HomeMy WebLinkAbout2022.02.01 Agenda Packet - Regular MeetingCity Council Agenda
Tuesday, February 1, 2022
Closed Session 5:30 PM
Regular Meeting 6:30 PM
PUBLIC ADVISORY:
Consistent with State Assembly Bill 361, this meeting will be conducted telephonically and
Members of the City Council and staff will be participating via Teleconference. There will be no
physical meeting location for this meeting. Members of the public are encouraged to participate
and address the City Council during the public comment portion of the meeting via teleconference.
How to Observe the Meeting From Home:
The public can observe the meeting by calling +1 (562) 247 -8321, Access Code: 328-944-176 OR visit:
https://attendee.gotowebinar.com/register/8493955344146862862.
How to Submit Public Comment:
The public may provide public comment by attending the meeting in person, by sending an email, or by
logging into the teleconference. Please send email public comments to the City Clerk at
cityclerk@DiamondBarCA.gov by 4:00 p.m. on the day of the meeting and indicate in the Subject Line
“FOR PUBLIC COMMENT.” Written comments will be distributed to the Council Members, noted for the
record at the meeting and posted on the City’s official agenda webpage as soon as reasonably
practicable (found here: http://diamondbarca.iqm2.com/Citizens/Default.aspx).
The public may log into the meeting through this link:
https://attendee.gotowebinar.com/register/8493955344146862862. Members of the public will be
called upon one at a time during the Public Comment portion of the agenda. Speakers are limited to five
minutes per agenda item, unless the Mayor determines otherwise.
American Disability Act Accommodations:
Pursuant to the Executive Order, and in compliance with the Americans with Disabilities Act, if you need
special assistance to participate in the Council Meeting, please contact the City Clerk’s Office (909) 839 -
7010 within 72 hours of the meeting. City Council video recordings with transcription will be available
upon request the day following the Council Meeting.
The City of Diamond Bar thanks you in advance for taking all precautions to prevent
spreading the COVID-19 virus.
NANCY A. LYONS
Council Member
STAN LIU
Council Member
STEVE TYE
Council Member
RUTH M. LOW
Mayor
ANDREW CHOU
Mayor Pro Tem
City Manager Dan Fox • City Attorney David DeBerry • City Clerk Kristina Santana
DIAMOND BAR CITY COUNCIL MEETING RULES
Welcome to the meeting of the Diamond Bar City Council. Meetings are open to the public and are
broadcast on Spectrum Cable Channel 3 and Frontier FiOS television Channel 47. You are invited
to attend and participate. Copies of staff reports or other written documentation relating to agenda
items are on file and available for public inspection by contacting the Office of the City Clerk. If
requested, the agenda will be made available in an alternative format to a person with disability as
required by Section 202 of the Americans with Disabilities Act of 1990. If you have questions
regarding an agenda item, please contact the City Clerk at (909) 839-7010 during regular business
hours.
PUBLIC INPUT
Members of the public may address the Council on any item of business on the agenda during the
time the item is taken up by the Council. In addition, members of the public may, during the Public
Comment period address the Council on any Consent Calendar item or any matter not on the
agenda and within the Council’s subject matter jurisdiction. Any material to be submitted to the City
Council at the meeting should be submitted through the City Clerk.
Speakers are limited to five minutes per agenda item, unless the Mayor determines otherwise. The
Mayor may adjust this time limit depending on the number of people wishing to speak, the
complexity of the matter, the length of the agenda, the hour and any other relevant consideration.
Speakers may address the Council only once on an agenda item, except during public hearings,
when the applicant/appellant may be afforded a rebuttal.
Public comments must be directed to the City Council. Behavior that disrupts the orderly conduct of
the meeting may result in the speaker being removed from the meeting.
INFORMATION RELATING TO AGENDAS AND ACTIONS OF THE COUNCIL
Agendas for regular City Council meetings are available 72 hours prior to the meeting and are
posted in the City’s regular posting locations, on DBTV Channel 3, Spectrum Cable Channel 3,
Frontier FiOS television Channel 47 and on the City’s website at www.diamondbarca.gov. The City
Council may take action on any item listed on the agenda.
HELPFUL PHONE NUMBERS
Copies of agendas, rules of the Council, Video of meetings: (909) 839-7010
Computer access to agendas: www.diamondbarca.gov
General information: (909) 839-7000
Written materials distributed to the City Council within 72 hours of the City Council meeting are
available for public inspection immediately upon distribution in the City Clerk’s Office at 21810 Copley
Dr., Diamond Bar, California, during normal business hours.
THIS MEETING IS BEING VIDEO RECORDED AND BY PARTICIPATING VIA
TELECONFERENCE, YOU ARE GIVING YOUR PERMISSION TO BE TELEVISED.
THIS MEETING WILL BE RE-BROADCAST EVERY SATURDAY AND SUNDAY AT
9:00 A.M. AND ALTERNATE TUESDAYS AT 8:00 P.M. AND IS ALSO AVAILABLE FOR
LIVE VIEWING AT
HTTPS://ATTENDEE.GOTOWEBINAR.COM/REGISTER/8493955344146862862 AND
ARCHIVED VIEWING ON THE CITY’S WEB SITE AT WWW.DIAMONDBARCA.GOV.
CITY OF DIAMOND BAR
CITY COUNCIL AGENDA
February 01, 2022
CLOSED SESSION: 5:30 p.m.
Public Comments
CONFERENCE WITH LEGAL COUNSEL –
ANTICIPATED LITIGATION
Significant exposure to litigation pursuant to
Government Code section 54956.9
One potential case.
Claim of polarized voting in the City.
CALL TO ORDER: 6:30 p.m.
PLEDGE OF ALLEGIANCE: Mayor
INVOCATION: Deacon Alfredo Guerrero, St. Denis Catholic
Church
ROLL CALL: Liu, Lyons, Tye, Mayor Pro Tem Chou, Mayor
Low
APPROVAL OF AGENDA: Mayor
1. SPECIAL PRESENTATIONS, CERTIFICATES, PROCLAMATIONS:
1.1 New Business of the Month – Niagara Bottling, LLC
FEBRUARY 1, 2022 PAGE 2
2. CITY MANAGER REPORTS AND RECOMMENDATIONS:
2.1 Q1/Q2 Strategic Plan Update
3. PUBLIC COMMENTS:
"Public Comments" is the time reserved on each regular meeting agenda to
provide an opportunity for members of the public to directly address the Council
on Consent Calendar items or other matters of interest not on the agenda that
are within the subject matter jurisdiction of the Council. Although the City Council
values your comments, pursuant to the Brown Act, members of the City Council
or Staff may briefly respond to public comments if necessary, but no extended
discussion and no action on such matters may take place. There is a five-minute
maximum time limit when addressing the City Council. At this time, the
teleconference moderator will ask callers one at a time to give their name and if
there is an agenda item number they wish to speak on before providing their
comment. If you wish to speak on a public hearing item or council consideration
item, you will then be called upon to speak at that point in the agenda.
4. SCHEDULE OF FUTURE EVENTS:
4.1 Planning Commission Meeting – February 8, 2022 – 6:30 p.m. online
teleconference only.
4.2 City Council Meeting – February 15, 2022, 6:30 p.m. online
teleconference only.
4.3 Tres Hermanos Conservation Authority Board of Directors Regular
Meeting – February 16, 2022 – 6:00 p.m. online teleconference only
5. CONSENT CALENDAR:
All items listed on the Consent Calendar are considered by the City Council to be
routine and will be acted on by a single motion unless a Council Member or
member of the public request otherwise, in which case, the item will be removed
for separate consideration.
5.1 CITY COUNCIL MINUTES OF THE JANUARY 18, 2022 REGULAR
MEETING.
5.1.a January 18, 2022 City Council Minutes
Recommended Action:
Approve the January 18, 2022 Regular City Council meeting minutes.
Requested by: City Clerk
FEBRUARY 1, 2022 PAGE 3
5.2 RATIFICATION OF CHECK REGISTER DATED JANUARY 12, 2022
THROUGH JANUARY 25, 2022 TOTALING $646,572.30.
Recommended Action:
Ratify the Check Register.
Requested by: Finance Department
5.3 TREASURER'S STATEMENT
Recommended Action:
Approve the December 2021 Treasurer’s Statement.
Requested by: Finance Department
5.4 BLACK HISTORY MONTH PROCLAMATION.
Recommended Action:
Adopt the Proclamation declaring February as Black History Month.
Requested by: City Manager
5.5 SECOND AMENDMENT TO THE CONSULTANT SERVICES
AGREEMENT WITH ENVIRONMENTAL SCIENCE ASSOCIATES (ESA),
FOR A NOT-TO-EXCEED AMOUNT OF $190,980 TO PREPARE A
MITIGATED NEGATIVE DECLARATION FOR THE CROOKED CREEK
RESIDENTIAL SUBDIVISION PROJECT.
Recommended Action:
Approve and authorize the City Manager to sign Second Amendment to
the Consultant Services Agreement with Environmental Science
Associates.
Requested by: Community Development Department
5.6 CONSULTING SERVICES AGREEMENT WITH NICHOLS CONSULTING
ENGINEERS (NCE) FOR THE DIAMOND BAR PAVEMENT
MANAGEMENT SYSTEM (PMS) UPDATE.
Recommended Action:
Approve, and authorize the Mayor to sign, the Consulting Service
Agreements with Nichols Consulting Engineers (NCE) in the amount of
$60,200, plus a contingency amount of $6,020, for a total authorization
amount of $66,220.
Requested by: Public Works Department
6. PUBLIC HEARINGS: NONE.
FEBRUARY 1, 2022 PAGE 4
7. COUNCIL CONSIDERATION: NONE.
8. COUNCIL SUB-COMMITTEE REPORTS AND MEETING ATTENDANCE
REPORTS/COUNCIL MEMBER COMMENTS:
9. ADJOURNMENT:
Agenda #: 5.1
Meeting Date: February 1, 2022
TO: Honorable Mayor and Members of the City Council
FROM: Daniel Fox, City Manager
TITLE: CITY COUNCIL MINUTES OF THE JANUARY 18, 2022 REGULAR
MEETING.
STRATEGIC
GOAL:
Open, Engaged & Responsive Government
RECOMMENDATION:
Approve the January 18, 2022 Regular City Council meeting minutes.
FINANCIAL IMPACT:
None.
BACKGROUND/DISCUSSION:
Minutes have been prepared and are being presented for approval.
PREPARED BY:
REVIEWED BY:
5.1
Packet Pg. 7
Attachments:
1. 5.1.a January 18, 2022 City Council Minutes
5.1
Packet Pg. 8
CITY OF DIAMOND BAR
MINUTES OF THE CITY COUNCIL
REGULAR MEETING
JANUARY 18, 2022
CALL TO ORDER: Mayor Low called the Regular City Council meeting to
order at 6:30 p.m.
M/Low stated that consistent with COVID-19 regulations, members of the public were
encouraged to participate and address the City Council during the public comment
portion of the meeting via teleconference and that City Council Members and staff were
also participating telephonically.
PLEDGE OF ALLEGIANCE: Mayor Low led the Pledge of Allegiance.
ROLL CALL: Council Members Stan Liu, Nancy Lyons, Steve Tye,
Mayor Pro Tem Andrew Chou, and Mayor Ruth Low
Staff in Attendance: Dan Fox, City Manager; Ryan McLean, Assistant City
Manager; David DeBerry, City Attorney; Anthony Santos, Assistant to the City Manager;
Amy Haug, Human Resources and Risk Manager; Marsha Roa, Public Information
Manager; Greg Gubman, Community Development Director; David Liu, Public Works
Director; Hal Ghafari, Public Works Manager/Assistant City Engineer; Anthony Jordan,
Parks & Maintenance Superintendent; Claude Bradley, Facilities Maintenance
Supervisor; Jason Jacobsen, Finance Director; Ryan Wright, Parks and Recreation
Director; Ken Desforges, Director of Information Services; Alfredo Estevez, Information
Systems Analyst; Kristina Santana, City Clerk
APPROVAL OF AGENDA: As presented.
1. SPECIAL PRESENTATIONS, CERTIFICATES, PROCLAMATIONS:
1.1 New Business of the Month – Hanna Bridal
Mayor Low presented the New Business of the Month and encouraged
everyone to view the New Business of the Month video on the City’s
website.
1.2 Certificates in Recognition of Chaparral Middle School 3rd Place LA
County Mock Trial Team and Diamond Bar High School 2021 LA County
Mock Trial Team Champion.
Mayor Low commended both teams and Angela Brunson spoke about her
assisting role as attorney coach for the Diamond Bar High School Mock
Trial Team and expressed her pride in their accomplishment.
2. CITY MANAGER REPORTS AND RECOMMENDATIONS: NONE.
3. PUBLIC COMMENTS: NONE.
4. SCHEDULE OF FUTURE EVENTS: CM/Fox presented the Calendar of
Future Events.
5.1.a
Packet Pg. 9
JANUARY 18, 2022 PAGE 2 CITY COUNCIL
5. CONSENT CALENDAR: C/Lyons moved, C/Tye seconded, to approve the
Consent Calendar as presented. Motion carried by the following Roll Call vote:
AYES: COUNCIL MEMBERS: Liu, Lyons, Tye, MPT/Chou, M/Low
NOES: COUNCIL MEMBERS: None
ABSENT: COUNCIL MEMBERS: None
5.1 APPROVED CITY COUNCIL MINUTES:
5.1a REGULAR MEETING OF DECEMBER 21, 2021.
5.2 RATIFIED CHECK REGISTER DATED DECEMBER 15, 2021 THROUGH
JANUARY 11, 2022 TOTALING $1,317,396.43.
5.3 APPROVED THE OCTOBER 2021 AND NOVEMBER 2021
TREASURER’S STATEMENTS.
5.4 ADOPTED RESOLUTION NO. 2022-01, PROVIDING FOR CONTINUED
USE OF TELECONFERENCING AND OTHER FORMATS AS DEFINED
AND IN COMPLIANCE WITH ASSEMBLY BILL 361 FOR MEETINGS OF
THE DIAMOND BAR CITY COUNCIL, CITY COMMISSIONS AND
SUBCOMMITTEES.
5.5 AUTHORIZED THE CITY MANAGER TO SIGN A MAINTENANCE
SERVICE AGREEMENT WITH EXTERIOR PRODUCTS CORP FOR ON-
CALL ELECTRICAL AND LIGHTING SERVICES THROUGH JUNE 30,
2022.
5.6 ADOPTED RESOLUTION NO. 2022-02, ESTABLISHING ELECTRIC
VEHICLE CHARGING STATION FEE RATES EFFECTIVE JANUARY 19,
2022.
6. PUBLIC HEARINGS:
6.1 CONSIDERATION TO DISSOLVE LANDSCAPE ASSESSMENT
DISTRICT NO. 39 AND TO DECLARE INTENTION TO FORM A NEW
LANDSCAPE ASSESSMENT DISTRICT NO. 39-2022.
MPT/Chou and M/Low, both of whom live in the district, recused
themselves from Item 6.1.and M/Low requested that C/Tye preside over
the matter with concurrence of C/Liu and C/Lyons.
PWM/Ghafari presented the staff report.
C/Tye opened the Public Hearing.
5.1.a
Packet Pg. 10
JANUARY 18, 2022 PAGE 3 CITY COUNCIL
Edwin Feng asked why the entire City was not sharing the costs of LLAD
No. 39.
Jose Flores asked for a better visual of the parcels and wanted to know
why the entire City was not paying for areas that are open to all residents.
Sharon Butler also wanted to know why all residents of the City were not
paying for the district.
Ms. Davenport was concerned that this proposal was adversely affecting
her homeowners insurance.
C/Tye closed the Public Hearing.
PWM/Ghafari stated that approximately 20 individuals attended the
December 2, 2021 community meeting and that the assessments
referenced on Page 29 of the report are annual assessments that are
attached to individual property tax bills.
PWM/Ghafari further stated that the utilities line item covers water and
electricity, most of which goes to the cost of water for the irrigation
systems that will remain in place for residents’ use so that they can
connect their system to their provider as a group or individually.
At the request of C/Tye, PWM/Ghafari explained how LLAD’s 39 and 41
currently function and what residents will be responsible to maintain and
what citywide areas are covered by District 38 including medians, etc.
C/Tye explained that property tax bills reflect the amount for District No.
39, which is not a new assessment but a proposed increase in the
assessment to cover the additional cost that the City’s General Fund has
been supplementing over the years.
PWM/Ghafari reiterated that postcards and all communications were
mailed to property owners (not tenants) according to information on the
tax documents. In districts where they existed, HOA’s became involved
with the process which led to a successful ballot outcome. In attempting
to dissolve LLAD 39 which had no HOA, groups of residents indicated
they wished to go through the same process but because it was too late in
the process, the district was extended for another year at the same rate
that had been in place for 30 years. Because residents are speaking for
the first time this evening, it verifies that the outreach program is working
and the City needs to continue reaching out to the residents so they
understand the process. In addition, while the majority of the properties
do not have this kind of maintenance service provided on their property,
but because they are part of the tract, they are directly or indirectly
benefiting from the maintenance services that are currently being provided
which reduces the fire risk in the neighborhood. If proper maintenance is
5.1.a
Packet Pg. 11
JANUARY 18, 2022 PAGE 4 CITY COUNCIL
not provided, insurance companies determine that certain properties are
at “high risk” and will increase their premiums and/or deductibles.
CA/DeBerry stated that if rates are reduced no public hearing is required.
It is only when rates are proposed to be increased that this process is
required. The way this is structured, there will always be a maximum rate
which is set by the CPI increase, but if the City were to reduce the rate, it
could go up to the cap and no higher.
C/Lyons recalled that in March 2021 individual homeowners who attended
the meeting as well as many who attended telephonically asked for one
more chance at this and she believes the homeowners should be given a
chance to vote on the issue again.
C/Tye reopened the Public Hearing.
Maryann Hess stated that she visited homeowners in the district with a
petition asking the City to give them a chance of one more vote and hoped
that through these meetings and community joint efforts property owners
would reconsider their past vote. The beautification of the City and
greenbelt areas are reasons people move to Diamond Bar which helps
preserve the integrity of the area and increases the appearance of the
neighborhoods and keeps the cost of insurance down while preserving
property values. A local appraiser has stated that by keeping the areas
maintained, it helps every homeowner and supports local venues such as
the Diamond Bar Center. She hopes that everyone will encourage their
neighbors to vote “yes” and appreciates the City giving the homeowners of
District 39 a second chance to keep their properties maintained.
C/Tye closed the Public Hearing.
C/Lyons moved, C/Liu seconded to Adopt Resolution No. 2022-03 to
dissolve Landscape Assessment District No. 39. Motion carried by the
following Roll Call vote:
AYES: COUNCIL MEMBERS: Liu, Lyons, Tye
NOES: COUNCIL MEMBERS: None
ABSENT: COUNCIL MEMBERS: MPT/Chou, M/Low
C/Lyons moved, C/Liu seconded, to Adopt Resolution No. 2022-04
declaring intention to form Landscape Assessment District No. 39-2022
and levy assessments, preliminarily approving the Engineer’s Report,
providing notice of Public Hearing, and ordering the mailing of the
assessment ballot. Motion carried by the following Roll Call vote:
AYES: COUNCIL MEMBERS: Liu, Lyons, Tye
NOES: COUNCIL MEMBERS: None
ABSENT: COUNCIL MEMBERS: MPT/Chou, M/Low
5.1.a
Packet Pg. 12
JANUARY 18, 2022 PAGE 5 CITY COUNCIL
6.2 COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROGRAM
ALLOCATIONS FOR FISCAL YEAR 2022/2023.
CDD/Gubman presented the staff report.
M/Low opened the Public Hearing.
With no one wishing to speak on this item, M/Low closed the Public
Hearing.
C/Tye moved, C/Liu seconded, to Adopt Resolution No. 2022-05
approving the Community Development Block Grant Funding Allocations
for Fiscal Year 2022/2023. Motion carried 5-0 by the following Roll Call
vote:
AYES: COUNCIL MEMBERS: Liu, Lyons, Tye, MPT/Chou,
M/Low
NOES: COUNCIL MEMBERS: None
ABSENT: COUNCIL MEMBERS: None
7. COUNCIL CONSIDERATION:
7.1 TRANSMITTAL OF THE FISCAL YEAR 2020-21 ANNUAL
COMPREHENSIVE FINANCIAL REPORT (ACFR) AND
APPROPRIATION OF UNASSIGNED GENERAL FUND RESERVES TO
VARIOUS FUNDS.
FD/Jacobsen and Kirk Hamblin, CPA, LSL Auditors, presented the staff
report.
Edwin Feng thanked the City Council and staff for their efforts toward
maintaining fiscal responsibility.
C/Lyons moved, C/Liu seconded, to:
A. Receive and File the Fiscal Year 2020-21 Annual Comprehensive
Financial Report;
B. Assign $100,000 of Unassigned General Fund Reserves to the
Technology Reserve Fund (104);
C. Assign $260,826 of Unassigned General Fund Reserves to the
OPEB Reserve Fund (105).
D. Approve an appropriation of Unassigned General Fund Reserves
in the amount of $742,536 to the Park & Facility Development Fund
(262); and,
5.1.a
Packet Pg. 13
JANUARY 18, 2022 PAGE 6 CITY COUNCIL
E. Approve an appropriation of Unassigned General Fund Reserves
in the amount of $742,536 to the Building Maintenance &
Replacement Fund (504).
Motion on Items A through E carried 5-0 by the following Roll Call vote:
AYES: COUNCIL MEMBERS: Liu, Lyons, Tye, MPT/Chou,
M/Low
NOES: COUNCIL MEMBERS: None
ABSENT: COUNCIL MEMBERS: None
8. COUNCIL SUBCOMMITTEE REPORTS AND MEETING ATTENDANCE
REPORTS/COUNCIL MEMBER COMMENTS:
C/Liu thanked staff for tonight’s presentations and the community for their care
and compassion for one another and keeping the community safe.
C/Tye said that with respect to the action on LLAD No. 39 he highly
recommended that everyone reach out to their neighbors to make sure that
everything is kept in order relative to the beauty and landscaping as well as,
caretaking of the mini parks. Meals on Wheels provides meals for those in need
and if anyone is interesting in helping, they can call 626-333-4570 or email at
info@MealsonWheels411.org. C/Tye wished everyone a Happy New Year and
acknowledged that tonight’s meeting would be adjourned in honor of Johnny
Gonzales, a longtime member of the Diamond Bar community and family.
