Loading...
HomeMy WebLinkAbout10/22/2013 PC AgendaPLANNING COMMISSION FILE COPY AGENDA October 22, 2013 7:00 P.M. City Hall, Windmill Community Room 21810 Copley Drive Diamond Bar, CA 91765 Chairman Vice Chairman Commissioner Commissioner Commissioner Tony Torng Frank Farago Ashok Dhingra Jimmy Lin Jack Shah Copies of staff reports or other written documentation relating to agenda items are on file in the Planning Division of the Community Development Department, located at 21810 Copley Drive, and are available for public inspection. If you have questions regarding an agenda item, please call (909) 839-7030 during regular business hours. Written materials distributed to the Planning Commission within 72 hours of the Planning Commission meeting are available for public inspection immediately upon distribution in the City Clerk's office at 21810 Copley Drive, Diamond Bar, California, during normal business hours. In an effort to comply with the requirements of Title li of the Americans with Disabilities Act of 1990, the City of Diamond Bar requires that any person in need of any type of special equipment, assistance or accommodation(s) in order to communicate at a City public meeting must inform the Community Development Department at (909) 839-7030 a minimum of 72 hours prior to the scheduled meeting. as Please refrain from smoking, eating or The City of Diamond Bar uses recycled paper drinking in the Auditorium and encourages you to do the same City of Diamond Bar Planning Commission MEETING RULES U1):74[HP111j The meetings of the Diamond Bar Planning Commission are open to the public. A member of the public may address the Commission on the subject of one or more agenda items and/or other items of which are within the subject matter jurisdiction of the Diamond Bar Planning Commission. A request to address the Commission should be submitted in writing at the public hearing, to the Secretary of the Commission. As a general rule, the opportunity for public comments will take place at the discretion of the Chair. However, in order to facilitate the meeting, persons who are interested parties for an item may be requested to give their presentation at the time the item is called on the calendar. The Chair may limit individual public input to five minutes on any item; or the Chair may limit the total amount of time allocated for public testimony based on the number of people requesting to speak and the business of the Commission. Individuals are requested to conduct themselves in a professional and businesslike manner. Comments and questions are welcome so that all points of view are considered prior to the Commission making recommendations to the staff and City. Council. In accordance with State Law (Brown Act), all matters to be acted on by the Commission must be posted at least 72 hours prior to the Commission meeting. In case of emergency or when a subject matter arises subsequent to the posting of the agenda, upon making certain findings, the Commission may act on item that is not on the posted agenda. INFORMATION RELATING TO AGENDAS AND ACTIONS OF THE COMMISSION Agendas for Diamond Bar Planning Commission meetings are prepared by the Planning Division of the Community Development Department. Agendas are available 72 hours prior to the meeting at City. Hall and the public library, and may be accessed by personal computer at the contact information below. Every meeting of the Planning Commission is recorded and duplicate recordings are available for a nominal charge. ADA REQUIREMENTS A cordless microphone is available for those persons with mobility impairments who cannot access the public speaking area. The service of the cordless microphone and sign language interpreter services are available by giving notice at least three business days in advance of the meeting. Please telephone (909) 839-7030 between 7:30 a.m. and 5:30 p.m., Monday through Thursday, and 7:30 a.m. and 4:30 p.m., Friday. HELPFUL CONTACT INFORMATION Copies of Agenda, Rules of the Commission, CDs of Meetings (909) 839-7030 Email: info(aY)diamondbarca.gov Website: www.diamondbarca.gov CITY OF DIAMOND BAR PLANNING COMMISSION Tuesday, October 22, 2013 AGENDA CALL TO ORDER: 7:00 p.m. Next Resolution No. 2013-24 PLEDGE OF ALLEGIANCE: 1. ROLL CALL: COMMISSIONERS: Chairman Tony Torng, Vice Chairman Frank Farago, Ashok Dhingra, Jimmy Lin, Jack Shah 2. MATTERS FROM THE AUDIENCE/PUBLIC COMMENTS: This is the time and place for the, general public to address the members of the Planning Commission on any item that is within their jurisdiction, allowing the public an opportunity to speak on non-public hearing and non -agenda items. Please complete a Speaker's Card for the recording Secretary (completion of this form is voluntary) There is a five-minute maximum time limit when addressing the Planning Commission. 3. APPROVAL OF AGENDA: Chairman 4. CONSENT CALENDAR: The following items listed on the consent calendar are considered routine and are approved by a single motion. Consent calendar items may be removed from the agenda by request of the Commission only: 4.1 Minutes of the Regular Meeting: October 8, 2013 5. OLD BUSINESS: None 6. NEW BUSINESS: None 7, CONTINUED PUBLIC HEARING(S): 7.1 Development Review No. PL2013-77 — Under the authority of Diamond Bar Municipal Code (DBMC) Section 22.48, the applicant Steven Phillips, and property owner, Mei Deng, is requesting Development Review approval to construct a new single-family residence consisting of 13,360 square feet of livable area; 2,207 square -foot garage; and 2,471 square feet of patios areas on a 1.21 gross acre (52,707 square -foot) lot. The subject property is zoned OCTOBER 24, 2013 PAGE 2 PLANNING COMMISSION AGENDA Rural Residential (RR) with a consistent underlying General Plan land use designation of Rural Residential. (Continued from October 8, 2013) Project Address: 24074 Falcons View Drive Property Owner: Mei Deng #500-999 West Broadway Vancouver, BC VSZIKS Applicant: Steven Phillips 23177 La Cadena Drive, #101 Laguna Hills, CA 92677 Environmental Determination: The project has been reviewed for compliance with the California Environmental Quality Act (CEQA). Based on that assessment, the City has determined the project to be Categorically Exempt from the provisions of CEQA pursuant to Article 19 under Section 15303(a) (one single-family residence in a residential zone) of the CEQA Guidelines. No further environmental review is required. Recommendation: Staff recommends that the Planning Commission approve Development Review No. PL2013-77, based on the Findings of Fact, and subject to the conditions of approval as listed within the draft resolution. PUBLIC HEARING(S): 8.1 Development Review No. PL2013-147 — Under the authority of Diamond Bar Municipal Code Section 22.48, the applicant/property owner, Dr. Umesh Shah, is requesting Development Review approval to construct a 2,828 square -foot two story addition to an existing two-story single-family residence on a 0.47 gross acre (20,607 square -foot) lot. The subject property is zoned Low Medium Density Residential (RLM) with a consistent underlying General Plan land use designation of Low Medium, Density Residential. Project Address: 21955 Birds Eye Drive Property Owner/ Dr. Umesh Shah Applicant: 21955 Birds Eye Drive Diamond Bar, CA 91765 OCTOBER 24, 2013 PAGE 3 PLANNING COMMISSION AGENDA Environmental Determination: The project has been reviewed for compliance with the California Environmental Quality Act *(CEQA). Based on that assessment, the City has determined the project to be Categorically Exempt from the provisions of CEQA pursuant to Article 19 under Section 15301(e) (additions to existing structures) of the CEQA Guidelines. No further environmental review is required. Recommendation: Staff recommends that the Planning Commission table this matter so that it can be re -noticed with a corrected project title and description. The revised notice will set the matter for public hearing on November 12, 2013. 9. PLANNING COMMISSION COMMENTS / INFORMATIONAL ITEMS: 10. STAFF COMMENTS/ INFORMATIONAL ITEMS: 10.1 Public Hearing dates for future projects: 11. SCHEDULE OF FUTURE EVENTS: PARKS AND RECREATION COMMISSION MEETING: CITY COUNCIL MEETING: PLANNING COMMISSION MEETING: TRAFFIC AND TRANSPORTATION COMMISSION MEETING: 12. ADJOURNMENT: Thursday, October 24, 2013, 7:00 p.m. Diamond Bar City Hall Windmill Community Room 21810 Copley Drive Tuesday, November 5, 2013, 6:30 p.m. Diamond Bar City Hall Windmill Community Room 21810 Copley Drive (temporary location) Tuesday, November 12, 2013, 7:00 p.m. Diamond Bar City Hall Windmill Community Room 21810 Copley Drive Thursday, November 14, 2013 - 7:00 p.m. Diamond Bar City Hall Windmill Community Room 21810 Copley Drive MINUTES OF THE CITY OF DIAMOND BAR L' REGULAR MEETING OF THE PLANNING COMMISSION OCTOBER 8, 2013 CALL TO ORDER: Chairman Torng called the meeting to order at 7:05 p.m. in the City Hall Windmill Room, 21810 Copley Drive, Diamond Bar, CA 91765. PLEDGE OF ALLEGIANCE: Commissioner Dhingra led the Pledge of Allegiance. 1. ROLL CALL: Present: Commissioners Ashok Dhingra, Jimmy Lin, Jack Shah, Vice ChairmanFrank Farago, Chairman Tony Torng Also present: Greg Gubman, Community Development Director; Dave DeBerry, City Attorney; Grace Lee, Senior Planner; Natalie Tobon, Assistant Planner; and Stella Marquez, Administrative Coordinator. 2. MATTERS FROM THE AUDIENCE/PUBLIC COMMENTS: Vinod Kashyap owns a property at 3839 Castle Rock Road which gets a lot of noise and shaking of the retaining walls from the freeway. In some instances people have gone off the freeway, through the fence and ended up close to his back yard. The traffic flow is very fast and there are a lot of heavy vehicles going through the area. He fears that one day someone will plow into his house. He asked the Commission to address the safety issues in the area. 3. APPROVAL OF AGENDA: As presented 4. CONSENT CALENDAR: 4.1 Minutes of the September 24, 2013, Regular Meeting. VC/Farago moved, C/Dhingra seconded, to approve the September 24, 2013, regular meeting minutes as presented. Motion carried by the following Roll Call vote: AYES: NOES: ABSENT: 5. OLD BUSINESS 6. NEW BUSINESS COMMISSIONERS: COMMISSIONERS: COMMISSIONERS: None None Dhingra, Lin, Shah, VC/ Farago, Chair/Torng None None OCTOBER 8, 2013 7 PUBLIC HEARING(S): PAGE 2 PLANNING COMMISSION 7.1 Development Review No. PL2013-77 — Under the authority of Diamond Bar Municipal Code Section 22.48, applicant Steven Phillips and property owner Mei Deng, requested Development Review approval to construct a new single- family residence consisting of 13,360 square feet of livable area; a 2,207 square foot garage, and 2,471 square feet of patio areas on a 1.21 gross acre (52,707 square foot) lot. The subject property is zoned Rural Residential (RR) with a consistent underlying General Plan land use designation of Rural Residential. PROJECT ADDRESS: PROPERTY OWNER: 24074 Falcons View Drive Diamond Bar, CA 91765 Mei Deng 500-999 West Broadway Vancouver, BC VSZIKS APPLICANT: Steven Phillips 23177 La Cadena Drive #101 Laguna Hills, CA 92677 CDD/Gubman recommended that the Planning Commission continue the matter to October 22, 2013, to allow the applicant additional time to complete the public hearing notification requirements. Chair/Torng opened the public hearing. There was no one present who wished to speak on this item. C/Dhingra moved, VC/Farago seconded, to continue Development Review No. PL2013-77 to October 22, 2013. Motion carried by the following Roll Call vote: AYES: COMMISSIONERS: Dhingra, Lin, Shah, VC/ Farago, Chair/Torng NOES: COMMISSIONERS: None ABSENT: COMMISSIONERS: None 7.2 Development Review No. PL2013-215 — Under the authority of Diamond Bar Municipal Code Section 22.48, applicant Dan Wainwright, representing America's Tire Co and property owner Larry Zerner, representing Diamond Bar Plaza, requested Development Review approval to construct a 7,149 square foot building for a new retail automotive parts and service establishment. The subject property is zoned Community Commercial (C-2) with an underlying General Plan land use designation of General Commercial. _-:-:i 2 iS 9 A it T OCTOBER 8, 2013 PAGE 3 PLANNING COMMISSION PROJECT ADDRESS: 2875 S. Diamond Bar Boulevard Diamond Bar, CA 91765 PROPERTY OWNER: Diamond r Plaza 1801 Centtuary Pak East, Suite 2400 Los Angeles, CA 90067 APPLICANT: Daniel Wainwright America's Tire Co. 20225 N. Scottsdale Rd Scottsdale, AZ 85255 AP/Tobon presented staff's report and recommended Planning Commission approval of Development Review No. PL2013-215, based on the Findings of Fact, and subject to the conditions of approval as listed within the resolution. C/Shah asked what is currently on the site and AP/Tobon reiterated that the site is a vacant lot. Daniel Wainwright, America's Tire Co., 20225 N. Scottsdale Road, Scottsdale, AZ 85255, said he was before the Commission to request approval of a Development Review application for a new America's Tire station on Diamond Bar Boulevard at Cold Springs Road. He gave a brief background of the company and talked about the proposed project. America's Tire Co. has been in business for 54 years and there are currently 865 locations in 24 states with over 15,000 full time employees. America's Tire is the largest and most successful retail tire company in the United States. The company does not perform any mechanical work, there are no automotive fluids and there is no hazardous waste. The business is strictly retail sales and service of passenger car and light truck tires and wheels. All of the work is done inside of the building; all of the storage is inside of the building; and, in this case the service bays face to the north, away from the residential property. All of the work is performed within a clean, modern and efficient environment. Hours of operation are Monday through Friday from 8:30 a.m. to 6:00 p.m., Saturday from 8:30 a.m. to 5:00 p.m. and the shops are closed on Sundays. This project will create about 10 full time new jobs for the community and those employees will receive benefits, retirement plans, medical insurance, training, etc. In the 50 years the company has been in business it has never laid off any employees. He thanked staff for their input and fine tuning to the project. He said his company agrees to all of the conditions of approval which to him are comprehensive and thorough. C/Lin asked if the headquarters was in Ann Arbor, Michigan. Mr. Wainwright responded that the company was started in Ann Arbor and there is still an office in that City. The owner decided he would like to live in warmer climate and 30 2 & In��wT OCTOBER 8, 2013 PAGE 4 PLANNING COMMISSION years ago he and his wife moved to Scottsdale, Arizona. C/Lin asked why the company was hiring only 10 employees in Diamond Bar when the average store staffs 20 employees. Mr. Wainwright responded that 10 would be the initial employment level to get the business going. As the store becomes established, which usually occurs within a year, more staff would be brought on as the level of business dictates. C/Dhingra said that staff and the applicant were to be congratulated on a very good project and design. He also spoke supportively of the site plan design that eliminates the shared drive aisle with the neighboring car wash. Chair/Torng opened the public hearing. Natalia Baudin, 2904 Crooked Creek, said she retired from South Coast Air Quality Management District where she worked in environmental justice. She is concerned about the proposed tire company. When there was a service station in the location, people would work on cars all night and compressors could be heard at 2:00 a.m. With the shopping center, the building noises start at 5:30 to 6:00 a.m. in the mornings and after stores open, there were large 18 -wheel transfer trucks in the neighborhood that would park along Cold Spring Lane waiting to gain access to the shopping center area, trucks which sat along the side of the fence bordering her yard and dump diesel fumes into the yard. Now there are trucks delivering to the super market with half loads that when they hit the speed bumps she is violently awakened. In addition, she has to contend with lawn service at 6:00 a.m. for the daycare. She does not mind the businesses being in her neighborhood but wishes they would realize there are people who are retired and sleep later in the morning. Her concerns about the tire store is: 1) that the noise be minimized during the building of the store by limiting the hours from 8:00 a.m. to 7:00 p.m.; include in the occupancy permit, no compressors, impact wrenches or other noise making tools be used prior to 8:00 a.m.; tire deliveries should be made by of Diamond Bar Boulevard and not Cold Spring Lane; all tires left outside of the building should be covered; and, no parking for the business along Cold Spring Lane; 2) no underground storage of chemicals or vats larger than 50 gallons, no use of toxic chemicals that can be released into the neighborhood; and 3) she is concerned about loss of property values. Tire stores generate a lot of traffic and cars to be worked on and all cars that are being worked on should be kept in the property boundaries of the company. Mrs. Baudin said that she and her husband have worked hard to build a pleasant life in Diamond Bar and she understands that the City needs revenues. Tire stores in neighborhoods are not very pretty. She asked the Planning Commission to reconsider this project or put limitations she has stated on the occupancy permit. Vinod Kashyap said he appreciated the presentation. He asked if the tires were American made and asked if the company had a provision for vocational OCTOBER 8, 2013 PR Di PAGE 5 PLANNING COMMISSION training for kids. He wanted to know if it was a LEED design based on zero energy use. The previous speaker covered his other concerns. Mr. Wainwright responded to speakers that with respect to noise the hours of operation (as previously stated) are 8:30 a.m. to 6:00 p.m. Monday through Friday and 8:30 a.m. to 5:00 p.m. on Saturday. The store is closed on Sunday. Construction hours will be complied with in accordance with the