Loading...
HomeMy WebLinkAbout01/26/2021 PC Reg Mtg PLANNING COMMISSION AGENDA January 26, 2021 6:30 PM CONSISTENT WITH THE GOVERNOR’S EXECUTIVE ORDER TO STAY AT HOME, AVOID GATHERINGS AND MAINTAIN SOCIAL DISTANCING, THIS MEETING WILL BE CONDUCTED TELEPHONICALLY. MEMBERS OF THE PLANNING COMMISION AND CITY STAFF WILL BE PARTICIPATING VIA TELECONFERENCE, WHICH IS BEING RECORDED. YOU CAN PARTICIPATE IN THE MEETING BY VISITING: https://attendee.gotowebinar.com/register /458799126941300492 Audio +1 (562) 247 -8321 - Attendee Access Code: 848-288-309 Copies of staff reports or other written documentation relating to agenda items are on file in the Planning Division of the Community Development Department, located at 21810 Copley Drive, and are available for public inspection. If you have questions regarding an agenda item, please call (909) 839-7030 during regular business hours. Written materials distributed to the Planning Commission within 72 hours of the Planning Commission meeting are available for public inspection online at: http://diamondbarca.iqm2.com/Citizens/Default.aspx Chairperson Kenneth Mok Vice Chairperson William Rawlings Commissioner Naila Barlas Commissioner Mahendra Garg Commissioner Raymond Wolfe In an effort to comply with the requirements of Title II of the Americans with Disabilities Act of 1990, the City of Diamond Bar requires that any person in need of any type of special equipment, assistance or accommodation(s) in order to communicate at a City public meeting must inform the Community Development Department at (909) 839-7030 a minimum of 72 hours prior to the scheduled meeting. The City of Diamond Bar uses recycled paper and encourages you to do the same City of Diamond Bar Planning Commission MEETING RULES PUBLIC INPUT The meetings of the Diamond Bar Planning Commission are open to the public. A member of the public may address the Commission on the subject of one or more agenda items and/or other items of which are within the subject matter jurisdiction of the Diamond Bar Planning Commission. At this time, the teleconference moderator will ask callers one at a time to give their name and if there is an agenda item number they wish to speak on before providing their comment. If you wish to speak on a public hearing item or commission consideration item, you will then be called upon to speak at that point in the agenda. As a general rule, the opportunity for public comments will take place at the discretion of the Chairperson. However, in order to facilitate the meeting, persons who are interested parties for an item may be requested to give their presentation at the time the item is called on the calendar. The Chairperson may limit individual public input to five minutes on any item; or the Chairperson may limit the total amount of time allocated for public testimony based on the number of people requesting to speak and the business of the Commission. Individuals are requested to conduct themselves in a professional and businesslike manner. Comments and questions are welcome so that all points of view are considered prior to the Commission making recommendations to the staff and City Council. When speaking, please direct your questions and comments to the Commission, not to staff or other members of the public. In accordance with State Law (Brown Act), all matters to be acted on by the Commission must be posted at least 72 hours prior to the Commission meeting. In case of emergency or when a subject matter arises subsequent to the posting of the agenda, upon making certain findings, the Commission may act on item that is not on the posted agenda. INFORMATION RELATING TO AGENDAS AND ACTIONS OF THE COMMISSION Agendas for Diamond Bar Planning Commission meetings are prepared by the Planning Division of the Community Development Department. Every meeting of the Planning Commission is recorded and duplicate recordings are available for a nominal charge. HELPFUL CONTACT INFORMATION Copies of Agenda, Rules of the Commission, CDs of Meetings (909) 839-7030 Email: info@diamondbarca.gov Website: www.diamondbarca.gov Consistent with the Governor’s Executive Order to stay at home, avoid gatherings and maintain social distancing, this meeting will be conducted telephonically and Members of the Planning Commission and City staff will be participating via Teleconference. There will be no physical meeting location. CITY OF DIAMOND BAR PLANNING COMMISSION January 26, 2021 AGENDA Next Resolution No. 2021-02 CALL TO ORDER: 6:30 p.m. PLEDGE OF ALLEGIANCE: 1. ROLL CALL: COMMISSIONERS: Naila Barlas, Mahendra Garg, Raymond Wolfe, Vice Chairperson William Rawlings, Chairperson Kenneth Mok 2. MATTERS FROM THE AUDIENCE/PUBLIC COMMENTS: This is the time and place for the general public to address the members of the Planning Commission on any item that is within its jurisdiction, allowing the public an opportunity to speak on non-public hearing and non-agenda items. At this time, the teleconference moderator will ask callers one at a time to give their name and if there is an agenda item number they wish to speak on before providing their comment. If you wish to speak on a public hearing item or commission consideration item, you will then be called upon to speak at that point in the agenda 3. APPROVAL OF AGENDA: Chairperson 4. CONSENT CALENDAR: The following items listed on the consent calendar are considered routine and are approved by a single motion. Consent calendar items may be removed from the agenda by request of the Commission only: 4.1. Minutes of Planning Commission – January 12, 2021 5. OLD BUSINESS: None. 6. NEW BUSINESS: None. JANUARY 26, 2021 PAGE 2 PLANNING COMMISSION 7. PUBLIC HEARINGS: 7.1 Development Review and Conditional Use Permit Amendment PL2020 -123 Under the authority of Diamond Bar Municipal Code Sections 22.48 and 22.58, the applicant and property owner are requesting Development Review and Conditional Use Permit Amendment approval to renovate and construct a 1,138 square-foot addition to the existing children’s center building and playground area; construct 3,752 square feet of covered patio/canopy for community gathering areas, relandscape and restripe parking spaces at Evangelical Free Church of Diamond Bar. The subject property is zoned Low Medium Residential (RLM) with an underlying General Plan land use designation of Low Medium Residential. PROJECT ADDRESS: 3255 S. Diamond Bar Blvd. Diamond Bar, CA 91765 PROPERTY OWNER: Evangelical Free Church of Diamond Bar 3255 S. Diamond Bar Blvd. Diamond Bar, CA 91765 APPLICANT: Ruben Van Colenberghe 21330 Hidden Pines Dr. Diamond Bar, CA 91765 ENVIRONMENTAL DETERMINATION: The project has been reviewed for compliance with the California Environmental Quality Act (CEQA). Based on that assessment, the City has determined the project to be Categorically Exempt from the provisions of CEQA pursuant to Article 19 under 15301(e)(additions to existing structures) and 15311 (accessory structures) of the CEQA Guidelines. No further environmental review is required. RECOMMENDATION: Staff recommends that the Planning Commission approve Development Review and Conditional Use Permit No. PL2020-123, based on the Findings of Fact, and subject to the conditions of approval as listed within the draft resolution. 8. PLANNING COMMISSION COMMENTS / INFORMATIONAL ITEMS: 9. STAFF COMMENTS / INFORMATIONAL ITEMS: 10. SCHEDULE OF FUTURE EVENTS: *Until further notice and consistent with the Governor’s latest Executive Order to stay at home, all City meetings will be conducted telephonically. CITY COUNCIL MEETING: Tuesday, February 2, 2021 – 6:30 pm JANUARY 26, 2021 PAGE 3 PLANNING COMMISSION 11. ADJOURNMENT: PLANNING COMMISSION MEETING: Tuesday, February 9, 2021, 6:30 pm PRESIDENTS’ DAY HOLIDAY Monday, February 15, 2021 In observance of the holiday, City offices will be closed. City offices will re-open on Tuesday, February 16, 2021 CITY COUNCIL MEETING: Tuesday, February 16, 2021, 6:30 pm PLANNING COMMISSION MEETING: Tuesday, February 23, 2021, 6:30 pm TRAFFIC AND TRANSPORTATION COMMISSION MEETING: Thursday, March 11, 2021, 6:30 pm PARKS AND RECREATION COMMISSION MEETING: Thursday, March 25, 2021, 6:30 pm MINUTES OF THE CITY OF DIAMOND BAR MEETING OF THE PLANNING COMMISSION JANUARY 12, 2021 CONSISTENT WITH THE GOVERNOR’S LATEST EXECUTIVE ORDER TO STAY AT HOME, AVOID GATHERINGS, AND MAINTAIN SOCIAL DISTANCING, THIS MEETING WAS CONDUCTED TELEPHONICALLY AND PLANNING COMMISSIONERS, CITY STAFF, AND MEMBERS OF THE PUBLIC PARTICIPATED VIA TELECONFERENCE. CALL TO ORDER: Chair/Mok called the meeting to order at 6:32 p.m. PLEDGE OF ALLEGIANCE: Commissioner Wolfe led the Pledge of Allegiance. 1. ROLL CALL: Commissioners: Naila Barlas, Mahendra Garg, Raymond Wolfe, Vice Chairperson William Rawlings and Chairman Kenneth Mok Staff participating telephonically: Greg Gubman, Community Development Director; James Eggart, Assistant City Attorney; Grace Lee, Senior Planner; and Stella Marquez, Administrative Coordinator 2. PUBLIC COMMENTS: None 3. APPROVAL OF AGENDA: As presented. 4. CONSENT CALENDAR: 4.1 Minutes of the Regular Planning Commission Meeting – December 8, 2020. VC/Rawlings requested that the minutes reflect, to indicate his presence, he was present and heard the entirety of the meeting, however, due to audio error, was unable to be heard, therefore, not able to participate. C/Wolfe moved, C/Barlas seconded, to approve the December 8, 2020, Meeting Minutes with VC/Rawlings request noted. Motion carried by the following Roll Call vote: AYES: COMMISSIONERS: Barlas, Garg, Wolfe, VC/Rawlings, Chair/Mok NOES: COMMISSIONERS: None ABSENT: COMMISSIONERS: None 5. OLD BUSINESS: None 6. NEW BUSINESS: None 4.1 Packet Pg. 6 ________________________________________________________________________ JANUARY 12, 2021 PAGE 2 PLANNING COMMISSION ________________________________________________________________________ 7. PUBLIC HEARING(S): 7.1 Development Review and Tree Permit No. PL2020-70 – Under the authority of Diamond Bar Municipal Code Section 22.48, the applicant and property owner requested Development Review approval to construct a 3,088 square foot two - story addition and 911 square foot garage addition and, 766 square feet of balcony area to an existing 2,190 square foot single family residence on a 51,836 gross square foot (1.19 gross acre) lot. A Tree Permit was also requested to protect 16 Southern California black walnut and six coast live oak trees. The subject property is zoned Rural Residential (RR) with an underlying General Plan land use designation of Rural Residential. PROJECT ADDRESS: 2366 Clear Creek Lane Diamond Bar, CA 91765 PROPERTY OWNER: Lawrence Ogbechie 2366 Clear Creek Lane Diamond Bar, CA 91765 APPLICANT: Pete Volbeda 164 N. 2nd Avenue, Suite 100 Upland, CA 91786 SP/Lee presented staff’s report and recommended Planning Commission approval of Development Review and Tree Permit No. PL2020-70, based on the Findings of Fact, and subject to the conditions of approval. Chair/Mok opened the public hearing. Pete Volbeda, Architect, thanked staff for their assistance on this project, explained the project’s reduction from three stories to two and explained the setbacks. Robin Smith, Diamond Bar resident, liked the design, was pleased about the proposal for the avoidance of native trees on the subject property, and thanked the Planning Department for their careful consideration of projects. Chair/Mok closed the public hearing. VC/Rawlings moved, C/Wolfe seconded, to approve Development Review and Tree Permit No. PL2020-70, based upon the Findings of Fact and Conditions of Approval as listed within the Resolution. Motion carried by the following Roll Call vote: 4.1 Packet Pg. 7 ________________________________________________________________________ JANUARY 12, 2021 PAGE 3 PLANNING COMMISSION ________________________________________________________________________ AYES: COMMISSIONERS: Barlas, Garg, Wolfe, VC/Rawlings, Chair/Mok NOES: COMMISSIONERS: None ABSENT: COMMISSIONERS: None 8. PLANNING COMMISSION COMMENTS/INFORMATIONAL ITEMS: Chair/Mok asked everyone to please continue to patronize local businesses during the pandemic. 9. STAFF COMMENTS/INFORMATIONAL ITEMS: CDD/Gubman stated that prior to the next meeting of January 26th, beginning at 5:30 p.m., there will be a Joint City Council/Planning Commission Community Workshop on the upcoming Housing Element Update and will provide a general overview of the Housing Element Update process. An agenda packet will be provided to Commissioners prior to the meeting. The January 26th regular meeting will commence at 6:30 p.m. with one public hearing item, a proposal from Evangelical Free Church at South Diamond Bar Boulevard/Brea Canyon Road for a remodel and expansion of the campus. 