HomeMy WebLinkAbout01/26/2021 PC Reg Mtg PLANNING
COMMISSION
AGENDA
January 26, 2021
6:30 PM
CONSISTENT WITH THE GOVERNOR’S EXECUTIVE ORDER TO STAY AT HOME,
AVOID GATHERINGS AND MAINTAIN SOCIAL DISTANCING, THIS MEETING
WILL BE CONDUCTED TELEPHONICALLY. MEMBERS OF THE PLANNING
COMMISION AND CITY STAFF WILL BE PARTICIPATING VIA
TELECONFERENCE, WHICH IS BEING RECORDED.
YOU CAN PARTICIPATE IN THE MEETING BY VISITING:
https://attendee.gotowebinar.com/register /458799126941300492
Audio +1 (562) 247 -8321 - Attendee Access Code: 848-288-309
Copies of staff reports or other written documentation relating to agenda items are on
file in the Planning Division of the Community Development Department, located at
21810 Copley Drive, and are available for public inspection. If you have questions regarding
an agenda item, please call (909) 839-7030 during regular business hours.
Written materials distributed to the Planning Commission within 72 hours of the Planning Commission
meeting are available for public inspection online at:
http://diamondbarca.iqm2.com/Citizens/Default.aspx
Chairperson Kenneth Mok
Vice Chairperson William Rawlings
Commissioner Naila Barlas
Commissioner Mahendra Garg
Commissioner Raymond Wolfe
In an effort to comply with the requirements of Title II of the Americans with
Disabilities Act of 1990, the City of Diamond Bar requires that any person in need of any
type of special equipment, assistance or accommodation(s) in order to communicate at a
City public meeting must inform the Community Development Department at
(909) 839-7030 a minimum of 72 hours prior to the scheduled meeting.
The City of Diamond Bar uses recycled paper
and encourages you to do the same
City of Diamond Bar
Planning Commission
MEETING RULES
PUBLIC INPUT
The meetings of the Diamond Bar Planning Commission are open to the public. A member of the public
may address the Commission on the subject of one or more agenda items and/or other items of which
are within the subject matter jurisdiction of the Diamond Bar Planning Commission. At this time, the
teleconference moderator will ask callers one at a time to give their name and if there is an agenda item
number they wish to speak on before providing their comment. If you wish to speak on a public hearing
item or commission consideration item, you will then be called upon to speak at that point in the
agenda.
As a general rule, the opportunity for public comments will take place at the discretion of the
Chairperson. However, in order to facilitate the meeting, persons who are interested parties for an item
may be requested to give their presentation at the time the item is called on the calendar. The
Chairperson may limit individual public input to five minutes on any item; or the Chairperson may limit
the total amount of time allocated for public testimony based on the number of people requesting to
speak and the business of the Commission.
Individuals are requested to conduct themselves in a professional and businesslike manner.
Comments and questions are welcome so that all points of view are considered prior to the
Commission making recommendations to the staff and City Council. When speaking, please direct your
questions and comments to the Commission, not to staff or other members of the public.
In accordance with State Law (Brown Act), all matters to be acted on by the Commission must be
posted at least 72 hours prior to the Commission meeting. In case of emergency or when a subject
matter arises subsequent to the posting of the agenda, upon making certain findings, the Commission
may act on item that is not on the posted agenda.
INFORMATION RELATING TO AGENDAS AND ACTIONS OF THE COMMISSION
Agendas for Diamond Bar Planning Commission meetings are prepared by the Planning Division of the
Community Development Department.
Every meeting of the Planning Commission is recorded and duplicate recordings are available for a
nominal charge.
HELPFUL CONTACT INFORMATION
Copies of Agenda, Rules of the Commission, CDs of Meetings (909) 839-7030
Email: info@diamondbarca.gov
Website: www.diamondbarca.gov
Consistent with the Governor’s Executive Order to stay at home, avoid gatherings and maintain
social distancing, this meeting will be conducted telephonically and Members of the Planning
Commission and City staff will be participating via Teleconference. There will be no physical
meeting location.
CITY OF DIAMOND BAR
PLANNING COMMISSION
January 26, 2021
AGENDA
Next Resolution No. 2021-02
CALL TO ORDER: 6:30 p.m.
PLEDGE OF ALLEGIANCE:
1. ROLL CALL: COMMISSIONERS: Naila Barlas, Mahendra
Garg, Raymond Wolfe, Vice Chairperson William
Rawlings, Chairperson Kenneth Mok
2. MATTERS FROM THE AUDIENCE/PUBLIC COMMENTS:
This is the time and place for the general public to address the members of the
Planning Commission on any item that is within its jurisdiction, allowing the public
an opportunity to speak on non-public hearing and non-agenda items. At this
time, the teleconference moderator will ask callers one at a time to give their
name and if there is an agenda item number they wish to speak on before
providing their comment. If you wish to speak on a public hearing item or
commission consideration item, you will then be called upon to speak at that
point in the agenda
3. APPROVAL OF
AGENDA:
Chairperson
4. CONSENT CALENDAR:
The following items listed on the consent calendar are considered routine and
are approved by a single motion. Consent calendar items may be removed from
the agenda by request of the Commission only:
4.1. Minutes of Planning Commission – January 12, 2021
5. OLD BUSINESS: None.
6. NEW BUSINESS: None.
JANUARY 26, 2021 PAGE 2 PLANNING COMMISSION
7. PUBLIC HEARINGS:
7.1 Development Review and Conditional Use Permit Amendment PL2020 -123
Under the authority of Diamond Bar Municipal Code Sections 22.48 and 22.58,
the applicant and property owner are requesting Development Review and
Conditional Use Permit Amendment approval to renovate and construct a 1,138
square-foot addition to the existing children’s center building and playground
area; construct 3,752 square feet of covered patio/canopy for community
gathering areas, relandscape and restripe parking spaces at Evangelical Free
Church of Diamond Bar. The subject property is zoned Low Medium Residential
(RLM) with an underlying General Plan land use designation of Low Medium
Residential.
PROJECT ADDRESS: 3255 S. Diamond Bar Blvd.
Diamond Bar, CA 91765
PROPERTY OWNER: Evangelical Free Church of Diamond Bar
3255 S. Diamond Bar Blvd.
Diamond Bar, CA 91765
APPLICANT: Ruben Van Colenberghe
21330 Hidden Pines Dr.
Diamond Bar, CA 91765
ENVIRONMENTAL DETERMINATION: The project has been reviewed for
compliance with the California Environmental Quality Act (CEQA). Based on that
assessment, the City has determined the project to be Categorically Exempt from
the provisions of CEQA pursuant to Article 19 under 15301(e)(additions to
existing structures) and 15311 (accessory structures) of the CEQA Guidelines.
No further environmental review is required.
RECOMMENDATION: Staff recommends that the Planning Commission
approve Development Review and Conditional Use Permit No. PL2020-123,
based on the Findings of Fact, and subject to the conditions of approval as listed
within the draft resolution.
8. PLANNING COMMISSION COMMENTS / INFORMATIONAL ITEMS:
9. STAFF COMMENTS / INFORMATIONAL ITEMS:
10. SCHEDULE OF FUTURE EVENTS:
*Until further notice and consistent with the Governor’s latest Executive
Order to stay at home, all City meetings will be conducted telephonically.
CITY COUNCIL MEETING: Tuesday, February 2, 2021 – 6:30 pm
JANUARY 26, 2021 PAGE 3 PLANNING COMMISSION
11. ADJOURNMENT:
PLANNING COMMISSION MEETING: Tuesday, February 9, 2021, 6:30 pm
PRESIDENTS’ DAY HOLIDAY
Monday, February 15, 2021
In observance of the holiday, City offices
will be closed. City offices will re-open on
Tuesday, February 16, 2021
CITY COUNCIL MEETING: Tuesday, February 16, 2021, 6:30 pm
PLANNING COMMISSION MEETING: Tuesday, February 23, 2021, 6:30 pm
TRAFFIC AND TRANSPORTATION
COMMISSION MEETING:
Thursday, March 11, 2021, 6:30 pm
PARKS AND RECREATION
COMMISSION MEETING:
Thursday, March 25, 2021, 6:30 pm
MINUTES OF THE CITY OF DIAMOND BAR
MEETING OF THE PLANNING COMMISSION
JANUARY 12, 2021
CONSISTENT WITH THE GOVERNOR’S LATEST EXECUTIVE ORDER TO STAY AT
HOME, AVOID GATHERINGS, AND MAINTAIN SOCIAL DISTANCING, THIS MEETING WAS
CONDUCTED TELEPHONICALLY AND PLANNING COMMISSIONERS, CITY STAFF, AND
MEMBERS OF THE PUBLIC PARTICIPATED VIA TELECONFERENCE.
CALL TO ORDER:
Chair/Mok called the meeting to order at 6:32 p.m.
PLEDGE OF ALLEGIANCE: Commissioner Wolfe led the Pledge of Allegiance.
1. ROLL CALL: Commissioners: Naila Barlas, Mahendra Garg, Raymond
Wolfe, Vice Chairperson William Rawlings and Chairman Kenneth Mok
Staff participating telephonically: Greg Gubman, Community Development Director; James
Eggart, Assistant City Attorney; Grace Lee, Senior Planner; and Stella Marquez, Administrative
Coordinator
2. PUBLIC COMMENTS: None
3. APPROVAL OF AGENDA: As presented.
4. CONSENT CALENDAR:
4.1 Minutes of the Regular Planning Commission Meeting – December 8, 2020.
VC/Rawlings requested that the minutes reflect, to indicate his presence, he was
present and heard the entirety of the meeting, however, due to audio error, was
unable to be heard, therefore, not able to participate.
C/Wolfe moved, C/Barlas seconded, to approve the December 8, 2020, Meeting
Minutes with VC/Rawlings request noted. Motion carried by the following Roll
Call vote:
AYES: COMMISSIONERS: Barlas, Garg, Wolfe, VC/Rawlings,
Chair/Mok
NOES: COMMISSIONERS: None
ABSENT: COMMISSIONERS: None
5. OLD BUSINESS: None
6. NEW BUSINESS: None
4.1
Packet Pg. 6
________________________________________________________________________
JANUARY 12, 2021 PAGE 2 PLANNING COMMISSION
________________________________________________________________________
7. PUBLIC HEARING(S):
7.1 Development Review and Tree Permit No. PL2020-70 – Under the authority of
Diamond Bar Municipal Code Section 22.48, the applicant and property owner
requested Development Review approval to construct a 3,088 square foot two -
story addition and 911 square foot garage addition and, 766 square feet of
balcony area to an existing 2,190 square foot single family residence on a 51,836
gross square foot (1.19 gross acre) lot. A Tree Permit was also requested to
protect 16 Southern California black walnut and six coast live oak trees. The
subject property is zoned Rural Residential (RR) with an underlying General Plan
land use designation of Rural Residential.
PROJECT ADDRESS: 2366 Clear Creek Lane
Diamond Bar, CA 91765
PROPERTY OWNER: Lawrence Ogbechie
2366 Clear Creek Lane
Diamond Bar, CA 91765
APPLICANT: Pete Volbeda
164 N. 2nd Avenue, Suite 100
Upland, CA 91786
SP/Lee presented staff’s report and recommended Planning Commission
approval of Development Review and Tree Permit No. PL2020-70, based on the
Findings of Fact, and subject to the conditions of approval.
Chair/Mok opened the public hearing.
Pete Volbeda, Architect, thanked staff for their assistance on this project,
explained the project’s reduction from three stories to two and explained the
setbacks.
Robin Smith, Diamond Bar resident, liked the design, was pleased about the
proposal for the avoidance of native trees on the subject property, and thanked
the Planning Department for their careful consideration of projects.
Chair/Mok closed the public hearing.
VC/Rawlings moved, C/Wolfe seconded, to approve Development Review and
Tree Permit No. PL2020-70, based upon the Findings of Fact and Conditions of
Approval as listed within the Resolution. Motion carried by the following Roll Call
vote:
4.1
Packet Pg. 7
________________________________________________________________________
JANUARY 12, 2021 PAGE 3 PLANNING COMMISSION
________________________________________________________________________
AYES: COMMISSIONERS: Barlas, Garg, Wolfe, VC/Rawlings,
Chair/Mok
NOES: COMMISSIONERS: None
ABSENT: COMMISSIONERS: None
8. PLANNING COMMISSION COMMENTS/INFORMATIONAL ITEMS:
Chair/Mok asked everyone to please continue to patronize local businesses during the
pandemic.
9. STAFF COMMENTS/INFORMATIONAL ITEMS:
CDD/Gubman stated that prior to the next meeting of January 26th, beginning at
5:30 p.m., there will be a Joint City Council/Planning Commission Community Workshop
on the upcoming Housing Element Update and will provide a general overview of the
Housing Element Update process. An agenda packet will be provided to
Commissioners prior to the meeting. The January 26th regular meeting will commence
at 6:30 p.m. with one public hearing item, a proposal from Evangelical Free Church at
South Diamond Bar Boulevard/Brea Canyon Road for a remodel and expansion of the
campus.
10. SCHEDULE OF FUTURE EVENTS:
As listed in the agenda.
ADJOURNMENT: With no further business before the Planning Commission,
Chair/Mok adjourned the regular meeting at 6:57 p.m.
The foregoing minutes are hereby approved this 26th day of January, 2021.
Attest:
Respectfully Submitted,
_______________________________________
Greg Gubman, Community Development Director
_______________________________
Kenneth Mok, Chairperson
4.1
Packet Pg. 8
PLANNING COMMISSION
AGENDA REPORT
AGENDA ITEM NUMBER: 7.1
MEETING DATE: January 26, 2021
CASE/FILE NUMBER: Development Review and Conditional Use
Permit Amendment No. PL2020-123
PROJECT LOCATION:
3255 S. Diamond Bar Blvd.
Diamond Bar, CA 91765
(APN: 8285-028-034)
GENERAL PLAN DESIGNATION: Low Medium Residential
ZONING DISTRICT: Low Medium Residential
PROPERTY OWNER:
Phil Meister – Elder Chair
Evangelical Free Church of Diamond Bar
3255 S Diamond Bar Blvd
Diamond Bar, CA 91765
APPLICANT:
Ruben Van Colenberghe
21330 Hidden Pines Dr
Diamond Bar, CA 91765
SUMMARY:
The applicant is requesting Development Review and Conditional Use Permit
Amendment approval to renovate and construct a 1,138 square-foot addition to the
existing children’s center building and playground area, construct 3,752 square feet of
covered patio/canopy for community gathering areas , relandscape and restripe parking
spaces at Evangelical Free Church of Diamond Bar (EFree Church).
CITY OF DIAMOND BAR ~ 21810 COPLEY DRIVE ~ DIAMOND BAR, CA 91765 ~ TEL. (909) 839-7030 ~ FAX (909) 861-3117
7.1
Packet Pg. 9
Development Review and Conditional Use Permit Amendment No. PL2020 -123
Page 2 of 12
RECOMMENDATION:
Adopt the attached Resolution (Attachment A) approving Development Review and
Conditional Use Permit Amendment No. PL2020-123, based on the findings of Diamond
Bar Municipal Code (DBMC) Chapters 22.48 and 22.58, subject to conditions.
The subject property consists of a 2.3 7-acre triangular-shaped parcel located on the
northerly side of Diamond Bar Boulevard between Brea Canyon Road and Cherrydale
Drive. The property was developed in multiple phases over the years. A history of
approved entitlements is listed below:
Entitlement History
November 1980
Approved by the County for a church facility, classrooms and a
nursery to be constructed in three phases within 10 years
(CUP 1634(1))
Phase 1 – Multi-purpose room, classroom, offices and 41 parking
spaces
Phase 2 – Two-story classroom structure
Phase 3 – Main sanctuary and classrooms. 35 additional parking
spaces
May 1991 Extension approved
May 1995
Revisions to original approved Repealed CUP 1634(1). Removed
constraint of time, removed the one-story classroom near knoll,
installed two temporary modular classroom units and a two-story
sanctuary with cellar (CUP 95-1, DR 95-1, and Neg Dec 95-1)
October 1999
Added 34 parking spaces, reduce stall dimensions, remove and
replace protected trees. (CUP 95-1(1), Variance 99-8, Tree Permit
No. 99-2 and amendment to Neg Dec 95-1 and amendment to
CUP 95-1).