City's conditions. He will be personally involved with the project throughout the construction phase and if there are any concerns about early morning starts, he will address those and make certain everything is properly handled. With respect to chemicals, he again stated that the store does not handle any automotive fluids or any kind of hazardous waste, oil, antifreeze or brake fluid and no fluids are stored on site or used in any of the store's operations. Some of the tires are American made and many are "world source" tires. Tires are made in a number of countries and the company does not discriminate against any nation's products. The company looks very closely at the quality of the tires.Any tire that the company sells is thoroughly tested by staff. The company's poly chemist looks at the construction of every tire and works with the manufacture to make certain the tire has the proper adhesives, tread design, as well as steel and polymer ingredients to ensure that it is a safe tire. The company also wants to offer customers good value for their tire and not everyone can afford the most expensive tire so the company offers tires that are good value at all market points throughout the range of products. With respect to vocational training, the company absolutely welcomes young people. As he previously mentioned, the company has an extensive training program and loves to have young people after school that have an interest and a passion in working for a really good company that promotes from within. The company would love to partner with vocational instructors at the local high schools and community colleges to bring folks into the organization. The company has looked at the LEED design very closely. The building does not quite meet the LEED criteria. The company has tried but the nature of the use of the building makes it very difficult to create the energy envelope. However, what they have done in the design is to include a number of skylights that are screened behind the parapet walls to harvest natural sunlight. The building also uses occupancy sensors and light level sensors within the building and an extensive number of LED light fixtures to reduce the electrical demand. The roof is made from steel, about 90 percent of which is recycled, and the remaining components are masonry and concrete which can be recycled at the end of the useful life of the facility. This site was formerly a gas station which closed due to leaking underground storage tanks and were removed a number of years ago and significant mitigation measures were performed to bring any toxic levels of contaminant below the minimum thresholds. In fact, the report from the water quality board verified that indeed, the contamination levels are below action limits and the site case is closed. The store proposes to do a ground lease on the site for 40 to 50 years. The company makes a long-term commitment to the F OCTOBER 8, 2013 PAGE 6 PLANNING COMMISSION community. The construction costs for the building will be approximately $1.5 million. America's Tire Co. plans to be a long-term positive part of the Diamond Bar community. Mr. Wainwright said that customers will be on the property for 30-45 minutes and cars are not kept offsite nor are they kept overnight. Generally, 85 percent of the product is available on site and customers can be on their way in about 30 minutes. C/Shah asked about the storage of used and new tires and if during construction the project uncovers contaminant materials how will that be handled. Mr. Wainwright responded that all of the new tires are stored within the building and all of the used tires are stored within the building and picked up by a licensed recycler that converts them to crumb rubber which is used to make road beds (overtopping for asphalt) which reduces road noise and tire wear. Tires do not go to the landfill. Phase I and Phase II environmental site assessment and technical evaluation have been conducted. Multiple borings were done at the site to assess both the geostrategic analysis and structural foundation designs. Samples were taken to validate that the environmental contamination had decreased to below action levels. C/Lin said that the property has 20 parking spaces with 10 spaces taken up by employees. He asked if the remaining 10 spaces would be adequate to take care of customer parking with no spill over onto the streets. Mr. Wainwright said he believed the parking would be sufficient because customer vehicles are turned over (bay turn) so quickly. There are four service bays which leaves sufficient parking for additional customers. C/Shah asked whether tire delivery and pickup would take place during working hours. Mr. Wainwright responded that tire delivery takes place during normal business hours only. Trucks deliver replenishment goods only to replace what was sold the previous week. Chair/Torng asked staff about the parking and whether there was a "no parking" zone on the street. CDD/Gubman said he was not familiar with the history on reviewing the parking situation or studying whether or not to designate Cold Spring Lane as a "no parking" zone because that is actually within the purview of the Traffic and Transportation Commission, which is staffed by the City's Public Works Department and any recommendation that would follow such a review and analysis would be forwarded to the City Council for discussion and possible action. This question can be directed to the Public Works Director and staff would be happy to get in touch with Mrs. Baudin to provide her with a more thorough answer about the traffic situation on her street and how her request/inquiry can be responded to. C DRAT OCTOBER 8, 2013 PAGE 7 PLANNING COMMISSION Vinod Kashyap felt that an influx of business from shopping center visitors would create traffic flow and parking problems for the tire store and shopping center. VC/Farago asked staff to respond to Mrs. Baudin's concerns about construction hours. CDD/Gubman stated that the City's Code limits hours of construction and construction related noise to Monday through Saturday 7:00 a.m. to 7:00 p.m. C/Dhingra asked if the delivery would be executed via Diamond Bar Boulevard or Cold Spring Lane. CDD/Gubman responded that there is no stated restriction on the delivery points of access. Since this is a use that is permitted by right and not a conditional use, there are no use restrictions that could be conditioned on the project. However, America's Tire Co. is a national credit tenant that has a highly regarded reputation for being a good neighbor so this is probably a more appropriate opportunity to have this discussion with America's Tire Co. so that the company can reach out to the neighborhood residents and address any issues with respect to the property and the availability of the company representatives to the neighborhood to abate any potential and/or future problems. Chair/Torng closed the public hearing. C/Lin said that typically, tire stores generate about half of the traffic of a service station. With respect to more people visiting the store on Saturday, the opportunity for service is limited by the parking and bays so generally, people will be scheduled to return. He believes it is a good project and architecturally, the project is very sound. C/Lin moved, C/Shah seconded, to approve Development Review No. PL2013- 215, based on the Findings of Fact, and subject to the conditions of approval as listed within the resolution. Motion carried by the following Roll Call vote: AYES: COMMISSIONERS: Dgra, Lin, Shah, VC/ Farago, Cha r NOES: COMMISSIONERS: None ABSENT: COMMISSIONERS: None 7.3 Vesting tentative lla�L M- ---- - Permit No. PL2013-229 — The applicant requested approval of a Vesting Tentative Tract Map to subdivide an existing vacant 30 -acre site known as "Site D" into 63 lots for the development of 182 for -sale dwelling units and a minimum two -acre neighborhood public park. Development Review approval was requested for the proposed architectural and landscape design elements associated with the proposed residential component of Site D. A Tree Permit OCTOBER 8, 2013 PAGE 8 PLANNING COMMISSION was also requested to remove 83 existing protected trees consisting of 75 Southern Black Walnuts, 6 Willows and 2 Coast Live Oaks; and, replace them at a 3:1 ratio with 75 Coast Live Oak and 174 Sycamore trees. The property is zoned Specific Plan (SP) with a consistent underlying General Plan land use designation of Specific Plan. PROJECT ADDRESS: Site comprised of approximately 30.36 acres located at the southeast corner of Brea Canyon Road and Diamond Bar Boulevard (Los Angeles County Assessor's Parcel Numbers 8714-002-900, 8714- 002-901, 8714-002-902, 8714-002-903 and 8714- 015-001). PROPERTY OWNERS: Walnut Valley Unified School District and City of Diamond Bar APPLICANT: Lennar Homes of California, Inc. 25 Enterprise, Suite 300 Aliso Viejo, CA 92656 CDD/Gubman explained that Site D is predominately surplus Walnut Valley Unified School District property and has been surplus property for several decades. The City, in partnership with the school district embarked on a master planning effort around 2008 to establish a roadmap and set of goals, policies and objectives for the buildout of the Site D property. Initially, over the 30 acre site, the Specific Plan that was presented to the public and Planning Commission when the public hearing process started consisted of half of the site (about 15 gross acres) being allocated for up to two hundred residences and the other half (about 15 gross and 10 net acres) would be a commercial shopping center with a maximum intensity of about 153,000 square feet. The public process that ensued resulted in neighborhood workshops and further analysis of the market feasibility of the commercial, etc. and the outcome of the public process was that the commercial component was eliminated from the project and approved as a 100 percent residential development but still with a unit count capped at 200. In addition, the Specific Plan included a requirement for a minimum of a two -acre useable park that would be constructed by the eventual purchaser and developer of the property and would then be dedicated to the City in a turnkey fashion. The Specific Plan was ultimately approved with those specifications in early 2012 and since that time, the property has been placed for sale. Lennar Homes, one of the country's largest residential developers, has entered into escrow with the school district as the majority owner of the property and the City which is 4.5 percent owner of a small sliver of the property. Since entering into escrow Lennar has followed through with obligations to embark on a public outreach effort on the park design and although the particulars of the park are not a part of tonight's approval, there is OCTOBER 8, 2013 PAGE 9 ME PLANNING COMMISSION a park concept plan, provided in the Planning Commission packet, that is being designed for presentation to the City Council at a later date. It should be noted, however, that the conceptual plan is faithful to the neighborhood consensus that was achieved through the neighborhood outreach process. What the Commission is being presented with tonight is a residential development for 182 units and 2.5 usable acre neighborhood park that would. be dedicated to the City upon completion. The Commission's charge this evening is to review the Tract Map, Development Review and Tree Permit and the Addendum to the EIR that addresses refinements to the actual project in comparison to the vision for the development that was set forth in the Specific Plan, and to determine whether or not what is being proposed is substantial conformance with the Site D Specific Plan. If so, staff would recommend that the Planning Commission adopt a Resolution that recommends approval of the project that is composed of several entitlement components to the City Council for its approval. CDD/Gubman further stated that the components of the park that the Commission will be reviewing are in the Tract Map wherein the two parcels are delineated that provide the location for the park. If the Commission recommends approval of the Tract Map it will set in place the footprint in which the park would be placed. As SP/Lee will explain, there is a part of the park called "the rain garden." Under the Federal and State Water Quality mandate/requirements, all of the stormwater runoff for this site needs to be retained up to a specified storm event. The proposed rain garden satisfies that stormwater retention requirement but it is being placed within the park and similar to how a golf course is often designed within a flood plain, this feature is being designed as a useable recreational amenity. As far as the concept of the rain garden, it will be a necessary and integral component to this development because it serves a stormwater retention mandate. Park amenities such as benches and play equipment, tree species and other features are part of a public park, which is outside the scope of the Planning Commission's review authority. The Parks and Recreation Commission will review the park portion of the project and provide its recommendation to the City Council. SPILee stated that this project executes the Site D Specific Plan which was approved in February 2012. The Specific Plan set forth criteria to guide the development of this approximately 30 -acre vacant land to allow up to 200 for - sale dwelling units and require that at least two useable acres be set aside for a public neighborhood park. The project is located at the Southeast corner of Brea Canyon Road and Diamond Bar Boulevard and consists primarily of Walnut Valley Unified School District property, as well as an approximately one acre strip of land along Brea Canyon Road west of the flood control channel. The flood control channel and the portion of the channel that breaches the City and school district properties is owned and maintained by the LA County Flood Control District. Lennar Homes is proposing to develop a new master planned gated residential community which consists of 182 for -sale dwelling units, as ED OCTOBER 8, 2013 PAGE 10 PLANNING COMMISSION well as a 4.7 gross acre -2.5 useable acre -neighborhood park to be dedicated to the City. The following entitlements are being requested and the Planning Commission will forward its recommendation to the City Council for a Vesting Tentative Tract Map to subdivide the property into 63 lots for the development of 182 units and a 2.5 net useable acre public park; Development Review of the proposed architectural landscape design elements associated with the proposed residential project; and, a Tree Permit to remove 83 existing protected trees and replace them at a 3:1 ratio with 249 trees to be planted on site. The project site can be described as a relatively flat plateau with steep slopes. There are three types of protected trees that currently reside on the property including 75 Southern California Black Walnut, 6 Willow and 2 Coast Live Oak. There are three intermittent blue line streams which flow generally from east to west. The site has unique planning challenges due to ancient landslides on the property and although the landslides are inactive, they have created layers of weakness that require designing the site to achieve minimum code of factors of safety. There are two main building pads proposed which were designed around the geotechnical constraints of the site. The site was designed to build the southeastern portion of the site indicated as Pad #1 at a higher elevation in order to establish grades that meet certain elevation targets to comply with the minimum safety factors. Raising the pad levels resulted in the curvature of the private streets. There are two 16 foot high retaining walls (highlighted in red on the plan) that separate the two main building pads. The townhome and detached single family neighborhoods are located on the lower pad which is indicated as Pad #2 and the detached single family neighborhood is located on Pad #1. The lower pad consists of two tiers, townhomes on the lower tier (far western portion of the site) and the single family detached condos on the upper tier (along the north side of the site). The design to build up the building pads along the southeastern portion of the site also helps to stabilize the slopes of the existing homes on Ambusher Street abutting the site. The basic framework for development of the underlying Tract Map, the Vesting Tentative Map, proposes to subdivide the property to accommodate the following different uses: 62 townhomes; 73 detached condominiums (cluster homes) on Pad #2; 47 lots for individual sale of production homes on Pad #1 along the southeast portion of the site; private streets, slopes, open space areas owned in common by the HOA and a neighborhood park. Lennar proposes to market the new community as Willow Heights and the development will consist of the three distinct neighborhoods previously mentioned, each of which will be defined by its own housing type. The project complies with the Specific Plan Design Guidelines through a diversity of architectural styles and smooth transitions between structures and landscape features. L" 1 0 R A ia` { OCTOBER 8, 2013 PAGE 11 PLANNING COMMISSION One of the neighborhoods includes 62 townhomes. Each structure is three stories high with a total of 11 structures. There are four different floor plans with livable areas ranging from 1,491 to approximately 2000 square feet. The townhomes have two architectural styles, Spanish and Italian. Buildings provide articulation and integration of various textures, colors and accents on walls, as well as variation of details around the entry doors to create individuality between the units. There are 72 units proposed for the cluster homes (detached single family condos). Each home is two -stories high with a maximum height of 32 feet. There are three different floor plans with livable areas ranging from approximately 1,800 to 2,000 square feet. The homes have good streetscape diversity facing Diamond Bar Boulevard and within the private streets. There is individuality between each unit that faces street