C/Lyons complimented staff for their work on the audit and information on LLAD
No. 39. She agreed with C/Tye that residents of the district should reach out to
their neighbors and friends to discuss whether spending a little more to beautify
the area is worth it to them, and encouraged everyone to sign up to receive their
four free COVID test kits.
MPT/Chou thanked staff for the excellent financial report and appreciates the
work of staff and Council to make sure that during COVID Diamond Bar
continues to provide vital services to its residents. He wished everyone a Happy
Lunar Chinese New Year.
M/Low reported that she and MPT/Chou attended the audit subcommittee
meeting and were thrilled to learn about the City’s financial position. She
thanked Mr. Hamblin and FD/Jacobsen and their teams for answering all of their
questions and acknowledged that the clean audit is in recognition of the talent
and extra effort by everyone on the team. The City Council appreciates the
diligent stewardship of the assets that have been entrusted to it and appreciates
that this body is adhering to the principals of government transparency.
Yesterday she attended the groundbreaking of the Grand Century Plaza in
Rowland Heights, a new shopping center that will feature a grocery store, hotel
and entertainment venue which will bring new jobs to the area and provide more
5.1.a
Packet Pg. 14
JANUARY 18, 2022 PAGE 7 CITY COUNCIL
choices for dining, shopping and entertainment. She congratulated students
whose artwork was selected to be featured in the Metropolitan Water District’s
Southern California 2022 Student Art Calendar “Water is Life”.
CM/Fox stated that funeral services for Johnny Gonzales will be held on Friday,
January 21st beginning at 11:30 a.m. at Stone Funeral Home, 355 East 9th Street,
Upland, followed by graveside services beginning at 1:00 p.m. at Bellevue
Memorial Park, 1240 West G Street, Ontario.
M/Low recited the following: Johnny Gonzales joined the City on June 12, 2009
and served a key role at the Diamond Bar Center. He was a leader and a friend
to many in the department and was responsible for supporting dozens of
weddings and once-in-a lifetime events at the Diamond Bar Center. He regularly
helped set up for Council meetings at the AQMD and always greeted residents
and Council Members with a smile. Many staff in a variety of departments
respected Johnny and enjoyed his wit and dedicated service to the City. He was
a father, grandfather, great grandfather, a US Veteran, a local hero, a proud
postal carrier in the community and a Diamond Bar resident since 1988. Johnny
received a Key to the City for saving a life while on his postal route. Based on
his decades of experience as a postal carrier in Diamond Bar, Johnny would help
young part-time recreation staff with driving directions – he was basically the
City’s GPS before there was a MapQuest or Google Maps. Others in the City will
remember his camaraderie while spending time at Oak Tree Lanes. Many have
positive memories and incredible stories of Johnny, who will be greatly missed.
We extend our deepest condolences to Johnny’s family, his friends and his loved
ones.
ADJOURNMENT: With no further business to conduct, Mayor Low adjourned
the Regular City Council Meeting at 8:29 p.m. in memory of Johnny Gonzales.
Respectfully submitted:
__________________________
Kristina Santana, City Clerk
The foregoing minutes are hereby approved this 1st day of February, 2022.
__________________________
Ruth M. Low, Mayor
5.1.a
Packet Pg. 15
Agenda #: 5.2
Meeting Date: February 1, 2022
TO: Honorable Mayor and Members of the City Council
FROM: Daniel Fox, City Manager
TITLE: RATIFICATION OF CHECK REGISTER DATED JANUARY 12, 2022
THROUGH JANUARY 25, 2022 TOTALING $646,572.30.
STRATEGIC
GOAL:
Responsible Stewardship of Public Resources
RECOMMENDATION:
Ratify the Check Register.
FINANCIAL IMPACT:
Expenditure of $646,572.30.
BACKGROUND/DISCUSSION:
The City has established the policy of issuing accounts payable checks on a weekly
basis with City Council ratification at the next scheduled City Council Meeting.
The attached check register containing checks dated January 12, 2022 through January
25, 2022 totaling $646,572.30 is being presented for ratification. All payments have
been made in compliance with the City’s purchasing policies and procedures, and have
been reviewed and approved by the appropriate departmental staff. The attached
Affidavit affirms that the check register has been audited and deemed accurate by the
Finance Director.
PREPARED BY:
5.2
Packet Pg. 16
REVIEWED BY:
Attachments:
1. 5.2.a Check Register Affidavit - 2-1-2022
2. 5.2.b Check Register 2-1-2022
5.2
Packet Pg. 17
5.2.a
Packet Pg. 18
City of Diamond Bar Check Register
CHECK #
CHECK DATE
VENDOR NAME
OTP VENDOR NAME
INVOICE DESCRIPTION
ORG
OBJECT
AMOUNT
4239 1/21/2022 TASC FLEX SPENDING MEDICAL/CHILDCARE
01/21/2022
238 21118 $9.62
1/21/2022 TASC FLEX SPENDING MEDICAL/CHILDCARE
01/21/2022
239 21118 $9.62
1/21/2022 TASC FLEX SPENDING MEDICAL/CHILDCARE
01/21/2022
207 21118 $12.79
1/21/2022 TASC FLEX SPENDING MEDICAL/CHILDCARE
01/21/2022
250 21118 $27.56
1/21/2022 TASC FLEX SPENDING MEDICAL/CHILDCARE
01/21/2022
206 21118 $43.44
1/21/2022 TASC FLEX SPENDING MEDICAL/CHILDCARE
01/21/2022
100 21118 $1,241.12
CHECK TOTAL $1,344.15
4240 1/21/2022 VANTAGEPOINT TRNSFR AGNTS-
303248
DEFERRED COMP
CONTRIBUTIONS/LOAN PYMTS
01/21/2022
225 21109 $19.69
1/21/2022 VANTAGEPOINT TRNSFR AGNTS-
303248
DEFERRED COMP
CONTRIBUTIONS/LOAN PYMTS
01/21/2022
239 21109 $103.85
1/21/2022 VANTAGEPOINT TRNSFR AGNTS-
303248
DEFERRED COMP
CONTRIBUTIONS/LOAN PYMTS
01/21/2022
201 21109 $145.83
1/21/2022 VANTAGEPOINT TRNSFR AGNTS-
303248
DEFERRED COMP
CONTRIBUTIONS/LOAN PYMTS
01/21/2022
250 21109 $201.07
1/21/2022 VANTAGEPOINT TRNSFR AGNTS-
303248
DEFERRED COMP
CONTRIBUTIONS/LOAN PYMTS
01/21/2022
238 21109 $207.70
1/21/2022 VANTAGEPOINT TRNSFR AGNTS-
303248
DEFERRED COMP
CONTRIBUTIONS/LOAN PYMTS
01/21/2022
207 21109 $327.77
1/21/2022 VANTAGEPOINT TRNSFR AGNTS-
303248
DEFERRED COMP
CONTRIBUTIONS/LOAN PYMTS
01/21/2022
206 21109 $606.63
1/21/2022 VANTAGEPOINT TRNSFR AGNTS-
303248
DEFERRED COMP
CONTRIBUTIONS/LOAN PYMTS
01/21/2022
100 21109 $14,353.10
CHECK TOTAL $15,965.64
5.2.b
Packet Pg. 19
City of Diamond Bar Check Register
CHECK #
CHECK DATE
VENDOR NAME
OTP VENDOR NAME
INVOICE DESCRIPTION
ORG
OBJECT
AMOUNT
4241 1/21/2022 CALPERS PENSION CONTRIB 1/1/22-1/14/22 &
1/1/22-1/31/2022
239 21110 $145.37
1/21/2022 CALPERS PENSION CONTRIB 1/1/22-1/14/22 &
1/1/22-1/31/2022
225 21110 $166.23
1/21/2022 CALPERS PENSION CONTRIB 1/1/22-1/14/22 &
1/1/22-1/31/2022
238 21110 $222.53
1/21/2022 CALPERS PENSION CONTRIB 1/1/22-1/14/22 &
1/1/22-1/31/2022
201 21110 $400.03
1/21/2022 CALPERS PENSION CONTRIB 1/1/22-1/14/22 &
1/1/22-1/31/2022
207 21110 $799.93
1/21/2022 CALPERS PENSION CONTRIB 1/1/22-1/14/22 &
1/1/22-1/31/2022
250 21110 $1,045.66
1/21/2022 CALPERS PENSION CONTRIB 1/1/22-1/14/22 &
1/1/22-1/31/2022
206 21110 $1,059.16
1/21/2022 CALPERS PENSION CONTRIB 1/1/22-1/14/22 &
1/1/22-1/31/2022
100 21110 $31,335.44
CHECK TOTAL $35,174.35
4242 1/25/2022 A1 PARTY RENTALS WINTER SNOW FEST EQUIPMENT RENTAL 100520 52300 $3,754.42
1/25/2022 A1 PARTY RENTALS WINTER SNOW FEST EQUIPMENT RENTAL 100520 52300 $9,000.00
CHECK TOTAL $12,754.42
4243 1/25/2022 ABSOLUTE SECURITY
INTERNATIONAL INC
DECEMBER SECURITY GUARD SERVICES 100510 55330 $1,991.25
CHECK TOTAL $1,991.25
4244 1/25/2022 AIRGAS INC HELIUM 100630 51200 $9.86
1/25/2022 AIRGAS INC HELIUM 100520 51200 $98.58
CHECK TOTAL $108.44
4245 1/25/2022 AMERICAN GUARD SERVICES
INC
CROSSING GUARD SERVICES - NOV
2021
100310 55412 $14,157.00
1/25/2022 AMERICAN GUARD SERVICES
INC
CROSSING GUARD SERVICES - DEC
2021
100310 55412 $11,586.96
CHECK TOTAL $25,743.96
4246 1/25/2022 ASSA ABLOY ENTRANCE SYSTEMS
US INC
BUILDING MAINTENANCE (CITY HALL) 100620 52320 $502.79
CHECK TOTAL $502.79
4247 1/25/2022 BULLSEYE TELECOM INC ANALOG PHONE LINES - JAN 2022 100230 52200 $1,751.23
5.2.b
Packet Pg. 20
City of Diamond Bar Check Register
CHECK #
CHECK DATE
VENDOR NAME
OTP VENDOR NAME
INVOICE DESCRIPTION
ORG
OBJECT
AMOUNT
CHECK TOTAL $1,751.23
4248 1/25/2022 CANNON CORPORATION PLAN CHECK - 850 BREA CANYON 100 22109 $2,574.00
1/25/2022 CANNON CORPORATION PLAN CHECK - 22438 STEEPLECHASE -
PLAN REVISIONS
100 22109 $231.50
1/25/2022 CANNON CORPORATION PLAN CHECK - 1819 DERRINGER PLAN
REVISIONS
100 22109 $800.75
1/25/2022 CANNON CORPORATION ENGR. DESIGN SERVICES - UTILITY 100615 54400 $360.00
CHECK TOTAL $3,966.25
4249 1/25/2022 CDW GOVERNMENT CISCO SMARTNET ANNUAL MAINT -
1/1/22 - 12/21/22
100230 52314 $42,986.77
1/25/2022 CDW GOVERNMENT APC REPLACEMENT BATTERY
CARTRIDGES - 12
100230 51200 $605.12
1/25/2022 CDW GOVERNMENT HP LTO5 CUSTOM LABEL - 20PK 100230 51200 $1,560.42
1/25/2022 CDW GOVERNMENT HP FHD
MONITORS/WEBCAMS/RECYCLING FEES
- 3
100230 51300 $1,297.48
1/25/2022 CDW GOVERNMENT TRIPP DISPLAY PORT - HDMI ADAPTER - 3 100230 51300 $108.63
1/25/2022 CDW GOVERNMENT FATPIPE PLATINUM SERVICE - ANNUAL
RENEWAL
100230 52314 $9,181.54
CHECK TOTAL $55,739.96
4250 1/25/2022 CITY OF WALNUT DB/WALNUT SHARED AGREEMENT - AT-
RISK COUNSELING
280310 54900 $5,000.00
CHECK TOTAL $5,000.00
4251 1/25/2022 CIVICPLUS LLC SEECLICKFIX UNLTD ANNUAL LICENSES -
22-23
100230 52314 $15,450.01
1/25/2022 CIVICPLUS LLC CIVICPLUS WEBSITE ANNUAL FEE - 22-23 100230 52314 $22,016.41
1/25/2022 CIVICPLUS LLC SEECLICKFIX 9/15/21-2/13/22 100230 52314 $2,077.62
CHECK TOTAL $39,544.04
4252 1/25/2022 COLLEY AUTO CARS INC VEHICLE MAINTENANCE (LIC #1363852) 502630 52312 $609.35
CHECK TOTAL $609.35
4253 1/25/2022 DAVID EVANS AND ASSOCIATES
INC
GRAND/GSD INTERSECTION - DEC 2021 301610 56105 $106.29
CHECK TOTAL $106.29
4254 1/25/2022 DEPARTMENT OF JUSTICE LIVESCAN FEES 100220 52510 $256.00
5.2.b
Packet Pg. 21
City of Diamond Bar Check Register
CHECK #
CHECK DATE
VENDOR NAME
OTP VENDOR NAME
INVOICE DESCRIPTION
ORG
OBJECT
AMOUNT
CHECK TOTAL $256.00
4255 1/25/2022 DIANA CHO & ASSOCIATES CDBG CONSULTANT ADM SVC-SENIOR
PROGRAM OCT-DEC 21
225440 54900 $765.00
1/25/2022 DIANA CHO & ASSOCIATES CDBG CONSULTANT ADM SVC-ADA
CURB RAMP-OCT-DEC 2021
225440 54900 $1,445.00
CHECK TOTAL $2,210.00
4256 1/25/2022 DMPR 4 LLC STORAGE RENTAL UNITS IN FEB 2022 100130 52302 $1,281.00
CHECK TOTAL $1,281.00
4257 1/25/2022 ECOFERT INC FERTILIZER INJECTION SYSTEM (DEC) 100630 52320 $1,150.00
CHECK TOTAL $1,150.00
4258 1/25/2022 ENVIRONMENTAL SCIENCE
ASSOCIATES
CEQA CONSULTANT SVCS – NOVEMBER
2021-TTM54081
100 22107 $465.23
CHECK TOTAL $465.23
4259 1/25/2022 ESRI INC ARC GIS ONLINE VIEWER SERVICE - DEC
2021-2022
100230 52314 $1,600.00
1/25/2022 ESRI INC ARC GIS DESKTOP MAINTENANCE -
2021-2022
100230 52314 $5,600.00
CHECK TOTAL $7,200.00
4260 1/25/2022 EXTERIOR PRODUCTS CORP LIGHTING MAINTENANCE (MAPLE HILL
PARK)
100630 52320 $502.66
1/25/2022 EXTERIOR PRODUCTS CORP LIGHTING MAINTENANCE (LORBEER) 100630 52320 $663.97
CHECK TOTAL $1,166.63
4261 1/25/2022 FIDUCIARY EXPERTS LLC FIDUCIARY OVERSIGHT FEE 100220 54900 $2,000.00
CHECK TOTAL $2,000.00
4262 1/25/2022 FOOTHILL BUILDING MATERIALS
INC
SAND/SANDBAGS FOR FIRE STATIONS
#119 & 121
100350 51200 $1,135.30
CHECK TOTAL $1,135.30
4263 1/25/2022 FRONTIER COMMUNICATIONS
CORP
SUMMARY BILL - INTERNET SERVICES -
JAN 2022
100230 54030 $775.00
CHECK TOTAL $775.00
4264 1/25/2022 GATEWAY WATER
MANAGEMENT AUTHORITY
HARBOR TOXIC UPSTREAM
MONITORING - FY 21-22
201610 54200 $5,307.40
CHECK TOTAL $5,307.40
4265 1/25/2022 GLOBALSTAR USA SATELLITE PHONES/ANNUAL FEE - 8 LINES 100350 52200 $9,393.53
5.2.b
Packet Pg. 22
City of Diamond Bar Check Register
CHECK #
CHECK DATE
VENDOR NAME
OTP VENDOR NAME
INVOICE DESCRIPTION
ORG
OBJECT
AMOUNT
CHECK TOTAL $9,393.53
4266 1/25/2022 GRACE HU INSTRUCTOR PAYMENT - YOGA - FALL 21 100520 55320 $176.40
CHECK TOTAL $176.40
4267 1/25/2022 HODGMAN ENTERPRISES PRINTING AND MAILING OF WINTER 21
SPRING REC GUIDE
100240 52110 $8,714.66
CHECK TOTAL $8,714.66
4268 1/25/2022 HR GREEN PACIFIC INC BLDG & SAFETY TEMP PERMIT TECH-11/1
THRU 12/9/21
100420 55100 $14,812.50
CHECK TOTAL $14,812.50
4269 1/25/2022 HUMANE SOCIETY OF POMONA
VALLEY INC
IVHS ANIMAL CONTROL SERVICES FOR
DEC. 2021
100340 55404 $33,322.00
CHECK TOTAL $33,322.00
4270 1/25/2022 INTEGRUS LLC RICOH COPY CHARGES - 12/19/21 -
1/18/22
100230 52100 $198.47
CHECK TOTAL $198.47
4271 1/25/2022 JIVE COMMUNICATIONS INC CITYWIDE PHONE SYSTEM- JAN 2022 100230 52200 $2,448.57
CHECK TOTAL $2,448.57
4272 1/25/2022 JOSUE PABLO ESPINO PLANNING SERVICES CONSULTANT-
12/27/21-1/7/22
100410 54900 $4,350.00
CHECK TOTAL $4,350.00
4273 1/25/2022 KEVIN D JONES PS - SR57/60 CONFLUENCE PROJ
ADVOCACY - DEC 2021
100615 54400 $4,000.00
CHECK TOTAL $4,000.00
4274 1/25/2022 LOS ANGELES COUNTY PUBLIC
WORKS
INDUSTRIAL WASTE SERVICES - OCT 2021 100610 55550 $3,731.49
CHECK TOTAL $3,731.49
4275 1/25/2022 MCE CORPORATION LANDSCAPE MAINTENANCE LLAD'S 38,
39, 41 (DEC)
241641 55524 $4,922.61
1/25/2022 MCE CORPORATION LANDSCAPE MAINTENANCE LLAD'S 38,
39, 41 (DEC)
239639 55524 $12,173.54
1/25/2022 MCE CORPORATION LANDSCAPE MAINTENANCE LLAD'S 38,
39, 41 (DEC)
238638 55524 $14,806.30
1/25/2022 MCE CORPORATION ADDL' LANDSCAPE MAINT (LLAD 41) 241641 52320 $2,485.00
CHECK TOTAL $34,387.45
5.2.b
Packet Pg. 23
City of Diamond Bar Check Register
CHECK #
CHECK DATE
VENDOR NAME
OTP VENDOR NAME
INVOICE DESCRIPTION
ORG
OBJECT
AMOUNT
4276 1/25/2022 MERCURY DISPOSAL SYSTEMS
INC
NOVEMBER HHW AT ACE HARDWARE 250170 55000 $1,726.53
1/25/2022 MERCURY DISPOSAL SYSTEMS
INC
HHW PICK UP AT ACE HARDWARE AUG
2021
250170 55000 $933.61
CHECK TOTAL $2,660.14
4277 1/25/2022 METROLINK METROLINK PASSES - DEC 2021 206650 55610 $1,019.90
1/25/2022 METROLINK METROLINK PASSES - DEC 2021 206650 55620 $4,079.60
CHECK TOTAL $5,099.50
4278 1/25/2022 MOSS CONSULTING CDBG HOME IMPR ADMN SVC- 10/30
THRU 12/31/21
225440 54900 $5,280.00
CHECK TOTAL $5,280.00
4279 1/25/2022 MULHOLLAND CONSULTING INC SYCAMORE CYN CREEK REPAIR - DEC
2021
301630 56104 $3,007.48
1/25/2022 MULHOLLAND CONSULTING INC SYCAMORE CYN CREEK REPAIR - NOV
2021
301630 56104 $1,265.88
CHECK TOTAL $4,273.36
4280 1/25/2022 MUNICIPAL CODE
CORPORATION
ONLINE CODE HOSTING IN 2022 100140 54900 $900.00
CHECK TOTAL $900.00
4281 1/25/2022 MV CHENG & ASSOCIATES INC TEMP STAFFING - FINANCE DEPT DEC
2021
100210 54900 $11,878.75
CHECK TOTAL $11,878.75
4282 1/25/2022 OCCUPATIONAL HEALTH
CENTERS OF CALIFORNIA
PRE-EMPLOYMENT PHYSICAL FEES 100220 52510 $240.00
1/25/2022 OCCUPATIONAL HEALTH
CENTERS OF CALIFORNIA
PRE-EMPLOYMENT PHYSICAL FEES 100220 52510 $2,029.50
1/25/2022 OCCUPATIONAL HEALTH
CENTERS OF CALIFORNIA
PRE-EMPLOYMENT PHYSICAL FEES 100220 52510 $1,075.50
1/25/2022 OCCUPATIONAL HEALTH
CENTERS OF CALIFORNIA
PRE-EMPLOYMENT PHYSICAL FEES 100220 52510 $298.50
1/25/2022 OCCUPATIONAL HEALTH
CENTERS OF CALIFORNIA
PRE-EMPLOYMENT PHYSICAL FEES 100220 52510 $972.50
1/25/2022 OCCUPATIONAL HEALTH
CENTERS OF CALIFORNIA
PRE-EMPLOYMENT PHYSICAL FEES 100220 52510 $60.00
1/25/2022 OCCUPATIONAL HEALTH
CENTERS OF CALIFORNIA
PRE-EMPLOYMENT PHYSICAL FEES 100220 52510 $597.00
CHECK TOTAL $5,273.00
5.2.b
Packet Pg. 24
City of Diamond Bar Check Register
CHECK #
CHECK DATE
VENDOR NAME
OTP VENDOR NAME
INVOICE DESCRIPTION
ORG
OBJECT
AMOUNT
4283 1/25/2022 OFFICE SOLUTIONS SUPPLIES - P/WORKS OCT 2021 100610 51200 $14.04
1/25/2022 OFFICE SOLUTIONS SUPPLIES - P/WORKS APR 2021 100230 51200 $40.95
CHECK TOTAL $54.99
4284 1/25/2022 ONE TIME PAY VENDOR AILEN GUZMAN PICNIC DEPOSIT REFUND 100 20202 $100.00
CHECK TOTAL $100.00
4285 1/25/2022 ONE TIME PAY VENDOR CHRISTOPHER PHAM FACILITY DEPOSIT REFUND 100 20202 $1,250.00
CHECK TOTAL $1,250.00
4286 1/25/2022 ONE TIME PAY VENDOR DOMINIQUE CRAMER PICNIC DEPOSIT REFUND 100 20202 $100.00
CHECK TOTAL $100.00
4287 1/25/2022 ONE TIME PAY VENDOR EVERETT NEWMAN FACILITY DEPOSIT REFUND 100 20202 $850.00
CHECK TOTAL $850.00
4288 1/25/2022 ONE TIME PAY VENDOR FLORDELIZA CASTILLO FACILITY DEPOSIT REFUND 100 20202 $100.00
CHECK TOTAL $100.00
4289 1/25/2022 ONE TIME PAY VENDOR FOAGLA INC. FACILITY DEPOSIT REFUND 100 20202 $1,250.00
CHECK TOTAL $1,250.00
4290 1/25/2022 ONE TIME PAY VENDOR GLENDORA HIGH
SCHOOL
FACILITY DEPOSIT REFUND 100 20202 $500.00
CHECK TOTAL $500.00
4291 1/25/2022 ONE TIME PAY VENDOR GUDIEL BATRES FACILITY DEPOSIT REFUND 100 20202 $1,450.00
CHECK TOTAL $1,450.00
4292 1/25/2022 ONE TIME PAY VENDOR GYOUNGA KANG FACILITY DEPOSIT REFUND 100 20202 $200.00
CHECK TOTAL $200.00
4293 1/25/2022 ONE TIME PAY VENDOR JACKSON LUONG FACILITY REFUND 100 20202 $1,329.97
CHECK TOTAL $1,329.97
4294 1/25/2022 ONE TIME PAY VENDOR JENNIFER BARAJAS KINDER SKILLS REFUND 100 20202 $639.50
CHECK TOTAL $639.50
4295 1/25/2022 ONE TIME PAY VENDOR JOCELYN VARNAL FACILITY REFUND 100 20202 $1,196.96
CHECK TOTAL $1,196.96
4296 1/25/2022 ONE TIME PAY VENDOR KAREN HOECKMANN FACILITY DEPOSIT REFUND 100 20202 $200.00
5.2.b
Packet Pg. 25
