Loading...
HomeMy WebLinkAboutPR201800078500 PERMIT #: PR20180007850 CITY OF DIAMOND BAR COMMUNITY DEVELOPMENT DEPARTMENT 21810 Copley Dnve, Diamond Bar, CA 91765 (909)939-7020 Fax: (909) 8614117 Building Inspection Hotline (909) 839-7027 DIAMOND BAR BUILDING PERMIT APPLICATION www.citvofdiamondbar.com building@diamondbarca.gov JOB SITE ADDRESS: 22840 RIDGE LINE RD, Diamond Bar, CA 91765 APN $713030030 LOT# OWNER NAME DUA HARVINDER & GURVINDER TRACT# ADDRESS 631 RIDGEVIEW CT CITY DIAMOND BAR ZIP 91765 APPLICANT NAME TEL <N0 PRIMARY PHONE> TEL CONTRACTOR NAME Dynamic Solar&Electric ADDRESS 944 WINDSONG CT CITY DIAMOND BAR STATE CA ZIP 91765 TEL (909)573.6919 ARCH/ENG/DES NAME ADDRESS -.. . CITY STATE CA ZIP TEL P/C DATE I55UE DATE 07 Mar 2018 P/C# _ PR# PR20180007850 TYPE CONSTRUCTION OCC GROUP SCOPE OF WORK Ground 23120 (68) Mount PV System kW modules #DWELL UNITS 0 #STORIES #BEDROOMS BUILDING FEES DESCRIPTION SO FT FACTORPSF ADJAREA/VALUATION SFR/ADD/REM GARAGE/CARPORT PATIO/DECK POOL/SPA RE -ROOF COMMERCIAL TOTAL VALUATION. TOTAL. $10000 Electrical TYPE QUANTITY AMOUNT TOTAL Photovoltaic Systems 1 $57 75 $57 75 PLAN CHECK FEES PERMIT FEES CONSTRUCTION $87 78 PLAN REVIEW $50 00 ELECTRICAL $69 30 PLUMBING MECHANICAL INSPECTION FEE _ ISSUANCE $75 75 SMIP $910 ENERGY RETENTION FEE $10 07 PRE/ALT FEE BASF $3 00 PLOT PLAN ZONING CLEARANCE RECYCLING AND WASTE DEPOSIT TOTAL FEES: $305 00 COMMENTS P/C RECEIPT # PAY METHOD VALIDATION PERMIT RECEIPT # PAY METHOD VALIDATION .On 14 PERMIT #: PR20180007850 CITY OF DIAMOND BAR INSPECTION RECORD INSPECTION SETBACK / LETTER .. TRACK AND LEDGER DATE: FOOTINGS FORMS 04/23/2018 T-BAR SLAB POOL DEMOLITION UG PLUMBING ROOF DRAINS UG ELECTRICAL POOL/SPA UFER GROUND GAS TEST, EL, PL, ME SEWER LATERAL PRE GUNITE SEWER CLEANOUT POOL PRE DECK BONDING MAIN WATER LINE P-TRAP ROOF SHEATHING FENCE / GATE / ALARM FLOOR SHEATHING FINAL POOL SHEAR WALLS EXTERIOR WADS SHEAR WALLS INTERIOR WALL FOOTING/STEEL FRAMING/VENTING WALL STEEL 1ST( 12ND( I LIFT RO MECHANICAL WALLDRAIN/SEAL RO ELECTRICAL W () C () WALL FINAL RO PLUMBING RO FRAMING PLANNING APPROVAL INSULATION WALL ROUGH FIRE APPROVAL INSULATION CEILING FINAL FIRE DEPARTMENT HOT MOP/SHOW ERPAN FINAL PLANNING DRYWALL FINAL PW ENGINEERING LATH EXTERIOR FINAL PWMAINTENANCE LATH INTERIOR FINAL HEALTH DEFT GAS TEST FINAL INDUSTRIAL WASTE SCRATCH COAT FINAL BUILDING p O ELECTRIC METER RELEASE FINAL MECHANICAL GAS METER RELEASE FINAL ELECTRICAL U SPECIAL INSPECTION FINAL PLUMBING SMOKE & CARBON MONOXIDE DETECTORS T C OF OCCUPANCY CERT OF OCCUPANCY COMMENTS