contact person, address and telephone number. 1 1 1 11 1 1 1 95-31-281-00 3 3.0 PROJECT DESCRIPTION 3.1 Meadowglen Drive Converse has reviewed the City of Diamond Bar grading files for Meadowglen Drive. This residential street was originally graded and constructed in 1976 as part of Tract 31062. Meadowglen Drive is about 64 feet wide and consists of two 20-foot wide traffic lanes and two 12-foot wide sidewalk/parkway easements along each side of the street. The Meadowglen study section is about 1000 feet long and extends from the intersection of Silver Rain Drive to Ironhorse Road. The street has a gentle gradient and varies in elevation from about 858 feet at the Silver Rain intersection to elevation 876 feet near the intersection with Ironhorse. A number of buried utility lines are located beneath the street and within the parkway easements, including water, sewer, and gas lines. A large 30-inch diameter high- pressure gas main runs across the street between 1579 and 1576 Meadowglen Drive. Review of the March 2, 1976 Los Angeles County Road Plan for Meadowglen indicated that the road surface was designed to consist of two inches of asphalt pavement over six to ten inches of crushed base. The design thickness of the base material was greatest near the concrete curb and gutters. Concrete sidewalks along each side of the street were designed to be five feet wide and four inches thick. A landscaped parkway was located between the sidewalk and property frontages along the street. A site visit was made on November 13, 1995. Groundwater seepage and ponding was observed on the street and along the sidewalks and parkways. Groundwater seepage discharge was observed along the contacts between the curb and street, along the street gutters, between the sidewalk and curb, and between the sidewalks and lawns. A slippery, green algae has established itself along most seepage areas, including the sidewalks and driveways. Groundwater seepage was also observed along many of the cracks in the street pavement. Pavement was distressed throughout most of the study section and exhibited an "alligator" crack pattern characteristic of roadway subgrade distress. Accumulated groundwater seepage flows down the gutters on both side of the street to the storm drains located on Meadowglen Drive near the intersection of Silver Rain Drive. Estimated flow in the east gutter was 3 to 4 gallons per minute (gpm) and about 1 gpm along the west street gutter. The invert of the storm drain pipe was 4 to 5 feet below the street grade. 3.2 Ambushers Street Ambushers Street is located at the southern edge of the City of Diamond Bar. Review of City grading files for Ambushers Street indicated that the street was originally graded as part of Tract 34160 in 1978. The project site consisted of hillside terrain which was graded into terraced building pads by cutting the hillside ridges and filling the side canyons. Slope areas between thebuildingpads were constructed with terrace drains. A fill canyon with a mapped canyon bottom subdrain extends 95- 31-281-00 4 P . w on R4ercw P", Converse Consultants West 5 iJ northward across the project study area. The project study will fodus primarily on the private properties located on the south side of Ambushers Street between Woodhill Circle and 20914 Ambushers Street. No evidence of significant pavement distress was observed in the street. The problem consists primarily of groundwater discharge running down the gutter on the south side of the street, although minor surface flow was observed along the north side of the street on and below Pasado Drive. Most of this water discharge on the north side of the street is from the drain outlets which convey surface runoff from the rear yard slope drains to the front yard street gutter. Evidence of near -surface groundwater was observed along some property frontages on the south side of the street. The cumulative surface flow discharging into the storm drain at 20914 Ambushers Street was estimated to be about 5 to 6 gpm. A dark green algae growth had established itself in the street gutter and along the seepage areas. Fallen leaves and debris had washed down with the water and created a small blockage near the storm drain grate. Terrace drains located on the rear yard slopes appeared to be poorly maintained. The drains were blocked with weeds and accumulated soils which had washed down from the slopes. Water flow in the drains was slowed and in many cases partially blocked causing ponding in the channels. Cracks were observed in some of the concrete terrace drains which could permit water to infiltrate into the slopes. 95-31-281-00 AinW on a.cy9cwd P. Converse Consultants West 9 I 4.0 PROJECT INVESTIGATION We propose to provide personnel, equipment and material to explore both these sites, perform geotechnical laboratory testing, provide hydrogeologic and geotechnical engineering analyses, and prepare two separate reports summarizing our findings and presenting mitigation recommendations. These studies do not include an evaluation of the potential for soil and/or groundwater contamination at the sites. Proposed tasks are described further in the following subsections. 4.1 Research and Review We will conduct a review of the City of Diamond Bar Building Department files for information and reports on the two subject sites. Any additional site -specific information identified by Converse or brought to our attention will be reviewed during the course of the investigations. As an option, Converse can formulate a questionnaire which can be distributed to the homeowners within and adjacent to these study areas. For the purposes of this proposal, it is assumed that a maximum of 50 homeowners would be contacted. Once permission. to interview the homeowners is achieved from appropriate City personnel, a survey would be formulated, including space for written essay comments/response. Converse personnel would both distribute and collect these surveys. Survey results would be collated and included as an appendix to our final t report (described in Section 4.5 below). Results of these surveys would be collated prior to subsurface exploration. Based upon results of the surveys, the subsurface exploration program may be modified. 4.2 Geologic Mapping Geologic reconnaissance mapping will be performed at each site to visually identify potential sources of water, identify affected property frontages in the study areas, estimate the quantity of water flowing to the surface, and map exposed geologic materials. Information obtained from the geologic mapping will be used to identify areas for subsurface exploration and installation of monitoring wells. Geologic reconnaissance studies are recommended for all of the up -gradient areas near the subject sites. Most of these up -gradient properties are privately owned and will require permission of the homeowners to gain access for visual observations. 4.3 Subsurface Exploration Converse will procure the appropriate Underground Service Alert notifications prior to subsurface drilling, and will obtain Los Angeles County Well Permits for the proposed monitoring wells. All monitoring wells will be located in City rights -of -way. We assume the City of Diamond Bar will be responsible for notifying the homeowners in and around the study area of the proposed investigation and work related to the study. The City of Diamond Bar will secure permission to access private properties as 95-31-281-00 6 N"e On B''d Pp, Converse Consultants West 1 required for the investigations. For the purposes of this proposal, it is assumed that ready access to the exploration areas will be provided. Any available utility information for these sites should be provided to Converse prior to exploration, to reduce the potential for damaging underground utilities. We propose to drill ten borings to depths ranging from 10 to 50 feet below existing grade. These borings will be located in the street or City parkway. Eight of the borings will be drilled along or near Meadowglen Drive, four of which will be e converted to monitoring wells (on Meadowglen and Straw Flower Lane). Two borings are planned for the south side of Ambushers Street, which will be converted to wells. The eight borings on Meadowglen will be spaced slightly less than 300 feet on -center. Considering the complex geologic conditions of the mass -graded residential tract canyon fills, alluvial valleys and dipping bedrock), the number of borings is considered an essential minimum. The Ambushers Street problem appears to be less complex, and therefore does not require as much subsurface exploration. A truck -mounted drill rig will be used when access permits, and relatively undisturbed ring and bulk samples will be obtained for geotechnical testing. Driving blow counts and continuous logs of the subsurface conditions encountered in the exploratory borings will be recorded by our field personnel. These borings will be backfilled with soil cement and pavements will be patched at the surface, where penetrated. Six of the exploratory borings will be converted to monitoring wells. A 2-inch diameter, slotted polyvinyl chloride (PVC) pipe, with a 3-foot blank section at the top of the pipe will be installed. The pipe will be surrounded with fine filter sand at the slotted portion, and bentonite and concrete at the blank section. Locking wellheads will be provided at each of the six wells. Los Angeles County well permits will be obtained for these wells. 