views. All of the front entrances have alcoves. The Italian style has exposed rafter tails and stone veneer incorporated around the building are the Tuscan style has detailed cornices below the edges of the roof, trim around the corners of the exterior walls and wainscoting on the base of the building. There are 47 units proposed on 60 x 70 foot parcels which have two exterior styles, Spanish and Tuscan. Lot sizes range from approximately 4,000 to 7,800 square feet. Each home is two stories with the maximum building height at 29 feet. There are two floor plans with livable areas ranging from 2,850 to 3,400 square feet. These detached traditional single family homes have a higher caliber of design detail and materials such as simulated limestone around the base of the buildings, entry doors with roof elements and varied window enhancements that are thoughtfully arranged and balanced. The conceptual park plan incorporates an approximately 4.7 gross area neighborhood park which contains the City owned parcel along Brea Canyon Road and 3.8 acres of land east of the flood control channel. The 3.8 acres includes a rain garden and paseo along the southwest portion of the site. The conceptual park plan was derived with input from the park design charrette early January 2013. The precise plan of the park is not part of the Planning Commission's review this evening; however, it is noteworthy that the Specific Plan envisioned the neighborhood park site near Pasado Drive with vehicular access through the park through a public street at Cherrydale Drive and Diamond Bar Boulevard. At the time, the Specific Plan did not envision a viable use of the City owned strip along Brea Canyon Road, therefore, was not viewed to be a park site since the area did not meet the 2 -acre minimum requirement. However, during the Specific Plan neighborhood workshops, the community wanted a park where it is currently proposed near Brea Canyon Road and with input from the park design charrette held early this year, Lennar came up with creative use of the land along. Brea Canyon Road by providing a link between the two parcels via a pedestrian bridge. OCTOBER 8, 2013 PAGE 12 PLANNING COMMISSION The park is comprised of the following features: The rain garden which serves a dual purpose as a public recreational amenity and a private stormwater collection facility for the residential development. The rain garden is modeled after a facility in Aliso Viejo, which is very similar to the one being proposed for this project. The park also contains an approximately 600 foot long. 30 foot wide pedestrian trail along the southwesterly boundary of the site. The pedestrian access is at the end of Pasado Drive which leads to the rain garden and pedestrian bridge that connects to the park. An entry feature will be located in close proximity to the corner of Brea Canyon Road and Diamond Bar Boulevard which will serve as a prominent landmark into the entrance of the City and the precise location of the park entry feature will be determined when the park plans are finalized. Parking for the park trailhead will be incorporated along the Brea Canyon Road on the City owned piece of property. The configuration and number of parking spaces will be finalized at a later date. SP/Lee showed slides of the Glenwood Basin in Aliso Viejo which showed trail access, native landscaping and water features. Primary access to the project is at Diamond Bar Boulevard at Cherrydale Drive which will serve as the spine road to the tract and terminates at the cul-de-sac at the southeast corner at the uppermost portion of the property. The development will be gated and the internal streets will be private roadways maintained by the HOA. Secondary emergency -only access will be provided at the cul-de-sac of Pasado Drive and will be gated to prohibit vehicular ingress/egress. The access way from Pasado Drive will be an entrance into the park from the adjoining neighborhood. Upon entering there will be a linear paved trail along the southerly boundary of the site. The proposed development is designed according to the Development Standards and Design Guidelines contained in the Site D Specific Plan and incorporates the following features: It provides a green and sustainability model requirement that looks at energy efficiency, as well as healthy indoor air quality, water efficiency, and the landscape irrigation will be designed for a future reclaimed water connection. Buildings will have 30 foot landscape setbacks from Diamond Bar Boulevard and along the perimeter of the project site. The building along street view will be articulated and diversified and in addition, a dense stand of Sycamore and Oak trees to replace the protected trees on site will be planted within the large slopes abutting the existing residences. All retaining walls constructed along Diamond Bar Boulevard will be three feet high with integral color -faced retaining walls and hedges to cover the face of the walls to soften its visual appearance along Diamond Bar Boulevard. The two 16 foot high Verdura walls will be filled with live vegetation landscaping and flowering evergreen vines will be planted at the top of the slope to provide for cascading plants to further landscape the retaining wall. Canopy trees will be planted along the private internal streets, as well as along Diamond Bar OCTOBER 8, 2013 PAGE 13 PLANNING COMMISSION Boulevard and special treatment and decorative textured pavement at the main driveway. The table compares the proposed project with the development standards in the Specific Plan and the Specific Plan assumes that there would be modifications to these standards with a project -specific application and that the appropriate setbacks would be determined at the project level. Based on the traffic impact analysis prepared for the original EIR and updated to address the proposed development, the proposed project will not cause any intersections or street segments in the vicinity to operate at unacceptable levels with the following mitigation measures and improvements: 1) At Brea Canyon Road and Diamond Bar Boulevard the developer will be required to widen and/or restripe the northbound Brea Canyon Road to provide second dedicated right -turn lanes; 2) widen and/or restripe the eastbound departure on Diamond Bar Boulevard to provide a third through -lane through the project frontage; 3) modify the existing median and restripe the westbound approach on Diamond Bar Boulevard to provide a second left -turn lane; 4) and maintain the existing bike lane on Diamond Bar Boulevard along the entire project frontage. At Cherrydale Drive and Diamond Bar Boulevard, the developer will provide: 1) an option left -through lane and a separate right -turn lane on the northbound approach; 2) restripe the southbound approach to provide an option left -through right -turn lane on Cherrydale Road; 3) widen the eastbound approach to provide a third through -lane along the project frontage; and f) widen the eastbound approach to provide a second separate right -turn lane. Additional improvements will include modifying medians and restriping Diamond Bar Boulevard to provide a single westbound left -turn lane and installing a traffic signal. In addition, the developer will pay fair -share fees of construction costs to implement additional traffic mitigation improvements. The project is designed to conform to the City's Hillside Management Regulations and the Specific Plan complements the character and topography of the hillside areas with 16 foot high Verdura walls which are lower than the maximum 18 foot high retaining walls prescribed in the Specific Plan. The retaining wall supporting fill slopes along the perimeter of the property do not exceed four feet. All finished slopes are not greater than 50 percent and earth tone building materials and color schemes are used to blend in with the natural landscape and landscaping is used to screen view of downslope building elevations. The project is designed to be compatible and complementary to the neighborhood by providing a quality housing development that will be attractive and serve as a visual gateway into the City; it is designed to minimize the negative impacts on the surrounding homes by providing landscape buffers; it creates minimal visual impact to the adjacent homes by building the new homes downhill on a lower pad level than the existing homes in the vicinity in order to retain view corridors; it creates a community environment with recreational OCTOBER 8, 2013 PAGE 14 PLANNING COMMISSION opportunities by incorporating a neighborhood park; and it incorporates a community identity through a landmark entry feature at the corner of Brea Canyon Road and Diamond Bar Boulevard. The project will include street improvements along Diamond Bar Boulevard with street trees, sidewalk and bike trails and will comply with the Streetscape Design Standards currently being drafted by the City, which will incorporate tree wells, bus shelters, fencing and walls within the public right-of-way. Although there is no view protection standard in the City's Development Regulations, staff required a viewshed analysis because the southeasterly portion of the site is more elevated than envisioned in the Specific Plan. As. shown in the visual simulations, the proposed development will respect the views of existing residential uses abutting the site. The key map illustrates the viewsheds from the rear yards of five existing residences located on Ambusher Street. These five homes were selected because the area of the site is elevated due to geotechnical constraints of the site. These residences are located approximately 120 to 190 plus feet away from the nearest buildings within the development. The existing residences are located on an approximately 10 foot higher building pad than the proposed homes. The applicant lowered the building pads by approximately 10 feet for the lots that most impact the lots on Ambusher Street. The City certified the Final EIR for the Specific Plan in February 2012 and the Final EIR analyzed the potential impacts resulting from the Specific Plan approval from both programmatic and project level perspectives. It analyzed development of the site for residential and recreational uses. With submittal of the project, staff prepared an Addendum to the Final EIR which includes minor technical changes in order to determine the project's consistency with the Specific Plan and documents that no new environmental issues have been identified. The project has been conditioned to include the mitigation measures to address the site-specific conditions for the project in order to make the project acceptable. SP/Lee noted a typo on Page 16 of the Resolution under Tentative Tract Map Condition of Approval #5 to include the following change to the last sentence: "If the 100th dwelling unit is within a multi -unit building, the building permit for the entire building shall be withheld until the park is completed." SP/Lee noted that staff received a letter from a resident recommending that the project be denied because the project will cause traffic to be worse than it currently is, a copy of which has been presented to the Commission this evening. Staff recommends that the Planning Commission adopt the attached resolution recommending City Council approval of Vesting Tentative Tract Map No. 72295, Development Review and Tree Permit No. PL2013-229, based on the OCTOBER 8, 2013 PAGE 15 PLANNING COMMISSION Findings of Fact, and subject to the conditions of approval as listed within the Resolution. C/Shah asked for an explanation of the proposed "optional" left turn. Rich Barretto, PE, LLG Engineers, who prepared the traffic addendum for the project, responded to C/Shah that it is an optional left through lane so the project would require the addition of appropriate striping to indicate that on a particular lane, a driver is permitted to make either a left turn or continue through the intersection. Chair/Torng asked for a clarification of the lot sizes on Page 5. He asked for a clarification of the "Next Gen" home also referred to on Page 5. SP/Lee explained that one of the floor plans in the 60 x 70 lots include a master suite. These homes are called multi -generational homes marketed by Lennar as "NextGen", The Home within a Home®. The intent of the suites is to provide a flexible space that is connected to the main living areas of the home which contains a separate space with separate entrance, living area, bedroom, wet bar and laundry unit that could be used for a variety of uses or lifestyles including a second master bedroom suite, entertainment area or guest suite. These homes will be required as part of the CC&R's, as well as a condition of approval to prohibit cooktop kitchen facilities and separate metered utilities. All utilities serving the site will be common and dependent on the primary residence. Chair/Torng asked if a fire truck could go through the secondary emergency access and SP/Lee said that the gate functions as a pedestrian access but also serves as an emergency -only access that allows safety vehicles which will be able to access the subdivision. CDD/Gubman said that neighborhood access to the park would be allowed for pedestrians at Pasado Drive which would be served by a pedestrian gate which would be locked during the hours the park is closed. In the event of an emergency requiring emergency vehicles or if the fire department mandates an evacuation, the gate would be opened up for such purposes. Chair/Torng asked if Sycamore trees were a proper replacement tree for protected trees. SP/Lee explained that Sycamore trees are a protected trees in the City's Tree Preservation Ordinance so the applicant will be replacing with Sycamores and Oaks, both of which are protected trees. Chair/Torng opened the public hearing. Geoff Smith, Lennar Homes, applicant, said that Lennar Homes is very excited to bring Willow Heights to the City and to the Planning Commission for its consideration. When this project was first contemplated, Lennar Homes was OCTOBER 8, 2013 PAGE 16 PLANNING COMMISSION very happy to read the Specific Plan because it is really a great example of modern master planning techniques and methods so Lennar simply used the Specific Plan as its template for moving forward. Beyond the Specific Plan, the company drew its inspiration from the rich character of the site, surrounding area and the authenticity and rich character of the City. For example, Lennar Homes took to its heart the Tree Protection Ordinance and will use Live Oaks and Sycamores which are protected trees in Diamond Bar. These trees will be used throughout the site as a street tree and in focal areas, open space areas, etc. Lennar is using materials such as pavers and retaining wall in neutral earth tones to blend the development into the hillside. Lennar is using decorative luminaires in the streets that will provide a common design theme throughout the community. And the community will boast sustainable building practices such as high energy efficient homes, use of low VOC paint and drought tolerant landscaping. The homes located in one of three neighborhoods offer a diverse range of housing types for the City and will provide for a broad range of lifestyles. Some homes will be designed to meet the needs of multi -general households, which is a very common situation in today's society. With all of that said Willow Heights will bring a wonderful amenity to the City, with the four - acre public park which will offer new linkages to existing trails that will provide a connection to the natural environment and promote a healthy lifestyle. He introduced his design team and offered to respond to any questions the Commissioners might have. C/Lin said there was a specific reference to "the sufficiency of the project's sewer storage" and it was very vague as to how it will be solved when the sewage capacity is overrun. Mr. Smith responded that the EIR spoke in broad terms about the site sewer being connected to a public system. As Lennar moved forward with its technical studies there was a specific study done generating sewage rates, etc. and through that process working through the City and LA County Public Works Department, it was determined that the storage capacity of the existing system for decades has been deficient when it comes to emergency storage. So during this process which is still ongoing as to how the City, as the owner of the system, and how LA County as the maintenance purveyor of the system, can work together to increase the emergency capacity or the safety of the system during power outage and other emergencies. Willow Heights was somewhat caught in the middle of that situation so Lennar's solution to that tonight is that Lennar will be paying a fair - share fee to the City that is related to this project's fair -share of the emergency storage. At a later date, the City and LA County will address the deficiency. C/Lin said it was a very costly undertaking and was surprised that the sewage capacity was deficient and in case of a major power outage after two hours the sewage would spill back. C/Lin said that neighbors are very concerned about the traffic. He read the traffic report this evening which states that this project will generate about 1,800 n t RAFT OCTOBER 8, 2013 PAGE 17 PLANNING COMMISSION cars per day which is not a lot in the scheme of things except during a.m. and p.m. peak hours when Diamond Bar Boulevard usually spills back to the proposed project entrance. The report says that both today and in the horizon year of 2030 when everything is built out, the level of service will be E and F for those intersections under analysis. Furthermore, there are recommended improvements but he did not see the resulting analysis after implementation of the recommendations. Also, it was not quite clear that upgrading street facilities at a cost of about $6.1 million would meet the horizon years' traffic demands. And, the project share is only $158,000 which seems to be a very small portion. He lives in a newer gated facility and he wanted to know how far the gate would be located from the street. He presumes that