Today, the site is developed with a 14,945 square-foot sanctuary, 4,011 square-foot
children’s center, and a 4,524 square-foot one-story building. There are 114 existing
parking spaces on site.
The property is legally described as Lot 19 of Tract No. 33417 and the Assessor’s
Parcel Number (APN) is 8285-028-034.
Site and Surrounding General Plan, Zoning and Land Uses
The image on the following page highlights the subject property:
7.1
Packet Pg. 10
Development Review and Conditional Use Permit Amendment No. PL2020 -123
Page 3 of 12
The following table summarizes the land use status of the subject property and its
surroundings:
General Plan Designation Zoning
District Land Use
Site Low Medium Residential RLM Church
North Low Medium Residential RLM Single-Family Residential
South Specific Plan SP Condominiums and
Single-Family Residential
East Low Medium Residential RLM Single-Family Residential
West General Commercial C-1 Shopping Center
7.1
Packet Pg. 11
Development Review and Conditional Use Permit Amendment No. PL2020 -123
Page 4 of 12
Project Description
The applicant is proposing to renovate and construct a 1,138 square-foot addition to the
existing children’s center building and playground area, construct 3,752 square feet of
covered patio/canopy for community gathering areas , relandscape and restripe parking
spaces.
Site Plan
The building footprint of all existing structures will remain unchanged. A new
1,138 square-foot building is proposed next to the existing children’s center building.
The existing playground will be renovated and a community plaza with concrete pavers
will be upgraded in the existing space between the children’s center building and
sanctuary. The “meet and greet” plaza is a 2,310 square-foot patio structure proposed
at the front of the church facility along with 680 square feet of sunshade fabric canopies.
The applicant is proposing to reconfigure the parking and landscape planter areas on
the north, south and west sides of the facility. There are 114 parking spaces on the
project site, and the proposed adjustments will result in no net loss to the number of
parking spaces provided.
Proposed Site Plan
N
Diamond Bar Blvd.
7.1
Packet Pg. 12
Development Review and Conditional Use Permit Amendment No. PL2020 -123
Page 5 of 12
Proposed Floor Plan:
The existing children’s center building is a two-story structure with six classrooms. One
of the existing classrooms on the first floor will be converted into a nursery with check -in
office. The new 1,138 square-foot building will consist of three stories. The first floor
includes a reception area, kitchen, and restroom. The second floor includes a workshop,
office, and storage. The third floor is a mechanical deck and access is restricted for
maintenance purposes only. An elevator and stairway provide access to all three floors.
Architecture
The existing buildings includes both hipped and gable styled roofs with red clay pantiles,
large wall expanses with a single stucco material in an ivory color. The lan ding building
and children’s center are rectangular in form, whereas the sanctuary is asymmetrical
with diagonal wall planes.
Existing South (Front) Elevation (View from Diamond Bar Blvd.)
(Sanctuary and One-Story Building)
Existing East Side Elevation
(One-Story Building)
7.1
Packet Pg. 13
Development Review and Conditional Use Permit Amendment No. PL2020 -123
Page 6 of 12
The applicant is proposing to update the architecture to a modern design that blends the
old with the new, by introducing a coordinated palette of finish materials, roof lines, and
architectural projections. The reimagined exterior design incorporates the following
elements:
• The new children’s center building to be designed in a modern architectural style
with horizontal wall planes, steel columns, metal canopy and railing, large
windows and painted with vibrant colors in teal, blue and white.
• The existing children’s center will be renovated by repainting the building with
vibrant colors in white, pink, yellow, green and blue. The addition of a high wall
to the north, east and west sides of the existing building create the illusion of a
modern style with its similar lines, shapes and form with the new building.
• A “meet and greet” plaza will be constructed with a metal roof panel and laminate
glass over a wood canopy structure. The acoustic wood ceiling will bring warmth
to the space to contrast with the metal and glass.
• Coral-colored sunshade fabric canopies lining the walkway between buildings.
The existing red clay pantile roofing material will remain on all buildings. T he sanctuary
and one-story buildings will be repainted “Snowbound white” to match the updated color
palette.
Existing North (Rear) Elevation
(Children’s Center Building and Sanctuary)
7.1
Packet Pg. 14
Development Review and Conditional Use Permit Amendment No. PL2020 -123
Page 7 of 12
Lighting
A condition of approval is included to replace all parking lot light ing with new LED
lighting that conforms to the City’s CALGreen energy efficiency requirements. Pursuant
to DBMC Section 22.16.050(b), lighting shall provide a minimum one footcandle of
illumination at the ground throughout the parking area and walkways. All lighting will be
shielded to prevent light spill and specular glare to adjacent properties.
Landscape Plans
There is existing landscaping throughout the perimeter of the site, consisting of mature
trees, shrubs and hedges that provides screening to the adjacent land uses. The
perimeter landscaping will remain. The applicant is proposing to plant two large
Rendering of Renovated Buildings
7.1
Packet Pg. 15
Development Review and Conditional Use Permit Amendment No. PL2020 -123
Page 8 of 12
California box elder or white oak trees and four medium-sized western cottonwood trees
near the playground area. Three trees will also be added near the community plaza.
Drought-tolerant shrubs are proposed throughout the site in existing planters near the
playground, new children’s center building, and main entrance.
Currently, the street frontage is planted with turf and is void of any street trees. The
applicant will replace the landscaping along the street with climate-appropriate trees,
shrubs, and groundcover. However, the applicant has requested to submit the
landscape plan for the street frontage at a later time in an effort to save time and move
the process along for the buildings and exterior improvements. Therefore, a condition
of approval is included to submit a landscape plan that complies with the City’s Water
Efficient Landscaping Ordinance, and install landscape improvements prior to the
release of final occupancy of the new children’s center building.
ANALYSIS
Review Authority (Diamond Bar Municipal Code (DBMC) Sections 22.48 and
22.58)
The proposed project requires Planning Commission review and approval of two
entitlement applications: Development Review (DR) and a Conditional Use Permit
(CUP) Amendment. The analysis that follows provides the basis for staff’s
recommendation to approve the DR and CUP Amendment applications.
Development Review (DBMC Chapter 22.48)
Projects involving a substantial change or intensification of land use requires Planning
Commission approval of a Development Review application. Development Review
approval is required to ensure compliance with the City’s General Plan policies,
development standards and design guidelines, and to minimize adverse effects of the
proposed project upon the surrounding properties and the City in general.
As stated in Section 22.48.010 of the Development Code, the Development Review
process was established to ensure that new development and additions to existing
development are consistent with the General Plan “through the promotion of high
functional and aesthetic standards to complement and add to the economic, physical,
and social character” of Diamond Bar.
Development Standards: The following table compares the proposed project with the
City’s development standards for residential development in the RLM zone:
7.1
Packet Pg. 16
Development Review and Conditional Use Permit Amendment No. PL2020 -123
Page 9 of 12
Development
Feature
Residential
Development
Standards
Existing Proposed Meets
Requirements
Front Setback 20 feet 55’-11” feet 55’-3” feet Yes
Side Setbacks 10 feet on one side and
5 feet on the other
70’-1” – east side
61’-6” – west side
67-6” – east side
61’-6” – west side Yes
Side Yard Minimum
Between Adjoining
Structures
15 feet
92’-9” – east side
Flood control channel
on north and west sides
92’-9” – east side
Flood control channel
on north and west sides
Yes
Rear Setback 20 feet 101 feet 101 feet Yes
Lot Coverage Maximum of 40% 16% 18% Yes
Building Height
Limit 35 feet 35 feet 35 feet Yes
Parking
As required by Chapter
22.30 (Parking and
Loading)
114 parking spaces 114 parking spaces *No
*Existing legal nonconforming parking spaces. See parking discussion below.
Consistency with Citywide Design Guidelines
The applicant has worked closely with staff to ensure that the project is consistent with
the City’s Citywide Design Guidelines. It is staff’s opinion that the project successfully
captures the spirit and intent of the Design Guidelines.
In addition to conforming to the minimum development standards prescribed for the
RLM zoning district, the project will significantly upgrade the aesthetics of the subject
property by updating the buildings to a more modern theme and create an inviting new
main entrance with gathering areas. Additionally, the updated landscaping will provide
shade for parked cars, reduce the visual impact of the parking lot, enhance the
architecture, and break up the building mass.
Notable elements of the project design which address the Citywide Design Guidelines
include, among other things, the following:
• The project’s design reflects community character while suggesting uniqueness
and quality;
• The architectural treatment of the new building extends to all visible sides and
parapet walls are treated as an integral part of the building design;
• A visual link is established between buildings. This link is accomplished through
the use of open canopies and the addition of landscaping;
7.1
Packet Pg. 17
Development Review and Conditional Use Permit Amendment No. PL2020 -123
Page 10 of 12
• The addition of the open canopies creates spatial relationships between buildings
that provide for and promote pedestrian access and movement in an
environment that reflects a human scale;
• A transition between base and accent colors relate to changes in building
materials or changes of building planes. Colors meet and change with a physi cal
change or definition;
• Overhangs, canopies, and projections contribute to the character of the site and
create shadow patterns and shelter from the sun; and
• There is variation of scale, pattern and texture of the buildings and landscaping
elements to encourage a more visually interesting project.
The overall composition of building forms, articulation and details is visually pleasing
and harmonious. The mix of the old and new improvements work cohesively through
the use of a varied palette of materials and details, including wood, glass, metal, smooth
stucco, large open windows, and a coordinated vibrant color scheme.
Conditional Use Permit Amendment (DBMC Section 22.58)
A CUP is required for uses whose effect on the surrounding area cannot be de termined
before being analyzed for suitability at a particular location.
When reviewing a CUP, consideration is given to the location, design, configuration,
operational characteristics and potential impacts to determine whether or not the
proposed use will pose a detriment to the public health, safety and welfare. If it can be
found that the proposed use is likely to be compatible with its surroundings, the
Commission may approve the proposed use subject to conditions stipulating the
manner in which the use must be conducted. If the Commission finds that the proposed
use is likely to be detrimental to the general peace, health and general welfare, then it
must deny the request.
When a CUP is approved, it runs with the land and all conditions placed on the CUP are
binding on all successors in interest. In other words, if the church were to close , a new
tenant could locate in the space and operate the same type of use. The new tenant
would be required to comply with the same conditions as the previous t enant and would
not be permitted to expand the use without full review and approval by the Planning
Commission.
Pursuant to DBMC Section 22.08.030 Table 2-3, religious places of worship—as
defined by DBMC Section 22.80.020—are permitted in the RLM zoning district with
approval of a CUP. The existing child care use is ancillary to the main church use.
Adults attend service in the sanctuary while the children are being watched in the child
care area. The purpose of the new children’s center building is to s erve the existing
congregation with the addition of a reception area and additional room for staff.
7.1
Packet Pg. 18
Development Review and Conditional Use Permit Amendment No. PL2020 -123
Page 11 of 12
Parking
The church facility was required to provide 76 parking spaces as part of the original
CUP approval. This parking requirement was based on providing one parking space for
every five occupants of the largest assembly area, which was 375 seats in the
sanctuary. Thirty-four (34) additional parking spaces were added in 1999, which
created a total of 110 parking spaces on site.
Pursuant to the City’s Development Code, the dimensions of a standard parking stall
are 9 feet by 19 feet, including bumper overhang. The Los Angeles County Planning
and Zoning Code under which the church facility was approved allowed compact
parking stalls (7.5 feet by 15 feet) and standard parking stall dimensions were 8 feet by
18 feet. Additionally, the church received a variance to reduce the required parking
space dimensions when granted the approval in 1999 to construct 34 additional parking
spaces. Therefore, there are existing nonconforming parking spaces throughout the
project site. A recent field survey indicated that there are actually 114 parking spaces
on site.
The applicant is proposing to reconfigure four parking spaces by removing or reducing
the size of the existing landscape planters. The proposed adjustments will result in no
net loss to the number of parking spaces provided and all existing driveway widths will
remain intact. Since the purpose of the new children’s center building is to serve the
existing congregation, additional parking spaces is not required.
Compatibility with Existing Land Uses
The proposed project complies with the goals and objectives as set forth in the adopted
General Plan in terms of land use. “Efree Church” has been operating a church at this
location since 1982. It is surrounded by residential land uses and a commercial center
to the west. The project will not negatively affect the existing surrounding land uses as it
is currently being utilized as a church, and the design an d appearance of the proposed
project is unique, but compatible with the surrounding community. The operational
characteristics will not change and are compatible with the existing uses within the
neighborhood.
Additional Review
The Public Works Department and Building and Safety Division reviewed this project,
and their conditions are included in the attached resolution as conditions of approval.
NOTICE OF PUBLIC HEARING:
On January 13, 2021, public hearing notices were mailed to property owners withi n a
500-foot radius of the subject property. On January 15, 2021, the notice was published
in the San Gabriel Valley Tribune newspaper and the project site was posted with a
7.1
Packet Pg. 19
Development Review and Conditional Use Permit Amendment No. PL2020 -123
Page 12 of 12
notice display board, and a copy of the public notice was posted at the City’s four
designated community posting sites.
Public Comments Received
At the time the staff report was published, staff did not receive any comments in
opposition to the Project.
ENVIRONMENTAL ASSESSMENT:
The project has been reviewed for compliance with t he California Environmental Quality
Act (CEQA). Based on that assessment, the City has determined the project to be
Categorically Exempt from the provisions of CEQA pursuant to Article 19 under
15301(e) (additions to existing structures) and 15311 (accessory structures) of the
CEQA Guidelines. No further environmental review is required.
PREPARED BY:
REVIEWED BY:
Attachments:
A. Draft Resolution No. 2021-XX, Standard Conditions of Approval
B. Site Plan, Floor Plan, Elevation, Roof Plan, Conceptual Landsc ape Plan, Grading
Plan
7.1
Packet Pg. 20
PLANNING COMMISSION
RESOLUTION NO. 2021-XX
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DIAMOND
BAR, CALIFORNIA, APPROVING DEVELOPMENT REVIEW AND CONDITIONAL
USE PERMIT AMENDMENT NO. PL2020-123 TO RENOVATE AND CONSTRUCT
A 1,138 SQUARE-FOOT ADDITION TO THE EXISTING CHILDREN’S CENTER
BUILDING AND PLAYGROUND AREA, CONSTRUCT 3,752 SQUARE FEET OF
COVERED PATIO/CANOPY FOR COMMUNITY GATHERING AREAS,
RELANDSCAPE AND RESTRIPE PARKING SPACES AT EVANGELICAL FREE
CHURCH OF DIAMOND BAR LOCATED AT 3255 S. DIAMOND BAR BOULEVARD,
DIAMOND BAR, CA 91765 (APN 8285-028-034).
A. RECITALS
1. The property owner, Evangelical Free Church of Diamond Bar, and applicant,
Ruben Van Colenberghe, have filed an application for Development Review and
Conditional Use Permit No. PL2020-123 to request the following from the
Planning Commission:
(a) Development Review to renovate and construct a 1,138 square-foot
addition to the existing children’s center building and playground area,
construct 3,752 square feet of covered patio/canopy for community
gathering areas, relandscape and restripe parking spaces; and
(b) Conditional Use Permit Amendment to amend existing Conditional Use
Permit No. 95-1(1) to allow a church and related parking.
Hereinafter in this Resolution, the subject Development Review and Conditional
Use Permit Amendment shall be referred to as the "Proposed Project."
