HomeMy WebLinkAboutRE_ 22819 Canyon View (103).msgGood Morning Elie,
Did the architect already call to schedule a meeting with you?
Thanks,
Esmeralda Magallanes | Permit Technician
City of Diamond Bar | Building & Safety Division
21810 Copley Drive | Diamond Bar, CA 91765
(909) 839-7020 | (909) 396-7486 (f)
www.DiamondBarCa.Gov | EMagallanes@DiamondBarCA.Gov
From: Esmeralda Magallanes
Sent: Thursday, January 07, 2016 6:27 PM
To: 'Elie Nasr' <enasr@rkagroup.com>
Cc: Raymond Tao <RTao@DiamondBarCA.Gov>; 'Russ Peirson' <rpeirson@rkagroup.com>; Jeff Tol <JTol@DiamondBarCA.Gov>; Aaron Lucas <ALucas@DiamondBarCA.Gov>
Subject: FW: 22819 Canyon View
Elie,
The architect came in today to resolve some issues with the project with our Director, Greg Gubman. Due to some of these issues, it appears that we need to expedite this plan check.
You have already met with the applicant sometime last week to approve a detail for the new garage door opening. They will be contacting you sometime next week to schedule to meet
with you. Given that you have only approved a portion of the scope of work, I want to ensure that you are aware of the entire scope of work and that it’s approved as such.
· Scope of Work: Retaining Walls at new driveway, close off (E) garage door, relocate garage door (which you approved), convert (E) basement into a garage
Please let me know if you have any questions.
Thank you,
Esmeralda Magallanes | Permit Technician
City of Diamond Bar | Building & Safety Division
21810 Copley Drive | Diamond Bar, CA 91765
(909) 839-7020 | (909) 396-7486 (f)
www.DiamondBarCa.Gov<http://www.DiamondBarCa.Gov> | EMagallanes@DiamondBarCA.Gov<mailto:EMagallanes@DiamondBarCA.Gov>
From: Esmeralda Magallanes
Sent: Thursday, December 31, 2015 10:45 AM
To: 'Elie Nasr' <enasr@rkagroup.com<mailto:enasr@rkagroup.com>>; 'Russ Peirson' <rpeirson@rkagroup.com<mailto:rpeirson@rkagroup.com>>
Cc: Raymond Tao <RTao@DiamondBarCA.Gov<mailto:RTao@DiamondBarCA.Gov>>; Jeff Tol <JTol@DiamondBarCA.Gov<mailto:JTol@DiamondBarCA.Gov>>
Subject: FW: 22819 Canyon View
Sheet S-1A was submitted directly to RKA it appears on the 15th rather than submitting to City of Diamond Bar. I’m not sure when the plans returned from RKA as approved but I only see
the one sheet. Did they submit the rest of the plans? I don’t know if this needs to be routed back to Planning and Engineering.
Thanks,
Esmeralda Magallanes | Permit Technician
City of Diamond Bar | Building & Safety Division
21810 Copley Drive | Diamond Bar, CA 91765
(909) 839-7020 | (909) 396-7486 (f)
www.DiamondBarCa.Gov<http://www.DiamondBarCa.Gov> | EMagallanes@DiamondBarCA.Gov<mailto:EMagallanes@DiamondBarCA.Gov>
From: Raymond Tao
Sent: Thursday, December 17, 2015 4:00 PM
To: Jeff Tol <JTol@DiamondBarCA.Gov<mailto:JTol@DiamondBarCA.Gov>>; Esmeralda Magallanes <EMagallanes@DiamondBarCA.Gov<mailto:EMagallanes@DiamondBarCA.Gov>>
Subject: Fwd: 22819 Canyon View
Thanks,
Raymond Tao l Building Official
City of Diamond Bar l Building and Safety Division
21810 Copley Drive l Diamond Bar, CA 91765-4178<x-apple-data-detectors://1/0>
909.839.7021<tel:909.839.7021> l 909.396.7486<tel:909.396.7486> (f)
www.DiamondBarCA.gov<http://www.diamondbarca.gov/>
Begin forwarded message:
From: Ken Kurose <kenkurose@kkarch.net<mailto:kenkurose@kkarch.net>>
Date: December 18, 2015 at 7:57:32 AM GMT+9
To: Mayuko Nakajima <MNakajima@DiamondBarCA.Gov<mailto:MNakajima@diamondbarca.gov>>, "verdugoassoc@yahoo.com<mailto:verdugoassoc@yahoo.com>" <verdugoassoc@yahoo.com<mailto:verdugoassoc@yahoo.com>>,