the project does not want to have a guardhouse at the gate in the future. In fact, his neighborhood did not intend to have a guardhouse but later put one in. A guardhouse is usually 20-25 feet further toward the street from the gate which means that at times, the tail of the third car might be sticking out into the street. Mr. Smith said he understood about the stacking distance behind the gate. Lennar asked the traffic engineer to look at that to ensure that a reasonable number of cars could stack behind the gate while it opened and Lennar felt comfortable with the design. He said he would check to see the exact distance between the gate and the street. He knows that the LA County Fire Department has definite requirements for that issue. C/Lin said that 50 feet is required. Mr. Smith said that in terms of level of service questions were best left to his traffic engineer. Rich Barretto stated that with respect to project impacts to the surrounding street system that yes, Diamond Bar has congested intersections and interchanges which are most likely due to bypass freeway traffic. The report identified locations of impacts at Diamond Bar Boulevard and Brea Canyon Road, Cherrydale Drive at Diamond Bar Boulevard and the southbound ramps at Diamond Bar Boulevard. With respect to the impacts at the southbound ramps and Diamond Bar Boulevard, the mitigation has been completed. That area has been signalized to take care of the bad service level. With respect to Diamond Bar Boulevard and Brea Canyon Road, the report calls out what the resulting service level would be at that intersection if the mitigation measures as identified were implemented and the result is a good service level. At Cherrydale Drive and Diamond Bar Boulevard, the result of implementing the mitigation measures is a good service level. Tables call out the result of implementation of recommended mitigation measures. He referred to Table 6, intersection 16 which looks at a buildout scenario. Regarding the project's fair -share of only $154,000 of the total $6.9 million projected for mitigation measures, it is relative to the project's contribution from a volume standpoint to the intersection. Table 6, ICU increment barely gets more than 2 percent at any of the intersections and in most cases, the report is down to the third level before any project impacts can be identified which is the primary reason the project's share is so small — it is because the measurable impact resulting from the added volume from the project is so small to everything else that is going on in the area. 1,500 trips during peak hours in comparison to what the original traffic study looked at with 11 DIR 6"T OCTOBER 8, 2013 PAGE 18 PLANNING COMMISSION a mixed-use commercial with 150,000 square feet of retail resulted in over 9000 daily trips and under that scenario that project's impact resulted in a much higher fair -share contribution. Because this project looks at residential units based on peak hour volumes it actually lowers the volume. If all of the improvements are implemented along the frontage at Diamond Bar Boulevard and Brea Canyon Road the project's impacts are more than offset. In fact, more capacity will be added for the traffic making its way through the City and not traffic that is generated by the project. Relative to the gate location, the document reports on the LA County Fire Department requirements for access and location and beyond that the analysis looked at a queuing assessment. Figure #14 calls out the dimensions including the location of the call box which is 50 feet in from the property line and from the curb face it is probably closer to 60 feet. The critical issue for most gated communities is not what the residential queue would be, because the remote gate opener in the driver's car would have been used and the gate would be open by the time the driver reached it. The guest queue demand for a community of this size would most likely be no more than one guest car during the peak period. He said he felt confident in saying that there would not likely be an issue of visitor vehicles backing up onto Diamond Bar Boulevard. C/Lin asked for confirmation that the $158,000 fair -share fee was a fee in addition to completion of the mitigation measures. Mr. Barretto responded "absolutely" and that includes the supposed share for the Diamond Bar Boulevard and Brea Canyon intersection for which the City is making improvements beyond the project's recommendations. On top of that, the signal is already installed at the southbound ramps but because the starting point on this project was pre -signal it made sense to do an apples - to -apples comparison and consider how the street may have changed from that standpoint. C/Dhingra said the plans show 6,000 cubic yards more of cut than the 2013 EIR indicates. He asked how the impacts of the truck traffic would be mitigated during grading and construction. Mr. Smith said that he is concerned about truck traffic on the City streets as well, and one of the conditions of approval is to prepare a traffic control plan for any construction traffic that would be required on City streets. In terms of the 6,000 yards, there may or may not be that amount by the time all of the grading activity and soil shrinkage occurs. There may not be any export or there may be more export. The odds are that there will be some export from the site and plans will be implemented to keep the City streets safe and proper demarcation of sidewalks and bike lanes will be done. C/Dhingra asked if this was intended to be a mitigation measure and Mr. Smith said he believed it was a condition of approval prior to grading permit. Jeanette Ulrich, Assistant Superintendent of Business, Walnut Valley School District, stated that the district is very excited to be involved in this project with Lennar Homes. The Walnut Valley Unified School District is a very desirable district for schools to attend as the areas within the district are very sought after M DFIA OCTOBER 8, 2013 PAGE 19 PLANNING COMMISSION with respect to property and property values. Should the district succeed with the closing of escrow in this project the district can continue to provide a superior educational program for students within Diamond Bar and the City of Walnut and to continue updating its facilities and keep its facilities in the condition they are matured to at this time with the support of the constituents in the issues of Measures S and Y which moves modernization of facilities forward. She thanked the Commission for its consideration. Chair/Torng repeated that the public hearing was open for comments. Taylor Luan, 20955 Gold Run Drive, felt the project would negatively impact an already difficult traffic situation, especially during peak hours and wanted to know if that issue was addressed in the report. He complained that mature trees would be replaced with smaller trees. Vinod Kashyap, 21452 Chirping Sparrow Road and 3839 Castle Rock Road, said he went to the City Council meeting and expressed his concerns that the EIR was flawed for the following reasons: The EIR was based on as if one was doing a room addition on a cul-de-sac. He asked if he could have a list of people who were mailed notices because he lives within 300 yards and from what point is the distance measured for notices. He did not believe that anyone is living within 300 yards. CDD/Gubman touched on the history. This land was given to the school district in 1970 when the SR 57 was built, specifically for educational purposes. He is personally going to have Supervisor Knabe investigate the City Council and this entire process because the City paid for the EIR and said he believes fraud is being perpetrated on the citizens of Diamond Bar. He stated that this project is not going to happen. RECESS: Chair/Torng recessed the meeting at 9:08 p.m. RECONVENE: Chair/Torng reconvened the meeting at 9:20 p.m. Taylor Luan, 20955 Gold Run Drive expressed concerns about removal of mature trees and traffic in the area. Nick Prokop, 20909 Gold Run Drive was upset that this was a "done deal' and wondered why he was here this evening. He was concerned about traffic and other issues. He commented that when the City was unincorporated the citizens were promised that incorporation would never happen and look at where we are today. John Jones, 20925 Ambushers, stated he is a woodshop teacher and walnut trees make great furniture. He understands the EIR and Specific Plan are approved and will move forward and wondered if the trees that were being removed could be used for class projects. He was also concerned about OCTOBER 8, 2013 PAGE 20 PLANNING COMMISSION construction relocating wildlife into nearby neighborhoods. He was also concerned about traffic but believed traffic would be a problem in the City whether or not this project was built. He further added that he visited a new park in the City of Brea and would like to see one here too. He asked if the wetlands (rain garden) was designed to address mosquito problems. Octavio Colon, 3101 Crooked Creek Drive, asked why the fire fighters and police were not present tonight and was curious to know how the proposed development would impact the response time. He was also concerned about wildlife, and the trees that would be removed. He stated that he lives on a curved street and it was designed incorrectly. He asked who would be responsible if a car ends up on his yard. Ryan Farsai, Laguna Hills and owner of the Diamond Bar Arco station said he understands the neighborhood's concern however he was in favor of the project and believed it would beautify the corner and rid the area of trespassers and dirt bike riders. Darcy Gunter, 3427 Castle Rock Road said they told her that she could not attend any meetings (she did not clarify who "they' were) and pointed out the location of her house and how she thought the project would affect her. She stated that this was the first she heard of these meetings and did not know they were going on for as long as has been mentioned this evening. She believes the City did not do a good job in notifying the residents and she is very upset. She went to the' board and identified her home and wanted the Commission to know how this development would affect her neighborhood. She believes it is a bad development that would lower the value of homes around her neighborhood. After hearing Ryan Farsai speak in favor of the project she said she would no longer buy her gas at the Arco Station and would persuade her neighbors to do the same. Lew Herndon, resides on Rio Lobos, spoke on behalf of Pastor Mark Hopper of the Evangelical Free Church located across the street from Site D. Pastor Hopper had to leave the meeting due to another commitment. The church wants to know if this project would cause the City to withdraw its permit for street parking on Diamond Bar Boulevard in front of the church on Sundays. David R. Busse, 21455 Ambushers Street attended all of the meetings. Unfortunately, when the applicant was responding to comments people were speaking from the audience and he missed the response about how high or low the new houses would be compared to his house. He still has not received an answer to that question. He has listened to the applicant but still no direct answer how high or low the homes will be as it relates to his property. He said he did not want to live in Irvine or Aliso Viejo or sit in traffic for 40 minutes. He added that there should be access to the park from the development. He was OCTOBER 8, 2013 PAGE 21 c=� a„fig F, A F PLANNING COMMISSION upset that this appeared to be a done deal with a lack of transparency and it greatly concerns him. Fara Lou, resides on Gold run. She stated that she has concerns with the planting of Sycamore trees causing allergies. She asked if adequate visitor parking is provided on-site and whether it complies with the development code. Mike Perez, 3241 Castle Rock, stated there was lack of transparency and information was not on City's website. James Eng, 20935 Running Branch Road, expressed concerns about traffic patterns at the intersections of Diamond Bar Boulevard at Brea Canyon Road and at Copper Canyon Road on work days. Salim Akbany, 21179 Chirping Sparrow Road, said he was ignorant about this project until today and now finds it is progressing toward conclusion and questioned the notification process. Brenda Ashraf, 3407 Crooked Creek Drive said that until today she knew nothing about this project and did not understand the concept of protected trees if the trees were going to be removed. Chair[Torng closed the public hearing. Mr. Smith responded to Mr. Busse that in working with staff, existing home sites were selected because they represented the "worst case” of the viewshed. The way the topography works is that these homes climb higher further away from Willow Heights so the viewshed becomes better and better as one moves up Ambushers Drive. He provided a visual to show Mr. Busse that at a certain point his home is 74 feet above the homes and over 335 feet away. The Tentative Tract Map establishes grades and the rear yard of the home pointed out on the visual is 74 feet above the grade established on the Tentative Tract Map. Mr. Busse asked if that grade was higher or lower at that point than the present elevation of the ground. Mr. Smith responded that the proposed grade is roughly 10 feet above natural in that area. Mr. Smith explained that the viewshed analysis is based on proposed and not existing so the analysis is reflecting the future condition. Mr. Smith responded to speakers concerned about tree replacement that there are a number of problems with the Black Walnuts. The landscape architect explained that he attempted to work within the confines and outline of the replacement trees that were dictated by the City and while the Black Walnut is certainly a candidate tree, in his experience it tends to have a weak branch structure and is susceptible to breakage during windstorms. And while this is no longer an open space situation and more of a rural suburban development, i�` !, if a �G� j` OCTOBER 8, 2013 PAGE 22 PLANNING COMMISSION his team sought a tree that was more respectful of those exposures and leaned toward the Sycamore. While there have been comments about the allergy consideration of the Sycamore, there are considerations with different cultivars of Sycamore and he is not sure that the tree replacement that the City has provided allows for that interpretation but it may be a consideration. The same is true of Oak Trees. There are smaller varieties of oak trees as opposed to Live Oak that would allow for planting of more oaks and less Sycamores which is also a consideration. Mr. Smith stated that as the project moves forward with its final design they will work with staff to choose the correct variety and number of Sycamores versus Live Oaks to create a good balance. As part of the permits with the Fish and Wildlife Agency they are mitigating at a 3:1 ratio Black Walnut habitat offsite. Mr. Smith responded to a question about traffic on Pasado Drive. This project will not be using Pasado, Crooked Creek or Castle Rock as construction entrances. The construction entrance will be off of Diamond Bar Boulevard and will have a traffic control plan implemented for construction traffic. Mr. Smith responded to a question about rodent control prior to grading and Lennar has agreed to a Condition of Approval prior to grading that would involve rodent control. This is a concern that the company has had in the past that as soon as the machines are fired up the rodents move into neighbors yards so there will be a rodent control measure implemented. Mr. Smith responded to a question about a timeline and stated that Lennar is planning to break ground in January 2014 and should have model homes open in the fall of 2014. Mr. Smith stated that with respect to mosquitoes in the rain garden, Lennar will be working with the LA County Vector Control. Most important is that the park maintenance plan will be critical and Lennar will work with City staff on an adequate maintenance plan that will ensure that any plants that are grown in the pond do not take over the pond and become a mosquito habitat. Regular maintenance will be provided to ensure that mosquito fish are kept alive and the ponds can be adequately accessed to keep them maintained which will be part of the strategy going forward. Regarding comments about the pictures of the Aliso Viejo Glenwood Basin, Mr. Smith indicated that tonight the design details of the park are not being addressed but it will be the City's unique opportunity to help Lennar design the park that meets the City's and community's needs. In no way is Lennar attempting to copy a landscape palette from Aliso Viejo, this park will be the City's own and Lennar will be working with the Parks and Recreation Commission and CSD/Rose and his people to ensure development of a park that meets the needs of the City. OCTOBER 8, 2013 PAGE 23 PLANNING COMMISSION Mr. Smith responded to comments about emergency access, traffic and the fire department review. The Tentative Tract Map was reviewed by the LA County Fire Department and was approved as part of the process. Mr. Smith stated in response to a comment about construction hours that the City Ordinance calls out hours of 7:00 a.m. to 7:00 P.M. Monday through Saturday and the project hours will typically not go until 7:00 p.m., rather typically to 3:00 p.m. There are times when extended work is necessary but by and large construction will go from 7:00 a.m. to approximately 3:00 p.m. Monday through Friday. , C/Shah asked Mr. Smith to comment on visitor parking for the park. Mr. Smith said that this project far exceeds the visitor parking requirement called out in the Specific Plan. Visitor parking is distributed throughout the site and generally for the single family detached homes and the detached condos the parking will be along the backbone streets which are wide enough to accommodate parking on both sides. For the townhomes, parking stalls will be spread throughout the area. C/Shah asked about access points for the park area. Mr. Smith said this is a very important