City of Diamond Bar Check Register
CHECK #
CHECK DATE
VENDOR NAME
OTP VENDOR NAME
INVOICE DESCRIPTION
ORG
OBJECT
AMOUNT
CHECK TOTAL $200.00
4297 1/25/2022 ONE TIME PAY VENDOR KARINA FELIX FACILITY REFUND 100 20202 $1,042.33
CHECK TOTAL $1,042.33
4298 1/25/2022 ONE TIME PAY VENDOR LAURA ABARCA FACILITY DEPOSIT REFUND 100 20202 $100.00
CHECK TOTAL $100.00
4299 1/25/2022 ONE TIME PAY VENDOR LEATA OLOTOA-ASI SPORTS REFUND 100 20202 $100.00
CHECK TOTAL $100.00
4300 1/25/2022 ONE TIME PAY VENDOR LYVUI DUONG FACILITY DEPOSIT REFUND 100 20202 $600.00
CHECK TOTAL $600.00
4301 1/25/2022 ONE TIME PAY VENDOR ROCIO GONZALEZ SPORTS REFUND 100 20202 $95.00
CHECK TOTAL $95.00
4302 1/25/2022 ONE TIME PAY VENDOR ROXANA OGATA FACILITY DEPOSIT REFUND 100 20202 $100.00
CHECK TOTAL $100.00
4303 1/25/2022 ONE TIME PAY VENDOR SHARMISTHA
CHAKRABORTY
FACILITY DEPOSIT REFUND 100 20202 $1,250.00
CHECK TOTAL $1,250.00
4304 1/25/2022 ONE TIME PAY VENDOR SUNNY TSAO CLASS REFUND 100 20202 $99.00
CHECK TOTAL $99.00
4305 1/25/2022 ONE TIME PAY VENDOR VICTOR PACHECO FACILITY DEPOSIT REFUND 100 20202 $700.00
CHECK TOTAL $700.00
4306 1/25/2022 ONE TIME PAY VENDOR VIVIAN WING YEUNG SPORTS REFUND 100 20202 $95.00
CHECK TOTAL $95.00
4307 1/25/2022 ONE TIME PAY VENDOR WALNUT VALLEY UNIFIED
SCHOOL DISTRICT
FACILITY DEPOSIT REFUND 100 20202 $100.00
CHECK TOTAL $100.00
4308 1/25/2022 ONE TIME PAY VENDOR YANNING PAN SPORTS REFUND 100 20202 $95.00
CHECK TOTAL $95.00
4309 1/25/2022 PAPER RECYCLING &
SHREDDING
PAPER DESTRUCTION 1/19/2022 250170 55000 $150.00
CHECK TOTAL $150.00
5.2.b
Packet Pg. 26
City of Diamond Bar Check Register
CHECK #
CHECK DATE
VENDOR NAME
OTP VENDOR NAME
INVOICE DESCRIPTION
ORG
OBJECT
AMOUNT
4310 1/25/2022 PARKWOOD LANDSCAPE
MAINTENANCE INC
LANDSCAPE MAINTENANCE SVCS (CITY
PARKS) DEC
100510 55505 $5,865.00
1/25/2022 PARKWOOD LANDSCAPE
MAINTENANCE INC
LANDSCAPE MAINTENANCE SVCS (CITY
PARKS) DEC
100630 55505 $27,411.00
CHECK TOTAL $33,276.00
4311 1/25/2022 PHOTO ART INDUSTRIES PHOTOS FOR CITY COUNCIL 100110 52130 $2,165.76
CHECK TOTAL $2,165.76
4312 1/25/2022 PUBLIC STORAGE #23051 STORAGE RENTAL UNIT FOR FEB. 2022 100130 52302 $526.00
CHECK TOTAL $526.00
4313 1/25/2022 RJ NOBLE COMPANY RETENTION PAYMENT - DBB REHAB
PROJECT
301 29004 $52,939.55
CHECK TOTAL $52,939.55
4314 1/25/2022 RKA CONSULTING GROUP BUILDING AND SAFETY SERVICES-NOV
2021
100420 55100 $39,154.80
CHECK TOTAL $39,154.80
4315 1/25/2022 SC FUELS FLEET VEHICLE FUEL 502130 52330 $45.04
1/25/2022 SC FUELS FLEET VEHICLE FUEL 502620 52330 $47.39
1/25/2022 SC FUELS FLEET VEHICLE FUEL 502430 52330 $96.94
1/25/2022 SC FUELS FLEET VEHICLE FUEL 502655 52330 $134.23
1/25/2022 SC FUELS FLEET VEHICLE FUEL 502630 52330 $509.87
1/25/2022 SC FUELS FLEET VEHICLE FUEL 502430 52330 $101.82
1/25/2022 SC FUELS FLEET VEHICLE FUEL 502620 52330 $182.84
1/25/2022 SC FUELS FLEET VEHICLE FUEL 502630 52330 $442.20
1/25/2022 SC FUELS FLEET VEHICLE FUEL 502655 52330 $579.02
CHECK TOTAL $2,139.35
4316 1/25/2022 SCHAFER CONSULTING CONSULTING SERVICES FOR ERP
PROJECT - DEC 2021
503230 56135 $4,960.00
CHECK TOTAL $4,960.00
4317 1/25/2022 SIMPSON ADVERTISING INC PHOTO CONTEST 2021 INSTALLATION 100240 54900 $2,160.30
CHECK TOTAL $2,160.30
4318 1/25/2022 SOCIAL VOCATIONAL SERVICES LITTER AND WEED REMOVAL SVCS
(ROW) DEC
100645 55528 $2,909.00
5.2.b
Packet Pg. 27
City of Diamond Bar Check Register
CHECK #
CHECK DATE
VENDOR NAME
OTP VENDOR NAME
INVOICE DESCRIPTION
ORG
OBJECT
AMOUNT
CHECK TOTAL $2,909.00
4319 1/25/2022 SOUTHERN CALIFORNIA EDISON 21208 WASHINGTON (12.13.21 -
01.11.22)
100630 52210 $18.10
1/25/2022 SOUTHERN CALIFORNIA EDISON 20850 HIGH COUNTRY (12.13.21 -
01.11.22)
241641 52210 $17.78
1/25/2022 SOUTHERN CALIFORNIA EDISON 20980 CANYON RIDGE (12.13.21 -
01.11.22)
241641 52210 $17.78
1/25/2022 SOUTHERN CALIFORNIA EDISON 633 GRAND (12.10.21 - 01.10.22) 238638 52210 $18.98
1/25/2022 SOUTHERN CALIFORNIA EDISON 1000 LEMON (12.14.21 - 01.12.22) 238638 52210 $18.80
1/25/2022 SOUTHERN CALIFORNIA EDISON CITY HALL (12.15.21 - 01.13.22) 100620 52210 $9,160.01
1/25/2022 SOUTHERN CALIFORNIA EDISON 2746 BREA CANYON ROAD (12.15.21 -
11.13.22)
238638 52210 $17.80
1/25/2022 SOUTHERN CALIFORNIA EDISON 2025 DIAMOND BAR BLVD (12.15.21 -
01.13.22)
238638 52210 $17.80
1/25/2022 SOUTHERN CALIFORNIA EDISON 22745 SUNSET CROSSING ROAD
(12.15.21 - 11.13.22)
238638 52210 $17.99
1/25/2022 SOUTHERN CALIFORNIA EDISON 3564 BREA CANYON ROAD (12.15.21 -
01.13.22)
238638 52210 $17.80
CHECK TOTAL $9,322.84
4320 1/25/2022 SPECTRUM BUSINESS INTERNET SERVICE - HERITAGE PARK -
JAN 2022
100230 54030 $537.90
CHECK TOTAL $537.90
4321 1/25/2022 STERICYCLE INC WASTE DISPOSAL DBC 250170 55000 $290.61
CHECK TOTAL $290.61
4322 1/25/2022 TASC FSA FEES 100220 52515 $112.32
CHECK TOTAL $112.32
4323 1/25/2022 TEMCAL DEVELOPMENT CORP VEHICLE MAINTENANCE (NOV) 502430 52312 $24.99
1/25/2022 TEMCAL DEVELOPMENT CORP VEHICLE MAINTENANCE (NOV) 502630 52312 $43.98
1/25/2022 TEMCAL DEVELOPMENT CORP VEHICLE MAINTENANCE (NOV) 502620 52312 $124.88
1/25/2022 TEMCAL DEVELOPMENT CORP VEHICLE MAINTENANCE (NOV) 502655 52312 $131.32
1/25/2022 TEMCAL DEVELOPMENT CORP VEHICLE MAINTENANCE (DEC) 502655 52312 $9.99
1/25/2022 TEMCAL DEVELOPMENT CORP VEHICLE MAINTENANCE (DEC) 502430 52312 $32.43
1/25/2022 TEMCAL DEVELOPMENT CORP VEHICLE MAINTENANCE (DEC) 502630 52312 $63.97
5.2.b
Packet Pg. 28
City of Diamond Bar Check Register
CHECK #
CHECK DATE
VENDOR NAME
OTP VENDOR NAME
INVOICE DESCRIPTION
ORG
OBJECT
AMOUNT
1/25/2022 TEMCAL DEVELOPMENT CORP VEHICLE MAINTENANCE (DEC) 502620 52312 $251.87
CHECK TOTAL $683.43
4324 1/25/2022 TENNIS ANYONE INC TENNIS INSTRUCTION - DECEMBER 2021 100520 55320 $11,325.39
CHECK TOTAL $11,325.39
4325 1/25/2022 THE COMDYN GROUP INC GIS SUPPORT - 12/18/21 - 12/31/21 100230 54900 $794.30
CHECK TOTAL $794.30
4326 1/25/2022 THE GAS COMPANY HERITAGE PARK (12.15.21 - 01.14.22) 100630 52215 $1,029.94
1/25/2022 THE GAS COMPANY CITY HALL (12.14.21 - 01.13.22) 100620 52215 $1,439.22
CHECK TOTAL $2,469.16
4327 1/25/2022 TISCARENO'S CATERING &
EVENTS
SENIOR DANCE CATERING 100520 55310 $2,014.80
CHECK TOTAL $2,014.80
4328 1/25/2022 TRIFYTT SPORTS LLC CONTRACT CLASS INSTRUCTOR - YOUTH
SPORTS
100520 55320 $772.20
CHECK TOTAL $772.20
4329 1/25/2022 UNITED RECORDS MANAGEMENT
INC
OFF-SITE BACK-UP TAPE STORAGE - DEC
2021
100230 55000 $594.00
CHECK TOTAL $594.00
4330 1/25/2022 VIDIFLO LLC WINDMILL ROOM AV UPGRADE
PROJECT MANAGEMENT
100240 54900 $2,979.35
CHECK TOTAL $2,979.35
4331 1/25/2022 WAXIE SANITARY SUPPLY JANITORIAL SUPPLIES (DBC) 100510 51210 $297.49
CHECK TOTAL $297.49
4332 1/25/2022 WEST COAST ARBORISTS INC TREE MAINTENANCE (11.01.21 -
11.15.21)
100645 55522 $5,863.95
1/25/2022 WEST COAST ARBORISTS INC TREE MAINTENANCE (11.16.21 -
11.30.21)
100645 55522 $17,401.20
1/25/2022 WEST COAST ARBORISTS INC TREE MAINTENANCE (12.01.21 -
12.15.21)
100645 55522 $26,473.10
1/25/2022 WEST COAST ARBORISTS INC TREE MAINTENANCE (12.16.21 -
12.31.21)
100645 55522 $18,833.60
CHECK TOTAL $68,571.85
4333 1/25/2022 WILLDAN GEOTECHNICAL GEOTECH REVIEW - 2775 SHADOW
CANYON
100 22109 $400.00
5.2.b
Packet Pg. 29
City of Diamond Bar Check Register
CHECK #
CHECK DATE
VENDOR NAME
OTP VENDOR NAME
INVOICE DESCRIPTION
ORG
OBJECT
AMOUNT
CHECK TOTAL $400.00
4334 1/25/2022 YUNEX LLC TS MAINTENANCE - CALL OUTS JULY
2021
207650 55536 $10,870.65
1/25/2022 YUNEX LLC TS MAINTENANCE & BBS INSPECTION -
JULY 2021
207650 55536 $6,409.00
CHECK TOTAL $17,279.65
GRAND TOTAL $646,572.30
5.2.b
Packet Pg. 30
Agenda #: 5.3
Meeting Date: February 1, 2022
TO: Honorable Mayor and Members of the City Council
FROM: Daniel Fox, City Manager
TITLE: TREASURER'S STATEMENT
STRATEGIC
GOAL:
Responsible Stewardship of Public Resources
RECOMMENDATION:
Approve the December 2021 Treasurer’s Statement.
FINANCIAL IMPACT:
None.
BACKGROUND/DISCUSSION:
Consistent with City policy, the Finance Department presents the monthly Treasurer’s
Statement to the City Council for review and approval. This statement shows the cash
balances with a breakdown of various investment accounts and the yield to maturity
from investments. This statement also includes an investment portfolio management
report which details the activities of investments. All investments have been made in
accordance with the City’s Investment Policy.
PREPARED BY:
5.3
Packet Pg. 31
REVIEWED BY:
Attachments:
1. 5.3.a Treasurer Cash Report Dec 2021
2. 5.3.b Treasurer Certification and Investment Report Dec 2021
5.3
Packet Pg. 32
TOTAL CASH BREAKDOWN
Cash Funds
General Account $3,860,737.21
Payroll Account $39,509.24
Change Fund - General Fund $2,000.00
Change Fund - Prop A Fund $300.00
Petty Cash Account $500.00
Parking Account Minimum $250.00
Cash With Fiscal Agent (US Bank 2021 Bonds)$22,758.17
Total Cash Funds $3,926,054.62
Investment Funds (Book Value):
Local Agency Investment Fund $40,019,751.21
Other Fixed-Income Securities (0-5 year maturity) $11,457,731.52
Total Investment Funds $51,477,482.73
Fiscal Year-To-Date Effective Rate of Return 0.65%
FY 2021-22 Budgeted Annual Interest Earnings $622,900.00
Fiscal Year-To-Date Interest Earnings $164,179.73
Invested Funds With OPEB Trust $534,837.07
Fiscal Year-To-Date- Effective Rate of Return 3.38%
Fiscal Year-To-Date Interest Earnings $17,508.98
Total Cash and Investments $55,938,374.42
CITY OF DIAMOND BAR - CITY TREASURER'S REPORT
AS OF DECEMBER 31, 2021
5.3.a
Packet Pg. 33
5.3.bPacket Pg. 34
City of Diamond Bar
Portfolio Management
December 31, 2021
City of Diamond Bar
21810 Copley Drive
Diamond Bar, CA
(909)839-7053
Portfolio Summary
% of
Portfolio
Book
ValueInvestmentsMarket
Value
Par
Value
Days to
MaturityTerm
YTM/C
Federal Credit Union CD 993,000.00 1,6431.93 1.8399161,001,279.02993,000.00
Local Agency Investment Funds 40,019,751.21 177.74 0.230140,023,071.6540,019,751.21
Corporate Notes 1,736,353.60 1,7163.37 2.8004211,801,434.251,750,000.00
Federal Agency Callable 1,499,377.92 1,7042.91 0.7521941,500,560.501,500,000.00
Certificate of Deposit 6,429,000.00 1,79612.49 1.9355266,560,863.856,429,000.00
Municipal Bonds 800,000.00 1,5991.55 1.311768805,640.00800,000.00
51,477,482.73 100.00%Investments 51,692,849.2751,491,751.21 389 116 0.593
Current Year
December 31
26,588.49
Fiscal Year To Date
164,179.73
Average Daily Balance
Effective Rate of Return
50,072,832.50 50,360,323.69
0.65%0.63%
Total Earnings Month Ending
__________________________________________________ ____________________
Jason M. Jacobsen, Finance Director
Portfolio POOL
AP
Reporting period 12/01/2021-12/31/2021
Run Date: 01/14/2022 - 16:37 PM (PRF_PM1) 7.3.0
Report Ver. 7.3.6.1
01/26/2022
5.3.b
Packet Pg. 35
Days to
Maturity
Page 1
Par Value Book Value
Maturity
Date
Stated
RateMarket Value
December 31, 2021
Portfolio Details - Investments
Average
BalanceIssuer
Portfolio Management
City of Diamond Bar
YTM/C
TermCUSIPInvestment #
Purchase
Date
Federal Credit Union CD
1,810America's Credit Union10402 248,000.00 248,000.00 12/16/20261.35012/16/2021 248,000.00 1,82606251A3K4 1.350
1,517GREENSTATE CREDIT UNION10255 248,000.00 248,000.00 02/26/20260.65002/26/2021 245,813.38 1,82639573LAV0 0.650
30Keesler Federal Credit Union10222 249,000.00 249,000.00 01/31/20223.05001/31/2019 252,716.82 1,09649254FAG1 3.050
311Mountain Amer Fed Cr Union10207 248,000.00 248,000.00 11/08/20222.30011/08/2017 254,748.82 1,82662384RAC0 2.300
993,000.00 1,6431,001,279.02993,000.001,041,677.42Subtotal and Average 916 1.839
Local Agency Investment Funds
1Local Agency Investment Fund10028 40,019,751.21 40,019,751.21 0.23040,023,071.65 1LAIF 0.230
40,019,751.21 140,023,071.6540,019,751.2138,406,847.98Subtotal and Average 1 0.230
Corporate Notes
39Apple Inc10186 250,000.00 249,939.31 02/09/20222.15002/09/2017 252,494.25 1,826037833AY6 2.395
338Chevron Corp., Corporate Bond10214 500,000.00 496,793.60 12/05/20222.35505/30/2018 511,638.50 1,650166764AB6 2.355
655Toyota MTR Credit Corp10223 500,000.00 493,743.08 10/18/20232.25002/28/2019 519,911.50 1,69389236TDK8 3.001
465Walmart Inc.10216 500,000.00 495,877.61 04/11/20232.55006/27/2018 517,390.00 1,749931142DH3 3.251
1,736,353.60 1,7161,801,434.251,750,000.001,735,935.02Subtotal and Average 421 2.800
Federal Agency Callable
61Federal Farm Credit Bank10258 500,000.00 500,000.00 03/03/20260.79003/03/2021 499,617.00 1,8263133EMSH6 0.790
468Federal Farm Credit Bank10259 500,000.00 500,000.00 04/14/20250.69004/14/2021 503,163.00 1,4613133EMVS8 0.690
54Federal Home Loan Bank10254 500,000.00 499,377.92 02/24/20260.62502/24/2021 497,780.50 1,8263130AL7M0 0.776
1,499,377.92 1,7041,500,560.501,500,000.001,499,372.07Subtotal and Average 194 0.752
Certificate of Deposit
285Alliance Credit Union, CD10206 247,000.00 247,000.00 10/13/20222.25010/13/2017 253,259.72 1,82601859BAA3 2.251
115American Express Bank10192 247,000.00 247,000.00 04/26/20222.40004/26/2017 251,280.51 1,82602587DQ84 2.401
122American Express Bank10195 247,000.00 247,000.00 05/03/20222.35005/03/2017 251,307.93 1,82602587CEM8 2.351
117Balboa Thrift & Loan10194 248,000.00 248,000.00 04/28/20222.00004/28/2017 251,571.94 1,82605765LAL1 2.000
192Barclays Bank10204 247,000.00 247,000.00 07/12/20222.20007/12/2017 251,973.35 1,82606740KKD8 2.201
1,524BANK UNITED NA10256 248,000.00 248,000.00 03/05/20260.65003/05/2021 245,731.79 1,826066519QK8 0.000
47BMW Bank10188 248,000.00 248,000.00 02/17/20222.15002/17/2017 250,824.22 1,82605580AGE8 2.151
129Capital One Bank10196 247,000.00 247,000.00 05/10/20222.30005/10/2017 251,314.35 1,82614042RFL0 2.301
478CIT Bank10213 248,000.00 248,000.00 04/24/20233.00004/24/2018 259,826.62 1,82617312QJ67 3.002
150Comenity Capital Bank10198 248,000.00 248,000.00 05/31/20222.35005/31/2017 252,693.15 1,82620033AUB0.2.350
949EnerBank USA10230 247,000.00 247,000.00 08/07/20242.15008/07/2019 258,715.70 1,82729278TKJ8 2.152
Portfolio POOL
AP
Run Date: 01/14/2022 - 16:37 PM (PRF_PM2) 7.3.0
Report Ver. 7.3.6.1
5.3.b
Packet Pg. 36
Days to
Maturity
Page 2
Par Value Book Value
Maturity
Date
Stated
RateMarket Value
December 31, 2021
Portfolio Details - Investments
Average
BalanceIssuer
Portfolio Management
City of Diamond Bar
YTM/C
TermCUSIPInvestment #
Purchase
Date
Certificate of Deposit
227Everbank/Jacksonville FL10205 247,000.00 247,000.00 08/16/20222.20008/16/2017 252,375.71 1,82687270LAJ2 2.201
171First Bank of Highland Park10202 247,000.00 247,000.00 06/21/20222.10006/21/2017 251,454.89 1,826319141GL5 2.101
375First Source Bank10248 242,000.00 242,000.00 01/11/20231.40003/11/2020 246,239.36 1,03633646CLX0 1.401
1,711Goldman Sachs Bank10260 248,000.00 248,000.00 09/08/20261.05009/08/2021 248,000.00 1,82638149MZJ5 1.051
452Indust & Comm Bank China10212 248,000.00 248,000.00 03/29/20232.90003/29/2018 258,987.14 1,82645581EAS0 2.902
25State Bank of India10184 248,000.00 248,000.00 01/26/20222.35001/26/2017 250,812.32 1,8268562845Z3 2.351
878JP Morgan Chase10250 248,000.00 248,000.00 05/28/20251.00005/28/2020 251,544.17 1,82648128UDS5 1.001
159Medallion Bank10199 248,000.00 248,000.00 06/09/20222.15006/09/2017 252,398.28 1,82658403B6R2 2.150
396Morgan Stanley Bank10209 246,000.00 246,000.00 02/01/20232.65002/01/2018 255,028.20 1,82661747MH95 2.651
852Morgan Stanley Bank10226 246,000.00 246,000.00 05/02/20242.75005/02/2019 261,179.68 1,82761760AZR3 2.753
1,530Pathfinder Bank10257 249,000.00 249,000.00 03/11/20260.70003/11/2021 247,212.43 1,82670320KAX9 0.000
965Raymond James Bank NA10233 247,000.00 247,000.00 08/23/20242.00008/23/2019 257,732.15 1,82775472RAE1 2.002
80Sallie Mae Bank10190 247,000.00 247,000.00 03/22/20222.35003/22/2017 250,650.91 1,826795450ZW8 2.351
33Synchrony Bank10185 248,000.00 248,000.00 02/03/20222.25002/03/2017 250,749.33 1,82687164XPG5 2.251
1,712UBS Bank USA10261 248,000.00 248,000.00 09/09/20260.95009/09/2021 248,000.00 1,82690348JS92 0.000
6,429,000.00 1,7966,560,863.856,429,000.006,589,000.00Subtotal and Average 526 1.935
Municipal Bonds
882CALIF STATE HLTH FACS AUTH10252 200,000.00 200,000.00 06/01/20240.75211/04/2020 200,664.40 1,30513032UXL7 0.752
1,247CALIF STATE HLTH FACS AUTH10253 250,000.00 250,000.00 06/01/20250.95211/04/2020 250,834.00 1,67013032UXM5 0.952
1,035California St Univ Rev-Bond10251 100,000.00 100,000.00 11/01/20240.68509/17/2020 100,400.10 1,50613077DMK5 0.685
90California State HSG Fin AGY10193 250,000.00 250,000.00 04/01/20222.36704/27/2017 253,741.50 1,80013063DAD0 2.367
800,000.00 1,599805,640.00800,000.00800,000.00Subtotal and Average 768 1.311
Wells Fargo Sweep Account
1Wells Fargo10036 0.00 0.00 0.01007/01/2012 0.00 1SWEEP 0.010
0.00 00.000.000.00Subtotal and Average 0 0.000
38950,072,832.50 51,491,751.21 116 0.59351,692,849.27 51,477,482.73Total and Average
Portfolio POOL
AP
Run Date: 01/14/2022 - 16:37 PM (PRF_PM2) 7.3.0
5.3.b
Packet Pg. 37
Agenda #: 5.4
Meeting Date: February 1, 2022
TO: Honorable Mayor and Members of the City Council
FROM: Daniel Fox, City Manager
TITLE: BLACK HISTORY MONTH PROCLAMATION.