2. The subject property is made up of one parcel totaling 2.37 acres. It is located in
the Low Medium Residential (RLM) zone with an underlying General Plan land
use designation of the Low Medium Residential.
3. The legal description of the subject property is Lot 19 of Tract No. 33417. The
Assessor’s Parcel Number is 8285-028-034.
4. On January 13, 2021, public hearing notices were mailed to property owners
within a 500-foot radius of the Project site. Also, public notices were posted at
the project site and the City’s four designated community posting sites. On
January 15, 2021, notification of the public hearing for this project was published
in the San Gabriel Valley Tribune newspaper.
5. On January 26, 2021, the Planning Commission of the City of Diamond Bar
conducted a duly noticed public hearing, solicited testimony from all interested
individuals, and concluded said hearing on that date.
7.1.a
Packet Pg. 21
2 PC Resolution No. 2021-XX
B. RESOLUTION
NOW, THEREFORE, it is found, determined and resolved by the Planning Commission
of the City of Diamond Bar as follows:
1. The Planning Commission hereby specifically finds that all of the facts set forth
in the Recitals, Part A, of this Resolution are true and correct; and
2. The Planning Commission hereby determines the Project to be Categorically
Exempt from the provisions of CEQA pursuant to Article 19 under
15301(e) (additions to existing structures) and 15311 (accessory structures) of
the CEQA Guidelines. No further environmental review is required.
C. FINDINGS OF FACT
Based on the findings and conclusions set forth herein and as prescribed un der
Diamond Bar Municipal Code (DBMC) Sections 22.48 and 22.58, this Planning
Commission hereby finds as follows:
Development Review Findings (DBMC Section 22.48.040)
1. The design and layout of the proposed development is consistent with the
applicable elements of the City's General Plan, City Design Guidelines, and
development standards of the applicable district, design guidelines, and
architectural criteria for special areas (e.g., theme areas, specific plans,
community plans, boulevards or planned developments).
The design and layout of the proposed building, exterior and landscaping
renovation is consistent with the City’s General Plan, City Design Guidelines and
Development Code standards.
The City’s General Plan Policy LU-P-1 ensures that the scale and massing of
new development provides sensitive transitions or design techniques in building
height, bulk, and landscaping to minimize impacts on adjacent, less intensive
uses, particularly residential uses Although the project will significantly upgrade
the buildings to a more modern theme, the overall building scale and massing
are not changing since all existing buildings will be utilized. The maximum height
of the tallest building remains unchanged. There is existing landscaping
throughout the perimeter of the site, consisting of mature trees, shrubs and
hedges that provides an appropriate buffer to the adjacent residential land uses.
Additionally, adjacent residential land uses are at a higher grade which further
reduces potential impacts.
The buildings will be updated to a modern design that blends the old with the
new, by introducing new roof lines, architectural projections and a coordinated
palette of finish materials such as wood, glass, metal, smooth stucco, large open
windows, and a coordinated vibrant color scheme . As such, there is variation of
scale, pattern and texture of the buildings and landscaping elements to
encourage a more visually interesting project [City’s Design Guidelines B.
Architecture (20)].
7.1.a
Packet Pg. 22
3 PC Resolution No. 2021-XX
With the exception of the existing legal nonconforming parking spaces, the
Project complies with all development standards of the Low Medium Residential
zoning district by complying with all development standards such as required
setbacks, building height, and lot coverage. The project site is not part of any
theme area, specific plan, community plan, boulevard or planned development.
2. The design and layout of the proposed development will not interfere with the use
and enjoyment of neighboring existing or future development s, and will not create
traffic or pedestrian hazards.
The Proposed Project will not interfere with the use and enjoyment of neighboring
existing or future developments because the use of the project site is existing and
the main sanctuary area is not increasing. The purpose of the new children’s
center building is to serve the existing congregation with the addition of a
reception area and additional room for staff , and is ancillary to the main church
use.
The Proposed Project will not interfere with vehicular or pedestrian movements ,
such as access or other functional requirements of a church because it complies
with the requirements for driveway widths and is a continuation of an existing use .
3. The architectural design of the proposed development is compatible with the
character of the surrounding neighborhood and will maintain and enhance the
harmonious, orderly and attractive development contemplated by Chapter 22.48:
Development Review Standards, the City’s Design Guidelines, the City's General
Plan, or any applicable specific plan.
The Proposed Project is compatible with the character of the surrounding
neighborhood in that it will maintain the existing church facility. The main
sanctuary area is not increasing and the purpose of the new children’s center
building is to serve the existing congregation with the addition of a reception area
and additional room for staff, and is ancillary to the main church use. “Efree
Church” has been in operation at this location since 1982. It is surrounded by
residential land uses and a commercial center to the west. The project will not
negatively affect the existing surrounding land uses as it is currently being utilized
as a church facility, and the design and appearance of the proposed project is
unique, but compatible with the surrounding community. The operational
characteristics will not change and are compatible with the existing uses within
the neighborhood. Additionally, the modern theme of the Proposed Project uses
design elements, colors and materials that are consistent with the City’s Design
Guidelines.
4. The design of the proposed development will provide a desirable environment for
its occupants and visiting public as well as its neighbors through good aesthetic
use of materials, texture, color, and will remain aesthetically appealing.
The applicant is proposing to update the architecture to a modern design that
blends the old with the new, by introducing a coordinated palette of finish
materials, roof lines, and architectural projections. The project will significantly
upgrade the aesthetics of the subject property by updating the buildings to a more
7.1.a
Packet Pg. 23
4 PC Resolution No. 2021-XX
modern theme and create an inviting main entrance with gathering areas.
Additionally, the updated landscaping will provide shade for parked cars, reduce
the visual impact of the parking lot, enhance the arc hitecture, and break up the
building mass.
5. The proposed development will not be detrimental to public health, safety or
welfare or materially injurious (e.g., negative effect on property values or
resale(s) of property) to the properties or improvements in the vicinity.
Before the issuance of any City permits, the proposed project is required to
comply with all conditions within the approved resolution, and the Building and
Safety Division and Public Works Departments requirements.
Through the permit and inspection process, the referenced agencies will ensure
that the proposed project is not detrimental to the public health, safety or welfare
or materially injurious to the properties or improvements in the vicinity.
6. The proposed project has been reviewed in compliance with the provisions of the
California Environmental Quality Act (CEQA).
The proposed project is Categorically Exempt from the provisions of CEQA
pursuant to Article 19 under 15301(e)(additions to existing structures) and 15311
(accessory structures) of the CEQA Guidelines.
Conditional Use Permit Review Findings (DBMC Section 22.58)
1. The Proposed Use is allowed within the subject zoning district with the approval
of a conditional use permit and complies with all other applicable provisions of
this Development Code and the Municipal Code.
Pursuant to DBMC Section 22.08.030 Table 2-3, religious places of worship—as
defined by DBMC Section 22.80.020—are permitted in the RLM zoning district
with approval of a conditional use permit. The purpose of the new children’s
center building is to serve the existing congregation with the addition of a
reception area and additional room for staff. The proposed outdoor
improvements will be located within the existing facility. Through compliance with
the conditions of approval stipulating the manner in which the use must be
conducted, the Proposed Use will be compatible with neighboring uses in the
surrounding neighborhood.
2. The Proposed Use is consistent with the general plan and any applicable specific
plan.
The Proposed Use is consistent with General Plan Goal LU-G-6: (“Preserve
existing residential neighborhoods to retain the qualities Diamond Bar residents
love, such as easy access to preserved natural open spaces, while supporting
and encouraging well-designed, complete neighborhoods with safe streets,
access to shopping and services, and community parks and gathering places”)
in that the Proposed Use will continue to provide religious services to Diamond
Bar residents.
7.1.a
Packet Pg. 24
5 PC Resolution No. 2021-XX
The Project site is not subject to the provisions of any specific plan.
3. The design, location, size and operating characteristics of the Proposed Use are
compatible with the existing and future land uses in the vicinity.
The Proposed Use is located within an existing neighborhood that has a diversity
of uses, including single-family residences and other retail and service uses. The
location, size and operating characteristics are not changing with the existing
church.
Through compliance with the conditions of approval stipulating the manner in
which the use must be conducted, the Proposed Use is and will continue to be
compatible with the other uses within the neighborhood.
4. The subject site is physically suitable for the type and density/intensity of use
being proposed, including access, provision of utilities, compatibility with
adjoining land uses, and the absence of physical constraints.
The Project site is located within an existing church facility. There are 114 parking
spaces at the existing site. The proposed adjustments to the parking lot will result
in no net loss to the number of parking spaces provided and all existing driveway
widths will remain intact. Since the purpose of the new children’s center building
is to serve the existing congregation, additional parking spaces were not required.
Based on these observations, there is likely a sufficient amount of parking for
current and future uses to accommodate peak-period demands. Given the same
operational characteristics, the overall parking demands, and the types of
adjoining uses, it is reasonable to conclude that the Proposed Use is and will
continue to be compatible with the other uses within the neighborhood .
The Proposed Use is physically suitable with the subject site because it will be
located at an existing church facility. In addition, the Proposed Use is intended
to operate within the existing church facility site and will be using existing access
and parking.
5. Granting the conditional use permit will not be detrimental to the public interest,
health, safety, convenience, or welfare, or injurious to persons, property, or
improvements in the vicinity and zoning district in which the property is located.
Prior to the issuance of any city permits, the Project is required to comply with all
conditions of approval within the attached resolution, the Building and Safety
Division and Public Works Department.
Based upon the findings and conclusion set forth above, the Planning Commission hereby
approves this Application, subject to the following conditions:
1. Development shall substantially comply with the plans and documents presented
to the Planning Commission at the public hearing.
7.1.a
Packet Pg. 25
6 PC Resolution No. 2021-XX
2. Prior to building permit issuance, a Certification of Design, together with
landscape and irrigation plans prepared by a licensed landscape architect, shall
be submitted to the Planning Division for review and approval by the City’s
Consulting Landscape Architect. Landscape and irrigation plans shall comply
with the updated Water Efficient Landscaping Ordinance.
3. Prior to the release of final occupancy for the new children’s center building,
landscaping along the street shall be installed and completed per approved
landscape plans.
4. Prior to building permit issuance, submit plans to replace all existing parking lot
lighting with new LED lighting.
5. Standard Conditions. The applicant shall comply with the standard development
conditions attached hereto.
The Planning Commission shall:
a. Certify to the adoption of this Resolution; and
b. Forthwith transmit a certified copy of this Resolution, by certified mail to
the property owner, Phil Meister – Elder Chair, Evangelical Free Church
of Diamond Bar, 3255 S Diamond Bar Blvd, Diamond Bar, CA 91765, and
applicant, Ruben Van Colenberghe, 21330 Hidden Pines Dr, Diamond
Bar, CA 91765.
APPROVED AND ADOPTED THIS 26TH DAY OF JANUARY 2021, BY THE PLANNING
COMMISSION OF THE CITY OF DIAMOND BAR.
By: ______________________________________
Kenneth Mok, Chairperson
I, Greg Gubman, Planning Commission Secretary, do hereby certify that the foregoing
Resolution was duly introduced, passed, and adopted, at a regular meeting of the Planning
Commission held on the 26th day of January, 2021, by the following vote:
AYES: Commissioners:
NOES: Commissioners:
ABSENT: Commissioners:
ABSTAIN: Commissioners:
ATTEST: ___________________________
Greg Gubman, Secretary
7.1.a
Packet Pg. 26
7 PC Resolution No. 2021-XX
COMMUNITY DEVELOPMENT DEPARTMENT
STANDARD CONDITIONS
USE PERMITS, COMMERCIAL AND RESIDENTIAL NEW AND
REMODELED STRUCTURES
PROJECT #:
Development Review and Conditional Use Permit Amendment
No. PL 2020-123
SUBJECT:
Development Review and Conditional Use Permit Amendment
approval to renovate and construct a 1,138 square-foot addition to
the existing children’s center building and playground area,
construct 3,752 square feet of covered patio/canopy for
community gathering areas, relandscape and restripe parking
spaces at Evangelical Free Church of Diamond Bar.
PROPERTY
OWNER:
Phil Meister – Elder Chair
Evangelical Free Church of Diamond Bar
3255 S Diamond Bar Blvd
Diamond Bar, CA 91765
APPLICANT:
Ruben Van Colenberghe
21330 Hidden Pines Dr
Diamond Bar, CA 91765
LOCATION:
3255 S. Diamond Bar Blvd., Diamond Bar, CA 91765
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
I. APPLICANT SHALL CONTACT THE PLANNING DIVISION AT (909) 839-7030, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
A. GENERAL REQUIREMENTS
1. The applicant shall defend, indemnify, and hold harmless the City, and its
officers, agents and employees, from any claim, action, or proceeding to
attack, set-aside, void or annul, the approval of Development Review and
Conditional Use Permit Amendment No. PL2020-123 brought within the
time period provided by Government Code Section 66499.37. In the event
7.1.a
Packet Pg. 27
8 PC Resolution No. 2021-XX
the city and/or its officers, agents and employees are made a party of any
such action:
(a) Applicant shall provide a defense to the City defendants or at the
City's option reimburse the City its costs of defense, including
reasonable attorneys fees, incurred in defense of such claims.
(b) Applicant shall promptly pay any final judgment rendered against
the City defendants. The City shall promptly notify the applicant of
any claim, action of proceeding, and shall cooperate fully in the
defense thereof.
2. This approval shall not be effective for any purpose until the applicant and
owner of the property involved have filed, within twenty-one (21) days of
approval of this Development Review and Conditional Use Permit
Amendment No. PL2020-123, at the City of Diamond Bar Community
Development Department, their affidavit stating that they are aware of and
agree to accept all the conditions of this approval. Further, this approval
shall not be effective until the applicants pay remaining City processing
fees, school fees and fees for the review of submitted reports.
3. All designers, architects, engineers, and contractors associated with this
project shall obtain a Diamond Bar Business License; and a zoning
approval for those businesses located in Diamond Bar.
4. Signed copies of Planning Commission Resolution No. 2021-XX,
Standard Conditions, and all environmental mitigations shall be included
on the plans (full size). The sheet(s) are for information only to all parties
involved in the construction/grading activities and are not required to be
wet sealed/stamped by a licensed Engineer/Architect.
5. Prior to any use of the project site or business activity being commenced
thereon, all conditions of approval shall be completed.
6. The project site shall be maintained and operated in full compliance with
the conditions of approval and all laws, or other applicable regulations.
7. Approval of this request shall not waive compliance with all sections of the
Development Code, all other applicable City Ordinances, and any
applicable Specific Plan in effect at the time of building permit issuance.
8. All site, grading, landscape/irrigation, and roof plans, and elevation plans
shall be coordinated for consistency prior to issuance of City permits (such
as grading, tree removal, encroachment, building, etc.) or approved use
has commenced, whichever comes first.
9. The hours during which construction activities causing the operation of any
tools or equipment used in construction, drilling, repair, alteration, or
7.1.a
Packet Pg. 28
9 PC Resolution No. 2021-XX
demolition work are limited to Monday through Saturday, between the
hours of 7:00 a.m. and 7:00 p.m., and are not allowed at any time on
Sundays or holidays.
10. The property owner/applicant shall remove the public hearing notice board
within three days of this project's approval.
11. The applicant shall comply with the requirements of City Planning, Building
and Safety Divisions, Public Works Department, and the Fire Department.
B. FEES/DEPOSITS
1. Applicant shall pay development fees (including but not limited to
Planning, Building and Safety Divisions, Public Works Department and
Mitigation Monitoring) at the established rates, prior to issuance of building
or grading permit (whichever comes first), as required by the City. School
fees as required shall be paid prior to the issuance of building permit. In
addition, the applicant shall pay all remaining prorated City project review
and processing fees prior to issuance of grading or building permit,
whichever comes first.
