HomeMy WebLinkAboutPR20180034096b-11111
A '
C_/ ✓
PERMIT #: PR20180034096
CITY OF DIAMOND BAR
COMMUNITY DEVELOPMENT DEPARTMENT
21810 Copley Drive, Diamond Bar, CA 91765
(909) 839-7020 Fax: (909) 861-3117 Building Inspection Hotline (909) 839-7027
DIAMOND BAR BUILDING PERMIT APPLICATION www.citvofdiamondbar.com building@diamondbarca.gov
JOB SITE ADDRESS: 24234 BRECKENRIDGE CT, DIAMOND BAR, CA 91765
APN 8701039004 LOT# TRACT#
OWNER NAME MO DAI HONG
ADDRESS 24234 BRECKENRIDGE CT
CITY DIAMOND BAR ZIP 91765 TEL <NO PRIMARY PHONE>
APPLICANT NAME TEL
CONTRACTOR NAME Ray Young Electric Corp
ADDRESS 1903 Merced Ave
CITY S El Monte STATE CA ZIP 91733 TEL (626) 712-3032
ARCH/ENG/DES NAME
ADDRESS
CITY STATE CA ZIP TEL
P/C DATE P/C#
ISSUE DATE 28 Aug 2018 PR# PR20180034096
TYPE CONSTRUCTION OCCGROUP
SCOPE OF WORK MPU -125A TO 200A PANEL UPGRADE
#DWELL UNITS #STORIES #BEDROOMS
BUILDING FEES
DESCRIPTION
SO, FT
FACTOR PSF
ADJ AREA/VALUATION
SFR/ADD/REM
GARAGE/CARPORT
PATIO/DECK
POOL/SPA
RE -ROOF
COMMERCIAL
TOTALVALUATION-
TOTAL -
Electrical
TYPE
QUANTITY
AMOUNT
TOTAL
Panel Upgrade (200-1000 amps)
S72 28
$72 28
PLAN CHECK FEES
PERMIT FEES
CONSTRUCTION
PLAN REVIEW
ELECTRICAL
$72 28
PLUMBING
MECHANICAL
INSPECTION FEE
ISSUANCE
$45 02
SMIP
ENERGY
TENTION FEE
$3 61
PRE/ALT FEE
BASF
PLOT PLAN
ZONING CLEARANCE
RECYCLING AND WASTE DEPOSIT
TOTAL FEES:
$120 91
COMMENTS
P/C RECEIPT # PAY METHOD VALIDATION
PERMIT RECEIPT# PAY METHOD VALIDATION
1........ • i # i
141
in NUIR i • ' i
INSPECTION•
SETBACK/LETTER
TRACK AND LEDGER
••INSPECTOR:
FOOTINGS FORMS
T-BAR
SLAB
POOL DEMOLITION
UG PLUMBING
ROOFORAINS
UG ELECTRICAL
PLTOL/SPA
UFER GROUND
GAS TEST, EL, PL, ME
SEWER LATERAL
PRE GUNITE
SEWER CLEANOUT
POOL PRE DECK BONDING
MAIN WATER LINE
P-TRAP
ROOF SHEATHING
FENCE / GATE / ALARM
FLOOR SHEATHING
FINAL POOL
SHEAR WALLS EXTERIOR
WALLS
SHEAR WALLS INTERIOR
WALL FOOTINGISTEEL
FRAMING/VENTING
WALL STEEL 1ST{) 2ND{) LIFT
RO MECHANICAL
WALL DRAIN/SEAL
RO ELECTRICAL W () C ()
WALL FINAL
RO PLUMBING
RO FRAMING PLANNING
APPROVAL
INSULATION WALL
ROUGH FIREAPPROVAL
INSULATION CEILING
FINAL FIRE DEPARTMENT
NOT MOP/SHOW ERPAN
FINAL PLANNING
DRYWALL
FINAL PW ENGINEERING
LATH EXTERIOR
FINAL PWMALNTENANCE
LATH INTERIOR
FINAL HEALTNDFPT
''..
GAS TEST
FINAL WOUSM14L WASTE
SCRATCH COAT
FNAAL BUILDING
ELECTRIC METER RELEASE
FINAL MECHANICAL
Q
GASMETERRELEASE
FINAL ELECTRICAL
SPECIAL INSPECTION
FINAL PLUMBING
SMOKE & CARBON
MONOXIDE DETECTORS
'..
TC OF OCCUPANCY
CERT OF OCCUPANCY
COMMENTS