consideration that Lennar has given a lot of attention. Certainly, there will be pedestrian public access from Pasado Drive. From inside the community there will be points of connection for pedestrians and obviously, the entrance will also have pedestrian gates. Other access points are under consideration. C/Lin asked the distance between the intersections of Diamond Bar Boulevard and Cherrydale Drive and Brea Canyon Road. Mr. Smith responded that the distance is approximately 900 feet. C/Lin asked if the traffic engineer tested the queuing to see if the overall coordination would work during the pm peak hours. Mr. Barretto responded that the 800-900 feet meets the stacking requirement for the project. Cherrydale is a non -issue. The project is adding a second lane southbound on Brea Canyon which extend +220 feet. The critical movement is the westbound left to go southbound and bypass traffic to northbound right. The project improvement is the second northbound right. With respect to comments about traffic, Mr. Barretto explained that from a traffic standpoint and a modeling standpoint, the general belief is that when projects like these are built, traffic generally gets worse which may be the case in some instances; however, when the project is actually putting in capacity enhancing improvements like a second westbound left and a second northbound right, the post project condition is actually better. C/Shah said that the City and residents are very concerned about cut through traffic and 2030 projections. Mr. Barretto said that as these improvements are installed the traffic gets to a good service level and the project is actually OCTOBER 8, 2013 PAGE 24 PLANNING COMMISSION implementing one of the most important improvements in the City because of the congestion in the area. C/Shah said the report did not project cut through traffic. Mr. Barretto said that C/Shah is correct. One of the modeling expectations when looking at forecasting volumes in the future is to either use a model that tries to consider what is happening on the freeway, or whether it is a straight line growth or compounded growth. What the report does take into consideration is what is happening in terms of planned improvements so the forecast volumes take into consideration the project, freeway, proposed improvements and Caltrans proposed improvements. Is it to the point one could actually predict that all of this growth that is happening between now and 2030 is X amount of cut through traffic and that cut through traffic will double or triple? No, the report does not get into that level of specificity. C/Dhingra said that earlier it was stated that the distance between Brea Canyon Road and Cherrydale Drive was about 900 feet. He asked what kind of stacking Cherrydale Drive can take to make a left turn exiting the development. Mr. Barretto reiterated that the gate is 80 feet back and will accommodate four cars. There has been a lot of talk about cut through traffic but when people come off of the SR57 to make a right turn on Grand Avenue it is the portion of roadway that is generally most congested. One of the mitigation measures is to put pressure sensors on the extension of Cherrydale Drive which would give a driver the prior right to make a left turn. This is a City of Diamond Bar issue, not a project issue, and is probably not within the purview of the Planning Commission but more likely within the purview of the Traffic and Transportation Commission to see how the arterial and cut through traffic that has to sit at traffic lights will quit cutting through. His point to the designers is that four cars to make a left turn is not adequate because traffic will begin to stack up on Cherrydale Drive. Mr. Barretto responded that this project deals with less than 200 homes. C/Dhingra said that what is not acceptable is that during peak hours only four people can make a left turn. Chair/Torng said he believed that the City had been open and transparent about this project and he has complete confidence in City staff. The audience seems to have concerns about the issue of transparency and he asked staff to tell the audience where they can get the information pertinent to this project. Chair/Torng also asked staff to comment on the notification procedure. CDD/Gubman stated that the notification boundary is 1000 feet from the perimeter of the project. He used an overhead to show the perimeter and indicated that all properties touched by the 1000 foot radius would receive a notice. In addition to properties within 1000 feet of the exterior boundaries of the project site a mailing list was maintained for individuals that had contacted the City in response to other notifications, either in the City's newsletter or the City's website. When the EIR was out for public review and when public workshops were being held there was information on the homepage of the OCTOBER 8, 2013 PAGE 25 PLANNING COMMISSION Diamond Bar website. There is still information on Site D under a search bar on the home page. In addition to the radius and people who asked to be notified, through the four workshops that were held during the entire Specific Plan and Park effort, anyone who attended those workshops and signed in were added to the mailing list. There were several efforts to publicize this project during the Specific Plan process and through the notification process, while state law requires a 300 foot radius Diamond Bar goes out 1000 feet and adds to its mailing list when requested to do so. In addition to the numerous contacts received by the City when the Draft EIR was released for public review, those individuals were added to the mailing list. In terms of transparency, the City makes every effort to go as far as possible to notify people. Unfortunately, no matter how genuine the attempt to provide public notification, staff always hears it has fallen short. The reality is that the City takes extra efforts to reach out to the public about its projects. Chair/Torng asked about a speaker's concern regarding the Church parking issue and CDD/Gubman said he had no response other than if the Church is currently permitted by the City to park on the street it is a Public Works approval and a matter for that department. He said he did not see a nexus between development of this project and continuing the on -street parking along the Church frontage. The Church is looking at doing some improvements. In fact, CDD/Gubman has met with Pastor Hopper about plans being envisioned for the site which include opportunities to add off-street parking and parking within the Church campus. He said he did not believe there would be anything as a result of this project that would preclude an ongoing practice with respect to on -street parking to serve the Church. C/Dhingra asked if the Tree Ordinance contains a blanket 3:1 replacement ratio or is it based on tree damage which evolved into a ratio of 3:1. CDD/Gubman said the Ordinance calls out a 3:1 ratio and there is a minimum diameter and the caliper for a protected tree has to be eight (8) inches and if it is at that threshold or larger it would have to be replaced at a 3:1 ratio. With the 3:1 ratio there is a proportion of a 24 -inch box and 15 gallon trees that have to be provided for. C/Lin said that there has been a lot of discussion about traffic issues and the purpose of this agenda item has been lost, one of which is to review the architectural landscape design elements. He asked if the building color is set in stone and CDD/Gubman responded that part of the Commission's design authority is to comment on the colors and make recommendations. C/Lin said that the color on the Tuscan home A-21 is not really earth toned. He would not buy a home with this color on the exterior. Mr. Smith provided the color charts to the Commissioners. Allen Scales from KTGY Group said he recognized that color output sometimes shifts on copy process and from one computer to the next. There is no intent to go with "blue" color schemes and the colors are A V' T OCTOBER 8, 2013 PAGE 26 PLANNING COMMISSION trying to conform to a warmer and richer earth tone. Certainly, the color design is very subjective and they are open to making changes and finding a palette that is acceptable to the City. The goal of the project is to provide variety to the street scene. The cluster home colors are provided six different color schemes to meet that objective — three are for the Spanish architecture and three additional color schemes for the Tuscan architecture. C/Lin said that when the plan is approved, the sequence of the color scheme will be set and homeowners will not be allowed to stray from those colors. Mr. Smith said Lennar would work with the architect, design team and the City to create a plotting of colors so that they are distributed in a way that makes sense and remains in overall harmony with the project. C/Lin is correct that the developer does not allow the homeowner to pick and choose colors because it could potentially create a "scatterboard" effect. The developer takes a holistic approach to the community in making sure that everything is in harmony and all of the design works together. C/Lin read from Item C on Page 5 with reference to selling a portion of a unit. He felt there was no way that the HOA would find out if a cooktop kitchen was installed because the best CC&R's would not prevent people from doing so. Mr. Smith said the intent of those conditions is to discourage the NextGen component of the home to be sold or rented. One could not sell the NextGen piece separately because the property is not being subdivided in that manner. Regarding the metering, the developer will be processing meter plans with the City and utility agencies and these homes will not have two meters and two services to each home. With respect to the cooktop, in any situation a developer can only control what it builds and a developer can set up CC&R's that it trusts and hopes will maintain the integrity of the community down the road. Ultimately, the developer does not have much control after that. He felt it would be prohibitive for a homeowner to put in a cooktop because it would result in a major remodel and at that point the City would not allow a building permit. C/Dhingra stated that with respect to this project, the scope of the Planning Commission is very narrow because the EIR has been certified and the Specific Plan has been adopted and approved. He is frankly very surprised that people have said tonight that they have not heard about this project. When one considers how long this project has been in the works and in his opinion, staff has done a tremendous job. There were four workshops and residents within 1000 feet of the project were notified even though the state requires only 300 feet. The Planning Commission's scope is the Tree Permit, Development Review (architecture and color schemes, etc) and Vesting. Vesting is essentially the right of the property owner to develop the property. The Commission's scope is to determine that this project complies with the Specific Plan and that the EIR has been certified. If people feel strongly about a R OCTOBER 8, 2013 PAGE 27 PLANNING COMMISSION developer being able to drive a tractor through the area they need to challenge CEQA on the matter. From his vantage point he is satisfied that the Tree Permit complies with the City Ordinance. The applicant made concessions to look at a different blend of Sycamores and Oaks for a better balance in the event that some of the species produce more allergies and 75 of the trees are Black Walnut which will be mitigated under a California Fish and Game Wildlife Permit. Someone asked why the City would destroy protected species and if they are being destroyed at.a 3:1 ratio those trees are being planted elsewhere in accordance with the state agency's requirement. With respect to the Development Review, there is room to figure out the final color panels and there are at least one half dozen schemes that have been shown to the Commission. Regarding the Vesting Tract Map he understands that traffic is an issue but traffic is an issue not because of this development, it is because of the people using Diamond Bar Boulevard as an alternative to the freeway which is not within the purview of the Planning Commission. Perhaps people who are present tonight could attend one of the Traffic and Transportation Commission meetings and ask them to alleviate those concerns. The Traffic and Transportation Commission would provide a more appropriate forum for those particular concerns. ; C/Shah said he agreed with C/Dhingra's summary of the project. The community has some good ideas about the traffic and believes these issues should be aired in front of the Traffic and Transportation Commission which has the authority to respond to such concerns. What he observed is that the developer has shown good faith in his estimation of this project. He is and will remain concerned about traffic but that issue is not within the purview of the Planning Commission. C/Lin echoed C/Dhingra's comments that the scope of tonight's meeting is limited to those three items. He understands that traffic and other issues are very emotional issues for residents. He believes the developer is doing their best to mitigate the 1,500 daily vehicle trips and spending a substantial amount to alleviate the traffic issue. The big problem is 50,000 or so cars a day on Diamond Bar Boulevard that will not go away whether a piece of property is developed or not. Chair/Torng thanked residents for attending tonight's meeting and understands their concern for Diamond Bar. He thanked staff, his colleagues and the developer for addressing all of the questions and concerns. Tonight's decision will be based on the facts and what the Planning Commission is challenged to do at this time. Chair/Torng advised Mr. Herndon to contact staff about parking on Diamond Bar Boulevard in front of the Evangelical Free Church. C/Dhingra moved to approve staff's recommendation that the Planning Commission recommend approval to the City Council of Vesting Tentative Tract OCTOBER 8, 2013 91 0 PAGE 28 PLANNING COMMISSION Map No. 72295, Development Review and Tree Permit No. PL2013-229, based on the Findings of Fact, and subject to the conditions of approval as listed within the resolution. C/Shah seconded the motion. Motion carried by the following Roll Call vote: AYES: COMMISSIONERS NOES: COMMISSIONERS ABSENT: COMMISSIONERS Dhingra, Lin, Shah, VC/ Farago, Chair/Torng None None PLANNING COMMISSIONER COMMENTS/INFORMATIONAL ITEMS: C/Shah said this was an interesting meeting that was handled very well by Chair/Torng and his colleagues. Of course staff put a great deal of effort into tonight's presentation and he thanked staff and Lennar Homes. C/Dhingra thanked staff for doing such a wonderful job and preparing the Commission as it did. He said he was very pleased to see the participation by the public on a project like this. If nothing else it not only voices their concerns it shows their concern for the community in which they live and in the City as a whole. VC/Farago thanked staff for doing a great job preparing the Commission for tonight's meeting. He thanked C/Dhingra for so eloquently stating the Commission's charge to the public which really moved things along. Chair/Torng felt C/Dhingra did a very good job tonight and the City is very fortunate to have such an experienced individual join the Planning Commission. He just learned that four of the five Commissioners are engineers. VC/Farago said he was a construction manager. Chair/Torng thanked staff and his colleagues for a very smooth meeting. The Commission does its best to do its job as it is charged to do for the benefit of the community. STAFF COMMENTS/INFORMATIONAL ITEMS: 9.1 Public Hearing dates for future projects. CDD/Gubman thanked the Commissioners for their compliments to staff for supporting them for their charge as Commissioners. He highlighted SP/Lee's exemplary efforts in preparing a very difficult staff report and putting together a very densely packed and information filled presentation and delivering it to the Commission. It was not an easy task and was made even more difficult because she had to turn in her work to him to be reviewed because he is not the shiest person with a red pen. OCTOBER 8, 2013 PAGE 29 PLANNING COMMISSION The next Planning Commission meeting is October 22. He will be on vacation that week and the meeting will be staffed by SP/Lee. The October 22 agenda consists of the matter that was continued tonight, the new residence on Falcons View. In addition, there is an addition to an existing residence on Birdseye. The continuance for the addition on Ridgeline to address the retaining wall issue, the applicant is ready and the item will be heard on November 12, the only item on the November agenda at this time. 10. SCHEDULE OF FUTURE EVENTS: As listed in tonight's agenda. ADJOURNMENT: With no further business before the Planning Commission, Chairman Torng adjourned the regular meeting at 10:47 P.M. The foregoing minutes are hereby approved this 22nd day of October, 2013. Attest: Respectfully Submitted, Greg Gubman Community Development Director Tony Torng, Chairman PLANNING COMMISSION AGENDA REPORT CITY OF DIAMOND BAR - 21810 COPLEY DRIVE - DIAMOND BAR, CA 91765 - TEL. (909) 839-7030 - FAX (909) 861-3117 AGENDA ITEM NUMBER: 7.1 MEETING DATE: October 22, 2013 CASE/FILE NUMBER: Development Review No. PL2013-77 PROJECT LOCATION: 24074 Falcons View Drive, Diamond Bar, CA 91765 (APN 8713-041-015) GENERAL PLAN DESIGNATION: Rural Residential ZONING DISTRICT: RR (Rural Residential) PROPERTY OWNER: Mei Deng #500-999 West Broadway Vancouver, BC V5Z IKS. APPLICANT: Steven Phillips 23177 La Cadena Suite 101 Newport Beach, CA 92653 SUMMARY: The applicant is requesting approval of a Development Review application to construct a new single-family residence consisting of 13,360 square feet of living space, and 2,207 square -foot four -car garage on a 1.21 gross acre (52,707 square -foot) lot. RECOMMENDATION: Adopt the attached Resolution (Attachment 1) approving Development Review No. PL2013-77, based on the findings of Diamond Bar Municipal Code (DBMC) Section 22.48, subject to conditions. BACKGROUND: The application was originally placed on the October 8, 2013, Planning Commission agenda. However, the applicant did not post the site with a public hearing notice board at least 10 days prior to the hearing date as required. On October 8, 2013, the Planning Commission opened the public hearing and continued the item to the October 22, 2013, meeting to allow additional time for all of the public hearing notification requirements to be met. Proiect Description The proposed new single-family home consists of the following site plan and architectural components: Site Plan The site is located in The Diamond Bar Country Estates (The Country) on the east side of Falcons View Drive, south of Indian Creek Road. It is an existing vacant lot with no protected trees on site. The site has an irregularly shaped front property line (see below) where the front property line jogs in 30 feet and continues towards the north property line for another 71 feet. Approximately half of the street frontage is, thus, actually an extended portion of the adjacent neighbor's property to the north. The applicant is not proposing to construct any improvements on this portion of land for access. Legend t�I_- Subject Property Adjacent Property to North Approximate Location of Street Development Review No. PL 2013-77 544501!' FH '/ - T40080t" SFS - ' 78.30 50.14 NO y o' 162 SF „9 5682*"PST 4203 RU �.