2. Prior to any plan check, all deposit accounts for the processing of this
project shall have no deficits.
C. TIME LIMITS
1. The approval of Development Review and Conditional Use Permit
Amendment No. PL2020-123 expires within two years from the date of
approval if the use has not been exercised as defined pursuant to
Diamond Bar Municipal Code (DBMC) Section 22.66.050(b)(1). In
accordance with DBMC Section 22.60.050(c), the applicant may request,
in writing, a one-year time extension for Planning Commission
consideration. Such a request must be submitted to the Planning Division
prior to the expiration date and be accompanied by the review fee in
accordance with the Fee Schedule in effect at the time of submittal.
D. SITE DEVELOPMENT
1. This approval is to renovate and construct a 1,138 square-foot addition to
the existing children’s center building and playground area, construct
3,752 square feet of covered patio/canopy for community gathering areas,
relandscape and restripe parking spaces at Efree Church located at
3255 S. Diamond Bar Blvd., as described in the staff report and depicted
on the approved plans on file with the Planning Division, subject to the
conditions listed herein.
2. The construction documents submitted for plan check shall be in
substantial compliance with the architectural plans approved by the
7.1.a
Packet Pg. 29
10 PC Resolution No. 2021-XX
Planning Commission, as modified pursuant to the conditions below. If
the plan check submittal is not in substantial compliance with the approved
Development Review and Conditional Use Permit Amendment submittal,
the plans may require further staff review and re -notification of the
surrounding property owners, which may delay the project and entail
additional fees.
3. To ensure compliance with the provisions of the Planning Commission
approval, a final inspection is required from the Planning Division when
work for any phase of the project has been completed. The applicant shall
inform the Planning Division and schedule an appointment for such an
inspection.
4. The above conditions shall run with the land and shall be binding upon all
future owners, operators, or successors thereto of the property. Non -
compliance with any condition of approval or mitigation measure imposed
as a condition of the approval shall constitute a violation of the City’s
Development Code. Violations may be enforced in accordance with the
provisions of the Development Code.
5. Failure to comply with any of the conditions set forth above or as
subsequently amended in writing by the City, may result in failure to obtain
a building final and/or a certificate of occupancy until full compliance is
reached. The City’s requirement for full compliance may require minor
corrections and/or complete demolition of a non-compliant improvement,
regardless of costs incurred where the project does not comply with design
requirements and approvals that the applicant agreed to when permits
were pulled to construct the project.
6. The project site shall be developed and maintained in substantial
conformance with the approved plans submitted to, approved, and
amended herein by the Planning Commission, collectively attached
referenced as site plans, floor plans, architectural elevatio ns, and
landscape plans on file with the Planning Division, the conditions
contained herein, and the Development Code regulations.
7. All ground-mounted utility appurtenances such as transformers, air
conditioning condensers, etc., shall be located out of public view and
adequately screened through the use of a combination of concrete or
masonry walls, berms, and/or landscaping to the satisfaction of the
Planning Division.
8. All roof-mounted equipment shall be screened from public view.
9. All structures, including walls, trash enclosures, canopies, etc., shall be
maintained in a structurally sound, safe manner with a clean, orderly
appearance. All graffiti shall be removed within 72 hours by the property
owners/occupant.
7.1.a
Packet Pg. 30
11 PC Resolution No. 2021-XX
10. All landscaping, structures, architectural features and public
improvements damaged during construction shall be repaired or replaced
upon project completion.
E. SOLID WASTE
1. The site shall be maintained in a condition, which is free of debris both
during and after the construction, addition, or implementation of the
entitlement approved herein. The removal of all trash, debris, and refuse,
whether during or subsequent to construction shall be done only by the
property owner, applicant or by a duly permitted waste contractor, who has
been authorized by the City to provide collection, transportation, and
disposal of solid waste from residential, commercial, construction, and
industrial areas within the City. It shall be the applicant's obligation to
insq21ure that the waste contractor used has obtained permits from the
City of Diamond Bar to provide such services.
2. Mandatory solid waste disposal services shall be provided by the City
franchised waste hauler to all parcels/lots or uses affected by approval of
this project.
II. APPLICANT SHALL CONTACT THE PUBLIC WORKS DEPARTMENT,
(909) 839-7040, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
A. GENERAL
1. An Erosion Control Plan shall be submitted concurrently with the grading plan
clearly detailing erosion control measures. These measures shall be
implemented during construction. The erosion control plan shall conform to
national Pollutant Discharge Elimination System (NPDES) standards and
incorporate the appropriate Best Management Practices (BMP’s) as specified in
the Storm Water BMP Certification. For construction activity which disturbs one
acre or greater soil a Storm Water Pollution Prevention Plan (SWPPP) will be
needed.
B. DRAINAGE
1. Detailed drainage system information of the lot with careful attention to any flood
hazard area shall be submitted. All drainage/runoff from the development shall
be conveyed from the site to the natural drainage course. No on -site drainage
shall be conveyed to adjacent parcels, unless that is the natural drainage course.
C. OFF-SITE STREET IMPROVEMENTS
1. Applicant shall remove and replace five (5) existing concrete sidewalk panels
along the subject property’s frontage in accordance with current American Public
Works Association (APWA) standards.
7.1.a
Packet Pg. 31
12 PC Resolution No. 2021-XX
2. Applicant shall remove and replace two (2) existing concrete driveway
approaches along the subject property’s frontage in accordance with current
American Public Works Association (APWA) Standard 110 -2 Type C.
3. All public improvement shall be approved by the City Engineer and completed
prior to final inspection/certificate of occupancy issuance. Any improvements
within the City’s Right-of-Way shall be constructed with an encroachment permit.
Applicant shall apply for an encroachment permit from the Public Works
Department and coordinate a pre-construction meeting with the City’s Inspector
to establish the improvement limits.
4. Applicant shall replace and record any centerline ties and monuments that are
removed as part of this construction with the Los Angeles County Department
Public Works Survey Division. Proof of replacement shall be submitted to the City
Engineer.
III. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION, (909) 839-
7020, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
General Conditions:
1. At the time of plan check submittal, plans and construction shall conform to
current State and Local Building Code (i.e., 2019 California Building Code series
will apply) requirements and all other applicable construction codes, ordinances
and regulations in effect.
2. Provisions for CAL Green shall be implemented onto plans and certification shall
be provided by a third party as required by the Building Division. Specific water,
waste, low VOC, and related conservation measures shall be shown on plans.
Construction shall conform to the current CAL Green Code.
3. The Children’s Center building highest level/roof level “mechanical deck” is not
to be occupied.
Plan Check – Items to be addressed prior to plan approval:
4. The minimum design load for wind in this area is 95 M.P.H. exposures “C” and
the site is within seismic zone D or E. The applicant shall submit drawings and
calculations prepared by a California State licensed Architect/Engineer with wet
stamp and signature.
5. This project shall comply with the energy conservation requirements of the State
of California Energy Commission. All required State energy forms shall be
completed and commissioning testing requirements outlined in California Energy
Code 120.8(d).
7.1.a
Packet Pg. 32
13 PC Resolution No. 2021-XX
6. Indoor air quality shall be provided consistent with ASHRAE 62.1 as required per
California Mechanical Code Table 402.1.
7. Public Works/Engineering Department is required to review and approve grading
plans that clearly show all finish elevations, drainage, and retaining wall(s)
locations. These plans shall be consistent with the site plan submitted to the
Building and Safety Division.
8. “Separate permit shall be required for all wall and monument signs” and shall be
noted on plans.
9. An exit analysis shall be provided during plan check, showing occupant load for
each space, exit width, exit signs, etc.
10. Number of plumbing fixtures shall be in compliance with CPC T-422.
11. Indicate the proposed addition and existing building on the plans. Submit code
analysis and justification showing the following:
a. Each building square footage
b. Each building height
c. Type of construction
d. Sprinkler system
e. Each group occupancy
f. Property line location in relation to each building (side yard)
g. Exit analysis for each building (occupant load/corridor rating/exit width/exit
signs, etc.)
h. Accessibility analysis for the entire site and for each building
i. Shaft rating/ exterior wall construction/ opening protection
12. Plans shall reflect adequate exit requirements. The distance between required
exits shall be ½ of the overall building diagonal dimension.
13. All balconies and decks shall be designed for 1.5 times the live load for the area
served per CBC Table 1607.1 and where not over enclosed space, provide
ventilation in the joist space per CBC 2304.12.2.6.
14. All easements shall be shown on the site plan.
15. Fire Department approval shall be required. A copy of the Los Angeles County
Fire approval for use and sprinkler location is required.
16. A soils report is required per CBC 1803 and all recommendations of the soils
report shall be adhered to.
17. Design for future electric vehicle charging shall be provided consistent with C AL
Green 4.106.4.
7.1.a
Packet Pg. 33
14 PC Resolution No. 2021-XX
18. ADA upgrades are required for the existing parking and path of travel from
street/public way to primary entrance as required per CBC 11B-202. A new path
of travel to the street, path of travel to the entrances, and parking shall be
provided. No final certificate of occupancy shall be granted until the ADA path of
travel is in-place.
19. The sunshade material shall be non-combustible material and listed by the State
Fire Marshal in accordance to CBC 3104.
20. Rated openings and walls shall be provided at the awning canopy/pedestrian
walkway in accordance with CBC 3104.
21. Fire alarms shall be provided where educational E occupancies apply with over
49 occupants or day care facilities in conformance with CBC 907.2.3 and
907.2.3.10 respectively.
Permit – Items required prior to building permit issuance:
22. Solid waste management of construction material shall incorporate recycling
material collection per Diamond Bar Municipal Code 8.16 of Title 8. The
contractor shall complete all required forms and pay applicable deposits prior to
permit.
23. Prior to building permit issuance, all school district fees shall be paid. Please
obtain a form from the Building and Safety Division to take directly to the school
district.
24. AQMD notification is required at least 10 days prior to any demolition. Proof of
notification is required at permit issuance.
25. All workers on the job shall be covered by workman’s comp ensation insurance
under a licensed general contractor. Any changes to the contractor shall be
updated on the building permit.
Construction – Conditions required during construction:
26. Occupancy of the facilities shall not commence until all California Bu ilding Code
and State Fire Marshal regulations have been met. The buildings shall be
inspected for compliance prior to occupancy.
27. Every permit issued by the building official under the provisions of this Code shall
expire and become null and void unless the work authorized by such permit is
commenced within one-hundred-eighty (180) days after permit issuance, and if a
successful inspection has not been obtained from the building official within one-
hundred-eighty (180) days from the date of permit issuance or the last successful
inspection. A successful inspection shall mean a documented passed inspection
by the city building inspector as outlined in Section 110.6.
7.1.a
Packet Pg. 34
15 PC Resolution No. 2021-XX
28. All structures and property shall be maintained in a safe and clean manner during
construction. The property shall be free of debris, trash, and weeds.
29. Existing fencing shall remain in-place during construction including pool barrier
fencing. Any alteration of the fencing may result in a discontinuation of
construction until the fences are returned to its original state.
30. All equipment staging areas shall be maintained in an orderly manner and
screened behind a minimum 6’ high fence.
31. All existing facilities that remain in operation during construction shall maintain
safeguards to protect the public from construction hazards.
32. The project shall be protected by a construction fence to the satisfaction of the
Building Official, and shall comply with the NPDES & BMP requirements (sand
bags, etc.). All fencing shall be view obstructing with opaque surfaces.
33. The applicant shall contact Dig Alert and have underground utility locations
marked by the utility companies prior to any excavation. Contact Dig Alert by
dialing 811 or their website at www.digalert.org.
34. The applicant shall first request and secure approval from the City for any
changes or deviations from approved plans prior to proceeding with any work in
accordance with such changes or deviations.
35. All glazing in hazardous locations shall be labeled as safety glass. The labeling
shall be visible for inspection.
36. Drainage patterns shall match the approved grading/drainage plan from the
Public Works/Engineering Department. Surface water shall drain away from the
building at a 2% minimum slope. The final as-built conditions shall match the
grading/drainage plan or otherwise approved as-built grading/drainage plan.
37. Decks, roofs, and other flat surfaces shall slope at least 1/4”/ft with approved and
listed water proofing material. Guardrails shall be provided for these surfaces at
least 42” minimum in height, 4” maximum spacing between rails, and capable of
resisting at least 20 pounds per lineal foot of lateral load.
38. Special inspections and structural observation will be required in confo rmance
with CBC 1704 to 1709.
39. All plumbing fixtures, including those in existing areas, shall be low-flow models
consistent with California Civil Code Section 1101.1 to 1101.8.
