Loading...
HomeMy WebLinkAboutPR20180034030PERMIT #: PR20180034030 CITY OF DIAMOND BAR COMMUNITY DEVELOPMENT DEPARTMENT 21810 Copley Drive, Diamond Bar, CA 91765 (909) 839-7020 Fax: (909) 861-3117 Building Inspection Hotline (909) 839-7027 DIAiAAC9NO BAR BUILDING PERMIT APPLICATION www.cetVofdiamondbar.com budding@diamondbarca.gov JOB SITE ADDRESS: 562 PINTO MESA OR, DIAMOND BAR, CA 9176S APN 8281003013 LOT# OWNER NAME CHUNG KEVIN C TRACT# ADDRESS 562 PINTO MESA OR ............ CITY DIAMOND BAR ZIP 9176S APPLICANT NAME TEL <NO PRIMARY PHONE> TEL CONTRACTOR NAME Amenserve Repiping ADDRESS 16837 Parthema CITY Northridge STATE CA Zip 91343 TEL (818) 787.9777 ARCH/ENG/DES NAME ADDRESS CITY STATE CA ZIP TEL P/C DATE ISSUE DATE 20Aug 2018 PIC# PR# PR20180034030 TYPE CONSTRUCTION OCC GROUP SCOPE OF WORK:-"- Pex R"pe---,-..a-- � #DWELL UNITS #STORIES #BEDROOMS BUILDING, FEES DESCRIPTION SO, FT FACTOR PSF ADJ AREA/VALUATION SFR/ADD/REM GARAGE/CARPORT PATIO/DECK POOL/SPA RE -ROOF COMMERCIAL TOTAL VALUATION TOTAL, Plumbing TYPE QUANTITY AMOUNT TOTAL Plumbing Fixture / Trap or Set of Fixtures 11 $19 82 $218 02 Water Heater (Changeout Same Location) 1 $19 82 51982 PLAN CHECK FEES PERMIT FEES CONSTRUCTION PLAN REVIEW ELECTRICAL PLUMBING $237 84 MECHANICAL INSPECTION FEE ISSUANCE $45 02 SMIP ENERGY RETENTION FEE $1189 PRE/ALT FEE BASF PLOT PLAN ZONING CLEARANCE RECYCLING AND WASTE DEPOSIT TOTAL FEES- $294 75 COMMENTS P/C RECEIPT # PAY METHOD VALIDATION PERMIT RECEIPT # PAY METHOD VALIDATION PERMIT #: PR20180034030 INSPECTION►• SETBACK / LETTER ♦• • TRACK AND LEDGER ►INSPECTOR: FOOTINGS FORMS T BAR SLAB POOL DEMOLITION UG PLUMBING ROOF DRAINS UG ELECTRICAL POOVSPA UFER GROUND GAS TEST, EL, PL, ME SEWER LATERAL PRE GUNITE SEWER CLEANOUT POOL PRE DECK BONDING MAIN WATER LINE P•TRAP ROOF SHEATHING FENCE / GATE / ALARM FLOOR SHEATHING FINAL POOL SHEAR WALLS EXTERIOR WALLS SHEAR WALLS INTERIOR WALL FOOTING/STEEL FRAMINGIVENTING WALL STEEL LET(2ND(j LIFT RO MECHANICAL WALLDRAIN/SEAL RO ELECTRICAL W (j C j j WAIL FINAL AD PLUMBING -,"At } j RO FRAMING PLANNING APPROVAL INSULATION WALL ROUGH FtREAPPROVAL INSULATION CEIUNG FINAL FIRE DEPARTMENT HOT MOP/SHOWERPAN FINAL PLANNING DRYWALL FINAL PW ENGINEERING LATH EXTERIOR FINALPW MAINTENANCE LATH INTERIOR FINALHEALTHOEPT GAS TEST FINAL RYOUSTRIAL WASTE SCRATCH COAT FINAL BUILDING ELECTRIC METER RELEASE FINAL MECHANICAL GAS METER RELEASE FINAL ELECTRICAL SPECIAL INSPECTION FINAL PLUMBING - SMOKE B CARBON MONOXIDE DETECTORS T C OF OCCUPANCY CERT. OF OCCUPANCY COMMENTS