Loading...
HomeMy WebLinkAboutRe_ 22819 Canyon View - As-BuiltEsmmy, I did a preliminary review with a comment list. This is a conceptual review. Afterwards they will need to submit a full plan check set. I also noted a field visit at a later date in the comments. I placed them in the completed plan checks from RKA bin. Thanks, Raymond Tao l Building Official City of Diamond Bar l Building and Safety Division 21810 Copley Drive l Diamond Bar, CA 91765-4178<x-apple-data-detectors://1/0> 909.839.7021<tel:909.839.7021> l 909.396.7486<tel:909.396.7486> (f) www.DiamondBarCA.gov<http://www.diamondbarca.gov/> [X] On Jul 25, 2019, at 2:52 PM, Esmeralda Magallanes <EMagallanes@diamondbarca.gov<mailto:EMagallanes@diamondbarca.gov>> wrote: The owners came in with an architect and designer to submit as-builts. I’m not sure if you were planning on going out to the site first with the plans before formal submittal. I took them in without a formal plan check until further direction. KU & Associates, Inc 650 Camino De Gloria Walnut, Ca 91789 * Richard Chan, AIA (909) 869-5828 ext 121 * Kai Chiu, Designer (909) 869-5828 ext 117 Since I will be out this coming Monday and Tuesday, I will leave the plans on your chair. Thank you, Esmeralda Magallanes | Permit Services Coordinator City of Diamond Bar | Building & Safety Division 21810 Copley Drive | Diamond Bar, CA 91765 (909) 839-7020 | (909) 396-7486 (f) www.DiamondBarCa.Gov<http://www.DiamondBarCa.Gov> | EMagallanes@DiamondBarCA.Gov<mailto:EMagallanes@DiamondBarCA.Gov>