HomeMy WebLinkAboutPC 99-17PLANNING COMMISSION
RESOLUTION NO. 99-17
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF DIAMOND -BAR APPROVING DEVELOPMENT
REVIEW NO. 99-4 AND NEGATIVE DECLARATION
NO. 99-5, A REQUEST TO CONSTRUCT A TWO-STORY
OFFICE BUILDING OF APPROXIMATELY 18,400 GROSS
SQUARE FEET. THE PROJECT SITE IS LOCATED AT
1315 S. VALLEY VISTA DRIVE, (LOT 5, TRACT
NO. 39679) DIAMOND BAR, CALIFORNIA.
1. The property owner, Diamond Bar Business Associates c/o AEW
Capital Management, LP and applicant, Bernard Abrams of
V -Tek Systems Corporation, have filed an application for
Development Review No. 99-4 and Negative Declaration
No. 99-5 for a property located at 1315 S. Valley Vista
Drive, Diamond Bar, Los Angeles County, California.
Hereinafter in this Resolution, the subject Development
Review and Negative Declaration shall be referred to as the
"Application".
2. On June 22 1999 the PlanningCommission ss on of the City of
Diamond Bar conducted a duly noticed public hearing on the
Application.
3. Notification of the public hearing for this project was
provided in the San Gabriel Valley Tribune and Inland Valley
Daily Bulletin newspapers on June 1, 1999. Public hearing
notices were mailed to approximately 14 property owners of
record within a 500 -foot radius of the project on May 24,
1999. Furthermore, the project site was posted with the
required display board on May 19, 1999.
B. Resolution.
NOW, THEREFORE, it is found, determined and resolved by the
Planning Commission of the City of Diamond Bar as follows:
1. This Planning Commission hereby specifically finds that all
of the facts set forth in the Recitals, Part A, of this
Resolution are true and correct.
2. The Planning Commission hereby finds that the Initial Study
review and Negative Declaration No. 99-5 have been prepared
U, by the City of Diamond Bar in compliance with the
1
requirement of the California Environmental Quality Act
(CEQA) and guidelines promulgated thereunder, pursuant to
Section 15070. Furthermore, Negative Declaration No. 99-5
reflects the independent judgement of the City of Diamond �;I^I,
Bar. C,I? if
3. The Planning Commission hereby specifically finds and
determines that, having considered the record as a whole
including the findings set forth below, and changes and
alterations which have been incorporated into and
conditioned upon the proposed project set forth in the
application, there is no evidence before this Planning
Commission 'that 'the project proposed'herein will have the
potential of an adverse effect on wild life resources or the
habitat upon which the wildlife depends. Based upon
substantial evidence, this Planning Commission hereby rebuts
the presumption of adverse effects contained in
Section 753.5 (d) of Title 14 of the California Code of
Regulations.
4. Based on the findings and conclusions set forth herein, this
Planning Commission hereby finds as follows:
(a) The project relates to an irregular-shaped, vacant lot,
approximately 2.53 with a 41,000 square foot graded
pad. The project site is bound by descending slopes on
the south and west, by Valley Vista Drive'on the east
and Gateway Center Drive on the north. The project
site contains a catch basin and two -ten foot wide
easements, outside of the development envelope. The
catch basin is located in the northwest corner of the
site. One easement is for the sanitary sewer. It
traverses the site generally in an east/west direction
and within the rear portion of the site. The other
easement is for the storm drain and storm drain ingress
and egress. It traverses the site in a north/south-
direction
orth/southdirection and generally within the north/east portion
of the site. The project site was mass graded as part
of the overall, grading for the corporate complex.
(b) The project site has a General Plan land use
designation of Professional Office (OP). Pursuant to
the General Plan, this land use designation provides
for the establishment of office -based working
environments for general, professional, and
administrative offices, as well as support uses.
Additionally, development within the OP designation
will maintain a maximum floor area ratio (FAR) of 1.00.
(c) The project site is within the Professional Office -
Billboard Exclusion -Unilateral Contract (OP-BE-U/C)
Zone. This zoning designation permits general office
uses.
(d) Generally, the following zones and use surround the
r project site: To the north is the Orange Freeway
(SR 57); and to the south, east and west is the OP-BE-
U/C Zone. The project site is also located within the
City's Redevelopment Agency's Economic Revitalization
Area.
(e) The Application request is to construct a two-story
office building of approximately 18,400 gross square
feet. (17,500 net square feet) to be utilized for
general office.
