HomeMy WebLinkAbout20210901121224431.pdfT. K. ENGINEERING CORP.
Geotechnical & Environmental Consultants
3565 Lexington Avenue
El Monte, California 91731
626)575-2856 - Fax (626)575-1582
LIMITED SOILS ENGINEERING
INVESTIGATION REPORT
Proposed 4 to 6 Feet High
Retaining Wall & Swimming Pool Construction
2819 Crystal Ridge Road
Tract 47850, Lot #26)
Diamond Bar, California
TKE Job No. 02-168F
June 4, 2002
For
Mr. Roger Yang
A & C Construction, Inc.
T. K. ENGINEERING CORP.
Geotechnical & Environmental Consultants
3565 Lexington Avenue
El Monte, California 91731
626)575-2856 • Fax (626)575-1582
June 4, 2002
A & C Construction, Inc.
316 Pasco Tesoro Street
Walnut, CA 91789
Attn: Mr. Roger Yang
TKE Job No. 02-168F)
Subject : LIMITED SOILS ENGINEERING INVESTIGATION
Proposed 4 to 6 Feet High Retaining Wall & Swimming Pool Construction
2819 Crystal Ridge Road (Tract 47850, Lot #26)
Diamond Bar, California
Dear Roger:
We are pleased to present the following Limited Soils Engineering Investigation Report for the
proposed 4 to 6 feet high retaining wall & swimming pool construction at the subject site.
This work was performed in accordance with our proposal dated May 21, 2002, and was accepted
by you. A preliminary evaluation of the subsurface condition was made with respect to the
proposed structure. The results of our studies indicate that the site is suitable for the proposed
development from a geotechnical engineer's standpoint, if the recommendations presented in this
report are incorporated into the design and construction.
Thank you for the opportunity to be of service on this project. PIease contact the undersigned,
if there is any question concerning this report.
Respectfully submitted,
T.K. ENGINEERING CORP.
Wan Lain-Allan) Tsai,/R(
Principal
XC: (4) Copies: Addressee
z
A2lMaA O
TABLE OF CONTENTS
COVER LETTER
TABLE OF CONTENT
0914110 owlyAli .: 9
Page No.
SCOPEOF WORK................................................................. 1
PROJECT DESCRIPTION....................................................... 2
SITE CONDITIONS....................................................... 2
FIELD AND LABORATORY INVESTIGATION ........................... 3
SUBSURFACE CONDITIONS ............................................. 3
CONCLUSIONS AND RECOMMENDATIONS .................
General............................ I .......................... 4
Site Preparation .............................................. 4
Foundation....................................................... 5
Bearing Capacity .............................................. 5
Lateral Resistance ..................................... 5
Retaining Wall Design ...................................... 6
Foundation Settlement ..................................... 6
Seismic Parameters ...................................... 7
Wall Backfills............................................... 7
Concrete Slab On -Grade ........................................ 7
Swimming Pool ............................................... 8
Slope Maintenance ........................................... 9
Temporary Excavation ...................................... 10
Drainage ............ 11
Construction Observation & Testing ................... 11
REMARKS...................................................................... 12
APPENDIX A - Exploration and Laboratory Testing
APPENDIX B - .General Specifications for Site Grading & Excavation
APPENDIX C -'REFERENCE
Plot Plan............................................................... Plate A-1
Log of Test Pit ............................................. Plates B-1 & B-2
Shear Test Diagrams ............................................. Plate D-1
Proposed 4 to 6 ft, high retaining wall & swimming pool Job No. 02-168F
2819 Crystal Ridge Road June 4, 2002
Diamond Bar, California
SCOPE OF WORK
This report presents the results of a limited soils engineering investigation for the proposed 4 to 6
feet high retaining wall, and swimming pool construction at the subject site. The locations of
proposed retaining wall, swimming pool, and test pits are shown on the attached Plate A-1.
Our exploration was limited to the area of proposed retaining wall and swimming pool and this was
based on the preliminary landscape plan, prepared by A & C Landscaping, Inc. dated 5/14/2002.