(�,. 060tSF� 61, 24 _ - ^; 7 ' `l f •'o RNs 7,21 AC 0 10t"PST Rr�TR/ 0,1W*Ru `'- VSPq CTPp s 26 K IPA s sF 10 ` 16 ' 94g9;) �o N oz"Psr 2b 3 ea 000 Page 2 of 13 The property's gross lot area is 52,707 square feet (1.21 acres), and includes a 30 -foot wide private street easement for Falcons View Drive along its frontage. There are two Restricted Use Areas on the site—one along the south side property line and another located towards the northeast corner of the lot. The property's net buildable area (i.e., minus the private street easement and the Restricted Use Areas) is 45,421 square feet (1.04 acre). Landscaping is proposed throughout the front and rear yard to enhance the architecture and to create an overall site design that blends in with neighboring homes and the natural environment of the site. Staff is including a condition of approval to remove the proposed parking area in the front yard and replace with landscaping. The only hardscape allowed within the front yard is for driveways leading to a garage and walkways. Architecture The proposed three-story, single-family residence consists of the following components: 3,965 square -foot basement floor consisting of an art studio, game room, movie theater, wet bar, wine cellar, laundry room, bedroom, and powder room; ® 3,464 square -foot first floor living area including library, living room, dining room, kitchen, great room, art gallery, bedroom and bathroom, and powder room; 3,218 square -foot second floor living area including master bedroom suite, three bedrooms and bathrooms, and second library; 2,207 square -foot four -car garage located on the basement level; 9 304 square -foot patio cover in the rear yard; ® 2,471 square feet of patios and loggias; and ® Pool and spa. The height of the proposed building is 35', measured from the finished grade to the highest point of the roofline. The applicant has obtained approval from The Diamond Bar Country Estates Association. Development Review No. PL 2013-77 Page 3 of 13 Site and Surrounding General Plan, Zoning and Land Uses Site Aerial ANALYSIS Review Authority (Diamond Bar Municipal Code (DBMC) Section 22.48) Construction of a new single-family residence requires Planning Commission approval of a Development Review application. Development Review approval is required to ensure compliance with the City's General Pian policies, development standards and Development Review No. PL 2013-77 Page 4 of 13 Gen Zoning District Land Use D- . Rural Residential RR Vacant Site North Rural Residential RR Single -Family Residential South Rural Residential RR Single -Family Residential East Rural Residential RR Single -Family Residential West Rural Residential RR Single -Family Residential Site Aerial ANALYSIS Review Authority (Diamond Bar Municipal Code (DBMC) Section 22.48) Construction of a new single-family residence requires Planning Commission approval of a Development Review application. Development Review approval is required to ensure compliance with the City's General Pian policies, development standards and Development Review No. PL 2013-77 Page 4 of 13 design guidelines, and to minimize adverse effects of the proposed project upon the surrounding properties and the City in general. As stated in Section 22.48.010 of the Development Code, the Development Review process was established to ensure that new development and additions to existing development are consistent with the General Plan "through the promotion of high functional and aesthetic standards to complement and add to the economic, physical, and social character" of Diamond Bar. Development Review (DBMC Section 22.48) Development Standards: The following table compares the proposed project with the City's development standards for residential development in the RR zone: abuts a descending slope. Site and Grading Configuration: The project site is located on a rectangular shaped lot with an average descending slope of 14%. The applicant is proposing to cut 1,200 cubic yards of soil towards the front of the property and fill 1,200 cubic yards of soil towards the rear of the property; therefore, the site will be balanced. Page 5 of 13 Development Review No. PL 2013-77 The applicant is proposing split building pads throughout the property to step up the natural grade. A series of four, 4 -foot high tiered retaining walls will be constructed in order to create the required buildable pad at the rear of the property. Architectural Features, Colors, and Materials: The architectural style of the building is Italian Villa. The proposed Baroque gable serves as the entryway to the residence from the front yard. This design element is inspired from Italianate and Spanish Colonial Revival architecture of Adison Mizner. A low pitched, hipped roof with clay roof tiles is used to create a low building envelope and minimize massing of the structure. The scale and proportions of the building are well balanced and appropriate for the site. The applicant designed the project to have a variety of architectural elements to reflect the Italian Villa style, including the following design features: • Fagade details such as grouped windows, smooth stucco finish; • Decorative features, such as corbels, are proposed around the windows; Arches are incorporated on all sides of the building; and • Natural colors used to highlight architectural details. Front (West) Elevation Development Review No. PL 2013-77 Page 6 of 13 Rear (East) Elevation Side (South) Elevation Development Review No. PL 2013-77 Page 7 of 13 UU7 U371 0 - -- F__i_ - ------------ z ---- - - ----- ----- -- ----------------------- - -- - --- -- -- NORTH UVAMN Side (North) Elevation The applicant provided color samples which call for earth tone colors for the exterior finish to soften the building's visual impact on the hillside. Landscaping: Landscaping is used to soften the look of the paved surfaces, enhance the architecture, and create an overall site design that blends in with neighboring homes and the natural environment of the site. In the front yard, five -gallon shrubs such as rosemary, lavender, wiri blush, crimson dwarf Japanese barberry, orange flame torch lily are proposed along the driveway. Strawberry, Coast Live Oak, and Olive trees are proposed to frame the facade and complement the architectural massing of the house. Tall shrubs, such as dwarf Carolina laurel cherry, pineapple guava, and pride of Madeira, and trees, such as strawberry and California bay laurel trees, are proposed along the north and south side property lines to be used as additional screening between properties. A total of 49 trees will be planted on-site. Five and fifteen -gallon size shrubs, such as sweet pea, pink stripe New Zealand flax, heart leaf geranium, and desert azaleas, are used to screen the proposed retaining walls located in the side and rear yard. All plant types will be drought tolerant and non-invasive species. The project is required to comply with the City's water -efficient landscape requirements, which is noted on the preliminary landscape plans and will be verified during building plan check. The subject property is located within the Los Angeles County Fire Department "Very High Fire Hazard Severity Zone." Therefore, the proposed landscaping must comply with the Fire Department's Fuel Modification Plan requirements. The proposed landscaping plans will be submitted for review and approval by the Fire Department during building plan check. The plans show a parking area in the front yard. However, parking within the front yard is permissible only on driveways leading to a garage or when a circular drive is Development Review No. PL 2013-77 Page 8 of 13 provided. Staff included a condition of approval to remove the proposed parking area in the front yard and replace with landscaping. The landscaping will be reviewed during landscape plan check. Compliance with Hillside Management Ordinance (DBMC Section 22.22 The proposed project was reviewed for compliance with the City's Hillside Management Design Guidelines and regulations. DBMC Section 22.22.120(a)(1) establishes a height limit of 35 feet as measured from the finished grade to the highest point of the roofline. The project demonstrates that the proposed building will be 35 feet at the highest point. The project complies with all of the regulations and guidelines to ensure that development will complement the character and topography of hillside areas set forth in the Development Code. The project site was designed as follows: Avoid any excessive cantilevers on downhill elevations; • All proposed retaining walls associated with the building pad at a maximum exposed height of four feet; • Utilization of below grade rooms (basement level) to reduce effective bulk and to provide energy efficient and environmentally desired space; a Split pads are used to step up the natural slope;. a Architectural treatment is provided on all sides of the structure; and ® Earth tone building materials and color schemes are used that blend in with the natural landscape. The project complies with all of the regulations and guidelines to ensure that development will complement the character and topography of hillside areas set forth in the Development Code. _Compatibility with Neighborhood The proposed project complies with the goals and objectives as set forth in the adopted General Plan in terms of land use and density. The project will not negatively affect the existing surrounding land uses, and the design and appearance of the proposed single- family residence is compatible with the surrounding community. The project is designed to be compatible with the character of the eclectic neighborhoods in The Country Estates. The project incorporates the principles of tl)e City's Residential Design Guidelines as follows: Page 9 of 13 Development Review No. PL 2013-77 • The new single family residence will conform to all development standards, including building height and setbacks, which is consistent with other homes in the Country Estates; • A transition between the project and adjacent properties is achieved through appropriate setbacks, building height, landscaping, and window and door placement; • The proposed new single family residence is appropriate in mass and scale to the site; • Elevations are treated with detailed architectural elements; • Roof lines are representative of the design and scale of the structure through vertical and horizontal articulations such as hips; • Proper screening for ground and roof -mounted equipment is architecturally compatible with the dwelling in terms of materials, color, shape, and size and blends in with the proposed building design; • Large wall expanses without windows or doors are avoided; • Landscaping is used to emphasize and highlight focal points such as gardens, patios and walkways; and • Landscaping is used to soften building lines and blend in with the structure and its environment, creating a transition between the hard vertical edges of the structure and the softer horizontal lines of the site. Adjacent Property to North Additional Review Project Site Adjacent Property to South The Public Works Department and Building and Safety Division reviewed this project, and their comments are included in the attached resolution as conditions of approval. Development Review No. PL 2013-77 Page 10 of 13 On September 26, 2013, public hearing notices were mailed to property owners within a 1,000 -foot radius of the project site and the notice was published in the San Gabriel Valley Tribune and Inland Valley Daily Bulletin newspapers.. The project was continued from the October 8, 2013, Planning Commission meeting because the site had not been posted with the public hearing notice board. A notice display board was posted at the site on October 8, 2013. Because the public hearing was opened and continued to the October 22, 2013, Planning Commission meeting, the project did not require re -noticing and re -advertising in the newspapers. Public Comments Received On October 7, 2013, the adjacent neighbor located directly to the north at 2160 Indian Creek Road submitted a letter (Attachment 2) stating the following concerns with the proposed project: 1. There is illegally filled soil on the property and it needs to be removed to reflect the natural grade on the property. The foundation of the new residence should be able to support the neighbor's property to prevent any damage or -landslide. Staff Response: The Public Works/Engineering Department is aware that a stockpile of earthen material was illegally dumped on the subject property. The stockpile will be addressed during grading plan check through the submittal of a geotechnical report, along with precise grading plans. Grading and foundation design methods will follow the recommendations of the geotechnical report and be subject to California Building Code requirements to avoid structural or slope failures. In addition, the foundations of the new residence will be submitted to the Building and Safety Division during plan check for compliance with the California Building Code. 2. There is a 70' x 30' area of land in front of the subject property that belongs to the adjacent neighbor located to the north, and cannot be used for a driveway; Staff Response: The applicant is not proposing to do any access related improvements on the neighbor's property. The driveway and access will be located on the project site. 3. The adjacent neighbor to the north is concerned that the proposed house will be located too close to their swimming pool, and that the proposed retaining wall located near the north side property line should be strong enough to support the swimming pool. Page 11 of 13 Development Review No. PL 2013-77 Staff Response: The proposed structures comply with all of the Development Code standards, including the required setbacks. The location of the proposed house is approximately 49 feet from the residence on the adjacent property to the north. The Development Code requirement for separation between structures on adjacent lots is 25 feet in the Rural Residential zone, and does not have a requirement for distances between structures and pools on adjacent lots. In addition, structural plans for all proposed structures including retaining walls will be submitted to the Building and Safety Division during building plan check to for compliance with the California Building Code. 4. The roots of the proposed trees along the north side of the property will damage the neighbor's swimming pool, and is asking not to plant large trees on the site because the area can be very windy and trees could fall and hurt people. Staff Response: The applicant is proposing to plant strawberry and California Bay Laurel trees adjacent to the north property line. Strawberry trees typically have fibrous, surface roots. California Bay Laurel trees have a deep and wide spreading root system. The applicant is proposing to install root barriers to redirect the tree roots downward and to prevent root damage to structures, which also keeps the trees healthy and strong. Landscape plans will be reviewed by the City's Consultant Landscape Architect to verify that the proposed landscaping will be installed appropriately to prevent damage to any structures or foundations. Additionally, staff included a condition of approval authorizing the City to require substitute tree selections if the City's Landscape Architect determines that the proposed tree species could compromise structural or slope integrity on the project site or the adjacent properties. Through the plan check and inspection process, the proposed project will be reviewed for compliance with appropriate requirements to ensure that the project is not detrimental to the safety of the properties or improvements on the project site and in the vicinity. ENVIRONMENTAL ASSESSMENT: This project has been reviewed for compliance with the California Environmental Quality Act (CEQA). Based on that assessment, the City has determined the project to be Categorically Exempt from the provisions of CEQA pursuant to the provisions of Article 19 Section 15303(a) (Construction of a New Single Family Residence) of the CEQA Guidelines. No further environmental review is required. Development Review No. PL 2013-77 Page 12 of 13 RECOMMENDATION: Staff recommends that the Planning Commission adopt the attached resolution (Attachment 1) approving Development Review No. PL 2013-77, to construct a new single-family residence based on the findings of DBMC Section 22.48, subject to conditions of approval as listed within the draft resolution. Prepared by: Natalie Tobon Assistant Planner Attachments: Reviewed by: Grace Lee Senior Planner 1. Draft Resolution No. 2013 -XX and Standard Conditions of Approval 2. Letter from Neighbor Located at 2160 Indian Creek 3. Site Plan, Floor Plans, Elevations, Landscape Plans, and Conceptual Grading Plans Development Review No. PL 2013-77 Page 13 of 13 PLANNING COMMISSION RESOLUTION NO. 2013 -XX A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DIAMOND BAR, CALIFORNIA, APPROVING DEVELOPMENT REVIEW NO. PL2013-77 TO CONSTRUCT A NEW SINGLE FAMILY RESIDENCE CONSISTING OF 13,360 SQUARE FEET OF LIVING SPACE AND A 2,207 SQUARE -FOOT FOUR -CAR GARAGE ON A 1.21 GROSS ACRE (52,707 SQUARE -FOOT) LOT LOCATED AT 24074 FALCONS VIEW DRIVE, DIAMOND BAR, CA 91765 (APN 8713-041-015). A. RECITALS 1. The property owner, Mei Deng, and applicant, Steven Phillips, have filed an application for Development Review No. PL2013-77 to construct a new single-family residence consisting of a 3,965 square -foot basement floor; 3,464 square -foot first story; 3,931 square -foot second story; and 2,207 square -foot four -car garage located at 24074 Falcons View Drive, City of Diamond Bar, County of Los Angeles, California. Hereinafter in this resolution, the subject Development Review shall collectively be referred to as the "Project." 