Verdugo Mike <verdugoassociates@gmail.com<mailto:verdugoassociates@gmail.com>>
Cc: Greg Gubman <GGubman@DiamondBarCA.Gov<mailto:GGubman@diamondbarca.gov>>, Raymond Tao <RTao@DiamondBarCA.Gov<mailto:RTao@diamondbarca.gov>>, Sterling Mosley <SMosley@DiamondBarCA.Gov<mailto:SMosle
y@diamondbarca.gov>>
Subject: Re: 22819 Canyon View
Reply-To: Ken Kurose <kenkurose@kkarch.net<mailto:kenkurose@kkarch.net>>
Ms. Nakajima:
Thank you for your reply below. Unfortunately we are now in a position that essentially puts us back to square one with a design solution that is unwieldy, unsightly and cost prohibitive.
We reviewed the current solution where we eliminated the series of retaining walls back in August, 2015. As you can see on the attached Time Line, we proceeded on good faith with the
information we were given by the City of Diamond Bar. We submitted the revised plans on September 18, 2015 with Mr. Jeff Tol who said there would be a quick turnaround on the corrections
(ten working days). Unfortunately we later find out Mr. Tol was on medical leave and we did not get the corrections back until October 20, 2015, more than a month after we submitted
the plans. The only corrections we received were for the structural drawings.
We did not know there were going to be any additional corrections until November 17, 2015, over three months since our first conversation with Mr. Gubman in August. At our meeting on
December 8 with Mr. Tao, who brought you in together with Mr. Mosley, you were going to review the Planning comments as the original planner, Josue (last name?) was no longer with the
City. It was not until this week on December 15, over four months from our meeting with Mr. Gubman, that we were informed Planning will not accept the revised plan.
To bring you all up to date, yesterday we met with Mr. Elie Nsar at his office; he cleared all of the structural corrections and said he would return the approved drawings to the City
of Diamond Bar this weel. The one correction from Grading, as discussed with Mr. Mosley, was a minor one that we have taken care of. This leaves approval from Planning as the remaining
correction.
We are not writing this email to assess who is to blame or who dropped the ball, etc. We are only interested in a fair and equitable resolution that will allow the revised driveway
and new opening to the garage to be permitted. We look to the City of Diamond Bar to help us to move forward, not backwards.
Incidentally, Mike and I have discussed design solutions that will keep the revised driveway and could meet Planning requirements. We hope you can meet with us sometime tomorrow morning.
Please let me know if you have any questions; my cell is 626 824-6796.
Regards,
Ken
Ken Kurose Architect
595 Lincoln Avenue No. 205
Pasadena, California 91103
626 585-8185 tel
626 585-8172 fax
PS in my phone message this afternoon to Ms. Nakajima, I may have called you Mayumi, not Mayuko. My sincere apoligies.
________________________________
From: Mayuko Nakajima <MNakajima@DiamondBarCA.Gov<mailto:MNakajima@diamondbarca.gov>>
To: "info@kkarch.net<mailto:info@kkarch.net>" <info@kkarch.net<mailto:info@kkarch.net>>; "verdugoassoc@yahoo.com<mailto:verdugoassoc@yahoo.com>" <verdugoassoc@yahoo.com<mailto:verdugoassoc@yahoo.com>
>
Sent: Tuesday, December 15, 2015 4:28 PM
Subject: 22819 Canyon View
Hello Mr. Verdugo and Mr. Kurose,
Thanks for giving me the opportunity to look into the matter. I spoke with both Grace Lee, Senior Planner, and Community Development Director, Greg Gubman, regarding this project Plot
Plan PL2014-211 on 22819 Canyon View.