10. SCHEDULE OF FUTURE EVENTS: As listed in the agenda. ADJOURNMENT: With no further business before the Planning Commission, Chair/Mok adjourned the regular meeting at 6:57 p.m. The foregoing minutes are hereby approved this 26th day of January, 2021. Attest: Respectfully Submitted, _______________________________________ Greg Gubman, Community Development Director _______________________________ Kenneth Mok, Chairperson 4.1 Packet Pg. 8 PLANNING COMMISSION AGENDA REPORT AGENDA ITEM NUMBER: 7.1 MEETING DATE: January 26, 2021 CASE/FILE NUMBER: Development Review and Conditional Use Permit Amendment No. PL2020-123 PROJECT LOCATION: 3255 S. Diamond Bar Blvd. Diamond Bar, CA 91765 (APN: 8285-028-034) GENERAL PLAN DESIGNATION: Low Medium Residential ZONING DISTRICT: Low Medium Residential PROPERTY OWNER: Phil Meister – Elder Chair Evangelical Free Church of Diamond Bar 3255 S Diamond Bar Blvd Diamond Bar, CA 91765 APPLICANT: Ruben Van Colenberghe 21330 Hidden Pines Dr Diamond Bar, CA 91765 SUMMARY: The applicant is requesting Development Review and Conditional Use Permit Amendment approval to renovate and construct a 1,138 square-foot addition to the existing children’s center building and playground area, construct 3,752 square feet of covered patio/canopy for community gathering areas , relandscape and restripe parking spaces at Evangelical Free Church of Diamond Bar (EFree Church). CITY OF DIAMOND BAR ~ 21810 COPLEY DRIVE ~ DIAMOND BAR, CA 91765 ~ TEL. (909) 839-7030 ~ FAX (909) 861-3117 7.1 Packet Pg. 9 Development Review and Conditional Use Permit Amendment No. PL2020 -123 Page 2 of 12 RECOMMENDATION: Adopt the attached Resolution (Attachment A) approving Development Review and Conditional Use Permit Amendment No. PL2020-123, based on the findings of Diamond Bar Municipal Code (DBMC) Chapters 22.48 and 22.58, subject to conditions. The subject property consists of a 2.3 7-acre triangular-shaped parcel located on the northerly side of Diamond Bar Boulevard between Brea Canyon Road and Cherrydale Drive. The property was developed in multiple phases over the years. A history of approved entitlements is listed below: Entitlement History November 1980 Approved by the County for a church facility, classrooms and a nursery to be constructed in three phases within 10 years (CUP 1634(1)) Phase 1 – Multi-purpose room, classroom, offices and 41 parking spaces Phase 2 – Two-story classroom structure Phase 3 – Main sanctuary and classrooms. 35 additional parking spaces May 1991 Extension approved May 1995 Revisions to original approved Repealed CUP 1634(1). Removed constraint of time, removed the one-story classroom near knoll, installed two temporary modular classroom units and a two-story sanctuary with cellar (CUP 95-1, DR 95-1, and Neg Dec 95-1) October 1999 Added 34 parking spaces, reduce stall dimensions, remove and replace protected trees. (CUP 95-1(1), Variance 99-8, Tree Permit No. 99-2 and amendment to Neg Dec 95-1 and amendment to CUP 95-1). Today, the site is developed with a 14,945 square-foot sanctuary, 4,011 square-foot children’s center, and a 4,524 square-foot one-story building. There are 114 existing parking spaces on site. The property is legally described as Lot 19 of Tract No. 33417 and the Assessor’s Parcel Number (APN) is 8285-028-034. Site and Surrounding General Plan, Zoning and Land Uses The image on the following page highlights the subject property: 7.1 Packet Pg. 10 Development Review and Conditional Use Permit Amendment No. PL2020 -123 Page 3 of 12 The following table summarizes the land use status of the subject property and its surroundings: General Plan Designation Zoning District Land Use Site Low Medium Residential RLM Church North Low Medium Residential RLM Single-Family Residential South Specific Plan SP Condominiums and Single-Family Residential East Low Medium Residential RLM Single-Family Residential West General Commercial C-1 Shopping Center 7.1 Packet Pg. 11 Development Review and Conditional Use Permit Amendment No. PL2020 -123 Page 4 of 12 Project Description The applicant is proposing to renovate and construct a 1,138 square-foot addition to the existing children’s center building and playground area, construct 3,752 square feet of covered patio/canopy for community gathering areas , relandscape and restripe parking spaces. Site Plan The building footprint of all existing structures will remain unchanged. A new 1,138 square-foot building is proposed next to the existing children’s center building. The existing playground will be renovated and a community plaza with concrete pavers will be upgraded in the existing space between the children’s center building and sanctuary. The “meet and greet” plaza is a 2,310 square-foot patio structure proposed at the front of the church facility along with 680 square feet of sunshade fabric canopies. The applicant is proposing to reconfigure the parking and landscape planter areas on the north, south and west sides of the facility. There are 114 parking spaces on the project site, and the proposed adjustments will result in no net loss to the number of parking spaces provided. Proposed Site Plan N Diamond Bar Blvd. 7.1 Packet Pg. 12 Development Review and Conditional Use Permit Amendment No. PL2020 -123 Page 5 of 12 Proposed Floor Plan: The existing children’s center building is a two-story structure with six classrooms. One of the existing classrooms on the first floor will be converted into a nursery with check -in office. The new 1,138 square-foot building will consist of three stories. The first floor includes a reception area, kitchen, and restroom. The second floor includes a workshop, office, and storage. The third floor is a mechanical deck and access is restricted for maintenance purposes only. An elevator and stairway provide access to all three floors. Architecture The existing buildings includes both hipped and gable styled roofs with red clay pantiles, large wall expanses with a single stucco material in an ivory color. The lan ding building and children’s center are rectangular in form, whereas the sanctuary is asymmetrical with diagonal wall planes. Existing South (Front) Elevation (View from Diamond Bar Blvd.) (Sanctuary and One-Story Building) Existing East Side Elevation (One-Story Building) 7.1 Packet Pg. 13 Development Review and Conditional Use Permit Amendment No. PL2020 -123 Page 6 of 12 The applicant is proposing to update the architecture to a modern design that blends the old with the new, by introducing a coordinated palette of finish materials, roof lines, and architectural projections. The reimagined exterior design incorporates the following elements: • The new children’s center building to be designed in a modern architectural style with horizontal wall planes, steel columns, metal canopy and railing, large windows and painted with vibrant colors in teal, blue and white. • The existing children’s center will be renovated by repainting the building with vibrant colors in white, pink, yellow, green and blue. The addition of a high wall to the north, east and west sides of the existing building create the illusion of a modern style with its similar lines, shapes and form with the new building. • A “meet and greet” plaza will be constructed with a metal roof panel and laminate glass over a wood canopy structure. The acoustic wood ceiling will bring warmth to the space to contrast with the metal and glass. • Coral-colored sunshade fabric canopies lining the walkway between buildings. The existing red clay pantile roofing material will remain on all buildings. T he sanctuary and one-story buildings will be repainted “Snowbound white” to match the updated color palette. Existing North (Rear) Elevation (Children’s Center Building and Sanctuary) 7.1 Packet Pg. 14 Development Review and Conditional Use Permit Amendment No. PL2020 -123 Page 7 of 12 Lighting A condition of approval is included to replace all parking lot light ing with new LED lighting that conforms to the City’s CALGreen energy efficiency requirements. Pursuant to DBMC Section 22.16.050(b), lighting shall provide a minimum one footcandle of illumination at the ground throughout the parking area and walkways. All lighting will be shielded to prevent light spill and specular glare to adjacent properties. Landscape Plans There is existing landscaping throughout the perimeter of the site, consisting of mature trees, shrubs and hedges that provides screening to the adjacent land uses. The perimeter landscaping will remain. The applicant is proposing to plant two large Rendering of Renovated Buildings 7.1 Packet Pg. 15 Development Review and Conditional Use Permit Amendment No. PL2020 -123 Page 8 of 12 California box elder or white oak trees and four medium-sized western cottonwood trees near the playground area. Three trees will also be added near the community plaza. Drought-tolerant shrubs are proposed throughout the site in existing planters near the playground, new children’s center building, and main entrance. Currently, the street frontage is planted with turf and is void of any street trees. The applicant will replace the landscaping along the street with climate-appropriate trees, shrubs, and groundcover. However, the applicant has requested to submit the landscape plan for the street frontage at a later time in an effort to save time and move the process along for the buildings and exterior improvements. Therefore, a condition of approval is included to submit a landscape plan that complies with the City’s Water Efficient Landscaping Ordinance, and install landscape improvements prior to the release of final occupancy of the new children’s center building. ANALYSIS Review Authority (Diamond Bar Municipal Code (DBMC) Sections 22.48 and 22.58) The proposed project requires Planning Commission review and approval of two entitlement applications: Development Review (DR) and a Conditional Use Permit (CUP) Amendment. The analysis that follows provides the basis for staff’s recommendation to approve the DR and CUP Amendment applications. Development Review (DBMC Chapter 22.48) Projects involving a substantial change or intensification of land use requires Planning Commission approval of a Development Review application. Development Review approval is required to ensure compliance with the City’s General Plan policies, development standards and design guidelines, and to minimize adverse effects of the proposed project upon the surrounding properties and the City in general. As stated in Section 22.48.010 of the Development Code, the Development Review process was established to ensure that new development and additions to existing development are consistent with the General Plan “through the promotion of high functional and aesthetic standards to complement and add to the economic, physical, and social character” of Diamond Bar. Development Standards: The following table compares the proposed project with the City’s development standards for residential development in the RLM zone: 7.1 Packet Pg. 16 Development Review and Conditional Use Permit Amendment No. PL2020 -123 Page 9 of 12 Development Feature Residential Development Standards Existing Proposed Meets Requirements Front Setback 20 feet 55’-11” feet 55’-3” feet Yes Side Setbacks 10 feet on one side and 5 feet on the other 70’-1” – east side 61’-6” – west side 67-6” – east side 61’-6” – west side Yes Side Yard Minimum Between Adjoining Structures 15 feet 92’-9” – east side Flood control channel on north and west sides 92’-9” – east side Flood control channel on north and west sides Yes Rear Setback 20 feet 101 feet 101 feet Yes Lot Coverage Maximum of 40% 16% 18% Yes Building Height Limit 35 feet 35 feet 35 feet Yes Parking As required by Chapter 22.30 (Parking and Loading) 114 parking spaces 114 parking spaces *No *Existing legal nonconforming parking spaces. See parking discussion below. Consistency with Citywide Design Guidelines The applicant has worked closely with staff to ensure that the project is consistent with the City’s Citywide Design Guidelines. It is staff’s opinion that the project successfully captures the spirit and intent of the Design Guidelines. In addition to conforming to the minimum development standards prescribed for the RLM zoning district, the project will significantly upgrade the aesthetics of the subject property by updating the buildings to a more modern theme and create an inviting new main entrance with gathering areas. Additionally, the updated landscaping will provide shade for parked cars, reduce the visual impact of the parking lot, enhance the architecture, and break up the building mass. Notable elements of the project design which address the Citywide Design Guidelines include, among other things, the following: • The project’s design reflects community character while suggesting uniqueness and quality; • The architectural treatment of the new building extends to all visible sides and parapet walls are treated as an integral part of the building design; • A visual link is established between buildings. This link is accomplished through the use of open canopies and the addition of landscaping; 7.1 Packet Pg. 17 Development Review and Conditional Use Permit Amendment No. PL2020 -123 Page 10 of 12 • The addition of the open canopies creates spatial relationships between buildings that provide for and promote pedestrian access and movement in an environment that reflects a human scale; • A transition between base and accent colors relate to changes in building materials or changes of building planes. Colors meet and change with a physi cal change or definition; • Overhangs, canopies, and projections contribute to the character of the site and create shadow patterns and shelter from the sun; and • There is variation of scale, pattern and texture of the buildings and landscaping elements to encourage a more visually interesting project. The overall composition of building forms, articulation and details is visually pleasing and harmonious. The mix of the old and new improvements work cohesively through the use of a varied palette of materials and details, including wood, glass, metal, smooth stucco, large open windows, and a coordinated vibrant color scheme. Conditional Use Permit Amendment (DBMC Section 22.58) A CUP is required for uses whose effect on the surrounding area cannot be de termined before being analyzed for suitability at a particular location. When reviewing a CUP, consideration is given to the location, design, configuration, operational characteristics and potential impacts to determine whether or not the proposed use will pose a detriment to the public health, safety and welfare. If it can be found that the proposed use is likely to be compatible with its surroundings, the Commission may approve the proposed use subject to conditions stipulating the manner in which the use must be conducted. If the Commission finds that the proposed use is likely to be detrimental to the general peace, health and general welfare, then it must deny the request. When a CUP is approved, it runs with the land and all conditions placed on the CUP are binding on all successors in interest. In other words, if the church were to close , a new tenant could locate in the space and operate the same type of use. The new tenant would be required to comply with the same conditions as the previous t enant and would not be permitted to expand the use without full review and approval by the Planning Commission. Pursuant to DBMC Section 22.08.030 Table 2-3, religious places of worship—as defined by DBMC Section 22.80.020—are permitted in the RLM zoning district with approval of a CUP. The existing child care use is ancillary to the main church use. Adults attend service in the sanctuary while the children are being watched in the child care area. The purpose of the new children’s center building is to s erve the existing congregation with the addition of a reception area and additional room for staff. 