The investigation was conducted in accordance with generally accepted geotechnical practice. This
investigation was also authorized to determine the static and physical characteristics of the soils
beneath the site for design purpose. This investigation includes the following steps:
Review of the Geotechnical Report of Rough Grading for Lots 1 through 26, 29 through
36, Parcels A through G, and Lots 45-50, Tract 47850, Diamond Bar, prepared by
Harrington Geotechnical Engineering Inc., dated 6/2/1998. HGEI Project No. 98-02-
Geotechnical reconnaissance of the existing site conditions.
Logging, and sampling of two (2) test pits, excavated by the client at the subject site.
Laboratory testing of the representative samples of on -site earth materials to determine their
properties.
Review and engineering analysis of the test data with respect to the proposed structure.
Preparation of this report.
Page 1 T.K. ENGINEERING CORP.
Proposed 4 to 6 ft. high retaining wall & swimming pool Job No. 02-168F
2819 Crystal Ridge Road June 4, 2002
Diamond Bar California
The results of the field exploration and laboratory tests, which form the basis of our
recommendations, are presented in the attached Appendices.
PROJECT DESCRIPTION
Based on the preliminary landscape plan prepared by A & C Landscaping, Inc., and information
provided by the client, it is our understanding that the proposed development is to construct a 4 to
6 high retaining wall on the existing 2: 1 descending slope at the south and west of existing 2-story
house and a swimming pool at the back yard.
The purpose of this retaining wall is to expand the backyard and side yard for landscape and
hardscape improvement. No grading plan is available for review. However, it is our request when
foundation and grading plans become available, they should be forwarded to this office for review
prior to construction.
SITE CONDITIONS
The subject site is a hillside lot located on the south side of Crystal Ridge Road, in " The Country"
a gated community, at the City of Diamond Bar, California. The surrounding areas have been
developed with single family houses and graded vacant lots.
The subject property contained a 2-story single family house with an attached garage. The
residential structure is located on the front (i.e. north) portion of property and is on a pre -graded
Page 2 T.K. ENGINEERING CORP.
Proposed 4 to 6 ft. high retaining wall & swimming pool Job No. 02-168F
2819 Crystal Ridge Road June 4, 2002
Diamond Bar California
flat pad. The flat pad is surrounded by a 2 : 1 descending slope on the east, west and south. The
proposed retaining wall will be located on the existing south and west 2:1 descending slope. And
the proposed swimming pool and spa will be located on the existing flat back yard area.
At the time of our exploration, the proposed construction area was vacant, but contained some
vegetation.
FIELD AND LABORATORY INVESTIGATION
Field exploration was performed on May 28, 2002. Two test pits were excavated to a depth of 8.5
feet to 9 feet below the existing ground surface within the existing back yard area. Approximate
locations of the test pits are shown on Plate A-1.
Selected samples obtained during field exploration were tested in the laboratory. A description of
the field exploration and laboratory testings are presented in Appendix A.
SUBSURFACE CONDITIONS
The subsurface materials encountered in the test pits are consisted of compacted fill. Based on the
geotechnical report of rough grading for tract #47580, the fill had been certified by Harrington
Geotechnical Engineering Inc. However, the test pit logs indicate that the top 1 to 2 feet fill is
relative loose. Details of description for subsurface soil conditions are presented in the pit logs,
Plates B-1 & B-2.
Page 3 T.K. ENGINEERING CORP.
Proposed 4 to 6 ft. high retaining wall & swimming pool Job No. 02-168F
2819 Crystal Ridge Road June 4, 2002
Diamond Bar, California
Neither groundwater nor seepage was observed in the either of two test pits to the drilled depths.
CONCLUSIONS AND RECOMMENDATIONS
General
The information obtained during our investigation indicated that the subject site is suitable for the
proposed development provided that the following recommendations are incorporated into the
design, and in the job specifications, and are implemented during the construction. It should be
noted that the recommendations contained herein are intended to serve as guidelines to provide the
project design consultants with preliminary design parameters.
Prior to construction, any geotechnical related plans and/or documents should be reviewed by the
soils engineer so that such plans and documents will comply with our recommendations. Any need
for revised recommendations will be given upon the review.
Site Preparation
According to the preliminary landscape plan, prepared by A & C Landscaping, Inc., fill up to 6
feet will be needed for the retaining wall backfill. It is recommended that the top 1 to 2 feet loose
soils within the proposed retaining wall footing, retaining wall backfill, and concrete slab on -grade
areas be removed and recompacted to at least 90 % relative compaction. Bottom of excavation
should be scarified, moistened, and properly compacted to a minimum of 90% relative compaction
for at least upper 8 inches.