2. The subject property is made up of one parcel totaling 52,707 square feet (1.21 gross acres). It is located in the Rural Residential (RR) zone with an underlying General Plan land use designation of Rural Residential. 3. The legal description of the subject property is Lot 26 of Tract 30577. The Assessor's Parcel Number is 8713-041-015. 4. On September 26, 2013, notification of the public hearing for this project was published in the San Gabriel Valley Tribune and the Inland Valley Daily Bulletin newspapers. Public hearing notices were mailed to property owners within a 1,000 -foot radius of the Project site and public notices were posted at the City's designated community posting sites on September 26, 2013. 5, On October 8, 2013, the Planning Commission of the City of Diamond Bar opened the public hearing to accept testimony from the public. The item was then continued because the site had not been posted with the public hearing notice board. 6. On October 8, 2013, the project site was posted with a display board. 7. On October 22, 2013, the Planning Commission of the City of Diamond Bar conducted a duly noticed public hearing, solicited testimony from all interested individuals, and concluded said hearing on that date. B. RESOLUTION NOW, THEREFORE, it is found, determined and resolved by the Planning Commission of the City of Diamond Bar as follows: 1. The Planning Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct; and 2. The Planning Commission hereby determines the Project to be Categorically Exempt from the provisions of the California Environmental Quality Act (CEQA) pursuant to the provisions of Article 19, Section 15303 (a) (Construction of a New Single Family Residence) of the CEQA Guidelines. Therefore, no further environmental review is required. C. FINDINGS OF FACT Based on the findings and conclusions set forth herein and as prescribed under Diamond Bar Municipal Code (DBMC) Section 22.48, this Planning Commission hereby finds as follows: Development Review Findings (DBMC Section 22 48 040) 1. The design and layout of the proposed development is consistent with the applicable elements of the City's General Plan, City Design Guidelines, and development standards of the applicable district, design guidelines, and architectural criteria for special areas (e.g., theme areas, specific plans, community plans, boulevards or planned developments); The design and layout of the proposed 13,360 square -foot single-family residence and 2,207 square -foot garage is consistent with the City's General Plan, City Design Guidelines and development standards by meeting all of the setbacks and requirements of the City's development code. The house incorporates various fagade details such as low pitched hipped roof lines with clay roof tiles, decorative architectural features such as corbels around windows, natural colors are used to highlight architectural features and appropriate massing to fit the site. In addition, appropriate screening and integration of the home to the natural environment is accomplished by providing a variety of groundcover, shrubs, and trees throughout the site. The project site is not part of any theme area, specific plan, community plan, boulevard or planned development. 2. The design and layout of the proposed development will not interfere with the use and enjoyment of neighboring existing or future developments, and will not create traffic or pedestrian hazards; 2 OR NO. PL2013-77 The proposed single-family residence will not interfere with the use and enjoyment of neighboring existing or future developments because the use of the project site is designed for a single-family home and the surrounding uses are also single-family homes. The proposed single-family home will not interfere with vehicular or pedestrian movements, such as access or other functional requirements of a single-family home because it complies with the requirements for driveway widths and grades. 3. The architectural design of the proposed development is compatible with the character of the surrounding neighborhood and will maintain and enhance the harmonious, orderly and attractive development contemplated by Chapter 22.48: Development Review Standards, the City's Design Guidelines, the City's General Plan, or any applicable specific plan; The new single-family home is designed to be compatible with the character of the eclectic neighborhoods in The Country Estates. The architectural style is Italian Villa, including features such as low pitched hipped roof, grouped windows arches over entryways, and integration with the natural landscape. It is designed in an Italian Villa style of architecture with compatible neutral colors of exterior finish materials to soften the building's visual impact and assist in preserving the hillside's aesthetic value. 4. The design of the proposed development will provide a desirable environment for its occupants and visiting public as well as its neighbors through good aesthetic use of materials, texture, color, and will remain aesthetically appealing; The design of the new single-family home is Italian Villa architecture. Variation in the building elements has been achieved through the utilization of attractive architectural features, building materials, and landscaping. Earth -tone shades for the exterior finish are used to soften the building's visual impact and assist in preserving the hillside's aesthetic value. Also, landscaping is integrated into the site to complement the streetscape in order to maintain a desirable environment. 5. The proposed development will not be detrimental to public health, safety or welfare or materially injurious (e.g., negative effect on property values or resale(s) of property) to the properties or improvements in the vicinity; and Before the issuance of any City permits, the proposed project is required to comply with all conditions within the approved resolution, and the Building and Safety Division and Public Works Departments requirements. 3 DR NO. PL2013-77 Through the permit and inspection process, the referenced agencies will ensure that the proposed project is not detrimental to the public health, safety or welfare or materially injurious to the properties or improvements in the vicinity. 6. The proposed project has been reviewed in compliance with the provisions of the California Environmental Quality Act (CEQA). The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) as set forth under Article 19 Section 15303 (a) (Construction of a New Single Family Residence) of the CEQA guidelines. Based upon the findings and conclusion set forth above, the Planning Commission hereby approves this Application, subject to the following conditions: 1. Development shall substantially comply with the plans and documents presented to the Planning Commission at the public hearing. 2. If, during plan check of the landscape construction documents, the City determines that any trees or other plant materials could compromise the structural or slope integrity on the subject property or the adjacent properties the City reserves the authority to require substitute plant material selections to be specified on the plans prior to permit issuance. 3. The parking area in the front yard shall be replaced with landscaping. A revised landscape plan shall be submitted for review during plan check. 4. Prior to building permit issuance, the required landscape plan shall be designed to meet the requirements of the Los Angeles County Fire Department's Fuel Modification Plan Guidelines in terms of plant selection, placement and maintenance. The final landscape and fuel modification plans shall be submitted to the Los Angeles Fire Department for review and approval. 5. Prior to building permit issuance, landscape and irrigation plans shall be reviewed and approved by the City's Consulting Landscape Architect and shall comply with the Water Conservation Landscaping Ordinance, 6. Standard Conditions. The applicant shall comply with the standard development conditions attached hereto. 4 DR NO. PL2013-77 The Planning Commission shall: a. Certify to the adoption of this Resolution; and b. Forthwith transmit a certified copy of this Resolution, by certified mail to the property owner, Mei Deng #500-999 West Broadway, Vancouver, BC V5Z IKS; and applicant, Steven Phillips, 23177 La Cadena, Suite 101, Newport Beach, CA 92653. APPROVED AND ADOPTED THIS 22ND DAY OF OCTOBER 2013, BY THE PLANNING COMMISSION OF THE CITY OF DIAMOND BAR. By: Tony Torng, Chairman I, Greg Gubman, Planning Commission Secretary, do hereby certify that the foregoing Resolution was duly introduced, passed, and adopted, at a regular meeting of the Planning Commission held on the 22nd day of October, 2013, by the following vote: AYES: Commissioners: NOES: Commissioners: ABSENT: Commissioners: ABSTAIN: Commissioners: ATTEST: Greg Gubman, Secretary 5 DR NO. PL2613-77 '`gy4 I . I tJl ''fel COMMUNITY DEVELOPMENT DEPARTMENT m ,� STANDARD CONDITIONS USE PERMITS, COMMERCIAL AND RESIDENTIAL NEW AND REMODELED STRUCTURES PROJECT #: Development Review No. PL 2013-77 SUBJECT: To construct a new single family residence consisting of 13,360 square feet of living space and a 2,207 square -foot garage. PROPERTY Mei Deng OWNER(S): #500-999 West Broadway Vancouver, BC V5Z IKS APPLICANT: Steven Phillips 23177 La Cadena, Suite 101 Newport Beach, CA 92653 LOCATION: 24074 Falcons View Drive, Diamond Bar, CA 91765 ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DIVISION AT (909) 839-7030, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. GENERAL REQUIREMENTS 1. In accordance with Government Code Section 66474.9(b)(1), the applicant shall defend, indemnify, and hold harmless the City, and its officers, agents and employees, from any claim, action, or proceeding to attack, set-aside, void or annul, the approval of Development Review No. PL2013-77 brought within the time period provided by Government Code Section 66499.37. In the event the city and/or its officers, agents and employees are made a party of any such action: (a) Applicant shall provide a defense to the City defendants or at the City's option reimburse the City its costs of defense, including reasonable attorneys fees, incurred in defense of such claims. 6 DR NO. PL2013-77 (b) Applicant shall promptly pay any final judgment rendered against the City defendants. The City shall promptly notify the applicant of any claim, action of proceeding, and shall cooperate fully in the defense thereof. 2. This approval shall not be effective for any purpose until the applicant and owner of the property involved have filed, within twenty-one (21) days of approval of this Development Review No. PL2013-77, at the City of Diamond Bar Community Development Department, their affidavit stating that they are aware of and agree to accept all the conditions of this approval. Further, this approval shall not be effective until the applicants pay remaining City processing fees, school fees and fees for the review of submitted reports. 3. All designers, architects, engineers, and contractors associated with this project shall obtain a Diamond Bar Business License; and a zoning approval for those businesses located in Diamond Bar. 4. Signed copies of Planning Commission Resolution No. 2013 -XX, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 5. Prior to the plan check, revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for Planning Division review and approval. 6. Prior to any use of the project site or business activity being commenced thereon, all conditions of approval shall be completed. 7. The project site shall be maintained and operated in full compliance with the conditions of approval and all laws, or other applicable regulations. 8. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and any applicable Specific Plan in effect at the time of building permit issuance. g. All site, grading, landscape/irrigation, and roof plans, and elevation plans shall be coordinated for consistency prior to issuance of City permits (such as grading, tree removal, encroachment, building, etc.,) or approved use has commenced, whichever comes first. 10. The property owner/applicant shall remove the public hearing notice board within three days of this project's approval. 11. The applicant shall comply with the requirements of City Planning, Building and Safety Divisions, Public Works Department, and the Fire Department. 7 DR NO. PL2013-77 B. FEES/DEPOSITS 1. Applicant shall pay development fees (including but not limited to Planning, Building and Safety Divisions, Public Works Department and Mitigation Monitoring) at the established rates, prior to issuance of building or grading permit (whichever comes first), as required by the City. School fees as required shall be paid prior to the issuance of building permit. In addition, the applicant shall pay all remaining prorated City project review and processing fees prior to issuance of grading or building permit, whichever comes first. 2. Prior to any plan check, all deposit accounts for the processing of this project shall have no deficits. C. TIME LIMITS 1. The approval of Development Review No. PL2013-77 expires within two years from the date of approval if the use has not been exercised as defined per Diamond Bar Municipal Code (DBMC) Section 22.66.050 (b)(1). The applicant may request in writing a one year time extension subject to DBMC Section 22.60.050(c) for Planning Commission approval. D. SITE DEVELOPMENT 1. The project site shall be developed and maintained in substantial conformance with the approved plans submitted to, approved, and amended herein by the Planning Commission, collectively attached referenced as site plans, floor plans, architectural elevations, and landscape plans on file with the Planning Division, the conditions contained herein, and the Development Code regulations. 2. All ground -mounted utility appurtenances such as transformers, air conditioning condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berms, and/or landscaping to the satisfaction of the Planning Division. 3. All roof -mounted equipment shall be screened from public view. 4. All structures, including walls, trash enclosures, canopies, etc., shall be maintained in a structurally sound, safe manner with a clean, orderly appearance. All graffiti shall be removed within 72 hours by the property owners/occupant. 5. All landscaping, structures, architectural features and public improvements damaged during construction shall be repaired or replaced upon project completion. M DR NO. PL2013-77 E. SOLID WASTE 1. The site shall be maintained in a condition, which is free of debris both during and after the construction, addition, or implementation of the entitlement approved herein. The removal of all trash, debris, and refuse, whether during or subsequent to construction shall be done only by the property owner, applicant or by a duly permitted waste contractor, who has been authorized by the City to provide collection, transportation, and disposal of solid waste from residential, commercial, construction, and industrial areas within the City. It shall be the applicant's obligation to insure that the waste contractor used has obtained permits from the City of Diamond Bar to provide such services. ces be ided by the City 2 Mandatoryfranchised n ised wase haulertoto disposal parcels/lots or uses affectedvby approval of this project. F. FIRE PROTECTION STANDARDS 1. Development shall be constructed to reduce the potential for spread of brushfire. re ve s are contained a In the case of in he UniformaBu Building Code orconflict, where oin the tfirevcode,/Ithe nmore restrictive provisions shall prevail. b. Roofs shall be covered with noncombustible materials as defined in the building code. Open eave ends shall be stopped in order to prevent bird nests or other combustible material lodging within the roof and to preclude entry of flames. C. Exterior walls shall be surfaced with noncombustible or fire-resistant materials. d. Balconies, patio roofs, eaves and other similar overhangs shall be of noncombustible construction or shall be protected by fire-resistant material in compliance with the building code. 2. All development shall be constructed with adequate water supply and pressure for all proposed development in compliance with standards established by the fire marshal. 3. A permanent fuel modification area shall be required around development projects or portions thereof that are adjacent or exposed to hazardous fire areas for the purpose of fire protection. The required width of the fuel modification area shall be based on applicable building and fire codes and a fire hazard analysis study developed by the fire marshal. In the event abatement is not performed, the council may instruct the fire marshal to give notice to the owner of the property upon which the condition exists to correct the prohibited 9 DR NO. PL201347 condition. If the owner fails to correct the condition, the council may cause the abatement to be performed and make the expense of the correction a lien on the property upon which the conditions exist. 