Unfortunately, the deck needs to remain in order for the residence to meet the 35 foot height limit required by the Development Code.
Also, Greg does not recall an agreement to change the previously approved plans by removing the deck and retaining walls.
Therefore, Planning cannot approve the plan check as submitted. Please revise per the plan check correction sheet.
Please let me know how I can assist further. Thank you,
Mayuko Nakajima | Associate Planner
Community Development Department | Planning Division
City of Diamond Bar | 21810 Copley Drive | Diamond Bar, CA 91765
909.839.7033 | 909.861.3117 (fax)
MNakajima@DiamondBarCA.gov<mailto:MNakajima@diamondbarca.gov> | www.DiamondBarCA.gov<http://www.diamondbarca.gov>
________________________________
Confidential Communications
The information contained in this e-mail message is intended only for the use of the individual or individuals named above. If the person actually receiving this message or any other
reader of the message is not the named recipient or the employee or agent responsible to deliver it to the named recipient, any use, dissemination, distribution, or copying of the communication
is strictly prohibited. If you have received this communication in error, please immediately destroy AND notify us by telephone at 909.839.7080.
癥汥灯敭瑮䌠摯㰠猯慰㹮猼慰瑳汹㵥昧湯慦業祬∺效癬瑥捩≡猬湡敳楲㭦潣潬㩲汢捡❫㰾㩯㹰⼼㩯㹰⼼灳湡㰾瀯㰾搯癩㰾楤⁶摩∽畹彩弳㘱たㅟㅟ㔴㌰〹〲ㄴ〴㑟㤰∹㰾⁰汣獡㵳獍乯牯慭瑳汹㵥戧捡杫潲湵㩤桷瑩❥㰾灳湡猠祴敬✽潦瑮昭浡汩㩹䠢汥敶楴慣Ⱒ慳獮猭牥晩挻汯牯⌺㈵㈵㈵㸧渦獢㭰⼼灳湡㰾灳湡猠祴敬✽潦瑮昭浡汩㩹䠢汥敶楴慣Ⱒ慳獮猭牥晩挻汯牯戺慬正㸧漼瀺㰾漯瀺㰾猯慰㹮⼼㹰⼼楤㹶搼癩椠㵤礢極㍟ㅟ弶弰弱㐱〵㤳㈰㐰㐱
弰㌴㌲㸢瀼挠慬獳䴽潳潎浲污猠祴敬✽慢正牧畯摮眺楨整㸧猼慰瑳汹㵥昧湯慦業祬∺效癬瑥捩≡猬湡敳楲㭦潣潬㩲㔣㔲㔲✲䄾獬Ɐ䜠敲潤獥渠瑯爠捥污湡愠牧敥敭瑮琠档湡敧琠敨瀠敲楶畯汳⁹灡牰癯摥瀠慬獮戠⁹敲潭楶杮琠敨搠捥湡敲慴湩湩慷汬㰠猯慰㹮猼慰瑳汹㵥昧湯慦業祬∺效癬瑥捩≡猬湡敳楲㭦潣潬㩲汢捡❫㰾㩯㹰⼼㩯㹰⼼灳湡㰾瀯㰾搯癩㰾楤⁶摩∽畹彩弳㘱たㅟㅟ㔴㌰〹〲ㄴ〴㑟㤳∲㰾⁰汣獡㵳獍乯牯慭瑳汹
㵥戧捡杫潲湵㩤桷瑩❥㰾灳湡猠祴敬✽潦瑮昭浡汩㩹䠢汥敶楴慣Ⱒ慳獮猭牥晩挻汯牯⌺㈵㈵㈵㸧渦獢㭰⼼灳湡㰾灳湡猠祴敬✽潦瑮昭浡汩㩹䠢汥敶楴慣Ⱒ慳獮猭牥晩挻汯牯戺慬正㸧漼瀺㰾漯瀺㰾猯慰㹮⼼㹰⼼楤㹶搼癩椠㵤礢極㍟ㅟ弶弰弱㐱〵㤳㈰㐰㐱弰〴㠹㸢瀼挠慬獳䴽潳潎浲污猠祴敬✽慢正牧畯摮眺楨整㸧猼慰瑳汹㵥昧湯慦業祬∺效癬瑥捩≡猬湡敳楲㭦潣潬㩲㔣㔲㔲✲吾敨敲潦敲汐湡楮杮挠湡潮⁴灡牰癯桴汰湡挠敨正愠畳浢瑩整