1 1 1 1 Wells will be purged on the day installed and allowed to recharge. A water sample will be obtained at a later date after the well has stabilized. Water samples will be transported to a subcontracted analytical laboratory for testing, 4.4 Geotechnical Laboratory Testing Earth material samples obtained from the explorations will be transported to our Monrovia geotechnical laboratory. Geotechnical testing will be performed in general accordance with the applicable ASTM Standards and may include the following tests: in -place moisture and density, compaction curve, sieve analysis, Expansion Index (Ell, R-value, and permeability. 95-31-281-00 7 Plima On R.11 tl P.m Converse Consultants West Samples will be stored in the laboratory for 30 days after completion of the report. After 30 days, samples will be discarded, unless we are notified otherwise. t Two water samples obtained from the groundwater monitoring wells will be trans- ported to a subcontracted California -licensed analytical laboratory. These ground- water samples will be tested for pH, total dissolved solids, total suspended solids, settleable matter, turbidity, chloride content, sulfate content, sulfide content, and nitrate content. The purpose of this testing is to provide preliminary information for use in obtaining a National Pollutant Discharge Elimination System (NPDES) permit from the Regional Water Quality Control Board (RWQCB), if long-term groundwater discharge will be necessary (requiring a permit). 4.5 Geotechnical Analyses and Report Preparation Data obtained from the research, geologic mapping, subsurface explorations, and geotechnical and analytical laboratory testing will be evaluated. Engineering analyses will be performed to evaluate groundwater seepage conditions and pavement distress at each site. A separate report will be prepared for each site. Both will be signed and stamped by a California -entitled Geotechnical Engineer (GE) and certified Hydrogeologist (HG). These reports will include the following items: A list of references of reviewed data and a synopsis of available geotechnical/ geologic information for these study areas, Field and. laboratory procedures used in the investigations, A discussion of results of the geologic mapping, groundwater and seepage conditions encountered, measured engineering properties, and water test results, Identification of the probable source of the groundwater at the sites, t• Recommendations for remediation measures to mitigate distress conditions, Asphalt pavement sections for Traffic Indexes of 4.0, 5.0, 6.0 and 7.0, including subgrade preparation recommendations, A plan showing the location of the subsurface explorations and monitoring wells, proposed mitigation scheme (including location of any proposed new wells and proposed piping/discharge systemis)), and 1 • An engineering cost estimate for the proposed remediation scheme. Six bound copies of each report will be provided and distributed as requested by the City of Diamond Bar. lJ 1 95-31-281-00 Printed On Pecycke Pew, Converse Consultants West I 4.6 Subseauent Well Monitoring and Reporting To evaluate seasonal fluctuation of groundwater levels and flow quantities at the two study areas, it is recommended that subsequent readings of the groundwater levels in the six wells be performed. Also, slug/drawdown tests could be performed in an effort to determine the site -specific hydraulic conductivity. It is suggested that subsequent well monitoring initially be performed on a bi-monthly (8-week) basis. Brief reports documenting subsequent well monitoring would also be prepared. Subsequent monitoring may not be essential for the remediation scheme proposed. However, it is included in this proposal as an optional item. I h 11 r 1 I 1 I I 1 1 Fl 95-31-281-00 PflrnE On R.,.e PW Converse Consultants West P i 5.0 PROJECT SCHEDULING A schedule for the project is depicted on Figure 2, "Project Schedule". Project set-up, field work, laboratory testing, ;and draft report preparation are expected to be completed in eight weeks. We anticipate that it will require one week for City review and one week to incorporate the review comments into the final version of the report and reproduce six copies of each report. Three project meetings are scheduled: the first will be the kick-off meeting, the second at the completion of field work and the third at the completion of the draft report review. If a homeowner survey is proposed, it is suggested that one month be budgeted to allow for homeowner response. l Subsequent well monitoring can be performed within five working days after notice to perform additional groundwater level monitoring in the wells. It is assumed that all six wells can be measured in one-half working day. The brief report can be prepared within roughly ten working days after completion of the field work. Therefore, roughly three weeks should be scheduled to complete a subsequent well monitoring report, after notice to proceed with subsequent monitoring. An annual schedule can be established with the City, if it is deemed prudent to perform ongoing subsequent well monitoring. r I I I 1 I 1 r I 95-31-281-00 10 Aimea I fn Y W W I 0 w 11L UZ m JJ p W U) U W 3 3 W O o ZLLJ bi ~ UO U W LL Z lrO O F W a J1-m o Qa z Ir o zm O O m cn Ld d O F cr O Ir W Z Z to QJ Q p C7 O F- I GOH Waz0 Ohs a. Q O Z Z J Q Q W O 2 NF F- WzLLI0Boa a W 0 g R O P Z a o o IF a W U F Et a U N a w W F- W J O W F S O Q UO J N W cn H wO J UW pJ W p} Z F_ p aU)F O W Qz Cl- W rH ZZ OC 3 n_3 wao w0 xW. 0 a ir u u. a WJ D 0 cu V O oC a z N wm co a. z wa Z J O0) UU2 O U 6.0 GEOTECHNICAL FEES 6.1 Fee Estimate An itemized "Fee Breakdown" for each project site is presented in Appendix D. As shown in Appendix D, it is estimated that our fees will be on the order of $16,000 for the Meadowglen study, and $8,300 for the Ambushers Street study, for a total of 24,300. The homeowner questionnaire option can be performed for an incremental not -to -exceed fee of $1,960. Subsequent well monitoring reports can be prepared for an incremental not -to -exceed fee of $575. The total "not -to -exceed" fee for both sites and both options (one subsequent well reading) is $26,835.00. Invoices will be submitted monthly in accordance with the attached Fee Schedule. 6.2 Schedule of Fees Our "Schedule of Fees" (SC-95A) is presented in Appendix E. Although it is indicated on this standard Southern California fee schedule that it will expire at the end of January, .1996, this fee schedule will remain applicable for this project through at least June 1996., General Conditions do not apply for this contract. All personnel will be billed out at a direct payroll multiplier of 3.5. For the five key geotechnical professionals listed in Section 2.0, Figure 1, who will be assigned this project, the following billing rates will be charged: NAME.. TITLE HOURLY RATE Thomas C. Benson, Jr. Project Manager 138.66 L. T. Evans, Jr. Geotechnical Engineer 148.08 1 Mark B. Schluter Project Geologist 92.19 Hector E. Marin Laboratory Manager 52.01 Danny Arteaga Senior Staff Engineer 55.10 6.3 Agreement and Insurance Converse has reviewed Attachment A enclosed with the November 3, 1995 RFP, which was a "Consulting Services Agreement". All terms and conditions are acceptable to Converse as presented in RFP Attachment A. Converse will provide an insurance certificate for Professional Liability, General Liability, Automobile Liability and Workers' Compensation Insurance, upon award of this project. Insurance coverage specified in Section BJ of the "Consulting Services Agreement" will be provided as follows: I 95-31-281-00 12 P,imt 0. Fe<ydaE Ppn Converse Consultants west 1 1,000,000 500,000 1,000,000 500,000 u The City, its officers, employees, attorneys and volunteers will be named as additional insured. 