7.1 Packet Pg. 18 Development Review and Conditional Use Permit Amendment No. PL2020 -123 Page 11 of 12 Parking The church facility was required to provide 76 parking spaces as part of the original CUP approval. This parking requirement was based on providing one parking space for every five occupants of the largest assembly area, which was 375 seats in the sanctuary. Thirty-four (34) additional parking spaces were added in 1999, which created a total of 110 parking spaces on site. Pursuant to the City’s Development Code, the dimensions of a standard parking stall are 9 feet by 19 feet, including bumper overhang. The Los Angeles County Planning and Zoning Code under which the church facility was approved allowed compact parking stalls (7.5 feet by 15 feet) and standard parking stall dimensions were 8 feet by 18 feet. Additionally, the church received a variance to reduce the required parking space dimensions when granted the approval in 1999 to construct 34 additional parking spaces. Therefore, there are existing nonconforming parking spaces throughout the project site. A recent field survey indicated that there are actually 114 parking spaces on site. The applicant is proposing to reconfigure four parking spaces by removing or reducing the size of the existing landscape planters. The proposed adjustments will result in no net loss to the number of parking spaces provided and all existing driveway widths will remain intact. Since the purpose of the new children’s center building is to serve the existing congregation, additional parking spaces is not required. Compatibility with Existing Land Uses The proposed project complies with the goals and objectives as set forth in the adopted General Plan in terms of land use. “Efree Church” has been operating a church at this location since 1982. It is surrounded by residential land uses and a commercial center to the west. The project will not negatively affect the existing surrounding land uses as it is currently being utilized as a church, and the design an d appearance of the proposed project is unique, but compatible with the surrounding community. The operational characteristics will not change and are compatible with the existing uses within the neighborhood. Additional Review The Public Works Department and Building and Safety Division reviewed this project, and their conditions are included in the attached resolution as conditions of approval. NOTICE OF PUBLIC HEARING: On January 13, 2021, public hearing notices were mailed to property owners withi n a 500-foot radius of the subject property. On January 15, 2021, the notice was published in the San Gabriel Valley Tribune newspaper and the project site was posted with a 7.1 Packet Pg. 19 Development Review and Conditional Use Permit Amendment No. PL2020 -123 Page 12 of 12 notice display board, and a copy of the public notice was posted at the City’s four designated community posting sites. Public Comments Received At the time the staff report was published, staff did not receive any comments in opposition to the Project. ENVIRONMENTAL ASSESSMENT: The project has been reviewed for compliance with t he California Environmental Quality Act (CEQA). Based on that assessment, the City has determined the project to be Categorically Exempt from the provisions of CEQA pursuant to Article 19 under 15301(e) (additions to existing structures) and 15311 (accessory structures) of the CEQA Guidelines. No further environmental review is required. PREPARED BY: REVIEWED BY: Attachments: A. Draft Resolution No. 2021-XX, Standard Conditions of Approval B. Site Plan, Floor Plan, Elevation, Roof Plan, Conceptual Landsc ape Plan, Grading Plan 7.1 Packet Pg. 20 PLANNING COMMISSION RESOLUTION NO. 2021-XX A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DIAMOND BAR, CALIFORNIA, APPROVING DEVELOPMENT REVIEW AND CONDITIONAL USE PERMIT AMENDMENT NO. PL2020-123 TO RENOVATE AND CONSTRUCT A 1,138 SQUARE-FOOT ADDITION TO THE EXISTING CHILDREN’S CENTER BUILDING AND PLAYGROUND AREA, CONSTRUCT 3,752 SQUARE FEET OF COVERED PATIO/CANOPY FOR COMMUNITY GATHERING AREAS, RELANDSCAPE AND RESTRIPE PARKING SPACES AT EVANGELICAL FREE CHURCH OF DIAMOND BAR LOCATED AT 3255 S. DIAMOND BAR BOULEVARD, DIAMOND BAR, CA 91765 (APN 8285-028-034). A. RECITALS 1. The property owner, Evangelical Free Church of Diamond Bar, and applicant, Ruben Van Colenberghe, have filed an application for Development Review and Conditional Use Permit No. PL2020-123 to request the following from the Planning Commission: (a) Development Review to renovate and construct a 1,138 square-foot addition to the existing children’s center building and playground area, construct 3,752 square feet of covered patio/canopy for community gathering areas, relandscape and restripe parking spaces; and (b) Conditional Use Permit Amendment to amend existing Conditional Use Permit No. 95-1(1) to allow a church and related parking. Hereinafter in this Resolution, the subject Development Review and Conditional Use Permit Amendment shall be referred to as the "Proposed Project." 2. The subject property is made up of one parcel totaling 2.37 acres. It is located in the Low Medium Residential (RLM) zone with an underlying General Plan land use designation of the Low Medium Residential. 3. The legal description of the subject property is Lot 19 of Tract No. 33417. The Assessor’s Parcel Number is 8285-028-034. 4. On January 13, 2021, public hearing notices were mailed to property owners within a 500-foot radius of the Project site. Also, public notices were posted at the project site and the City’s four designated community posting sites. On January 15, 2021, notification of the public hearing for this project was published in the San Gabriel Valley Tribune newspaper. 5. On January 26, 2021, the Planning Commission of the City of Diamond Bar conducted a duly noticed public hearing, solicited testimony from all interested individuals, and concluded said hearing on that date. 7.1.a Packet Pg. 21 2 PC Resolution No. 2021-XX B. RESOLUTION NOW, THEREFORE, it is found, determined and resolved by the Planning Commission of the City of Diamond Bar as follows: 1. The Planning Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct; and 2. The Planning Commission hereby determines the Project to be Categorically Exempt from the provisions of CEQA pursuant to Article 19 under 15301(e) (additions to existing structures) and 15311 (accessory structures) of the CEQA Guidelines. No further environmental review is required. C. FINDINGS OF FACT Based on the findings and conclusions set forth herein and as prescribed un der Diamond Bar Municipal Code (DBMC) Sections 22.48 and 22.58, this Planning Commission hereby finds as follows: Development Review Findings (DBMC Section 22.48.040) 1. The design and layout of the proposed development is consistent with the applicable elements of the City's General Plan, City Design Guidelines, and development standards of the applicable district, design guidelines, and architectural criteria for special areas (e.g., theme areas, specific plans, community plans, boulevards or planned developments). The design and layout of the proposed building, exterior and landscaping renovation is consistent with the City’s General Plan, City Design Guidelines and Development Code standards. The City’s General Plan Policy LU-P-1 ensures that the scale and massing of new development provides sensitive transitions or design techniques in building height, bulk, and landscaping to minimize impacts on adjacent, less intensive uses, particularly residential uses Although the project will significantly upgrade the buildings to a more modern theme, the overall building scale and massing are not changing since all existing buildings will be utilized. The maximum height of the tallest building remains unchanged. There is existing landscaping throughout the perimeter of the site, consisting of mature trees, shrubs and hedges that provides an appropriate buffer to the adjacent residential land uses. Additionally, adjacent residential land uses are at a higher grade which further reduces potential impacts. The buildings will be updated to a modern design that blends the old with the new, by introducing new roof lines, architectural projections and a coordinated palette of finish materials such as wood, glass, metal, smooth stucco, large open windows, and a coordinated vibrant color scheme . As such, there is variation of scale, pattern and texture of the buildings and landscaping elements to encourage a more visually interesting project [City’s Design Guidelines B. Architecture (20)]. 7.1.a Packet Pg. 22 3 PC Resolution No. 2021-XX With the exception of the existing legal nonconforming parking spaces, the Project complies with all development standards of the Low Medium Residential zoning district by complying with all development standards such as required setbacks, building height, and lot coverage. The project site is not part of any theme area, specific plan, community plan, boulevard or planned development. 2. The design and layout of the proposed development will not interfere with the use and enjoyment of neighboring existing or future development s, and will not create traffic or pedestrian hazards. The Proposed Project will not interfere with the use and enjoyment of neighboring existing or future developments because the use of the project site is existing and the main sanctuary area is not increasing. The purpose of the new children’s center building is to serve the existing congregation with the addition of a reception area and additional room for staff , and is ancillary to the main church use. The Proposed Project will not interfere with vehicular or pedestrian movements , such as access or other functional requirements of a church because it complies with the requirements for driveway widths and is a continuation of an existing use . 3. The architectural design of the proposed development is compatible with the character of the surrounding neighborhood and will maintain and enhance the harmonious, orderly and attractive development contemplated by Chapter 22.48: Development Review Standards, the City’s Design Guidelines, the City's General Plan, or any applicable specific plan. The Proposed Project is compatible with the character of the surrounding neighborhood in that it will maintain the existing church facility. The main sanctuary area is not increasing and the purpose of the new children’s center building is to serve the existing congregation with the addition of a reception area and additional room for staff, and is ancillary to the main church use. “Efree Church” has been in operation at this location since 1982. It is surrounded by residential land uses and a commercial center to the west. The project will not negatively affect the existing surrounding land uses as it is currently being utilized as a church facility, and the design and appearance of the proposed project is unique, but compatible with the surrounding community. The operational characteristics will not change and are compatible with the existing uses within the neighborhood. Additionally, the modern theme of the Proposed Project uses design elements, colors and materials that are consistent with the City’s Design Guidelines. 4. The design of the proposed development will provide a desirable environment for its occupants and visiting public as well as its neighbors through good aesthetic use of materials, texture, color, and will remain aesthetically appealing. The applicant is proposing to update the architecture to a modern design that blends the old with the new, by introducing a coordinated palette of finish materials, roof lines, and architectural projections. The project will significantly upgrade the aesthetics of the subject property by updating the buildings to a more 7.1.a Packet Pg. 23 4 PC Resolution No. 2021-XX modern theme and create an inviting main entrance with gathering areas. Additionally, the updated landscaping will provide shade for parked cars, reduce the visual impact of the parking lot, enhance the arc hitecture, and break up the building mass. 5. The proposed development will not be detrimental to public health, safety or welfare or materially injurious (e.g., negative effect on property values or resale(s) of property) to the properties or improvements in the vicinity. Before the issuance of any City permits, the proposed project is required to comply with all conditions within the approved resolution, and the Building and Safety Division and Public Works Departments requirements. Through the permit and inspection process, the referenced agencies will ensure that the proposed project is not detrimental to the public health, safety or welfare or materially injurious to the properties or improvements in the vicinity. 