40. Playground equipment shall meet CBC 424 non-combustible material standards.
END
7.1.a
Packet Pg. 35
N
T.O.W.+31'-8"
TOP OF ROOF+27'-0"
(N) COMMUNITY
PLAZA
(N)
PLAYGROUND
TOP OF ROOF+25'-8"
TOP OF RIDGE+16'-9 1/2"
S DIAMOND BAR BLVDPROPERTY LINEFLOOD CONTROL CHANNELEMERGENCY
EXIT GATE IN
FENCE
SANCTUARY
(E) TWO-STORY BUILDING
LANDING
(E) ONE-STORY BUILDING
(N) TWO-STORY
ADDITION
(SPRINKLERED)
(SPRINKLERED)
OCC: A-3 / E
OCC: A-3 / E
OCC: A-3 / E / B
CHILDRENS CENTER
(E) TWO-STORY BUILDING
(NON-SPRINKLERD)
(SPRINKLERED)
TOP OF SKYLIGHT+35'-0"
(N) CANOPY
(SPRINKLERED)
PLAZA AREA:
1500SF
OCC: A-3
T.O.W.+27'-10"
TO OF ROOF+28'-3"
S S S S S S SSSSSSSSSSSS S S S S S S S S S SSSSCCCCCCCCCCC CS S SCSADAADA SSSSSSSSSSSSSSSSSSSS
SSCCCCS SCCCCCCCCCCCCC SSSSSSSSA
D
A
A
D
A CCCCCCCCCCCSSTALL
HEDGE
FOR OCCUPANCY
LOAD FIGURES
REFERS TO AS-1.8
SITE PLAN /INDEX
AS-1.0 Rev A1"=60'
SITE PLAN 1
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40 41 42
43 44 45 46
47
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
74
75
76
77
788081828384858687888990
9193949596979899100101102103
104
92
105
106
107
73
79
108
109
48
110
111
112
113
114
PROJECT DATA
OWNER
EVANGELICAL FREE CHURCH OF DIAMOND BAR
PROJECT ADDRESS
3255 S DIAMOND BAR BLVD, DIAMOND BAR, CA 91765
SITE DATA
PARCEL #: 8285 028 034
LEGAL DESCRIPTION:TRACT 33417, LOT 19
LOT AREA: 103,406 SF (2.374 ACRES)
CUP #1634-1 & CUP 95-1
EXISTING USE:OFFICE / CHURCH / DAYCARE
PROPOSED USE: OFFICE / CHURCH / DAYCARE
CONSTRUCTION TYPE:V-B (SPRINKLERED WITH EXCEPTION
OF (E) LANDING BUILDING
OCCUPANCY GROUP E / A-3 / B
EXISTING LOT COVERAGE:16,491 SF (16.0%)
PROPOSED LOT COVERAGE:18,592 SF (18.0%)
PROPOSED MAX BUILDING HEIGHT: 35'-0"
AREAS
EXISTING GFA:
CHILDREN'S CENTER: 4,011 SF
SANCTUARY:14,945 SF
THE LANDING: 4,524 SF
ADDED GFA:
CHILDREN'S CENTER ADDITION : 1,138 SF
PROPOSED TOTAL:19,344 SF
PARKING
EXISTING PARKING SPACES:114
STANDARD PARKING SPACES: 69
COMPACT PARKING SPACES: 41
ADA PARKING SPACES: 4
TOTAL PROPOSED PARKING SPACES : 114
PROJECT DESCRIPTION
UPGRADES TO EXISTING EFREE CHURCH CAMPUS, TO INCLUDE:
- RENOVATION AND ADDITION TO (E) CHILDREN'S CENTER
- RENOVATION OF (E) KIDS PLAYGROUND AREA
- RENOVATION OF COMMUNITY PLAZA
- RENOVATION OF 'MEET + GREET' PLAZA WITH (N) CANOPY
- VARIOUS LANDSCAPE + PARKING ADJUSTMENTS
(MAINTAIN EXISTING NUMBER OF PARKING SPACES)
- ADD SPRINKLERS TO THE LANDING BUILDING
SHEET INDEX
AS-1.0 SITE PLAN
AS-1.1 PROPERTY PLAN
AS-1.2 EXISTING SITE PLAN
AS-1.3 DETAILED PROPOSED SITE PLAN
AS-1.4 LANDSCAPE PLAN
AS-1.5 PARCEL 1- LANDSCAPE PLAN
AS-1.6 PARCEL 2- LANDSCAPE PLAN
AS-1.7 GRADING PLAN
AS-1.8 SITE OCCUPANCY
AS-2.0 CHILDREN'S CENTER FIRST FLOOR PLAN
AS-2.1 CHILDREN'S CENTER SECOND FLOOR PLAN
AS-2.2 CHILDREN'S CENTER THIRD FLOOR PLAN
AS-2.3 CHILDREN'S CENTER ROOF FLOOR PLAN
AS-2.4 CHILDREN'S CENTER PROPOSED ELEVATION
AS-2.5 CHILDREN'S CENTER ADDITIONAL ELEVATION
AS-2.6 CHILDREN'S CENTER EXISTING L01 PLAN
AS-2.7 CHILDREN'S CENTER EXISTING L02 PLAN
AS-3.0 MEET + GREET PLAZA FLOOR PLAN
AS-3.1 CANOPY ROOF FLOOR PLAN
AS-3.2 CANOPY ELEVATION
AS-4.0 EXISTING SITE VIEWS
AS-4.1 PROPOSED VIEWS
AS-4.2 PROPOSED VIEWS
AS-5.0 MATERIAL OVERALL PALETTE
AS-5.1 MATERIAL CATALOGUE
AS-6.0 PROPOSED ELEVATIONS - SOUTH + WEST
AS-6.1 PROPOSED ELEVATIONS - SOUTH + EAST
AS-6.2 PROPOSED ELEVATIONS- NORTH
AS-7.0 COLORED CHILDREN'S CENTER PLANS
AS-7.1 COLORED MEET& GREET PLAZA PLAN
STORYSUSEAREAS
#
8,489 7,227
2 31’-8”--1545 1,545 --
2 27 2,587 987 -1,600
FEET
BUILDING
HEIGHT
SF SF SF SF SF
987(OS)-3,024
SF SF SF
COMMENT
SITE
COVE-
RAGE
EXISTING (Excluding
roof
overhang)
SITE
COVE-
RAGE
DEMO-
LISHED
SITE
COVERAGE
ADDED
SITE
COVERAGE
TOTAL
GFA
EXISTING
GFA
DEMOLISHED
GFA ADDED
(CBC 202)
GFA
TOTAL
DAYCARE
ACCESSORY
TO
CHURCH
987 DECK ON 2ND
LEVEL NOT INCLUDED
IN GFA
OCCUPIED ROOF AREA
NOT INCLUDED IN GFA
AS ALLOWED BY 503.1.4
OS = DECK STRUCTURE
OVER USABLE AREA
1,512 (1)
1,512 (2)
987 (OS)
DAYCARE
ACCESSORY
TO
CHURCH
887 (1)
334 (2)
658 (OS)
(E)
CHILDREN
CENTER
(N) ADDITION
TO
CHILDREN
CENTER
(E)
SANCTUARY
RELIGIOUS
ASSEMBLY
375 SEATS
2+
BASE-
MENT
(BELOW
GRADE
PLANE)
212 +
1051 -
B = 6,663
1 = 6,749
2 = 1,533
TOTAL =
14,945
EXTERIOR
SECOND FLOOR
WALKWAY 212
EXTERIOR
ENTRANCE
CANOPY 1,050
-
(N) PLAZA
CANOPY
MEET AND
GREET 1 20
35
--2,310 2,310 1,500--
(N)SUNSHADE
(SUNBRELLA)--680 680 AREA NOT OVERLAYING
PLAZA CANOPY
(E) LANDING RELIGIOUS
ASSEMBLY 1 27 5,415 393 208 5,230 4,524 EXTERIOR
ENTRANCE
CANOPY 393
-
SITE TOTALS
COVERAGE %
103,406 SF
2 35 16,491 2,643 9,973 18,592 2,642 1,138
--16 --18
7.1.b
Packet Pg. 36
N
500 FT
PROPERTY PLAN
AS-1.11"=200'
PROPERTY PLAN 1
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
7.1.b
Packet Pg. 37
DRAINAGE
LANDING
(E) ONE-STORY BUILDING
(SPRINKLERED)
CHILDRENS CENTER
(E) TWO-STORY BUILDING
(NON-SPRINKLERED)
EXISTING GFA:4,524 SF
EXISTING GFA:4,011 SF
DRAINAGE8'-0"15
'
-
0
"8'-0"18
'
-
0
"8'-6"8'-6"8'-6"8'-6"8'-6"8'-6"8'-0"8'-0"8'-0"8'-0"8'-0"8'-0"8'-0"8'-6"8'-6"8'-6"9'-0"9'-0"9'-0"8'-8"18'
-0
"
8'-8"
8'-8"
8'-8"8'-8"8'-8"8'-8"
8'-8"
9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"
18'-0"8'-5"26'-2"8'-5"8'-5"8'-5"8'-5"8'-5"26'-0"8'-5"26'
-0
"
26
'
-
1
"8'-0"8'-0"18'-0"
9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"24'-7"25'-8"26'-2"8'-6"8'-6"8'-6"8'-6"8'-6"8'-6"8'-6"8'-6"9'-0"8'-0"8'-0"8'-0"15
'
-
0
"
15
'
-
0
"8'-7"8'-7"8'-7"8'-7"8'-7"9'-0"9'-0"18'
-0"
9'-4"9'-4"9'-4"18'-0"26
'
-
9
"8'-0"26'-9"
1
5
'
-
0
"18'-0"SANCTUARY
(E) TWO-STORY BUILDING(SPRINKLERED)
EXISTING GFA:14,945 SF
EXISTING SEATING = 375 92'-9"
103'-2"
121'-7"SSCCSSCCCCCCCCCCCCCCCCCCCCCCCCCCCCCS S S S S S S S
S S S SSSS
S S S
A
D
A
A
D
A
ADAADASSSSSSSSSSSSSSSSSSSSSSSSSS S S S
S S SSSSSS
One-way Traffic Flow
SSSSSSS S S SCCCCCCCCCC 8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-0"8'-0"8'-0"8'-0"8'-6"Stall Dimensioned to Include
2' Overhang, to Follow
Existing Permit Layout
Stall Dimensioned
to Include 2'
Overhang, to
Follow Existing
Permit Layout5'-0"5'-0"8'-7"8'-7"8'-7"8'-7"8'-7"9'-0"9'-0"9'-0"
1
8
'
-
0
"
25
'
-
2
"
18'-0"
1"=50'
EXISTING SITE PLAN 1
EXISTING SITE PLAN
AS-1.2 Rev A
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
30
31
32
33
34
35
36 37 38 39
42
43
44
45
46
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75767778798081828384858687
8990919293949596979899
88
40 41
28
29
47
100
101
102
103
104
105
106
107
108
109
110
111
112 113
114
PARKING
EXISTING PARKING SPACES:114
STANDARD PARKING SPACES: 69
COMPACT PARKING SPACES: 41
ADA PARKING SPACES: 4
TOTAL EXISTING PARKING SPACES : 114
EVENT
TYPE
EVENT
LOCATION
EVENT
HOURS ATTENDENCE
REQUIRED
ONSITE
PARKING
OFF SITE PARKING
(AGREEMENT)NOTES
SERVICE INDOOR 8:30 AM -
12:00 PM 200-350 90-114 ABOVE 300 ATTENDEES
UP TO 30 SPOTS EXTRA
70% OF THE TIME CHURCH
PARKING IS SUFFICIENTTYPICAL SUNDAY MORNING
CLASSES INDOOR 12:00 PM -
3:00 PM 75 - 100 50 - 75 N/ATYPICAL SUNDAY AFTERNOON
CLASSES INDOOR 6:00 PM -
8:30 PM 75 - 100 40 - 60 N/ATYPICAL WEDNESDAY EVENING A LOT ARE BEING DROPPED
OFF
COMMUNITY
EVENT
OUTDOOR/
INDOOR 3 HOURS 300 - 500 114 ABOVE 300 ATTENDEES
UP TO 30 SPOTS EXTRA
LARGER EVENTS (TYPICAL
SANTURDAY)
3 TIMES A YEAR. A LOT OF
WALK-INS, DROP OFFS
7.1.b
Packet Pg. 38
N
S S S S S S SSSSSSSSSSSS S S S S S S S S S SSSSCCCCCCCCCCCC CS S S
(N) PLAYGROUND
CS
S DIAMOND BAR BLVDPROPERTY LINEADAADAA
D
AFLOOD CONTROL CHANNELA
D
A
SSSSSSSSSSSSSSSSSSSSSS
SSCCCCCS S
N
7'-7"26'
2
9
'
-
8
"9'-8"7'-7"21
'
-
5
"6'-8"5'
-
4
"
SEWER
48'-3"SEWER
40'-1"LANDING
(E) ONE-STORY BUILDING
CHILDRENS CENTER
(E) TWO-STORY BUILDING
(NON-SPRINKLERD)
PARKING UNIT
ADDED
PARKING
UNIT ADDED
PARKING
UNIT ADDED
ROOF AREA:5,151 SF
4'-9"2'
2'-3"88'-2"1'-11"86'-2"10'5'5'10'5'5'CL OF 10' WIDE EASEMENT OF
SOUTHERN CALIFORNIA EDISON
COMPANY FOR PUBLIC UTILITY
PURPOSE PER O.R.43774-241
CL OF 10' WIDE EASEMENT OF
GENERAL TELEPHONE COMPANY FOR
PUBLIC UTILITY PURPOSE PER
O.R.44446-33
CL OF 10' WIDE EASEMENT OF
SOUTHERN CALIFORNIA EDISON
COMPANY FOR PUBLIC UTILITY
PURPOSE PER O.R.78-1063699,
RECORDED SEPTEMBER 25, 1978
Minor adjustments to parking layout
will not change the existing finish,
levels, or drainage. Overall
impervious area will be maintained
(new impervious will be off set by
new pervious landscape to the north
of the children's playground)
Children's center renovation will
remove the upper access deck but
will not change the existing levels, or
drainage.
All landscape and grading outside of
parcel areas to remain unchanged.
Adjustments to parking areas
Community Plaza, Meet + Greet
Plaza and Children's Play area to
follow existing grade
New building for Children's Center
will require foundations at grade, foot
print is 660 sq.ft.
The improved children's playground
will not impact grading, drainage or
amount of impervious finish.
No impact on any surrounding trees,
grading, drainage or ground cover
Community Plaza to be repaved with
concrete pavers
Meet + Greet Plaza: Existing
concrete finish, levels, drainage +
steps to Meet + Greet Plaza to be
maintained and made good where
impacted by canopy foundation
14'-7"(N) COMMUNITY
PLAZA
(N) TWO-STORY
ADDITION(SPRINKLERED)ROOF AREA:1,068 SF
(SPRINKLERED)ROOF AREA:2,168 SF
5'-6"4'-7"34'-6"4'
4 PARKING
UNITS REMOVED
FENCE
STORM WATER
DRAIN
696 ' FS
694 ' FS
695 ' FS
693 ' FS
694 ' FS
695 ' FS
692 ' FS
691 ' FS
683 ' FS
690 ' FS
684 ' FS
686 ' FS 688 ' FS 690 ' FS 692 ' FS 694 ' FS
693 ' FS
692 ' FS691 ' FS (N)CANOPY TO MEET+ GREET PLAZA
ROOF AREA:1,500 SF(SPRINKLERED)
SANCTUARY
(E) TWO-STORY BUILDING
ROOF AREA:7,001 SF
(SPRINKLERED)
99'-8"
92'-9"8'-0"15
'
-
0
"8'-0"18
'
-
0
"8'-0"8'-0"8'-0"8'-0"8'-0"8'-0"8'-0"8'-0"8'-8"18'
-0
"
8'-8"
8'-8"8'-8"8'-8"8'-8"8'-8"8'-8"
9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"
18'-0"8'-5"26'-2"8'-5"8'-5"8'-5"8'-5"8'-5"26'-0"8'-5"8'-0"8'-0"18'-0"
9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"25'-8"26'-2"8'-0"8'-0"8'-0"8'-0"7'-10"9'-0"9'-0"18'-0"26
'
-
1
"8'-0"27'-1"18'-0"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-0"8'-0"8'-0"8'-0"5'-0"5'-0"9'-0"9'-0"9'-0"
1
8
'
-
0
"
2
5
'
-
2
"
18'-0"8'-0"8'-0"8'-0"8'-0"8'-0"8'-0"8'-0"8'-0"8'-0"8'-0"15
'
-
0
"
9'-0"
26
'
-
1
"C8'-0"C8'-0"C8'-0"C8'-0"C8'-0"C8'-0"C8'-0"C8'-0"C8'-0"C8'-0"C8'-0"C8'-0"C8'-0"26'
-0
"CSSSSSS7'-10"C7'-10"C7'-10"C7'-10"C7'-10"C7'-10"C7'-10"C7'-10"CSSPARKING UNIT
CHANGED FROM
COMPACT TO
STANDARD
Stall Dimensioned to Include 2'
Overhang, to Follow Existing Permit
Layout
Stall Dimensionedto Include 2'Overhang, toFollow ExistingPermit Layout
21'-11"
1
5
'
-
0
"
1
5
'
-
0
"
Add sprinklers to the Landing building
Existing ADAroute to street tobe reviewed aspart of BoulevardLandscapeupgrade package
DETAILED PROPOSED
SITE PLAN
AS-1.3 Rev A1"=50'
DETAILED PROPOSED SITE PLAN DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
PROJECT DATA
OWNER
EVANGELICAL FREE CHURCH OF DIAMOND BAR
PROJECT ADDRESS
3255 S DIAMOND BAR BLVD, DIAMOND BAR, CA 91765
SITE DATA
PARCEL #: 8285 028 034
LEGAL DESCRIPTION:TRACT 33417, LOT 19
LOT AREA: 103,406 SF (2.374 ACRES)
CUP #1634-1 & CUP 95-1
EXISTING USE:OFFICE / CHURCH / DAYCARE
PROPOSED USE: OFFICE / CHURCH / DAYCARE
CONSTRUCTION TYPE:V-B (SPRINKLERED WITH
EXCEPTION OF
(E) LANDING BUILDING
OCCUPANCY GROUP E / A-3 / B
EXISTING LOT COVERAGE:16,491 SF (16.0%)
PROPOSED LOT COVERAGE:18,592 SF (18.0%)
PROPOSED MAX BUILDING HEIGHT: 35'-0"
AREAS
EXISTING GFA:
CHILDREN'S CENTER: 4,011 SF
SANCTUARY:14,945 SF
THE LANDING: 4,524 SF
ADDED GFA:
CHILDREN'S CENTER ADDITION : 1,138 SF
PROPOSED TOTAL:19,344 SF
PARKING
EXISTING PARKING SPACES:114
STANDARD PARKING SPACES: 69
COMPACT PARKING SPACES: 41
ADA PARKING SPACES: 4
TOTAL PROPOSED PARKING SPACES : 114
7.1.b
Packet Pg. 39
N
S DIAMOND BAR BLVD
05
1
06
1
EXISTING EMBANKMENT
RETAINING WALL + TREES -
UNCHANGED
EXISTING SCREEN
WALL TO A/C UNITS
EXISTING PARKING, CURB,
DRAINAGE + HARDSCAPE -
UNCHANGED
EXISTING EMBANKMENT
RETAINING WALL + TREES -
UNCHANGED [MIXED MATURE
TREE SPECIES + LOCATION
SHOW INDICATIVELY ONLY]
A/C
A/C
EXISTING
EXIT
EXISTING PLANTED BOARDED -
UNCHANGED
PUBLIC SIDE WALK - CONCRETE
EXISTING 'EFREE' SIGNAGE
EXISTING
ENTRANCE
ADA ENTRANCE
EXISTING ELECTRICAL
TRANSFORM
EXISTING
GARAGE BIN -
SCREEN WALL
RELOCATED
A/C UNIT FOR
LANDING
BUILDING
EXISTING
EMBANKMENT
RETAINING WALL +
TREES -
UNCHANGED1
2
3
4
LEGEND:
PARKING - EXISTING ASPHALT
IN-SITIL CONCRETE SIDEWALK -
BRUSHED FINISH
PLANTER BED - FLUSH
COMMUNITY PLAZA -GRID OF COLORED
CONCRETE PAVERS + IN-SITIL CONCRETE
DECOMPOSED GRANITE
CHILDREN'S PLAY AREA - FINISHES BY OWNER
LARGE SHADE TREE - CALIFORNIA BOX ELDER
OR WHITE OAK
MEDIUM SHADE TREE - WESTERN COTTON
WOOD
4' HEDGE -IAN BUSH MANZANITA
SHRUB - SALVIA CELESTIAL BLUE OR
MOUNTAIN LILAC
SANCTUARY
(E) TWO-STORY BUILDING LANDING
(E) ONE-STORY BUILDING
CHILDREN'S CENTER
(E) TWO-STORY BUILDING
(N) TWO-STORY
ADDITION
DETAILED LANDSCAPE DESIGN TO FOLLOW
DIAMOND BAR CITY CODE TITLE 8 HEALTH +
SAFETY, CHAPTER 8.14 - WATER EFFICIENT
LANDSCAPING DESIGN ORDINANCE AND
GUIDELINES.