Page 4 T.K. ENGINEERING CORP.
Proposed 4 to 6 ft. high retaining wall &swimmJob
No. 02-168Fing poolJune4, 2002 2819
Crystal Ridge Road Diamond
Bar California Acceptable
fill material should be placed in thin lifts not exceeding 6 inches in thickness when loose and
should be properly compacted to at least 90 percent of the maximum dry density as determined by
ASTM Test Method D1557. Bottom of removal for unsuitable materials and placement of compacted
fill should be performed under the observation and testing of the Soil Engineer or his representative.
All
site grading should comply with the applicable portion of the City of Diamond Bar grading code and
the General Specification attached in Appendix B. Foundation
For
adequate support of proposed 4 to 6 feet high retaining wall, we recommend that all footings be
embedded at least 18 inches into competent ground. The footing should be reinforced with at least
four (4) rebar #4, 2 placed near the top and 2 placed near the bottom. Footing, located on or adjacent
to a descending slope , should have a minimum of 7 feet setback, measured from the outer edge
of footing to the slope surface. Bearing
Capacity An
allowable soil bearing pressure of 1500 psf may be used for footing placed as recommended. The
above value may be increased by 33 % when considering short duration seismic or wind loads. Lateral
Resistance Resistance
to lateral loads may be provided by friction acting on the base of footings and by passive Page
5 T.K. ENGINEERING CORP.
Proposed 4 to 6 ft. high retaining wall & swimming pool Job No. 02-168F
2819 Crystal Ridge Road June 4, 2002
Diamond Bar California
earth pressure. Coefficient of friction between the base of footings and competent compacted fill
or bedrock may be assumed as 0.35. An allowable lateral bearing value against the sides of
footings is recommended to be 250 pounds per square foot per foot of depth to a maximum of 2500
pounds per square foot for the footings in contact with competent compacted fills. No passive
pressure can be used in the design until the footing meets the 7 feet setback.
Seismic Parameters
Based on the UBC's Seismic Map, the recommended seismic parameters are as follows:
Soil Profile Type: SD
Ca = 0.44 Na
Cv = 0.64 Nv
Na = 1.3
Nv = 1.6
Seismic Source Type: B
Retaining Wall Design
The recommendations for retaining wall design are as follows:
1. Where free-standing retaining structures are proposed, an equivalent fluid pressure of 40
pounds per cubic foot (Le. pcf) may be used in the design, provided a level, backfill is
maintained. For the surcharge load induced by the adjacent structures and service
conditions, a coefficient of 0.4 may be used to convert the surcharge load in a uniform
distribution force to the wall, if the surcharge load is located within the distance less than
the height of wall. All backfill should be compacted to at least 90% relative compaction and
should also be tested at every 2-foot vertical interval or less.
Page 6 T.K. ENGINEERING CORP.
Proposed 4 to 6 ft. high retaining wail & swimming pool Job No. 02-168F
2819 Crystal Ridge Road June 4, 2002
Diamond Bar California
2. All design pressures assume that sufficient drainage will be provided behind the walls to
prevent the build-up of hydrostatic pressures from surface water infiltration. Adequate
drainage may be provided by means of a system of subdrains and/or weep holes with filter
materials installed behind walls.
Foundation Settlement
Settlement of the footings placed as recommended and subject to no more than allowable loads is
not expected to exceed one inch. Differential settlement between adjacent columns is not
anticipated to exceed 1/2 inch.
Wall Backfrlls
All wall backfills should be properly compacted to at least 90% of laboratory maximum dry
density. Wall backfills should be tested at every height not to exceed 2 feet. Care should be taken
when compacting adjacent to walls. Improper compaction techniques or equipments can produce
excessive lateral loads.
Concrete Slab On -Grade
The on -site soils are considered to be medium to high for expansion potential. If the
recommendations for site preparation are followed, concrete slab -on -grade supported on compacted
fill should have a minimum thickness of 4 inches, and be reinforced with at least rebar #4 bar, 18
inches on centers, both ways, or its equivalent placed at slab mid - height.