95-31-281-00 13 Rintea on aeeymed F.Nr Converse Consultants West I I I I I 1 I I I I I I 7.0 CLOSURE We believe that this proposal demonstrates that Converse is uniquely qualified to p6irform this study: As iridicked-in Se:btion V of the November 3, 1995 RFP, criteria for evaluation of the proposal may include but need not be limited to the following: RESPONSECONVERSE Completeness of proposal Converse has followed the proposed format and content listed in Section III of the RFP references included in Section 2.0, "Converse Experience.* Firm's and key project team member's We have assembled a team of hydrogeologists experience in performing similar work and geotechnical engineers with significant experience in Southern California working on similar groundwater projects. Firm's and key project team member's record We suggest contacting our references who in accomplishing work assignments for will document that we complete our projects projects in the agreed work within the agreed -upon schedule, fees and achieve the agreed -upon outcome/results. Consultant's demonstrated understanding of We have reiterated our understanding of this the scope of work project and the scope of work in this proposal. Quality of workpreviouslyperformed by the Once again,. we recommend that you contact firm our references or others regarding Converse's quality of work and capabilities. Our laboratory and staff are constantly undergoing quality assurance assessments. The resources and fee required to perform the See Appendix D, "Fee Breakdown." requested services The consultant's comments on the Converse will sign the Professional Services Professional Services Agreement Agreement included as Attachment A of the RFP. References We believe Converse has satisfied numerous past clients (listed in Appendix C, References"). 95- 31-281-00 14 Prin1W On R*cvv PaP"r Converse Consultants West I I 1 1 1 1 i 1 1 1 1 1 1 1 i 1 1 APPENDIX A RESUMES 1 95-31-281-00 P tir On R.c,e N,, Converse Consultants West I l 1 1 1 1 1 1 1 1 1 1 i 1 n 1 Thomas C. Benson, Jr. Senior Vice President/Managing Officer CONVERSE > CONSULTANTS EDUCATION M.S., Geotechnical Engineering, University of California, Berkeley, 1982 B.S., Civil Engineering, Michigan State University, 1981 REGISTRATIONS Civil Engineer, California Geotechnical Engineer, California Registered Environmental Assessor, California MEMBERSHIPS Structural Engineers Association of Southern California American Society of Civil Engineers International Society of Soils Mechanics and Foundation Engineering Earthquake Engineering Research Institute EXPERIENCE CONVERSE CONSULTANTS WEST (since 1988). As Managing Officer, Mr. Benson performs and manages geotechnical explora- tions and construction monitoring of earthwork and foundation projects for Converse Consultants West, a subsidiary company of the Converse Professional Group. In this capacity, he serves as engineer on a wide variety of geotechnical projects, including pipelines, pavements, reservoirs, high- and low-rise structures, mass grading and residential tracts, distress investigations, and other various geotechnical studies. Specific analytical capabilities include earthquake engineering, bearing capacity and settlement calculations, spread footing and pile design, slope stability studies, earthwork stabilization design, shoring and tie -back design, and pipe bedding, pavement, and backfill recommendations and design. Some recent projects he has managed include 20 Air Route Traffic Control Centers through- out the United States, the Los Angeles County Children's Courthouse in Monterey Park, the UCLA Anderson Graduate School of Management and University Elementary School relocation, and two site studies for the proposed Laser Interferometer Gravity Observatory (LIGO) Caltech project. He has also worked on more than 30 water tanks and reservoirs throughout Southern California, and numerous pipelines and conduits. Sewage treatment plant experience includes recent expansion projects at the Los Angeles Harbor, Huntington Beach, and Burbank plants. He also worked on numerous Northridge Earthquake repair projects, including stabilization of a cliff with rock anchors. GILES ENGINEERING ASSOCIATES (1987 to 1988). Mr. Benson managed the California office for Giles Engineering Associates for approximately one year before being recruited to Converse. Clients consisted primarily of national franchise firms which required timely investigations throughout the United States. Numerous different and sometimes difficult soil conditions were encountered. Many of the sites consisted of former gasoline stations with leaking underground storage tanks, which required remediation. SCHAEFER DIXON ASSOCIATES (1982 to 1987). Some of the projects that he worked on included expansion of the Hyperion Waste- water Treatment Plant, expansion of the Los Angeles Convention Center, analyses and consultation for the second level roadway at John Wayne (Orange County) Airport, the Woodcrest Water Supply Pipeline, modification of Big Bear Dam, several high-rise projects such as the Federal Reserve Bank Los Angeles Branch, the Western Jewelry Mart, and the Director's Guild Building, KMAX radio tower, expansion of LAX Terminal Four (American Air- lines), and numerous water treatment, pipeline, road improvement and earthwork projects. Numerous distress investigations were also performed by Mr. Benson. MNIESUME5 ENSUN 12M4 CONVERSE CONSULTANTS e EDUCATION 1 Ph.D., Civil Engineering: University of California Berkeley, 1982 M.Eng., Civil Engineering: University of California Berkeley, 1981 M.S., Civil Engineering: Stanford University, 1958 B.S., Civil Engineering: Stanford University, 1955 REGISTRATIONS Civil Engineer, California Geotechnical Engineer; California Professional Engineer, Arizona PROFESSIONAL MEMBERSHIPS American Society of Civil Engineers Earthquake Engineering Research Institute International Society of Soil Mechanics and Foundation Engineering EXPERIENCE CONVERSE CONSULTANTS WEST (since 1983). As Chief Engineer of Converse Consultants West, Dr. Evans has over 39 t years' experience in the geotechnical engineering field in California. He is responsible for technical supervision of the engineering staff for soils, foundation and earthquake engineering studies and acts as project manager for specific projects. In addition, he has overall engineering responsibility for technical standards, quality control, research and development. Dr. Evans has worked on a multitude of projects ranging from high rise buildings to hillside developments and landslide observations. In addition, he has supervised numerous projects involving expansive or collapsing soils. He has been project manager for numerous earthquake engineering investigations, including ground response, liquefaction and determination of response spectra. Leonard T. Evans, Jr., Ph.D. Vice President/Chief Engineer HARDING LAWSON ASSOCIATES 11679. As Project Manager, he was in responsible charge of geotechnical investigations for hillside developments, office buildings, schools and hospitals. L.T. EVANS, Inc. (1958 to 1978). As Vice President, he was in charge of the operations of the organization. Starting in 1958 as an office engineer, he directed foundation investigations for over 1,000 projects. Major projects included foundation investigation studies for high-rise buildings such as Equitable Life, First Interstate Bank and Mutual Benefit Life of Los Angeles. He served as foundation engineer for numerous port facilities in Los Angeles Harbor and Marina complexes such as Huntington Harbour in Huntington Beach, California. PUBLICATIONS Evans, L.T., Jr. and Duncan, J.M. (1982). Simplified Analysis of Laterally Loaded Piles, University of California Berkeley Geotechnical Engineering Report UCB/GT/82.04. Duncan, J.M., Evans, L.T., Jr, and Ooi, P.S.K. 1994). Lateral Load Analysis of Single Piles and Drilled Shafts, ASCE Journal of Geotechnical Engineering, Vol. 120 No. 6. 1 MMESUMMEVMS 12/ 4 I 1 1 1 1 1. 