HomeMy WebLinkAboutParking Study Addendum 11-07-2019 PARKING STUDY ADDENDUM 750 N. DIAMOND BAR BOULEVARD BUILDING Diamond Bar, California November 7, 2019 (original study dated August 8, 2018) N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\3839 -Parking Study Addendum 11-07-2019.docx November 7, 2019 Mr. Howard Zelefsky Zelefsky & Associates 9735 La Capilla Avenue Fountain Valley, CA 92708 LLG Reference: 2.17.3839.1 Subject: Parking Study Addendum for the 750 N. Diamond Bar Boulevard Building Diamond Bar, California Dear Mr. Zelefsky: As requested, Linscott, Law & Greenspan, Engineers (LLG) is pleased to submit the findings of a Parking Study Addendum we completed for the 750 N. Diamond Bar Boulevard (DBB) Building, located in the City of Diamond Bar. This letter report supplements our prior study dated August 8, 2018 to further validate the adequacy of on-site parking with the conversion of office-designated floor area to medical office space (herein after referred to as Project) as well as address the comments/concerns from adjacent property owners regarding potential parking intrusion by the Project. The existing building consists of general office, medical office, medical lab, bank, and storage uses, totaling 35,687 square feet (SF). As currently envisioned, the applicant/owner of the building proposes to convert 5,272 SF of office space within four (4) suites to medical office uses, plus add 1,190 SF of retail pharmacy space in place of office space. It should be noted that of the 5,272 SF of office space to be converted to medical office use, 2,771 SF of office space is currently occupied in Suites 222 and 222a, and the remaining 2,501 SF is currently vacant in Suites 224 and 228. Based on a review of the Project site plan prepared by Primior, the on-site parking supply would be increased from an existing total of 102 spaces to a proposed total of 119 spaces. Therefore, the Project’s proposed parking supply of 119 spaces was utilized as the proposed future parking supply for the DBB Building Project. This Parking Study Addendum evaluates the Project’s parking requirements based on the City of Diamond Bar Municipal Code, application of the shared parking Mr. Howard Zelefsky November 7, 2019 Page 2 3839 -Parking Study Addendum 11-07-2019N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\3839 -Parking Study Addendum 11-07-2019.docx methodology as outlined in Urban Land Institute’s (ULI) Shared Parking, 2nd Edition as well as the approved Scope of Work for this study that was developed in conjunction with City of Diamond Bar Planning Division staff. The study focused on the following:  Validation of existing parking spaces on the site (i.e. visitor, short-term parking, handicapped parking, reserved, etc.)  Calculates the Code-based parking requirements for the existing and proposed mix of uses/tenants for the DBB Building based on the application of City Code parking ratios.  Collection of existing parking demand surveys of the DBB Building over a three- day period to establish actual “shared” parking peak parking requirements for the current mix of office and medical office tenants, inclusive of potential parking intrusion by the Project at adjacent properties to the immediate north and immediate south.  Estimates future parking demands for the DBB Building by utilizing existing parking survey data, proposed tenant mix and ULI rates.  Compares survey plus shared parking demand against the existing/future parking supply, in order to identify any potential, operational surplus or deficiency in parking supply upon implementation of the Project. Our method of analysis, findings, and conclusions are described in detail in the following sections of this report. PROJECT DESCRIPTION The Project is an existing medical office/professional office building located at 750 N. Diamond Bar Boulevard. The existing building has a total of 35,387 square-feet (SF) of floor area on two levels. Currently, a total of 102 parking spaces are now provided at the subject property. Figure 1 presents an aerial map of the DBB Building, as well as the adjoining buildings. Figure 2-1 presents an existing site plan for the DBB Building, inclusive of a breakdown of the existing on-site parking supply. Table 1 presents the existing development summary and tenant mix, as well as the proposed Project and tenant mix for the DBB Building. The current tenant mix, which occupies 31,996 SF, consists of 15,552 SF of office space, 11,634 SF of medical office uses, a 1,343 SF medical lab, a 2,755 SF credit union, and 712 SF of storage space. The remaining floor area of 3,691 SF is a vacant office floor area. Mr. Howard Zelefsky November 7, 2019 Page 3 3839 -Parking Study Addendum 11-07-2019N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\3839 -Parking Study Addendum 11-07-2019.docx A summary of the information provided in Table 1 is provided below. As shown the applicant/owner of the building proposes to increase the medical office uses from 11,634 SF to 16,906 SF, plus add 1,190 SF of retail pharmacy space in place of office space. With the Project, the existing office floor area would be reduced from 19,243 SF to 12,781 SF. Figure 2-2 presents the proposed site plan for the Project and associated parking facilities, prepared by Primior. Review of Figure 2-2 shows that with the relocation/restriping of handicap stalls and the construction of new stalls on the eastern-most portion of the site would result in a net total of 17 new parking stalls. Therefore, the on-site parking supply would be increased to 119 spaces, which would meet the requirements of the City’s Municipal Code, as shown below and in Table 1. EXISTING AND PROPOSED PROJECT DEVELOPMENT SUMMARY Use Parking Requirement (DBMC §22.30.040) Existing Proposed SF Parking required SF Parking required General Office 1/400 19,243 48 12,781 32 Medical Office 1/250 11,634 47 16,906 68 Pharmacy 1/250 0 0 1,190 5 Medical Lab 1/300 1,343 5 1,343 5 Bank 1/300 2,755 9 2,755 9 Storage N/A 712 0 712 0 Totals 35,687 109 35,687 119 PROJECT CITY CODE PARKING REQUIREMENTS As presented in the lower portion of Table 1, and summarized above, the City Code parking calculations for the existing tenant mix and proposed tenant mix for the DBB Building are based on the application of City of Diamond Bar Municipal Code requirements outlined in Chapter 22.30 – Off Street Parking and Loading Standards. Parking ratios from the City Code relevant to the project site in either its current or proposed development pattern are as follows:  Office, administrative, corporate: 1 space/400 square-feet (SF) gross floor area (GFA)  Clinics, medical/dental offices: 1 space/250 SF GFA Mr. Howard Zelefsky November 7, 2019 Page 4 3839 -Parking Study Addendum 11-07-2019N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\3839 -Parking Study Addendum 11-07-2019.docx  General retail: 1 space/250 SF GFA  Banks and financial services: 1 space/300 SF GFA Under the existing land use mix, the City Code requirement totals 109 spaces, which corresponds to a Code-based deficiency of 7 spaces when compared against the existing supply of 102 