(f) The design and layout of the proposed development is
consistent with the applicable elements of the City's
General Plan, City Design Guidelines, and development
standards of the applicable district, design
guidelines, and architectural criteria for special
areas (e.g., theme areas, specific plans, community
plans, boulevards or planned developments).
The proposed project provides for the establishment of
an office -based working environment for general
offices within the General Plan's OP land use
designation. Pursuant to the General Plan, the
proposed project will yield a pleasant environment for
those working and visiting the office facility through
its exemplary design, use of materials and colors,
landscaping that will offer a variety of plant species
and adequate on-site parking. Additionally, the
proposed project complies with the development
standards prescribed in the Gateway Corporate Center
Unilateral Contract and has received the approval of
the Gateway Corporate Center Architectural Committee.
(g). The design and layout of the proposed development will
not interfere with the use and enjoyment of neighboring
existing or future development and will not create
traffic or pedestrian hazards.
The proposed project is within the Professional
Office -Billboard Exclusion -Unilateral Contract (O.P-BE-
U/C) Zone, which permits the proposed general office
use. The project site is within the established
Gateway Corporate Center, which permits general office
uses. General office uses were reviewed and approved
with the original approval of the Center processed by
Los Angeles County. Additionally, the Center's
certified Environmental Impact Report reviewed impacts
related to traffic and pedestrians. As a result, the
following traffic mitigation measures were required
and were installed.
(1) Improve that portion
along Golden Springs
Corporate Center.
of the proposed bikeway
Drive fronting on Gateway
(2) Golden Springs Drive shall be widened to provide
left -turn pockets at both entrance streets to the
Center.
(3) Traffic signals shall be installed on Golden
Springs Drive, at the two entrance drives to the
Center.
Additionally, a traffic impact analysis dated
April 22, 1999, and supplemental traffic impact
analysis (responding to City comments) dated May 26,
1999 prepared by Linscott, Law and Greenspan
recommends the following:
(1) Widen and/or re -stripe the northbound approach on
Golden Springs Drive to provide dual left lanes;
(2) Modify the existing traffic signal phasing to
provide northbound right -turn, eastbound right -
turn and southbound right -turn overlap phased;
and
(3) Northbound right -turn overlap will require that
all westbound U-turns along Grand Avenue be
prohibited.
The identified traffic improvement measures are
expected to mitigate the impacts of existing traffic,
mitigate the impact of future and background and
project traffic; and improve LOS at Grand Avenue and
Golden Springs Drive to an acceptable range.
(h) The architectural design -of the proposed development is
compatible with the character of the surrounding
neighborhood and will maintain the harmonious, orderly
and attractive development contemplated by
Chapter 22.48.20. Development Review standards, City
Design Guidelines and the City's General Plan.
As also referenced in Item 4. (f) above, and
(i) below, the proposed project will be consistent and
compatible with the architectural design, materials,
and colors of the other office buildings within the
Gateway Corporate Center and its Unilateral Contract
originally reviewed and approved by Los Angeles
County and adopted by the City of Diamond Bar. The
Unilateral .Contract sets forth land restrictions
/development standards. The development standards
require an architectural style that is
I
--Jl.riLU I
Modern/Contemporary ,r with materials, textures and
colors that complement this style. The proposed
project has received the Center's architectural
committee's approval. Therefore, the proposed project
will be compatible with the character of the
surrounding neighborhood and will maintain the
harmonious, orderly and attractive development
contemplated by the City's Development Review
requirements and General Plan.
(i} The design of the proposed development will provide a
desirable environment for its occupants and visiting
public as well as its neighbors through good aesthetic
use of materials, texture, and color that will remain
aesthetically appealing and will retain a reasonably
adequate level of maintenance.
As referenced in the above findings, the proposed
project will provide a desirable environment for its
occupants and visiting public as well as its neighbors
through good aesthetic use of materials, texture and
color that will remain aesthetically appealing. The
construction materials, Smokey Grey glazing and Dove
Grey plaster will retain a reasonably adequate level
of maintenance.
(j) The proposed development will not be detrimental to
public health, safety or welfare or materially
injurious (e.g. negative affect on property values or
resale(s) of property) to the properties or
improvements in the vicinity; and
Before the issuance of any City permits, the proposed
project is required to comply with all conditions
within the approved resolution and the Building and
Safety Division, Public Works Division, Health
Department and Fire Department requirements. The
referenced agencies' involvement will ensure that the
proposed revision is not detrimental to the public
health, safety or welfare or materially injurious to
the properties -or improvements in the vicinity.
(k) The proposed project has been reviewed in compliance
with the provisions of the California Environmental
Quality Act (CEQA).