1 1 1 1 IJ 1 1 1 1 1 1 1 1 CONVERSE V4. CONSULTANTS EDUCATION M.S. Graduate Studies, Engineering Geology/Groundwater Hydrology: California State University, Los Angeles B.S., Earth Science, California State Poly- technic University, Pomona, 1979 REGISTRATIONS California Certified Engineering Geologist California Certified Hydrogeologist California Registered Geologist 40-Hour Hazardous Materials Health & Safety Course, 29 CFR 1910.120, 1990 8-Hour Annual Refresher Course, 29 CFR 1916.120, 1994 MEMBERSHIPS Association of Engineering Geologist Geological Society of America EXPERIENCE CONVERSE CONSULTANTS WEST (since 1979): Mr. Schluter has more than 15 years' of diverse consulting experience in the applied disciplines of engineering geology, geotechnical engineering, hydrogeology, construction moni- toring, testing, and instrumentation. Mr. Schluter serves as project manager and geologist on a broad range of geotechnical and environmental investigations for public transit projects, commercial buildings, industrial facilities, reservoirs, hospitals, landslide distress, residential distress, and litigation studies throughout the western United States. Some recent project experience includes: LOS ANGELES COUNTY METRO RAIL SYSTEM: Conducted geotechnical and environmental investigations along 18 miles of the Los Angeles County Metropolitan Transportation Authority's Metro Rail System. Performed subsurface drilling, sampling and testing for evaluation of anticipated ground behavior for tunnel and surface station sites, performed pump tests for construction dewatering, installed groundwater wells and Mark B. Schluter Senior Engineering Geologist instrumentation to monitor subsurface conditions, and evaluated rock strengths and characteristic for tunneling design. MORRIS DAM REANALYSIS AND INVESTI- GATION (Los Angeles County, California): Conducted geotechnical investigation to obtain, develop and provide information regarding rock quality, faulting and bedrock motion for static and dynamic analysis of the dam. Performed concrete and bedrock coring to evaluate the condition of the dam structure and foundation rock, pressure tested critical sections within exploratory borings to evaluate faulted and fractured bedrock conditions and conducted geologic examination of existing adits and drifts within the foundation rock. LOS ANGELES COUNTY SANITATION DIS- TRICT: Conducted detailed study of bedrock joint orientations in fractured granitic rock to evaluate programs for containment of seepage into a Scholl Canyon solid waste landfill. Responsible for geologic mapping, subsurface exploration, groundwater sampling and surface water monitoring, evaluation of groundwater conditions, and prepared design recommen- dations to intercept groundwater seepage from bedrock fractures. HIGHWAY 78 ROAD CUT EVALUATION (West- chester County, New York): Performed geologic evaluation of 1100 feet of bedrock cut slope to assess slope stability and highway safety. Mapped and photographed road cut exposures, measured fracture orientations, located ground- water seeps and springs, evaluated mechanical weathering processes on slope face including root growth and frost heave and identified zones of weakness and slope instability. WHALE ROCK DAM REANALYSIS (San Luis Obispo County, California): Analysis of seismic stability of the embankment and landslide potential of the abutments. Installed horizontal drainage systems to intercept and drain groundwater from dam embankments, performed laboratory testing on embankment materials, alluvial sediments and bedrock samples to determine physical properties and engineering characteristics of the earth materials. MMESUMEMSCHLU ER 7/96 I e 1 CONVERSE CONSULTANTS 0 EDUCATION Ph.D. Civil and Environmental Engineering Geotechnical), Utah State University, 1991 M.B.A. Finance, Universidad Autonoma de Madrid, Spain, 1986 1 M.S. Civil and Environmental Engineering Geotechnical), Utah State University, 1983 B.S. Civil and Environmental Engineering, Utah 1 State University, 1982. REGISTRATION Registered Professional Engineer in California and Utah. PUBLICATIONS Analysis and soil structure interaction model of a double bulkhead wall using the finite element method. (1992) The Gaussian Quadrature numerical integration 1 scheme applied to slope stability analysis. 1992) Finite element modeling of soil -structure inter- actions systems; Selection of hyperbolic para- meters. (1993) Densification of granular hydro -collapsible soilstinadesertenvironmentbycompactiongrout- ing, a test program case history. (1993) Tomography applied to geotechnical engineer- ing problems. (1995) EXPERIENCE CONVERSE CONSULTANTS WEST (since 1994). As Project Engineer, Dr. Marin's responsibilities include proposal preparation, site assessment, subsurface exploration, laboratory testing of soil materials, engineering analysis, research, computer -aided design and report preparation. Typical projects consist of tWWSUMETMARIN 7M6 Hector E. Marin, Ph.D. Project Engineer a variety of geotechnical/soil and foundation investigations for a number of civil structures, including site assessment and earthquake damage for residential buildings. Specific analytical capabilities include earthquake analysis, bearing capacity and settlement computations, slope stability studies, founda- tion design and earthwork stabilization. In addition, Dr. Marin manages the soils laboratory at the Pasadena Converse office. CONVERSE CONSULTANTS SOUTHWEST 1992-1994) As Staff Engineer, Dr. Marin's responsibilities included proposal preparation, on -site subsurface explorations, laboratory test- ing of soil materials, verification and control of field and laboratory data, engineering analysis and computer -aided design, and report prepara- tion. Typical projects included a variety of geotechnical/soil and foundation investigations for embankments, high- and low-rise struc- tures, commercial and residential develop- ments, public buildings, pipelines, and bridge abutment support. Other projects included earth retaining structures, soil stabilization by compaction grouting, pavement design and road distress mitigation as a result of subsidence -related faults and fissures, landfill closures, stability of slopes and channels, street rehabilitation and reconstruction, and other civil works. UTAH STATE UNIVERSITY, LOGAN, UTAH. 1986-1992). Instructor in Civil Engineering, primarily in the area of soil mechanics. Responsibilities included teaching, research, and laboratory testing of soil materials. COMPANIA BOLIVIANA de INGENIERIA, LA PAZ, BOLIVIA (1983-1984). Staff Engineer responsible for the supervision, scheduling, and testing of soil materials during the construction of various water supply systems for the city of La Paz, Bolivia. CONVERSE M CONSULTANTS o EDUCATION B.S., Geological Engineering, Colorado School of Mines, 1986 MEMBERSHIPS Engineer -in -Training 40-hour Health and Safety Training (CFR 1910.120) CONVERSE CONSULTANTS WEST (since 1987) As a Senior Staff Engineer, Mr. Arteaga has been responsible for performing and managing geotechnical explorations and construction monitoring of earthwork and foundation projects. Geotechnical projects include pipelines, pavements, airfield facilities, mass grading of residential developments, hospitals, petroleum refineries, high- and low- rise structures, and distress investigations. Specific analytical capacities include bearing capacity and settlement calculations, spread footing and pile design, slope stability analysis, pavement and backfill recommendations and design. Daniel Arteaga Senior Staff Engineer SOILS INTERNATIONAL (1986 to 1987). Asa Staff Engineer, Mr. Arteaga was responsible for the coordination and supervision of laboratory personnel performing soil and materials testing, performed geological mapping and borehole logging, and evaluated and interpreted field observations and construction monitoring of private and public developments, including pipelines, water treatment facilities, low- and high-rise structures, pavements, and residential tracts. REPRESENTATIVE BURBANK WATER RECLAMATION PLANT EXPANSION PROJECT (Burbank, California) Project Engineer - Performed subsurface included new aeration 'basins and new secondary clarifiers. Prepared report to resent design and construction recommendations. M:S00.31WESUMES. ROZA I1\93 1 1 1 1 1 1 1 1 1 CONVERSE a_ CONSULTANTS EDUCATION B.S. Geology: California State University Los Angeles, 1988 Graduate Studies, CSULA REGISTRATION