CHILDREN'S PLAYGROUND
COMMUNITY PLAZA
SITE AREA (103,406 SQ.FT.) : BUILDINGS FOOTPRINT (7,001 SQ.FT.)
= 14.77:1 (6.8%)
HARDSCAPE AREA-INCLUDE PARKING (53,097 SQ.FT.) : LANDSCAPE
AREA (36,462 SQ.FT.) = 1.45:1 (68.6%)
HARDSCAPE AREA -EXCLUDE PARKING (36,690 SQ.FT.) : LANDSCAPE
AREA (36,462 SQ.FT.) = 1:1 (99.3%)
BOULEVARD FRONTAGE
LANDSCAPE IMPROVEMENT
UNDER PARALLEL SUBMISSION -
TO INCLUDE ADA UPGRADE(TO
BE INSTALLED PRIOR TO FINAL
OCCUPANCY
AREA : 3016 SQ.FT.
AREA : 1642 SQ.FT.
S S S S S S SSSSSSSSSSSS S S S S S S S S S SSSSCCCCCCCCCCC CS S SCSADAADA SSSSSSSSSSSSSSSSSSSS
SSCCCCS SCCCCCCCCCCCCC SSSSSSSSA
D
A
A
D
A CCCCCCCCCCCSSCExisting ADA route tostreet to be reviewedas part of BoulevardLandscape upgradepackage
LANDSCAPE PLAN
AS-1.4 Rev A
1"=50'
LANDSCAPE PLAN
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
7.1.b
Packet Pg. 40
CC692.50' FS
691.85' FS
691.40' FS
DN
RAMP
DOWN
UP
26'-0 1/16"
SANCTUARY
(E) TWO-STORY BUILDING
LANDING
(E) ONE-STORY BUILDING
MEET + GREET
PLAZA
RENOVATED
CHILDREN'S CENTER
(E) TWO-STORY BUILDING
COMMUNITY PLAZA NEW BUILD
CHILDREN'S CENTER
A/C
UNITS
MAIN SITE
ENTRANCE
EXISTING IN-SITIL
CONCRETE FINISH
TO PLAZA TO BE
REPAIRED
L01B01
MAIN
ENTRANCE
DISABLED
ENTRANCE
EXISTING
DRAINAGE +
GRADING TO
BE MAINTAINED
SUNBRELLA
SUN SHADE
OVER
CANOPY +
SKYLIGHT
OVER
RELOCATED
A/C UNIT
MONUMENT
SIGN WALLMONUMENT
SIGN WALL
SCREEN WALL SCREEN WALL
AREA : 1642 SQ.FT.
AREA : 3072 SQ.FT.
A
D
A
A
D
A CS S S S S SS S SADAADA S
PARCEL -2
LANDSCAPE PLAN
AS-1.6 Rev A
1"=20'
PARCEL -2 LANDSCAPE PLAN
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
A/C
1
2
SANCTUARY
(E) TWO-STORY BUILDING LANDING
(E) ONE-STORY BUILDING
CHILDREN'S CENTER
(E) TWO-STORY BUILDING
(N) TWO-STORY
ADDITION
CHILDREN'S PLAYGROUND
COMMUNITY PLAZA
AREA : 3016 SQ.FT.
AREA : 1642 SQ.FT.SSSSSSSCSSSSSSSSSSSSSSSSSSS
CCCCCCCCCCCCCA
D
A
A
D
A CCCCCCCCCSSPARCEL - 1
LANDSCAPE PLAN
AS-1.5 Rev A1"=20'
PARCEL -1 LANDSCAPE PLAN
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
7.1.b
Packet Pg. 41
CC692.50' FS
691.85' FS
691.40' FS
DN
RAMP
DOWN
UP
26'-0 1/16"
SANCTUARY
(E) TWO-STORY BUILDING
LANDING
(E) ONE-STORY BUILDING
MEET + GREET
PLAZA
RENOVATED
CHILDREN'S CENTER
(E) TWO-STORY BUILDING
COMMUNITY PLAZA NEW BUILD
CHILDREN'S CENTER
A/C
UNITS
MAIN SITE
ENTRANCE
EXISTING IN-SITIL
CONCRETE FINISH
TO PLAZA TO BE
REPAIRED
L01B01
MAIN
ENTRANCE
DISABLED
ENTRANCE
EXISTING
DRAINAGE +
GRADING TO
BE MAINTAINED
SUNBRELLA
SUN SHADE
OVER
CANOPY +
SKYLIGHT
OVER
RELOCATED
A/C UNIT
MONUMENT
SIGN WALLMONUMENT
SIGN WALL
SCREEN WALL SCREEN WALL
AREA : 1642 SQ.FT.
AREA : 3072 SQ.FT.
A
D
A
A
D
A CS S S S S SS S SADAADA S
PARCEL -2
LANDSCAPE PLAN
AS-1.6 Rev A
1"=20'
PARCEL -2 LANDSCAPE PLAN
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
7.1.b
Packet Pg. 42
N
694.00' FS
692.50' FS
693.00' FS
692.50' FS
692.00' FS
691.44' FS
695.00' FS
696.00' FS
689.75' FS
692.00' FS
693.00' FS
694.00' FS
695.00' FS
691.00' FS
691.40' FS
695.32' FS
695.55' FS
695.45' FS
(N) PLAYGROUND
S DIAMOND BAR BLVDPROPERTY LINEFLOOD CONTROL CHANNELDN
DN
RAMP
DOWN
UP
UP
DS
DS
PLANTER
26'-0 1/16"9'-8"SANCTUARY
(E) TWO-STORY BUILDING
LANDING
(E) ONE-STORY BUILDING
(SPRINKLERED)
(SPRINKLERED)
CHILDRENS CENTER
(E) TWO-STORY BUILDING
(NON-SPRINKLERED)
Meet + Greet Plaza Improvements will
not change the existing finish, levels,
drainage, steps + ramps
(N) MEET & GREET
PLAZA
(N) COMMUNITY
PLAZA
IN
OUT
EXISTING GFA:14,945 SF
EXISTING GFA:4,524 SF
(SPRINKLERED)
See Detailed Site Plan for additional
notes regarding grade and drainage.
Note that the only change in grading is
to the foundations for new build
children's center (foot print 660 sq.ft.)
(N) TWO-STORY
ADDITION
ADDED GFA:1,138 SF
691.85' FS
692.70' FS
No impact on any surrounding trees,
grading, drainage or ground cover
No change in grading or drainage to
existing parking
S S S S S S SSSSSSSSSSSS S S S S S S S S S SSSSCCCCCCCCCCC CS S SCSADAADA SSSSSSSSSSSSSSSSSSSS
SSCCCCS SCCCCCCCCCCCCC SSSSSSSSA
D
A
A
D
A CCCCCCCCCCCSS695.00' FS
EXISTING GFA:4,011 SF
EXISTING GFA:3,872 SF
GRADING PLAN
1"=50'
GRADING PLAN
AS-1.7 Rev A
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
7.1.b
Packet Pg. 43
N
T.O.W.+31'-8"
TOP OF ROOF+27'-0"
TOP OF ROOF+25'-8"
TOP OF RIDGE+16'-9 1/2"
S DIAMOND BAR BLVDPROPERTY LINEFLOOD CONTROL CHANNELTOP OF SKYLIGHT+35'-0"
T.O.W.+27'-10"
TO OF ROOF+28'-3"
S S S S S S SSSSSSSSSSSS S S S S S S S S S SSSSCCCCCCCCCCC CS S SCSADAADA SSSSSSSSSSSSSSSSSSSS
SSCCCCS SCCCCCCCCCCCCC SSSSSSSSA
D
A
A
D
A CCCCCCCCCCCSSSITE OCCUPANCY
AS-1.81"=60'
SITE OCCUPANCY PLAN 1
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Oct 26th, 2020
KEY PLAN
(E) LANDING
BLDG.
(E) SANCTUARY
(E) CHILDREN'S
CENTER WITH
(N) ADDITION
(E) EXTERIOR
PLAZA CANOPY
2019 CALIFORNIA BUILDING CODE ANALYSIS
AREAS
STORYS
#
ALLOWABLE #
STORYS ABOVE
GRADE PLANE
(CBC TABLE 504.4)
#
BUILDING
HEIGHT
FEET
ALLOWABLE
BUILDING HEIGHT
(CBC TABLE 504.3)
FEET
SPRINKLERED
CONSTRUCTION
TYPE
(CBC 602)
GFA
EXISTING
AREA
SF
GFA
DEMOLISHED
AREA
SF
GFA
PROPOSED
AREA
SF
GFA
TOTAL
AREA
SF
ALLOWABLE
AREA
(CBC TABLE
506.2)
SF
OCCUPANCY
CLASSIFICATION
AND USE
(CBC 302)
MAXIMUM FLOOR AREA
ALLOWANCE PER
OCCUPANT.
(OCCUPANCY LOAD
FACTOR)
(CBC TABLE 1
1004.5)
OCCUPANCY
LOAD
(CBC 1004)
#
COMMENT
(E) CHILDREN’S CENTER WITH
(N) ADDITION 2 E (S): 2 32 60 S V-B 4,011 987 1,138 4,162 E(SM)
28,500 E
DAYCARE: 35 NET
BUSINESS AREAS: 150
GROSS
LOBBY:15 NET
3,200/35=91
500/150=4
230/15=16
TOTAL =111
(E) SANCTUARY
2 + BASEMENT
[BELOW GRADE
PLANE]
E (S): 2
A-3(S): 2 35 60 S
V-B
B = 6,663
1ST =
6,749
2ND =
1,533
TOTAL
14,945
212 +1051 - 13,682
E(SM)
28,500
A-3(SM)
18,000
E
A-3
E CLASSRM: 20
A-STANDING: 5
A-CHAIRS: 7
A-TABLES & CHAIRS: 15
(ALL NET)
B: 4,290/20
=214
1 ST: 5,177/7=740
439/20=22
300/15=20
300/5=60
2ND:1220/20=61
TOTAL: 1,117
(N) EXTERIOR PLAZA CANOPY 1 A-3(S): 2 20 IIB =75 S
II-B
[SEE COMMENT
NOTE]
-
1,500 1,500 A-3(S1)
38,000 A-3 ASSEMBLY
(UNCONCENTRATED):15 100
BUILDING OFFICIAL TO CONFIRM IF 3104.2 CAN BE APPLIED:
PEDESTRIAN WALKWAYS AND TUNNELS
CBC 3104.2 STATES: SEPARATE STRUCTURES
CAN BE COMBUSTIBLE CONSTRUCTION WHERE CONNECTED
BUILDINGS ARE OF COMBUSTIBLE CONSTRUCTION
BUT,
AWNINGS AND CANOPIES CBC 3105.3 REQUIRES
NON-COMBUSTIBLE FRAMES AND FLAME-RESISTANT COVERS.
(E) LANDING 2 E (S): 2 27 60 S V-B 4,524 393 208 4,339
E(SM)
28,500
A-3(SM)
18,000
A-3
E
E CLASSRM: 20
A-STANDING: 5
A-CHAIRS: 7
A-TABLES & CHAIRS: 15
(ALL NET)
B-BUSINESS AREAS: 150
GROSS
1,610/7=230
1,343/20=68
613/150=4
243/5=49
TOTAL: 351
BUILDING OFFICIAL TO AGREE IT CAN BE CLASSIFIED AS
EDUCATION USE AND NOT AN ASSEMBLY USE.
TOTAL
CONSIDERED PORTIONS OF ONE
BUILDING.
[BUILDING ON SAME LOT CBC 503.1.2]
2 2 35 60 S V-B 23,480 2,643 2,846 23,683
18,000+ 75%
[Area Factor
Increase (CBC
506.3)]
31,500
A-3 - -
FRONTAGE AREA FACTOR INCREASE CALCULATION:
If = [F/P-0.25]W/30
= 0.75 =75%
WHERE:
F/P=1
W=30
MATERIAL OVERALL
PALETTE
AS-5.0
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
7.1.b
Packet Pg. 44
PASTOR WORK ROOM
RECEPTION/
SECURITY
STAFF
WC
EXT.
STOR.
LOBBY
265 SF
CHECK IN/
RECEPTION
NURSERY
CHECK-IN
58 SF
2-3 YR OLD
CLASSROOM
426 SF
4-5 YR OLD
CLASSROOM
426 SF
NURSERY
384 SF
UP
UP
SECURE
NURSERY
PLAY
ELEVATOR
CAR
KIDS PLAY
PATIO
COMMUNITY
PLAZA
KITCHEN
5
0
'
-
7
1
/
2
"
1
6
'
-
0
"24'-0"20'-0"21'-11 1/2"9'-9"
91 SF 77 SF
8'-4"3'-11"3'
-
8
"19'-0 1/2"10'-1 1/2"3'-3"
BUILT IN
SEAT
TURNSTILE
PASS
GATE
7'-6"TOY
STORAGE
3'
-
8
"
3'
-
0
"
3'
-
0
"
3'
-
0
"
DS
DS
DS
DS
695.55'
695.32'
695.00'
695.59'
694.16'
695.32'
695.57'
1
6
'
-
3
"
16
'
-2
1
/2
"32'-7 1/2"8'
-
0
"8'-0"16'-8"
WC
43 SF
WC
43 SF
OCC: E
6'
-
0
"3'-8"CLEARSTAIR
STAIR
DS
3'
-
8
"3'-8
"
PASS
GATE
ACCESSIBLE
WC48" MIN1
8
"
M
I
N 3'-0
"
18
"
M
INPLANTEROCC: E
OCC: E
COMBINED AREA: 575 SF
OCC: B
FOR OCCUPANCY LOAD FIGURES
REFER TO AS-1.8
CHILDREN'S CENTER
FIRST FLOOR PLAN
AS-2.0 Rev A
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
1" = 10'
CHILDREN'S CENTER L01 PLAN
7.1.b
Packet Pg. 45
WORKSHOP
134 SF
STOR.