STRATEGIC
GOAL:
Safe, Sustainable & Healthy Community
RECOMMENDATION:
Adopt the Proclamation declaring February as Black History Month.
BACKGROUND:
Black History Month is an annual celebration in February which recognizes and
celebrates the significant contributions that African-Americans have made to American
history.
Historian and author Dr. Carter G. Woodson founded what has now become National
Black History Month in 1926, to remember and celebrate African American history.
Black History Month has been recognized by every U.S. President since 1976 when
Gerald Ford issued the first African-American History Month Proclamation, urging
Americans to “honor the too-often neglected accomplishments of Black Americans in
every area of endeavor throughout our history.” The Association for the Study of African
American Life and History has highlighted “Black Health and Wellness” as the theme for
2022 Black History Month.
The City of Diamond Bar is proud to honor the achievements and accomplishments of
Black Americans in our community, throughout our state, and nation.
PREPARED BY:
5.4
Packet Pg. 38
REVIEWED BY:
Attachments:
1. 5.4.a Black History Month Proclamation
5.4
Packet Pg. 39
PROCLAMATION
“BLACK HISTORY MONTH”
WHEREAS, the City of Diamond Bar recognizes and values diversity, equity, and inclusion within our
community; and
WHEREAS, Blacks and African Americans throughout the nation’s history have made countless
indelible contributions in the fields of science, medicine, law, social justice, athletics, the arts,
government, and more; and
WHEREAS, since 1976, every U.S. president has officially designated the month of February as Black
History Month to honor and affirm the importance of Black history throughout the American
experience; and
WHEREAS, the Black History Month 2022 theme, “Black Health and Wellness” explores the “legacy
of not only Black Scholars and medical practitioners in Western medicine, but also other ways of
knowing throughout the African Diaspora; and
WHEREAS, Black History Month is an opportunity to remember, reflect on, and celebrate the
important people and events who paved the way for equality and justice, to advance the civil rights of all
Americans, and to battle racism for a more inclusive and just society; and
WHEREAS, Black History Month calls on our collective need to recognize and combat racism, and to
continue to build a community that embraces all ages, races, and religions; and,
WHEREAS, Diamond Bar joins the country in honoring the achievements and accomplishments of
Black Americans who have contributed to the progress of our nation, state and city; and
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Diamond Bar does
hereby proclaim February 2022 as “BLACK HISTORY MONTH” and affirms its commitment to live
up to the ideals of freedom, equity, justice and access for all.
February 1, 2022
Ruth M. Low
Mayor
Andrew Chou Stan Liu
Mayor Pro Tem Council Member
Nancy A. Lyons Steve Tye
Council Member Council Member
5.4.a
Packet Pg. 40
Agenda #: 5.5
Meeting Date: February 1, 2022
TO: Honorable Mayor and Members of the City Council
FROM: Daniel Fox, City Manager
TITLE: SECOND AMENDMENT TO THE CONSULTANT SERVICES
AGREEMENT WITH ENVIRONMENTAL SCIENCE ASSOCIATES
(ESA), FOR A NOT-TO-EXCEED AMOUNT OF $190,980 TO PREPARE
A MITIGATED NEGATIVE DECLARATION FOR THE CROOKED
CREEK RESIDENTIAL SUBDIVISION PROJECT.
STRATEGIC
GOAL:
Open, Engaged & Responsive Government
RECOMMENDATION:
Approve and authorize the City Manager to sign Second Amendment to the Consultant
Services Agreement with Environmental Science Associates.
FINANCIAL IMPACT:
None. All costs associated with the preparation of the Initial Study/Mitigated Negative
Declaration (IS/MND) shall be borne by the applicant. The applicant will be required to
submit the total contract amount to the City. Consultant invoices will be paid out of the
developer deposit account. The proposed Second Amendment to the Consulting
Services Agreement would increase the not-to-exceed amount by $43,420 for a total of
$190,980.
BACKGROUND:
On April 7, 2020, the City executed into a Consultant Services Agreement with ESA to
provide environmental services for the Crooked Creek Residential Subdivision Project.
At the time, it was determined that an environmental impact report (EIR) would be
required as part of the environmental review. After the execution of the agreement, the
project was significantly redesigned: the number of residential lots was reduced from
eleven to seven; several retaining walls were eliminated; and the proposed extension of
Crooked Creek Road was reconfigured to follow the natural contours of the hillside,
reducing potential impacts related to aesthetics and existing biological resources. Based
on these design changes, staff determined that an EIR was no longer necessary, and
5.5
Packet Pg. 41
that an Initial Study/Mitigated Negative Declaration (IS/MND) would be the appropriate
environmental document. As a result of this determination, the First Amendment to the
original Consultant Services Agreement (“First Amendment”) was executed on
September 22, 2020.
ANALYISIS:
During the preparation of the IS/MND, revisions to the proposed project’s grading plans,
landscape plans and tree replacement plans required additional analyses to be
performed by ESA that were not anticipated in the scope of work set forth in the First
Amendment. ESA is thus requesting a Second Amendment (Attachment 1) to the
original agreement so that the additional tasks can be properly completed and invoiced.
Exhibit “A” to the Second Amendment describes the expanded scope of work in further
detail.
The total not-to-exceed compensation set forth in the First Amendment was the sum of
$147,560. This Second Amendment would increase that amount by $43,420 so that the
total not-to-exceed compensation, shall not exceed $190,980 without the prior
authorization of the City.
LEGAL REVIEW:
The City Attorney has reviewed and approved the Agreement as to form.
PREPARED BY:
REVIEWED BY:
Attachments:
1. 5.5.a Second Amendment to Consultant Services Agreement
5.5
Packet Pg. 42
1518802.1
SECOND AMENDMENT TO CONSULTANT SERVICES AGREEMENT WITH
ENVIRONMENTAL SCIENCE ASSOCIATES FOR
ENVIRONMENTAL CONSULTING SERVICES
This Second Amendment to Consultant Services Agreement (“Second Amendment”)
is executed as of February 1, 2022, by and between the City of Diamond Bar, a municipal
corporation (“City”), and Environmental Science Associates, a California corporation (herein
referred to as the “Consultant”) with reference to the following:
A. The City and the Consultant entered into that certain Consultant Services
Agreement dated as of April 7, 2020, which is incorporated herein by this reference (the
“Original Agreement”); and
B. The City and the Consultant entered into that certain First Amendment dated
as of September 22, 2020, which is incorporated herein by this reference (“First
Amendment”), which First Amendment and Original Agreement collectively are referred to
herein as the “Agreement.”
NOW, THEREFORE, the parties hereby agree as follows:
1. Defined Terms. Except as otherwise defined herein, all capitalized terms used
herein shall have the meanings set forth for such terms in the Agreement.
2. Revised Scope of Services. The Scope of Services to the First Amendment
is hereby amended, modified and supplemented to include the services described on Exhibit
"A" attached hereto and incorporated herein by this reference.
3. Compensation. The total not-to-exceed compensation set forth in Section 3
of the First Amendment was the sum of One Hundred Forty-Seven Thousand Five Hundred
Sixty Dollars ($147,560) for the preparation of a Mitigated Negative Declaration. Section 3
of the First Amendment is hereby amended to provide for an increase of Forty-Three
Thousand Four Hundred Twenty Dollars ($43,420) so that the total not-to-exceed
compensation, as amended by this Second Amendment, shall not exceed One Hundred
Ninety Thousand Nine Hundred Eighty Dollars ($190,980) without the prior authorization of
the City.
4. Integration. This Second Amendment and all attachments hereto (if any)
integrate all of the terms and conditions mentioned herein, and supersede all negotiations
with respect hereto. This Second Amendment amends, as set forth herein, the Original
Agreement and except as specifically amended hereby, the Original Agreement shall remain
in full force and effect. To the extent that there is any conflict or inconsistency between the
terms and provisions of this Second Amendment and the terms and provisions of the Original
Agreement, the terms and provisions of this Second Amendment shall control.
IN WITNESS hereof, the parties enter into this Second Amendment on the year and
day as first set forth above.
5.5.a
Packet Pg. 43
1518802.1
"Consultant" "City"
Environmental Science Associates CITY OF DIAMOND BAR
By: ______ By: ____
Ruta Thomas, Senior Vice President Dan Fox, City Manager
ATTEST:
____
Kristina Santana, City Clerk
Approved as to form:
By:____
David DeBerry, City Attorney
*NOTE:If Consultant is a corporation, the City requires the following signature(s):
--(1) the Chairman of the Board, the President or a Vice-President, AND (2) the Secretary, the
Chief Financial Officer, the Treasurer, an Assistant Secretary or an Assistant Treasurer. If only
one corporate officer exists or one corporate officer holds more than one corporate office,
please so indicate. OR
-- The corporate officer named in a corporate resolution as authorized to enter into this
Agreement. A copy of the corporate resolution, certified by the Secretary close in time to the
execution of the Agreement, must be provided to the City.
5.5.a
Packet Pg. 44
Exhibit A – Scope of Work
5.5.a
Packet Pg. 45
16755 Von Karman Avenue
Suite 200
Irvine, CA 92606
949.753.7001 phone
949.753.7002 fax
esassoc.com
January 9, 2022
Mayuko Nakajima, Associate Planner
City of Diamond Bar, Planning Division
21810 Copley Drive
Diamond Bar, CA 91765
Subject: Additional Services for Crooked Creek Residential Subdivision Mitigated Negative Declaration
Dear Ms. Nakajima:
As we have discussed over the past several months, there are services that we have provided that have been outside the
original executed contract. We decided that after receipt of the comments on the Public Review Draft Initial
Study/Mitigated Negative Declaration (IS/MND), we would submit an additional services request. These additional
services are associated with additional documentation for technical reports, CEQA reviews of the Applicant’s technical
reports, numerous revisions to the project plans that lead to revisions to the IS/MND, additional
management/coordination of the IS/MND process, and additional hours needed to respond to comments on the Public
Review Draft IS/MND than originally estimated. Following is a detailed description of each of the additional services.
Revised ESA Technical Reports
During the preparation of the IS/MND, revisions to the grading plans, landscape plans and tree replacement plans
resulted in the need to recalculate the impacts to trees meeting the City’s Tree Preservation and Protection Ordinance.
The process in determining potential impacts resulted in the need to re-review the Dudek Arborist Report as well as
overlaying the existing trees on the revised grading plans while reviewing the modification to the tree replacement
plan. Once the recalculation was completed, ESA was required to revise the December 2020 Peer Review of the
Biological Resources Assessment and Arborist Report and update the information in October 2021based on revised
plans.
In addition to supplemental biological resources documentation, the air quality, greenhouse gas and energy technical
information was required to be modified to address the revised Project description that included five assessor dwelling
units.
Project Manager/Senior Biologist 14 hours @ $240/hour $3,360
Air Quality/GHG/Energy Specialist 12 hours @ $190/hour 2,185
GIS Specialist 14 hours @ 190/hour 2,660
Project Biologist 10 hours @ $175 1,750
Subtotal $9,955
CEQA Review of Applicant’s Technical Reports
ESA reviewed various technical reports prepared by the Applicant’s consultants. ESA reviewed the original (August
2020) Preliminary Hydrology and Hydraulics (H&H) Report and the original (August 2020) Preliminary Low Impact
Development (LID) Plan. Due to modifications to the Project, two additional versions of both documents were
5.5.a
Packet Pg. 46
Ms. Nakajima
January 9, 2022
Page 2
prepared: H&H in February 2021 and May 2021 and LID Plan in January 2021 and June 2021. The additional versions
of these technical reports required CEQA reviews prior to incorporating the revised documentation into the IS/MND.
Various revisions to the Fuel Modification (FM) Plans occurred that required substantially more time than originally
estimated. Discussions with both City staff and the Applicant occurred regarding issues associated with the FM Plans.
In addition, when there was a decision to add accessory dwelling units to the Project, a revision to the Trip Generation
and VMT Screening Assessment was required. ESA provided a CEQA review of the revisions to the Assessment.
Project Manager/Senior Biologist 32 hours @ $240/hour $7,680
Subtotal $7,680
Revisions to Project Plans and Preparation of the IS/MND
During the preparation of the IS/MND, the Applicant submitted numerous revisions to the Project plans. The initial
plans that were received and used for initial evaluation were prepared in September 2020. Subsequent to the initial
plans, revised plans were submitted in March 2021, June 2021, August 2021, September 2021 and October 2021.
These revisions required various updates to the documentation within the IS/MND.
Project Manager/Senior Biologist 40 hours @ $240/hour $9,600
Air Quality/GHG/Energy Specialist 5 hours @ $190/hour 950
GIS Specialist 5 hours @ $190/hour 950
Associate 11 hours @ $125/hour 1,375
Graphics/Project Technician 27 hours @ $120/hour 3,240
Subtotal $16,115
Management/Coordination
The original scope of work assumed the preparation of an Administrative IS/MND within three months from the
Project Kickoff meeting in September 2020. Due to revisions to project plans as well as corresponding revisions to
technical reports, the timeframe to prepare the Administrative IS/MND was increased to approximately nine months to
June 2021. This increase in time required additional coordination and management among our staff, City staff and the
Applicant than originally estimated. Subsequent to the preparation of the Administrative Draft, our original estimate
was to complete the Public Review Draft within approximately two months. Due to further revisions to the Project
plans, the Public Review Draft was distributed for public review approximately five months after the submittal of the
Administrative IS/MND. This increased in time required further coordination and management than originally
estimated.
Project Manager 24 hours @ $240/hour $5,760
Subtotal $5,760
5.5.a
Packet Pg. 47
Ms. Nakajima
January 9, 2022
Page 3
Response to Comments on Draft IS/MND
The public review period for the Draft IS/MND concluded on December 20, 2021. The City received seven comment
letters. ESA’s original estimate to provide a draft version of the responses to comments was 30 hours of technical staff
time. Based on our review of the comments that were received, ESA estimates an additional 19 hours of technical staff
time beyond the original estimate of 30 hours of technical staff time to prepare the draft version of the responses to
comments.
Project Manager/Senior Biologist 9 hours @ $240/hour $2,160
Project Biologist 10 hours @ $175/hour 1,750
Subtotal $3,910
Summary
As noted above, substantial additional services were provided during the IS/MND process. Above are the detailed
breakdowns of hours by staff classification for each of the additional services. The total budget amendment is
summarized below and is $43,420.
Task Cost
Revised ESA Technical Reports $9,955
CEQA Review of Applicant’s Technical Reports 7,680
Revisions to Project Plans and Preparation of the IS/MND 16,115
Management/Coordination 5,760
Response to Comments on Draft IS/MND 3,910
Total $43,420
Please let me know if you have any questions.
Sincerely,
Michael E. Houlihan, AICP
Principal Associate
5.5.a
Packet Pg. 48
Agenda #: 5.6
Meeting Date: February 1, 2022
TO: Honorable Mayor and Members of the City Council
FROM: Daniel Fox, City Manager
TITLE: CONSULTING SERVICES AGREEMENT WITH NICHOLS
CONSULTING ENGINEERS (NCE) FOR THE DIAMOND BAR
PAVEMENT MANAGEMENT SYSTEM (PMS) UPDATE.
STRATEGIC
GOAL:
Safe, Sustainable & Healthy Community
RECOMMENDATION:
Approve, and authorize the Mayor to sign, the Consulting Service Agreements with
Nichols Consulting Engineers (NCE) in the amount of $60,200, plus a contingency
amount of $6,020, for a total authorization amount of $66,220.
FINANCIAL IMPACT:
The proposed agreement has a not-to-exceed amount of $60,200. The total cost with a
10% contingency is estimated at $66,220. Adequate funding is available for this project
in the Fiscal Year 2021-2022 Proposition C Special Fund.
BACKGROUND:
Since 1990, the City has been managing its pavement assets using a Pavement
Management System (PMS). This system provides the tools to plan and schedule
pavement maintenance and rehabilitation based on existing conditions and engineering
analysis. The system was implemented by creating an inventory using historical
construction data for all arterial and residential roadways in Diamond Bar. The roadway
inventory was then assessed in the field, and a Pavement Condition Index (PCI) was
assigned to each roadway segment. The PCI is a numerical index between 0 and 100,
with 100 representing the best possible pavement condition and 0 representing the
worst possible pavement condition. The PCI is a critical factor used to develop the
schedule for when roadways would need to be resurfaced or reconstructed.
A PMS consists of two basic components: 1) a comprehensive database that contains
current and historical information on pavement conditions, pavement structures, and
5.6
Packet Pg. 49
traffic on all City streets; and 2) a set of tools that allows us to determine existing and
future pavement conditions, and predict financial needs. This information is stored for
each pavement section in the PMS database.
Gas Tax, Measure M and Measure R Funds, Proposition C, and SB-1 Funds have been
the City's primary funding sources to maintain and rehabilitate the City streets. As such,
jurisdictions are required to certify that they have conducted and maintain a PMS when
proposing to use Prop A/C funding for roadway projects pursuant to Prop A/C
Guidelines and States and Highways Code Section 2108.1. The PMS must be updated
triennially and submitted to Metro to maintain funding eligibility. Staff utilizes the PMS to
comply with this requirement as well as help to maintain the integrity of our City street
assets.
In March 2019, the last PMS final report was updated, and the 132 centerline mile
roadway network was re-assessed. From the City's continuous investment in
maintenance of the roadways, the average citywide PCI achieved was 71 which is
considered a "good" condition, as shown by Figure 1 below.
Figure 1
DISCUSSION:
On November 11, 2021, the City issued a Request for Proposals (RFP) for professional
engineering services. The RFP requested the Consultant to design and implement an
update for the City's Pavement Management System. A total of three (3) responsive
proposals were received on December 6, 2021, from the following consulting firms:
Firm Fee
1. Applied Research Associates $92,940
2. HR Green Pacific $65,488
3. Nichols Consulting Engineers (NCE) $60,200
An evaluation committee of City staff members met to review and evaluate the
proposals using the following criteria:
• Staff Qualifications
5.6
Packet Pg. 50
• Approach/Methodology
• Level of Effort (Staffing commitment and time allocation)
• Ability to meet City's schedule and expectations
• Relevant References (Record of performance)
The staff panel agreed that NCE would best meet the project scope and schedule
demands given their qualifications, understanding of the scope of work, technical
expertise, and relevant experience. Additionally, NCE has successfully produced
multiple PMS reports for Diamond Bar, including the most recent report from 2019. The
project is scheduled to be completed by June of 2022.