California: Registered Geologist Certified Engineering Geologist Idaho: Registered Professional Geologist MEMBERSHIPS Association of Engineering Geologists Seismological Society of America Earthquake Engineering Research Institute Caltech/USGS Earthquake Research Affiliates Geological Society of America American Geophysical Union CONVERSE CONSULTANTS WEST (since 1987) Mr. Santo has 7 years' of diverse professional experience in the applied disciplines of en- gineering geology and geotechnical engineering. As project engineering geologist, Mr. Santo is responsible for a broad range of investigations including remote sensing, geologic, fault risk, landslide, liquefaction and groundwater studies. Selected projects include: BARRET LAKE DAM RENOVATION, San Diego, California - Engineering geologic study for 11 miles of overflow conduit at Barret Lake Dam. Performed joint analyses and developed recommendations for extensive rock bolting in granitic rock to stabilize flume designs. Performed field observations in flue support footing excavations and provided general direction for field rock bolting operations. Interfaced with client, owner and contractor. SPY GLASS HILL LANDSLIDE, Whittier, California - Geotechnical investigation of a landslide affecting 17 residential properties. Performed field exploration including geologic mapping and downhole logging of bucket -auger borings. Installed and monitored slope Doug S. Santo Project Engineering Geologist inclinometers, piezometers and horizontal drains. Performed slope stability analyses and back - calculated strength parameters for the slide. Designed a slope repair plan that involved removing the slide mass with heavy grading equipment and construction of a shear key buttress. Presented the plan to local reviewing agencies and the homeowner group. SOUTH SHORES PARCELS, Palos Verdes, Cali- fornia - Geotechnical feasibility investigation for a 150-acre ocean -front property. The parcel is located between two mega -landslide complexes. Performed every aspect of the investigation including continuous core diamond drilling, geophysical logging, and exploratory trenching. Designed the equipment for two in -situ direct shear tests and successfully completed them. Developed a detailed laboratory schedule for characterization of bentonitic tuff including specialized direct shear, triaxial shear, and ring shear testing, x-ray diffraction analyses, and direct current plasma spectroscopy. Performed an in-depth rock mass classification using the Rock Mass Rating system and the Q-system. METRO RAIL TUNNEL PROJECT, Los Angeles, California Engineering geologic study of a 3-mile section of shallow, soft ground tunnel alignment below high-rise structures near Pershing Square in downtown Los Angeles. Developed special sampling equipment for use in pre -drilled grout pipes located in the high-rise basements. Prepared geologic profiles with emphasis on micro soil stratigraphy for identification and remediation of running sands. Performed geotechnical pre -siting evaluation and prepared Draft EIS/EIR for the Metro Red Line Eastern Extension Corridor Study Area. The investigation included geotechnical and environmental analyses of twelve proposed sub- way routes through eastern Los Angeles. Per- formed deterministic and probabilistic seismic hazard analyses and identified the design level earthquakes and ground motions. Evaluated potential gaseous tunneling conditions. 1 MMESUMES\SMTO. P 1/96 I J 1 1 1 1 1 1 1 1 1 Evaluated pump test data and modeled drawdown at the Universal City Station in North Hollywood. Developed aquifer characteristics using Cooper -Jacob and Hantush-type curves. Modeled drawdown using a finite element analysis. COMBINED SEWER OVERFLOW PROJECT, Providence, Rhode Island - Member of Lead Design Management Team, responsible for geotechnical pre -siting evaluation for a deep tunnel CSO facility. Evaluated existing information. Developed regional geologic and hydrogeologic settings for the northern Narragansett Basin. Located potential tunnel corridors and ranked them ,based on local geo- technical conditions. Evaluated geotechnical SOQs and contributed in the selection of short- listed firms. Prepared RFP for geotechnical exploration and conceptual tunnel design. RIVER MOUNTAINS TUNNEL, LAS VEGAS, NV: Engineering geologic study for 4 miles of 17- foot-diameter pressure tunnel through hard volcanic rock. Developed and managed field exploration and laboratory testing program. Performed engineering rock mass classification using the Rock Mass Rating System (RMR) and the Q-System. Performed deterministic and probabilistic seismic hazard analyses and developed probabilistic fault model for the Las Vegas Valley. Prepared geotechnical data report GDR) and assisted with geotechnical design summary report (GDSR)• Responsible for geo- technical siting studies for earth embankment dam storage facilities at portal locations. SEISMIC HAZARD ANALYSES - HOSPITALS/ California: Performed probabilistic seismic hazard analyses for numerous hospitals throughout California, including recent Title 24 code changes. Mr. Santo is familiar with the use and operation of the computer programs FRISK89, FRISKSP, EQSEARCH, and EQFAULT. Recent sites include The Memorial Hospital of Southern California -Arcadia; Robert F. Kennedy Memoria Center -Hawthorne; Redding Medical Center -Redding. LOMA PRIETA AND NORTHRIDGE EARTH- QUAKE ASSESSMENT/California: Member of Emergency Earthquake Response Team. Responsible for post -quake safety inspections for over 40 single-family residential structures. Performed geotechnical investigations for quake - induced slope failures and ground movements. Doug S. Santo Page 2 Developed isoseismal maps of peak horizontal ground acceleration generated during the quakes as an aid in evaluating distress claims. WARREN COUNTY LANDFILL, Warren County New Jersey - Geologic reconnaissance to evalu- ate the potential for faulting and possible effects on groundwater flow and contaminant migration at a partially completed solid waste landfill. Evaluated landslides within the working landfill. JPL/NASA Deep Space Communications Com- plex, California - Fault and seismic risk investiga- tion for 70m and 34m Mars and Uranus antennas. The antennas are one of three critical ground stations in the NASA Deep Space Network. HIGHGROVE LANDFILL EXPANSION RIVERSIDE COUNTY, California - Field Investigations for active faulting including geologic mapping, aerial photo interpretation, and exploratory trenching. COMPUTER SKILLS Proficient with a wide variety of computer software including: OFFICE SLOPE STABILITY Windows TSLOPE WordPerfect TSTAB Excel ROCKPAC GRAPHING SEISMIC HAZARD Surfer SEISRISK III Grapher FRISK89 ROCKFALL GROUNDWATER CRSP AQUIX4S PUBLICATIONS Santo, D.S., et al., 1992, Fault Identification Using Multidisciplinary Techniques, Goldstone Deep Space Communications Complex, California: in AEG Special Publication No. 4. Santo, D.S., and Spellman, H.A., 1992, Isoseismal Map Reveals Interesting Phenomena - Landers, California Earthquake of June 28, 1992: in Abstracts of the 88th Annual Meeting, Seismological Society of America. 1 MMESUMESI MTO.SPL 1196 CONVERSE CONSULTANTS = a a EDUCATION B.S., Civil Engineering, California State Uni- versity, Los Angeles, 1974 REGISTRATIONS Civil Engineer, California No. 35064 American Society of Civil Engineers California Chi Epsilon - Honorary Engineering Fraternity EXPERIENCE CONVERSE CONSULTANTS WEST (since 1994). Mr. Mar, a Project Engineer in Con- verse's Monrovia office, is a registered Civil Engineer with over 20 years of geotechnical experience. Mr. Mar's technical experience includes experience in a large variety of different types of geotechnical projects, including high-rise buildings, public transporta- tion systems, transmission lines, oil refineries, tanks, hospitals, schools, ports and airport facilities, shopping centers, parking structures, storm drains, sewer lines, and paving projects. Specific analytical capabilities include bearing capacity, active and passive pressure, liquefac- tion analyses, and settlement calculations, developing design recommendations for spread footings, drilled and driven piles and caissons. Selected projects at Converse include: ROCK ANCHOR INSTALLATION for ALLSTATE INSURANCE, Los Angeles, California. Project involved a geotechnical investigation for dam- age to a structure on a cliff at Beech Knoll Road due