6. The proposed project has been reviewed in compliance with the provisions of the California Environmental Quality Act (CEQA). The proposed project is Categorically Exempt from the provisions of CEQA pursuant to Article 19 under 15301(e)(additions to existing structures) and 15311 (accessory structures) of the CEQA Guidelines. Conditional Use Permit Review Findings (DBMC Section 22.58) 1. The Proposed Use is allowed within the subject zoning district with the approval of a conditional use permit and complies with all other applicable provisions of this Development Code and the Municipal Code. Pursuant to DBMC Section 22.08.030 Table 2-3, religious places of worship—as defined by DBMC Section 22.80.020—are permitted in the RLM zoning district with approval of a conditional use permit. The purpose of the new children’s center building is to serve the existing congregation with the addition of a reception area and additional room for staff. The proposed outdoor improvements will be located within the existing facility. Through compliance with the conditions of approval stipulating the manner in which the use must be conducted, the Proposed Use will be compatible with neighboring uses in the surrounding neighborhood. 2. The Proposed Use is consistent with the general plan and any applicable specific plan. The Proposed Use is consistent with General Plan Goal LU-G-6: (“Preserve existing residential neighborhoods to retain the qualities Diamond Bar residents love, such as easy access to preserved natural open spaces, while supporting and encouraging well-designed, complete neighborhoods with safe streets, access to shopping and services, and community parks and gathering places”) in that the Proposed Use will continue to provide religious services to Diamond Bar residents. 7.1.a Packet Pg. 24 5 PC Resolution No. 2021-XX The Project site is not subject to the provisions of any specific plan. 3. The design, location, size and operating characteristics of the Proposed Use are compatible with the existing and future land uses in the vicinity. The Proposed Use is located within an existing neighborhood that has a diversity of uses, including single-family residences and other retail and service uses. The location, size and operating characteristics are not changing with the existing church. Through compliance with the conditions of approval stipulating the manner in which the use must be conducted, the Proposed Use is and will continue to be compatible with the other uses within the neighborhood. 4. The subject site is physically suitable for the type and density/intensity of use being proposed, including access, provision of utilities, compatibility with adjoining land uses, and the absence of physical constraints. The Project site is located within an existing church facility. There are 114 parking spaces at the existing site. The proposed adjustments to the parking lot will result in no net loss to the number of parking spaces provided and all existing driveway widths will remain intact. Since the purpose of the new children’s center building is to serve the existing congregation, additional parking spaces were not required. Based on these observations, there is likely a sufficient amount of parking for current and future uses to accommodate peak-period demands. Given the same operational characteristics, the overall parking demands, and the types of adjoining uses, it is reasonable to conclude that the Proposed Use is and will continue to be compatible with the other uses within the neighborhood . The Proposed Use is physically suitable with the subject site because it will be located at an existing church facility. In addition, the Proposed Use is intended to operate within the existing church facility site and will be using existing access and parking. 5. Granting the conditional use permit will not be detrimental to the public interest, health, safety, convenience, or welfare, or injurious to persons, property, or improvements in the vicinity and zoning district in which the property is located. Prior to the issuance of any city permits, the Project is required to comply with all conditions of approval within the attached resolution, the Building and Safety Division and Public Works Department. Based upon the findings and conclusion set forth above, the Planning Commission hereby approves this Application, subject to the following conditions: 1. Development shall substantially comply with the plans and documents presented to the Planning Commission at the public hearing. 7.1.a Packet Pg. 25 6 PC Resolution No. 2021-XX 2. Prior to building permit issuance, a Certification of Design, together with landscape and irrigation plans prepared by a licensed landscape architect, shall be submitted to the Planning Division for review and approval by the City’s Consulting Landscape Architect. Landscape and irrigation plans shall comply with the updated Water Efficient Landscaping Ordinance. 3. Prior to the release of final occupancy for the new children’s center building, landscaping along the street shall be installed and completed per approved landscape plans. 4. Prior to building permit issuance, submit plans to replace all existing parking lot lighting with new LED lighting. 5. Standard Conditions. The applicant shall comply with the standard development conditions attached hereto. The Planning Commission shall: a. Certify to the adoption of this Resolution; and b. Forthwith transmit a certified copy of this Resolution, by certified mail to the property owner, Phil Meister – Elder Chair, Evangelical Free Church of Diamond Bar, 3255 S Diamond Bar Blvd, Diamond Bar, CA 91765, and applicant, Ruben Van Colenberghe, 21330 Hidden Pines Dr, Diamond Bar, CA 91765. APPROVED AND ADOPTED THIS 26TH DAY OF JANUARY 2021, BY THE PLANNING COMMISSION OF THE CITY OF DIAMOND BAR. By: ______________________________________ Kenneth Mok, Chairperson I, Greg Gubman, Planning Commission Secretary, do hereby certify that the foregoing Resolution was duly introduced, passed, and adopted, at a regular meeting of the Planning Commission held on the 26th day of January, 2021, by the following vote: AYES: Commissioners: NOES: Commissioners: ABSENT: Commissioners: ABSTAIN: Commissioners: ATTEST: ___________________________ Greg Gubman, Secretary 7.1.a Packet Pg. 26 7 PC Resolution No. 2021-XX COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS USE PERMITS, COMMERCIAL AND RESIDENTIAL NEW AND REMODELED STRUCTURES PROJECT #: Development Review and Conditional Use Permit Amendment No. PL 2020-123 SUBJECT: Development Review and Conditional Use Permit Amendment approval to renovate and construct a 1,138 square-foot addition to the existing children’s center building and playground area, construct 3,752 square feet of covered patio/canopy for community gathering areas, relandscape and restripe parking spaces at Evangelical Free Church of Diamond Bar. PROPERTY OWNER: Phil Meister – Elder Chair Evangelical Free Church of Diamond Bar 3255 S Diamond Bar Blvd Diamond Bar, CA 91765 APPLICANT: Ruben Van Colenberghe 21330 Hidden Pines Dr Diamond Bar, CA 91765 LOCATION: 3255 S. Diamond Bar Blvd., Diamond Bar, CA 91765 ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. I. APPLICANT SHALL CONTACT THE PLANNING DIVISION AT (909) 839-7030, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. GENERAL REQUIREMENTS 1. The applicant shall defend, indemnify, and hold harmless the City, and its officers, agents and employees, from any claim, action, or proceeding to attack, set-aside, void or annul, the approval of Development Review and Conditional Use Permit Amendment No. PL2020-123 brought within the time period provided by Government Code Section 66499.37. In the event 7.1.a Packet Pg. 27 8 PC Resolution No. 2021-XX the city and/or its officers, agents and employees are made a party of any such action: (a) Applicant shall provide a defense to the City defendants or at the City's option reimburse the City its costs of defense, including reasonable attorneys fees, incurred in defense of such claims. (b) Applicant shall promptly pay any final judgment rendered against the City defendants. The City shall promptly notify the applicant of any claim, action of proceeding, and shall cooperate fully in the defense thereof. 2. This approval shall not be effective for any purpose until the applicant and owner of the property involved have filed, within twenty-one (21) days of approval of this Development Review and Conditional Use Permit Amendment No. PL2020-123, at the City of Diamond Bar Community Development Department, their affidavit stating that they are aware of and agree to accept all the conditions of this approval. Further, this approval shall not be effective until the applicants pay remaining City processing fees, school fees and fees for the review of submitted reports. 3. All designers, architects, engineers, and contractors associated with this project shall obtain a Diamond Bar Business License; and a zoning approval for those businesses located in Diamond Bar. 4. Signed copies of Planning Commission Resolution No. 2021-XX, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 5. Prior to any use of the project site or business activity being commenced thereon, all conditions of approval shall be completed. 6. The project site shall be maintained and operated in full compliance with the conditions of approval and all laws, or other applicable regulations. 7. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and any applicable Specific Plan in effect at the time of building permit issuance. 8. All site, grading, landscape/irrigation, and roof plans, and elevation plans shall be coordinated for consistency prior to issuance of City permits (such as grading, tree removal, encroachment, building, etc.) or approved use has commenced, whichever comes first. 9. The hours during which construction activities causing the operation of any tools or equipment used in construction, drilling, repair, alteration, or 7.1.a Packet Pg. 28 9 PC Resolution No. 2021-XX demolition work are limited to Monday through Saturday, between the hours of 7:00 a.m. and 7:00 p.m., and are not allowed at any time on Sundays or holidays. 10. The property owner/applicant shall remove the public hearing notice board within three days of this project's approval. 11. The applicant shall comply with the requirements of City Planning, Building and Safety Divisions, Public Works Department, and the Fire Department. B. FEES/DEPOSITS 1. Applicant shall pay development fees (including but not limited to Planning, Building and Safety Divisions, Public Works Department and Mitigation Monitoring) at the established rates, prior to issuance of building or grading permit (whichever comes first), as required by the City. School fees as required shall be paid prior to the issuance of building permit. In addition, the applicant shall pay all remaining prorated City project review and processing fees prior to issuance of grading or building permit, whichever comes first. 2. Prior to any plan check, all deposit accounts for the processing of this project shall have no deficits. C. TIME LIMITS 1. The approval of Development Review and Conditional Use Permit Amendment No. PL2020-123 expires within two years from the date of approval if the use has not been exercised as defined pursuant to Diamond Bar Municipal Code (DBMC) Section 22.66.050(b)(1). In accordance with DBMC Section 22.60.050(c), the applicant may request, in writing, a one-year time extension for Planning Commission consideration. Such a request must be submitted to the Planning Division prior to the expiration date and be accompanied by the review fee in accordance with the Fee Schedule in effect at the time of submittal. D. SITE DEVELOPMENT 1. This approval is to renovate and construct a 1,138 square-foot addition to the existing children’s center building and playground area, construct 3,752 square feet of covered patio/canopy for community gathering areas, relandscape and restripe parking spaces at Efree Church located at 3255 S. Diamond Bar Blvd., as described in the staff report and depicted on the approved plans on file with the Planning Division, subject to the conditions listed herein. 2. The construction documents submitted for plan check shall be in substantial compliance with the architectural plans approved by the 7.1.a Packet Pg. 29 10 PC Resolution No. 2021-XX Planning Commission, as modified pursuant to the conditions below. If the plan check submittal is not in substantial compliance with the approved Development Review and Conditional Use Permit Amendment submittal, the plans may require further staff review and re -notification of the surrounding property owners, which may delay the project and entail additional fees. 3. To ensure compliance with the provisions of the Planning Commission approval, a final inspection is required from the Planning Division when work for any phase of the project has been completed. The applicant shall inform the Planning Division and schedule an appointment for such an inspection. 