LEGAL REVIEW:
The City Attorney has reviewed and approved the Agreement as to form.
PREPARED BY:
REVIEWED BY:
Attachments:
1. 5.6.a Consulting Services Agreement - NCE
5.6
Packet Pg. 51
1
CONSULTANT SERVICES AGREEMENT
THIS AGREEMENT (the "Agreement") is made as of February 1, 2022 by and
between the City of Diamond Bar, a municipal corporation ("City") and Nichols
Consulting Engineers, a Nevada corporation ("Consultant").
1. Consultant's Services.
Subject to the terms and conditions set forth in this Agreement Consultant shall
provide to the reasonable satisfaction of the City the Diamond Bar Pavement
Management System (PMS) Update services set forth in the attached Exhibit "A",
which is incorporated herein by this reference. As a material inducement to the City to
enter into this Agreement, Consultant represents and warrants that it has thoroughly
investigated the work and fully understands the difficulties and restrictions in performing
the work. Consultant represents that it is fully qualified to perform such consulting
services by virtue of its experience and the training, education and expertise of its
principals and employees.
Fabian Aoun, Associate Engineer (herein referred to as the “City’s Project
Manager”), shall be the person to whom the Consultant will report for the performance
of services hereunder. It is understood that Consultant shall coordinate its services
hereunder with the City’s Project Manager to the extent required by the City’s Project
Manager, and that all performances required hereunder by Consultant shall be
performed to the satisfaction of the City’s Project Manager and the City Manager
2. Term of Agreement. This Agreement shall take effect February 1, 2022,
and shall continue unless earlier terminated pursuant to the provisions herein.
3. Compensation. City agrees to compensate Consultant for each service
which Consultant performs to the satisfaction of City in compliance with the scope of
services set forth in Exhibit "A". Payment will be made only after submission of proper
invoices in the form specified by City. Total payment to Consultant pursuant to this
Agreement shall not exceed sixty thousand two hundred dollars ($60,200) without
the prior written consent of the City. The above not to exceed amount shall include all
costs, including, but not limited to, all clerical, administrative, overhead, telephone,
travel and all related expenses.
4. Payment.
A. As scheduled services are completed, Consultant shall submit to City an
invoice for the services completed, authorized expenses and authorized extra work
actually performed or incurred.
B. All such invoices shall state the basis for the amount invoiced, including
services completed, the number of hours spent and any extra work performed.
5.6.a
Packet Pg. 52
2
C. City will pay Consultant the amount properly invoiced within 35 days of
receipt.
D. Payment shall constitute payment in full for all services, authorized costs
and authorized extra work covered by that invoice.
5. Change Orders. No payment for extra services caused by a change in
the scope or complexity of work, or for any other reason, shall be made unless and until
such extra services and a price therefore have been previously authorized in writing and
approved by the City Manager or his designee as an amendment to this Agreement.
The amendment shall set forth the changes of work, extension of time, if any, and
adjustment of the fee to be paid by City to Consultant.
6. Priority of Documents. In the event of any inconsistency between this
Agreement and the attached exhibits, the following order of precedence shall apply: (a)
This Agreement; (b) The City's Request for Proposal, dated November 16, 2021; and
(c) Consultant's Proposal dated December 6, 2021.
7. Status as Independent Contractor.
A. Consultant is, and shall at all times remain as to City, a wholly
independent contractor. Consultant shall have no power to incur any debt, obligation, or
liability on behalf of City or otherwise act on behalf of City as an agent, except as
specifically provided herein. Neither City nor any of its agents shall have control over
the conduct of Consultant or any of Consultant's employees, except as set forth in this
Agreement. Consultant shall not, at any time, or in any manner, represent that it or any
of its agents or employees are in any manner employees of City.
B. Consultant agrees to pay all required taxes on amounts paid to Consultant
under this Agreement, and to indemnify and hold City harmless from any and all taxes,
assessments, penalties, and interest asserted against City by reason of the
independent contractor relationship created by this Agreement. In the event that City is
audited by any Federal or State agency regarding the independent contractor status of
Consultant and the audit in any way fails to sustain the validity of a wholly independent
contractor relationship between City and Consultant, then Consultant agrees to
reimburse City for all costs, including accounting and attorney's fees, arising out of such
audit and any appeals relating thereto.
C. Consultant shall fully comply with Workers' Compensation laws regarding
Consultant and Consultant's employees. Consultant further agrees to indemnify and
hold City harmless from any failure of Consultant to comply with applicable Worker's
Compensation laws.
D. Consultant shall, at Consultant’s sole cost and expense apply the
reasonable standard of care to comply with all federal, state and local governmental
permit or licensing requirements, including but not limited to the City of Diamond Bar,
South Coast Air Quality Management District, and California Air Resources Board.
5.6.a
Packet Pg. 53
3
E. In addition to any other remedies it may have, City shall have the right to
offset against the amount of any fees due to Consultant under this Agreement any
amount due to City from Consultant as a result of Consultant's failure to promptly pay to
City any reimbursement or indemnification required by this Agreement or for any
amount or penalty levied against the City for Consultant’s failure to comply with this
Section.
8. Standard of Performance. Consultant shall perform all work consistent
with and limited to the standard of care and skill ordinarily exercised by members of the
profession under similar conditions and at the same time and locality where the
Services are performed and represents that it and any subcontractors it may engage,
possess any and all licenses which are required to perform the work contemplated by
this Agreement and shall maintain all appropriate licenses during the performance of the
work.
9. Indemnification.
Consultant shall indemnify, reimburse the apportioned costs to defend with
counsel approved by City, and hold harmless City, its officers, officials, employees and
volunteers ("Indemnitees") from and against all liability, loss, pure economic damage,
expense, cost (including without limitation reasonable attorneys' fees, expert fees and
all other costs and fees of litigation) of every nature arising out of or in connection with:
(1) Any and all claims under Workers’ Compensation Act and other
employee benefit acts with respect to Consultant’s employees or Consultant’s
contractor’s employees arising out of Consultant’s work under this Agreement;
and
(2) Any and all claims to the extent caused by Consultant's negligence or
willful misconduct in the performance of any of its obligations contained in this
Agreement, regardless of City’s passive negligence, but excepting such loss or
damage which is caused by the negligence or willful misconduct of the City.
Should City in its sole discretion find Consultant’s legal counsel unacceptable,
then Consultant shall reimburse the City its costs of defense, including without
limitation reasonable attorneys' fees, expert fees and all other costs and fees of
litigation. The Consultant shall promptly pay any final judgment rendered against
the Indemnitees. It is expressly understood and agreed that the foregoing
provisions are intended to be as broad and inclusive as is permitted by the law of
the State of California and will survive termination of this Agreement. Except for
the Indemnitees, this Agreement shall not be construed to extend to any third
party indemnification rights of any kind.
(3) The Consultant's obligations to indemnify, defend and hold harmless
the City shall survive termination of this Agreement.
10. Insurance.
5.6.a
Packet Pg. 54
4
A. Consultant shall at all times during the term of this Agreement carry,
maintain, and keep in full force and effect, with an insurance company authorized to do
business in the State of California and approved by the City the following insurance:
(1) a policy or policies of broad-form comprehensive general liability
insurance written on an occurrence basis with minimum limits of $1,000,000.00
combined single limit coverage against any injury, death, loss or pure economic
damage as a result of wrongful or negligent acts by Consultant, its officers,
employees, agents, and independent contractors in performance of services
under this Agreement;
(2) property damage insurance with a minimum limit of $500,000.00 per
occurrence;
(3) automotive liability insurance written on an occurrence basis covering
all owned, non-owned and hired automobiles, with minimum combined single
limits coverage of $1,000,000.00; and
(4) Worker's Compensation insurance when required by law, with a
minimum limit of $500,000.00 or the amount required by law, whichever is
greater.
B. The City, its officers, employees, agents, and volunteers shall be named
as additional insureds on the policies as to comprehensive general liability, property
damage, and automotive liability. The policies as to comprehensive general liability,
property damage, and automobile liability shall provide that they are primary, and that
any insurance maintained by the City shall be excess insurance only.
C. All insurance policies shall provide that the insurance coverage shall not
be non-renewed, canceled, reduced, or otherwise modified (except through the addition
of additional insureds to the policy) by the insurance carrier without the insurance carrier
giving City at least ten (10) days prior written notice thereof. Consultant agrees that it
will not cancel, reduce or otherwise modify the insurance coverage and in the event of
any of the same by the insurer to immediately notify the City.
D. All policies of insurance shall cover the obligations of Consultant pursuant
to the terms of this Agreement and shall be issued by an insurance company which is
authorized to do business in the State of California or which is approved in writing by
the City; and shall be placed have a current A.M. Best's rating of no less than A-, VII.
E. Consultant shall submit to City (1) insurance certificates indicating
compliance with the minimum insurance requirements above, and (2) insurance policy
endorsements or a copy of the insurance policy evidencing the additional insured
requirements in this Agreement, in a form acceptable to the City.
5.6.a
Packet Pg. 55
5
F. Self-Insured Retention/Deductibles. All policies required by this
Agreement shall allow City, as additional insured, to satisfy the self-insured retention
(“SIR”) and/or deductible of the policy in lieu of the Consultant (as the named insured)
should Consultant fail to pay the SIR or deductible requirements. The amount of the
SIR or deductible shall be subject to the approval of the City. Consultant understands
and agrees that satisfaction of this requirement is an express condition precedent to the
effectiveness of this Agreement. Failure by Consultant as primary insured to pay its SIR
or deductible constitutes a material breach of this Agreement. Should City pay the SIR
or deductible on Consultant’s due to such failure in order to secure defense and
indemnification as an additional insured under the policy, City may include such
amounts as damages in any action against Consultant for breach of this Agreement in
addition to any other damages incurred by City due to the breach.
G. Subrogation. With respect to any Workers' Compensation Insurance or
Employer's Liability Insurance, the insurer shall waive all rights of subrogation and
contribution it may have against the Indemnitees.
H. Failure to Maintain Insurance. If Consultant fails to keep the insurance
required under this Agreement in full force and effect, City may take out the necessary
insurance and any premiums paid, plus 10% administrative overhead, shall be paid by
Consultant, which amounts may be deducted from any payments due Consultant.
I. Consultant shall include all subcontractors, if any, as insureds under its
policies or shall furnish separate certificates and endorsements for each subcontractor
to the City for review and approval. All insurance for subcontractors shall be subject to
all of the requirements stated herein.
11. Confidentiality. Consultant in the course of its duties may have access
to confidential data of City, private individuals, or employees of the City. Consultant
covenants that all data, documents, discussion, or other information developed or
received by Consultant or provided for performance of this Agreement are deemed
confidential and shall not be disclosed by Consultant without written authorization by
City. City shall grant such authorization if disclosure is required by law. All City data
shall be returned to City upon the termination of this Agreement. Consultant's covenant
under this section shall survive the termination of this Agreement. Notwithstanding the
foregoing, to the extent Consultant prepares reports of a proprietary nature specifically
for and in connection with certain projects, the City shall not, except with Consultant's
prior written consent, use the same for other unrelated projects.
12. Ownership of Materials. Except as specifically provided in this
Agreement, all materials provided by Consultant in the performance of this Agreement
shall be and remain the property of City without restriction or limitation upon its use or
dissemination by City. Consultant may, however, make and retain such copies of said
documents and materials as Consultant may desire.
13. Maintenance and Inspection of Records. In accordance with generally
accepted accounting principles, Consultant and its subcontractors shall maintain
5.6.a
Packet Pg. 56
6
reasonably full and complete books, documents, papers, accounting records, and other
information (collectively, the “records”) pertaining to the costs of and completion of
services performed under this Agreement. The City and any of their authorized
representatives shall have access to and the right to audit and reproduce any of
Consultant's records regarding the services provided under this Agreement. Consultant
shall maintain all such records for a period of at least three (3) years after termination or
completion of this Agreement. Consultant agrees to make available all such records for
inspection or audit at its offices during normal business hours and upon three (3) days'
notice from the City, and copies thereof shall be furnished if requested.
14. Conflict of Interest.
A. Consultant covenants that it presently has no interest and shall not
acquire any interest, direct or indirect, which may be affected by the services to be
performed by Consultant under this Agreement, or which would conflict in any manner
with the performance of its services hereunder. Consultant further covenants that, in
performance of this Agreement, no person having any such interest shall be employed
by it. Furthermore, Consultant shall avoid the appearance of having any interest which
would conflict in any manner with the performance of its services pursuant to this
Agreement.
B. Consultant covenants not to give or receive any compensation, monetary
or otherwise, to or from the ultimate vendor(s) of hardware or software to City as a
result of the performance of this Agreement. Consultant's covenant under this section
shall survive the termination of this Agreement.
15. Termination. The City may terminate this Agreement with or without
cause upon fifteen (15) days' written notice to Consultant. The effective date of
termination shall be upon the date specified in the notice of termination, or, in the event
no date is specified, upon the fifteenth (15th) day following delivery of the notice. In the
event of such termination, City agrees to pay Consultant for services satisfactorily
rendered prior to the effective date of termination. Immediately upon receiving written
notice of termination, Consultant shall discontinue performing services, unless the
notice provides otherwise, except those services reasonably necessary to effectuate the
termination. The City shall be not liable for any claim of lost profits.
16. Personnel/Designated Person. Consultant represents that it has, or will
secure at its own expense, all personnel required to perform the services under this
Agreement. All of the services required under this Agreement will be performed by
Consultant or under it supervision, and all personnel engaged in the work shall be
qualified to perform such services. Except as provided in this Agreement, Consultant
reserves the right to determine the assignment of its own employees to the performance
of Consultant's services under this Agreement, but City reserves the right in its sole
discretion to require Consultant to exclude any employee from performing services on
City's premises.
5.6.a
Packet Pg. 57
7
17. Prevailing Wage. Notice is hereby given that in accordance with the
provisions of California Labor Code, Division 2, Part 7, Chapter 1, Articles 1 and 2, the
Consultant is required to pay not less than the general prevailing rate of per diem wages
for work of a similar character in the locality in which the public works is performed, and
not less than the general prevailing rate of per diem wages for holiday and overtime
work. In that regard, the Director of the Department of Industrial Relations of the State
of California is required to and has determined such general prevailing rates of per diem
wages. Copies of such prevailing rates of per diem wages are on file in the Office of the
City Clerk of the City of Diamond Bar, 21810 Copley Drive, Diamond Bar, California,
and are available to any interested party on request. City also shall cause a copy of
such determinations to be posted at the job site.
The Consultant shall forfeit, as penalty to City, not more than twenty-five dollars
($25.00) for each laborer, workman or mechanic employed for each calendar day or
portion thereof, if such laborer, workman or mechanic is paid less than the general
prevailing rate of wages hereinbefore stipulated for any work done under this
Agreement, by him or by any subcontractor under him.
The Consultant and any of its subcontractors must be registered with the
Department of Industrial Relations pursuant to Labor Code section 1725.5, which
precludes the award of a contract for a public work on any public works project awarded
after April 1, 2015. This Agreement is subject to compliance monitoring and
enforcement by the Department of Industrial Relations.
18. Non-Discrimination and Equal Employment Opportunity.
A. Consultant shall not discriminate as to race, color, creed, religion, sex,
marital status, national origin, ancestry, age, physical or mental handicap, medical
condition, or sexual orientation, in the performance of its services and duties pursuant to
this Agreement, and will comply with all rules and regulations of City relating thereto.
Such nondiscrimination shall include but not be limited to the following: employment,
upgrading, demotion, transfers, recruitment or recruitment advertising; layoff or
termination; rates of pay or other forms of compensation; and selection for training,
including apprenticeship.
B. Consultant will, in all solicitations or advertisements for employees placed
by or on behalf of Consultant state either that it is an equal opportunity employer or that
all qualified applicants will receive consideration for employment without regard to race,
color, creed, religion, sex, marital status, national origin, ancestry, age, physical or
mental handicap, medical condition, or sexual orientation.
C. Consultant will cause the foregoing provisions to be inserted in all
subcontracts for any work covered by this Agreement except contracts or subcontracts
for standard commercial supplies or raw materials.
5.6.a
Packet Pg. 58
8
19. Time of Completion. Consultant agrees to commence the work provided
for in this Agreement within (5) days of being notified by the City to proceed and to
diligently prosecute completion of the work by June 15, 2022.
20. Time Is of the Essence. Time is of the essence in this Agreement.
Consultant shall do all things necessary and incidental to the prosecution of
Consultant's work.
21. Delays and Extensions of Time. Consultant's sole remedy for delays
outside its control shall be an extension of time. No matter what the cause of the delay,
Consultant must document any delay and request an extension of time in writing at the
time of the delay to the satisfaction of City. Any extensions granted shall be limited to
the length of the delay outside Consultant’s control. If Consultant believes that delays
caused by the City will cause it to incur additional costs, it must specify, in writing, why
the delay has caused additional costs to be incurred and the exact amount of such cost
within 10 days of the time the delay occurs. No additional costs can be paid that
exceed the not to exceed amount absent a written amendment to this Agreement. In no
event shall the Consultant be entitled to any claim for lost profits due to any delay,
whether caused by the City or due to some other cause.
22. Assignment. Consultant shall not assign or transfer any interest in this
Agreement nor the performance of any of Consultant's obligations hereunder, without
the prior written consent of City, and any attempt by Consultant to so assign this
Agreement or any rights, duties, or obligations arising hereunder shall be void and of no
effect.
23. Compliance with Laws. Consultant shall comply with all applicable laws,
ordinances, codes and regulations of the federal, state, and local governments.
24. Non-Waiver of Terms, Rights and Remedies. Waiver by either party of
any one or more of the conditions of performance under this Agreement shall not be a
waiver of any other condition of performance under this Agreement. In no event shall
the making by City of any payment to Consultant constitute or be construed as a waiver
by City of any breach of covenant, or any default which may then exist on the part of
Consultant, and the making of any such payment by City shall in no way impair or
prejudice any right or remedy available to City with regard to such breach or default.
25. Reserved
26. Mediation. Any dispute or controversy arising under this Agreement, or in
connection with any of the terms and conditions hereof, which cannot be resolved by
the parties, may be referred by the parties hereto for mediation. A third party, neutral
mediation service shall be selected, as agreed upon by the parties and the costs and
expenses thereof shall be borne equally by the parties hereto. The parties agree to
utilize their good faith efforts to resolve any such dispute or controversy so submitted to
mediation. It is specifically understood and agreed by the parties hereto that mutual
good faith efforts to resolve the same any dispute or controversy as provided herein,
5.6.a
Packet Pg. 59
9
shall be a condition precedent to the institution of any action or proceeding, whether at
law or in equity with respect to any such dispute or controversy.
27. Notices. Any notices, bills, invoices, or reports required by this
Agreement shall be deemed received on (a) the day of delivery if delivered by hand
during regular business hours or by facsimile before or during regular business hours;
or (b) on the third business day following deposit in the United States mail, postage
prepaid, to the addresses heretofore set forth in the Agreement, or to such other
addresses as the parties may, from time to time, designate in writing pursuant to the
provisions of this section.
“CONSULTANT” “CITY”
Nichols Consulting Engineers City of Diamond Bar
17050 Bushard Street, Suite 200 21810 Copley Drive
Fountain Valley, CA 92708 Diamond Bar, CA 91765-4178
Attn.: Charlene Palmer Attn.: Daniel Fox, City Manager
Phone: (562) 233-9507 Phone: 909-839-7010
E-Mail: CPalmer@ncenet.com E-mail: dfox@diamondbarca.gov
28. Governing Law. This Agreement shall be interpreted, construed and
enforced in accordance with the laws of the State of California. The venue for any
action brought under this Agreement shall be in Los Angeles County.
29. Counterparts. This Agreement may be executed in any number of
counterparts, each of which shall be deemed to be the original, and all of which together
shall constitute one and the same instrument.
30. Entire Agreement. This Agreement, and any other documents
incorporated herein by reference, represent the entire and integrated agreement
between Consultant and City. This Agreement supersedes all prior oral or written
negotiations, representations or agreements. This Agreement may not be amended,
nor any provision or breach hereof waived, except in a writing signed by the parties
which expressly refers to this Agreement. Amendments on behalf of the City will only
be valid if signed by a person duly authorized to do so under the City's Purchasing
Ordinance.
5.6.a
Packet Pg. 60
10
IN WITNESS of this Agreement, the parties have executed this Agreement as of
the date first written above.
"Consultant" "City"
NICHOLS CONSULTING ENGINEERS CITY OF DIAMOND BAR
By: ______ By: ____
Printed Name: Ruth M. Low, Mayor
Title:
By: ATTEST:
Printed Name:
Title:
Kristina Santana, City Clerk
Approved as to form:
By:____
David A. DeBerry, City Attorney
*NOTE: If Consultant is a corporation, the City requires the following signature(s):
-- (1) the Chairman of the Board, the President or a Vice-President, AND (2) the Secretary,
the Chief Financial Officer, the Treasurer, an Assistant Secretary or an Assistant
Treasurer. If only one corporate officer exists or one corporate officer holds more than
one corporate office, please so indicate. OR
-- The corporate officer named in a corporate resolution as authorized to enter into this
Agreement. A copy of the corporate resolution, certified by the Secretary close in time to
the execution of the Agreement, must be provided to the City.
Greg Fasiano
Principal & Secretary
Margot Yapp
President
5.6.a
Packet Pg. 61
December 6, 2021
Engineering Ser vices for the Diamond Bar
Pavement Management System (PMS) Update
City of Diamond Bar
PROPOSAL TO PROVIDE
Submitted By:
NCE
17050 Bushard Street, Suite 200
Fountain Valley, CA 92708
Phone: 714.848.8897
5.6.a
Packet Pg. 62
Fountain Valley, CA
17050 Bushard Street, Suite #200
Fountain Valley, CA 92708
(714) 848‐8897
December 6, 2021
Mr. Fabian Aoun, Associate Engineer
City of Diamond Bar
Department of Public Works
21810 Copley Drive
Diamond Bar, CA 91765
Proposal – Engineering Services for the City of Diamond Bar’s Pavement Management System (PMS) Update
Dear Mr. Aoun and Members of the Selection Committee:
Pavement networks are often the most valuable asset that a city owns. This asset is not only expensive to replace
but is an essential component to the traveling public’s safety. Cities are looking for cost‐effective ways to perform
engineering, maintenance, management, and rehabilitation of roadways more than ever before to stretch funding
allocations.
