Loading...
HomeMy WebLinkAboutPR20180034015 (363)rF;l PERMIT #: PR20180034015 CITY OF DIAMOND BAR COMMUNITY DEVELOPMENT DEPARTMENT 21810 Copley Drive, Diamond Bar, CA 91765 (909) 839-7020 Fax: (909) 861-3217 Building inspection Hotline (909) 839-7027 DI9f OIANIC)NO BAR BUILDING PERMIT APPLICATION www.citvofdiamandbar.com building@diamandbarca.gov JOB SITE ADDRESS: 2775 Shadow Canyon APN LOT# OWNER NAME TRACT# ADDRESS CITY ZIP APPLICANT NAME TEL TEL CONTRACTOR NAME United Site Services ADDRESS 4511 Rowland Ave CITY EI Monte STATE CA ZIP 91731 TEL 626) 698-3090 ARCHIENG/DES NAME ADDRESS CITY STATE CA ZIP TEL P/C DATE P(C# ISSUE DATE 16 Aug 2018 PR# PR20ISM3401S TYPE CONSTRUCTION OCCGROUP SCOPE OF WORK Temporary Power Pole 100 amp #OWELLUNITS #STORIES #BEDROOMS BUILDING FEES DESCRIPTION SO, FT FACTOR PSF ADl AREA/VALUATION SFR/ADD/REM GARAGE/CARPORT PATIO/DECK POOL/SPA ROOF COMMERCIAL TOTAL VALUATION _ TOTAL, Electrical TYPE QUANTITY AMOUNT TOTAL Temporary Semce Power Pole or Pedestal 1 $52 23 $52 23 PLAN CHECK FEES PERMIT FEES CONSTRUCTION PLAN REVIEW ELECTRICAL _ $55 76 PLUMBING MECHANICAL INSPECTION FEE ISSUANCE $45 02 SMIP ENERGY RETENTION FEE $2 79 PRE/ALT FEE _ BASF PLOT FLAN ZONING CLEARANCE RECYCLING AND WASTE DEPOSIT TOTAL FEES: $103 57 COMMENTS PjC RECEIPT it • PAY METHOD VALIDATION PERMIT RECEIPT PAY METHOD VALIDATION PERMIT #: PR20180034015 CITY OF DIAMOND BAR INSPECTION RECORD INSPECTION SETBACK / LETTER .• TRACK AND LEDGER DATE: INSPECTOR: FOOTINGS FORMS T-BAR SLAB POOL DEMOLITION UG PLUMBING ROOF DRAINS UG ELECTRICAL POOL/SPA LIFERGROUND GAS TEST, EL, PL, ME SEWER LATERAL PRE GUNITE SEWER CLEANOUT POOL PRE DECK BONDING MAIN WATER LINE P-TRAP ROOF SHEATHING FENCE / GATE / ALARM FLOOR SHEATHING FINAL POOL SHEAR WALLS EXTERIOR WALLS SHEAR WALLS INTERIOR WALL FOOTING/STEEL FRAMING/VENTING WALL STEEL 1ST( 12ND( I LIFT RO MECHANICAL WALLDRAIN/SEAL RO ELECTRICAL W OCO WALL FINAL RO PLUMBING RO FRAMING PLANNING APPROVAL INSULATION WALL ROUGH FIREAPPROVAL INSULATION CEILING FINAL FIRE DEPARTMENT HOT MOP/SHO W ERPAN FINAL PLANNING DRYWALL FINAL PW ENGINEERING LATH EXTERIOR FINAL PIN MAINTENANCE LATH INTERIOR FINAL HEALTH DEPT GAS TEST FINAL INDUSTRIAL WASTE SCRATCH COAT FINAL BUILDING ELECTRIC METER RELEASE FINAL MECHANICAL GAS METER RELEASE FINAL Eg=ICAL O•ZZ��b !JJ SPECIAL INSPECTION FINAL PLUMBING SMOKE & CARBON MONOXIDE DETECTORS T C OF OCCUPANCY CERT OFOCCUPANCY COMMENTS