倠敬獡敲楶敳瀠牥琠敨瀠慬档捥潣牲捥楴湯猠敨瑥⼼灳湡㰾灳湡猠祴敬✽潦瑮昭浡汩㩹䠢汥敶楴慣Ⱒ慳獮猭牥晩挻汯牯戺慬正㸧漼瀺㰾漯瀺㰾猯慰㹮⼼㹰⼼楤㹶搼癩椠㵤礢極㍟ㅟ弶弰弱㐱〵㤳㈰㐰㐱弰㌴㌹㸢瀼挠慬獳䴽潳潎浲污猠祴敬✽慢正牧畯摮眺楨整㸧猼慰瑳汹㵥昧湯慦業祬∺效癬瑥捩≡猬湡敳楲㭦潣潬㩲㔣㔲㔲✲☾扮灳㰻猯慰㹮猼慰瑳汹㵥昧湯慦業祬∺效癬瑥捩≡猬湡敳楲㭦潣潬㩲汢捡❫㰾㩯㹰⼼㩯㹰⼼灳湡㰾瀯㰾搯癩
㰾楤⁶摩∽畹彩弳㘱たㅟㅟ㔴㌰〹〲ㄴ〴㑟㤰∶㰾⁰汣獡㵳獍乯牯慭瑳汹㵥戧捡杫潲湵㩤桷瑩❥㰾灳湡猠祴敬✽潦瑮昭浡汩㩹䠢汥敶楴慣Ⱒ慳獮猭牥晩挻汯牯⌺㈵㈵㈵㸧汐慥敳氠瑥洠湫睯栠睯䤠挠湡愠獳獩⁴畦瑲敨吠慨歮礠畯㰬猯慰㹮猼慰瑳汹㵥昧湯慦業祬∺效癬瑥捩≡猬湡敳楲㭦潣潬㩲汢捡❫㰾㩯㹰⼼㩯㹰⼼灳湡㰾瀯㰾搯癩㰾楤⁶摩∽畹彩弳㘱たㅟㅟ㔴㌰〹〲ㄴ〴㑟㤳∵㰾⁰汣獡㵳獍乯牯慭瑳汹㵥戧捡杫潲湵㩤桷瑩❥㰾灳湡猠祴敬
✽潦瑮昭浡汩㩹䠢汥敶楴慣Ⱒ慳獮猭牥晩挻汯牯⌺㈵㈵㈵㸧渦獢㭰⼼灳湡㰾灳湡猠祴敬✽潦瑮昭浡汩㩹䠢汥敶楴慣Ⱒ慳獮猭牥晩挻汯牯戺慬正㸧漼瀺㰾漯瀺㰾猯慰㹮⼼㹰⼼楤㹶搼癩椠㵤礢極㍟ㅟ弶弰弱㐱〵㤳㈰㐰㐱弰〴㔹㸢瀼挠慬獳䴽潳潎浲污猠祴敬✽慢正牧畯摮眺楨整㸧戼㰾灳湡猠祴敬✽潦瑮昭浡汩㩹䠢汥敶楴慣Ⱒ慳獮猭牥晩挻汯牯⌺䈳㠳㠳㸧慍畹潫丠歡橡浩⼼灳湡㰾戯㰾灳湡猠祴敬✽潦瑮昭浡汩㩹䠢汥敶楴慣Ⱒ慳獮猭牥晩挻汯牯⌺䈳㠳㠳㸧⁼
獁潳楣瑡汐湡敮㱲猯慰㹮猼慰瑳汹㵥昧湯慦業祬∺效癬瑥捩≡猬湡敳楲㭦潣潬㩲汢捡❫㰾㩯㹰⼼㩯㹰⼼灳湡㰾瀯㰾搯癩㰾楤⁶摩∽畹彩弳㘱たㅟㅟ㔴㌰〹〲ㄴ〴㑟㤳∹㰾⁰汣獡㵳獍乯牯慭瑳汹㵥戧捡杫潲湵㩤桷瑩❥㰾㹢猼慰瑳汹㵥昧湯慦業祬∺效癬瑥捩≡猬湡敳楲㭦潣潬㩲㌣㍂㌸✸䌾浯畭楮祴䐠癥汥灯敭瑮䐠灥牡浴湥㱴猯慰㹮⼼㹢猼慰瑳汹㵥昧湯慦業祬∺效癬瑥捩≡猬湡敳楲㭦潣潬㩲㌣㍂㌸✸‾⁼汐湡楮杮䐠癩獩潩㱮猯慰㹮
猼慰瑳汹㵥昧湯慦業祬∺效癬瑥捩≡猬湡敳楲㭦潣潬㩲汢捡❫㰾㩯㹰⼼㩯㹰⼼灳湡㰾瀯㰾搯癩㰾楤⁶摩∽畹彩弳㘱たㅟㅟ㔴㌰〹〲ㄴ〴㑟㤰∴㰾⁰汣獡㵳獍乯牯慭瑳汹㵥戧捡杫潲湵㩤桷瑩❥㰾㹢猼慰瑳汹㵥昧湯慦業祬∺效癬瑥捩≡猬湡敳楲㭦潣潬㩲㌣㍂㌸✸䌾瑩⁹景䐠慩潭摮䈠牡㰠猯慰㹮⼼㹢猼慰瑳汹㵥昧湯慦業祬∺效癬瑥捩≡猬湡敳楲㭦潣潬㩲㌣㍂㌸✸簾㈠㠱〱䌠灯敬⁹牄癩⁼楄浡湯慂Ⱳ䌠⁁ㄹ㘷㰵猯慰㹮猼慰瑳汹㵥
昧湯慦業祬∺效癬瑥捩≡猬湡敳楲㭦潣潬㩲汢捡❫㰾㩯㹰⼼㩯㹰⼼灳湡㰾瀯㰾搯癩㰾楤⁶摩∽畹彩弳㘱たㅟㅟ㔴㌰〹〲ㄴ〴㑟㠰∶㰾⁰汣獡㵳獍乯牯慭瑳汹㵥戧捡杫潲湵㩤桷瑩❥㰾灳湡猠祴敬✽潦瑮昭浡汩㩹䠢汥敶楴慣Ⱒ慳獮猭牥晩挻汯牯⌺䈳㠳㠳㸧〹⸹㌸⸹〷㌳簠㤠㤰㠮ㄶ㌮ㄱ‷昨硡