Today, there is a renewed focus on roads and transportation in California as a whole and the demand for more
accurate data is expected to grow. The last three years have seen remarkable changes in the funding picture with
the recent passage of the Road Maintenance and Rehabilitation Act (RMRA or SB 1). As a whole, Diamond Bar is
expected to receive approximately $2.6 million/year. But new revenues come with new accountability measures;
roads that will be maintained with SB 1 funds will require submittal to the California Transportation Commission for
approval. In addition, many voters supported the repeal of SB 1,
so it is even more critical that the public perceives that
maintenance be performed in the most cost‐effective manner
possible.
A robust PMS will provide the accountability that Diamond Bar
residents demand by developing cost‐effective, multi‐year
maintenance work plans.
NCE can provide the City with the means to achieve those goals.
We are a client‐focused engineering, science, planning, and
construction services firm with six offices in California and
Nevada and over 110 employees. We have extensive experience
in implementing and updating PMPs and working with cities to
maximize allocated funding. With 31 years of focus on pavement
research, design, testing, and evaluation, NCE has more
knowledge and understanding than any other pavement
consulting firm in California. Our highly trained technical staff are
experienced in data collection and has worked together on
numerous similar PMS projects and developed an excellent
reputation for dedication, integrity, productivity, quality of work
and service to our clients.
NCE has completed similar projects for over 200 public agencies
throughout California (see map to the right). With more than 100
person‐years of experience with StreetSaver®, and as a
Metropolitan Transportation Commission (MTC) certified
consultant, NCE offers the following to Diamond Bar:
5.6.a
Packet Pg. 63
Fountain Valley, CA
17050 Bushard Street, Suite #200
Fountain Valley, CA 92708
(714) 848‐8897
Previous Diamond Bar PMS Experience – NCE has successfully updated the City’s PMS since 2015. Our
proposed team can provide the City with the technical and management experience to deliver the PMS
project on schedule and within budget as we have in the past. We are familiar with City’s PMS and road
network including intersections segmentations and have established working relationships with City staff.
Familiarity with LA Metro Requirements – NCE has performed dozens of similar PMS projects for agencies
in LA County, and we routinely compile PMS reports to meet the LA Metro submittal requirements.
StreetSaver® Experience and Proficiency – The NCE team has worked with StreetSaver® for more than 30
years. We have worked with more than 200 public agencies, throughout California, Nevada, Washington,
Oregon and the nation, on similar PMS projects. We have provided both implementation, training and
technical assistance since 1997, and trained over 500 engineers, technicians, and agency staff in California.
Certified Inspectors – NCE's field inspectors and engineers are certified through the Orange County
Transportation Authority's (OCTA) and the Metropolitan Transportation Commission's (MTC) Inspector
Certification Programs. Field inspectors and engineers attend an internal re‐fresher training once a year.
Expertise in Pavement Engineering – NCE employs several pavement experts that specialize in asphalt and
concrete materials. If requested, NCE can provide a scope and fee to assist the City in developing practical
and economical solutions for maintenance and rehabilitation (M&R) as part of a budget analyses.
Innovative Pavement Strategies – NCE is on the forefront of new pavement design methods, as well as mix
designs and specifications that include warm mixes, recycling, use of rubber tires, and long‐life pavements.
Incorporating Sustainability Options – NCE has expertise to assist agency staff in the use of sustainable
materials/recycling where possible and thereby decrease green‐house gas emissions to meet AB32 goals.
Real‐life Knowledge – NCE understands local agencies’ needs and the types of problems frequently
encountered, such as lack of trained personnel or funds, budgetary concerns, and other institutional issues
inherent in the use of PMP, and the constraints and has assisted agencies in arriving at realistic solutions.
Rigorous Quality Control – NCE’s projects include a Quality Control (QC) Manager, and our engineers and
technicians undergo a mandatory internal training/calibration once a year for field condition surveys.
NCE acknowledges receipt of Addendum No. 1, dated December 3, 2021, which has been reviewed, signed and
included as an attachment in the Appendix. This proposal is valid for 90 calendar days from the date of its submittal.
Ms. Lisa K. Senn is NCE’s proposed Project Manager and single point of contact for any questions. She is located at
17050 Bushard Street, Suite 200, Fountain Valley, CA 92708 and can be reached at (714) 848‐8897 x104 or via email
at lsenn@ncenet.com. NCE looks forward to your favorable review of our proposal and the opportunity to work
again with the City of Diamond Bar.
Sincerely,
NCE
Charlene R. Palmer Lisa K. Senn
Principal Senior Project Manager
5.6.a
Packet Pg. 64
PROPOSAL
Page | 3
Firm Introduction
Founded in 1990, NCE is a client‐focused engineering, science, planning, and construction services firm with more
than 110 employees working across seven offices throughout California and Nevada. NCE has grown significantly in
expertise and capabilities beyond its origin as a transportation research and pavement management firm working
with the Federal Highway Administration (FHWA). Unique from other civil engineering firms, we have specialized
in pavement technology, including pavement management, design, and research for over 30 years. We have
performed pavement condition surveys ranging from state highways in 12 states to local street networks in over
200 cities and counties in California. We have surveyed over 100,000 miles of pavements including parking lots. Our
field data collection ranges from walking surveys as per the StreetSaver® protocols to using specialized automated
equipment to collect data such as pavement distresses, roughness, structural strength (deflection testing) to asset
data (signs, signals, curb ramps, marking, sidewalks, etc.). Additionally, NCE has teamed with märker geospatial on
numerous semi‐automated projects for municipal agencies in Southern California for close to a decade.
Sustainable and Innovative Pavement Technologies
There are numerous pavement rehabilitation techniques available today with
new binders, new additives, and polymers all of which may be applied in various
layers to preserve pavement life. NCE constantly seeks to identify the most cost‐
efficient alternatives for cities and counties, such as cold‐in‐place recycling (CIR),
full‐depth reclamation (FDR), warm mix asphalt, and terminal blend asphalt
rubber binders. Many of the technologies NCE can implement will meet potential
County sustainability or environmental goals and policies. Some examples are
described in the following paragraphs.
Sustainable pavements – NCE is involved with projects at both the national
and local levels on issues, such as sustainable pavements, and premature
failures. For example, Dr. Tom Van Dam is NCE’s Principal Investigator for
the FHWA on Sustainable Pavement Systems. He has developed technical
guidelines and a webinar series and is an internal resource for NCE when
addressing sustainability for our projects.
Cool pavements – NCE prepared a report to discuss cool pavement
alternatives for the City of Chula Vista as a means of mitigating the urban
heat island impact. This included the use of pavement alternatives, such as
porous or permeable pavements, pavers, concrete pavements, and use of
light‐colored aggregates.
Cold‐In‐Place Recycling (CIR) –
A cost‐effective alternative to
traditional mill and fill pavement treatments, cold‐in‐place recycling can
yield cost savings of as much as 30% using existing asphalt concrete (AC)
materials, which produces less truck hauling and better time efficiency
during construction.
Full‐Depth Reclamation (FDR) – Full‐depth reclamation is a process that
reconstructs failed AC pavements by recycling the existing roadway
materials. The full‐depth reclamation method recycles the materials in‐
situ and can offer significant cost savings over conventional roadway
reconstruction techniques. It is generally cost‐effective for areas as little
as 25,000 square feet.
5.6.a
Packet Pg. 65
City of Diamond Bar
Pavement Management System (PMS) Update
December 6, 2021
Page | 4
A. Project Team
Organization Chart
NCE has assembled a project team of
highly qualified individuals who have the
in‐depth knowledge and extensive local
experience implementing similar PMS
updates throughout California and the
West Coast. Our staff have expertise with
StreetSaver® as well as with Los Angeles
County Metropolitan Transportation
Authority’s requirements. NCE is
dedicated to continuous training in the
latest versions of software, design, and
construction techniques. We not only
frequently participate in such training,
but also instruct and conduct extensive
training including field distress and
software workshops to 200+ technical
staff within the engineering community.
The City can count on our team to provide superior, responsive service on this project. The NCE team is committed
to the project for its duration; personnel will not be substituted without prior approval from the City. The NCE Team
and communications structure are presented in this section and focused resumes are in the Appendix.
Roles and Responsibilities
The NCE team has completed hundreds of projects together throughout California fulfilling the following roles and
responsibilities on similar local PMS projects:
Charlene Palmer is NCE’s proposed Principal‐in‐Charge (PIC) and QC Manager for this project. Ms. Palmer
will be responsible for implementing NCE’s quality assurance management program for the project. She will
be responsible for calibration of data collection activities, review of field activities, including spot checks on
the field crews, reviewing field procedures and making changes as needed, comparing the field data
collected with on‐site conditions, review of all data entry functions, including random spot checks, review
of reports generated, and analyses performed to ensure a quality product. She will be responsible for
overseeing the project through the phases and assist in the development of the scope, budget, planning,
scheduling, coordination and quality of the project. She will assist with ensuring the proper resources are
available to successfully deliver the project and participate in key meetings. Ms. Palmer was the PIC for the
City of Diamond Bar’s 2018 PMS update.
Lisa K. Senn is NCE’s proposed Senior Project Manager. Ms. Senn will be responsible for day‐to‐day project
management and will be the City’s single point of contact. She will direct the data collection activities,
pavement condition index (PCI) calculations, budget analyses, and the preparation of reports. Ms. Senn
was the Project Manager for the City of Diamond Bar’s 2015 and 2018 PMS updates.
James Signore, PhD, PE, is NCE’s proposed Pavement Specialist. Dr. Signore will provide input regarding
appropriate treatments and experience with their application along with sustainable alternatives.
Shahram Misaghi, PE, is NCE’s proposed Senior Project Engineer. Mr. Misaghi will perform the funding
analysis and update maintenance and rehabilitation (M&R) decision trees.
Ken Huisman (märker) is NCE’s proposed Field Supervisor. Mr. Huisman will coordinate and manage all
facets of the semi‐automated survey field work, including crew coordination, survey scheduling, quality
components, and timely completion of all fieldwork collection deliverables. He has worked collectively with
the NCE team on several PMS projects using StreetSaver®.
NCE’s proposed Field Technicians will perform the functions relating to data collection and cross‐checks.
5.6.a
Packet Pg. 66
City of Diamond Bar
Pavement Management System (PMS) Update
December 6, 2021
Page | 5
Training
NCE employs experts in pavement engineering, many with advanced degrees. Each employee receives in‐house
training on our quality management plan. Our employees are active in industry groups and routinely attend
workshops and conferences that increase their technical knowledge. NCE also provides in‐house training for field
employees to receive refresher training on pavement distresses once a year. This training is conducted by Ms. Senn
and overseen by Ms. Margot Yapp, PE (PIC/QC Manager for the City’s 2015 PMS Update), focuses on the latest
ASTM protocols and methods, and builds on safety, traffic control, and emergency preparedness practices.
B. Firm’s Experience
NCE has completed over 200 identical or similar projects throughout California delivering the services the City has
requested for this project, including PMP updates for 80+ cities and counties located in Southern California alone.
This section provides examples of relevant projects completed by NCE and NCE proposed personnel that
demonstrate our PMP/PMS expertise as well as our experience and capabilities that we can provide to the City. In
addition, these projects were successfully performed for other public agencies within the greater Los Angeles area.
Pavement Management Plan (PMP) Update, Anaheim, CA (2013/20, 2021/23)
NCE updated the City of Anaheim's PAVER PMS in compliance with OCTA's Measure M
requirements from 2013 to 2021 and the contract continues through 2023. The street
network consists of approximately 584 centerline miles of pavement including 155
miles of Arterial Highway System (AHS) and 429 centerline miles of Local Street System
(LSS). NCE has performed the following project tasks:
Performing distress/condition surveys as per ASTM D6433
Collecting both ride quality (International Roughness Index) and
digital images of the pavements
Identifying missing sidewalk gaps
Implementing a rigorous QC plan for data control and delivery
Performing funding scenarios
Maintaining the current backlog of streets, i.e., PCI<40 or 12%
Maintaining current PCI: Arterial PCI of 73 and local street PCI of 69
Updating the maintenance and rehabilitation (M&R) history since
2015
Creating shapefiles and KML files with the pavement condition information
Targeting seven‐year network average Arterial PCI of 75 and PCI 71 for local streets with no more than a
12% backlog
Targeting seven‐year network average Arterial PCI of 75 and PCI 71 for local streets with backlog below 12%
Performing additional scenarios per OCTA guidelines
Preparing all reports and submittals to OCTA.
The City converted its Pavement Management database from
MicroPAVER™ to StreetSaver® in 2019 and continues to use that
software for PMP updates. This software allows for easier
analysis for Target Driven PCI’s. NCE was recently selected to
perform the 2021/2023 PMP update.
Year Report Completed: 2017, 2019, and 2021
Project Team: Lisa K. Senn – Senior Project Manager, Charlene
Palmer – Principal‐in‐Charge, Margot Yapp – QC/QA Manager,
and Ken Huisman/märker – Field Supervisor.
Owner/Client
Cesar Carrillo, PE
City of Anaheim
200 South Anaheim Boulevard
Anaheim, CA 92805
(714) 765‐5175
5.6.a
Packet Pg. 67
City of Diamond Bar
Pavement Management System (PMS) Update
December 6, 2021
Page | 6
Pavement Management Program Update and Asset Data Collection, Redondo Beach, CA (2017/19, 2020/21)
NCE converted the City of Redondo Beach’s legacy PMP to StreetSaver® in 2017
and provided updated information to the City Council. The street network
consists of about 126 centerline miles of paved streets. NCE has performed the
following project tasks:
Converted RoadMatrix database to StreetSaver®
Performing distress/condition surveys as per ASTM D6433
Implementing a rigorous QC Plan for data control and delivery
Updating the M&R history since 2015
Performing funding scenarios: ͳ Maintain current PCI
Increase the current PCI
Impacts of current funding levels
Prepare all reports and submittals for LA Metro
Presenting results to City Council.
NCE also collected non‐pavement asset data for signs (inventory and retro reflectivity), curb ramp(s) inventory,
curbs, sidewalk inventory, pavement markings, cross gutters, and manholes.
In 2020, NCE was again selected to update the City’s PMS so that SB1 funds would be effectively used. Additionally,
prior to the field work starting NCE met with staff to discuss PMP software choices. The City decided to convert to
StreetSaver®.
Year Report Completed: 2017 and 2021
Project Team: Lisa K. Sen – Senior Project Manager, Charlene Palmer – Principal‐in‐Charge/Project Manager,
Margot Yapp – QC/QA Manager, Mei‐Hui Lee – Senior Project Engineer, and Ken Huisman/märker – Field Supervisor.
Pavement Management Update and Software Conversion, Manhattan Beach, CA (2016‐2021)
NCE was selected to update their pavement management program in 2016 and is currently
conducting their 2021 update. The City had utilized the RoadMatrix software for many
years but desired a program that could be utilized by in‐house staff. After discussions with
City staff regarding their goals and objectives, NCE converted the old database to the
StreetSaver® program in 2016. NCE has performed the following project tasks:
Converted RoadMatrix database to StreetSaver®
Performed distress/condition surveys on about 104.6 miles of streets in
accordance with ASTM D6433‐11
Calculated pavement condition indexes for each street section and the entire
network
Developed maintenance and rehabilitation strategies and unit costs
Performed budgetary analyses and developed maintenance work
plan
Linked database to GIS
Prepared final reports and maps
Trained City staff on StreetSaver® software.
Year Report Completed: 2021
Project Team: Lisa K. Senn – Project Manager, Charlene Palmer – Principal‐in‐Charge, James Signore – QC/QA
Manager/Pavement Specialist, Mei‐Hui Lee – Senior Project Engineer, and Ken Huisman/märker – Field Supervisor
Owner/Client
Lauren Sablan, PE
Principal Engineer
City of Redondo Beach PWD
415 Diamond Street
Redondo Beach, CA 90277
Owner/Client
Prem Kumar, PE
City of Manhattan Beach PWD
41400 Highland Avenue
Manhattan Beach, CA 90266
(714) 765‐5175
5.6.a
Packet Pg. 68
City of Diamond Bar
Pavement Management System (PMS) Update
December 6, 2021
Page | 7
C. Project Understanding
Diamond Bar is located in the rolling terrain of eastern Los
Angeles County and was one of the first master‐planned
communities in the United States. The California SR‐57 and
SR‐60 freeway corridors traverse the mostly residential city,
and safety and promoting a sustainable and natural
environment are key elements for residents.
The SR‐57 and SR‐60 transportation corridor’s interface with
the street network is even more important with the award of
a $30 million grant from the 2021 Infrastructure for
Rebuilding America (INFRA) program. The Los Angeles County
Metropolitan Transportation Authority (Metro) partnered
with the City on the SR 57/60 interchange project and this
significant transportation corridor’s confluence project will bring the City’s street network into national focus.
NCE understands that the City of Diamond Bar is seeking proposals from consulting firms with expertise in updating
its StreetSaver® PMS. With SB 1 funding expected to add approximately $2.6 m a year to the paving budget, an up‐
to‐date PMS will be critical in assisting the City in developing funding scenarios as well as multi‐year budget and
treatment plans that are practical and cost‐effective.
Ideally, the PMS is used to prepare a multi‐year maintenance plan, which
consists of a rotating maintenance schedule using a zone improvement
approach. Currently, the City has seven zones (see map to the right). This
approach is used by many neighboring cities, as it reduces construction
costs by reducing mobilization and minimizes disruptions to businesses
and residents. NCE has performed similar analyses for Diamond Bar in
2015 and 2018 as well as for numerous other cities in California.
The street network is approximately 145 centerline miles with 1,014
pavement segments. The last PMS update was performed in 2018/19 by
NCE and had a citywide average PCI of 71, which is in the “good” category.
Based on the analysis, the City needed approximately $3.2 m to $3.6 m
annually to maintain the PCI.
The PMS update will provide City staff with two key pieces of information:
1. A multi‐year workplan, which will show the Council and the public the most cost‐effective manner of
spending new revenues such as SB 1.
2. A long‐term funding analysis to determine future needs that will help guide Council in making informed
policy decisions.
The scope of work will include the following:
Perform an update of PMS StreetSaver® database
Perform condition surveys using the semi‐automated method as per ASTM D6433
Determine PCIs for each pavement segment, provide PCI ranges per condition category
Implement a Quality Control Plan
Review and update maintenance treatments and unit costs
Develop a five‐year street maintenance and rehabilitation (M&R) list for each of the budget scenarios
Prepare a report that complies with LA Metro’s requirements
Link the City’s GIS shapefile to the StreetSaver database
Present results of the budget scenarios
5.6.a
Packet Pg. 69
City of Diamond Bar
Pavement Management System (PMS) Update
December 6, 2021
Page | 8
Scope of Work
Based on the above project understanding, the following tasks describe in more detail the approach that the NCE
team will pursue, and the Scope of Work that we propose to perform to meet the City’s needs and objectives.
Task 1: Kick‐off Meeting
NCE will first meet with City staff to kick‐off the project by reviewing the technical approach and any administrative
matters that may be necessary. At a minimum, items to be discussed will include:
Scope of work and schedule
Field work:
o Scheduling and access requirements
o Public safety concerns
o Quality Control Plan (QCP)
Available files:
o StreetSaver® database
o GIS shapefiles
o Available maps and other relevant data
o New streets to be added, if any
Maintenance practices, history and costs
Paving budgets
Other issues as appropriate
Prior to the kick‐off meeting, NCE will prepare a detailed agenda. Four additional meetings will be held at
appropriate milestones in addition to two City Council meetings. These meetings will be to discuss M&R strategies,
at the 65% level, the draft report and Council presentations. Monthly written status reports will be sent to the City
that discuss the work that has been completed and the work remaining.
Part of NCE’s value to the City is the information that we can bring and share from other agencies, and the results
based on tight budgetary constraints. We can share the perspective of our work in the California Statewide Needs
Assessment study, which included an assessment of all 529 cities and counties.
TASK 1 DELIVERABLES:
Meeting agenda and technical memorandum summarizing kick‐off meeting
Monthly Status reports
Task 2: Update Maintenance & Rehabilitation History
Prior to starting the surveys, NCE will review the current StreetSaver® database for accuracy. Quality checks include:
City maintained street verification
Limits compared to previous update
Functional classifications
Newly annexed streets
Maintenance activities since 2019
Populating the PMS database with recent maintenance &rehabilitation (M&R)
historical data is extremely useful for determining future treatments and
predicting performance of the various pavement sections. The chart provided on
the right is an example of a custom performance curve developed using historical
data. M&R activities, e.g., overlays, reconstructions and any surface seals that
have occurred since 2019 will be entered into StreetSaver®. The M&R historical
records will include the following information:
5.6.a
Packet Pg. 70
City of Diamond Bar
Pavement Management System (PMS) Update
December 6, 2021
Page | 9
Street Name and identifiers
Beginning and ending limits of work
Type of treatment
Date of treatment
TASK 2 DELIVERABLES:
Inventory report
M&R history report
Task 3: Pavement Condition Surveys
NCE/märker will perform distress collections surveys on the
145 centerline miles of street segments as per ASTM D6433‐18
protocols. The evaluation of the pavement surface distress is
based on three components:
Type is defined as ‘What kind of crack or defect is it?’
based on environmental distresses (e.g., block,
longitudinal/ transverse cracking, weathering) or load
related distresses (e.g., alligator cracking, rutting).
Severity is defined as ‘How bad is the defect?’ in terms
of the measurement or degree of wear associated with
the condition.
Extent refers to quantity or ‘How much?’ of the
pavement is affected by a particular distress.
We have seen considerable advancements in technology over the last 15 years. The assessment of pavement
condition has seen a transformation from more labor‐ intensive manual efforts to high‐speed automated surveys
that combine the use of roadway sensors and digital imagery. Our team is well positioned to collect, measure and
map all roadway data with a sophisticated automated approach using LiDAR & pavement laser scanners. Our goal
is to provide accurate, repeatable and economical pavement condition assessments.