to the January 17, 1994 Northridge earthquake. A slope stability analysis was per- formed. To stabilize the cliff, a design using rock anchors was developed. Involvement Do Gene Mar Project Engineer included the installation and monitoring of the rock anchors. QUALITY CONTROL BUILDING for ALPHA THERAPEUTIC CORPORATION, Los Angeles, California. Foundation investigation to determine the engineering properties of the earth materials at the site, and to provide geotechnical recommendations for the design and construction of the proposed facility. A slope stability analysis was performed for the site which was located on the top of a 65-foot- high slope. ROADWAY SLOPE DISTRESS for CITY OF LOS ANGELES, Los Angeles, California. Project involved investigating a site on Mulholland Drive which had a failing earth retaining structure. Provided geotechnical information for repair of retaining structure. ROADWAY SLOPE DISTRESS for CITY OF LOS ANGELES, Bel Air, California. Project involved investigating a slope failure for a roadway at Strada Vecchia Road. Provided geotechnical information for the design of a retaining structure for the roadway. ROADWAY SLOPE DISTRESS for CITY OF LOS ANGELES, Mount Olympus, California. Project involved investigating a slope failure for a roadway at Palo Vista Drive. Provided geo- technical information for repair of the roadway. LIQUEFACTION EVALUATION for RED ONION RESTAURANT, Redondo Beach, California. Cone Penetration Test (CPT) sounding and bor- ings were used to evaluate the soil conditions at the site. A liquefaction analysis of the site was performed. Provided recommendations to mitigate the potential for soil liquefaction. COMPACTION GROUTING for WESTMONT HOMEOWNERS ASSOCIATION, San Pedro, California. Foundation investigation involving M:NESUMESWAR.SPL 8M6 Do Gene Mar Page Two I condominiums on top of a slope. The condo- miniums had excessive settlement and cracking of slabs. A program of grout and lime injection to mitigate the problem was developed. Involvement included the monitoring of the compaction grouting and lime treatment. GEOFON, INC. (1992-1994). Mr. Mar joined Geofon as a project engineer and was involved in all aspects of geotechnical investigations, including directing the performance of field work, analyses of exploration and laboratory test data, developing engineering recommen- dations, and preparation of written reports. His experience at Geofon consisted primarily of work on Caltrans projects. He was project engineer on the State Route 91 High- t way Improvements from 1-5 to State College Boulevard Project. The project involved the construction of new HOV lanes and auxiliary lanes in each direction, seven bridge widenings, on- and off -ramps, CHP enforcement areas, reconstruction of storm drain channel, sound - walls and retaining walls. Mr. Mar also worked as project engineer on two State Route 30 projects. LAW/CRANDALL, INC. (1974 to 1992). He was involved in all aspects of foundation investigations, including proposals, analyses of exploration and laboratory test data, and preparation of written reports. His experience also included directing the performance of field work and the analysis of data for downhole and refraction seismic surveys. He was project engineer on the major Metro Blue Line and Metro Green Line projects, part of the Orange County Transportation Corridor project, Library Square project, Channel Gateway project which included two 16-story condominium towers and two 6-story office buildings, Los Angeles Center project which included two office buildings 42 stories in height, the proposed Los Angeles Chamber of Commerce Building, trans- fer container facility for the Port of Los Angeles, and the renovation of the Los Angeles Coliseum. 1 WWESUMES M.S SM5 I I 1 CONVERSE _ MYEASCONSULTANTS EDUCATION A.S., Engineering Technologies, Everett Community College, Everett, Washington Continued Studies, University of Washington CERTIFICATIONS City of Los Angeles Deputy Grading Inspector N93-2265 I.C.B.O. Certified Special Inspector Reinforced Concrete No. 44134 Structural Masonry No. 46703 Registered Special Building Inspector City of Pasadena City of Burbank National Institute for Certification in Engineering Technologies Certified Level II Engineering Technician - Soils and Asphalt American Concrete Institute Certified Grade I Concrete Field Testing Technician Troxler Nuclear Safety Certified Radiation Safety Officer Trained Caltrans Laboratory and Field Proficiency Certified EXPERIENCE CONVERSE CONSULTANTS WEST (October, 1989 to Present). As Construction Services Manager for Converse Consultants West, Mr. Tuengel manages and directs geotechnical monitoring and materials testing and inspection operations. His responsibilities extend throughout the construction phases of projects following the initial geotechnical investigation. Mr. Tuengel prepares proposals and manages projects throughout the Southern California area, including state, federal, and local municipality governed construction involving reinforced concrete, structural steel, masonry and geotechnical monitoring. He also performs inspections and directs deputy grading inspectors for Converse, under the direct supervision of a registered engineer. Todd N. Tuengel Construction Services Manager Some key Converse projects Mr. Tuengel worked on include: Caltech Parking Structure Geotechnical and Materials) Palos Verdes Library Addition - central library Geotechnical) Los Angeles County Childrens Courthouse Geotechnical) Numerous JPL projects Geotechnical and Materials) Warner Bros. Triangle Building Materials) UCLA Patient Family Guest House Geotechnical and Materials) West Los Angeles Community College Aerospace and Plant Facilities Geotechnical) Seventh Day Adventist Church Eagle Rock Geotechnical and Materials) Various Municipality Caltrans Projects City of West Hollywood - Asphalt City of Baldwin Park - Asphalt City of Santa Clarita - Geotechnical and Materials MCA Backdraft and Back -To -The -Future Attractions Geotechnical and Materials) Red Lion Hotel Glendale Geotechnical and Materials) City of Los Angeles North Hollywood Police Station Deputy Grading) LEROY CRANDALL AND ASSOCIATES February, 1989 to October, 1989). Duties: Laboratory and field testing and inspection of soils and asphalt. CASCADE TESTING AND GEOTECHNICAL LABORATORIES (June, 1984 to February, 1989)• Duties: Laboratory and field testing and inspection of concrete, masonry, soil and asphalt. City of Seattle licenses for reinforced concrete and batch plant inspection. 1 M9 ESUMMTUENGEL IM I I 1 APPENDIX B SELECTED GROUNDWATER PROJECT EXPERIENCE 1 1 1 1 1 1 1 1 95-31-281-00 gPfiml On A..VC d P., Converse Consultants West SELECTED GROUNDWATER PROJECT EXPERIENCE CLIENT PROJECT DESCRIPTION 1 J PL/CalTech Pasadena. California: Water percolation tests and feasibility East Parking Lot study for installation of additional surface water spreading t facilities adjacent to the existing Arroyo Seco Spreading Grounds located upstieam of Devil's Gate Dam, Pasadena, California. The purpose was to evaluate potential designs for a spreading facility, while at the same time and place retaining use of an existing parking lot about 1500 feet long by 400 feet wide, owned by the City of Pasadena and leased to JPL. 1994 Hillyer & Irwin San Diego, California: Groundwater and hydrogeologic San Diego Convention Center study of the dewatering and excavation for the San Diego Convention Center project located about 300 feet from San Diego Bay. Excavation of the 11-acre site required instal- lation of a well system to draw down the water level from about 11 to 15 feet below mean sea level (MSL) to permit excavation and construction of basement levels, as well as to maintain a water level of -2 feet MSL under the adjoining USO Building as per requirements of the San Diego Unified Port District. 1988 Engineering Management Los Angeles (Universal City). California: UNIVERSAL CITY Consultants (EMC) STATION -METRO RAIL DESIGN UNIT C-321. installed two 14-inch diameter wells and performed pump tests with attendant monitoring wells in order to provide contractor with appropriate number and spacing of dewatering wells for a two -year -long construction contract. Geotechnical investigation and Geotechnical Design Summary Report GDSR) for Universal City Station and Cross -over Structure. The proposed cut -and -cover structure is about 920 feet long, 70 feet wide, and requiring excavations about 80 to 90 feet below the existing surface located west of Lanker- shim Boulevard. Evaluated liquefaction potential of sandy soil alluvial deposits with groundwater only 20 feet below the ground surface. Provided dewatering, temporary and permanent stability for excavated slopes and tieback recommendations. 