spaces for the DBB Building. The City Code requirement for the Project totals 119 spaces. Compared against the 119-space supply, the 119-space Code requirement would exactly match the supply. Based on the above findings, the City Code-based parking requirements for the existing land use mix, and the proposed Project would be adequately served by the future on-site parking supply for the DBB Building (119 spaces). To validate the adequacy of the proposed parking supply of 119 spaces at the DBB Building with the existing mix of uses/tenants and the proposed Project as summarized in Table 1, a parking demand has been prepared based using actual field-studied demands (parking surveys) of the subject property. The following section calculates the parking requirements for the DBB Building based on actual field-studied demands (parking surveys) and application of the current shared parking methodology outlined in ULI Shared Parking, 2nd Edition. PARKING DEMAND ANALYSIS This section evaluates the actual field study data for the existing tenancies in combination with a forecast for the existing floor area vacancies, inclusive of the proposed Project, which utilizes the current Urban Land Institute (ULI) shared parking methodology. Given the DBB Building is an established office development, the collection of parking survey data provides support of the “shared” parking demands of the existing tenant mix. As noted earlier, this Parking Study Addendum estimates future parking demands for the DBB Building by utilizing existing parking survey data to establish the center’s existing peak parking demand, illustrate the sharing of a common parking supply by a mix of office and medical office uses, and via the use of the shared parking methodology, forecast the hourly demand for the proposed tenant mix, which includes additional medical office floor area and a proposed pharmacy. Observed Parking Demand Consistent with study parameters of the approved scope of work for this addendum, field studies of actual parking demand at DBB Building were undertaken to evaluate Mr. Howard Zelefsky November 7, 2019 Page 5 3839 -Parking Study Addendum 11-07-2019N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\3839 -Parking Study Addendum 11-07-2019.docx current parking conditions and to develop insights as to potential parking intrusion into the adjacent properties, as well as identify duration of vehicles parked on-site. To establish the existing (baseline) shared parking demand of the existing uses at DBB Building, hourly surveys of actual parking demand were conducted at the site from 6:00 AM – 6:00 PM on Monday, October 7, 2019, Tuesday, October 8, 2019, and Wednesday, October 9, 2019. As a supplement, pedestrian affinity observations were collected to determine the potential for parking intrusion from the northern/southern off-site adjacent lots1 (i.e. patrons of the Project parking off-site in adjacent lots and walking to the Project facilities). From these supplemental observations, “off-site parking demand” associated with the DBB building was determined, and therefore was added to the on- site parking demand. The parking surveys, conducted by NDS under the direction of LLG, consisted of counting the number of parked vehicles within the entire DBB Building lot and keeping track of the duration that were observed parked on-site. This information reflects a more precise parking demand for the DBB Building, specifically, the shared parking demand associated with 31,996 SF of occupied floor area (89.7% occupancy). Appendix A contains the detailed survey data with a summary of the data presented in the following tables noted below, as well as supplemental pedestrian affinity studies, and parking duration studies. A summary of the results of the parking surveys that were performed at the DBB Building on a recent Monday, Tuesday and Wednesday is summarized in Tables 2, 3, and 4, respectively. These tables present the parking demand at the DBB Building for each hour during the count dates, and compared observed demand against existing on-site parking supply of 102 spaces. A review of these tables indicate a total peak demand of 83 spaces (81% utilization) occurred on Wednesday at 11:00 AM (See Table 4), and was comprised of 83 occupied spaces for the DBB Building (on site and those observed parked in adjacent properties. Comparing the DBB Building’s 83- space peak demand against the existing supply of 102 spaces corresponds to an observed surplus of 19 spaces. A review of Tables 2 and 3 indicate that the peak parking demand observed at the DBB Building was less on Monday, October 7, 2019 and totaled 70 vehicles (69% utilization) at 11:00 PM, whereas the peak demand on Tuesday, October 8, 2019 was 1 For this analysis, the parking demand observed to park in adjacent properties to the north and to the south during the parking demand studies conducted on October 7, 8 and 9, 2019 were presumed to be generated by DBB Building. Mr. Howard Zelefsky November 7, 2019 Page 6 3839 -Parking Study Addendum 11-07-2019N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\3839 -Parking Study Addendum 11-07-2019.docx less than Wednesday as well and totaled 70 vehicles (69% utilization) at 12:00 PM, respectively. It is important to note that based on City code, the existing occupied uses, as shown below, would require 100 spaces whereas the existing observed peak demand for the current tenant mix totaled 83 spaces. EXISTING OCCUPIED AND VACANT SF CODE PARKING CALCULATIONS Description Existing Occupied SF Ratio Requirement General Office 15,552 SF 1 sp/400 SF 39 spaces Medical Office 11,634 SF 1 sp/250 SF 47 spaces Medical Lab 1,343 SF 1 sp/300 SF 5 spaces Bank 2,755 SF 1 sp/300 SF 9 spaces Storage 712 SF ---- 0 spaces Subtotal 31.996 SF 100 spaces Office (Vacant) 3,691 SF 1 sp/400 SF 9 spaces Total 35,687 SF 109 spaces Forecast Parking Demand Based on the results of actual parking demand studies of the DBB Building, it was established that the peak parking demand for the current occupied floor area and mix of tenants totaled 83 parking spaces (See Table 4 at 11:00 AM). Conservatively, without adjustment to account for the conversion of existing occupied office floor area of 2,771 SF, the code parking requirements associated with the addition of 5,272 SF of medical office space and a 1,190 SF pharmacy amounts to 21 spaces and 5 spaces, respectively for a total of 26 spaces. PROPOSED PROJECT SF CODE PARKING CALCULATIONS Description Proposed Project SF Ratio Requirement Medical Office 5,272 SF 1 sp/250 SF 21 spaces Pharmacy 1,190 SF 1 sp/250 SF 5 spaces Subtotal 6,462 SF 26 spaces Existing Peak Demand Occupied SF Wed, 10/9 at 11 am 83 spaces Total 35,687 SF 109 spaces This total, when added to the observed peak demand of 83 spaces results in a forecast peak parking demand for the DBB Building of 109 spaces (83 + 26) upon completion of the Project. Compared against the proposed 119-space supply, the forecast 109- space peak parking demand would result in a surplus of 10 spaces (8.4% contingency supply. Mr. Howard Zelefsky November 7, 2019 Page 7 3839 -Parking Study Addendum 