Page 7 T.K. ENGINEERING CORP.
Proposed 4 to 6 ft. high retaining wall & swimming pool Job No. 02-168F
2819 Crystal Ridge Road June 4, 2002
Diamond Bar California
Extra care should be exercised to ensure the placement of reinforcement at the slab med-height.
The reinforcement placed at or sagged to the bottom of slab will provide no reinforcement effect
and unusual cracks may develop on the slab.
Where upward capillary of moisture is not desired, a moisture barrier, such as vinyl membrane
with a minimum thickness of 6 mils, should be placed beneath the concrete slab. A minimum of
4-inch wash sand or gravel should also be provided beneath the concrete slab. The membrane
should be covered by 2 inches of sand to aid in uniform curing of the concrete. Care should be
taken not to puncture the membrane.
Prior to placement of concrete, the subgrade soils should be pre -saturated to at least 12 inches.
Swimming Pool
a. The proposed swimming pool wall may be designed as not -restrained wall. A minimum
equivalent fluid pressure of 62.4 pcf may be used in the design.
b. The setback between the pool and the top of slope or retaining wall should be at least 10
feet. if the setback is less than 10 feet, that portion of the pool wall within a horizontal
distance of 10 feet from the top of slope or retaining wall should be capable of supporting
the water in pool without soil support.
C. The entire pool bottom should be embedded into the competent ground.
Page 8 T.K. ENGINEERING CORP.
Proposed 4 to 6 ft. high retaining wall & swimming pool Job No. 02-168F
2819 Crystal Ridge Road June 4, 2002
Diamond Bar California
d. The pool should be designed for any possible surcharge loading from nearby structures,
should the pool/spa fall within a 45- degree plane (1;1) from the surcharging structure.
e. Adequate drainage system should be provided around the pool and pool deck area. All
surface water should be directed away from the pool and pool deck toward the approved
drainage devices.
Slone Maintenance
We recommend that the property owner maintain an adequate debris, erosion and fire control
program to protect the property.
Sloughing and slumping of the slope surface may be anticipated if the slopes are left unprotected
over a period of time, especially during rainy seasons. It should also be noted that excessive
landscape watering, rodent burrows and uncontrolled surface runoff may cause instability of the
slope surface. The following recommendations are provided so as to minimize the potential for
future erosion of the slope at the subject site.
1. The slope should be planted as soon as possible with suitably deep-rooted and drought
resistance vegetation. It is imperative that landscape watering be kept to the minimum
required for normal plant growth. Irrigation system should be checked on a regular basis
for its leakage. Any leaking encountered should be repaired immediately. Additional
protection may be provided by use of jute mesh or suitable geofabrics. If adequate ground
Page 9 T.K. ENGINEERING CORP.
Proposed 4 to 6 ft. high retaining wall & swimming pool Job No. 02-168F
2819 Crystal Ridge Road June 4, 2002
Diamond Bar California
cover is not established before the rainy season, sloughing and slumping of the surficial
soils may occur.
2. A berm or drainage channel should be placed at the top of slopes to prevent the flow of
water over the top of the slope. Paved drainage swales and downdrains on the slope and
drain inlet should be kept free of soils and debris. All drainage system should be
periodically cleaned up and properly maintained to insure its function.
3. During the rainy season, plastic sheets should be placed over the slopes to prevent runoff
water from eroding the slope surfaces if adequate ground cover is not established.
Temporary Excavation
Unsurcharged temporary excavations may be cut near vertical up to 5 feet and sloped back at a
ratio of 1 : 1 or flatter. During the rainy season, berm should be constructed and maintained on
top of slope to prevent runoff water from eroding the slope faces. Tops of excavation should be
barricaded at least 5 feet from the cut to prevent any storage or equipment loads.
We also recommend that a representative of this office be present during the excavation so the need
of modification or additional recommendations can be made at that time if different conditions are
found.
All excavation should be performed in accordance with the current standards delineated in CAL -
OSHA for safe working conditions.
Page 10 T.K. ENGINEERING CORP.
Proposed 4 to 6 ft. high retaining wall & swimming pool .lob No. 02-168F
2819 Crystal Ridge Road June 4, 2002
Diamond Bar California
Drainage
Drainage control is imperative for continued site stability. The risk of unusual settlement or slope
instability can be reduced by proper drainage control and maintenance of slopes and yards. It is the
responsibility of the homeowner to maintain slopes and drainage facilities and correct any
deficiencies found during occupancy of the property.