Pursuant to the provisions of CEQA, the City has
determined that a Negative Declaration is required for
this project. According to CEQA Section 15070,
Negative Declaration No. 99-5 has been prepared. The
Negative Declaration's review period began June 1, 1999
and ended June 21, 1999.
5
(1) The proposed project will be in substantial compliance
with the adopted Economic Revitalization Area.
The proposed project is located within the Economic
Revitalization Area. The proposed project is
consistent with the Economic Revitalization Area Plan
in that it implements the General Plan's policies,
goals, objectives and strategies. Additionally, the
proposed project provides an opportunity for office
uses; promotes the economic development of the Project
Area by providing an attractive, well -serviced, well -
protected environment for all residents and visitors;
promotes local job opportunities; and implements
design and use standards that assure high aesthetic
and environmental quality, and provide unity and
integrity to developments within the Project Area.
5. Based on ,the findings and conclusions set forth above, the
Planning Commission hereby approves the Application subject
to the following conditions:
(a) The project shall substantially conform to site plan,
grading plan, floor plan, elevations, final
landscape/irrigation plan, final exterior and parking
lot lighting plan/study and colors/materials board
collectively labeled as Exhibit "A" dated June 22,
1999, as submitted and approved by the Planning 771
Commission, as amended herein;
(b) The site shall be maintained in a condition, which is
free of debris both during and after the construction,
addition, or implementation of the entitlement granted
herein. The removal of all trash, debris, and refuse,
whether during or subsequent to construction shall be
done only by the property owner, applicant or by a duly
permitted waste contractor, who has been authorized by
the City to provide collection, transportation, and
disposal of solid waste from residential, commercial,
construction, and industrial areas within the City. It
shall be the applicant's obligation to insure that the
waste contractor utilized has obtained permits from the
City of Diamond Bar to provide such services;
(c) Before the issuance of any City permits, the applicant
shall submit a final landscape/ irrigation plan that
delineates plant species, size, quantity and location,
for the City's review and approval. The final
landscape plans shall also include existing planting
material on all slopes and the species, size, quantity
and location of the replacement plant material
destroyed during construction. In order to mitigate thei';G,,,
view of the retaining walls and the portion of the
north building elevation utilized to extend the
0
! —Il__.• ruu 1 � 11.11 IIIA ni«IYUnM— --Il—-t=�_Jllvtl�u-_ — __ _Jle_n.�GLdW9t iMi*r.axlnmx�uxnWnunNrwar _il_. _- J -_ _—
buildable pad, the lah'(4scaping shall be enhanced to the
satisfaction of the Planning Division. The landscape/
F -s irrigation plan shall comply with the City's
established Water Efficient Landscape Regulations and
shall be plan checked accordingly. All landscaping and
irrigation shall be installed before final inspection;
(d) Before the issuance of any City permits, the applicant
shall submit an exterior lighting plan/study for the
City's review and approval. Lighting shall comply with
all applicable Development Code standards;
(e) All roof -mounted equipment shall be screened from
public view;
(f) Prior to the issuance of a building permit, the
applicant shall submit a final detail 'of the
trash/recycle bin enclosure for the City's review and
approval;
(g) Prior to final inspection/ occupancy, the applicant
shall pay their "fair -share" (0.49 percent) of the
installation of the following traffic improvements
measures to the intersection of Golden Springs
Drive/Grand Avenue as required by the Deputy Public
Works Director:
F
(1) Widen and/or re -stripe the northbound approach on
Golden Springs Drive to provide dual left lanes;
(2) Modify the existing traffic signal phasing to
provide northbound right -turn, eastbound right -
turn and southbound right -turn overlap phased;
and
(3) Northbound right -turn overlap will require that
all westbound U-turns along Grand Avenue be
prohibited.
(h) Two parking stalls located furthest north in the
parking lot shall be reconfigured to provide a back-up
turning area, which allows for easier maneuverability
for the City's review and approval.
(i) Proposed retaining walls shall not exceed a height of
six feet.
(j) Applicant shall remove and replace the following to the
satisfaction of the Deputy Public Works Director:
(1) Damaged sidewalk along,the west side of Gateway
Center Drive, immediately north of the site;
7
----__. - - -� -- --...