11-07-2019N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\3839 -Parking Study Addendum 11-07-2019.docx Shared Parking Demand Assessment The Shared Parking methodology was applied in estimating the parking needs of the Project. This goes beyond simply calculating the City Code requirement, and looks at the operational demand picture within the actual physical setting. The objective of this Shared Parking analysis is to estimate the peak parking requirements for the various components of the Project based upon their combined parking demand patterns. In order to determine the most appropriate peak-parking requirement for the DBB Building with the proposed Project, utilization of the actual survey data for the existing land uses has been combined with ULI shared parking techniques applied to the proposed medical office uses and pharmacy retail floor area. The analytical procedures in a Shared Parking analysis are well documented in the Urban Land Institute’s (ULI’s) Shared Parking (First and Second Editions) publication. As part of the shared parking calculations, the Project’s shared parking requirements were added to the existing parking demand observed (based on parking demand field studies/surveys that were performed), and compares the resultant shared parking demand for the Project against the future parking supply, in order to identify any potential parking surplus or deficiency. The hourly parking demand profiles (expressed in percent of peak demand) utilized in this analysis and applied to the proposed Project at DBB Building are based on profiles developed by the Urban Land Institute (ULI) and published in Shared Parking, 2nd Edition, unless otherwise noted. For the Project’s proposed Pharmacy-use, the code requirement for general retail of 1 space per 250 SF was utilized and the ULI retail use profiles are applied directly. The resulting profiles represent the most likely hourly parking demand profile, and are applied to the City’s retail parking ratio of 1 space per 250 SF. From Table 1, a total of 1,190 SF of Pharmacy floor area is proposed. For medical office uses, the parking profile in the ULI publication was used and applied to the City’s Parking Code ratio of 1 space per 250 SF to forecast its weekday hourly demand. Based on the proposed Project, the applicant/owner of the building proposes to convert 5,272 SF of office space within four (4) suites to medical office uses. Since the existing parking surveys were conducted while 2,771 SF of office space was currently occupied in Suites 222 and 222a, adjustments were made to the existing parking surveys due to the proposed Project renovating and reoccupying these uses Mr. Howard Zelefsky November 7, 2019 Page 8 3839 -Parking Study Addendum 11-07-2019N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\3839 -Parking Study Addendum 11-07-2019.docx with medical office use. A composite parking ratio was calculated for each day that counts were collected and ranged from 2.19 to 2.59 spaces per 1000 SF of GFA, which is in line with the City’s office parking ratio of 2.5 spaces per 1000 SF of GFA (1 space per 400 SF of GFA). In order to provide a conservative assessment, the minimum ratio of 2.19 spaces per 1000 SF was applied to the 2,771 SF existing office to be converted to medical office and the ULI office use profiles were applied directly. Shared Parking Demand Analysis Results Tables 5, 6 and 7 summarize the results of this approach and present the forecast parking demand for the vacant uses and the proposed Project for a weekday (Monday, Tuesday and Wednesday) based on the survey-shared parking methodology. Appendix B contains the overall shared parking analysis calculation worksheets for DBB Building for a weekday. Column (1) of Tables 5, 6 and 7 presents a summary of the weekday (Monday, Tuesday and Wednesday) parking survey data collected at the site for 31,996 SF of occupied floor area, as summarized in Tables 2, 3 and 4, respectively, while Column (2) summarizes the estimated hourly parking demand associated with 2,771 SF of existing occupied office space that would be renovated to accommodate the proposed Project. Columns (3) and (4) present the parking accumulation characteristics of the proposed medical office and pharmacy components of the Project, respectively, for the hours of 6:00 AM to 6:00 PM. Column (5) presents the expected joint-use parking demand for the entire site on an hourly basis, while Column (6) summarizes the hourly parking surplus/deficiency for the DBB Building when compared to the proposed parking supply of 119 spaces; the percentage surplus/deficiency is also noted in this column. Survey/Shared Parking Analysis Results Review of Tables 5, 6 and 7 show that the overall peak-parking requirement for the DBB Building during a weekday, assuming full occupancy and completion of the proposed Project, occurs on Wednesday at 11:00 AM and totals 102 spaces (See Table 7); the peak parking demand for Monday and Tuesday is less than that, and totals 89 spaces and 87 spaces, respectively (See Table 5 and Table 6). Based on a proposed parking supply of 119 spaces, a minimum surplus of 17 spaces on (14% contingency) a weekday is forecast during the peak hours. Mr. Howard Zelefsky November 7, 2019 Page 9 3839 -Parking Study Addendum 11-07-2019N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\3839 -Parking Study Addendum 11-07-2019.docx Figures 3, 4, and 5 graphically illustrate the weekday (Monday, Tuesday and Wednesday) hourly parking demand forecast for the Project, respectively. Each vacant land use component and its corresponding hourly Shared Parking demand for various mixes of uses, which were presented in Tables 5, 6, and 7, are depicted in these figures relative to a proposed parking supply of 119 spaces. A review of these figures indicates that the center’s proposed parking supply of 119 spaces will adequately accommodate the DBB Building’s weekday hourly demand based on the survey plus shared parking demand analysis. Survey/Shared Parking Analysis Conclusions Our findings above indicate that the proposed parking supply for the DBB Building would be adequate in meeting the overall future parking demand, inclusive of those associated with the Project, and that it would be reasonable and enforceable for all Project components to share the parking facilities. Furthermore, review of Tables 5, 6 and 7 indicate that excluding the parking demand credit associated with the removal and conversion of 2,771 SF of existing office to medical office-use would result in an overall peak-parking requirement for the DBB Building of 108 spaces on Wednesday at 11:00 AM (See Table 7). The peak parking demand for Monday and Tuesday would be less than that, and total 95 spaces and 93 spaces, respectively. Therefore, if no parking credits were to be applied for the center, the proposed parking supply of 119 spaces would still adequately accommodate the DBB Building’s hourly demand. To help manage parking demands of the existing and proposed tenants it is recommended that the Property Owner and/or Property Management Company consider implementation of a Parking Management Plan (PMP). Mr. Howard Zelefsky November 7, 2019 Page 10 3839 -Parking Study Addendum 11-07-2019N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\3839 -Parking Study Addendum 11-07-2019.docx PARKING MANAGEMENT PLAN This Parking Management Plan (PMP) outlines the proposed allocation of parking supply on site and key parking management strategies to maximize the availability of parking for customers/visitors and employees of the DBB Building. When the Property Owner/Property Management Company deems it necessary, the following key Parking Management Strategies could be implemented to minimize customer/employee disruption. PMP measures Specific PMP measures relative to the employee parking operation and short-term parking for customers/visitors are described below, and were developed based on the following objectives:  The PMP should identify where the office/medical office employees park within the site.  