HomeMy WebLinkAboutMBE Cost Breakdown.pdfM. Brey Electric, Inc.
408 Elm Ave.
Beaumont, CA 92223
CSLB #581224 DIR #1000005926
Design Build Cost Proposal
To: City of Diamond Bar
EV Charging Stations @ City Hall
Scope of Work: Design Build installation of one (1) single -port and two (2) dual port EV Charging Stations. Work includes all labor,
material, equipment and incidentals necessary to design, engineer, supervise and install all work as required to achieve Owner requirements
Desrrptron
Unit
Cost
Engineered Drawings
LS
$
21,500.00
Project Management
LS
$
2,500.00
Mobilization
LS
$
6,200.00
Underground Distribution
LS
$
12,885.00
Concrete Bases
LS
$
2,400.00
Installation of Charging Stations
LS
$
42,247.00
Installation of Bollards/Signage/Striping
LS
$
6,000.00
Terminate/ Energize & Test
LS
$
5,600.00
Site Clean-Up/Demobilization
LS
$
9,830.00
Project As- Built Drawings
LS
$
4,200.00
Total Cost: $ 113,362.00
Comments
Subcontractor - Cal Boring, Inc.
Subcontractor - Superior Pavement Markings