II IIID III�I LL I 1 �._��,�,��,�,,,��.__T��m m,-�._,-,� II r I , , ., .__ .:uxw_-_a_
(2) Damaged section of sidewalk to the north that
contains a manhole; and
(3) Concrete drainage ditch below the site.
ljliN;���lf
(k) Prior to the issuance of� any City permits, the
applicant shall submit a complete grading plan in
accordance with the City's grading requirements for the
City's review and approval. The grading plan shall:
(1) Be signed/stamped by a civil engineer,
geotechnical engineer and geologist as required;
(2) Delineate the proposed and existing topography;
(3) Delineate finish surface, finish grade, flow
lines, top of wall, bottom of wall, bottom of
footing and finished surface for proposed
retaining walls;
(4) Delineate proper drainage with details and
sections; and
(5) Delineate slope ratio.
(1) Plans shall delineate retaining wall sections drawn to
scale with appropriate details, type of retaining wall
and structural calculations.
(m) Before the issuance of any City permits, the applicant
shall submit an erosion control plan for the City's
review and approval. The erosion control plan shall
conform to National Pollutant Discharge Elimination
System (NPDES) standards and incorporate the
appropriate Best Management Practices (BMP's).
Additionally, the applicant shall obtain the necessary
NPDES.permits.
(n) The applicant shall be responsible for sewer and storm
drain system/lateral installation and shall ensure
connection with the L. A. County Department of Public
Works for storm drain and sewer lateral if there are
none currently available. Additionally, the applicant
shall pay the County Sanitation District for connection
fees. Furthermore, the applicant shall be responsible
for all costs associated with the improvement,' review
and approval for the addition of sewer or storm drains.
(o) Sidewalks, curbs and gutters, etc. damaged during
construction shall be removed and replaced by the
applicant to the satisfaction of the Deputy Public
Works Director. 0
A
(p) No permanent structures shall encroach onto storm drain
lines or easements.
(q) The applicant shall obtain an encroachment permit for
all off-site improvements.
(r) Driveway slope shall not exceed 15 percent.
(s) All handicap parking shall comply with current State
handicap accessible regulation. Van parking shall be
provided. Site plan shall delineate path of travel
from parking lot,to building. Cross slope shall not
exceed two percent. All bathroom and ramps shall be
designed in compliance with State handicap accessible
regulations. Required handicap signage shall be
installed at each entrance.
(t) Plans shall conform to State and Local Building Code
(i.e. 1994 Uniform Building Code, Uniform Plumbing
Code, Uniform Mechanical Code, and the 1993 National
Electrical Code) requirements.
(u) Construction plans shall be engineered to meet wind
loads of 80 M.P.H. with a "C" exposure.
(v) Pursuant to the Building and Safety Division
requirements, the applicant shall provide construction
fencing surrounding the boundaries of the project site.
(w) Applicant shall submit construction plans to the
Los Angeles County Fire Department. Plans shall comply
with all applicable fire codes.
(x) This grant is valid for two years and shall be
exercised (i.e. construction started) within that
period or this grant shall expire. A one-year
extension of time may be approved when submitted to the
City in writing at least 60 days prior to the
expiration date. The Planning Commission will consider
the extension request at a duly noticed public hearing
in accordance with Chapter 22.72 of the City of Diamond
Bar Development Code.
(y) This grant shall not be effective for any purpose until
the permittee and owner of the property involved (if
other than the permittee) have filed, within fifteen
(15) days of approval of this grant, at the City of
Diamond Bar Community and Development Services
Department, their affidavit stating that they are aware
of and agree to accept all the conditions' of this
grant. Further, this grant shall not be effective
9
until the permittee pays remaining City processing
fees, school fees and fees for the review of submitted
reports.
(z) If the Department of Fish and Game determines that Fish
and Game'Code Section 711.4 applies to the approval of
this project, then the applicant shall remit to the
City, within five days of this grant's approval, a
cashier's check. of $25.00 for a documentary handling
fee in connection with Fish and Game Code requirements.
Furthermore, ifthis project is not exempt from a
filing fee imposed because the project has more than a
deminimis impaction fish and wildlife, the applicant
shall also pay to the Department of Fish and Game any
such fee and any fine which the Department determines
to be owed.
The Planning Commission shall:
(a) Certify to the adoption of this Resolution; and
(b) Forthwith transmit a certified copy of this Resolution,
by certified mail, to: Diamond Bar Business Associates
c/o AEW Capital Management, LP, 601 S. Figueroa, #2150,
Los Angeles, CA, 90017 and Bernard Abrams, V -Tek
Systems Corporation, 750 N. Diamond Bar Boulevard,
Diamond Bar, CA 91765
Ilk
APPROVED AND ADOPTED THIS 22ND OF JUNE 1999, BY THE PLANNING
COMMISSIONitev
HE CITY OF DIAMOND BAR.
