Loading...
HomeMy WebLinkAboutPR20180034050PERMIT #: PR20180034050 { CITY OF DIAMOND BAR COMMUNITY DEVELOPMENT DEPARTMENT 21810 Copley Drive, Diamond Bar, CA 91765 (909) 839-7020 Fax: (909) 861-3117 Building Inspection Hotline (909) 839-7027 DIAMOND BAR BUILDING PERMIT APPLICATION www.citvofdtamondbar.com building@diamondbama.gov 10B SITE ADDRESS: 2506 CROW FOOT LN, DIAMOND BAR, CA 9176S APN 8713037021 LOT# TRACT# OWNER NAME CHEN LAMES& PEI CHI ADDRESS 2506 CROW FOOT LN CITY DIAMOND BAR ZIP 91765 TEL <NO PRIMARY PHONE> APPLICANT NAME TEL CONTRACTOR NAME Pacific Stonegate, Inc DBA Solar Vast ADDRESS 8727 Lanyard Ct _ CITY Ranctro Cucamonga STATE CA ZIP 91730. TEL (626I239-1698 ARCH/ENG/DES NAME _ ADDRESS CITY STATE CA ZIP TEL P/C DATE P/C# ISSUE DATE 28 Aug 2018 PR# PR20180034050 TYPE CONSTRUCTION OCCGROUP SCOPE OF WORK. Roof mounted 28) solar 9 66 kW, 2W amp panel upgrade #DWELL UNITS 0 #STORIES #BEDROOMS BUILDING FEES DESCRIPTION SQ FT FACTOR PSF AD) AREA%VALUATION SFR/ADD/REM GARAGE/CARPORT PATIO/DECK POOLISPA RE -ROOF COMMERCIAL TOTAL VALUATION TOTAL• $30,000 0000 Electrical TYPE QUANTITY AMOUNT TOTAL Photovoltaic Systems 1 $7199 $7199 Panel Upgrade (less than 200 amps) 1 $4664 $4664 PLAN CHECK FEES PERMIT FEES CONSTRUCTION $98 25 PLAN REVIEW $50 00 ELECTRICAL _ _ $118 63 PLUMBING MECHANICAL INSPECTION FEE ISSUANCE $78 69 SMIP $3 90 ENERGY RETENTION FEE $12 00 PRE/ALTFEE BASF $2 00 PLOT PLAN--- ZONING CLEARANCE RECYCLING AND WASTE DEPOSIT TOTAL FEES! $36347 COMMENTS P/C RECEIPT # PAY METHOD VALIDATION _.... PERMIT RECEIPT # PAY METHOD VALIDATION PERMIT #: PR20180034050 CITY OF 1_ INSPECTION.• SETBACK / LETTER TRACK AND LEDGER DATE: FOOTINGS FORMS T-BAR SLAB POOL DEMOLITION UG PLUMBING ROOF DRAINS UG ELECTRICAL POOLISPA UFER GROUND GAS TEST, EL, PL, ME SEWER LATERAL PRE GUNITE SEWER CLEANOUT POOL PRE DECK BONDING MAIN WATER LINE P-TRAP ROOF SHEATHING FENCE / GATE / ALARM FLOOR SHEATHING FINAL POOL SHEAR WALLS EXTERIOR WALLS SHEAR WALLS INTERIOR WALL FOOTING/STEEL FRAMING/VENTING WALL STEEL 15TI ) 2NDO LIFT RO MECHANICAL WALL DRAIN / SEAL SO ELECTRICAL W { j C { J WALL FINAL SO PLUMBING SO FRAMING PLANNING APPROVAL INSULATION WALL ROUGH FIREAPPROVAL INSULATION CEILING FINALFIREDEPARTMENT HOT MOP/SHOWERPAN FINAL PLANNING DRYWALL FINAL PWENGINEERING LATH EXTERIOR FINAL PW AMA17EMAICE LATH INTERIOR FINALHEALTNDEPT GASTEST FINAL INDUSTRLAL WASTE SCRATCH COAT FINAL BUILDING ELECTRIC METER RELEASE ANAL MECHANICAL GAS METER RELEASE ANAL ELE SPECIAL INSPECTION FINAL PLUMBING d+• SMOKE & CARBON MONOXIDE DETECTORS TC OF OCCUPANCY CERT OF OCCUP6N2 COMMENTS