Adequate drainage system should be provided and designed by a civil engineer. All drainage should
be directed away from the foundation areas toward the approved drainage devices. In no cases shall
water be allowed to pond within the site or be drained down the slope in an uncontrolled and
concentrated manner.
Construction Observation and Testing
As a necessary requisite to the use of this report, the following construction stages shall be
observed and/or tested by a representative of this facility:
1. Temporary excavation.
2. Bottom of excavation prior to placement of any fill.
3. Placement and compaction of fill within the proposed retaining wall footing and
concrete slab on -grade areas.
4. Foundation excavation prior to forming and pouring.
S. Installation of subdrain system.
6. Placement and compaction of retaining wail backfiil.
7. The bottom of excavation for proposed swimming pool.
Page 11 T.K. ENGINEERING CORP.
Proposed 4 to 6 ft. high retaining wall & swimming pool Job No. 02-168F
2819 Crystal Ridge Road June 4, 2002
Diamond Bar, California
8. Pre -saturation of subgrade soils within the areas for proposed concrete stab on -
grade.
If T.K. Engineering Corp. is not allowed to perform sufficient observations and adequate testing
during construction, a statement regarding suitability and stability of the project can not be made
accordingly.
It is recommended that a joint meeting among the client, contractor, and the soil engineer be held
at least 2 days in advance of the commencement of construction to discuss specific procedures and
scheduling.
REMARKS
This report is prepared based upon the proposed project as described, observation and findings
during field investigation, and evaluation of the test results. The conclusions and recommendations
are based upon the assumption that soil conditions do not deviate significantly from those described
herein. If variations from our findings or undesirable conditions are found during construction, or
if the proposed construction differs from that presently planned, T.K. Engineering Corp. should
be notified so that supplemental recommendations can be given.
This report is issued with the understanding that it is the responsibility of the client to transmit the
information and recommendations of this report to developers, owners, buyers, Architects,
Engineers, and Designers for the project so that the necessary steps can be taken by the Contractors
and Subcontractors to carry out such recommendations in the field. The conclusions and
Page 12 T.K. ENGINEERING CORP.
Proposed 4 to 6 ft. high retaining wall & swimming pool Job No. 02-168F
2819 Crystal Ridge Road June 4, 2002
Diamond Bar, California
recommendations contained in this report are solely professional opinions derived in accordance
with current standards of professional practice.
This report has been prepared in accordance with generally accepted engineering practice and no
warranty is expressed or implied. All exploratory borings or pits used for subsurface exploration
were backfilled with reasonable effort to restore the areas to their original condition. As with any
backfill in an area as small and deep as a boring, some consolidation and subsidence of the backfill
soils may result in time, causing some depression at the boring area and possibly a potentially
hazardous condition. The client and/or owner of the property are advised to periodically examine
the boring area, and if necessary, backfill any resulting depressions.
T. K. Engineering Corp. should be retained during construction of the project so that continuous
observation of the subsurface conditions can be made and additional recommendations can be given
in the event of any change of condition. If another firm is retained for geotechnical observation
and testing services, our professional responsibility and liability would be impaired.
Page 13 T.K. ENGINEERING CORP.
Proposed 4 to 6 ft. high retaining wall & swimming pool Job No. 02-168F
2819 Crystal Ridge Road June 4, 2002
Diamond Bar, California _
APPENDIX A
EXPLORATION AND LABORATORY TESTING
FIELD EXPLORATION
Field exploration was performed by excavating two (2) test pits. The test pits were carried to
depths of 8.5 feet to 9 feet below the surface.
The encountered soils were continuously logged by our field personnel and classified by visual
examination. Relatively undisturbed samples and representative bulk samples were obtained for
laboratory testing. Relatively undisturbed samples of soils were observed at frequent intervals by
driving a thin -wall steel sampler with successive drops of a hammer. The soils were retained in
brass rings of 2.5 inches in diameter and one inch in height. Normally, the central portion of the
sample is retained in a plastic container for shipment to the laboratory.