Our mobile data collection equipment and team can collect the following (first three bullets are included in our
scope and cost):
Pavement Surface Distress
Pavement Profiling (Roughness / Rutting)
Positioning Spatial GPS & Linear Referencing
360 Right‐of‐way digital Imagery and 3D LiDAR Point Cloud Data
Mobile Collection Roadway / Roadside Asset Inventories
Sign / Pavement Marking Reflectivity
Roadway Cross Slope / Grade and Curvature
Roadway Collection Vehicle System Overview
During our roadway inspections, pavement profiling (ride quality,
rutting), GPS, and surface distress data is collected continuously
and seamlessly by our pavement technician team using our
automated data collection vehicle. Our pavement distress
data collection process involves the use of customized,
integrated keyboards, and laser scanning which are all used
to collect the type, severity, extent, start and stop points of
all the pavement surface distresses. Collection vehicle crews are typically composed of a two‐person crew traveling
in the vehicle and the crews gather visual distresses and monitor the equipment installed in the van.
5.6.a
Packet Pg. 71
City of Diamond Bar
Pavement Management System (PMS) Update
December 6, 2021
Page | 10
Street names, limits, lengths, widths, number of lanes and surface types will be field reviewed with functional
classifications reviewed in the office. Should there be any questions or variations noted, the City will be contacted
for clarification.
TASK 3 DELIVERABLES:
Updated StreetSaver® database with pavement distress data
Task 4: Quality Control Plan
Quality management practices for pavement management suggest that a one‐time inspection of the final data is
typically inadequate and involve a high risk of failure. We have recognized the importance to effectively implement
and ensure quality control and assurance practices on pavement distress data which is why NCE and märker have
teamed up once again. Together, we use a proven approach that integrates quality management and control
procedures throughout the entire data collection and delivery process.
The importance of accurate and reliable data cannot be overstated, as this leads directly to planning decisions (what
roads to repair?) as well as funding decisions and how much money is really needed?
NCE’s goal is to provide the highest quality work product for our clients. To meet this goal, a quality assurance/
quality control (QC/QA) component is incorporated into all our projects. For this project, Charlene Palmer as NCE’s
proposed QC Manager, will have the responsibility for incorporating the following QC/QA steps into our work:
Reviewing field activities, including spot checks on the field crews
Reviewing field procedures, making changes as needed
Comparing the field data collected with on‐site conditions
Reviewing all data entry functions, including spot checks
Reviewing reports generated and analyses performed to ensure high quality deliverables
NCE’s QC/QA Plan provides for a minimum of 5% of the field data to be re‐inspected by a different inspector. A
comparison of the distresses (type, severity, and quantity) will be made and at least 95% of re‐inspected sections
must be in compliance. Before the actual assessment begins, the NCE team will perform the following field QA/QC
steps as follows:
Field QA/QC Step 1: Correlation: The first step in this process is to have NCE’s
Project Manager, märker’s field manager and a field technician meet in the
field and drive a few roads and review some of the variety of pavement
conditions that exist in the City. This is required to calibrate the team’s view
of the various distresses.
Field QA/QC Step 2: Calibration: The QC team will conduct an independent
calibration of equipment used to perform pavement condition assessments
on the City’s pavement networks. This task is required to ensure that the
pavement data collected is consistent with standard protocols. Up to 25
pavement sites will be selected to the calibration. They will include a range of:
Pavement Types (AC or PCC)
Functional Classifications
Pavement condition or age
Field QA/QC Step 3: Re‐inspection “Checks”: A minimum of five percent of the sections will be re‐inspected by
other team members. Sections with a Pavement Condition Index (PCI) difference between the two assessments are
flagged for re‐inspection. At the time of re‐inspection, the actual distresses will be re‐inspected and verified, and
NCE’s pavement inspectors have undergone a rigorous certification test through both the Orange County
Transportation Authority’s (OCTA) and the Metropolitan Transportation Commission (MTC) “Inspector
Certification/Testing” programs. These cover both ASTM D6433 and StreetSaver® distress protocols.
5.6.a
Packet Pg. 72
City of Diamond Bar
Pavement Management System (PMS) Update
December 6, 2021
Page | 11
any corrections made, if necessary. Distress types and severities must be the same, and re‐measured quantities
within ±10% of the original measured quantity.
If corrections are required on more than 10% of the re‐inspected sample units, then an additional 5% will be re‐
inspected. This will continue until more than 95% of the re‐inspected sections meet the acceptability criteria. The
costs associated with additional re‐inspections due to a failure to meet the acceptance criteria will be borne by NCE.
Prior to the start of the field assessments, NCE/marker will meet with City staff to discuss City protocols for distress
collection. Lane closures are not required as part of distress collection. Typically, any stopped vehicles will be parked
in parking lanes, in nearby parking lots or on the shoulders, and will not in any way prevent the free flow of traffic.
TASK 4 DELIVERABLES:
QC/QA Plan
Task 5: PCI Report
NCE will process and upload the field survey data into StreetSaver® and the data will be verified and undergo a
rigorous quality check with any errors corrected. The PCI will be calculated, and a report will be prepared for the
City’s review.
TASK 5 DELIVERABLES:
PCI Report (electronic copy)
Task 6 – Budgetary Analysis & Draft Report (65%)
Maintenance Strategies: NCE will next review M&R strategies with City staff and include the recommendation of
appropriate treatments such as cape seals or overlays, and the determination of treatment unit costs. This will be
an appropriate time to review the use of new / sustainable treatments or materials, such as rubberized asphalt,
rubberized chip or cape seas, microsurfacing, rejuvenators, cold‐in‐place recycling, full depth reclamation, warm
mix asphalt, etc. NCE’s experience in pavement engineering
and design, as well as local conditions, allows our staff to be
able to provide the City with solutions that are innovative,
sustainable, practical, and workable.
Development of the M&R decision tree is a critical step in any
PMS update as it has a direct and significant impact on the
final work plan that is developed, as well as the budgeting
consequences. NCE’s experience in pavement engineering
and design, as well as local conditions, allows our staff to be
able to provide the City with solutions that are practical and
workable. The M&R alternatives are defined, a treatment
unit cost will be determined for each alternative. These
alternatives and costs will then be entered into the PMS
database for budgetary analysis.
The unit costs will have a huge impact on the City’s
projections or needs assessments. Therefore, NCE will review
any recent bid tabs, together with those from neighboring
cities as appropriate. Also, unit prices will be fully loaded
rates, and will include not just contractors’ prices, but also
design, inspection and testing costs.
Budgetary Analyses: NCE will then perform a Budget Needs analysis using an analysis period to be determined by
the City (typically 5 to 10 years). This will identify M&R requirements for each road section and determines the total
5.6.a
Packet Pg. 73
City of Diamond Bar
Pavement Management System (PMS) Update
December 6, 2021
Page | 12
maintenance and rehabilitation requirements over the entire analysis period. This forms the basis for performing
Budget Scenario evaluations, which optimizes the street sections for repair under constrained budgets.
The Budget Scenarios evaluation prioritizes sections for repair under constrained, realistic, budgetary assumptions.
Multiple budget‐ or target‐driven scenarios will be performed after discussions with City staff. Examples of typical
scenarios include:
Impacts of existing funding levels.
Impacts to model drops or increases in funding
Impact of SB1 funds (estimated to be $2.6 m a year by FY 2021/22)
The results will be used to develop a multi‐year rehabilitation program that includes the treatment and when it will
be applied to streets. NCE will develop a multi‐year workplan for the final selected scenario. Upon completion of
the analyses, NCE will prepare a draft report for the City to review. The report will contain, at a minimum:
Executive Summary
Introduction and methodology
Discussion of software and setup parameters
Inventory of City streets
PCI listing
Maintenance strategies and costs
M&R History Report
Results of budgetary analyses
GIS maps
Multi‐year work plan
The draft report will be submitted to the City for review in
electronic format.
TASK 6 DELIVERABLES:
M&R Decision tree
Draft 65% Report (electronic copy)
Task 7: Final Report and GIS Update
Upon receipt of the City’s comments on the draft report, NCE will make the appropriate revisions and corrections
and will submit the Final Report to the City. The Final Report will comply with LA Metro requirements. NCE will also
verify the database linkage to the GIS shapefile and prepare maps to be included in the final report. Example
provided to the right.
TASK 7 DELIVERABLES:
Final report (1 hard copy)
One (1) electronic copy of all data via flash drive
Updated StreetSaver® database with GIS links
In simple terms, the Budget Needs analysis answers the questions: “If I have unlimited funding for street
maintenance and repair, which streets should I fix? When should I fix them? What treatments should I
apply? How much will it cost?
Simply put, this module answers the question: “If I only have limited funds for street maintenance and
repair, which streets have the highest priority for repairs, when should I perform the repairs, and how much
will it cost?”
5.6.a
Packet Pg. 74
City of Diamond Bar
Pavement Management System (PMS) Update
December 6, 2021
Page | 13
Task 8: Council Presentations
Finally, NCE will prepare a presentation of the PMP update to City staff or City Council. The Council meetings can
cover a range of topics, from a short update to a more comprehensive educational/advocacy workshop, depending
on the City’s needs. NCE has recently completed similar presentations for the Cities of West Covina and Redondo
Beach. Typical maps to be presented include the examples below:
TASK 8 DELIVERABLES:
PowerPoint presentation(s)
Task 9: Focused Multi‐Year Work Plan (Optional)
As an optional task, NCE will develop a Multi‐Year M&R Work Plan; the PCI plays a role in treatment selection but
for design purposes, confirmation and refinement of proposed treatments must be performed as well as
consideration of base repair quantities, aggregation or re‐grouping of streets to maximize construction savings, and
separation/combination of surface seal or rehabilitation paving programs.
The criteria for various funding sources available to the City (i.e., Metro Measures C, R and M and local, SB 1, federal)
will be considered when selecting streets in the Work Plan. NCE will perform focused field reviews to identify the
following items for selected streets or alternative streets in the Work Plan (see example for Camarillo). The work
elements include:
Verify treatment type and project limits
Identify approximate base repair percentage or mark digouts
in the field
Identify number of ADA ramp upgrades triggered by proposed
treatments
Identify potential tripping hazards area caused by tree roots
or surface materials build‐up area near the pavement edge.
Tripping hazards area locations (house address or distance to
intersection) would be recorded in the field review.
Identify alternative newer technologies (CIR, FDR, etc.) and/or alternative surface seal treatments on cul‐
de‐sac areas
Identify excessive cracking problem and propose alternative treatments as appropriate.
Through performing multiple scenarios, NCE will generate enough candidate streets for grouping, consolidation,
removal of outlier, and determination of other conflicts. Based on the criteria agreed upon with the City, pavement
maintenance strategies and field observations, the sections selected would be grouped together geographically to
produce continuous sections for treatment and try to avoid inefficiencies with shorter and isolated street segments.
TASK 9 DELIVERABLES:
Technical memorandum summarizing work plan approach, draft and final street lists, and GIS maps
Approximate percentage of base repairs for candidate streets identified
5.6.a
Packet Pg. 75
City of Diamond Bar Pavement Management System (PMS) Update December 6, 2021 Page | 14 D. Project Scheduling Proposed Project Schedule NCE’s proposed project schedule is shown below and indicates that Tasks 1 through 7 will be completed within 4.5 months of receipt of the Notice to Proceed (NTP). NTP2 3 4 5 6 7 8 9 101112131415161718Task 1 ‐ Kick‐off and Progress MeetingsXTask 2 ‐ Update Maintenance & Rehabilitation HistoryTask 3 ‐ Pavement Condition SurveysXTask 4 ‐ Quality Control PlanTask 5 ‐ PCI ReportXTask 6 – Budgetary Analysis & Draft Report (65%)Prepare Draft ReportXSend to City for ReviewTask 7 ‐ Final Report and GIS UpdatePrepare Final ReportSend to City for ReviewAddress City Comments and FinalizeXTask 8 ‐ Council PresentationsOPTIONALTask 9 ‐ Focused Multi‐Year Work Plan (Optional)AssumptionsTask 1: Assumes 5 meetings. Task 3: Assumes review of maps prior to distress collection.Task 3: Assumes a 5 week processing time for data collections.Tasks 3 and 4: Assumes no weather delays or holidays.Task 6: Assumes City review and one revision for 65% submittal. Task 7: Assumes City review and one revision of final report.Task DescriptionWeeksTo Be Determined By the CityTo Be Determined By the City5.6.aPacket Pg. 76
City of Diamond Bar
Pavement Management System (PMS) Update
December 6, 2021
Page | 15
E. Resource Requirements
NCE’s “not‐to‐exceed” fee estimate is provided in a separate file marked “Fee Estimate,” per the requirements of
the RFP.
F. Fee Schedule
The Fee Schedule containing NCE’s hourly rates of all personnel assigned to this project is included in a separate file
along with Section E (Fee Estimate).
G. Agreement
“Exhibit A” a copy of the City’s Professional Services Agreement is in the Appendix, completed and signed. After
reviewing the professional services agreement included with the RFP, NCE respectfully requests that a few
modifications be considered, which are notated in red italics for the City’s review.
H. Insurance
NCE certifies that we have the required insurance coverage and can provide proof of insurance requirements
addressed in the professional services agreement of this Request for Proposal.
I. References
NCE has had the privilege to work with many counties, cities, and towns in California, including the City of Diamond
Bar. The following individuals and agencies are listed as NCE’s references for similar projects of scope and size which
we successfully completed. These are repeat clients, which testifies to the level of satisfaction with NCE work
products. Please see the Firm’s Experience section for full project descriptions.
Client References
Cesar Carrillo, PE,
Principal Civil Engineer
City of Anaheim
200 South Anaheim Boulevard
Anaheim, CA 92805
Tel: (714) 765‐5175
Email: ccarrillo@anaheim.net
Project: Pavement Management
Systems Update
Ms. Lauren Sablan, PE
Principal Engineer
City of Redondo Beach PWD
415 Diamond Street
Redondo Beach, CA 90277
Phone: (310) 318‐0661 x2520
Email: lauren.sablan@redondo.org
Project: Pavement Management
System & Asset Data Collection
Mr. Prem Kumar, PE
City Engineer or Ms. Adilia Miller,
PE Associate Engineer
City of Manhattan Beach PWD
1400 Highland Avenue
Manhattan Beach, CA 90266
Phone: (310) 802‐5352
Email: pkumar@citymb.info
Project: PMP Update & Conversion
5.6.a
Packet Pg. 77
APPENDIX
Appendix
Resumes
Lisa K. Senn – Senior Project Manager
Ms. Lisa K. Senn had a job in music when she agreed to help a friend’s company
with requests for information. This evolved into preparing inspections for field
crews, and, after a firm principal saw she had a knack for the work, he taught her
about deflection testing and coring. The more Ms. Senn learned, the more she
wanted to know and her career in pavement management and transportation
began. Ms. Senn’s experience includes managing projects, overseeing field
surveys and quality control procedures for cities and counties throughout
California. A natural teacher, Ms. Senn trains engineers, technicians, agencies,
and municipalities on various aspects of pavement management, software, and
field distress. A member of MTC’s software development team, she has helped
beta test new StreetSaver® modules and enhancements. She considers historical
knowledge gained on past projects yet stays up to date on developments in the
ever‐evolving area of pavement management.
Representative Projects
Multiple PMP/PMS Updates and Implementations, Various Cities and Counties,
CA. Project Manager and/or QC Manager. For PMP/PMS updates and
implementation, Ms. Senn is responsible for the analysis and QC of pavement
distress data, updating M&R decision trees and the treatment unit costs, and the
developing budget scenarios and summary reports. She has developed cost‐
effective maintenance treatments and strategies, prepared custom multiple‐year
detailed street maintenance plans and budget option reports, and linked GIS maps with management sections in
the client’s PMS database. She is an advanced user of both the MicroPAVER™ and StreetSaver® PMS software. Some
of her clients include the following California cities and counties:
Anaheim
Baldwin Park
Buena Park
Burbank
Chula Vista
Commerce
Corona
Dana Point
Diamond Bar
El Cajon
El Centro
Fresno COG
Fullerton
Garden Grove
Grover Beach
Hermosa Beach
Highland
Laguna Niguel
La Habra
Lake Forest
Lompoc
Manhattan Beach
Mission Viejo
Newport Beach
Oakley
Orange
Orange County
Pismo Beach
Poway
Redondo Beach
San Clemente
San Diego County
San Gabriel
San Luis Obispo County
San Ramon
Santa Ana
Santa Barbara
Santa Barbara County
Santa Clarita
Santa Maria
Santa Monica
Seal Beach
South Gate
Stanton
Temple City
Thousand Oaks
Torrance
Vacaville
Ventura County
West Covina
Whittier
Woodland
Pavement Management System StreetSaver® Conversion & Technical Support, County of Santa Barbara, CA.
Project Manager. Ms. Senn assisted the County with the database migration from PAVER™ to StreetSaver®. She
worked with the County to set up the maintenance and rehabilitation decision trees and unit costs, as well as the
cost breakdowns needed to run budgetary analysis for the County’s future RoadMap (County’s Road Maintenance
plan). She has worked with the County for the past 18 years and is intimately familiar with much of Santa Barbara.
She trains County staff on the functionality of the PMP software, as well as how it can be combined with the way
the County has traditionally created its maintenance work plans. The training occurs at various County offices.
Education
AA, Business Administration,
Cuesta College, 1988
Registrations/Certifications
Pavement Management
Training Levels 1 & 2, 2017
Affiliations
American Public Works
Association (APWA)
Years of Experience
23 years
5.6.a
Packet Pg. 78
City of Diamond Bar
Pavement Management System (PMS) Update
December 6, 2021
Appendix
Pavement Management Updates and Asset Management System & StreetSaver® Conversion, Orange County, CA.
Project Manager. For the current five‐year contract with the County of Orange and its contract city Dana Point (over
500 miles), Ms. Senn is responsible for quality control of collected pavement distress data, updating maintenance
and rehabilitation decision trees and the treatment unit costs, and the development of budget scenarios and
summary reports. She works closely with Cartegraph, who is contracted data collection for roads and non‐pavement
asset collection. Ms. Senn works with County and City staff to determine unit costs, applicable treatments for the
seven‐year budgeting scenarios and development of the respective street sections slated for rehabilitation over the
next seven years. The County has just approved NCE for the next project for PMS updates 2020‐2024.
Pavement Management Program Professional Services, City of Newport Beach, CA. Project Manager. The City of
Newport Beach selected NCE to perform an update of their pavement management plan with current pavement
conditions and funding analyses to inform and educate policy makers, as well as to comply with the Orange County
Transportation Authority’s Measure M2 Program. The City owns and maintains approximately 205.7 centerline
miles of pavements.
Pavement Management System Updates & StreetSaver® Conversion, City of Corona, CA. Project Manager. Ms.
Senn managed the City’s annual PMS updates that included pavement condition surveys and budgetary analyses.
In 2012 and 2013, she assisted the City as they converted from PAVER™ to StreetSaver®. This included a review of
current functional classifications, generating a list of roads needing surveys prior to conversion and helping to define
information migrated. Since that time, she has collaborated with City’s GIS department to obtain a current shapefile
for GIS integration for StreetSaver®. She also trained City staff on the use of StreetSaver®, including database entry
and how to generate GIS Maps.
Pavement Management System Update and Integration, City of Santa Monica, CA. Project Manager. The City
selected NCE to update the City’s PMS in 2016. NCE assisted the City in selecting and implementing PMS software
that best fit their current and future needs, including the maintenance and inventory of City streets to determine
street maintenance priorities. The City’s entire pavement network includes 71.4 centerline miles of arterials, 13.5
centerline miles of collectors, and 79.4 centerline miles of residentials/others.
Pavement Management System Updates & StreetSaver® Conversion, City of Corona, CA. Project Manager. Ms.
Senn managed the City’s annual PMS updates that included pavement condition surveys and budgetary analyses.
In 2012 and 2013, she assisted the City as they converted from PAVER™ to StreetSaver®. This included a review of
current functional classifications, generating a list of roads needing surveys prior to conversion and helping to define
information migrated. She collaborated with City’s GIS department to obtain a current shapefile for GIS integration
for StreetSaver®. She also trained City staff on the use of StreetSaver®.
Pavement Management System Update, City of Chula Vista, CA. Project Manager. The City updated the pavement
management condition surveys and budget analyses. The condition surveys included more than 440 centerline
miles. Ms. Senn updated the maintenance and rehabilitation strategies and treatment unit costs to accurately
reflect the effects of different multiple‐year budgets on the pavement network’s condition and the backlog of work.
She provided training for City staff members in distress collection using the StreetSaver® MobilRater® software.
Pavement Evaluation Services. Ms. Senn has managed numerous deflection testing projects. These projects
included using deflection testing to measure a pavement’s structural properties by applying a load on the pavement
and measuring the resulting deflection. In connection with deflection testing, coring was done to measure existing
pavement thicknesses to determine pavement structural capacity. Coring and R‐value testing was used in
conjunction with deflection testing and visual observations of current cracking conditions and roadside draining,
core testing provides the necessary data to provide sound repair or maintenance recommendations. She was
involved in the review traffic patterns to verify the accuracy of traffic indexes. She managed and participated in
performing classified truck counts where necessary to determine these indexes.
Asset Management. Ms. Senn has managed the collection of data related to sidewalks, curb and gutter, tree root
damage, ADA ramps, cross slopes of street segments, trip ‐fall hazards, culverts, signs, storm drains and catch
basins. These projects included visiting thousands of feet of concrete and identifying, quantifying and recording
them spatially to incorporate them on maps for future reference.
5.6.a
Packet Pg. 79
City of Diamond Bar
Pavement Management System (PMS) Update
December 6, 2021
Appendix
Charlene Palmer – Principal‐in‐Charge & QC Manager
Ms. Charlene Palmer’s brings 40+ years of extensive experience in the
engineering consulting industry for a broad base of engineering disciplines. She
is a licensed Professional Engineer in Kentucky. Charlene’s consulting experience
includes transportation, civil, rail and transit, infrastructure, water resources,
environmental, pavement, materials testing and inspection, and geotechnical
engineering. She has won and directed projects with services varying from
feasibility studies through design support during construction, construction
management and inspection services. Ms. Palmer has served as a Principal‐In‐
Charge, Quality Manager, Team Coordinator, Project or Program Manager on
many projects, including numerous PMS programs responsible for providing
project/program management and team coordination; handling and negotiating
contractual elements, leading task teams; developing scopes, project
understandings and approaches; setting budgets and schedules; providing
technical oversight; researching and preparing technical documents; and writing
training and safety manuals, and technical reports.
Representative Projects
Pavement Management Systems, Various Cities and Counties, Southern CA.
