HomeMy WebLinkAboutRE Crooked Creek, Diamond Bar - Updated Geotech StudyFrom: Mayuko Nakajima
Sent: Friday, September 11, 2020 4:26 PM
To: 'J. Rob Meserve'
Cc: Bryan Avilla; Ian Harvey; Christian Malpica
Subject: RE: Crooked Creek, Diamond Bar - Updated Geotech Study
Here you go. Please coordinate with Christian if you have any questions on the Geotech
comments. Thanks,
The Geotechnical Report has been reviewed and following are the correction:
1. Provide Legend for Plate 1 – Geotechnical Map. Total depth and depth to
bedrock at each boring location should be depicted on the plan next to each
boring.
2. Not all the boring logs are shown on the plan. The report should only include
borings that are within the project limits. Such as GeoSoils boring B-8-15 dated
7/2/15, or others.
3. Deeper compressible and collapsible alluvium is reported at and below
maximum recommended 15 feet over-excavation, at lower blow counts and
high collapse potential. Why the removal is limited to 15 feet?
4. Settlements of several inches of alluvium/landslide debris are reported under
Section 2.9 but later, in the same section the predicted settlement under footings
are reported as 0.5 inch or less. The settlement is reported as less than 1.0 inch
and 0.5 inch for total and differential case, and up to 2.0 inches for post-tension
foundation, Section 4.5.5 Foundation Settlement. Please clarify and provide
necessary explanations to support the stated conclusions.
5. Provide direct shear test results for engineered fill, alluvium, and slide debris, to
support the data used in slope stability analysis.
6. Print the name, address, and phone number of the Project Geotechnical
Consultant and list all applicable geotechnical reports on the grading plans.
7. All geotechnical recommended remedial grading, including limits and depths,
should be depicted on the final grading plans.
8. Geotechnical consultant should review the final grading (include limits and
depth of over-excavation) and foundation and confirm that their conclusions
and recommendations are valid with respect to the proposed design by signing
and stamping such plans.
9. The following note must appear on grading and foundation plans: “All the
remedial grading/over-excavation and foundation excavations, must be
observed and approved by the Project Geotechnical Consultant prior to
backfilling and placement of reinforcing steel.”
10. Geotechnical consultant of record should be present during grading and
foundation excavation.
11. A progress and final geotechnical report prepared by the geotechnical
consultant must be submitted to the City for review. The report must include the
results of all compaction tests as well as a map depicting the limits of over-
excavation, grading, observed geologic conditions, locations of all density tests,
locations and elevations of all removal bottoms, and location and elevation of
retaining wall backfill and subdrains outlets.
Mayuko Nakajima | Associate Planner
City of Diamond Bar | Planning Division
909.839.7033
Important Notice: Until further notice, all City facilities, including City Hall, the Diamond Bar Center and
Heritage Park will be closed to the public. In the meantime, staff is available to provide services and answer
questions by phone and email. For more information, visit www.diamondbarca.gov/covid19
From: J. Rob Meserve <rmeserve@newbridgehomes.com>
Sent: Friday, September 11, 2020 4:24 PM
To: Mayuko Nakajima <MNakajima@DiamondBarCA.Gov>
Cc: Bryan Avilla <bavilla@newbridgehomes.com>; Ian Harvey <iharvey@newbridgehomes.com>
Subject: RE: Crooked Creek, Diamond Bar - Updated Geotech Study
CAUTION: This message originated outside of our City of Diamond Bar network.
Yes. That would be helpful. Thanks
Rob
From: Mayuko Nakajima <MNakajima@DiamondBarCA.Gov>
Sent: Friday, September 11, 2020 4:23 PM
To: J. Rob Meserve <rmeserve@newbridgehomes.com>
Cc: Bryan Avilla <bavilla@newbridgehomes.com>; Ian Harvey <iharvey@newbridgehomes.com>
Subject: RE: Crooked Creek, Diamond Bar - Updated Geotech Study
Rob,
We received comments for the Geotech but it will be incorporated into the entire
Incompleteness Letter. The Incompleteness Letter is scheduled to go out no later than Sept 17.
Would you like to receive the Geotech comments now?