⼼灳湡㰾灳湡猠祴敬✽潦瑮昭浡汩㩹䠢汥敶楴慣Ⱒ慳獮猭牥晩挻汯牯戺慬正㸧漼瀺㰾漯瀺㰾猯慰㹮⼼㹰⼼楤㹶搼癩椠㵤礢極㍟ㅟ弶弰弱㐱〵㤳㈰㐰㐱弰㈶㜱㸢瀼挠慬獳䴽潳潎浲污猠祴敬✽慢正牧畯摮眺楨整㸧甼㰾灳湡猠祴敬✽潦瑮昭浡汩㩹䠢汥敶楴慣Ⱒ慳獮猭牥晩挻汯牯⌺䈳㠳㠳㸧愼栠敲㵦洢楡瑬㩯乍歡橡浩䁡楤浡湯扤牡慣朮癯㸢乍歡橡浩䁡楄浡湯䉤牡䅃朮癯⼼㹡⼼灳湡㰾甯㰾灳湡猠祴敬✽潦瑮昭浡汩㩹䠢汥敶楴慣Ⱒ慳獮猭牥晩挻汯牯⌺䈳㠳㠳㸧簠
㰠㹵愼栠敲㵦栢瑴㩰⼯睷楤浡湯扤牡慣朮癯㸢睷楄浡湯䉤牡䅃朮癯⼼㹡⼼㹵⼼灳湡㰾灳湡猠祴敬✽潦瑮昭浡汩㩹䠢汥敶楴慣Ⱒ慳獮猭牥晩挻汯牯戺慬正㸧漼瀺㰾漯瀺㰾猯慰㹮⼼㹰⼼楤㹶搼癩椠㵤礢極㍟ㅟ弶弰弱㐱〵㤳㈰㐰㐱弰㈶㘱㸢瀼挠慬獳䴽潳潎浲污猠祴敬✽慢正牧畯摮眺楨整㸧猼慰瑳汹㵥昧湯慦業祬∺效癬瑥捩≡猬湡敳楲㭦潣潬㩲汢捡❫☾扮灳㰻㩯㹰⼼㩯㹰⼼灳湡㰾瀯㰾搯癩㰾搯癩㰾⁰汣獡㵳獍乯牯慭瑳汹㵥戧捡杫潲湵㩤桷瑩❥㰾
灳湡猠祴敬✽潦瑮昭浡汩㩹䠢汥敶楴慣Ⱒ慳獮猭牥晩挻汯牯戺慬正㸧漼瀺☾扮灳㰻漯瀺㰾猯慰㹮⼼㹰搼癩挠慬獳䴽潳潎浲污愠楬湧挽湥整瑳汹㵥琧硥污杩㩮散瑮牥戻捡杫潲湵㩤桷瑩❥㰾灳湡猠祴敬✽潦瑮昭浡汩㩹䠢汥敶楴慣Ⱒ慳獮猭牥晩挻汯牯戺慬正㸧格楳敺㈽眠摩桴∽〱┰•污杩㵮散瑮牥㰾猯慰㹮⼼楤㹶瀼挠慬獳䴽潳潎浲污猠祴敬✽慢正牧畯摮眺楨整㸧猼慰瑳汹㵥昧湯楳敺ㄺ⸰瀰㭴潦瑮昭浡汩㩹䄢楲污Ⱒ慳獮猭牥晩挻汯牯机慲❹䌾湯楦
敤瑮慩潃浭湵捩瑡潩獮戼㹲戼㹲桔湩潦浲瑡潩潣瑮楡敮湩琠楨ⵥ慭汩洠獥慳敧椠湩整摮摥漠汮⁹潦桴獵景琠敨椠摮癩摩慵牯椠摮癩摩慵獬渠浡摥愠潢敶晉琠敨瀠牥潳捡畴污祬爠捥楥楶杮琠楨敭獳条牯愠祮漠桴牥爠慥敤景琠敨洠獥慳敧椠潮⁴桴慮敭敲楣楰湥⁴牯琠敨攠灭潬敹牯愠敧瑮爠獥潰獮扩敬琠敤楬敶瑩琠桴慮敭敲楣楰湥ⱴ愠祮甠敳楤獳浥湩瑡潩Ɱ搠獩牴扩瑵潩Ɱ漠潣祰湩景琠敨挠浯畭
楮慣楴湯椠瑳楲瑣祬瀠潲楨楢整䤠潹⁵慨敶爠捥楥敶桴獩挠浯畭楮慣楴湯椠牥潲Ⱳ瀠敬獡浩敭楤瑡汥⁹敤瑳潲⁹乁⁄潮楴祦甠祢琠汥灥潨敮愠⁴〹⸹㌸⸹〷〸㰮猯慰㹮猼慰瑳汹㵥昧湯慦業祬∺效癬瑥捩≡猬湡敳楲㭦潣潬㩲汢捡❫㰾㩯㹰⼼㩯㹰⼼灳湡㰾瀯㰾搯癩㰾搯癩㰾⁰汣獡㵳獍乯牯慭瑳汹㵥洧牡楧潢瑴浯ㄺ⸲瀰㭴慢正牧畯摮眺楨整㸧猼慰瑳汹㵥昧湯慦業祬∺效癬瑥捩≡猬湡敳楲㭦潣潬㩲汢捡❫㰾㩯㹰渦獢㭰⼼㩯㹰
⼼灳湡㰾瀯㰾搯癩㰾搯癩㰾搯癩㰾搯癩㰾搯癩㰾搯癩㰾戯潬正畱瑯㹥⼼楤㹶⼼潢祤㰾栯浴㹬