The PMP should identify where location of short-term parking spaces for customers/visitors to the bank, medical office, office, pharmacy-uses, etc. 1. The Property Owner/Property Management Company work with tenants of the center to implement an employee parking program, with the goal of providing convenient and accessible shopping experience for the customers/visitors of the building and to leave the most desirable parking spaces for use by customers/visitors. The location of designated employee parking spaces will be developed in collaboration between Property Owner/Property Management and the tenants. The employee parking spaces will be identified with a white or yellow circle. It is noted that these spaces will be open for customer use. 2. Property Owner/Property Management will work with tenants of the building to identify the need for “short term/time restricted spaces” on an as need basis, dependent on the needs of the proposed medical office and pharmacy uses. The short-term spaces may be used for “Patients/Visitors only”. The number and location of spaces will be determined by Property Owner/Property Management and the existing/potential tenants. 3. Property Owner/Property Management will work closely and inform with the tenants to ensure all parking demand associated with the DBB Building occurs on-site and eliminate parking intrusion in the adjacent properties. Property Owner/Property Management will work closely with the tenants to insure that both employees and property management work together to provide the best experience for the customers/visitors, as well as allowing the most desirable parking spaces to be accessed by the customers/visitors rather than the employees.   Mr. Howard Zelefsky November 7, 2019 Page 11 3839 -Parking Study Addendum 11-07-2019N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\3839 -Parking Study Addendum 11-07-2019.docx SUMMARY OF FINDINGS AND CONCLUSIONS 1. 750 N. Diamond Bar Boulevard (DBB) Building is an established professional office building that includes a tenant mix consisting of general office, medical office, medical lab, bank, and storage uses, totaling 35,687 square feet (SF). As currently envisioned, the applicant/owner of the building proposes to convert 5,272 SF of office space within four (4) suites to medical office uses, plus add 1,190 SF of retail pharmacy space in place of office space. Based on the Project site plan prepared by Primior, the on-site proposed parking supply would be increased from an existing 102 spaces to 119 spaces. 2. This Parking Study Addendum evaluates the existing tenancy condition as well as with full occupancy of the site with the proposed medical office and pharmacy uses using actual parking demand surveys. 3. Direct application of City parking codes to the existing and proposed mix of uses results in a total parking requirement of 119 parking spaces. When compared against the proposed parking supply of 119 spaces, the DBB Building satisfies the City’s parking code requirements. 4. To establish actual parking demand for the DBB Building, and identify potential parking intrusion into the adjacent properties, existing parking demand surveys of the subject property were conducted on three recent weekdays (Monday, October 7, 2019, Tuesday, October 8, 2019, and Wednesday, October 9, 2019). 5. The results of the parking demand surveys indicate that a total peak demand of 83 spaces occurred on Wednesday at 11:00 AM, inclusive of those observed parked in adjacent properties). Comparing the DBB Building’s 83-space peak demand against the existing supply of 102 spaces corresponds to an observed surplus of 19 spaces. This existing peak parking demand, when added to the 26- space code parking requirement of the Project, results in a forecast peak parking demand for the DBB Building of 109 spaces (83 + 26) upon completion of the Project. Compared against the proposed 119-space supply, the forecast 109- space peak parking demand would result in a surplus of 10 spaces (8.4% contingency supply. 6. A “blended” analysis of actual parking demand for existing occupancies that were based on a three-day survey of the Project site and the use of the shared parking approach indicates that the future minimum functional surplus at the DBB Building will be slightly greater. With additional medical space and a pharmacy, the resultant maximum or peak shared demand for the Project site is forecast to Mr. Howard Zelefsky November 7, 2019 Page 12 3839 -Parking Study Addendum 11-07-2019N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\3839 -Parking Study Addendum 11-07-2019.docx total 102 spaces, which translates to a surplus of 17 spaces when compared to a proposed parking supply of 119 spaces. 7. Based on the above findings, we conclude that based on the application of the shared parking approach, and on empirical study of existing parking demand, the parking needs of the DBB Building upon completion of the Project would be adequately served by the proposed parking supply. ● ● ● ● ● We appreciate the opportunity to provide this analysis. Please call us if you have any questions at 949.825.6175. Sincerely, Linscott, Law & Greenspan, Engineers Richard E. Barretto, P.E. Principal cc: Trissa de Jesus Allen, P.E., Senior Transportation Engineer Johnney Y. Zhang, Chief Executive Officer, Primior Richard De La Fuente, Architectural Manager, Primior N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\3839 -Parking Study Addendum 11-07-2019.docx TABLE 1 EXISTING AND PROPOSED PROJECT DEVELOPMENT SUMMARY & CITY CODE REQUIREMENTS [a] 750 N. DIAMOND BAR BOULEVARD, DIAMOND BAR Suite Tenant100 Magan Medical Clinic 3,326 3,326 3,326 3,326101 JYZRE 3,574 3,574 3,574 3,574102 Vacant 1,1901,190(1,190)1,190 1,190103 Leila Jabaji, MD 1,659 1,659 1,659 1,659110 Quest Diagnostics 1,343 1,343 1,343 1,343111 Pacific Federal Credit Union 2,755 2,755 2,755 2,755112 John Yun, D.D.S 1,764 1,764 1,764 1,764202 Office 988 988 988 988204 Barbara A. Ammon, PhD 460 460 460 460206 Philips Ranch Dental 2,435 2,435 2,435 2,435208 National College Resources Foundatio 2,150 2,150 2,150 2,150212 Paul Brown 1,075 1,075 1,075 1,075214 Disability Rights California 775 775 