1993 International Engineering San Joaquin Valley, California: Groundwater evaluation for Company, Inc. demand, supply and overdraft of groundwater resources in Kings River Conservation District 2500 square miles served by the Kings River drainage area, between Fresno and Tulare Lake, California. Consumptive and conjunctive use of groundwater and surface water per- colation basins was forecast to the year 2000. 1978 Page 1 of 4 Converse Consultants CLIENT PROJECT DESCRIPTION Southern California Rapid Los Angeles. California: LOS ANGELES METRO RAIL Transit District (SCRTD) SUBWAY PROJECT. Groundwater and geotechnical investi- gation for 18.6 miles of subway tunnel.. Seismic refraction, microgravity; downhole and crosshole well -logging geo- physical techniques were used to evaluate subsurface t geology and groundwater conditions. At Union Station a 16-inch diameter pump test well and monitoring wells were installed and pump tested for 72 hours to develop ground- water drawdown curves. From this, a dewatering well plan was designed to lower the water table from the existing 20 feet to 80 feet below the ground surface to allow two-year construction of the 80-foot-deep open cut for Union Station, Downtown Los Angeles. 1983 World Vision Claremont, California: Groundwater study to confirm that Business Park a 100-foot-deep, 10-acre gravel quarry could be used for a Business Park'. Installed a 10-inch diameter, 622-foot deep domestic well to help maintain drawdown of water table below the floor of the quarry. TDS was 290 ppm. Confirmed the San Jose and Indian Hill faults were ground- water barriers. Designed an innovative gravity drain system to carry runoff and groundwater out of the pit into an adjoining quarry downstream of the 'Business Park" during periods of high water levels. Moiave,Water. Agency Victorville. California: Hydrogeology investigations for final Victor Valley Regional Wastewater design and construction recommendations for proposed System Victor Valley Regional Wastewater System project which included approximately four acres of sludge lagoons, 100 acres of percolation ponds and associated dikes. Project involved 10 miles of interceptor line for George Air Force Base and the cities of Victorville and Oro Grande and alternatives lining investigation to determine most economical and feasible lining for sludge lagoons in order to 1 limit percolation losses to the lowest practical value Confidential Client Eastern United States: Groundwater supply evaluation for Petrochemical Plant a manufacturing facility. Study involved development of two deep -monitoring( wells, performance of surface and borehole geophysical surveys, and the design and construc- tion of an electrical subsurface leak -detection system for two wastewater ponds. tCrestline Sanitation District Crestline, California: Two -phased groundwater investigation Areawide Facilities Plan of unsewered areas to delineate potentially suitable waste- water disposal areas. Activities involved a geologic and groundwater review; photogeologic analysis and field recon- naissance of 2,300 acres; and geologic field mapping, seismic refraction surveys, subsurface exploration, field percolation tests, laboratory tests and geotechnical analysis of 720 acres. Page 2 of 4 M:\EXPERIENWRNDWTWSDD Convene Consuhants CLIENT PROJECT DESCRIPTION City of Point Arena Point Arena. California: Geologic and hydrologic site selection investigation for wastewater percolation ponds to minimize -groundwater contamination, ---Study--included detailed review of areal geology, groundwater conditions, field mapping, subsurface exploration. eBorough of Fairfield Fairfield, New Jersey: Groundwater pollution prevention study. Prediction of potential sources of groundwater pollution from a proposed recreational lake to be formed from fill excavation operations; study also included prediction of the impact construction site dewatering would have on municipal water supply wells. Operating Industries Monterey Park, California: Geologic and hydrogeologic analysis of an operational Class II-1 sanitary landfill. Purpose of investigation was to determine if hydraulic continuity existed between landfill and groundwater aquifers. Study included deep boring and sampling, field load testing, geologic mapping; also recommended geotechnical engineering methods to protect groundwater quality. Orange County Sanitation District San Juan Capistrano, California: Groundwater investigation for a proposed Class 11-2 waste disposal site. Study included• detailed evaluation of proposed-P.rima.Deshecha, landfill on areal groundwater quality and its potential impact on domestic well supplies; regional seismicity was also evaluated, as was the site's landslide potential and the postulated offsite seepage. Searles Lake Corporation Trona, California: Site reconnaissance and subsurface exploration for evaluating and monitoring seepage losses and determining the effect of highly saline groundwater on evaporation ponds in a desert environment; harvesting chemicals. Las Vegas Valley Water District Dry Lake, Nevada: Geohydrologic and soil engineering James M. Montgomery reconnaissance siting study to locate the most suitable 20- CH2M-Hill square -mile area within Dry Lake, Nevada, with respect.to Boyle Engineering groundwater contamination from sewage effluent deposited Carollo Engineers for evaporation.. Study also included design and construction recommendations for the required dikes. Los Angeles Department of Water Castaic, California: Hydrogeologic study to develop a and Power - Power System dewatering scheme for constructing the 1200-MW Castaic Power Plant foundation which is situated in creek bottom t 100 feet below Castaic Creek stream bed, Castaic, California. Included trenches, borings, pumping tests and recommendations for a slurry cut-off trench. Page 3 of 4 MAEAPEBI EN%GRN 0%VTA SJG Converse Consultants CLIENT PROJECT DESCRIPTION Denver Board of Water South Park, Park County, Colorado: Regional geologic Commissioners investigation to define groundwater. regime of the Upper, Regional geology of the South Middle -and South Forks of the South -Platte River -Basin .----•---:--•- Platte River Drainage Basin Denver Board of Water Colorado: Investigation to determine the amount of water Commissioners that has been developed by the 23-mile long Roberts Tunnel Harold D. Roberts Tunnel in granitic rock. Lake Arrowhead Sanitation Lake Arrowhead, California: Two -phased groundwater and District geotechnical investigation of unsewered areas to delineate Arrowhead Facilities Plan potentially suitable subsurface wastewater disposal areas. Activities involved a geologic and groundwater review; photogeologic analysis and field reconnaissance of 1,220 acres; ;and geologic field mapping, seismic refraction surveys, subsurface exploration; field percolation tests, laboratory tests, and geotechnical analysis of 630 acres. New Magma Irrigation and Florence. Arizona: Geologic review, analysis of Drainage District groundwater flow and potential drawdown conditions during New Magma Well Pump Tests construction of a proposed 3,000-feet deep open -pit mine. Study evaluated impacts of project on a producing ground- water aquifer nearby. Pine Grove Associates Milford, Utah: Geohydrologic investigation concerning Geohydrologic Study water quality and quantity prior to mine development. Study involved compilation of all geologic data and correlation of rock fracture and rock mechanics data to know porphyry deposits as well as correlation of data on proposed mine to a known porphyry mine. Rock chemistry was also evaluated to determine quality of water being released in relation to other porphyry rock systems. Page 4 of 4 Converse ConEOhenisWE%?ERI EMGRNGWrRXSOG I 1 1 1 1 1 A I I 1 1 I 1 I e APPENDIX C REFERENCES 95-31-281-00 I i 1 1 1 1 1 1 1 1 1 1 1 1 1 1 i 1 REFERENCES Engineering Management Consultants Mr. Bomi Ghadiali, Project Manager 707 Wilshire Boulevard Suite 2900 Los Angeles, California 90017 213) 362-4713 (PB/DMJM) Howard Needles Tammen and Bergendoff (HNTB) Mr. Wayne K. San Filippo, PE, Associate, Director of Aviation 665 South Oxford Avenue Los Angeles, California 90005 213) 386-7070 Jet Propulsion Laboratory Mr. William J. York, Jr., Manager Construction of Facilities Program Office 4800 Oak Grove Drive Pasadena, California 91109-8099 818) 354-4890 Kennedy/Jenks Mr. Harold B. Tennant, PE, Regional Chief Engineer 17310 Red Hill Avenue Suite 220 Irvine, California 92714 714) 261-1577 The Ralph M. Parsons Company Mr. M. A. Loayza, Principal Project Engineer, FAA Contract 100 West Walnut Street Pasadena, California 91124 213) 380-8465 Perliter and Ingalsbe Consulting Engineers Mr. W. E. ("Bill") Ingalsbe, President 1461 Chevy Chase Drive Glendale, California 91206 213) 245-5785 1 I 1 1 1 1 1 L 1 1 1 1 i 1 1 1 1 1 APPENDIX D FEE BREAKDOWN 1 95-31-281-00 APPENDIX D FEE BREAKDOWN Meadowglen Drive n.ITEM E. AMOUNT .j Senior Staff Engineer ......... 