BY:_,
e Tye,CFairman
I, James DeStefano, Planning Commission Secretary, do hereby certify
that the foregoing Resolution was duly introduced, passed, and adopted
by the Planning Commission of the City of Diamond Bar, at a regular
meeting of the Planning Commission held on the 22nd day of June 1999, by
the following vote:
AYES: Tye, Nelson, Kuo, McManus, Ruzicka
NOES: None
ABSENT: None
ABSTAIN: None
ATTEST: r
es DeStefa*, Secretary
10
PLANNING COMMISSION RESOLUTION NO. 99-17
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
DIAMOND -BAR APPROVING DEVELOPMENT REVIEW NO. 99-4 AND
NEGATIVE DECLARATION NO. 99-5, A REQUEST TO CONSTRUCT A TWO-
STORY OFFICE BUILDING OF APPROXIMATELY 18,400 GROSS SQUARE
FEET. THE PROJECT SITE IS LOCATED AT 1315 S. VALLEY VISTA DRIVE,
(LOT 5, TRACT NO. 39679) DIAMOND BAR, CALIFORNIA.
A. RECITALS.
1. The property owner, Diamond Bar Business Associates c/o AEW Capital Management, LP and
applicant, Bernard Abrams of V-T-ek Systems Corporation, have filed an application for
Development Review No. 99-4 and Negative Declaration No. 99-5 for a property located at
1315 S. Valley Vista Drive, Diamond Bar, Los Angeles County, California. Hereinafter in this
Resolution, the subject Development Review and Negative Declaration shall be referred to as
the "Application".
2. On June 22, 1999, the Planning Commission of the City of Diamond Bar conducted a duly noticed
public hearing on the Application.
3. Notification of the public hearing for this project was provided in the San Gabriel Valley Tribune and
Inland Valley Daily Bulletin newspapers on June 1, 1999. Public hearing notices were mailed
to approximately 14 property owners of record within a 500 -foot radius of the project on May
24, 19 9'9. Furthermore, the project site was posted with the required display board on May
19, 1999.
B. Resolution.
NOW, THEREFORE, it is found, determined and resolved by the Planning Commission of the City of
Diamond Bar as follows:
1. This Planning Commission hereby specifically finds that all of the facts set forth in the Recitals, Part
A. of this Resolution are true and correct.
2. The Planning Commission hereby finds that the Initial Study review and Negative Declaration No.
99-5 have been prepared by the City of Diamond Bar in compliance with the
requirement of the California Environmental Quality Act (CEQA) and guidelines promulgated
thereunder, pursuant to Section 15070. Furthermore, Negative Declaration No. 99-5 reflects
the independent judgement of the City of Diamond Bar.
3. The Planning Commission hereby specifically finds and determines that, having
considered the record as a whole including the findings set forth below, and changes
and alterations which have been incorporated into and conditioned upon the proposed
project set forth in the application, there is no evidence before this Planning
Commission that the project proposed herein will have the potential of an adverse
effect on wild life resources or the habitat upon which the wildlife depends. Based
upon substantial evidence, this Planning Commission hereby rebuts the presumption
of adverse effects contained in Section 753.5 (d) of Title 14 of the California Code of
Regulations.
4. Based on the findings and conclusions set forth herein, this Planning Commission hereby
finds as follows:
(a) The project relates to an irregular-shaped, vacant lot, approximately 2.53 with a
41,000 square foot graded pad. The project site is bound by descending slopes
on the south and west, by Valley Vista Drive'on the east and Gateway Center
Drive on the north. The project site contains a catch basin and two -ten foot
wide easements, outside of the development envelope. The catch basin is
located in the northwest corner of the site. One easement is for the sanitary
sewer. It traverses the site generally in an east/west direction and within the
rear portion of the site. The other easement is for the storm drain and storm
drain ingress and egress. It traverses the site in a north/southdirection and
generally within the north/east portion of the" site. The project site was mass
graded as part of the overall grading for the corporate complex.
(b) The project site has a General Plan land use designation of Professional Office
(OP). Pursuant to the General Plan, this land use designation provides for the
establishment of office-base'd working environments for general, professional,
and administrative offices, as well as support uses. Additionally, development
`within the OP designation will maintain a maximum floor area ratio (FAR) of
1.00.
(c) The project site is within the Professional OfficeBillboard Exclusion -Unilateral Contract
(OP-BE-U/C) Zone. This zoning designation permits general office uses.