775 775216 John Tchaboukian, DDS 1,375 1,375 1,375 1,375220 National Commercial Recovery 1,189 1,189 1,189 1,189222 Law Office of Mark Hawkins 2,502 2,502(2,502)2,502 2,502222a Law Office of Mark Hawkins 269 269(269)269 269224 Vacant 1,6771,677(1,677)1,677 1,677226 Waters & Robinson 3,645 3,645 3,645 3,645228 Vacant 824824(824)824 824Storage 1st Floor712 712 712 7120PROJECT TOTAL 19,243 11,634 0 1,343 2,755 712 35,687 12,781 16,906 1,190 1,343 2,755 712 35,687Land Use % Breakdown 54% 32% 0% 4% 8% 2% - 36% 47% 3% 4% 8% 2%- CITY CODE PARKING RATIOS [a]1 space 1 space 1 space 1 space 1 space - 1 space 1 space 1 space 1 space 1 space -per per per per per N/A per per per per per N/A400 SF 250 SF 250 SF [b] 300 SF 300 SF [c] 400 SF 250 SF 250 SF [b] 300 SF 300 SF [c] CITY CODE REQUIREMENTS 48 47 0 5 9 0 109 32 68 5 5 9 0 119EXISTING / FUTURE PARKING SUPPLY-- - ---102-- - ---119(spaces)CODE PARKING SURPLUS - - - - - -(7)-- - ---0(Supply minus Code Requirement)Note:[a] Source: City of Diamond Bar Municipal Code Chapter 22.30 - Off-Street Parking and Loading Standards.[b] City Code does not provide parking ratios for Pharmacy, therefore the ratio for General Retail of 1 space per 250 SF was utilized.[c] No additional parking requirements are attributed to storage because it is ancillary to other uses.Bank StorageTOTALGeneral OfficeMedical Office PharmacyMedical LabTOTALGeneral OfficeMedical Office PharmacyMedical Lab Bank StorageExisting GFA (SF) Proposed Project GFA (SF) 3839 -Parking Study Addendum 11-07-2019N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\3839 -Parking Study Addendum 11-07-2019.docx TABLE 2 SUMMARY OF EXISTING PARKING DEMAND SURVEYS – MONDAY, OCTOBER 7, 2019 750 N. DIAMOND BAR BOULEVARD, DIAMOND BAR RegularReserved Parking FCUHC HC Van Green Curb Reserved 20 MinsINVENTORY763311522102%(+/‐)‐‐ ‐‐%(+/‐)6:00 AM800010099%93099%937:00 AM700110099%9321111%918:00 AM190111002222%8032525%779:00 AM370003024241%6074948%5310:00 AM490016015756%4525958%4311:00 AM591116016968%3317069%3212:00 PM551116026665%3616766%351:00 PM510102015554%4705554%472:00 PM500114025857%4436160%413:00 PM520003025756%4505756%454:00 PM561006026564%3716665%365:00 PM340103013938%6303938%636:00 PM160103002020%8202020%82Notes:[1] Additional Cars that parked offsite includes vehicles that parked in the northern/southerm adjacent lots and walked to the Project building (750 N. Diamond Bar Boulevard). See Appendix A for details.Hourly Demand Totals750 N. Diamond Bar Blvd LotTIMESurplus DeficiencyExisting Demand Within Lot Plus Additional Cars Parked OffsiteExisting Plus Additional Cars Parked OffsiteAdditional Cars Parked Offsite [1]Percent OccupancySurplus DeficiencyExisting Demand Within LotPercent Occupancy 3839 -Parking Study Addendum 11-07-2019N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\3839 -Parking Study Addendum 11-07-2019.docx TABLE 3 SUMMARY OF EXISTING PARKING DEMAND SURVEYS – TUESDAY, OCTOBER 8, 2019 750 N. DIAMOND BAR BOULEVARD, DIAMOND BAR RegularReserved Parking FCUHC HC Van Green Curb Reserved 20 MinsINVENTORY763311522102%(+/‐)‐‐ ‐‐%(+/‐)6:00 AM100000122%100022%1007:00 AM140002011717%8542121%818:00 AM220102012625%7643029%729:00 AM400102024544%5755049%5210:00 AM500215026059%4216160%4111:00 AM570215026766%3516867%3412:00 PM592212026867%3427069%321:00 PM532313026463%3836766%352:00 PM531214026362%3956867%343:00 PM530215026362%3906362%394:00 PM500106025958%4305958%435:00 PM370004004140%6104140%616:00 PM180002002020%8202020%82Notes:[1] Additional Cars that parked offsite includes vehicles that parked in the northern/southerm adjacent lots and walked to the Project building (750 N. Diamond Bar Boulevard). See Appendix A for details.Hourly Demand Totals750 N. Diamond Bar Blvd LotTIMESurplus DeficiencyExisting Demand Within Lot Plus Additional Cars Parked OffsiteExisting Plus Additional Cars Parked OffsiteExisting Demand Within LotPercent OccupancyAdditional Cars Parked Offsite [1]Percent OccupancySurplus Deficiency 3839 -Parking Study Addendum 11-07-2019N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\3839 -Parking Study Addendum 11-07-2019.docx TABLE 4 SUMMARY OF EXISTING PARKING DEMAND SURVEYS – WEDNESDAY, OCTOBER 9, 2019 750 N. DIAMOND BAR BOULEVARD, DIAMOND BAR RegularReserved Parking FCUHC HC Van Green Curb Reserved 20 MinsINVENTORY763311522102%(+/‐)‐‐ ‐‐%(+/‐)6:00 AM300000033%99033%997:00 AM800000088%94199%938:00 AM220011012525%7742928%739:00 AM520212025958%4336261%4010:00 AM580214026766%3547170%3111:00 AM682316028280%2018381%1912:00 PM650104027271%3017372%291:00 PM570004026362%3916463%382:00 PM500003025554%4715655%463:00 PM560114026463%3816564%374:00 PM491003025554%4705554%475:00 PM341002023938%6303938%636:00 PM161000021919%8301919%83Notes:[1] Additional Cars that parked offsite includes vehicles that parked in the northern/southerm adjacent lots and walked to the Project building (750 N. Diamond Bar Boulevard). See Appendix A for details.Hourly Demand Totals750 N. Diamond Bar Blvd LotTIMESurplus DeficiencyExisting Demand Within Lot Plus Additional Cars Parked OffsiteExisting Plus Additional Cars Parked OffsiteExisting Demand Within LotPercent OccupancyAdditional Cars Parked Offsite [1]Percent OccupancySurplus Deficiency 3839 -Parking Study Addendum 11-07-2019N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\3839 -Parking Study Addendum 11-07-2019.docx TABLE 5 WEEKDAY SURVEY PLUS SHARED PARKING DEMAND ANALYSIS – MONDAY [1] 750 N. DIAMOND BAR BOULEVARD, DIAMOND BAR Land UseVacant/Proposed Medical OfficeProposed PharmacySize 31.996 KSF 2.771 KSF 5.272 KSF 1.190 KSFPkg Rate 2.19 /KSF [3] 4.0 /KSF 4.00 /KSF Comparison w/Gross 6 Spc. 21 Spc. 5 Spc. Parking SupplySpacesShared 119 Spaces [4]Number of Number of Number of Parking Surplus SurplusTime of Day Spaces Spaces Spaces Demand (Deficiency) Percentage6:00 AM 9 0 0 0 9 110 92%7:00 AM 11 -2 0 0 9 110 92%8:00 AM 25 -5 17 1 38 81 68%9:00 AM 49 -6 20 2 65 54 45%10:00 AM 59 -6 21 3 77 42 35%11:00 AM 70 -6 21 4 89 30 25%12:00 PM 67 -5 11 4 77 42 35%1:00 PM 55 -5 20 5 75 44 37%2:00 PM 61 -6 21 4 80 39 33%3:00 PM 57 -6 21 4 76 43 36%4:00 PM 66 -5 20 4 85 34 29%5:00 PM 39 -3 18 4 58 61 51%6:00 PM 20 -2 14 4 36 83 70%89Notes:[1] Source: ULI - Urban Land Institute "Shared Parking," Second Edition, 2005.[3] Parking demand associated with existing office to be removed was based on evaluation of existing parking data of 750 N. Diamond Bar Blvd. [4] Based on information provided by Primior, the total Proposed Parking Supply is 119 spaces.