ACCESSIBLE
WC
1ST+2ND GRADE
CLASSROOM
426 SF
3RD+4TH GRADE
CLASSROOM
426 SF
MULTI-PURPOSE
ROOM
447 SF
DN
UP
CM OFFICE
77 SF16'-8
"
14
'
-4
1
/2
"24'-0 1/2"6'-7
"
1
6
'
-
2
"
9'-9"
7'
-
1
"12'-11 1/2"3'-8"3'-8
"13'-0 1/2"9'-9"
SANCTUARY 3'-8"DS
DS
DS
DS
705.09'
REVISED
BALCONY LINE
DS
5
1
'
-
0
"
20'-0"22'-0"32'-9"8'-0
"8'-0"16'-10 1/2"
WC
43 SF
WC
43 SF
ELEVATOR
CAR
DN
COMBINED
AREA: 353 SF6'-5"3'-8"CLEAR3'-8"3'-8
"0'-8"1'
-
1
0
"48" MIN1
8
"
M
I
N
1
8
"
M
I
N
HALL
9'-8"6'-4"6'-8"FOR OCCUPANCY LOAD FIGURES
REFER TO AS-1.8
COMBINED AREA: 1,360 SF
OCC: E
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
CHILDREN'S CENTER
SECOND FLOOR PLAN
AS-2.1 Rev A1" = 10'
CHILDREN'S CENTER L02 PLAN
7.1.b
Packet Pg. 46
DN
5'-8"
(N) PARAPET WALL
FOR MECH. AREA
7'-7"8'-5"CANOPY
ABOVE
5
4
'
-
2
1
/
2
"20'-9"1
7
'
-
4
1
/
2
"
5
8
'
-
1
"
(E) ROOF TO
REMAIN
(E) ROOF TO
REMAIN
12'-0"
REVISED BALCONY LINE
20'-0"22'-0"36'-6"8'
-
0
"8'-0"3'-8"3'-8"8"17'-2"
MECHANICAL DECK
ELEVATOR
MOTOR
ROOM
335 SF
MECHANICAL DECK300 SF
48 SF
SANCTUARY
GATE
ACCESS ONLY TO
AUTHORIZED STAFF FOR
MAINTENANCE
ACCESS ONLY TO
AUTHORIZED STAFF FOR
MAINTENANCE
1" = 10'
CHILDREN'S CENTER
THIRD FLOOR PLAN
AS-2.2CHILDREN'S CENTER L03 PLAN
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
7.1.b
Packet Pg. 47
7'-7"8'-5"5
4
'
-
2
1
/
2
"20'-9"1
7
'
-
4
1
/
2
"
5
8
'
-
1
"
(E) ROOF TO
REMAIN
20'-0"22'-0"36'-6"8'
-
0
"8'-8"7'-3"SLOPESLOPES
L
O
P
E
S
L
O
P
E
SLOPE5:25:25:
2
5:
2
FALL FALLFALLTOP OF CANOPY+28'-10"
T.O.W.+31'-8"
TOP OF ROOF+27'-0"
T.O.W.+27'-10"
TO OF ROOF+28'-3"
SANCTUARY
12'-0"
CHILDREN'S CENTER
ROOF FLOOR PLAN
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
1" = 10'AS-2.3CHILDREN'S CENTER ROOF PLAN
7.1.b
Packet Pg. 48
27'-10"10'-0"7'-6"9'-2"1'-2"TL-100
(E) TILE ROOF
TO REMAIN
PT-100 PT-103
PT-104
PT-102
PT-108
PT-106
PT-107
PT-100
METAL
CLAD
LIGHT
SHELF
PT-108
MT-102 EXTERNAL
PAINT
EXTERNAL
PAINT
EXTERNAL
PAINT STUCCO
EXTERNAL
PAINT
EXTERNAL PAINT EXTERNAL PAINT
EXTERNAL
PAINT
EXTERNAL
PAINT ON
STUCCO EXTERNAL
PAINT
18'-8"9'-2"DOWNSPOUT +
ROOF DECK
OVERFLOW
(N)
DOWNSPOUT
8'-6"3'-6"13'-6"METAL GUARDRAIL/
SECURITY FENCE
H-200 PT-100H-100 TL-100
(E) TILE ROOF TO
REMAIN
METAL MESH FOR
IVY WALL
17'-6"PLANTER
EXTERIOR
PAINT
10'-0"9'-2"8'-8"HIGH TRAFFIC
WATERPROOF
LIQUID APPLIED
DECK MEMBRANE
LOBBY
DOWNSPOUT
TL-100PT-100
(E) TILE ROOF TO
REMAIN
PT-100
PAINTED STUCCO
SOFFIT
H-100
METAL
GUARDRAIL
5 12
EXTERNAL
PAINTED ON
STUCCO
1'-6"10'-0"7'-6"10'-4"(N) STAIR
BEHIND27'-10"TL-100
(E) TILE
ROOF TO
REMAIN
PT-100PT-103
PT-104
PT-102
PT-108
PT-106
PT-107
H-100
METAL
GUARDRAIL
PAINTED STEEL COLUMN
MT-200
5 12
EXTERIOR
PAINT
EXTERIOR
PAINT
EXTERIOR
PAINT
EXTERIOR
PAINT
EXTERIOR
PAINT
EXTERIOR
PAINT
EXTERIOR
PAINT
CHILDREN'S CENTER
PROPOSED ELEVATION
1NORTH ELEVATION
3/16" = 1'-0"3SOUTH ELEVATION4WEST ELEVATION
1" = 12'2EAST ELEVATION AS-2.4
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
1" = 12'
1" = 12'
3
4 1
2 18'-6"3'-6"31'-8"MT-101
PAINTED
METAL
CANOPY
MT-200 PT-101 H-100PT-108
METAL
GUARDRAIL
MT-200
PT-100
EXTERNAL
PAINT
STEEL
STRUCTURE
EXTERNAL
PAINT
EXTERNAL
PAINT
11'-6"10'-0"10'-0"11'-8"19'-0"3'-6"PT-101 PT-103
PT-100
MT-101
PAINTED
METAL
CANOPY
MT-200 PT-101
PT-100
EXTERIOR
LANDSCAPE WALL
H-100
METAL GUARDRAIL/
SECURITY FENCE
H-100
METAL
GUARDRAIL
EXTERNAL
PAINT
EXTERNAL
PAINT EXTERNAL
PAINT
EXTERNAL
PAINT
PT-10315'-6"10'-0"LOBBY
PT-101H-100
MT-101
PAINTED METAL
CANOPY
MT-200 PT-100
PT-103 PT-108
EXTERNAL
PAINT
EXTERNAL
PAINT
MATEL
GUARDRAIL
EXTERNAL
PAINT
EXTERNAL
PAINT
10'-0"11'-8"4'-4"14'-2"31'-8"MT-200
PAINTED
STEEL
COLUMN
MT-101
PAINTED
METAL
CANOPY
MT-200 PT-100H-100
H-100
METAL
GUARDRAIL
METAL
GUARDRAIL
EXTERNAL
PAINT
PT-101
PT-103
EXTERNAL
PAINT
EXTERNAL
PAINT
CHILDREN'S CENTER
ADDITIONAL ELEVATION
AS-2.5 Rev A
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
1NORTH ELEVATION
3/16" = 1'-0"3SOUTH ELEVATION4WEST ELEVATION
1" = 12'2EAST ELEVATION
1" = 12'
1" = 12'
3
4
1
2
7.1.b
Packet Pg. 49
18'-6"3'-6"31'-8"MT-101
PAINTED
METAL
CANOPY
MT-200 PT-101 H-100PT-108
METAL
GUARDRAIL
MT-200
PT-100
EXTERNAL
PAINT
STEEL
STRUCTURE
EXTERNAL
PAINT
EXTERNAL
PAINT
11'-6"10'-0"10'-0"11'-8"19'-0"3'-6"PT-101 PT-103
PT-100
MT-101
PAINTED
METAL
CANOPY
MT-200 PT-101
PT-100
EXTERIOR
LANDSCAPE WALL
H-100
METAL GUARDRAIL/
SECURITY FENCE
H-100
METAL
GUARDRAIL
EXTERNAL
PAINT
EXTERNAL
PAINT EXTERNAL
PAINT
EXTERNAL
PAINT
PT-10315'-6"10'-0"LOBBY
PT-101H-100
MT-101
PAINTED METAL
CANOPY
MT-200 PT-100
PT-103 PT-108
EXTERNAL
PAINT
EXTERNAL
PAINT
MATEL
GUARDRAIL
EXTERNAL
PAINT
EXTERNAL
PAINT
10'-0"11'-8"4'-4"14'-2"31'-8"MT-200
PAINTED
STEEL
COLUMN
MT-101
PAINTED
METAL
CANOPY
MT-200 PT-100H-100
H-100
METAL
GUARDRAIL
METAL
GUARDRAIL
EXTERNAL
PAINT
PT-101
PT-103
EXTERNAL
PAINT
EXTERNAL
PAINT
CHILDREN'S CENTER
ADDITIONAL ELEVATION
AS-2.5 Rev A
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
1NORTH ELEVATION
3/16" = 1'-0"3SOUTH ELEVATION4WEST ELEVATION
1" = 12'2EAST ELEVATION
1" = 12'
1" = 12'
3
4
1
2
7.1.b
Packet Pg. 50
PASTOR
THE LANDING
CLASSROOM
CLASSROOM
CLASSROOM
DECK OVER
KIDS PLAY
A/C
A/C
SHED
SHED
A/C A/C
DRAINAGE
LANDING32'-3"50'-3
"32'-2"5
0
'
-
2
1
/
2
"
WC
WC
WC
KIDS PLAY
KIDS PLAY
695.50'
695.60'
1"=10'
EXISTING CHILDREN'S L01 PLAN 1
EXISTING CHILDREN'S
L01 PLAN
AS-2.6
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
7.1.b
Packet Pg. 51
PASTOR
CLASSROOM
CLASSROOM
CLASSROOM32'-3"50'-3
"32'-2"5
0
'
-
2
1
/
2
"18'-10 1/2"18'-10 1/2"WORK ROOM THE LANDING
SANCTUARY
DOWN
A/C
A/C
SHED
SHED
KIDS PLAY
A/C A/C
DOWN
705.50'
705.60'
W.C
W.C
W.C
1"=10'
EXISTING CHILDREN'S L02 PLAN 1
EXISTING CHILDREN'S
L02 PLAN
AS-2.7
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
7.1.b
Packet Pg. 52
FOYER
OFFICE
KITCHEN
OFFICE
PASTOR WORK ROOM
FOYER
DN
DN
OFFICE OFFICE
OFFICE
SOUND
W.C
W.C
(N) MEET & GREET
PLAZA
695.50' FS
FALL
FALL
692' FS
(E) PLANTER
TO REMAIN
DN
DN
DN
(E) SANCTUARY
TO REMAIN
(E)
BUILDING TO REMAIN
(E) RAMP
TO REMAIN
(E) PLANTER
TO REMAIN
(E) STAIRS
TO REMAIN11'-1 1/2"20'-8 1/2"
13'-0 1/2"10'-1 1/2"695.57'
8'-4 1/2"11'-10 1/2"10'-4 1/2"22'-5 1/2"22'-3"19'-0"29'-4"EQEQ1'-3"MEET & GREET PLAZA
PLAN
AS-3.0
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
1" = 10'
PLAZA PLAN
7.1.b
Packet Pg. 53
(E) ROOF TO
REMAIN
SLOPE SLOPESLOPE
SLOPE1'-6"TYPGUTTER
EQ.
SLOPE SLOPE
SLOPE
EQ.EQ.
EQ.EQ.EQ.
EQ.EQ.14'-9"GUTTER 7'-4"(E) ROOF TO
REMAIN
SLOPE8'-4 1/2"11'-10 1/2"10'-4 1/2"22'-5 1/2"22'-3"19'-0"29'-4"9:1SLOPE9:1SLOPE3:1SLOPE3:1SLOPE
3:1
10:3 3:1
5:15:25:1
10:1 20:3
TOP OF ROOF+25'-8"
TOP OF RIDGE+16'-9 1/2"
TOP OF SKYLIGHT+35'-0"29'-7"SLOPE20:9SANCTUARY
(E) ROOF TO
REMAIN
S
L
O
P
E20:990'-0"SUNBRELLA SHADE LENGTH12'-0"
CANOPY ROOF PLAN
AS-3.1
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
1" = 10'
CHILDREN'S CENTER ROOF PLAN
7.1.b
Packet Pg. 54
121'-0"8'-5"9'-6 1/2"695' 6"
FS
+ 709'
+ 704' 5"
+ 709' 9 1/2"
+ 706' 10 1/4"
MEET & GREET
PLAZA
+ 713' 11 1/4"8'-11"+ 705' 4 1/4"
+ 707' 8 1/4"+ 707' 1"
PT-105
(N) SIGNAGE WALL
TL-100
(E) TILE ROOF TO
REMAIN
TL-100
(E) TILE ROOF TO
REMAIN
PT-100
(E) STUCCO TO BE
REPAINTED
(E) DOORS AND
WINDOWS TO
REMAIN
(E) STUCCO TO
BE REPAINTED
SUNBRELLA FIRESIST -
FLAME RESISTANT
FABRIC
METAL
ROOF
(E) DOORS AND
WINDOWS TO
REMAIN
TL-100
(E) TILE ROOF
TO REMAIN
PT-100
SP-200
MT-100PT-103
(N) SIGNAGE WALL
(E) STEPS,
PLANTERS,
AND RAMPS
TO REMAIN WD-300
MT-100
METAL FASCIA OVER
WOOD STRUCTURE
CANOPY
COLUMNS
MT-200
(E)
SANCTUARY
TO REMAIN
(E) LANDING
BUILDING TO
REMAIN
SP-200
SUNBRELLA
FIRESIST
- FLAME
RESISTANT
FABRIC
(E) METAL
GUARDRAIL
MT-100
METAL FASCIA
OVER WOOD
STRUCTURE
CANOPY ELEVATION
1" = 12'1CANOPY SOUTH EAST ELEVATION
1" = 12'2CANOPY NORTH WEST ELEVATION
AS-3.2 Rev A
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
1
2
7.1.b
Packet Pg. 55
EXISTING SITE VIEWS
AS-4.0
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
A
D
B E
C
A
B
C
D
E
7.1.b
Packet Pg. 56
PROPOSED VIEWS
AS-4.1
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
EXISTING
PROPOSED
PROPOSED VIEWS
AS-4.2
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
7.1.b
Packet Pg. 57
PROPOSED VIEWS
AS-4.2
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
A
B
A
B
7.1.b
Packet Pg. 58
MATERIAL OVERALL
PALETTE
AS-5.0
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
GALVALUME METAL ROOF PANEL
durable
FRITTED LOW-E SKYLIGHT GLASS
blocks harsh sun under canopy while maintaining
clear view
MESH FOR IVY WALL
low maintenance, easy to install, no special green
wall pockets, brings softness to buildings
ACOUSTIC WOOD CEILING
brings warmth to interior spaces, functions to
dampen sounds from loud spaces
CONCRETE COATING
coating type TBD, durable for high traffic, defines
plaza space
GLULAM-
available in custom size.
COMMUNITY PLAZA -
Stepstone modular narrow pavers
EXTERIOR SMOOTH FINISH STUCCO-
see color chart.