8 hours 56 448 PROJECT RESEARCH SUM ............................................448 Hydrogeologist .............. 1 6 1 hours 1 93 1 558 GEOLOGIC MAPPING SUM ............................................558 Well Permits ............... 4 wells 153 612 Truck Mounted Drill Rig ........ 16 hours 125 2,000 Concrete Cores ............. 8 boreholes 40 320 Locking Well Heads .......... 4 wells 150 600 Slotted PVC ................ 16 sections 40 640 PVC Coupling/Caps .......... 22 couplings 5 110 Pavement Patches ........... 4 boreholes 25 100 Filter Sand/Bentonite .......... 100 cubic ft. 2 200 Dumpster ................. 1 rofl-off 400 400 Project Geologist ............ 18 hours 90 1,620 FIELD EXPLORATION SUM .......................................... 6,602 In -Situ Moisture and Density .... 50 samples 15 750 Compaction Curve ........... 2 samples 150 300 Sieve Analyses .............. 4 samples 70 280 Expansion Index (EI) .......... 2 bulks 160 320 A -value ................... 2 bulks 175 350 Permeability ................ 2 samples 250 500 Water Tests ................ 2 samples 100 200 LABORATORY SUM ............................................... 2,700 Project Manager (PE, GE) ....... 10 hours 139 1,390 Geotechnical Engineer (GE) ..... 5 hours 148 740 Hydrogeologist (HG) .......... 10 hours 9 3 930 95-31-281-00 D - 1 Converse Consultants West I i 1 I I 1 1 1 1 11 FEE BREAKDOWN (cont'd) Drafting/CADD .............. Word Processing/Reproduction ... Blueprints, color Xerox, etc...... 10 10 6 hours hours reports 55 45 25 550 450 150 REPORTSUM ................................................... 4,210 Project Manager ............. 6 hours 139 834 Hydrogeologist 6 hours 93 558 MEETINGSUM .................................................. 1,392 95-31-281-00 D - 2 Printed On Recycb Paper Converse Consultants West I 1 1 I 1 1 r 1 1 1 1 1 I FEE BREAKDOWN Ambushers Street Senior Staff Engineer ............ 1 8 1 hours 1 $56 1 $448 PROJECT RESEARCH SUM ............................................ 448 Hydrogeologist ................. 8 hours 93 774 GEOLOGIC MAPPING SUM ............................................774 Well Permits .................. 2 wells 153 306 Laborers (Test Pits/Hand Auger) ..... 32 hours 30 960 Locking Well Heads ............. 2 wells 150 300 Slotted PVC ................... 4 sections 40 160 PVC Coupling/Caps ............. 8 couplings 5 40 Filter Sand/Bentonite ............. 20 cubic ft. 2 40 Project Geologist ............... 16 hours 90 1,440 FIELD EXPLORATION SUM .......................................... 3,246 In -Situ Moisture and Density ....... 20 samples 15 300 Sieve Analyses ................. 2 samples 70 140 R-value ...................... 1 bulk 175 175 Water Tests ................... 2 samples 100 200 LABORATORY SUM ................................................. 815 Project Manager ................ 5 hours 139 695 Geotechnical Engineer (GE) ........ 5 hours 148 740 Hydrogeologist (HG) ............. 10 hours 93 930 Drafting/CADD ................. 5 hours 55 275 Word Processing/Reproduction ...... 5 hours 45 225 Blueprints, color Xerox, etc......... 6 reports 25 150 REPORT SUM ................................................... 3,015 95-31-281-00 D - 3 Printed On Raeyela Paper Converse Consultants West I 1 1 1 1 1 1 1 1 1 1 1 u 1 1 1 1 1 APPENDIX E SCHEDULE OF FEES 1 95-31-281-00 I Schedule of Fees Introduction It is the objective of Converse to provide The City of Diamond Bar (client) with high -quality professional technical services and a 1 continuing source of professional advice and opinions. Services will be performed in a manner consistent with that level of care and Will ordinarifyexercised by membersof the profession currentlypracticingin the same localityunder similaroonditions. This Schedule Is valid for services performed through June 30, 1996; services commenced or continued further Into 19% maybe subject to anew Schedule. Hourly Charges for Personnel Ranges in hourly rates for proposed services reflect variations in experience and related salary level for personnel assigned to perform a particular service. Actual staff assignmentswill depend on personnel availability Job Complexity,project site location, and experience level required to satisfy the technical requirements of the project and to meet the prevailing standard of professional care. 1. Junior Technician (Drafting, Field, Lab) $ 30-45 8. Staff Support $ 30-55 2. Technician (Drafting, Field, Lab) 40-55 9. Staff Professional 50.70 3. Senior Technician (Drafting, Field, Lab) 50-65 10. Senior Staff Professional 65.75 4. Supervisory Technician (Drafting, Field, Lab) 55-75 11. Project Professional 70-90 5. Supednterdent 65-85 12. Senior Professional 85-110 6. CAD Operator 40-60 13. Principal Professional 100-135 7. Word Processor 40-55 14. Principals/Consultants 125-160 An overtime charge of twenty-five percent of the above hourlyrates will be added for hourly personnel (above categoryNos. 1 through t 8) for time In excess of eight hours per day at the Job site and for all time on Saturdays, Sundays, and holidays. Travel timeto and from the job site at the start and end of each day in excess of home to office commute will be charged at hourly rates for the appropriate personnel. Full travel time will be charged to and from the job site during the normal work day. Consultation and Litigation Fees for special oonsuhation; for consulting boards and for services in connection with lItigation are charged on.a daily basis;.rates for principal experts are available on request. Expenses 1. Special equipment will be charged at rates shown on attached schedules, 4 applicable. 2. In-house reproduction expenses are charged at cost. 3. In-house computer usage is charged at a rate of $15 per hour. 4. Exploration expenses (drilling, trenching, etc.) are charged at cost plus fifteen percent. 5. Travel and subsistence expenses (transportation, room and board, etc.) for individuals on projects requiring travel and/or living away from a principal office are charged at cost plus fifteen percent. 6. Automobile and truck expenses are charged at cost plus fifteen percent or at a rate of fifty cents per mile for company. owned vehicles traveling between principal office and project; or at a rate of $6 per hour for trucks and supplies to and from the project site and for time at the project site. 7. Communicationsexpenses (phone, fax, modem, etc.) are charged at three percent of Converse's fees. 8. Other out-of-pocket direct expenses (aerial photos, permits, bonds, outside printing services, tests, etc.) are charged at cost plus fifteen percent. Invoices 1. Invoices will be submitted to the Clienton a monthlybasis, and a final bill will be submitted upon completion of services. Invoices will show charges for each category of personnel and expense classification. 2. Paymentis due upon presentation of invoice and is past due thirty days from invoice date. In the event Client fails to make any paymentio Converse when due, Converse may immediatelycease work hereunder and/or withhold reports until said payment, together with a service charge at the rate of eighteen percent per annum (but not exceeding the maximum allowed bylaw) from the due date, has been received. Further, Converse may at Its sole option and discretion refuse to perform any further work irrespective of paymenlfrom Client in the event Client fails to pay Converse for services rendered when said payments are due. 3. Attofney's fees or other costs Incurred in collecting any delinquent amount shall be paid by Client. SC- 95A - Diamond Bar Converse Consultants West