HomeMy WebLinkAboutPR20180034624 (372)0 V PERMIT If: PR20180034624
CITY OF DIAMOND BAR
COMMUNITY DEVELOPMENT DEPARTMENT
21810 Copley Drive, Diamond Bar, CA 91765
(909) 839-7020 Fax: (909) 861-3117 Building Inspection Hotline (909) 839-7027
DIAMOND BAR BUILDING PERMIT APPLICATION www.cttvofdiamondbar.com building@diamondbarca.gov
JOB SITE ADDRESS, 1505 MAPLE HILL RD, DIAMOND BAR, CA 91765
APN 8293023010 LOT# TRACT#
OWNER NAME MOORE MACKW A&BONITAD
...............
ADDRESS 1505 MAPLE HILL RD
CITY DIAMOND BAR ZIP 91765 TEL <NO PRIMARY PHONE>
APPLICANT NAME TEL
CONTRACTOR NAME SOLARMAK RENEWABLE ENERGY PROVIDER INC
ADDRESS 30801ZTH STREET
...................
CITY %verside STATE CA ZIP 92507 TEL 951)300-0788
ARCH/ENGJDES NAME
ADDRESS
CITY STATE CA ZIP TEL
P/C DATE P(C#
ISSUE DATE 29 Nov 2018 PR# PR20180034624
TYPE CONSTRUCTION OCCGROUP
SCOPE OF WORK Roof mounted (18) solar pariels 5 94 kW with 200 amp panel upgrade
#DWELL UNITS 0 #STORIES #BEDROOMS
BUILDING FEES
DESCRIPTION
SCL FT
FACTOR PSF
ADJ AREA/VALUATION
SFR/ADD/REM
GARAGEICARPORT
PATIO/DECK
POOL/SPA
RE -ROOF
COMMERCIAL
TOTAL VALUATION
TOTAL
$17,000 DODD
Electrical
TYPE
QUANTITY
AMOUNT
TOTAL
Photovoltaic Systems
1
$7199
$7199
Panel Upgrade (less than 200 amps)
1
S46 64
$46 64
PLAN CHECK FEES
PERMIT FEES
CONSTRUCTION
$90 94
PLAN REVIEW
$5000
ELECTRICAL
$118 63
PLUMBING
MECHANICAL
INSPECTION FEE
ISSUANCE
$78 69
SMIP
$2 21
ENERGY
RETENTION FEE
$22 00
PREIALT FEE
BASF
$100
PLOT PLAN
ZONING CLEARANCE
RECYCLING AND WASTE DEPOSIT
TOTAL FEES:
$363 47
COMMENTS
P'C RECEIPT # PAY METHOD VALIDATION
PERMIT RECEIPT # PAY METHOD VALIDATION
PERMIT #: PR20180034624-
•
SETBACK / LETTER
•'
f
TRACK AND LEDGER
DATE:
FOOTINGS FORMS
T-BAR
SLAB
POOL DEMOLITION
UG PLUMBING
ROOF DRAINS
US ELECTRICAL
POOL/SPA
LIFER GROUND
'', GAS TEST, EL, PL. ME
SEWER LATERAL
PRE GUNITE
SEWER CLEANOUT
POOL PRE DECK BONDING
MAIN WATER LINE
P-TRAP
ROOF SHEATHING
FENCE / GATE / ALARM
FLOORSHEATHING
I
FINAL POOL
SHEAR WALLS EXTERIOR
WALLS
SHEAR WALLS INTERIOR
WALL FOOTING/STEEL
FRAMINGAIENTING
WALL STEEL 1ST() 2ND{) LIFT
RO MECHANICAL
WALL DRAIN/SEAL
RO ELECTRICAL W {) C O
WALL FINAL
RO PLUMBING
AO FRAMING PLANNING
APPROVAL
INSULATION WALL
ROUGH FIREAPPROVAL
INSULATION CEILING
FINAL FIRE DEPARTMENT
HOT MOP/SHOW ERPAN
FINAL PLANNING
DRYWALL
FINAL PIN ENGINEERING
LATH EXTERIOR
FINAL PIN MAINTENANCE
LATH INTERIOR
FWALHEALTNDEPT
GAS TEST
FINAL INDUSTRIAL WASTE
SCRATCH COAT
FINAL RLNUMNG
ELECTRIC METER RELEASE
FINAL MECHANICAL
GAS METER RELEASE
FINAL ELSMICAL
SPECIAL INSPECTION
FINAL PLUMBING
SMOKE & CARBON
MONOXIDE DETECTORS
T C OF OCCUPANCY
CERT OF OCCUPANCY
COMMENTS