EXTERIOR STUCCO - COLOR PALETTE
LOW-E GLASS FOR WINDOW AND DOORS-
Guardian SNR68
7.1.b
Packet Pg. 59
MATERIAL CATALOGUE
AS-5.1
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
Western Window or sim.
• Clean design, not bulky sightlines of window frames
• Integrated sustem for operable windows and doors
• Thermally broken Aluminum for better performance
• Customizable dual-paned Low-E glass
• In-stock finish options
Western Window and Doors
Exterior Lignting - Ligman Lighting
(Darke Sky Approved Series)
7.1.b
Packet Pg. 60
35'10'10'L01(+0' 0")
L02(+10' 0")
L03(+20' 0")
SANCTUARY TOP(+35' 0")31'-7"10'10'L01(+0' 0")
L02(+10' 0")
L03(+20' 0")
NEW BUILD TOP(+31' 7")
PROPOSED SITE ELEVATIONS -
SOUTH + WEST ELEVATION
AS-6.0 Rev B
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
Site Elevation - South (1"=22')
+35'
+27' 9"
+31' 8"
+0' 0"
Site Elevation - West (1"=22')
+35'
+27' 9"
+31' 8"
+0' 0"
Children's Center
(N) Two-story Addition
Children's Center
(N) Two-story Addition
LANDING
(E) Two-story Building
LANDING
(E) Two-story Building
SANCTUARY
(E) Two-story Building
SANCTUARY
(E) Two-story Building
CANOPY
(N) One-story Cover to Meet+ Greet Plaza
Children's Center
(E) Two-story Renovation
Children's Center
(E) Two-story Renovation
PT-100 - Paint:
Snowbound
PT-103 - Paint: Lupine PT-107 - Paint:
Humorous Green
SP-200 - Sunbrella
Firesist - flame resistant
fabric
MT-400 - Galvalume
Standing Seam Roof
GL-100 - Low-E
Laminate Glass w/ Frit
WD-300 - Wood
Structure
PT-500- Paint: Navel Existing red clay
pantiles
PT-103 - Paint: Lupine PT-100 - Paint:
Snowbound
Existing red clay
pantiles
H-200 - Mesh for Ivy
Green Wall
PT-108 - Paint: Splashy PT-500- Paint: NavelH-100- Paint: Guardrail WD-200- Exterior
Wood Celling
7.1.b
Packet Pg. 61
35'10'10'L01(+0' 0")
L02(+10' 0")
L03(+20' 0")
SANCTUARY TOP(+35' 0")31'-7"10'10'L01(+0' 0")
L02(+10' 0")
L03(+20' 0")
NEW BUILD TOP(+31' 7")
PROPOSED SITE ELEVATIONS -
SOUTH + WEST ELEVATION
AS-6.0 Rev B
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020 10'27'-9"10'L01(+0' 0")
L02(+10' 0")
L03(+20' 0")
RENOVATED CHILDREN'S
CENTER TOP(+27' 9")35'10'10'L01(+0' 0")
L02(+10' 0")
L03(+20' 0")
SANCTUARY TOP(+35' 0")
PROPOSED SITE ELEVATIONS -
SOUTH + EAST ELEVATION
AS-6.1 Rev A
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
Site Elevation/ Section - South (1"=22')
Children's Center
(E) Two-story Renovation
Children's Center
(N) Two-story Addition
Children's Center
(N) Two-story Addition
SANCTUARY
(E) Two-story Building
LANDING
(E) Two-story Building
CANOPY
(N) One-story Cover to Meet+ Greet Plaza
Children's Center
(E) Two-story Renovation
+27' 9"
+31' 7"
+0' 0"
Site Elevation - East (1"=22')
+35'
+27' 9"
+14' 11"
+10' 4"
+31' 8"
+0' 0"
Western Windows -
Classic Line
PT-103 - Paint: LupinePT-104 - Paint:
Vigorous Violet
PT-102 - Paint: Dishy
Coral
PT-100 - Paint:
Snowbound
H-200 - Mesh for Ivy
Green Wall
PT-106 - Paint:
Goldfinch
PT-107 - Paint:
Humorous Green
Existing red clay
pantiles
Existing red clay
pantiles
PT-108 - Paint: Splashy PT-101 - Paint: Grays
Harbor
PT-108 - Paint:
Splashy
PT-100 - Paint:
Snowbound
PT-101 - Paint: Grays
Harbor
Western Windows -
Classic Line
PT-103 - Paint:
Lupine
H-100- Paint:
Guardrail
WD-200- Exterior
Wood Celling
7.1.b
Packet Pg. 62
Children's Center
(N) Two-story Addition
SANCTUARY
(E) Two-story Building
LANDING
(E) Two-story Building
Children's Center
(E) Two-story Renovation
Site Elevation - North (1"=22')
+35'
+27' 9"
+31' 8"
+0' 0"
PT-101 - Paint: Grays
Harbor35'10'10'L01(+0' 0")
L02(+10' 0")
L03(+20' 0")
SANCTUARY TOP(+35' 0")
PROPOSED SITE ELEVATIONS -
NORTH ELEVATION
AS-6.2
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
PT-100 - Paint:
Snowbound
Existing red clay
pantiles
H-200 - Mesh for Ivy
Green Wall
PT-500- Paint: NavelH-100- Paint: GuardrailWD-200- Exterior
Wood Celling
7.1.b
Packet Pg. 63
35'10'10'L01(+0' 0")
L02(+10' 0")
L03(+20' 0")
SANCTUARY TOP(+35' 0")
PROPOSED SITE ELEVATIONS -
NORTH ELEVATION
AS-6.2
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
RECEPTION/
SECURITY
STAFF
WC
LOBBY
265 SF
NURSERY
CHECK-IN
58 SF
2-3 YR OLD
CLASSROOM
426 SF
4-5 YR OLD
CLASSROOM
426 SF
NURSERY
384 SF
ELEVATOR
CAR
KITCHEN50'-7
1
/2
"
16
'
-
0
"24'-0"21'-11 1/2"9'-9"
91 SF 77 SF
8'-4"3'-11"3'-
8
"19'-0 1/2"10'-1 1/2"3'-3"7'-6"3'-
8
"
3'
-
0
"
3'-
0
"
3'
-
0
"
16
'
-
3
"
16
'
-
2
1
/
2
"32'-7 1/2"8'
-
0
"8'-0"16'-8"
WC
43 SF
WC
43 SF
6'
-
0
"3'-8"CLEARSTAIR
STAIR
3'-
8
"
3'-
8
"
ACCESSIBLE
WC48" MIN18
"
M
I
N
3'-
0
"
18
"
M
I
N
COLORED
CHILDREN'S CENTER PLANS
AS-7.0 Rev A
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
CHILDREN'S CENTER L01 PLAN
WORKSHOP
134 SF
STOR.
ACCESSIBLE
WC
1ST+2ND GRADE
CLASSROOM
426 SF
3RD+4TH GRADE
CLASSROOM
426 SF
MULTI-PURPOSE
ROOM
447 SF
CM OFFICE
77 SF
16
'
-
8
"
14
'
-
4
1
/
2
"24'-0 1/2"6'-
7
"16'-2"
9'-9"
7'-
1
"12'-11 1/2"3'-8"3'-
8
"13'-0 1/2"9'-9"3'-8"705.09'51'-0"22'-0"32'-9"8'-
0
"8'-0"16'-10 1/2"
WC
43 SF
WC
43 SF
ELEVATOR
CAR6'-5"3'-8"CLEAR3'-8"3'-
8
"0'-8"1'-
1
0
"48" MIN1
8
"
M
I
N
1
8
"
M
I
N
HALL
9'-8"6'-4"6'-8"DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
CHILDREN'S CENTER L02 PLAN
DN
5'-8"
(N) PARAPET WALL FOR MECH. AREA
7'-7"8'-5"CANOPY ABOVE
5
4
'
-
2
1
/
2
"20'-9"1
7
'
-
4
1
/
2
"58'-1
"
(E) ROOF TO
REMAIN
(E) ROOF TO
REMAIN
12'-0"
REVISED BALCONY LINE
20'-0"22'-0"36'-6"8'-0
"8'-0"3'-8"3'-8"8"17'-2"
MECHANICAL DECK
ELEVATOR
MOTOR
ROOM
335 SF
MECHANICAL DECK300 SF
48 SF
SANCTUARY
GATE
ACCESS ONLY TO
AUTHORIZED STAFF FOR
MAINTENANCE
ACCESS ONLY TO
AUTHORIZED STAFF FOR
MAINTENANCE
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 4th, 2020
CHILDREN'S CENTER L03 PLAN
7.1.b
Packet Pg. 64
DN
(N) MEET & GREET
PLAZA
FALL
FALL
6'-2"(E) PLANTER
TO REMAIN
DN
DN
DN
(E) SANCTUARY
TO REMAIN
(E)
BUILDING TO REMAIN
(E) RAMP
TO REMAIN
(E) PLANTER
TO REMAIN
(E) STAIRS
TO REMAIN11'-1 1/2"20'-8 1/2"
13'-0 1/2"
N
20'-0"10'-1 1/2"8'-4 1/2"11'-10 1/2"10'-4 1/2"22'-5 1/2"22'-3"19'-0"29'-4"1'-4"DS
EQEQ1'-3"COLORED
MEET & GREET PLAZA PLAN
LEGEND:
THE LANDING
SANCTUARY
PLANTER BED
MEET & GREET PLAZA
PLANTS
MEET & GREET PLAZA PLAN
DRAWING NO:
DATE:
DRAWING TITLE:
PROJECT:
DESIGNER:
Goble Berriman Design
8032 Regis Way
Los Angeles CA 90045
EFREE CHURCH
KEY PLAN:
3255 S DIAMOND
BAR BLVD DIAMOND
BAR, CA 91765
DRAWING SET:
PLANNING SUBMISSION
N
Nov 5th, 2020
AS-7.1 Rev A
7.1.b
Packet Pg. 65
Project Status Report CITY OF DIAMOND BAR
January 26, 2021 COMMUNITY DEVELOPMENT DEPARTMENT
LEGEND PH = PUBLIC HEARING
X = NON PUBLIC HEARING
AP = ASSIGNED PLANNER
PC = PLANNING COMMISSION
AR = ADMINISTRATIVE REVIEW
CC = CITY COUNCIL
PROPERTY LOCATION
PLANNING COMMISSION REVIEW File # AP Applicant PC
1/26/21
CC
2/2/21
PC
2/9/21
CC
2/16/21
PC
2/23/21
CC
3/2/21
Housing Element Update 2021-2029 PL2021-004 GL City of Diamond
Bar
Joint workshop with
the City Council
(starts at 5:30 pm)
3255 S. Diamond Bar Blvd.
(EFree Church Renovate/new
construction)
DR/CUP Amend PL2020-123 MN Ruben Van
Colenberghe
PH
1523 Silver Rain Dr.
(Addition and remodel to single family
residence)
DR PL2020-142 MN Jim Pan PH
2825 S. Diamond Bar Blvd.
(Time Extension for Planet Fitness CUP)
TE PL2019-103 MN ROIC Diamond
Hills Plaza, LLC
PH
ADMINISTRATIVE REVIEW
Property Location AP Applicant
None
PENDING ITEMS
Property Location File # AP Applicant Status
1625 Bears Den
(Addition to single family residence)
DR PL2021-01 MN Pete Volbeda Under Review
2523 Blaze Trail
(New single family residence)
DR PL2020-49 MN Pete Volbeda Third Incomplete letter sent 10/16/20 - waiting for additional information
Crooked Creek
(7-unit subdivision)
TTM, DR, CUP, TP
PL2017-203
MN Rob Meserve Second incomplete letter sent 9/16/20 – waiting for additional information
1114 S. Diamond Bar Blvd.
(Veterinarian office)
CUP PL2020-120 MN Dr. Ratul Kumar Incomplete letter sent 9/30/20 – waiting for additional information
24011 Falcons View Dr.
(Addition and remodel to single family
residence)
DR PL2020-25 MN William
Edwards
Under Review
24206 Gingerwood Place
(Addition to single family residence)
DR PL2020-115 MN Angelo
Reginaldo
Incomplete letter sent 10/9/20 – waiting for additional information
9.1
Packet Pg. 66
Project Status Report CITY OF DIAMOND BAR Page 2
January 26, 2021 COMMUNITY DEVELOPMENT DEPARTMENT
PENDING ITEMS (continued)
Property Location File # AP Applicant Status
20657 Golden Springs
(Sign program amendment)
CUP PL2019-172 MN Sign Express Incomplete letter sent 10/10/19 – waiting for additional information
2234 Indian Creek
(New single family residence)
DR PL2020-159 MN Jeffrey Sun Incomplete letter sent 1/12/21 – waiting for additional information
2360 Indian Creek
(Addition and remodel to single family
residence)
DR PL2019-185 MN Pete Volbeda Second incomplete letter sent 2/26/20 – waiting for additional information
22938 ½ Ridge Line Rd.
(Wireless facility)
CUP PL2020-42 NTE/
GL
Jill Cleveland Incomplete letter sent 04/01/2020 – waiting for additional information
23121 Ridge Line Rd.
(New single family residence)
DR PL2020-31 NTE/
MN
Pete Volbeda Second incomplete letter sent 12/15/20 – waiting for additional information
23135 Ridge Line Rd.
(New single family residence)
DR PL2018-233 MN Faiz Ennabe Second incomplete letter sent 2/6/20 – waiting for additional information
9.1
Packet Pg. 67
CITY OF DIAMOND BAR
NOTICE OF PUBLIC MEETING
AND AFFIDAVIT OF POSTING
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES )
CITY OF DIAMOND BAR )
I, Stella Marquez, declare as follows:
I am employed by the City of Diamond Bar, Community Development Department. On
January 22, 2021, a copy of the January 26, 2021, Planning Commission Agenda, was
posted at the following locations:
SCAQMD/Government Center, 21865 Copley Drive
Heritage Park, 2900 Brea Canyon Road
City website: www.diamondbarca.gov
Due to COVID-19 closures, the Planning Commission Agenda could not be posted at
the following regular posting locations:
Diamond Bar City Hall
Diamond Bar Library
I declare under penalty of perjury that the foregoing is true and correct.
Executed on January 22, 2021, at Diamond Bar, California.
Stella Marquez
Community Development D partment
s ��.�Amaa�ero:a��b aoo
Stella Marquez
From: Greg Gubman
Sent: Tuesday, January 26, 2021 9:11 AM
Cc: James H. Eggart; Stella Marquez; Carol Dennis; Grace Lee; Mayuko Nakajima
Subject: FW: PUBLIC HEARING - PL2020-123
Dear Planning Commissioners,
The email below was submitted regarding the public hearing for the Efree Church
addition/renovation. If you have any questions, please feel free to contact May or me.
�re� Gubman, AICP � Community Development Director
Clay of Diamond Bar
909.839.7631
Irnpadanf Notice: Until further notice, all City facilities, including City Hall, the Diamond Bar Center and Heritage Park will be
closed to the public. In the meantime, staff is available to provide services and answer questions by phone and email. For
more information, visit www.diamondborca.gov/covidl9
From: Good Luck <gaodluck91776@Bmail.co�ry
Sent: Tuesday, January 26, 2021 8:58 AM
To: Mayuko Nakajima <MNakaiima@DiamondBarCA.Gov>
Subject: PUBLIC HEARING - PL2020-123
CAUTION: This message originated outside of our City of Diamond Bar network.
To whom it may,
My name is Ying Li. I am the owner of 3155 cherrydale dr, diamond bar.
As for
project 3255 s diamond bar blvd, diamond bar,
i disagree
and object the project cause it would cause lots of
noises
and inconvenience to us the neightboud.
the covered patio for gathering and parking, also will bring unsafe concerns to the neighbourhood, including
potential crimes.
Please consider my objection and thank you so much
Ying Li
626-438-7767