[2] Existing parking counts conducted by National Data & Surveying Services (NDS) on Monday, October 7, 2019. Includes cars that parked in the Northern/Southern Offsite Areas and walked to the Project SiteParkingDemand [2]Existing Occupied Center (Year 2019)Existing Office to be RemovedActualObservedHourly 3839 -Parking Study Addendum 11-07-2019N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\3839 -Parking Study Addendum 11-07-2019.docx TABLE 6 WEEKDAY SURVEY PLUS SHARED PARKING DEMAND ANALYSIS – TUESDAY [1] 750 N. DIAMOND BAR BOULEVARD, DIAMOND BAR Land UseVacant/Proposed Medical OfficeProposed PharmacySize 31.996 KSF 2.771 KSF 5.272 KSF 1.190 KSFPkg Rate 2.19 /KSF [3] 4.0 /KSF 4.00 /KSF Comparison w/Gross 6 Spc. 21 Spc. 5 Spc. Parking SupplySpacesShared 119 Spaces [4]Number of Number of Number of Parking Surplus SurplusTime of Day Spaces Spaces Spaces Demand (Deficiency) Percentage6:00 AM 2 0 0 0 2 117 98%7:00 AM 21 -2 0 0 19 100 84%8:00 AM 30 -5 17 1 43 76 64%9:00 AM 50 -6 20 2 66 53 45%10:00 AM 61 -6 21 3 79 40 34%11:00 AM 68 -6 21 4 87 32 27%12:00 PM 70 -5 11 4 80 39 33%1:00 PM 67 -5 20 5 87 32 27%2:00 PM 68 -6 21 4 87 32 27%3:00 PM 63 -6 21 4 82 37 31%4:00 PM 59 -5 20 4 78 41 34%5:00 PM 41 -3 18 4 60 59 50%6:00 PM 20 -2 14 4 36 83 70%87Notes:[1] Source: ULI - Urban Land Institute "Shared Parking," Second Edition, 2005.[3] Parking demand associated with existing office to be removed was based on evaluation of existing parking data of 750 N. Diamond Bar Blvd. [4] Based on information provided by Primior, the total Proposed Parking Supply is 119 spaces.ParkingDemand [2]HourlyExisting Occupied Center (Year 2019)Existing Office to be RemovedActual[2] Existing parking counts conducted by National Data & Surveying Services (NDS) on Tuesday, October 8, 2019. Includes cars that parked in the Northern/Southern Offsite Areas and walked to the Project SiteObserved 3839 -Parking Study Addendum 11-07-2019N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\3839 -Parking Study Addendum 11-07-2019.docx TABLE 7 WEEKDAY SURVEY PLUS SHARED PARKING DEMAND ANALYSIS – WEDNESDAY [1] 750 N. DIAMOND BAR BOULEVARD, DIAMOND BAR Land UseVacant/Proposed Medical OfficeProposed PharmacySize 31.996 KSF 2.771 KSF 5.272 KSF 1.190 KSFPkg Rate 2.19 /KSF [3] 4.0 /KSF 4.00 /KSF Comparison w/Gross 6 Spc. 21 Spc. 5 Spc. Parking SupplySpacesShared 119 Spaces [4]Number of Number of Number of Parking Surplus SurplusTime of Day Spaces Spaces Spaces Demand (Deficiency) Percentage6:00 AM 3 0 0 0 3 116 97%7:00 AM 9 -2 0 0 7 112 94%8:00 AM 29 -5 17 1 42 77 65%9:00 AM 62 -6 20 2 78 41 34%10:00 AM 71 -6 21 3 89 30 25%11:00 AM 83 -6 21 4 102 17 14%12:00 PM 73 -5 11 4 83 36 30%1:00 PM 64 -5 20 5 84 35 29%2:00 PM 56 -6 21 4 75 44 37%3:00 PM 65 -6 21 4 84 35 29%4:00 PM 55 -5 20 4 74 45 38%5:00 PM 39 -3 18 4 58 61 51%6:00 PM 19 -2 14 4 35 84 71%102Notes:[1] Source: ULI - Urban Land Institute "Shared Parking," Second Edition, 2005.[3] Parking demand associated with existing office to be removed was based on evaluation of existing parking data of 750 N. Diamond Bar Blvd. [4] Based on information provided by Primior, the total Proposed Parking Supply is 119 spaces.[2] Existing parking counts conducted by National Data & Surveying Services (NDS) on Wednesday, October 9, 2019. Includes cars that parked in the Northern/Southern Offsite Areas and walked to the Project SiteParkingDemand [2]Exis ting Occupied Center (Year 2019)Existing Office to be RemovedActualObservedHourly LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-17-3839-1 750 N. Diamond Bar Blvd Parking, Diamond Bar N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\Dividers\3839 Dividers.doc APPENDIX A EXISTING 750 N. DIAMOND BAR BLVD PARKING DEMAND COUNTS LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\Dividers\3839 Sub-Dividers.doc APPENDIX A-I PARKING DEMAND STUDY Location: 750 N Diamond Bar BlvdDate:10/7/2019City: Diamond BarDay:MondayRegularReserved Parking FCUHC HC Van Green Curb Reserved 20 MinsINVENTORY 76 3 3 1 15 2 2 1026:00800010097:00700110098:0019011100229:00370003024210:00490016015711:00591116016912:00551116026613:00510102015514:00500114025815:00520003025716:00561006026517:00340103013918:001601030020Parking StudyPrepared by National Data & Surveying ServicesMAX OCCUPANCYMAX HOUR6911:00:00 AMTOTALTIMELot 1 Location: 750 N Diamond Bar BlvdDate:10/8/2019City: Diamond BarDay:TuesdayRegularReserved Parking FCUHC HC Van Green Curb Reserved 20 MinsINVENTORY 76 3 3 1 15 2 2 1026:00100000127:0014000201178:0022010201269:00400102024510:00500215026011:00570215026712:00592212026813:00532313026414:00531214026315:00530215026316:00500106025917:00370004004118:001800020020MAX HOUR12:00:00 AMPrepared by National Data & Surveying ServicesParking StudyTIMELot 1TOTALMAX OCCUPANCY68 Location: 750 N Diamond Bar BlvdDate:10/9/2019City: Diamond BarDay:WednesdayRegularReserved Parking FCUHC HC Van Green Curb Reserved 20 MinsINVENTORY 76 3 3 1 15 2 2 1026:00300000037:00800000088:0022001101259:00520212025910:00580214026711:00682316028212:00650104027213:00570004026314:00500003025515:00560114026416:00491003025517:00341002023918:001610000219MAX HOUR11:00:00 AMPrepared by National Data & Surveying ServicesParking StudyTIMELot 1TOTALMAX OCCUPANCY82 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\Dividers\3839 Sub-Dividers.doc APPENDIX A-II PEDESTRIAN AFFINITY STUDY Location:750 N Diamond Bar BlvdDate:10/7/2019City:Diamond BarDay:MondayNumber of Pedestrians per GroupParked in Project Site and went to Northern Offsite AreaParked in Project Site and went to Southern Offsite AreaParked in Northern Offsite Area and went to Project SiteParked in Southern Offsite Area and went to Project Site7:56 AM2X8:42 AM1X8:56 AM1X8:57 AM1X9:01 AM1X9:09 AM1X9:12 AM1X9:19 AM1X9:32 AM1X9:33 AM1X9:40 AM1X10:10 AM1X10:57 AM1X11:00 AM1X12:26 PM1X2:25 PM1X2:26 PM1X2:56 PM1X4:16 PM1XPrepared by National Data & Surveying ServicesObservation StudyTime Location:750 N Diamond Bar BlvdDate:10/8/2019City:Diamond BarDay:TuesdayNumber of Pedestrians per GroupParked in Project Site and went to Northern Offsite AreaParked in Project Site and went to Southern Offsite AreaParked in Northern Offsite Area and went to Project SiteParked in Southern Offsite Area and went to Project Site7:56 AM2XX7:57 AM2X8:00 AM1X8:20 AM1X8:50 AM2X9:00 AM1X9:07 AM1X9:30 AM1X9:33 AM1X9:46 AM1X10:45 AM1X11:49 AM1X12:17 PM1X12:51 PM1X1:10 PM1XX1:50 PM2X2:21 PM1X2:24 PM1X2:53 PM2X2:57 PM1XPrepared by National Data & Surveying ServicesObservation StudyTime Location:750 N Diamond Bar BlvdDate:10/9/2019City:Diamond BarDay:WednesdayNumber of Pedestrians per GroupParked in Project Site and went to Northern Offsite AreaParked in Project Site and went to Southern Offsite AreaParked in Northern Offsite Area and went to Project SiteParked in Southern Offsite Area and went to Project Site7:58 AM1X8:00 AM1X8:14 AM1X8:39 AM1X8:51 AM1X9:30 AM1X9:41 AM1X9:53 AM1X10:35 AM1X10:35 AM1X10:36 AM1X10:48 AM1X11:46 AM1X12:25 PM1X1:10 PM1X2:41 PM1X3:42 PM1XPrepared by National Data & Surveying ServicesObservation StudyTime LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\Dividers\3839 Sub-Dividers.doc APPENDIX A-III TURNOVER/DURATION STUDY Project:19‐5601Date:10/7/2019City:Diamond BarDay:Monday6:00AM 7:00AM 8:00AM 9:00AM 10:00AM 11:00AM 12:00PM 1:00PM 2:00PM 3:00PM 4:00PM 5:00PM 6:00PM 0 ‐ 1 HRS 1 ‐ 2 HRS 2 ‐ 3 HRS 3 ‐ 4 HRS 4 ‐ 5 HRS 5 ‐ 6 HRS 6 ‐ 7 HRS 7 ‐ 8 HRS 8 ‐ 9 HRS 9 ‐ 10 HRS 10 ‐ 11 HRS 11 ‐ 12 HRS 12+ HRSLot 001 Reserved Parking FCU 1Lot 001 Reserved Parking FCU 2HOO2 A341 2Lot 001 Reserved Parking FCU 3UO92 1Lot 001 Regular 4D569 V792 X G932 E285 31Lot 001 Regular 5L7751Lot 001 Regular 6D911XXXXXXXX1Lot 001 Regular 757N1 X X E978 X11Lot 001 Regular 8S719 X P347 11Lot 001 Regular 9Y554 64C2 58V1 P8O9 W189 5Lot 001 Regular 