The locations of test borings are shown on Plate A-1. Description of the encountered soils are
presented on B-Plates.
LABORATORY TESTING
Classification
The field classification was verified in the laboratory. The final classification is shown on the B-
Plates.
Moisture -Density
The field moisture content and dry unit weight are determined for each of the undisturbed soil
samples. The dry unit weight is determined in pounds -per -cubic -foot. The field moisture content
is determined as a percentage of the dry weight of the soil. Both the field moisture content and the
dry density for each of the tested sample are shown on B-Plates.
Shear Tests
Shear tests were performed on selected ring samples to evaluate the shear strength of representative
on -site soils. The samples were tested following a soaked period of at least 24 hours. Each sample
is sheared at a constant rate of displacement of 0.015 in/min under a load of 1000 psf, 2000 psf and
4000 psf. The results are plotted on the Plates D-1 and D-2.
T.K. ENGINEERING CORP.
Proposed 4 to 6 ft. high retaining wail & swimming pool Job No. 02-168F
2819 Crystal Ridge Road June 4, 2002
Diamond Bar California
APPENDIX B
GENERAL SPECIFICATIONS FOR SITE GRADING AND EXCAVATIONS
The recommendations presented in the geotechnical report are part of the earthwork and grading
specifications, and shall supersede the provisions contained hereinafter in case of conflict.
Evaluation performed by the consultant during the course of grading may result in revised and/or
additional recommendations, which in turn, will supersede these specifications or the
recommendations of the geotechnical report.
It is necessary that the consultant provide adequate testing and observation so that the earthwork
will be accomplished in accordance with the specifications. It shall be the responsibility of the
contractor to assist the consultant and keep him apprised of work schedules and changes so that the
consultant may schedule his personnel accordingly.
1. All existing fill, near surface loose or soft soils, vegetation, debris and disturbed soils in
structure, slab or pavement areas shall be excavated. The excavated areas shall be observed
by the Soil Engineer.
2. Areas to receive compacted fill shall be scarified to a depth of at least 6 inches and
moistened, as required, to obtain near optimum moisture. Scarification shall continue until
the soil is broken down and free of large clay lumps or clods and until the working surface
is reasonable uniform and free of uneven features. The scarified areas shall be A)
compacted to at least 90 % of the maximum dry density as determined by the ASTM D
1557-78 compaction method, or B) compacted and approved by the Soil Engineer.
3. Any loose pockets, soft, dry, spongy, highly fractured or otherwise unsuitable soil,
extending to such a depth that surface processing can not adequately improve the condition,
shall be overexcavated down to firm ground. The excavated areas shall be observed and
approved by the Soil Engineer prior to placing compacted fill.
4. Fill, consisting of soil approved by the Soil Engineer, shall be placed in controlled layers
with appropriate compaction equipment. Each layer shall be compacted to at least 90 % of
the laboratory maximum dry density for the material used. The field density shall be
determined by the ASTM D-1556 Sand Cone Method or equivalent.
5. The excavated, on -site clean fill material is considered satisfactory for re -use as compacted
fill. All imported fill shall be non -expansive and approved by the Soil Engineer prior to use
in the fill areas. Rocks larger than 6 inches in diameter shall not be used.
T.K. ENGINEERING CORP.
Proposed 4 to 6 ft. high retaining wall & swimming pool Job No. 02-168F
2819 Crystal Ridge Road June 4, 2002
Diamond Bar, California
6. It shall be the sole responsibility of the contractor to provide adequate equipment and
methods to accomplish the work in accordance with applicable grading codes or agency
ordinances, the geotechnical recommendations and specifications presented herein, and the
approved grading plans. Observation and field tests shall be performed during grading by
the Soil Engineer to assist the contractor in obtaining the required degree of compaction and
the proper moisture content, Where compaction of less than 90 % is indicated, additional
compactive effort shall be made with the adjustment of the moisture content as necessary
until 90% compaction is obtained.
7. No fill soils shall be placed during unfavorable weather conditions. When work is
interrupted by rains, fill operations shall not resume until the field tests by the Soil Engineer
indicate the moisture content and the dry density of the fill are as previously specified.