4. The above conditions shall run with the land and shall be binding upon all future owners, operators, or successors thereto of the property. Non - compliance with any condition of approval or mitigation measure imposed as a condition of the approval shall constitute a violation of the City’s Development Code. Violations may be enforced in accordance with the provisions of the Development Code. 5. Failure to comply with any of the conditions set forth above or as subsequently amended in writing by the City, may result in failure to obtain a building final and/or a certificate of occupancy until full compliance is reached. The City’s requirement for full compliance may require minor corrections and/or complete demolition of a non-compliant improvement, regardless of costs incurred where the project does not comply with design requirements and approvals that the applicant agreed to when permits were pulled to construct the project. 6. The project site shall be developed and maintained in substantial conformance with the approved plans submitted to, approved, and amended herein by the Planning Commission, collectively attached referenced as site plans, floor plans, architectural elevatio ns, and landscape plans on file with the Planning Division, the conditions contained herein, and the Development Code regulations. 7. All ground-mounted utility appurtenances such as transformers, air conditioning condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berms, and/or landscaping to the satisfaction of the Planning Division. 8. All roof-mounted equipment shall be screened from public view. 9. All structures, including walls, trash enclosures, canopies, etc., shall be maintained in a structurally sound, safe manner with a clean, orderly appearance. All graffiti shall be removed within 72 hours by the property owners/occupant. 7.1.a Packet Pg. 30 11 PC Resolution No. 2021-XX 10. All landscaping, structures, architectural features and public improvements damaged during construction shall be repaired or replaced upon project completion. E. SOLID WASTE 1. The site shall be maintained in a condition, which is free of debris both during and after the construction, addition, or implementation of the entitlement approved herein. The removal of all trash, debris, and refuse, whether during or subsequent to construction shall be done only by the property owner, applicant or by a duly permitted waste contractor, who has been authorized by the City to provide collection, transportation, and disposal of solid waste from residential, commercial, construction, and industrial areas within the City. It shall be the applicant's obligation to insq21ure that the waste contractor used has obtained permits from the City of Diamond Bar to provide such services. 2. Mandatory solid waste disposal services shall be provided by the City franchised waste hauler to all parcels/lots or uses affected by approval of this project. II. APPLICANT SHALL CONTACT THE PUBLIC WORKS DEPARTMENT, (909) 839-7040, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. GENERAL 1. An Erosion Control Plan shall be submitted concurrently with the grading plan clearly detailing erosion control measures. These measures shall be implemented during construction. The erosion control plan shall conform to national Pollutant Discharge Elimination System (NPDES) standards and incorporate the appropriate Best Management Practices (BMP’s) as specified in the Storm Water BMP Certification. For construction activity which disturbs one acre or greater soil a Storm Water Pollution Prevention Plan (SWPPP) will be needed. B. DRAINAGE 1. Detailed drainage system information of the lot with careful attention to any flood hazard area shall be submitted. All drainage/runoff from the development shall be conveyed from the site to the natural drainage course. No on -site drainage shall be conveyed to adjacent parcels, unless that is the natural drainage course. C. OFF-SITE STREET IMPROVEMENTS 1. Applicant shall remove and replace five (5) existing concrete sidewalk panels along the subject property’s frontage in accordance with current American Public Works Association (APWA) standards. 7.1.a Packet Pg. 31 12 PC Resolution No. 2021-XX 2. Applicant shall remove and replace two (2) existing concrete driveway approaches along the subject property’s frontage in accordance with current American Public Works Association (APWA) Standard 110 -2 Type C. 3. All public improvement shall be approved by the City Engineer and completed prior to final inspection/certificate of occupancy issuance. Any improvements within the City’s Right-of-Way shall be constructed with an encroachment permit. Applicant shall apply for an encroachment permit from the Public Works Department and coordinate a pre-construction meeting with the City’s Inspector to establish the improvement limits. 4. Applicant shall replace and record any centerline ties and monuments that are removed as part of this construction with the Los Angeles County Department Public Works Survey Division. Proof of replacement shall be submitted to the City Engineer. III. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION, (909) 839- 7020, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: General Conditions: 1. At the time of plan check submittal, plans and construction shall conform to current State and Local Building Code (i.e., 2019 California Building Code series will apply) requirements and all other applicable construction codes, ordinances and regulations in effect. 2. Provisions for CAL Green shall be implemented onto plans and certification shall be provided by a third party as required by the Building Division. Specific water, waste, low VOC, and related conservation measures shall be shown on plans. Construction shall conform to the current CAL Green Code. 3. The Children’s Center building highest level/roof level “mechanical deck” is not to be occupied. Plan Check – Items to be addressed prior to plan approval: 4. The minimum design load for wind in this area is 95 M.P.H. exposures “C” and the site is within seismic zone D or E. The applicant shall submit drawings and calculations prepared by a California State licensed Architect/Engineer with wet stamp and signature. 5. This project shall comply with the energy conservation requirements of the State of California Energy Commission. All required State energy forms shall be completed and commissioning testing requirements outlined in California Energy Code 120.8(d). 7.1.a Packet Pg. 32 13 PC Resolution No. 2021-XX 6. Indoor air quality shall be provided consistent with ASHRAE 62.1 as required per California Mechanical Code Table 402.1. 7. Public Works/Engineering Department is required to review and approve grading plans that clearly show all finish elevations, drainage, and retaining wall(s) locations. These plans shall be consistent with the site plan submitted to the Building and Safety Division. 8. “Separate permit shall be required for all wall and monument signs” and shall be noted on plans. 9. An exit analysis shall be provided during plan check, showing occupant load for each space, exit width, exit signs, etc. 10. Number of plumbing fixtures shall be in compliance with CPC T-422. 11. Indicate the proposed addition and existing building on the plans. Submit code analysis and justification showing the following: a. Each building square footage b. Each building height c. Type of construction d. Sprinkler system e. Each group occupancy f. Property line location in relation to each building (side yard) g. Exit analysis for each building (occupant load/corridor rating/exit width/exit signs, etc.) h. Accessibility analysis for the entire site and for each building i. Shaft rating/ exterior wall construction/ opening protection 12. Plans shall reflect adequate exit requirements. The distance between required exits shall be ½ of the overall building diagonal dimension. 13. All balconies and decks shall be designed for 1.5 times the live load for the area served per CBC Table 1607.1 and where not over enclosed space, provide ventilation in the joist space per CBC 2304.12.2.6. 14. All easements shall be shown on the site plan. 15. Fire Department approval shall be required. A copy of the Los Angeles County Fire approval for use and sprinkler location is required. 16. A soils report is required per CBC 1803 and all recommendations of the soils report shall be adhered to. 17. Design for future electric vehicle charging shall be provided consistent with C AL Green 4.106.4. 7.1.a Packet Pg. 33 14 PC Resolution No. 2021-XX 18. ADA upgrades are required for the existing parking and path of travel from street/public way to primary entrance as required per CBC 11B-202. A new path of travel to the street, path of travel to the entrances, and parking shall be provided. No final certificate of occupancy shall be granted until the ADA path of travel is in-place. 19. The sunshade material shall be non-combustible material and listed by the State Fire Marshal in accordance to CBC 3104. 20. Rated openings and walls shall be provided at the awning canopy/pedestrian walkway in accordance with CBC 3104. 21. Fire alarms shall be provided where educational E occupancies apply with over 49 occupants or day care facilities in conformance with CBC 907.2.3 and 907.2.3.10 respectively. Permit – Items required prior to building permit issuance: 22. Solid waste management of construction material shall incorporate recycling material collection per Diamond Bar Municipal Code 8.16 of Title 8. The contractor shall complete all required forms and pay applicable deposits prior to permit. 23. Prior to building permit issuance, all school district fees shall be paid. Please obtain a form from the Building and Safety Division to take directly to the school district. 24. AQMD notification is required at least 10 days prior to any demolition. Proof of notification is required at permit issuance. 25. All workers on the job shall be covered by workman’s comp ensation insurance under a licensed general contractor. Any changes to the contractor shall be updated on the building permit. Construction – Conditions required during construction: 26. Occupancy of the facilities shall not commence until all California Bu ilding Code and State Fire Marshal regulations have been met. The buildings shall be inspected for compliance prior to occupancy. 27. Every permit issued by the building official under the provisions of this Code shall expire and become null and void unless the work authorized by such permit is commenced within one-hundred-eighty (180) days after permit issuance, and if a successful inspection has not been obtained from the building official within one- hundred-eighty (180) days from the date of permit issuance or the last successful inspection. A successful inspection shall mean a documented passed inspection by the city building inspector as outlined in Section 110.6. 7.1.a Packet Pg. 34 15 PC Resolution No. 2021-XX 28. All structures and property shall be maintained in a safe and clean manner during construction. The property shall be free of debris, trash, and weeds. 29. Existing fencing shall remain in-place during construction including pool barrier fencing. Any alteration of the fencing may result in a discontinuation of construction until the fences are returned to its original state. 30. All equipment staging areas shall be maintained in an orderly manner and screened behind a minimum 6’ high fence. 31. All existing facilities that remain in operation during construction shall maintain safeguards to protect the public from construction hazards. 32. The project shall be protected by a construction fence to the satisfaction of the Building Official, and shall comply with the NPDES & BMP requirements (sand bags, etc.). All fencing shall be view obstructing with opaque surfaces. 33. The applicant shall contact Dig Alert and have underground utility locations marked by the utility companies prior to any excavation. Contact Dig Alert by dialing 811 or their website at www.digalert.org. 34. The applicant shall first request and secure approval from the City for any changes or deviations from approved plans prior to proceeding with any work in accordance with such changes or deviations. 35. All glazing in hazardous locations shall be labeled as safety glass. The labeling shall be visible for inspection. 36. Drainage patterns shall match the approved grading/drainage plan from the Public Works/Engineering Department. Surface water shall drain away from the building at a 2% minimum slope. The final as-built conditions shall match the grading/drainage plan or otherwise approved as-built grading/drainage plan. 37. Decks, roofs, and other flat surfaces shall slope at least 1/4”/ft with approved and listed water proofing material. Guardrails shall be provided for these surfaces at least 42” minimum in height, 4” maximum spacing between rails, and capable of resisting at least 20 pounds per lineal foot of lateral load. 38. Special inspections and structural observation will be required in confo rmance with CBC 1704 to 1709. 39. All plumbing fixtures, including those in existing areas, shall be low-flow models consistent with California Civil Code Section 1101.1 to 1101.8. 40. Playground equipment shall meet CBC 424 non-combustible material standards. END 7.1.a Packet Pg. 35 N T.O.W.