10W291 A911XXXXX545O 21Lot 001 Regular 11G639 H439 X X 11Lot 001 Regular 12F5O8 N258XXXXXXXX 11Lot 001 Regular 13B266 1Lot 001 Regular 14Y577 X38O Z523 X X X296 SZEA X J481 X 321Lot 001 HC 15Lot 001 HC 16V617 9O6M 2Lot 001 HC 17D922 B64O L242 T433 X 31Lot 001 HC Van 18AZTC X C241 Y55O YOO6 A281 41Lot 001 Regular 19I4JJ A169 N598 NIMO X 31Lot 001 Green Curb 20DO14 M782XXXXXXX 11Lot 001 Green Curb 21U454 L83O 57O6 H1O9 K2OO 5Lot 001 Green Curb 22J894 T134 NIMO X 21Lot 001 Regular 23J875 IT7O J97O 3Lot 001 Regular 24T367XXXXXX1Lot 001 Regular 25W833 I66O NP W998 57N1 5Lot 001 Regular 26W883 C785 X D426 X X 111Lot 001 Regular 27V146 NP X428 U427 X X X 31Lot 001 Regular 28G3O7XXXXXXXXX1Lot 001 Regular 29C338XXXXXXX1Lot 001 Regular 30R898 L336XXXXX 11Lot 001 Regular 31C317XXXXXXXX1Lot 001 Regular 32J153 U296 Y128 3Lot 001 Regular 3342A2 X XXXXXXXXXXX1Lot 001 Regular 343O98XXXXXXXX1Lot 001 Regular 35G783 P892 2Lot 001 Regular 36DO33 F9O6XXXXXXXX 11Lot 001 Regular 37F996XXXXXXXX1Lot 001 Regular 38H535 T862XXXXXX 11Lot 001 Regular 39M33O 1PO9XXXXXXX 11Lot 001 Regular 40YO26XXXXXXX1Lot 001 Regular 41W984 X X D6O3 X433 21Lot 001 Regular 42C724XXXXXXX1Lot 001 Regular 43L1CP X X1Lot 001 Regular 44L191XXXXXXX1Lot 001 Regular 45D426 X X N3O9 A43O X W984 X 121Lot 001 Regular 46N215XXXX23O8 11Lot 001 Regular 47M736XXXXXXXX1Lot 001 Regular 48H49OXXXXXXX1Lot 001 Regular 49Lot 001 Regular 50Lot 001 Regular 51V662 X X X X 84T2XXXXX11Lot 001 Regular 52Lot 001 Regular 533OP1 X X FO42 E185 21Lot 001 Regular 54P841XXXXXXX1Lot 001 Regular 55RO89XXXXXXX1Lot 001 Regular 56E8O61Lot Space Type SpaceTimePrepared by National Data & Surveying ServicesParking StudyDuration Lot 001 Regular 57U926 LSQD X X R698 48FO X X 22Lot 001 Green Curb 58Lot 001 Green Curb 593OP1 X X X1Lot 001 Green Curb 60B1OO 1Lot 001 Green Curb 61H4O4XXXXXXX1Lot 001 Green Curb 62Lot 001 Green Curb 63D266 X X1Lot 001 Green Curb 64Lot 001 Green Curb 65D266 X X X X1Lot 001 Green Curb 66Lot 001 Green Curb 67M1O1 W997 2Lot 001 Green Curb 689189 1Lot 001 Green Curb 69H3O5 X X1Lot 001 Regular 70D398XXXXXXXX1Lot 001 Regular 71Lot 001 Regular 72M199XXXXXXXXX1Lot 001 Regular 73JO82XXXXXXX1Lot 001 Regular 74Lot 001 Regular 75Lot 001 Regular 76N24O X X X1Lot 001 Regular 7756POXXXXXXXX1Lot 001 Regular 78Lot 001 Regular 79U691 X XXXXXX1Lot 001 Regular 80J864XXXXXXXX1Lot 001 Regular 81EO19 X X X X X1Lot 001 Regular 82V657 X X X1Lot 001 Regular 83Lot 001 Regular 84N1O5XXXXXX1Lot 001 Regular 85J553XXXXXDOO4 11Lot 001 Regular 86NO62XXXXXXX1Lot 001 Regular 87VYZ GOOO M625 37N1 4Lot 001 Regular 88U9O6XXXX1Lot 001 Regular 89M246XXXXXXXX1Lot 001 Regular 90DO18 X D37OXXXX11Lot 001 Regular 91J424 XO56 HO64XXXXXX 21Lot 001 Regular 92R288XXXXXXXX1Lot 001 Regular 93F953XXXXXXXX1Lot 001 Reserved 94Lot 001 Reserved 95Lot 001 Regular 96O919 E876XXXXXXXXX 11Lot 001 Regular 97C1O1 J486XXXXXX 11Lot 001 Regular 98A461 X XXXXXXXXXXS584 11Lot 001 Regular 99ARNF X XXXXXXXXXK197 11Lot 001 Regular 100D983 X XXXXXLICP X V792 X X X11 1Lot 001 20 Mins 101C156XXXXXXXX1Lot 001 20 Mins 102B1OO U427 B1OO X X 21 Project:19‐5601Date:10/8/2019City:Diamond BarDay:Tuesday6:00AM 7:00AM 8:00AM 9:00AM 10:00AM 11:00AM 12:00PM 1:00PM 2:00PM 3:00PM 4:00PM 5:00PM 6:00PM 0 ‐ 1 HRS 1 ‐ 2 HRS 2 ‐ 3 HRS 3 ‐ 4 HRS 4 ‐ 5 HRS 5 ‐ 6 HRS 6 ‐ 7 HRS 7 ‐ 8 HRS 8 ‐ 9 HRS 9 ‐ 10 HRS 10 ‐ 11 HRS 11 ‐ 12 HRS 12+ HRSLot 001 Reserved Parking FCU 1P799 K511 X 11Lot 001 Reserved Parking FCU 25962 X1Lot 001 Reserved Parking FCU 3Lot 001 Regular 4Lot 001 Regular 55291 X1Lot 001 Regular 66A15 X E412 11Lot 001 Regular 7OOM2XXXXXXXX1Lot 001 Regular 8R636 53O2 F696 424O 75O2 X X 41Lot 001 Regular 9XBO2 Y144 G19O X 21Lot 001 Regular 10KO2O H768 O926 M576 4Lot 001 Regular 11F257 A444 D221 2344 4Lot 001 Regular 12L7531Lot 001 Regular 13R859 T867XXXXXXX 11Lot 001 Regular 14H732 J8O9XXXXXXXX 11Lot 001 HC 15V427 X P689 X2Lot 001 HC 16SX72 N24O X X XOO1 21Lot 001 HC 17X615 F438 J99OXXXX 21Lot 001 HC Van 18VO92 5321 X747 M217 X CO21 41Lot 001 Regular 19X742 X X X 135C V782 21Lot 001 Green Curb 20P534 P125 LC1P X X 21Lot 001 Green Curb 21G381 P66O 59N2 NIMO 4Lot 001 Green Curb 22E133 M792 J573 X 21Lot 001 Regular 23HO95 H5O2 X AANR X8O9 31Lot 001 Regular 24E4O7 V296 X X OLOR X D37O 211Lot 001 Regular 25ADHA W6O4XXXXXX 11Lot 001 Regular 265962 R61O NP X X H656 X 211Lot 001 Regular 27F953XXXXXXXXX1Lot 001 Regular 28C824 X X X X1Lot 001 Regular 29G3O7XXXXXX1Lot 001 Regular 30F996XXXXXXXX1Lot 001 Regular 31C317XXXXXXXX1Lot 001 Regular 32T367XXXXXXXXXX1Lot 001 Regular 3342A2 X XXXXXXXXXXX1Lot 001 Regular 343O9BXXXXXXXXX1Lot 001 Regular 35E664 YO24XXXXXXX 11Lot 001 Regular 36PO36 M782XXXXXXX 11Lot 001 Regular 37F9O6XXXXXXXX1Lot 001 Regular 3884T2XXXXXX1Lot 001 Regular 39A562 TPO9XXXXXX 11Lot 001 Regular 40P841XXXXXXX1Lot 001 Regular 41L567 X X L191XXXXX11Lot 001 Regular 42RO89XXXXXXX1Lot 001 Regular 43H4O4XXXXXXXXX1Lot 001 Regular 44H168 F671XXXXXX 11Lot 001 Regular 45L362 K362 W984XXXXXX 21Lot 001 Regular 46X427XXXXXV347 X X X11Lot 001 Regular 47M736XXXXXXXX1Lot 001 Regular 48N1O5XXXXXXXXX1Lot 001 Regular 49Lot 001 Regular 50Lot 001 Regular 51V662 XXXXXXXX1Lot 001 Regular 52671B XXXXXXXX1Lot 001 Regular 53BOO3 X1Lot 001 Regular 54D911XXXXXXXXX1Lot 001 Regular 55U631XXXXXX1Lot 001 Regular 563OP1XXXX1SpaceSpace TypeLotTimePrepared by National Data & Surveying ServicesParking StudyDuration Lot 001 Regular 57O919XXXX1Lot 001 Green Curb 58D398XXXXXXXXX1Lot 001 Green Curb 59PO34XXXXXXXX1Lot 001 Green Curb 60X264 X X X X1Lot 001 Green Curb 61Lot 001 Green Curb 62Lot 001 Green Curb 63Lot 001 Green Curb 64Lot 001 Green Curb 65Lot 001 Green Curb 66Lot 001 Green Curb 67U427XXXX1Lot 001 Green Curb 68Lot 001 Green Curb 69Lot 001 Regular 70R671XXXXX1Lot 001 Regular 7152J2 1Lot 001 Regular 72Lot 001 Regular 73M199XXXXX1Lot 001 Regular 74R211 X1Lot 001 Regular 753W7 1Lot 001 Regular 76K198 X X 24N2 X X2Lot 001 Regular 77S372XXXX1Lot 001 Regular 78Lot 001 Regular 79135C X F479 11Lot 001 Regular 80C724XXXXXX1Lot 001 Regular 81HO64XXXXXX1Lot 001 Regular 82G586 H49OXXXXXXXX 11Lot 001 Regular 83D3851Lot 001 Regular 84E8761Lot 001 Regular 85M246XXXXXXXXX1Lot 001 Regular 86JO82XXXXXXXX1Lot 001 Regular 87B1OOXXXXXX1Lot 001 Regular 88R614 X X C733 X X2Lot 001 Regular 89J553XXXXXP315 11Lot 001 Regular 90F876XXXXXX1Lot 001 Regular 91L385XXXXXXXX1Lot 001 Regular 9257N1XXXXXXXX1Lot 001 Regular 93C156XXXXXXX1Lot 001 Reserved 94Lot 001 Reserved 95Lot 001 Regular 9653O2 NP X X X T1O2 X X X 12Lot 001 Regular 97J864XXXXXXXX1Lot 001 Regular 98U691 XXXXXV792XXXXX2Lot 001 Regular 99A461 XXXXXXXXX1Lot 001 Regular 100D983 XXXXXR691 X X11Lot 001 20 Mins 101R288XXXXXXX1Lot 001 20 Mins 1022736 NP XXXXXXXXX 11 Project:19‐5601Date:10/9/2019City:Diamond BarDay:Wednesday6:00AM 7:00AM 8:00AM 9:00AM 10:00AM 11:00AM 12:00PM 1:00PM 2:00PM 3:00PM 4:00PM 5:00PM 6:00PM 0 ‐ 1 HRS 1 ‐ 2 HRS 2 ‐ 3 HRS 3 ‐ 4 HRS 4 ‐ 5 HRS 5 ‐ 6 HRS 6 ‐ 7 HRS 7 ‐ 8 HRS 8 ‐ 9 HRS 9 ‐ 10 HRS 10 ‐ 11 HRS 11 ‐ 12 HRS 12+ HRSLot 001 Reserved Parking FCU 16A151Lot 001 Reserved Parking FCU 2C823 V792 X X 11Lot 001 Reserved Parking FCU 3Lot 001 Regular 4L9O4XXXXX4O64 11Lot 001 Regular 5U732 U296 X 11Lot 001 Regular 6Z691 V896 2Lot 001 Regular 7W439 X R847 P776 