8. Where fill is to be placed on the ground with slopes steeper than 5 : 1 (horizontal : vertical),
the ground shall be stepped or benched. The lowest bench shall be a minimum of 15 feet
wide, at least 2 feet deep, shall expose firm materials and shall be approved by the
consultant. Other benches shall be excavated in firm materials for a minimum width of 4
feet. Ground sloping flatter than 5 : 1 shall be benched or otherwise overexcavated when
considered necessary by the consultant.
T.K. ENGINEERING CORP.
PLOT PLAN
Crystal Ridge Road
1
f
Existing
Residence
F
z
Proposed Swimming Pool.
1
Proposed Retaining Wall
F
Approximate Test Pit Location
Proposed 6 Feet High Retaining Wall & Swimming Pool. Construction J 0 B NO. 02-168F
2819 Crystal Ridge Road
Diamond Bar, California SCALE 1 "= N/A
T.K. ENGINEERING CORP. PLATE A-1
GEOTECHNICAL & ENVIRONMENTAL ENGINEERS
Project: Proposed 6' High Retaining Wall & Swimming Pool. Const.
2819 Crystal Ridge Road
Diamond Bar, California
LOG OF TEST PIT NO.
Date of Excavation: 5/28/2002 Excavation Contractor:A & C Construction
Size of Test Pit: 9'x 3.5'x 8.5' (L x W x D) Remarks:
Driving Energy:
Co
c
AO
m
SUMMARY OF TEST PIT
This test pit log repared ,by Flf. Engineering Corp. applies only at the sic excavation locatlon , andatmeoexloratidn. Subsurface conditions may drfter at other locations and may change atthisnwithtme. LABORATORY
TESTS a
3
c
c:
7i
u
Im
a L
be
3 +'
W
v 0
o tA
Surface
Elevation: + 0' Water E]evabon: Not encountered Reference:
Backyard Surface DESCRIPTION
1
2
3
4
5
s
8
9
1
11
12
13
14
1
16
17
18
19
21
22
23
24
2
2s
2l
2$
29
Sandy
silty clay with rock fragments, dry
to moist — brown/yellowish brown End
of pit at 8.5' CL
CH
99.
3 103.
2 11.
6 16.
9 Job
No. 02-168F T.K. ENGINEERING CORP GEOTECHNICAL
ENGINEERS PLATE
g. 1
Project: Proposed 6' High Retaining Wall & Swimming Pool. Const.
2819 Crystal Ridge Road
Diamond Bar, California
LOG OF TEST PIT NO. 2
Date of Excavation: 5/28/2002 Excavation Contractor:A & C Cbnstruction
Size of Test Pit: 11'x 3.5'x 9' (D x W x D) Remarks:
Driving Energy:
UL
c
N
d
6
a o
SUMMARY OF TEST PIT
This test pit log prepared by TX Engineering Corp. applies only at the specific excavaWn kcatlon,
and pt the time of a lore#on. Subsurface conftons may differ at other locsdions and may change
at this location with?me.
LABORATORY TESTS
a
rn
a
u
a
dP
s° o
p
Sru4aca Bevafion: ± 0' Water Devaton: Not encountered
Reference: Backyard Surface
DESCRIPTION
1
2
3
4
5
fi
7
s
s
1
11
12
13
14
1fi
17
18
13
2
21
22
23
24
2
26
27
28
29
Sandy silty clay with rock fragments,
damp to moist — brown/yellowish brown
End of pit at 9'
CL
IGH
101.3
102.4
12.6
17.8
x
X
Job No. 02-168F T.K. ENGINEERING CORP.
GEOTECHNICAL ENGINEERS
PLATE B- 2
5.0
4.5
4.0
3.5
3.0
a
w
a
1.5
1.0
0.5
0.0 6-
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
NORMAL STRESS, ksf
TEST PIT NO.: TP-1 DEPTH: 3'
DESCRIPTION: silty clay with rock fragments
STRENGTH INTERCEPT (C): 0.3 ksf
FRICTION ANGLE (0): 20 Degrees
REMARKS: Soil samples tested at increased moisture
Project: Proposed 6 Feet High Retaining Wall
Swimming pool Construction DIRECT SHEAR TEST
2819 Crystal Ridge Road
Diamond Bar, California RESULTS
Job No.
02-168F T.K. ENGINEERING PLATE D — 1
GEOTECHNICAL ENGINEERS