PERMIT #: PR20180007850
CITY OF DIAMOND BAR
COMMUNITY DEVELOPMENT DEPARTMENT
21810 Copley Dnve, Diamond Bar, CA 91765
(909)939-7020 Fax: (909) 8614117 Building Inspection Hotline (909) 839-7027
DIAMOND BAR BUILDING PERMIT APPLICATION www.citvofdiamondbar.com building@diamondbarca.gov
JOB SITE ADDRESS: 22840 RIDGE LINE RD, Diamond Bar, CA 91765
APN $713030030 LOT#
OWNER NAME DUA HARVINDER & GURVINDER
TRACT#
ADDRESS 631 RIDGEVIEW CT
CITY DIAMOND BAR ZIP 91765
APPLICANT NAME
TEL <N0 PRIMARY PHONE>
TEL
CONTRACTOR NAME Dynamic Solar&Electric
ADDRESS 944 WINDSONG CT
CITY DIAMOND BAR STATE CA
ZIP 91765 TEL (909)573.6919
ARCH/ENG/DES NAME
ADDRESS -..
.
CITY STATE CA
ZIP TEL
P/C DATE
I55UE DATE 07 Mar 2018
P/C# _
PR# PR20180007850
TYPE CONSTRUCTION
OCC GROUP
SCOPE OF WORK Ground
23120
(68)
Mount PV
System
kW
modules
#DWELL UNITS 0 #STORIES
#BEDROOMS
BUILDING FEES
DESCRIPTION
SO FT
FACTORPSF
ADJAREA/VALUATION
SFR/ADD/REM
GARAGE/CARPORT
PATIO/DECK
POOL/SPA
RE -ROOF
COMMERCIAL
TOTAL VALUATION.
TOTAL.
$10000
Electrical
TYPE
QUANTITY
AMOUNT
TOTAL
Photovoltaic Systems
1
$57 75
$57 75
PLAN CHECK FEES
PERMIT FEES
CONSTRUCTION
$87 78
PLAN REVIEW
$50 00
ELECTRICAL
$69 30
PLUMBING
MECHANICAL
INSPECTION FEE
_
ISSUANCE
$75 75
SMIP
$910
ENERGY
RETENTION FEE
$10 07
PRE/ALT FEE
BASF
$3 00
PLOT PLAN
ZONING CLEARANCE
RECYCLING AND WASTE DEPOSIT
TOTAL FEES:
$305 00
COMMENTS
P/C RECEIPT #
PAY METHOD VALIDATION
PERMIT RECEIPT #
PAY METHOD VALIDATION
.On
14
PERMIT #: PR20180007850
CITY OF DIAMOND BAR
INSPECTION RECORD
INSPECTION
SETBACK / LETTER
..
TRACK AND LEDGER
DATE:
FOOTINGS FORMS
04/23/2018
T-BAR
SLAB
POOL DEMOLITION
UG PLUMBING
ROOF DRAINS
UG ELECTRICAL
POOL/SPA
UFER GROUND
GAS TEST, EL, PL, ME
SEWER LATERAL
PRE GUNITE
SEWER CLEANOUT
POOL PRE DECK BONDING
MAIN WATER LINE
P-TRAP
ROOF SHEATHING
FENCE / GATE / ALARM
FLOOR SHEATHING
FINAL POOL
SHEAR WALLS EXTERIOR
WADS
SHEAR WALLS INTERIOR
WALL FOOTING/STEEL
FRAMING/VENTING
WALL STEEL 1ST( 12ND( I LIFT
RO MECHANICAL
WALLDRAIN/SEAL
RO ELECTRICAL W () C ()
WALL FINAL
RO PLUMBING
RO FRAMING PLANNING
APPROVAL
INSULATION WALL
ROUGH FIRE APPROVAL
INSULATION CEILING
FINAL FIRE DEPARTMENT
HOT MOP/SHOW ERPAN
FINAL PLANNING
DRYWALL
FINAL PW ENGINEERING
LATH EXTERIOR
FINAL PWMAINTENANCE
LATH INTERIOR
FINAL HEALTH DEFT
GAS TEST
FINAL INDUSTRIAL WASTE
SCRATCH COAT
FINAL BUILDING
p
O
ELECTRIC METER RELEASE
FINAL MECHANICAL
GAS METER RELEASE
FINAL ELECTRICAL
U
SPECIAL INSPECTION
FINAL PLUMBING
SMOKE & CARBON
MONOXIDE DETECTORS
T C OF OCCUPANCY
CERT OF OCCUPANCY