(d) Generally, the following zones and use surround the
project site: To the north is the Orange Freeway (SR 57); and to the south,
east and west is the OP-BEU/C Zone. The project site is also located within
the City's Redevelopment Agency's Economic Revitalization Area.
(e) The Application request is to construct a two-story office building of approximately
18,400 gross square feet. (17,500 net square feet) to be utilized for general
office.
(f) The design and layout of the proposed development is consistent with the
applicable elements of the City's General Plan, City Design Guidelines, and
development standards of the applicable district, design guidelines, and
architectural criteria for special areas (e.g., theme areas, specific plans,
community plans, boulevards or planned developments).
The proposed project provides for the establishment of an office -based
working environment for general offices within the General Plan's OP land use
designation. Pursuant to the General Plan, the proposed project will yield a
pleasant environment for those working and visiting the office facility through
its exemplary design, use of materials and colors, landscaping that will offer a
variety of plant species and adequate on-site parking. Additionally, the
proposed project complies with the development standards prescribed in the
Gateway Corporate Center Unilateral Contract and has received the approval
of the Gateway Corporate Center Architectural Committee.
(g)— The design and layout of the proposed development will not interfere with the
use and enjoyment of neighboring existing or future development and will not
create traffic or pedestrian hazards.
The proposed project is within the Professional Office -Billboard Exclusion -
Unilateral Contract (O.P-BEU/C) Zone, which permits the proposed general
office use. The project site is within the established Gateway Corporate
Center, which permits general office uses. General office uses were reviewed
and approved with the original approval of the Center processed by Los
Angeles County. Additionally, the Center's certified Environmental Impact
Report reviewed impacts related to traffic and pedestrians. As a re—;ult, the
following traffic mitigation measures were required and were installed.
(1) Improve that portion of the proposed bikeway along Golden Springs Drive
fronting on Gateway Corporate Center.
(2) Golden Springs Drive shall'be widened to provide left -turn pockets at both
entrance streets to the Center.
(3) Traffic signals shall be installed on Golden Springs Drive, at the two entrance
drives to the Center. ,
Additionally, a traffic impact analysis dated April 22, 1999, and supplemental
traffic impact analysis (responding to City comments) dated May 26, 1999
prepared by Linscott, Law and Greenspan recommends the following:
(1) Widen and/or re -stripe the northbound approach on Golden Springs Drive
(2) Modify the existing traffic signal phasing to provide northbound right -turn,
eastbound rightturn and southbound right -turn overlap phased; and
(3) Northbound right -turn overlap will require that all westbound U-turns along
Grand Avenue be prohibited.
The identified traffic improvement measures. are expected to mitigate the
impacts of existing traffic, mitigate the impact of future and background and
project traffic; and improve LOS at Grand Avenue and Golden Springs Drive to
an acceptable range.
(h) The architectural design -of the proposed development is compatible with the
character of the surrounding neighborhood and will maintain the harmonious,
orderly and attractive development contemplated by Chapter 22.48.20.
Development Review standards, City Design Guidelines and the City's
General Plan.
As also referenced in Item 4. (f) above, and (i) below, the proposed project will
be consistent and compatible with the architectural design, materials, and
colors of the other office buildings within the Gateway Corporate Center and
its Unilateral Contract originally reviewed and approved by Los Angeles
County and ad 'opted by the City of Diamond Bar. The Unilateral -Contract
sets forth land restrictions /development standards. The development
standards require an architectural style that is
Modern/Contemporary materials, textures and colors that complement this
style. The proposed project has received the Center's architectural
committeers approval. Therefore, the proposed project will be compatible with
the character of the surrounding neighborhood and will maintain the
harmonious, orderly and attractive development contemplated by the City's
Development Review requirements and General Plan.
The design of the proposed development will provide a desirable environment
for its occupants and visiting public as well as its neighbors through good
aesthetic use of materials, texture, and color that will remain aesthetically
appealing and will retain a reasonably adequate level of maintenance.
As referenced in the above findings, the proposed project will provide a
desirable environment for its occupants and visiting public as well as its
neighbors through good aesthetic use of materials, texture and color that will
remain aesthetically appealing. The construction materials, Smokey Grey
glazing and Dove Grey plaster will retain a reasonably adequate level of
maintenance.
Q) The proposed development will not be detrimental to public health, safety or
welfare or materially injurious (e.g. negative affect on property values or
resale(s) of property) to the properties or improvements in the vicinity; and
Before the issuance of any City permits, the proposed project is required to
comply with all conditions within the approved resolution and the Building and
Safety Division, Public Works Division, Health Department and Fire
Department requirements. The referenced agencies' involvement will ensure
that the proposed revision is not detrimental to the public health, safety or
welfare or materially injurious to the properties -or improvements in'the vicinity.