X 12Lot 001 Regular 8D136 X V657 X X X11Lot 001 Regular 9A222 V759 V128 LICP X X 31Lot 001 Regular 10NP X S751 11Lot 001 Regular 11J44O D458 NP X K613 X X 211Lot 001 Regular 12U8O9XXXXRAMC X11Lot 001 Regular 13C156XXXXO3M2 11Lot 001 Regular 14S641 M245 D899 P4O9 X 31Lot 001 HC 15N24O X X X1Lot 001 HC 1633LW X H48711Lot 001 HC 17F449 T423 2Lot 001 HC Van 18W357 V958 H597 X F5O6 31Lot 001 Regular 19J141 3681 RSHP N842 4Lot 001 Green Curb 20S838XXXXX75B1 X11Lot 001 Green Curb 21WO4O JJ9OXXXXN271 21Lot 001 Green Curb 22E678 X T15O A527 X D291 X 13Lot 001 Regular 23F35O 135C X X A873 H136 31Lot 001 Regular 246769 X X C422 H926 NIMOXXXX 211Lot 001 Regular 25D233 L826 T785 3Lot 001 Regular 26M992 X X X A34O F732 P84O 31Lot 001 Regular 27M782XXXXXXXXX1Lot 001 Regular 28F996XXXX NPXXX11Lot 001 Regular 29G3O7XXXXXXXX1Lot 001 Regular 30S725XXXXXXXXX1Lot 001 Regular 31C317XXXXL336XXXX2Lot 001 Regular 3257N1 X K397 11Lot 001 Regular 3342A2 X XXXXXXXXXXX1Lot 001 Regular 343O98XXXXXXXX1Lot 001 Regular 35W984XXXXXXXX1Lot 001 Regular 36B853 S59O X X JO82 X X X 111Lot 001 Regular 37BO7OXXXXXXXXC252 11Lot 001 Regular 3884T2XXXXXXXX1Lot 001 Regular 39U9O6XXXXXXXXX1Lot 001 Regular 40M378XXXXXXXX1Lot 001 Regular 41S691XXXXXXXX1Lot 001 Regular 42D911XXXXXXXX1Lot 001 Regular 4319O1XXXXXXXN846 11Lot 001 Regular 44D426XXXXXXXX1Lot 001 Regular 45T995 X E661 L191XXXXXX 111Lot 001 Regular 46C735XXXXXD37O NP X X 111Lot 001 Regular 47M736XXXXXXXXX1Lot 001 Regular 48M246XXXXXXXXX1Lot 001 Regular 49Lot 001 Regular 50Lot 001 Regular 51V7O7 1Lot 001 Regular 52V662 XXXXXXXX1Lot 001 Regular 53U926 X X E121 11Lot 001 Regular 54J412XXXX1Lot 001 Regular 55YO26XXXXXXX1Lot 001 Regular 563OP1 X X1Prepared by National Data & Surveying ServicesParking StudyLot Space Type SpaceTimeDuration Lot 001 Regular 57PO34XXXXXXXX1Lot 001 Green Curb 58K2521Lot 001 Green Curb 59Lot 001 Green Curb 60Lot 001 Green Curb 61Lot 001 Green Curb 62Lot 001 Green Curb 63YO791Lot 001 Green Curb 64Lot 001 Green Curb 65Lot 001 Green Curb 66B249 X1Lot 001 Green Curb 67Lot 001 Green Curb 68Lot 001 Green Curb 69K31O X J631 X X X M63O 111Lot 001 Regular 70D398XXXXX1Lot 001 Regular 71Lot 001 Regular 72M199XXXX1Lot 001 Regular 73J356 B5O52Lot 001 Regular 74F671XXXXXX1Lot 001 Regular 75U995 L7O5 X 11Lot 001 Regular 76L385XXXXXXX1Lot 001 Regular 77H49OXXXXXX1Lot 001 Regular 7856POXXXX1Lot 001 Regular 79B35O X X X1Lot 001 Regular 80D266 X X B356 X X X11Lot 001 Regular 81P863 Y7O7 3OP1XXXX 21Lot 001 Regular 82C724XXXXXX1Lot 001 Regular 83Lot 001 Regular 84N1O5XXXXXXX1Lot 001 Regular 85L744 K767 J553XXXXP485 X 211Lot 001 Regular 86R425XXXXXXXXX1Lot 001 Regular 87NP X X X Z499 F134 X X 111Lot 001 Regular 88RO89XXXXXXXX1Lot 001 Regular 89O8J1 B1OOXXXXNO62 X X X 111Lot 001 Regular 90E876XXXXXXXXX1Lot 001 Regular 91X427 XXXXXN58O 11Lot 001 Regular 92P841XXXXXXX1Lot 001 Regular 93R691 X X X S6OO X T367 X X X R691 X X112Lot 001 Reserved 94Lot 001 Reserved 95Lot 001 Regular 96U691 XXXXXXC733 X11Lot 001 Regular 97J864XXXXXXXXX1Lot 001 Regular 98A461 XXXXXXXXX1Lot 001 Regular 99ARFN XXXXXXXXG3E2 11Lot 001 Regular 100D983 XXXXXX135C 8P33 21Lot 001 20 Mins 101R288XXXXXXXA917 X11Lot 001 20 Mins 102F953XXXXXXXT367 X X11 Project:19‐5601City:Diamond Bar0 ‐ 1 HRS 1 ‐ 2 HRS 2 ‐ 3 HRS 3 ‐ 4 HRS 4 ‐ 5 HRS 5 ‐ 6 HRS 6 ‐ 7 HRS 7 ‐ 8 HRS 8 ‐ 9 HRS 9 ‐ 10 HRS 10 ‐ 11 HRS 11 ‐ 12 HRS 12+ HRSNumber of Vehicles881413555613143111Percentage of total52.1% 8.3% 7.7% 3.0% 3.0% 3.0% 3.6% 7.7% 8.3% 1.8% 0.6% 0.6% 0.6%Number of Vehicles601511478117149101Percentage of total40.5% 10.1% 7.4% 2.7% 4.7% 5.4% 7.4% 4.7% 9.5% 6.1% 0.7% 0.0% 0.7%Number of Vehicles6523131213567139001Percentage of total38.9% 13.8% 7.8% 7.2% 7.8% 3.0% 3.6% 4.2% 7.8% 5.4% 0.0% 0.0% 0.6%Number of Vehicles213 52 37 21 25 18 23 27 41 21 2 1 3Percentage of total44.0% 10.7% 7.6% 4.3% 5.2% 3.7% 4.8% 5.6% 8.5% 4.3% 0.4% 0.2% 0.6%Parking StudyPrepared by National Data & Surveying ServicesMondayTuesdayGrand TotalDurationWednesday LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-17-3839-1 750 N. Diamond Bar Blvd Parking, Diamond Bar N:\3800\2173839 - 750 N. Diamond Bar Blvd Parking, Diamond Bar\2019 Parking Study Addendum\Report\Dividers\3839 Dividers.doc APPENDIX B ULI SHARED PARKING CALCULATION WORKSHEETS Land Use Size 2.771 KSF Pkg Rate[2] 2.188 /KSF Mode Adjust 1.00 1.00 Non-Captive Ratio 1.00 1.00 Gross 6 Spaces Spaces 0 Visitor Spc. 6 Emp. Spc.Shared Time % Of # Of % Of # Of Parking of Day Peak [3] Spaces Peak [3] Spaces Demand 6:00 AM 0% 0 3% 0 0 7:00 AM 1% 0 30% 2 2 8:00 AM 20% 0 75% 5 5 9:00 AM 60% 0 95% 6 6 10:00 AM 100% 0 100% 6 6 11:00 AM 45% 0 100% 6 6 12:00 PM 15% 0 90% 5 5 1:00 PM 45% 0 90% 5 5 2:00 PM 100% 0 100% 6 6 3:00 PM 45% 0 100% 6 6 4:00 PM 15% 0 90% 5 5 5:00 PM 10% 0 50% 3 3 6:00 PM 5% 0 25% 2 2 Notes: [1] Source: ULI - Urban Land Institute "Shared Parking," Second Edition, 2005. [3] Percentage of peak parking demand factors reflect relationships between weekday parking demand ratios and peak parking demand ratios, as summarized in Table 2-2 of the "Shared Parking" manual. Appendix Table B-1 OCCUPIED OFFICE TO BE REMOVED WEEKDAY SHARED PARKING DEMAND ANALYSIS [1] Office [2] Parking rates for all land uses based on City code. Land Use Size 5.272 KSF Pkg Rate[2] 4 /KSF Mode Adjust 1.00 1.00 Non-Captive Ratio 1.00 1.00 Gross 21 Spaces Spaces 14 Visitor Spc. 7 Emp. Spc.Shared Time % Of # Of % Of # Of Parking of Day Peak [3] Spaces Peak [3] Spaces Demand 6:00 AM 0% 0 0% 0 0 7:00 AM 0% 0 0% 0 0 8:00 AM 90% 13 60% 4 17 9:00 AM 90% 13 100% 7 20 10:00 AM 100% 14 100% 7 21 11:00 AM 100% 14 100% 7 21 12:00 PM 30% 4 100% 7 11 1:00 PM 90% 13 100% 7 20 2:00 PM 100% 14 100% 7 21 3:00 PM 100% 14 100% 7 21 4:00 PM 90% 13 100% 7 20 5:00 PM 80% 11 100% 7 18 6:00 PM 67% 9 67% 5 14 Notes: [1] Source: ULI - Urban Land Institute "Shared Parking," Second Edition, 2005. [3] Percentage of peak parking demand factors reflect relationships between weekday parking demand ratios and peak parking demand ratios, as summarized in Table 2-2 of the "Shared Parking" manual. Appendix Table B-2 PROPOSED MEDICAL/DENTAL OFFICE WEEKDAY SHARED PARKING DEMAND ANALYSIS [1] Medical/Dental Office [2] Parking rates for all land uses based on City code. Land Use Size 1.190 KSF Pkg Rate[2] 4 /KSF Mode Adjust 1.00 1.00 Non-Captive Ratio 1.00 1.00 Gross 5 Spaces Spaces 4 Guest Spc. 1 Emp. Spc.Shared Time % Of # Of % Of # Of Parking of Day Peak [3] Spaces Peak [3] Spaces Demand 6:00 AM 1% 0 9% 0 0 7:00 AM 5% 0 14% 0 0 8:00 AM 14% 1 36% 0 1 9:00 AM 32% 1 68% 1 2 10:00 AM 59% 2 77% 1 3 11:00 AM 77% 3 86% 1 4 12:00 PM 86% 3 90% 1 4 1:00 PM 90% 4 90% 1 5 2:00 PM 86% 3 90% 1 4 3:00 PM 81% 3 90% 1 4 4:00 PM 81% 3 90% 1 4 5:00 PM 86% 3 86% 1 4 6:00 PM 86% 3 86% 1 4 Notes: [2] Parking rates for all land uses based on City code. Appendix Table B-3 PROPOSED PHARMACY WEEKDAY SHARED PARKING DEMAND ANALYSIS [1] Shopping Center (Typical Days) [1] Source: ULI - Urban Land Institute "Shared Parking," Second Edition, 2005. [3] Percentage of peak parking demand factors reflect relationships between weekday parking demand ratios and peak parking demand ratios, as summarized in Table 2-2 of the "Shared Parking" manual.