Principal‐In‐Charge. Responsible for project quality oversight and assisting with
coordination and communication with the team and the client for the:
City of Temple City 2018 Pavement Management Program Update
City of Burbank Pavement Management Program Update 2016‐2021
County of Orange 2016‐Ongoing PMP and asset management
County of Santa Barbara 2018/2020 PMS update/database development
City of Commerce PMS Update 2019
City of Manhattan Beach 2018 and 2021 PMP update
City of Diamond Bar 2018 PMP update
City of Corona 2017 PMS update and training
City of Carson 2017 PMP update, sidewalk assets, and truck route study
City of Torrance 2018 and 2021pavement and asset management system
City of Thousand Oaks 2019 PMP update
City of Anaheim 2019‐2023 Update
City of Huntington Park 2018 PMS update
City of Moreno Valley 2018 Pavement Management Update
City of Newport Beach, 2018‐2022 Pavement & Asset Management System
City of Redondo Beach 2017‐Ongoing Citywide Pavement Network Report
County of San Diego 2018‐Ongoing Pavement and Asset Management System
City of Downey 2019 Pavement Management Update
2018‐Ongoing Citywide Pavement Network Report, City of Redondo Beach, CA. Principal‐In‐Charge and Quality
Manager. Ms. Palmer was primarily responsible for project quality oversight and assisting with coordination and
communication with the team and the City for the pavement management system update and report.
2018‐2022 Pavement and Asset Management System, City of Newport Beach, CA. Principal‐In‐Charge and Quality
Manager. Ms. Palmer was primarily responsible for project quality oversight and assisting with coordination and
communication with the team and the City.
2018‐2020 Chakemco Street and Long Beach Boulevard Green Street Projects, South Gate, CA. Principal‐in‐Charge
and Senor Project Manager. As part of the Mark Thomas team, NCE provided pavement design for both projects.
Education
BS, Civil Engineering, Ohio
State University, 1981
AAS, Environmental Sciences,
MATC, 1975
Registrations/Certifications
Professional Engineer – Civil,
KY #15269
Affiliations
American Public Works
Association (APWA)
American Railway Engineering
and Maintenance‐of‐Way
Association
American Society of Civil
Engineers (ASCE)
National Society of
Professional Engineers
Women’s Transportation
Seminar
Railway Club of Southern
California, Order of the
Engineer
Years of Experience
40 years
5.6.a
Packet Pg. 80
City of Diamond Bar
Pavement Management System (PMS) Update
December 6, 2021
Appendix
James Signore, PhD, PE – Pavement Specialist
Dr. James Signore, PhD, PE, has been in the pavement field for over 25 years. He
serves is a Principal Pavement Engineer with expertise and extensive experience
in pavement design and evaluation, rehabilitation and maintenance, materials
assessment, and training. He has experience in designing pavements for many
local agencies, Caltrans, and for heavy vehicle loading applications for highways,
airfields and ports. He has spent years researching pavement materials, having
directed a state‐of‐the‐art AMRL certified and Superpave mix design equipped
research laboratory, and is well‐versed in state/local pavement practices and
specifications.
Representative Projects
On‐Call Pavement Engineering, Caltrans, Statewide, CA. Contract Manager and
Task Order Manager. Dr. Signore manages this multi‐year on‐call contract to
provide technical solutions and assist with implementing new strategies and
policies that will improve the State’s highway network. Key elements include
sustainability, forensics, design tools, performance modeling, data analysis, and
asphalt/concrete materials.
Pavement Management Program Update, City of Thousand Oaks, CA. QC
Manager. NCE performed a PMP update in 2018 with the following tasks: field
verified the pavement inventory – re‐segmented as necessary; perform distress/
condition surveys on the entire pavement network; calculate pavement
condition indices (PCI) for each street section as well as citywide; perform
budgetary analyses including five funding scenarios; develop a multi‐year
maintenance and repair work plan; prepared GIS maps to show yearly work
plans; presented final report to Council; and trained staff on StreetSaver®.
Peer Review and Management Update, City of Buena Park, CA. QC Manager.
NCE updated the City’s PMP to bring the City into compliance with OCTA’s
Measure M2 requirements. This includes pavement condition surveys of about
190 centerline miles of streets, quality control checks, reclassification of the
MPAH streets, PCI calculations and performing the budgetary analysis to prepare
the reports required by OCTA. Additionally, in 2015, the City moved its data from
the MicroPAVER™ PMS software to StreetSaver® PMP software. This change
allowed for a more detailed decision tree with costs for each functional
classification and surface type. The City has completed two cycles of updates
using StreetSaver® and provided the OCTA required PMP Update reports.
Transportation Infrastructure Rehabilitation Program, City of Davis, CA. Pavement Design Manager. Dr. Signore is
overseeing staff in the design of pavement rehabilitation treatments for eight streets throughout the City. NCE
provided civil design for these pavements. Work included preliminary and final field surveys to locate base repair
sections, potential rehabilitation strategies, and assess specific pavement conditions.
Multiple PMS/PMP Updates and Implementations, Various Cities and Counties, CA. QC Manager. Dr. Signore has
been responsible for quality control for PMS updates for many cities and counties in California. He is responsible
for the quality control of data and responsible for spot checks on the field crews during the pavement condition
surveys. Some of his current/past PMS clients include:
Buena Park
Chula Vista
Garden Grove
Elk Grove
Folsom
Lake County
Lakeport
Mission Viejo
Monterey County
San Francisco
Santa Clarita
Siskiyou County
Sonoma County
Thousand Oaks
Trinity County
Yuba City
Education
PhD, Civil Engineering,
University of Illinois – Urbana‐
Champaign, 1998
MS, Civil Engineering,
University of Illinois – Urbana‐
Champaign, 1994
BS, Electrical Engineering,
Clarkson University, 1985
Registrations/Certifications
Professional Engineer – Civil,
CA, #62647
Affiliations
Member Transportation
Research Board Committee
AFD70, Pavement
Rehabilitation
Member Transportation
Research Board Committee
AFD70‐1, Pavement Interlayer
Systems
Member Federal Aviation
Administration Pavement
Technical Working Group
Years of Experience
25 years
5.6.a
Packet Pg. 81
City of Diamond Bar
Pavement Management System (PMS) Update
December 6, 2021
Appendix
Shahram Misaghi, PE – Senior Project Engineer
For the past ten years, Mr. Shahram Misaghi has gained technical experience in
pavement rehabilitation and design through projects at various international
airfields. He serves as a Project Engineer for street projects requiring management,
maintenance, rehabilitation, design and planning. He is currently updating
pavement management systems for the Counties of Trinity, Tuolumne, and
Humboldt and the Cities of Santa Rosa, Richmond, Bakersfield and Fairfield. He has
also been involved with the roadway asset data collection for Orange County,
including signs, markings, sidewalks, curbs and gutters, traffic signals and storm
drain inlets/outlets. The Project included the creation of a geodatabase to store all
these assets and their attributes. He is well‐versed with the PAVER™ pavement
management system and was instrumental in teaching the program to 35 cities in
Orange County. Mr. Misaghi is certified by MTC to perform condition surveys.
Representative Projects
Citywide Sidewalk Assessment, City of Corona, CA. Project Engineer. NCE recently
completed a citywide assessment of approximately 700 miles of existing sidewalks
and over 4,700 curb ramps to determine compliance with the ADA requirements.
NCE developed distress criteria (i.e., faulting, vaulting, and cracking) that were
focused on tripping hazards for the sidewalks. The curb ramps were surveyed for
ADA compliance and included mid‐block ramps. In addition to the field surveys,
NCE prepared prioritized rankings based on criteria, such as proximity to schools,
senior centers, hospitals, commercial centers, and public buildings. The
deficiencies were identified, located, and assessed for severity, including tripping
hazards and appropriate recommendations for repair provided. A final report was
provided summarizing the overall condition of the City’s sidewalks, curb ramps, and gutters and included
recommendations for a five‐year completion plan.
Pavement Design, Various Clients, CA. Project Engineer. Mr. Misaghi was responsible for deflection testing,
pavement analysis and design of corridors using the Caltrans Highway Design Manual. His pavement design projects
included performing pavement analysis and design using non‐destructive pavement deflection testing in
accordance with CTM 356, pavement coring, visual pavement condition surveys and laboratory testing to assess
the pavement structural and section properties and evaluate subgrade soil conditions. In addition, a record of base
repair locations was tabulated to address subgrade failure and reviewed in detail. These multiple forms of data
were used to prepare thorough and cost‐effective pavement design recommendations.
Pavement Management Inspections, Various Locations. Project Engineer. Mr. Misaghi has been involved with
updating PMS for over 40 cities and counties in the Bay Area and Southern California. He is responsible for the
analysis and quality control of pavement distress data, updating maintenance and rehabilitation decision trees and
the treatment unit costs, and the development of budget scenarios and summary reports. He has developed the
most cost‐effective maintenance treatments and strategies, prepared custom multiple‐year detailed street
maintenance plans and budget option reports and linked GIS maps with management sections in the client’s PMS
database. He is an experienced user of the PAVER™ pavement management software. His PMS clients include:
Albany
Alameda
Anaheim
Atherton
Bakersfield
Berkeley
Camarillo
Citrus Heights
Dana Point
Dixon
El Cerrito
Fairfield
Fullerton
Humboldt County
Lake County APC
Lake Forest
Livermore
Mendocino COG
Monterey County
Pebble Beach
Richmond
San Francisco
San Ramon
Seal Beach
South Gate
Stanton
Torrance
Trinity County
Tuolumne County
West Sacramento
Walnut Creek
Yolo County
Education
MS Civil Engineering,
University of Texas, El Paso,
2011
BS Civil Engineering,
University of Science and
Technology, Tehran, 1999
Registrations/Certifications
Professional Engineer – Civil,
CA #82874
MTC StreetSaver® Rater
Certification
Years of Experience
20 years
5.6.a
Packet Pg. 82
City of Diamond Bar
Pavement Management System (PMS) Update
December 6, 2021
Appendix
Joseph De Leon – Field Technician
Mr. Joseph De Leon joined NCE in 2017 as a pavement management technician
and is experienced in collecting distress data for pavement management
systems. Apart from conducting field inspections, he has performed all functions
related to data collection and is an active participant in the quality control
process. As part of this process, he performs cross‐checks of data in the PMP
database. Mr. De Leon has performed quality control checks of field collected
data and pavement maintenance history to ensure that PMP databases are
accurate and up to date. During this process, he generates detailed reports,
needed to help perform his crosschecks of the data collected. Mr. De Leon has
also completed the Metropolitan Transportation Commission (MTC) “Distress
Identification” courses for Asphalt Concrete and Portland Cement Pavements.
Representative Projects
Pavement Asset and Management and Pavement Condition Surveys, Various
Cities and Counties, CA. Field Technician. Listed below are a collection of
agencies that he has performed condition inspections. Projects included various
forms of inspections for pavement distress data collection, such as walking,
windshield and/or semi‐automated. Some of his current/past PMS clients
include:
Baldwin Park
Buena Park
Carson
Downey
El Cajon
Elk Grove
Kings County
Lake APC
Lake Forest
Martinez
Oakland
Orange City
Orange Cove
Pacific Grove
Santa Ana
San Diego County
Sonoma County
Stockton
Thousand Oaks
Torrance
Ventura County
Education
Mendocino College
Registrations/Certifications
OCTA Pavement Inspector
Prequalification
MTC StreetSaver® Rater
Certification Program
Years of Experience
5 years
5.6.a
Packet Pg. 83
City of Diamond Bar
Pavement Management System (PMS) Update
December 6, 2021
Appendix
Ken Huisman – Field Supervisor
Mr. Huisman brings more than 27 years of experience in the pavement and
infrastructure management consulting industry. Over the course of Mr.
Huisman’s career, he has provided many aspects of infrastructure management
to government agencies across North America. During this time, Mr. Huisman has
supervised the creation of large and complex public pavement infrastructure and
GIS databases for many municipal, state, and federal projects.
Over the course of Mr. Huisman’s career, he has developed an extensive portfolio
in providing PMP services and is proficient with most off the shelf pavement
management programs in the marketplace. Mr. Huisman is routinely consulted
by various agencies to provide helpful solutions that are applied throughout the
entire life cycle of public infrastructure management. Mr. Huisman is a graduate
of the School of Engineering at Georgian College in Canada. He spent 17+ years
of his career with Stantec Consulting working his way up to Senior Associate
before founding Mission Geographic in 2007, now known as märker geospatial,
a firm dedicated to providing public works users and decision makers with a
variety of innovative and useful infrastructure asset management tools. In
summary, Mr. Huisman’s experience with various operation management
software technologies together with data collection and GIS mapping services—
such as infrastructure asset inventories, condition assessments, GIS field
infrastructure mapping, and 3D reality capture using LiDAR, has made him a great
resource for all the clients that he works with. In addition, Mr. Huisman is
certified by MTC to perform condition surveys.
Career Accolades:
Participate in the FHWA on the Long‐term Pavement Performance program
Served and helped over 220+ local government public works agencies
Aided ten (10) state and provincial governments on pavement management projects
Involved with some of the earlier high‐speed pavement profiling equipment provided in the industry
In summary, Mr. Huisman's experience with various operation management software technologies together with
data collection and GIS mapping services‐such as infrastructure asset inventories, condition assessments, GIS field
infrastructure mapping, and 3D reality capture using LiDAR, has made him a great resource for all of the clients that
he works with. Some of his clients include the following cities and counties:
City of Anaheim, CA
City of Auburn, WA
City of Augusta, GA
City of Austin, TX
City of Baldwin Park, CA
City of Beverly Hills, CA
City of Cheyenne, WY
City of Diamond Bar, CA
City of Fort Lauderdale, FL
City of Fort Worth, TX
City of Highland, CA
City of Lemoore, CA
City of Manhattan Beach, CA
City of Napa, CA
City of Newport Beach, CA
City of Norfolk, VA
City of Ottawa, CAN
City of Pekin, IL
City of Phoenix, AZ
City of Redondo Beach, CA
City of Sacramento, CA
City of Salem, OR
City of San Diego, CA
City of Thousand Oaks, CA
City of Topeka, KS
County of Adams, CO
County of Clackamas, OR
County of Clark, NV
County of Columbia, G
County of King, CA
County of Los Angeles, CA
County of Maricopa, AZ
County of Oakland, MI
County of Onondaga, NY
County of Orange, CA
County of Rio Blanco, CO
County of San Diego, CA
County of Santa Cruz, CA
County of Weld, CO
Subconsultant
märker geospatial, LLC
Education
Graduate of the School of
Engineering at Georgian
College in Canada
Registrations/Certifications
MTC StreetSaver® Rater
Certification Program
Years of Experience
27 years
5.6.a
Packet Pg. 84
City of Diamond Bar
Pavement Management System (PMS) Update
December 6, 2021
Appendix
John Zimmer – Senior Field Technician
Mr. John Zimmer is primarily responsible for much of märker geospatial LLC’s
field data collection assignments throughout the United States. Mr. Zimmer has
over 22 years of professional experience in transportation and civil engineering.
This includes the engineering design for streets and roadways, major drainage
facilities, storm sewer, sanitary sewer, and potable water distribution systems
with extensive knowledge in the field of pavement and infrastructure
management practices.
Since 1996, Mr. Zimmer has participated on numerous pavement and
infrastructure field data collection projects throughout North America and
abroad. It is during this time that Mr. Zimmer has been involved in nearly every
aspect of the project including project management, field data collection, data
processing and analysis, GIS mapping interfaces, software program
implementation, field inspection training, quality control, development and
customization of engineering models, budget programming reports, and
customer support.
Mr. Zimmer is a graduate of the University of Nevada, Las Vegas with his master’s
in engineering. He also obtained a Bachelor of Science in Environmental
Engineering at the California Polytechnic State University in San Luis Obispo, CA.
It is with Mr. Zimmer’s academic and dynamic professional project experience,
both in the field and office makes him a valuable member of the project team.
Representative Projects
Mr. Zimmer’s recent, similar project accomplishments include the following:
County of San Diego, CA (1,550 miles)
City of Colorado Springs (865 miles)
City of Augusta, GA (2,575 miles)
County of Siskiyou, CA (1,075 miles)
County of Adams, CO (575 miles)
County of Monterey (1,100 miles)
County of Madera (2,200 miles)
City of La Mesa, CA (225 miles)
City of Napa, CA (450 miles)
City of Puyallup, WA (145 miles)
Town of East Brunswick, NJ (160 miles)
City of Fort Lauderdale, FL (375 miles)
County of Clark, NV (2,250 miles)
Subconsultant
märker geospatial, LLC
Education
MS, Engineering, University of
Nevada, Las Vegas, 2006
BS, Environmental
Engineering, California State
Polytechnic University, San
Luis Obispo, 1997
Registrations/Certifications
Certified, Operation and
Maintenance of Automated
Pavement Profiler, ICC
ESRI GIS Software
Certification
Certified, Principles of
Radiation Protection
Petroleum and Minerals
Certified, Coring and
Perforation Field Engineer 1
Halliburton Energy Services
Years of Experience
22 years
5.6.a
Packet Pg. 85
'(3$570(172)38%/,&:25.6
2)),&,$/127,&(
5HTXHVWIRU3URSRVDOV
)RU
'LDPRQG%DU3DYHPHQW0DQDJHPHQW
6\VWHP3068SGDWH
$''(1'8012
7KHIROORZLQJFKDQJHVWRWKH5HTXHVWIRU3URSRVDOV5)3IRUWKHDERYHSURMHFWVKDOOEH
LQFRUSRUDWHGLQWRWKH5)3
7KH&RQVXOWDQWVKDOOVLJQWKLVSDJHDVDFNQRZOHGJHPHQWRIUHFHLSWRI$GGHQGXP1R
DQGDWWDFKLWWRWKHSURSRVDO
'DYLG*/LX3( 'DWH
'LUHFWRURI3XEOLF:RUNV&LW\(QJLQHHU
&RQVXOWDQW·V$XWKRUL]HG6LJQDWXUH
&KDUOHQH3DOPHU3ULQFLSDO
'LUHHHHHHHHHHHHHHHHHHHHHHFWRURI3XEOLF :RUNV&LW\
&RQVVVVVVVVVVVVXOXXXXXWDQW·V$XWXXKRUL]HG 6LJQ
&KKKKKKKDUDUDUDDUDUDUDUDUDUDUDUDDDUDUDDDDUDDDUDDDDDUDDDDDUDDDDUDDUDDDOHOOHOHOHOOOOHOOOOOOOOOOOOOOOQH3DOPHHHHHHU3ULQFLSDO
12/3/2021
5.6.a
Packet Pg. 86
Collaboration. Commitment. Confidence.
www.ncenet.com
5.6.a
Packet Pg. 87
Snr. Project MgrPIC / QC / QA MgrProject EngrField Tech Tech AdmMarker GeospatialTask 1: Kick‐off and Progress Meetings 20 4 20 7,600$ Task 2: Update Maintenance & Rehabilitation History4282,500$ Task 3: Pavement Condition Surveys 2 8 72 18,515$ 27,800$ Task 4: Quality Control Plan 2840 6,300$ Task 5: PCI Report21 8 2,000$ Task 6: Budgetary Analysis & Draft Report (65%) 6 2 5,200$ Task 7: Final Report and GIS Update 4 2 24 4 4,300$ Task 8: Council Presentations 10 16 2 4,500$ Totals 48 13 92 112 6 18,515$ 60,200$ OPTIONAL Task 9: Focused Multi‐Year Work Plan (Optional)AssumptionsTask 1: Includes 5 meetings with City staff. Task 2: The M&R history will be updated in this task (M&R since 2019).Task 3: Assumes 145 miles of streets to be surveyed.Task 4: Includes calibration and a 5% re‐inspection for QC.Task 6: Includes M&R treatment strategies.Task 8: Includes 2 Council presentations.Task 9: Optional task (cost estimate can be provided on request).To Be DeterminedCity of Diamond BarPavement Management System (PMS) UpdateCost ProposalHourly Breakdown by Personnel Total Cost Task DescriptionSubmitted by: NCEDate Submitted: December 6, 20215.6.aPacket Pg. 88
SCHEDULE OF CHARGES 2021 – PAVEMENT MANAGEMENT PROJECTS
PROFESSIONAL SERVICES
Principal ....................................................................... $225/hour
Associate ...................................................................... $215/hour
Senior ........................................................................ $165/hour
Project ......................................................................... $150/hour
Staff ............................................................................ $145/hour
TECHNICAL SERVICES
Senior Construction Manager* ......................... $145/($170-PW)/hour
Senior Designer ............................................................. $155/hour
CADD Designer ............................................................. $135/hour
Senior Technician* ........................................ $125/($150-PW)/hour
Construction Inspector* ................................. $130/($155-PW)/hour
CAD Technician ............................................................. $115/hour
Senior Field Scientist...................................................... $125/hour
Field Scientist ............................................................... $100/hour
Project Administrator ..................................................... $110/hour
Field/Engineering Technician* .......................... $100/($100-PW)hour
Technical Editor ............................................................. $100/hour
Technical Admin. ............................................................. $90/hour
CONTRACT LABOR
From time to time, NCE retains outside professional and technical labor
on a temporary basis to meet peak workload demands. Such contract
labor will be charged at regular Schedule charges.
LITIGATION SUPPORT
Engineer/Scientist ......................................................... $330/hour
Court Appearances & Depositions .................................... $550/hour
EQUIPMENT
Plotter Usage .............................................. (separate fee schedule)
Truck ............................................................................ $100/day
Automobile ................................... IRS Standard Mileage Rate+15%
Falling Weight Deflectometer Testing ............................. $3,500/Day
Coring ........................................................................ $4,500/Day
Environmental Equipment ............................. (separate fee schedule)
OUTSIDE SERVICES
Rental of equipment not ordinarily furnished by NCE and all other costs
such as special printing, photographic work, travel by common carrier,
subsistence, subcontractors, etc. ................................... cost + 15%
COMMUNICATION/
REPRODUCTION
In-house costs for long-distance telephone, faxing, postage, printing
and copying ........................................... project labor charges x 5%
TERMS
Billings are payable upon presentation and are past due 30 days from
invoice date. A finance charge of 1.5% per month, or the maximum
amount allowable by law, will be charged on past-due accounts. NCE
makes no warranty, either expressed or implied, as to its findings,
recommendations, specifications, or professional advice except that
they are prepared and issued in accordance with generally accepted
professional practice.
*A surcharge of $25/hour applied for technicians and construction inspectors to comply with Prevailing Wage
(PW) per requirements of California Department of Industrial Relations.
5.6.a
Packet Pg. 89