Mayuko Nakajima | Associate Planner
City of Diamond Bar | Planning Division
909.839.7033
Important Notice: Until further notice, all City facilities, including City Hall, the Diamond Bar Center and
Heritage Park will be closed to the public. In the meantime, staff is available to provide services and answer
questions by phone and email. For more information, visit www.diamondbarca.gov/covid19
From: J. Rob Meserve <rmeserve@newbridgehomes.com>
Sent: Friday, September 11, 2020 4:18 PM
To: Mayuko Nakajima <MNakajima@DiamondBarCA.Gov>
Cc: Bryan Avilla <bavilla@newbridgehomes.com>; Ian Harvey <iharvey@newbridgehomes.com>
Subject: RE: Crooked Creek, Diamond Bar - Updated Geotech Study
CAUTION: This message originated outside of our City of Diamond Bar network.
May,
Do you have any update? You mentioned last week that you thought you would have comments for us
this week.
Rob
J. Robert Meserve
500 Newport Center Drive, Suite 570
Newport Beach, CA 92660
P: (949) 344-2704
F: (949) 344-2702
C: (949) 500-2768
E: rmeserve@newbridgehomes.com
From: Mayuko Nakajima <MNakajima@DiamondBarCA.Gov>
Sent: Thursday, September 3, 2020 11:56 AM
To: J. Rob Meserve <rmeserve@newbridgehomes.com>; Christian Malpica
<CMalpica@DiamondBarCA.Gov>; Fabian P. Aoun <FAoun@DiamondBarCA.Gov>
Cc: Bryan Avilla <bavilla@newbridgehomes.com>; Ian Harvey <iharvey@newbridgehomes.com>;
Jasmine Liao <jasmine@cathyview.com>
Subject: RE: Crooked Creek, Diamond Bar - Updated Geotech Study
Thanks, I will forward to Public Works for their review.
Mayuko Nakajima | Associate Planner
City of Diamond Bar | Planning Division
909.839.7033
Important Notice: Until further notice, all City facilities, including City Hall, the Diamond Bar Center and
Heritage Park will be closed to the public. In the meantime, staff is available to provide services and answer
questions by phone and email. For more information, visit www.diamondbarca.gov/covid19
From: J. Rob Meserve <rmeserve@newbridgehomes.com>
Sent: Thursday, September 3, 2020 11:54 AM
To: Mayuko Nakajima <MNakajima@DiamondBarCA.Gov>
Cc: Bryan Avilla <bavilla@newbridgehomes.com>; Ian Harvey <iharvey@newbridgehomes.com>;
Jasmine Liao <jasmine@cathyview.com>
Subject: FW: Crooked Creek, Diamond Bar - Updated Geotech Study
CAUTION: This message originated outside of our City of Diamond Bar network.
May,
Attached is the updated geotech study for the new development/site plan.
Rob
J. Robert Meserve
500 Newport Center Drive, Suite 570
Newport Beach, CA 92660
P: (949) 344-2704
F: (949) 344-2702
C: (949) 500-2768
E: rmeserve@newbridgehomes.com
From: bhattar@lgcvalley.com <bhattar@lgcvalley.com>
Sent: Wednesday, September 2, 2020 5:44 PM
To: Ian Harvey <iharvey@newbridgehomes.com>
Cc: Bryan Avilla <bavilla@newbridgehomes.com>; J. Rob Meserve <rmeserve@newbridgehomes.com>
Subject: RE: Latest Autocad files for Crooked Creek Diamond Bar
Ian,
Here is the Final Geotechnical Report for Diamond Bar.
Please let me know if you have any questions or need anything else.
Basil Hattar
Vice President/Principal Engineer
LGC Valley, Inc.
28532 Constellation Road
Valencia, Ca 91355
Phone: 661-702-8474
Cell: 661-406-5721
From: Ian Harvey <iharvey@newbridgehomes.com>
Sent: Wednesday, August 19, 2020 4:24 PM
To: bhattar@lgcvalley.com
Cc: Bryan Avilla <bavilla@newbridgehomes.com>; J. Rob Meserve <rmeserve@newbridgehomes.com>
Subject: Latest Autocad files for Crooked Creek Diamond Bar
Basil,
Below is a link to the latest autocad files we have for the Crooked Creek project. Let me know if you
have any questions.
Best Regards,
Ian Harvey