+31'-8" TOP OF ROOF+27'-0" (N) COMMUNITY PLAZA (N) PLAYGROUND TOP OF ROOF+25'-8" TOP OF RIDGE+16'-9 1/2" S DIAMOND BAR BLVDPROPERTY LINEFLOOD CONTROL CHANNELEMERGENCY EXIT GATE IN FENCE SANCTUARY (E) TWO-STORY BUILDING LANDING (E) ONE-STORY BUILDING (N) TWO-STORY ADDITION (SPRINKLERED) (SPRINKLERED) OCC: A-3 / E OCC: A-3 / E OCC: A-3 / E / B CHILDRENS CENTER (E) TWO-STORY BUILDING (NON-SPRINKLERD) (SPRINKLERED) TOP OF SKYLIGHT+35'-0" (N) CANOPY (SPRINKLERED) PLAZA AREA: 1500SF OCC: A-3 T.O.W.+27'-10" TO OF ROOF+28'-3" S S S S S S SSSSSSSSSSSS S S S S S S S S S SSSSCCCCCCCCCCC CS S SCSADAADA SSSSSSSSSSSSSSSSSSSS SSCCCCS SCCCCCCCCCCCCC SSSSSSSSA D A A D A CCCCCCCCCCCSSTALL HEDGE FOR OCCUPANCY LOAD FIGURES REFERS TO AS-1.8 SITE PLAN /INDEX AS-1.0 Rev A1"=60' SITE PLAN 1 DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 74 75 76 77 788081828384858687888990 9193949596979899100101102103 104 92 105 106 107 73 79 108 109 48 110 111 112 113 114 PROJECT DATA OWNER EVANGELICAL FREE CHURCH OF DIAMOND BAR PROJECT ADDRESS 3255 S DIAMOND BAR BLVD, DIAMOND BAR, CA 91765 SITE DATA PARCEL #: 8285 028 034 LEGAL DESCRIPTION:TRACT 33417, LOT 19 LOT AREA: 103,406 SF (2.374 ACRES) CUP #1634-1 & CUP 95-1 EXISTING USE:OFFICE / CHURCH / DAYCARE PROPOSED USE: OFFICE / CHURCH / DAYCARE CONSTRUCTION TYPE:V-B (SPRINKLERED WITH EXCEPTION OF (E) LANDING BUILDING OCCUPANCY GROUP E / A-3 / B EXISTING LOT COVERAGE:16,491 SF (16.0%) PROPOSED LOT COVERAGE:18,592 SF (18.0%) PROPOSED MAX BUILDING HEIGHT: 35'-0" AREAS EXISTING GFA: CHILDREN'S CENTER: 4,011 SF SANCTUARY:14,945 SF THE LANDING: 4,524 SF ADDED GFA: CHILDREN'S CENTER ADDITION : 1,138 SF PROPOSED TOTAL:19,344 SF PARKING EXISTING PARKING SPACES:114 STANDARD PARKING SPACES: 69 COMPACT PARKING SPACES: 41 ADA PARKING SPACES: 4 TOTAL PROPOSED PARKING SPACES : 114 PROJECT DESCRIPTION UPGRADES TO EXISTING EFREE CHURCH CAMPUS, TO INCLUDE: - RENOVATION AND ADDITION TO (E) CHILDREN'S CENTER - RENOVATION OF (E) KIDS PLAYGROUND AREA - RENOVATION OF COMMUNITY PLAZA - RENOVATION OF 'MEET + GREET' PLAZA WITH (N) CANOPY - VARIOUS LANDSCAPE + PARKING ADJUSTMENTS (MAINTAIN EXISTING NUMBER OF PARKING SPACES) - ADD SPRINKLERS TO THE LANDING BUILDING SHEET INDEX AS-1.0 SITE PLAN AS-1.1 PROPERTY PLAN AS-1.2 EXISTING SITE PLAN AS-1.3 DETAILED PROPOSED SITE PLAN AS-1.4 LANDSCAPE PLAN AS-1.5 PARCEL 1- LANDSCAPE PLAN AS-1.6 PARCEL 2- LANDSCAPE PLAN AS-1.7 GRADING PLAN AS-1.8 SITE OCCUPANCY AS-2.0 CHILDREN'S CENTER FIRST FLOOR PLAN AS-2.1 CHILDREN'S CENTER SECOND FLOOR PLAN AS-2.2 CHILDREN'S CENTER THIRD FLOOR PLAN AS-2.3 CHILDREN'S CENTER ROOF FLOOR PLAN AS-2.4 CHILDREN'S CENTER PROPOSED ELEVATION AS-2.5 CHILDREN'S CENTER ADDITIONAL ELEVATION AS-2.6 CHILDREN'S CENTER EXISTING L01 PLAN AS-2.7 CHILDREN'S CENTER EXISTING L02 PLAN AS-3.0 MEET + GREET PLAZA FLOOR PLAN AS-3.1 CANOPY ROOF FLOOR PLAN AS-3.2 CANOPY ELEVATION AS-4.0 EXISTING SITE VIEWS AS-4.1 PROPOSED VIEWS AS-4.2 PROPOSED VIEWS AS-5.0 MATERIAL OVERALL PALETTE AS-5.1 MATERIAL CATALOGUE AS-6.0 PROPOSED ELEVATIONS - SOUTH + WEST AS-6.1 PROPOSED ELEVATIONS - SOUTH + EAST AS-6.2 PROPOSED ELEVATIONS- NORTH AS-7.0 COLORED CHILDREN'S CENTER PLANS AS-7.1 COLORED MEET& GREET PLAZA PLAN STORYSUSEAREAS # 8,489 7,227 2 31’-8”--1545 1,545 -- 2 27 2,587 987 -1,600 FEET BUILDING HEIGHT SF SF SF SF SF 987(OS)-3,024 SF SF SF COMMENT SITE COVE- RAGE EXISTING (Excluding roof overhang) SITE COVE- RAGE DEMO- LISHED SITE COVERAGE ADDED SITE COVERAGE TOTAL GFA EXISTING GFA DEMOLISHED GFA ADDED (CBC 202) GFA TOTAL DAYCARE ACCESSORY TO CHURCH 987 DECK ON 2ND LEVEL NOT INCLUDED IN GFA OCCUPIED ROOF AREA NOT INCLUDED IN GFA AS ALLOWED BY 503.1.4 OS = DECK STRUCTURE OVER USABLE AREA 1,512 (1) 1,512 (2) 987 (OS) DAYCARE ACCESSORY TO CHURCH 887 (1) 334 (2) 658 (OS) (E) CHILDREN CENTER (N) ADDITION TO CHILDREN CENTER (E) SANCTUARY RELIGIOUS ASSEMBLY 375 SEATS 2+ BASE- MENT (BELOW GRADE PLANE) 212 + 1051 - B = 6,663 1 = 6,749 2 = 1,533 TOTAL = 14,945 EXTERIOR SECOND FLOOR WALKWAY 212 EXTERIOR ENTRANCE CANOPY 1,050 - (N) PLAZA CANOPY MEET AND GREET 1 20 35 --2,310 2,310 1,500-- (N)SUNSHADE (SUNBRELLA)--680 680 AREA NOT OVERLAYING PLAZA CANOPY (E) LANDING RELIGIOUS ASSEMBLY 1 27 5,415 393 208 5,230 4,524 EXTERIOR ENTRANCE CANOPY 393 - SITE TOTALS COVERAGE % 103,406 SF 2 35 16,491 2,643 9,973 18,592 2,642 1,138 --16 --18 7.1.b Packet Pg. 36 N 500 FT PROPERTY PLAN AS-1.11"=200' PROPERTY PLAN 1 DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 7.1.b Packet Pg. 37 DRAINAGE LANDING (E) ONE-STORY BUILDING (SPRINKLERED) CHILDRENS CENTER (E) TWO-STORY BUILDING (NON-SPRINKLERED) EXISTING GFA:4,524 SF EXISTING GFA:4,011 SF DRAINAGE8'-0"15 ' - 0 "8'-0"18 ' - 0 "8'-6"8'-6"8'-6"8'-6"8'-6"8'-6"8'-0"8'-0"8'-0"8'-0"8'-0"8'-0"8'-0"8'-6"8'-6"8'-6"9'-0"9'-0"9'-0"8'-8"18' -0 " 8'-8" 8'-8" 8'-8"8'-8"8'-8"8'-8" 8'-8" 9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0" 18'-0"8'-5"26'-2"8'-5"8'-5"8'-5"8'-5"8'-5"26'-0"8'-5"26' -0 " 26 ' - 1 "8'-0"8'-0"18'-0" 9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"24'-7"25'-8"26'-2"8'-6"8'-6"8'-6"8'-6"8'-6"8'-6"8'-6"8'-6"9'-0"8'-0"8'-0"8'-0"15 ' - 0 " 15 ' - 0 "8'-7"8'-7"8'-7"8'-7"8'-7"9'-0"9'-0"18' -0" 9'-4"9'-4"9'-4"18'-0"26 ' - 9 "8'-0"26'-9" 1 5 ' - 0 "18'-0"SANCTUARY (E) TWO-STORY BUILDING(SPRINKLERED) EXISTING GFA:14,945 SF EXISTING SEATING = 375 92'-9" 103'-2" 121'-7"SSCCSSCCCCCCCCCCCCCCCCCCCCCCCCCCCCCS S S S S S S S S S S SSSS S S S A D A A D A ADAADASSSSSSSSSSSSSSSSSSSSSSSSSS S S S S S SSSSSS One-way Traffic Flow SSSSSSS S S SCCCCCCCCCC 8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-0"8'-0"8'-0"8'-0"8'-6"Stall Dimensioned to Include 2' Overhang, to Follow Existing Permit Layout Stall Dimensioned to Include 2' Overhang, to Follow Existing Permit Layout5'-0"5'-0"8'-7"8'-7"8'-7"8'-7"8'-7"9'-0"9'-0"9'-0" 1 8 ' - 0 " 25 ' - 2 " 18'-0" 1"=50' EXISTING SITE PLAN 1 EXISTING SITE PLAN AS-1.2 Rev A DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 30 31 32 33 34 35 36 37 38 39 42 43 44 45 46 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75767778798081828384858687 8990919293949596979899 88 40 41 28 29 47 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 PARKING EXISTING PARKING SPACES:114 STANDARD PARKING SPACES: 69 COMPACT PARKING SPACES: 41 ADA PARKING SPACES: 4 TOTAL EXISTING PARKING SPACES : 114 EVENT TYPE EVENT LOCATION EVENT HOURS ATTENDENCE REQUIRED ONSITE PARKING OFF SITE PARKING (AGREEMENT)NOTES SERVICE INDOOR 8:30 AM - 12:00 PM 200-350 90-114 ABOVE 300 ATTENDEES UP TO 30 SPOTS EXTRA 70% OF THE TIME CHURCH PARKING IS SUFFICIENTTYPICAL SUNDAY MORNING CLASSES INDOOR 12:00 PM - 3:00 PM 75 - 100 50 - 75 N/ATYPICAL SUNDAY AFTERNOON CLASSES INDOOR 6:00 PM - 8:30 PM 75 - 100 40 - 60 N/ATYPICAL WEDNESDAY EVENING A LOT ARE BEING DROPPED OFF COMMUNITY EVENT OUTDOOR/ INDOOR 3 HOURS 300 - 500 114 ABOVE 300 ATTENDEES UP TO 30 SPOTS EXTRA LARGER EVENTS (TYPICAL SANTURDAY) 3 TIMES A YEAR. A LOT OF WALK-INS, DROP OFFS 7.1.b Packet Pg. 38 N S S S S S S SSSSSSSSSSSS S S S S S S S S S SSSSCCCCCCCCCCCC CS S S (N) PLAYGROUND CS S DIAMOND BAR BLVDPROPERTY LINEADAADAA D AFLOOD CONTROL CHANNELA D A SSSSSSSSSSSSSSSSSSSSSS SSCCCCCS S N 7'-7"26' 2 9 ' - 8 "9'-8"7'-7"21 ' - 5 "6'-8"5' - 4 " SEWER 48'-3"SEWER 40'-1"LANDING (E) ONE-STORY BUILDING CHILDRENS CENTER (E) TWO-STORY BUILDING (NON-SPRINKLERD) PARKING UNIT ADDED PARKING UNIT ADDED PARKING UNIT ADDED ROOF AREA:5,151 SF 4'-9"2' 2'-3"88'-2"1'-11"86'-2"10'5'5'10'5'5'CL OF 10' WIDE EASEMENT OF SOUTHERN CALIFORNIA EDISON COMPANY FOR PUBLIC UTILITY PURPOSE PER O.R.43774-241 CL OF 10' WIDE EASEMENT OF GENERAL TELEPHONE COMPANY FOR PUBLIC UTILITY PURPOSE PER O.R.44446-33 CL OF 10' WIDE EASEMENT OF SOUTHERN CALIFORNIA EDISON COMPANY FOR PUBLIC UTILITY PURPOSE PER O.R.78-1063699, RECORDED SEPTEMBER 25, 1978 Minor adjustments to parking layout will not change the existing finish, levels, or drainage. Overall impervious area will be maintained (new impervious will be off set by new pervious landscape to the north of the children's playground) Children's center renovation will remove the upper access deck but will not change the existing levels, or drainage. All landscape and grading outside of parcel areas to remain unchanged. Adjustments to parking areas Community Plaza, Meet + Greet Plaza and Children's Play area to follow existing grade New building for Children's Center will require foundations at grade, foot print is 660 sq.ft. The improved children's playground will not impact grading, drainage or amount of impervious finish. No impact on any surrounding trees, grading, drainage or ground cover Community Plaza to be repaved with concrete pavers Meet + Greet Plaza: Existing concrete finish, levels, drainage + steps to Meet + Greet Plaza to be maintained and made good where impacted by canopy foundation 14'-7"(N) COMMUNITY PLAZA (N) TWO-STORY ADDITION(SPRINKLERED)ROOF AREA:1,068 SF (SPRINKLERED)ROOF AREA:2,168 SF 5'-6"4'-7"34'-6"4' 4 PARKING UNITS REMOVED FENCE STORM WATER DRAIN 696 ' FS 694 ' FS 695 ' FS 693 ' FS 694 ' FS 695 ' FS 692 ' FS 691 ' FS 683 ' FS 690 ' FS 684 ' FS 686 ' FS 688 ' FS 690 ' FS 692 ' FS 694 ' FS 693 ' FS 692 ' FS691 ' FS (N)CANOPY TO MEET+ GREET PLAZA ROOF AREA:1,500 SF(SPRINKLERED) SANCTUARY (E) TWO-STORY BUILDING ROOF AREA:7,001 SF (SPRINKLERED) 99'-8" 92'-9"8'-0"15 ' - 0 "8'-0"18 ' - 0 "8'-0"8'-0"8'-0"8'-0"8'-0"8'-0"8'-0"8'-0"8'-8"18' -0 " 8'-8" 8'-8"8'-8"8'-8"8'-8"8'-8"8'-8" 9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0" 18'-0"8'-5"26'-2"8'-5"8'-5"8'-5"8'-5"8'-5"26'-0"8'-5"8'-0"8'-0"18'-0" 9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"25'-8"26'-2"8'-0"8'-0"8'-0"8'-0"7'-10"9'-0"9'-0"18'-0"26 ' - 1 "8'-0"27'-1"18'-0"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-5"8'-0"8'-0"8'-0"8'-0"5'-0"5'-0"9'-0"9'-0"9'-0" 1 8 ' - 0 " 2 5 ' - 2 " 18'-0"8'-0"8'-0"8'-0"8'-0"8'-0"8'-0"8'-0"8'-0"8'-0"8'-0"15 ' - 0 " 9'-0" 26 ' - 1 "C8'-0"C8'-0"C8'-0"C8'-0"C8'-0"C8'-0"C8'-0"C8'-0"C8'-0"C8'-0"C8'-0"C8'-0"C8'-0"26' -0 "CSSSSSS7'-10"C7'-10"C7'-10"C7'-10"C7'-10"C7'-10"C7'-10"C7'-10"CSSPARKING UNIT CHANGED FROM COMPACT TO STANDARD Stall Dimensioned to Include 2' Overhang, to Follow Existing Permit Layout Stall Dimensionedto Include 2'Overhang, toFollow ExistingPermit Layout 21'-11" 1 5 ' - 0 " 1 5 ' - 0 " Add sprinklers to the Landing building Existing ADAroute to street tobe reviewed aspart of BoulevardLandscapeupgrade package DETAILED PROPOSED SITE PLAN AS-1.3 Rev A1"=50' DETAILED PROPOSED SITE PLAN DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 PROJECT DATA OWNER EVANGELICAL FREE CHURCH OF DIAMOND BAR PROJECT ADDRESS 3255 S DIAMOND BAR BLVD, DIAMOND BAR, CA 91765 SITE DATA PARCEL #: 8285 028 034 LEGAL DESCRIPTION:TRACT 33417, LOT 19 LOT AREA: 103,406 SF (2.374 ACRES) CUP #1634-1 & CUP 95-1 EXISTING USE:OFFICE / CHURCH / DAYCARE PROPOSED USE: OFFICE / CHURCH / DAYCARE CONSTRUCTION TYPE:V-B (SPRINKLERED WITH EXCEPTION OF (E) LANDING BUILDING OCCUPANCY GROUP E / A-3 / B EXISTING LOT COVERAGE:16,491 SF (16.0%) PROPOSED LOT COVERAGE:18,592 SF (18.0%) PROPOSED MAX BUILDING HEIGHT: 35'-0" AREAS EXISTING GFA: CHILDREN'S CENTER: 4,011 SF SANCTUARY:14,945 SF THE LANDING: 4,524 SF ADDED GFA: CHILDREN'S CENTER ADDITION : 1,138 SF PROPOSED TOTAL:19,344 SF PARKING EXISTING PARKING SPACES:114 STANDARD PARKING SPACES: 69 COMPACT PARKING SPACES: 41 ADA PARKING SPACES: 4 TOTAL PROPOSED PARKING SPACES : 114 7.1.b Packet Pg. 39 N S DIAMOND BAR BLVD 05 1 06 1 EXISTING EMBANKMENT RETAINING WALL + TREES - UNCHANGED EXISTING SCREEN WALL TO A/C UNITS EXISTING PARKING, CURB, DRAINAGE + HARDSCAPE - UNCHANGED EXISTING EMBANKMENT RETAINING WALL + TREES - UNCHANGED [MIXED MATURE TREE SPECIES + LOCATION SHOW INDICATIVELY ONLY] A/C A/C EXISTING EXIT EXISTING PLANTED BOARDED - UNCHANGED PUBLIC SIDE WALK - CONCRETE EXISTING 'EFREE' SIGNAGE EXISTING ENTRANCE ADA ENTRANCE EXISTING ELECTRICAL TRANSFORM EXISTING GARAGE BIN - SCREEN WALL RELOCATED A/C UNIT FOR LANDING BUILDING EXISTING EMBANKMENT RETAINING WALL + TREES - UNCHANGED1 2 3 4 LEGEND: PARKING - EXISTING ASPHALT IN-SITIL CONCRETE SIDEWALK - BRUSHED FINISH PLANTER BED - FLUSH COMMUNITY PLAZA -GRID OF COLORED CONCRETE PAVERS + IN-SITIL CONCRETE DECOMPOSED GRANITE CHILDREN'S PLAY AREA - FINISHES BY OWNER LARGE SHADE TREE - CALIFORNIA BOX ELDER OR WHITE OAK MEDIUM SHADE TREE - WESTERN COTTON WOOD 4' HEDGE -IAN BUSH MANZANITA SHRUB - SALVIA CELESTIAL BLUE OR MOUNTAIN LILAC SANCTUARY (E) TWO-STORY BUILDING LANDING (E) ONE-STORY BUILDING CHILDREN'S CENTER (E) TWO-STORY BUILDING (N) TWO-STORY ADDITION DETAILED LANDSCAPE DESIGN TO FOLLOW DIAMOND BAR CITY CODE TITLE 8 HEALTH + SAFETY, CHAPTER 8.14 - WATER EFFICIENT LANDSCAPING DESIGN ORDINANCE AND GUIDELINES. CHILDREN'S PLAYGROUND COMMUNITY PLAZA SITE AREA (103,406 SQ.FT.) : BUILDINGS FOOTPRINT (7,001 SQ.FT.) = 14.77:1 (6.8%) HARDSCAPE AREA-INCLUDE PARKING (53,097 SQ.FT.) : LANDSCAPE AREA (36,462 SQ.FT.) = 1.45:1 (68.6%) HARDSCAPE AREA -EXCLUDE PARKING (36,690 SQ.FT.) : LANDSCAPE AREA (36,462 SQ.FT.) = 1:1 (99.3%) BOULEVARD FRONTAGE LANDSCAPE IMPROVEMENT UNDER PARALLEL SUBMISSION - TO INCLUDE ADA UPGRADE(TO BE INSTALLED PRIOR TO FINAL OCCUPANCY AREA : 3016 SQ.FT. AREA : 1642 SQ.FT. S S S S S S SSSSSSSSSSSS S S S S S S S S S SSSSCCCCCCCCCCC CS S SCSADAADA SSSSSSSSSSSSSSSSSSSS SSCCCCS SCCCCCCCCCCCCC SSSSSSSSA D A A D A CCCCCCCCCCCSSCExisting ADA route tostreet to be reviewedas part of BoulevardLandscape upgradepackage LANDSCAPE PLAN AS-1.4 Rev A 1"=50' LANDSCAPE PLAN DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 7.1.b Packet Pg. 40 CC692.50' FS 691.85' FS 691.40' FS DN RAMP DOWN UP 26'-0 1/16" SANCTUARY (E) TWO-STORY BUILDING LANDING (E) ONE-STORY BUILDING MEET + GREET PLAZA RENOVATED CHILDREN'S CENTER (E) TWO-STORY BUILDING COMMUNITY PLAZA NEW BUILD CHILDREN'S CENTER A/C UNITS MAIN SITE ENTRANCE EXISTING IN-SITIL CONCRETE FINISH TO PLAZA TO BE REPAIRED L01B01 MAIN ENTRANCE DISABLED ENTRANCE EXISTING DRAINAGE + GRADING TO BE MAINTAINED SUNBRELLA SUN SHADE OVER CANOPY + SKYLIGHT OVER RELOCATED A/C UNIT MONUMENT SIGN WALLMONUMENT SIGN WALL SCREEN WALL SCREEN WALL AREA : 1642 SQ.FT. AREA : 3072 SQ.FT. A D A A D A CS S S S S SS S SADAADA S PARCEL -2 LANDSCAPE PLAN AS-1.6 Rev A 1"=20' PARCEL -2 LANDSCAPE PLAN DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 A/C 1 2 SANCTUARY (E) TWO-STORY BUILDING LANDING (E) ONE-STORY BUILDING CHILDREN'S CENTER (E) TWO-STORY BUILDING (N) TWO-STORY ADDITION CHILDREN'S PLAYGROUND COMMUNITY PLAZA AREA : 3016 SQ.FT. AREA : 1642 SQ.FT.SSSSSSSCSSSSSSSSSSSSSSSSSSS CCCCCCCCCCCCCA D A A D A CCCCCCCCCSSPARCEL - 1 LANDSCAPE PLAN AS-1.5 Rev A1"=20' PARCEL -1 LANDSCAPE PLAN DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 7.1.b Packet Pg. 41 CC692.50' FS 691.85' FS 691.40' FS DN RAMP DOWN UP 26'-0 1/16" SANCTUARY (E) TWO-STORY BUILDING LANDING (E) ONE-STORY BUILDING MEET + GREET PLAZA RENOVATED CHILDREN'S CENTER (E) TWO-STORY BUILDING COMMUNITY PLAZA NEW BUILD CHILDREN'S CENTER A/C UNITS MAIN SITE ENTRANCE EXISTING IN-SITIL CONCRETE FINISH TO PLAZA TO BE REPAIRED L01B01 MAIN ENTRANCE DISABLED ENTRANCE EXISTING DRAINAGE + GRADING TO BE MAINTAINED SUNBRELLA SUN SHADE OVER CANOPY + SKYLIGHT OVER RELOCATED A/C UNIT MONUMENT SIGN WALLMONUMENT SIGN WALL SCREEN WALL SCREEN WALL AREA : 1642 SQ.FT. AREA : 3072 SQ.FT. A D A A D A CS S S S S SS S SADAADA S PARCEL -2 LANDSCAPE PLAN AS-1.6 Rev A 1"=20' PARCEL -2 LANDSCAPE PLAN DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 7.1.b Packet Pg. 42 N 694.00' FS 692.50' FS 693.00' FS 692.50' FS 692.00' FS 691.44' FS 695.00' FS 696.00' FS 689.75' FS 692.00' FS 693.00' FS 694.00' FS 695.00' FS 691.00' FS 691.40' FS 695.32' FS 695.55' FS 695.45' FS (N) PLAYGROUND S DIAMOND BAR BLVDPROPERTY LINEFLOOD CONTROL CHANNELDN DN RAMP DOWN UP UP DS DS PLANTER 26'-0 1/16"9'-8"SANCTUARY (E) TWO-STORY BUILDING LANDING (E) ONE-STORY BUILDING (SPRINKLERED) (SPRINKLERED) CHILDRENS CENTER (E) TWO-STORY BUILDING (NON-SPRINKLERED) Meet + Greet Plaza Improvements will not change the existing finish, levels, drainage, steps + ramps (N) MEET & GREET PLAZA (N) COMMUNITY PLAZA IN OUT EXISTING GFA:14,945 SF EXISTING GFA:4,524 SF (SPRINKLERED) See Detailed Site Plan for additional notes regarding grade and drainage. Note that the only change in grading is to the foundations for new build children's center (foot print 660 sq.ft.) (N) TWO-STORY ADDITION ADDED GFA:1,138 SF 691.85' FS 692.70' FS No impact on any surrounding trees, grading, drainage or ground cover No change in grading or drainage to existing parking S S S S S S SSSSSSSSSSSS S S S S S S S S S SSSSCCCCCCCCCCC CS S SCSADAADA SSSSSSSSSSSSSSSSSSSS SSCCCCS SCCCCCCCCCCCCC SSSSSSSSA D A A D A CCCCCCCCCCCSS695.00' FS EXISTING GFA:4,011 SF EXISTING GFA:3,872 SF GRADING PLAN 1"=50' GRADING PLAN AS-1.7 Rev A DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 7.1.b Packet Pg. 43 N T.O.W.+31'-8" TOP OF ROOF+27'-0" TOP OF ROOF+25'-8" TOP OF RIDGE+16'-9 1/2" S DIAMOND BAR BLVDPROPERTY LINEFLOOD CONTROL CHANNELTOP OF SKYLIGHT+35'-0" T.O.W.+27'-10" TO OF ROOF+28'-3" S S S S S S SSSSSSSSSSSS S S S S S S S S S SSSSCCCCCCCCCCC CS S SCSADAADA SSSSSSSSSSSSSSSSSSSS SSCCCCS SCCCCCCCCCCCCC SSSSSSSSA D A A D A CCCCCCCCCCCSSSITE OCCUPANCY AS-1.81"=60' SITE OCCUPANCY PLAN 1 DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Oct 26th, 2020 KEY PLAN (E) LANDING BLDG. (E) SANCTUARY (E) CHILDREN'S CENTER WITH (N) ADDITION (E) EXTERIOR PLAZA CANOPY 2019 CALIFORNIA BUILDING CODE ANALYSIS AREAS STORYS # ALLOWABLE # STORYS ABOVE GRADE PLANE (CBC TABLE 504.4) # BUILDING HEIGHT FEET ALLOWABLE BUILDING HEIGHT (CBC TABLE 504.3) FEET SPRINKLERED CONSTRUCTION TYPE (CBC 602) GFA EXISTING AREA SF GFA DEMOLISHED AREA SF GFA PROPOSED AREA SF GFA TOTAL AREA SF ALLOWABLE AREA (CBC TABLE 506.2) SF OCCUPANCY CLASSIFICATION AND USE (CBC 302) MAXIMUM FLOOR AREA ALLOWANCE PER OCCUPANT. (OCCUPANCY LOAD FACTOR) (CBC TABLE 1 1004.5) OCCUPANCY LOAD (CBC 1004) # COMMENT (E) CHILDREN’S CENTER WITH (N) ADDITION 2 E (S): 2 32 60 S V-B 4,011 987 1,138 4,162 E(SM) 28,500 E DAYCARE: 35 NET BUSINESS AREAS: 150 GROSS LOBBY:15 NET 3,200/35=91 500/150=4 230/15=16 TOTAL =111 (E) SANCTUARY 2 + BASEMENT [BELOW GRADE PLANE] E (S): 2 A-3(S): 2 35 60 S V-B B = 6,663 1ST = 6,749 2ND = 1,533 TOTAL 14,945 212 +1051 - 13,682 E(SM) 28,500 A-3(SM) 18,000 E A-3 E CLASSRM: 20 A-STANDING: 5 A-CHAIRS: 7 A-TABLES & CHAIRS: 15 (ALL NET) B: 4,290/20 =214 1 ST: 5,177/7=740 439/20=22 300/15=20 300/5=60 2ND:1220/20=61 TOTAL: 1,117 (N) EXTERIOR PLAZA CANOPY 1 A-3(S): 2 20 IIB =75 S II-B [SEE COMMENT NOTE] - 1,500 1,500 A-3(S1) 38,000 A-3 ASSEMBLY (UNCONCENTRATED):15 100 BUILDING OFFICIAL TO CONFIRM IF 3104.2 CAN BE APPLIED: PEDESTRIAN WALKWAYS AND TUNNELS CBC 3104.2 STATES: SEPARATE STRUCTURES CAN BE COMBUSTIBLE CONSTRUCTION WHERE CONNECTED BUILDINGS ARE OF COMBUSTIBLE CONSTRUCTION BUT, AWNINGS AND CANOPIES CBC 3105.3 REQUIRES NON-COMBUSTIBLE FRAMES AND FLAME-RESISTANT COVERS. (E) LANDING 2 E (S): 2 27 60 S V-B 4,524 393 208 4,339 E(SM) 28,500 A-3(SM) 18,000 A-3 E E CLASSRM: 20 A-STANDING: 5 A-CHAIRS: 7 A-TABLES & CHAIRS: 15 (ALL NET) B-BUSINESS AREAS: 150 GROSS 1,610/7=230 1,343/20=68 613/150=4 243/5=49 TOTAL: 351 BUILDING OFFICIAL TO AGREE IT CAN BE CLASSIFIED AS EDUCATION USE AND NOT AN ASSEMBLY USE. TOTAL CONSIDERED PORTIONS OF ONE BUILDING. [BUILDING ON SAME LOT CBC 503.1.2] 2 2 35 60 S V-B 23,480 2,643 2,846 23,683 18,000+ 75% [Area Factor Increase (CBC 506.3)] 31,500 A-3 - - FRONTAGE AREA FACTOR INCREASE CALCULATION: If = [F/P-0.25]W/30 = 0.75 =75% WHERE: F/P=1 W=30 MATERIAL OVERALL PALETTE AS-5.0 DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 7.1.b Packet Pg. 44 PASTOR WORK ROOM RECEPTION/ SECURITY STAFF WC EXT. STOR. LOBBY 265 SF CHECK IN/ RECEPTION NURSERY CHECK-IN 58 SF 2-3 YR OLD CLASSROOM 426 SF 4-5 YR OLD CLASSROOM 426 SF NURSERY 384 SF UP UP SECURE NURSERY PLAY ELEVATOR CAR KIDS PLAY PATIO COMMUNITY PLAZA KITCHEN 5 0 ' - 7 1 / 2 " 1 6 ' - 0 "24'-0"20'-0"21'-11 1/2"9'-9" 91 SF 77 SF 8'-4"3'-11"3' - 8 "19'-0 1/2"10'-1 1/2"3'-3" BUILT IN SEAT TURNSTILE PASS GATE 7'-6"TOY STORAGE 3' - 8 " 3' - 0 " 3' - 0 " 3' - 0 " DS DS DS DS 695.55' 695.32' 695.00' 695.59' 694.16' 695.32' 695.57' 1 6 ' - 3 " 16 ' -2 1 /2 "32'-7 1/2"8' - 0 "8'-0"16'-8" WC 43 SF WC 43 SF OCC: E 6' - 0 "3'-8"CLEARSTAIR STAIR DS 3' - 8 "3'-8 " PASS GATE ACCESSIBLE WC48" MIN1 8 " M I N 3'-0 " 18 " M INPLANTEROCC: E OCC: E COMBINED AREA: 575 SF OCC: B FOR OCCUPANCY LOAD FIGURES REFER TO AS-1.8 CHILDREN'S CENTER FIRST FLOOR PLAN AS-2.0 Rev A DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 1" = 10' CHILDREN'S CENTER L01 PLAN 7.1.b Packet Pg. 45 WORKSHOP 134 SF STOR. ACCESSIBLE WC 1ST+2ND GRADE CLASSROOM 426 SF 3RD+4TH GRADE CLASSROOM 426 SF MULTI-PURPOSE ROOM 447 SF DN UP CM OFFICE 77 SF16'-8 " 14 ' -4 1 /2 "24'-0 1/2"6'-7 " 1 6 ' - 2 " 9'-9" 7' - 1 "12'-11 1/2"3'-8"3'-8 "13'-0 1/2"9'-9" SANCTUARY 3'-8"DS DS DS DS 705.09' REVISED BALCONY LINE DS 5 1 ' - 0 " 20'-0"22'-0"32'-9"8'-0 "8'-0"16'-10 1/2" WC 43 SF WC 43 SF ELEVATOR CAR DN COMBINED AREA: 353 SF6'-5"3'-8"CLEAR3'-8"3'-8 "0'-8"1' - 1 0 "48" MIN1 8 " M I N 1 8 " M I N HALL 9'-8"6'-4"6'-8"FOR OCCUPANCY LOAD FIGURES REFER TO AS-1.8 COMBINED AREA: 1,360 SF OCC: E DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 CHILDREN'S CENTER SECOND FLOOR PLAN AS-2.1 Rev A1" = 10' CHILDREN'S CENTER L02 PLAN 7.1.b Packet Pg. 46 DN 5'-8" (N) PARAPET WALL FOR MECH. AREA 7'-7"8'-5"CANOPY ABOVE 5 4 ' - 2 1 / 2 "20'-9"1 7 ' - 4 1 / 2 " 5 8 ' - 1 " (E) ROOF TO REMAIN (E) ROOF TO REMAIN 12'-0" REVISED BALCONY LINE 20'-0"22'-0"36'-6"8' - 0 "8'-0"3'-8"3'-8"8"17'-2" MECHANICAL DECK ELEVATOR MOTOR ROOM 335 SF MECHANICAL DECK300 SF 48 SF SANCTUARY GATE ACCESS ONLY TO AUTHORIZED STAFF FOR MAINTENANCE ACCESS ONLY TO AUTHORIZED STAFF FOR MAINTENANCE 1" = 10' CHILDREN'S CENTER THIRD FLOOR PLAN AS-2.2CHILDREN'S CENTER L03 PLAN DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 7.1.b Packet Pg. 47 7'-7"8'-5"5 4 ' - 2 1 / 2 "20'-9"1 7 ' - 4 1 / 2 " 5 8 ' - 1 " (E) ROOF TO REMAIN 20'-0"22'-0"36'-6"8' - 0 "8'-8"7'-3"SLOPESLOPES L O P E S L O P E SLOPE5:25:25: 2 5: 2 FALL FALLFALLTOP OF CANOPY+28'-10" T.O.W.+31'-8" TOP OF ROOF+27'-0" T.O.W.+27'-10" TO OF ROOF+28'-3" SANCTUARY 12'-0" CHILDREN'S CENTER ROOF FLOOR PLAN DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 1" = 10'AS-2.3CHILDREN'S CENTER ROOF PLAN 7.1.b Packet Pg. 48 27'-10"10'-0"7'-6"9'-2"1'-2"TL-100 (E) TILE ROOF TO REMAIN PT-100 PT-103 PT-104 PT-102 PT-108 PT-106 PT-107 PT-100 METAL CLAD LIGHT SHELF PT-108 MT-102 EXTERNAL PAINT EXTERNAL PAINT EXTERNAL PAINT STUCCO EXTERNAL PAINT EXTERNAL PAINT EXTERNAL PAINT EXTERNAL PAINT EXTERNAL PAINT ON STUCCO EXTERNAL PAINT 18'-8"9'-2"DOWNSPOUT + ROOF DECK OVERFLOW (N) DOWNSPOUT 8'-6"3'-6"13'-6"METAL GUARDRAIL/ SECURITY FENCE H-200 PT-100H-100 TL-100 (E) TILE ROOF TO REMAIN METAL MESH FOR IVY WALL 17'-6"PLANTER EXTERIOR PAINT 10'-0"9'-2"8'-8"HIGH TRAFFIC WATERPROOF LIQUID APPLIED DECK MEMBRANE LOBBY DOWNSPOUT TL-100PT-100 (E) TILE ROOF TO REMAIN PT-100 PAINTED STUCCO SOFFIT H-100 METAL GUARDRAIL 5 12 EXTERNAL PAINTED ON STUCCO 1'-6"10'-0"7'-6"10'-4"(N) STAIR BEHIND27'-10"TL-100 (E) TILE ROOF TO REMAIN PT-100PT-103 PT-104 PT-102 PT-108 PT-106 PT-107 H-100 METAL GUARDRAIL PAINTED STEEL COLUMN MT-200 5 12 EXTERIOR PAINT EXTERIOR PAINT EXTERIOR PAINT EXTERIOR PAINT EXTERIOR PAINT EXTERIOR PAINT EXTERIOR PAINT CHILDREN'S CENTER PROPOSED ELEVATION 1NORTH ELEVATION 3/16" = 1'-0"3SOUTH ELEVATION4WEST ELEVATION 1" = 12'2EAST ELEVATION AS-2.4 DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 1" = 12' 1" = 12' 3 4 1 2 18'-6"3'-6"31'-8"MT-101 PAINTED METAL CANOPY MT-200 PT-101 H-100PT-108 METAL GUARDRAIL MT-200 PT-100 EXTERNAL PAINT STEEL STRUCTURE EXTERNAL PAINT EXTERNAL PAINT 11'-6"10'-0"10'-0"11'-8"19'-0"3'-6"PT-101 PT-103 PT-100 MT-101 PAINTED METAL CANOPY MT-200 PT-101 PT-100 EXTERIOR LANDSCAPE WALL H-100 METAL GUARDRAIL/ SECURITY FENCE H-100 METAL GUARDRAIL EXTERNAL PAINT EXTERNAL PAINT EXTERNAL PAINT EXTERNAL PAINT PT-10315'-6"10'-0"LOBBY PT-101H-100 MT-101 PAINTED METAL CANOPY MT-200 PT-100 PT-103 PT-108 EXTERNAL PAINT EXTERNAL PAINT MATEL GUARDRAIL EXTERNAL PAINT EXTERNAL PAINT 10'-0"11'-8"4'-4"14'-2"31'-8"MT-200 PAINTED STEEL COLUMN MT-101 PAINTED METAL CANOPY MT-200 PT-100H-100 H-100 METAL GUARDRAIL METAL GUARDRAIL EXTERNAL PAINT PT-101 PT-103 EXTERNAL PAINT EXTERNAL PAINT CHILDREN'S CENTER ADDITIONAL ELEVATION AS-2.5 Rev A DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 1NORTH ELEVATION 3/16" = 1'-0"3SOUTH ELEVATION4WEST ELEVATION 1" = 12'2EAST ELEVATION 1" = 12' 1" = 12' 3 4 1 2 7.1.b Packet Pg. 49 18'-6"3'-6"31'-8"MT-101 PAINTED METAL CANOPY MT-200 PT-101 H-100PT-108 METAL GUARDRAIL MT-200 PT-100 EXTERNAL PAINT STEEL STRUCTURE EXTERNAL PAINT EXTERNAL PAINT 11'-6"10'-0"10'-0"11'-8"19'-0"3'-6"PT-101 PT-103 PT-100 MT-101 PAINTED METAL CANOPY MT-200 PT-101 PT-100 EXTERIOR LANDSCAPE WALL H-100 METAL GUARDRAIL/ SECURITY FENCE H-100 METAL GUARDRAIL EXTERNAL PAINT EXTERNAL PAINT EXTERNAL PAINT EXTERNAL PAINT PT-10315'-6"10'-0"LOBBY PT-101H-100 MT-101 PAINTED METAL CANOPY MT-200 PT-100 PT-103 PT-108 EXTERNAL PAINT EXTERNAL PAINT MATEL GUARDRAIL EXTERNAL PAINT EXTERNAL PAINT 10'-0"11'-8"4'-4"14'-2"31'-8"MT-200 PAINTED STEEL COLUMN MT-101 PAINTED METAL CANOPY MT-200 PT-100H-100 H-100 METAL GUARDRAIL METAL GUARDRAIL EXTERNAL PAINT PT-101 PT-103 EXTERNAL PAINT EXTERNAL PAINT CHILDREN'S CENTER ADDITIONAL ELEVATION AS-2.5 Rev A DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 1NORTH ELEVATION 3/16" = 1'-0"3SOUTH ELEVATION4WEST ELEVATION 1" = 12'2EAST ELEVATION 1" = 12' 1" = 12' 3 4 1 2 7.1.b Packet Pg. 50 PASTOR THE LANDING CLASSROOM CLASSROOM CLASSROOM DECK OVER KIDS PLAY A/C A/C SHED SHED A/C A/C DRAINAGE LANDING32'-3"50'-3 "32'-2"5 0 ' - 2 1 / 2 " WC WC WC KIDS PLAY KIDS PLAY 695.50' 695.60' 1"=10' EXISTING CHILDREN'S L01 PLAN 1 EXISTING CHILDREN'S L01 PLAN AS-2.6 DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 7.1.b Packet Pg. 51 PASTOR CLASSROOM CLASSROOM CLASSROOM32'-3"50'-3 "32'-2"5 0 ' - 2 1 / 2 "18'-10 1/2"18'-10 1/2"WORK ROOM THE LANDING SANCTUARY DOWN A/C A/C SHED SHED KIDS PLAY A/C A/C DOWN 705.50' 705.60' W.C W.C W.C 1"=10' EXISTING CHILDREN'S L02 PLAN 1 EXISTING CHILDREN'S L02 PLAN AS-2.7 DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 7.1.b Packet Pg. 52 FOYER OFFICE KITCHEN OFFICE PASTOR WORK ROOM FOYER DN DN OFFICE OFFICE OFFICE SOUND W.C W.C (N) MEET & GREET PLAZA 695.50' FS FALL FALL 692' FS (E) PLANTER TO REMAIN DN DN DN (E) SANCTUARY TO REMAIN (E) BUILDING TO REMAIN (E) RAMP TO REMAIN (E) PLANTER TO REMAIN (E) STAIRS TO REMAIN11'-1 1/2"20'-8 1/2" 13'-0 1/2"10'-1 1/2"695.57' 8'-4 1/2"11'-10 1/2"10'-4 1/2"22'-5 1/2"22'-3"19'-0"29'-4"EQEQ1'-3"MEET & GREET PLAZA PLAN AS-3.0 DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 1" = 10' PLAZA PLAN 7.1.b Packet Pg. 53 (E) ROOF TO REMAIN SLOPE SLOPESLOPE SLOPE1'-6"TYPGUTTER EQ. SLOPE SLOPE SLOPE EQ.EQ. EQ.EQ.EQ. EQ.EQ.14'-9"GUTTER 7'-4"(E) ROOF TO REMAIN SLOPE8'-4 1/2"11'-10 1/2"10'-4 1/2"22'-5 1/2"22'-3"19'-0"29'-4"9:1SLOPE9:1SLOPE3:1SLOPE3:1SLOPE 3:1 10:3 3:1 5:15:25:1 10:1 20:3 TOP OF ROOF+25'-8" TOP OF RIDGE+16'-9 1/2" TOP OF SKYLIGHT+35'-0"29'-7"SLOPE20:9SANCTUARY (E) ROOF TO REMAIN S L O P E20:990'-0"SUNBRELLA SHADE LENGTH12'-0" CANOPY ROOF PLAN AS-3.1 DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 