(k) The proposed project has been reviewed in compliance with the provisions of the
California Environmental Quality Act (CEQA).
Pursuant to the provisions of CEQA, the City has determined that a Negative
Declaration is required for this project. According to CEQA Section 15070,
Negative Declaration No. 99-5 has been prepared. The Negative Declaration's
review period began June 1, 1999 and ended June 21, 1999.
(1) The proposed project will be in substantial compliance with the adopted Economic
Revitalization Area.
The proposed project is located within the Economic Revitalization Area. The
proposed project is consistent with the Economic Revitalization Area Plan in
that it implements the General Plan's policies, goals, objectives and
strategies. Additionally, the proposed project provides an opportunity for
office uses; promotes the economic development of the Project Area by
providing an attractive, well -serviced, wellprotected environment for all
residents and visitors; promotes local job opportunities; and implements
design and use standards that assure high aesthetic and environmental
quality, and provide unity and integrity to developments within the Project
Area.
5. Based on the findings and conclusions set forth above, the Planning Commission hereby
approves the Application subject to the following conditions:
(a) The project shall substantially conform to site plan, grading plan, floor plan,
elevations, final landscape/irrigation plan, final exterior and parking lot lighting
plan/study and colors /materials board collectively labeled as Exhibit "A" dated
June 22, 1999, as submitted and approved by the Planning Commission, as
amended herein;
(b) The site shall be maintained in a condition, which is free of debris both during and
after the construction, addition, or implementation of the entitlement granted
herein. The removal of all trash, debris, and refuse, whether during or
subsequent to construction shall be done only by the property owner, applicant
or by a duly permitted waste contractor, who has been authorized by the City
to provide collection, transportation, and disposal of solid waste from
residential, commercial, construction, and industrial areas within the City. It
shall be the applicant's obligation to insure that the waste contractor utilized
has obtained permits from the City of Diamond Bar to provide such services;
(c) Before the issuance of any City permits, the applicant shall submit a final
landscape/ irrigation plan that delineates plant species, size, quantity and
location, for the City's review and approval. The final landscape plans shall
also include existing planting material on all slopes and the species, size,
quantity and location of the replacement plant material destroyed during
construction. In order to mitigate the view of the retaining walls and the portion
of the north building elevation utilized to extend the
buildable pad, the lan'd—caping shall be enhanced to the satisfaction of the
Planning Division. The landscape/ irrigation plan shall comply with the City's
established Water Efficient Landscape Regulations and shall be plan checked
accordingly. All landscaping and irrigation shall be installed before final
inspection;
(d) Before the issuance of any City permits, the applicant shall submit an exterior
lighting plan/study for the City's review and approval. Lighting shall comply
with all applicable Development Code standards;
(e) All roof -mounted equipment shall be screened from public view;
(f) Prior to the issuance of a building permit, the applicant shall submit a final detail
'of the trash/recycle bin enclosure for the City's review and approval;
(g) Prior to final inspection/occupancy, the applicant shall pay their "fair -share" (0.49
percent) of the installation - of the following traffic improvements measures to
the intersection of Golden Springs Drive/Grand Avenue as required by the
Deputy Public Works Director:
(1) Widen and/or re -stripe the northbound approach on Golden Springs Drive
(2) Modify the existing traffic signal phasing to provide northbound right -turn,
eastbound rightturn and southbound right -turn overlap phased; and
(3) Northbound right -turn overlap will require that all westbound U-turns along
Grand Avenue be prohibited.
(h) Two parking stalls located furthest north in the parking lot shall be reconfigured to
provide a back-up turning area, which allows for easier maneuverability for the
City's review and approval.
(i) Proposed retaining walls shall not exceed a height of six feet.
0) Applicant shall remove and replace the following to the satisfaction of the
(1) Damaged sidewalk along, the west side of Gateway Center Drive, immediately north
of the site;
(2) Damaged section of sidewalk to the north that contains a manhole; and
(3) Concrete drainage ditch below the site.
(k) Prior to the issuance of— any City permits, the applicant shall submit a complete
grading plan in accordance with the City's grading requirements for the City's
review and approval. The grading plan shall:
(1) Be signed/stamped by a civil engineer, geotechnical engineer and
(2) Delineate the proposed and existing topography;
(3) Delineate finish surface, finish grade, flow lines, top of wall, bottom of wall,
bottom of footing ' and finished surface for proposed retaining walls;
(4) Delineate proper drainage with details and sections; and
(5) Delineate slope ratio.