1" = 10' CHILDREN'S CENTER ROOF PLAN 7.1.b Packet Pg. 54 121'-0"8'-5"9'-6 1/2"695' 6" FS + 709' + 704' 5" + 709' 9 1/2" + 706' 10 1/4" MEET & GREET PLAZA + 713' 11 1/4"8'-11"+ 705' 4 1/4" + 707' 8 1/4"+ 707' 1" PT-105 (N) SIGNAGE WALL TL-100 (E) TILE ROOF TO REMAIN TL-100 (E) TILE ROOF TO REMAIN PT-100 (E) STUCCO TO BE REPAINTED (E) DOORS AND WINDOWS TO REMAIN (E) STUCCO TO BE REPAINTED SUNBRELLA FIRESIST - FLAME RESISTANT FABRIC METAL ROOF (E) DOORS AND WINDOWS TO REMAIN TL-100 (E) TILE ROOF TO REMAIN PT-100 SP-200 MT-100PT-103 (N) SIGNAGE WALL (E) STEPS, PLANTERS, AND RAMPS TO REMAIN WD-300 MT-100 METAL FASCIA OVER WOOD STRUCTURE CANOPY COLUMNS MT-200 (E) SANCTUARY TO REMAIN (E) LANDING BUILDING TO REMAIN SP-200 SUNBRELLA FIRESIST - FLAME RESISTANT FABRIC (E) METAL GUARDRAIL MT-100 METAL FASCIA OVER WOOD STRUCTURE CANOPY ELEVATION 1" = 12'1CANOPY SOUTH EAST ELEVATION 1" = 12'2CANOPY NORTH WEST ELEVATION AS-3.2 Rev A DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 1 2 7.1.b Packet Pg. 55 EXISTING SITE VIEWS AS-4.0 DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 A D B E C A B C D E 7.1.b Packet Pg. 56 PROPOSED VIEWS AS-4.1 DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 EXISTING PROPOSED PROPOSED VIEWS AS-4.2 DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 7.1.b Packet Pg. 57 PROPOSED VIEWS AS-4.2 DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 A B A B 7.1.b Packet Pg. 58 MATERIAL OVERALL PALETTE AS-5.0 DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 GALVALUME METAL ROOF PANEL durable FRITTED LOW-E SKYLIGHT GLASS blocks harsh sun under canopy while maintaining clear view MESH FOR IVY WALL low maintenance, easy to install, no special green wall pockets, brings softness to buildings ACOUSTIC WOOD CEILING brings warmth to interior spaces, functions to dampen sounds from loud spaces CONCRETE COATING coating type TBD, durable for high traffic, defines plaza space GLULAM- available in custom size. COMMUNITY PLAZA - Stepstone modular narrow pavers EXTERIOR SMOOTH FINISH STUCCO- see color chart. EXTERIOR STUCCO - COLOR PALETTE LOW-E GLASS FOR WINDOW AND DOORS- Guardian SNR68 7.1.b Packet Pg. 59 MATERIAL CATALOGUE AS-5.1 DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 Western Window or sim. • Clean design, not bulky sightlines of window frames • Integrated sustem for operable windows and doors • Thermally broken Aluminum for better performance • Customizable dual-paned Low-E glass • In-stock finish options Western Window and Doors Exterior Lignting - Ligman Lighting (Darke Sky Approved Series) 7.1.b Packet Pg. 60 35'10'10'L01(+0' 0") L02(+10' 0") L03(+20' 0") SANCTUARY TOP(+35' 0")31'-7"10'10'L01(+0' 0") L02(+10' 0") L03(+20' 0") NEW BUILD TOP(+31' 7") PROPOSED SITE ELEVATIONS - SOUTH + WEST ELEVATION AS-6.0 Rev B DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 Site Elevation - South (1"=22') +35' +27' 9" +31' 8" +0' 0" Site Elevation - West (1"=22') +35' +27' 9" +31' 8" +0' 0" Children's Center (N) Two-story Addition Children's Center (N) Two-story Addition LANDING (E) Two-story Building LANDING (E) Two-story Building SANCTUARY (E) Two-story Building SANCTUARY (E) Two-story Building CANOPY (N) One-story Cover to Meet+ Greet Plaza Children's Center (E) Two-story Renovation Children's Center (E) Two-story Renovation PT-100 - Paint: Snowbound PT-103 - Paint: Lupine PT-107 - Paint: Humorous Green SP-200 - Sunbrella Firesist - flame resistant fabric MT-400 - Galvalume Standing Seam Roof GL-100 - Low-E Laminate Glass w/ Frit WD-300 - Wood Structure PT-500- Paint: Navel Existing red clay pantiles PT-103 - Paint: Lupine PT-100 - Paint: Snowbound Existing red clay pantiles H-200 - Mesh for Ivy Green Wall PT-108 - Paint: Splashy PT-500- Paint: NavelH-100- Paint: Guardrail WD-200- Exterior Wood Celling 7.1.b Packet Pg. 61 35'10'10'L01(+0' 0") L02(+10' 0") L03(+20' 0") SANCTUARY TOP(+35' 0")31'-7"10'10'L01(+0' 0") L02(+10' 0") L03(+20' 0") NEW BUILD TOP(+31' 7") PROPOSED SITE ELEVATIONS - SOUTH + WEST ELEVATION AS-6.0 Rev B DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 10'27'-9"10'L01(+0' 0") L02(+10' 0") L03(+20' 0") RENOVATED CHILDREN'S CENTER TOP(+27' 9")35'10'10'L01(+0' 0") L02(+10' 0") L03(+20' 0") SANCTUARY TOP(+35' 0") PROPOSED SITE ELEVATIONS - SOUTH + EAST ELEVATION AS-6.1 Rev A DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 Site Elevation/ Section - South (1"=22') Children's Center (E) Two-story Renovation Children's Center (N) Two-story Addition Children's Center (N) Two-story Addition SANCTUARY (E) Two-story Building LANDING (E) Two-story Building CANOPY (N) One-story Cover to Meet+ Greet Plaza Children's Center (E) Two-story Renovation +27' 9" +31' 7" +0' 0" Site Elevation - East (1"=22') +35' +27' 9" +14' 11" +10' 4" +31' 8" +0' 0" Western Windows - Classic Line PT-103 - Paint: LupinePT-104 - Paint: Vigorous Violet PT-102 - Paint: Dishy Coral PT-100 - Paint: Snowbound H-200 - Mesh for Ivy Green Wall PT-106 - Paint: Goldfinch PT-107 - Paint: Humorous Green Existing red clay pantiles Existing red clay pantiles PT-108 - Paint: Splashy PT-101 - Paint: Grays Harbor PT-108 - Paint: Splashy PT-100 - Paint: Snowbound PT-101 - Paint: Grays Harbor Western Windows - Classic Line PT-103 - Paint: Lupine H-100- Paint: Guardrail WD-200- Exterior Wood Celling 7.1.b Packet Pg. 62 Children's Center (N) Two-story Addition SANCTUARY (E) Two-story Building LANDING (E) Two-story Building Children's Center (E) Two-story Renovation Site Elevation - North (1"=22') +35' +27' 9" +31' 8" +0' 0" PT-101 - Paint: Grays Harbor35'10'10'L01(+0' 0") L02(+10' 0") L03(+20' 0") SANCTUARY TOP(+35' 0") PROPOSED SITE ELEVATIONS - NORTH ELEVATION AS-6.2 DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 PT-100 - Paint: Snowbound Existing red clay pantiles H-200 - Mesh for Ivy Green Wall PT-500- Paint: NavelH-100- Paint: GuardrailWD-200- Exterior Wood Celling 7.1.b Packet Pg. 63 35'10'10'L01(+0' 0") L02(+10' 0") L03(+20' 0") SANCTUARY TOP(+35' 0") PROPOSED SITE ELEVATIONS - NORTH ELEVATION AS-6.2 DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 RECEPTION/ SECURITY STAFF WC LOBBY 265 SF NURSERY CHECK-IN 58 SF 2-3 YR OLD CLASSROOM 426 SF 4-5 YR OLD CLASSROOM 426 SF NURSERY 384 SF ELEVATOR CAR KITCHEN50'-7 1 /2 " 16 ' - 0 "24'-0"21'-11 1/2"9'-9" 91 SF 77 SF 8'-4"3'-11"3'- 8 "19'-0 1/2"10'-1 1/2"3'-3"7'-6"3'- 8 " 3' - 0 " 3'- 0 " 3' - 0 " 16 ' - 3 " 16 ' - 2 1 / 2 "32'-7 1/2"8' - 0 "8'-0"16'-8" WC 43 SF WC 43 SF 6' - 0 "3'-8"CLEARSTAIR STAIR 3'- 8 " 3'- 8 " ACCESSIBLE WC48" MIN18 " M I N 3'- 0 " 18 " M I N COLORED CHILDREN'S CENTER PLANS AS-7.0 Rev A DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 CHILDREN'S CENTER L01 PLAN WORKSHOP 134 SF STOR. ACCESSIBLE WC 1ST+2ND GRADE CLASSROOM 426 SF 3RD+4TH GRADE CLASSROOM 426 SF MULTI-PURPOSE ROOM 447 SF CM OFFICE 77 SF 16 ' - 8 " 14 ' - 4 1 / 2 "24'-0 1/2"6'- 7 "16'-2" 9'-9" 7'- 1 "12'-11 1/2"3'-8"3'- 8 "13'-0 1/2"9'-9"3'-8"705.09'51'-0"22'-0"32'-9"8'- 0 "8'-0"16'-10 1/2" WC 43 SF WC 43 SF ELEVATOR CAR6'-5"3'-8"CLEAR3'-8"3'- 8 "0'-8"1'- 1 0 "48" MIN1 8 " M I N 1 8 " M I N HALL 9'-8"6'-4"6'-8"DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 CHILDREN'S CENTER L02 PLAN DN 5'-8" (N) PARAPET WALL FOR MECH. AREA 7'-7"8'-5"CANOPY ABOVE 5 4 ' - 2 1 / 2 "20'-9"1 7 ' - 4 1 / 2 "58'-1 " (E) ROOF TO REMAIN (E) ROOF TO REMAIN 12'-0" REVISED BALCONY LINE 20'-0"22'-0"36'-6"8'-0 "8'-0"3'-8"3'-8"8"17'-2" MECHANICAL DECK ELEVATOR MOTOR ROOM 335 SF MECHANICAL DECK300 SF 48 SF SANCTUARY GATE ACCESS ONLY TO AUTHORIZED STAFF FOR MAINTENANCE ACCESS ONLY TO AUTHORIZED STAFF FOR MAINTENANCE DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 4th, 2020 CHILDREN'S CENTER L03 PLAN 7.1.b Packet Pg. 64 DN (N) MEET & GREET PLAZA FALL FALL 6'-2"(E) PLANTER TO REMAIN DN DN DN (E) SANCTUARY TO REMAIN (E) BUILDING TO REMAIN (E) RAMP TO REMAIN (E) PLANTER TO REMAIN (E) STAIRS TO REMAIN11'-1 1/2"20'-8 1/2" 13'-0 1/2" N 20'-0"10'-1 1/2"8'-4 1/2"11'-10 1/2"10'-4 1/2"22'-5 1/2"22'-3"19'-0"29'-4"1'-4"DS EQEQ1'-3"COLORED MEET & GREET PLAZA PLAN LEGEND: THE LANDING SANCTUARY PLANTER BED MEET & GREET PLAZA PLANTS MEET & GREET PLAZA PLAN DRAWING NO: DATE: DRAWING TITLE: PROJECT: DESIGNER: Goble Berriman Design 8032 Regis Way Los Angeles CA 90045 EFREE CHURCH KEY PLAN: 3255 S DIAMOND BAR BLVD DIAMOND BAR, CA 91765 DRAWING SET: PLANNING SUBMISSION N Nov 5th, 2020 AS-7.1 Rev A 7.1.b Packet Pg. 65 Project Status Report CITY OF DIAMOND BAR January 26, 2021 COMMUNITY DEVELOPMENT DEPARTMENT LEGEND PH = PUBLIC HEARING X = NON PUBLIC HEARING AP = ASSIGNED PLANNER PC = PLANNING COMMISSION AR = ADMINISTRATIVE REVIEW CC = CITY COUNCIL PROPERTY LOCATION PLANNING COMMISSION REVIEW File # AP Applicant PC 1/26/21 CC 2/2/21 PC 2/9/21 CC 2/16/21 PC 2/23/21 CC 3/2/21 Housing Element Update 2021-2029 PL2021-004 GL City of Diamond Bar Joint workshop with the City Council (starts at 5:30 pm) 3255 S. Diamond Bar Blvd. (EFree Church Renovate/new construction) DR/CUP Amend PL2020-123 MN Ruben Van Colenberghe PH 1523 Silver Rain Dr. (Addition and remodel to single family residence) DR PL2020-142 MN Jim Pan PH 2825 S. Diamond Bar Blvd. (Time Extension for Planet Fitness CUP) TE PL2019-103 MN ROIC Diamond Hills Plaza, LLC PH ADMINISTRATIVE REVIEW Property Location AP Applicant None PENDING ITEMS Property Location File # AP Applicant Status 1625 Bears Den (Addition to single family residence) DR PL2021-01 MN Pete Volbeda Under Review 2523 Blaze Trail (New single family residence) DR PL2020-49 MN Pete Volbeda Third Incomplete letter sent 10/16/20 - waiting for additional information Crooked Creek (7-unit subdivision) TTM, DR, CUP, TP PL2017-203 MN Rob Meserve Second incomplete letter sent 9/16/20 – waiting for additional information 1114 S. Diamond Bar Blvd. (Veterinarian office) CUP PL2020-120 MN Dr. Ratul Kumar Incomplete letter sent 9/30/20 – waiting for additional information 24011 Falcons View Dr. (Addition and remodel to single family residence) DR PL2020-25 MN William Edwards Under Review 24206 Gingerwood Place (Addition to single family residence) DR PL2020-115 MN Angelo Reginaldo Incomplete letter sent 10/9/20 – waiting for additional information 9.1 Packet Pg. 66 Project Status Report CITY OF DIAMOND BAR Page 2 January 26, 2021 COMMUNITY DEVELOPMENT DEPARTMENT PENDING ITEMS (continued) Property Location File # AP Applicant Status 20657 Golden Springs (Sign program amendment) CUP PL2019-172 MN Sign Express Incomplete letter sent 10/10/19 – waiting for additional information 2234 Indian Creek (New single family residence) DR PL2020-159 MN Jeffrey Sun Incomplete letter sent 1/12/21 – waiting for additional information 2360 Indian Creek (Addition and remodel to single family residence) DR PL2019-185 MN Pete Volbeda Second incomplete letter sent 2/26/20 – waiting for additional information 22938 ½ Ridge Line Rd. (Wireless facility) CUP PL2020-42 NTE/ GL Jill Cleveland Incomplete letter sent 04/01/2020 – waiting for additional information 23121 Ridge Line Rd. (New single family residence) DR PL2020-31 NTE/ MN Pete Volbeda Second incomplete letter sent 12/15/20 – waiting for additional information 23135 Ridge Line Rd. (New single family residence) DR PL2018-233 MN Faiz Ennabe Second incomplete letter sent 2/6/20 – waiting for additional information 9.1 Packet Pg. 67 CITY OF DIAMOND BAR NOTICE OF PUBLIC MEETING AND AFFIDAVIT OF POSTING STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES ) CITY OF DIAMOND BAR ) I, Stella Marquez, declare as follows: I am employed by the City of Diamond Bar, Community Development Department. On January 22, 2021, a copy of the January 26, 2021, Planning Commission Agenda, was posted at the following locations: SCAQMD/Government Center, 21865 Copley Drive Heritage Park, 2900 Brea Canyon Road City website: www.diamondbarca.gov Due to COVID-19 closures, the Planning Commission Agenda could not be posted at the following regular posting locations: Diamond Bar City Hall Diamond Bar Library I declare under penalty of perjury that the foregoing is true and correct. Executed on January 22, 2021, at Diamond Bar, California. Stella Marquez Community Development D partment s ��.�Amaa�ero:a��b aoo Stella Marquez From: Greg Gubman Sent: Tuesday, January 26, 2021 9:11 AM Cc: James H. Eggart; Stella Marquez; Carol Dennis; Grace Lee; Mayuko Nakajima Subject: FW: PUBLIC HEARING - PL2020-123 Dear Planning Commissioners, The email below was submitted regarding the public hearing for the Efree Church addition/renovation. If you have any questions, please feel free to contact May or me. �re� Gubman, AICP � Community Development Director Clay of Diamond Bar 909.839.7631 Irnpadanf Notice: Until further notice, all City facilities, including City Hall, the Diamond Bar Center and Heritage Park will be closed to the public. In the meantime, staff is available to provide services and answer questions by phone and email. For more information, visit www.diamondborca.gov/covidl9 From: Good Luck <gaodluck91776@Bmail.co�ry Sent: Tuesday, January 26, 2021 8:58 AM To: Mayuko Nakajima <MNakaiima@DiamondBarCA.Gov> Subject: PUBLIC HEARING - PL2020-123 CAUTION: This message originated outside of our City of Diamond Bar network. To whom it may, My name is Ying Li. I am the owner of 3155 cherrydale dr, diamond bar. As for project 3255 s diamond bar blvd, diamond bar, i disagree and object the project cause it would cause lots of noises and inconvenience to us the neightboud. the covered patio for gathering and parking, also will bring unsafe concerns to the neighbourhood, including potential crimes. Please consider my objection and thank you so much Ying Li 626-438-7767