(1) Plans shall delineate retaining wall sections drawn to
scale with appropriate details, type of retaining wall and structural calculations.
(m) Before the issuance of any City permits, the applicant shall submit an erosion control
plan for the City's review and approval. The erosion control plan shall conform to
National Pollutant Discharge Elimination System (NPDES) standards and incorporate
the appropriate Best Management Practices (BMP's). Additionally, the applicant shall
obtain the necessary NPDES.permits..
(n) The applicant shall be responsible for sewer and storm drain system/lateral
installation and shall ensure connection with the L. A. County Department of
Public Works for storm drain and sewer lateral if there are none currently
available. Additionally, the applicant shall pay the County Sanitation District for
connection fees. Furthermore, the applicant shall be responsible for all costs
associated with the improvement,' review and approval for the addition of
sewer or storm drains.
(o) Sidewalks, curbs and gutters, etc. damaged during construction shall be removed and
replaced by the applicant to the satisfaction of the Deputy Public Works Director.
(p) No permanent structures'shall encroach onto storm drain lines or easements.
(q) The applicant shall obtain an encroachment permit for all off-site improvements.
(r) Driveway slope shall not exceed 15 percent.
(s) All handicap parking shall comply with current State handicap accessible regulation. Van
parking shall be provided. Site plan shall delineate path of travel from parking lot,to
building. Cross slope shall not exceed two percent. All bathroom and ramps shall be
designed in compliance with State handicap accessible regulations. Required
handicap signage shall be installed 4at each entrance.
(t) Plans shall conform to State and Local Building Code (i.e. 1994 Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, and the 1993 National Electrical
Code) requirements.
(u) Construction plans shall be engineered to meet wind loads of 80 M.P.H. with a "C"
exposure.
(v) Pursuant to the Building and Safety Division requirements, the applicant shall provide
construction fencing surrounding the boundaries of the project site.
(w) Applicant shall submit construction plans to the Los Angeles County Fire Department.
Plans shall comply with all applicable fire codes.
W This grant is valid for two years and shall be exercised (i.e. construction started) within that
period or this grant shall expire. A one-year extension of time may be approved when
submitted to the City in writing at least 60 days prior to the expiration date. The
Planning Commission will consider the extension request at a duly noticed public
hearing in accordance with Chapter 22.72 of the City of Diamond Bar Development
Code.
(y) This grant shall not be effective for any purpose until the permittee and owner of the
property involved (if other than the permittee) have filed, within fifteen (15) days of
approval of this grant, at the City of Diamond Bar Community and Development
Services Department, their affidavit stating that they are aware of and aq:tee to accept
all the conditions' of this grant. Further, this grant shall not be effective
until the permittee pays remaining City processing fees, school fees and fees
for the review of submitted reports.
(z) If the Department of Fish and Game determines that Fish and Game -Code
Section 711.4 applies to the approval of this project, then the applicant shall
remit to the City, within five days of this grant's approval, a cashier's check, of
$25.00 for a documentary handling fee in connection with Fish and Game
Code requirements. Furthermore, if, this project is not exempt from a filing fee
imposed because the project has more than a deminimis impact on fish and
wildlife, the applicant shall also pay to the Department of Fish and Game any
such fee and any fine which the Department determines to be owed.
The Planning Commission shall:
(a) Certify to the adoption of this Resolution; and
(b) Forthwith transmit a certified copy of this Resolution, by certified mail, to:
Diamond Bar Business Associates c/o AEW Capital Management, LP, 601 S.
Figueroa, #2150, Los Angeles, CA, 90017 and Bernard Abrams, V -Tek
Systems Corporation, 750 N. Diamond Bar Boulevard, Diamond Bar, CA
91765
APPROVED AND ADOPTED THIS 22ND OF JUNE 1999, BY THE PLANNING
COMMISSION OF HE CITY OF DIAMOND BAR.
HE C1 17 BY:
tev T—
teve T e,/k—irman q
I, James DeStefano, Planning Commission Secretary, do hereby certify that the foregoing Resolution
was duly introduced, passed, and adopted by the Planning Commission of the City of Diamond Bar, at a
regular meeting of the Planning Commission held on the 22nd day of June 1999, by the following vote:
AYES: Tye, Nelson, Kuo, McManus, Ruzicka
NOES: None
ABSENT: None
ABSTAIN: None ATTEST:
—es DeStefadp,
Secretary
IN