4. Fuel modification areas shall incorporate soil erosion and sediment control measures to alleviate permanent scarring and accelerated erosion. 5. If the fire marshal determines in any specific case that difficult terrain, danger of erosion, or other unusual circumstances make strict compliance with the clearance of vegetation undesirable or impractical, the fire marshal may suspend enforcement and require reasonable alternative measures designed to advance the purposes of this chapter. 6. Special construction features may be required in the design of structures where site investigations confirm potential geologic hazards. APPLICANT SHALL CONTACT THE PUBLIC WORKS DEPARTMENT, (909) 839-7040, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. GENERAL 1. Applicant shall follow special requirements as required by the City Engineer for construction in a Restricted Use Area (RUA). No portion of the habitable structure shall be located in the Restricted Use Area and a Covenant and Agreement to construct in a Restricted Use Area shall be recorded and returned to the City prior to the issuance of any grading or retaining wall permits. There are two restricted use area within this property according to the Tract Map. The proposed Conceptual Plan does not reflect that. The RUA shall be reflected on the Plans and mitigation measures Identified. 2. An Erosion Control Plan shall be submitted concurrently with the grading plan clearly detailing erosion control measures. These measures shall be implemented during construction. The erosion control plan shall conform to national Pollutant Discharge Elimination System (NPDES) standards and incorporate the appropriate Best Management Practices (BMP's) as specified in the Storm Water BMP Certification. For construction activity which disturbs one acre or greater soil a Storm Water Pollution Prevention Plan (SWPPP) will be needed. Please refer to City handouts. 3. The applicant shall comply with Standard Urban Storm Water Mitigation Plan (SUSMP) requirements to the satisfaction of the City Engineer. Please refer to City handouts. 4. Grading and construction activities and the transportation of equipment and materials and operation of heavy grading equipment shall be limited to between the hours of 7:00 a.m. and 5:00 p.m., Monday through Saturday. Dust generated by grading and construction activities shall be reduced by watering 10 DR NO. Pr2013-77 the soil prior to and during the activities and in accordance with South Coast Air Quality Management District Rule 402 and Rule 403. Reclaimed water shall be used whenever possible. Additionally, all construction equipment shall be properly muffled to reduce noise levels. B. SOILS REPORT/GRADING/RETAINING WALLS 1. Prior to grading plan submittal, a geotechnical report prepared by a Geotechnical Engineer, licensed by the State of California, shall be submitted by the applicant for approval by the City. 2. Upon approval of the geotechnical report, the applicant shall submit drainage and grading plans prepared by a Civil 'Engineer, licensed by the State of California, prepared in accordance with the City's requirements for the City's review and approval. A list of requirements for grading plan check is available from the Public Works Department. All grading (cut and fill) calculations shall be submitted to the City concurrently with the grading plan. 3. Finished slopes shall conform to City Code Section 22.22.080 -Grading. 4. The grading plan shall show the location of any retaining walls and the elevations of the top of wall/footing/retaining and the finished grade on both sides of the retaining wall. Construction details for retaining walls shall be shown on the grading plan. Calculations and details of retaining walls shall be submitted to the Building and Safety Division for review and approval. 5. All equipment staging areas shall be located on the project site. Staging area, including material stockpile and equipment storage area, shall be enclosed within a 6 foot -high chain link fence. All access points in the fenced area shall be locked whenever the construction site is not supervised. 6. Grading of the subject property shall be in accordance with the California Building Code, City Grading Ordinance, Hillside Management Ordinance and acceptable grading practices. 7. The maximum grade of driveways serving building pad areas shall be 15 percent. In hillside areas driveway grades exceeding 15 percent shall have parking landings with a minimum 16 feet deep and shall not exceed five (5) percent grade or as required by the City Engineer. Driveways with a slope of 15 percent shall incorporate grooves for traction into the construction as required by the City Engineer. 8. All slopes shall be seeded per landscape plan and/or fuel modification plan with native grasses or planted with ground cover, shrubs, and trees for erosion control upon completion of grading or some other alternative method of erosion control shall be completed to the satisfaction of the City Engineer. 11 DR NO. PL2013-77 9. Submit a stockpile plan showing the proposed location for stockpile for grading export materials, and the route of transport. 10. Prior to the issuance of building permits, a pre -construction meeting shall be held at the project site with the grading contractor, applicant, and city grading inspector at least 48 hours prior to commencing grading operations. 11. Rough grade certifications by project soils and civil engineers shall be submitted prior to issuance of building permits for the foundation of the residential structure. Retaining wall permits may be issued without a rough grade certificate. 12. Final grade certifications by project civil engineers shall be submitted to the Public Works Department prior to the issuance of any project final inspections/certificate of occupancy respectively. 1. All drainage/runoff from the development shall be conveyed from the site to the natural drainage course. No on-site drainage shall be conveyed to adjacent parcels, unless that is the natural drainage course. 2. Prior to the issuance of a grading permit, a complete hydrology and hydraulic study shall be prepared by a Civil Engineer registered in the State of California to the satisfaction of the City Engineer and Los Angeles Public Works Department. D. SEWERS/SEPTIC TANK 1. Any homeowner that installs a new septic tank system, repairs an existing septic tank or adds any plumbing fixture units or bedroom equivalents to the facility served by an existing septic system will need to submit a Notice of Intent (NO]) to the Regional Water Quality Control Board for Waste Discharge Requirements and submit a copy of the sent NOI and check to the City. Please refer to City handouts. 2. The Applicant shall show septic tanks location, size and details on the plans. The Los Angeles County Health Department, California Water Control Board and the City's Geotechnical Engineer shall approve these plans prior to the issuance of any permits. The property owner shall be required to sign and record the City's Covenant for use of'a septic system. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION, (909) 839-7020, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: 1. Plans shall conform to current State and Local Building Code (i.e. Currently the 12 OR NO. PL2013-77 2010 California Building Code, California Plumbing Code, California MechanicalCode, and the California Electrical Code but the 2013 version will apply if plan check applied after January 1, 2014) requirements and all other applicable construction codes, ordinances and regulations in effect at the time of plan check submittal. 2. Provisions for Cal Green shall be implemented onto plans and certification provided by a third party as required by the Building Division. Specific water, waste, low VOC, and related conservation measures shall be shown on plans. 3. Fire sprinklers are required for new single family dwellings (CRC R313.2). 4. Occupancy of the facilities shall not commence until such time as all California Building Code and State Fire Marshal regulations have been met. The buildings shall be inspected for compliance prior to occupancy. 5. Every permit issued by the Building and Safety Division shall expire if the building or work authorized by such permit is not commenced within 180 days from the date of such permit or work has discontinued and not been signed -off on the job card by the building inspector. 6. Construction activities causing the operation of any tools or equipment used in construction, drilling, repair, alteration, or demolition work shall be conducted Mon. — Sat. between the hours of 7:00 a.m. and 7:00 p.m. 7. The project shall be protected by a construction fence to the satisfaction of the Building Official. All fencing shall be view obstructing with opaque surfaces. 8. All structures and property shall be maintained in a safe and clean manner during construction. The property shall be free of debris, trash, and weeds. 9. All equipment staging areas shall be maintained in an orderly manner and screened behind a minimum 6' high fence. 10. Solid waste management of construction material shall incorporate recycling material collection per Diamond Bar Municipal Code 8.16 of Title 8. 11. The minimum design load for wind in this area is 85 M.P.H. exposures "C" and the site is within seismic zone D or E. The applicant shall submit drawings and calculations prepared by a California State licensed Architect/Engineer with wet stamp and signature. 12. This project shall comply with the energy conservation requirements of the State of California Energy Commission. All lighting shall be high efficacy or equivalent per the current California Energy Code 119 and 150(k). 13. Indoor air quality shall be provided consistent with ASHRAE 62.2 as required per California Energy Code 150(o). 13 DR NO. PL2013-77 14. Only one single family dwelling per CBC 202 is allowed on this property unless specifically approved otherwise. 15. All site areas that have a drop of over 30" shall be provided with a guardrail per CBC 1013 and a handrail is required at all steps/stairs with 4 or more risers and shall meet CBC 1012. 16. Submit Public Works Department approved grading plans showing clearly all finish elevations, drainage, and retaining walls locations. 17. "Separate permits are required for pool, spa, cabana, BBQ/outdoor kitchen area, detached trellises and gazebos, fountains, retaining walls, fences over 6' in height, and tennis court" and shall be noted on plans. 18. A height and setback survey may be required at completion of framing and foundations respectively. 19. Prior to Building permit issuance, all school district fees must be paid. Please obtain a form from the Building and Safety Division to take directly to the school district. 20. All balconies shall be designed for 601b. live load. 21. Guardrails shall be designed for 20 load applied laterally at the top of the rail. 22. Indicate all easements on the site plan. 23. Fire Department approval shall be required. Contact the Fire Department to check the fire zone for the location of your property. If this project is located in High Hazard Fire Zone it shall meet of requirements of the fire zone per CBC Chapter 7A. a. All unenclosed under -floor areas shall be constructed as exterior wall. b. All openings into the attic, floor and/or other enclosed areas shall be covered with corrosion -resistant wire mesh not less than 1/4 inch or more than 1/2 inch in any dimension except where such openings are equipped with sash or door. c. Eaves shall be protected. d. Exterior construction shall be one-hour or non-combustible. e. Fuel modification plans shall be approved through LA County Fire Fuel Modification Unit. 24. All retaining walls shall be submitted to the Building & Safety and Public Work Departments for review and approval. 14 DR NO. PL2013-77 25. Submit grading plans showing clearly all finish elevations, drainage, and retaining wall locations. No building permits shall be issued prior to submitting a pad certification. 26. The project shall be protected by a construction fence and shall comply with the NPDES & BMP requirements (sand bags, etc.). 27. Check drainage patterns with Engineering Department. Surface water shall drain away from building at a 2% minimum slope. 28. Specify location of tempered glass as required by code. 29. Specify 1/4"/ft slope for all flat surfaces/ decks with approved water proofing material. Also, provide guardrail connection detail (height, spacing, etc.). 30. The property waste shall be conveyed via a public sewer system and shall be approved by the Los Angeles County Sanitation District. 31. Bodies of water that are greater than 18" in depth shall have the required barriers to prevent unintentional access per CBC 3904.4. 32. Special inspections and structural observation will be required in conformance to CBC 1704 to 1709. 33. A soils report is required and all recommendations of the soils report shall be adhered to. This includes a stabilization key certified by the geotechnical engineer at the rear of the property. 34. Slope setbacks consistent with California Building Code Figure 1805.3.1 and California Residential Code R4O3.1.7. Foundations shall provide a minimum distance to daylight. 35. The applicant shall contact Dig Alert and have underground utility locations marked by the utility companies prior to any excavation. Contact Dig Alert by dialing 811 or their website at www digalert.org. 36. The location of property lines and building pad may require a survey. 37. All workers on the job shall be covered by workman's compensation insurance under a licensed general contractor. 38. Any changes to approved plans during the course of construction shall be approved by the City prior to proceeding with any work. 39. Light and ventilation shall comply with CBC 1203 and 1205. The theater room shall be designed by a licensed mechanical engineer with artificial light and ventilation per these sections. 15 DR NO. PL2013-77 40. Carbon monoxide detectors are required in halls leading to sleeping rooms per CRC R315. 41. Two story windows shall be designed for out -of -plane forces. END 16 DR NO. PL2010-77 Attachment 2 CHALLENGES AND CONCERNS FOR PLANNING CASE NO. PL 2013-77 (" PROJECT") PROJECT ADDRESS: 24074 FALCONS VIEW DRIVE, DIAMOND BAR, CA 91765 (APN8713-041-015) PROPETY OWNER: MEI DENG, #500-999 WEST BROADWAY, VANCOUVER, BC VSZ IKS APPLICANT: STEVEN PHILLIPS, 23177 LA CADENA DR. #101, LAGUNA HILLS, CA 92677. TO: CITY OF DIAMOND BAR, PLANNING COMMISSION. ATTN: PLANNER AT (909)839-7034, FROM: THE PROPERTY OWNER OF 2160 INDIAN CREEK ROAD, DIAMOND BAR, CA 91765 MICHAEL (ZHI Z) LIU AND MENG ZHU ON Oct. 7,2013 For above project, we have the following challenges and concerns after review above case. 1. Above property was filled all by all illegal dirt and rubbishes and need to be removed all dirt and rubbishes from this property and to do new grading from the bottom of natural land. The new foundation of this new single —family residence need to be drilled and tested in a couple places and would support my property foundation and swimming pool foundation for protection to be slide or damaged by your projectjob. 2. We own 70'x30' land in the front of this property whichJs not allowed to be used as driveway of your project and new house. 3. This new project house is too close to our swimming pool which have full tank of heavy water. The new block wall need to be strong enough to support this heavy capacity of our swimming pool water. The roots of new planted trees, branches and leafs will be not allowed to damage our concrete base of swimming pool and cause water leaking and water pollution. In addition, both of our properties are very windy areas and please do not plant big trees for the protection of big trees to fall down to hurt peoples. For above concerns, we i ed to sign the agreement c')ntract between this property owner— Mei Deng and us .This property owner need to be responsible for any damages of our property and Swimming pool and our family people safety caused by your project due to improper and neglected architect design , grading, engineering , construction and other related jobs SETBACKS AT NEW AODITIOtJ L ALL ON-SITE TumeS SHALL BE PUCEO UNDERGROUND AT THE TIME OF DEVELGPMENT 3 PRIOR TO BNILON'0 PERMIT ISSUANCE}ANOSCME AND IRRIGATION PLANS ..ALL BE REVIEWED AND AS". O BY THE BIG CONS.IND LANDSCAPE oRYATICHITARCHITECTAND .HALL COMPLY WITH THE WATER N.EON LANOSCMING ORDNANCE. > IN CAME OP A�ONFLICT, WHERE MORE RESTI oNE R ,,CW IONS [ MW AED IN THE UNIFORM SUMMING [ OR IM IS FIRE COBE, THE MORE tSTINT..O PROWSIONS SHALL I., 4. ALL DMCONSTRUCTED UNTIN AOEOUATE WATER SSUPPLYLANDEPRESSURE FOR ALL ..B ESTABLISHED/ By THIS F PEEMRSHAL S. UEL MODIFICATION A SHALL BE REQUIRED AROUNDENT PDEVELOPMENT PROJECTS THEREOF THAT ARE AOJAEHT OR [MFOSEO TO HAZARDOUS BE PMlMGTRNL THE REOYIREO WIDTH.1 TH[EFUEL FMODFPCATIOH AI -1. M BASED ON APPLICABLE BUILDING FIRE CODE. AD A PIRG HATRD ANALY 'A SOT AND DEVELOPED BY THE FIRE ABATEMENT IS NOT PREFORMEDARE COUNCILVEN y INSTRUCT THE PIR. MARSHAL TO GIVE xOTmE TO THE OMER OF THE PROPERTY UPON WHICH THE CONDITION EXISTS TO CORRECT THE PROMITEO ASHINTIOINI, TN wu� R FAILS CAUSE TINS ABATEMENT TO TO Be PRe MAK pR E EWExsE OP THE THERiION A uM. ON THe PROPERTY UPON ..C. aRRemoxS ERIST. oFNEL MODIFICATION REAS SHALL INCORPORATE IL EROSION AND ALLEVIATE PERIMIMENT CONTROL SCRNG AND ACCELERATED ENGGiON I IF THE PINE MARSHAL BETER.I.. N RY SFDIC CASE THAT DIFFICULT TERRAIN, DANGER OF ¢ µOR OR¢R NUWAL C ONSUBTRCES MAKE sTglT COMPLIANCE WITH RE CLEARANCE OP VEGETATION EGETAi M>v N.EGSUSPABLE BE IM'NAG`N L, Rc REQUIRE PIKE MNSNAALTERNATIVE NERU ES DESIGNED[NT TO ADVANCE THE PURPOSES OF THIS CHAPTER SHEET WDEX: Attachment 3 T -T C0WK.HEET/GENERAL UIORAVQROH BAEEMENTLEYF.L, SP -T 51TEPW! ApDAESA 24074 FALCON VFW 5P-2 MEFLAN L E6AL LL'MLRIFTIOM LOT2MI, TRACT W. 375]1 C-1 CONCEFIUALGPADINGADRAINACEPLW Agit A-1 BASFMEMfLOORPIAN "MST, A8 MRSTFIDORRAN '(yy`RDA A3 SECONOFIDORPIAN �f y, A4 ER,,QoER.AQOHs $.,� �♦� A A-5 ROOF PUN �iTf A6 ECIEWOR EIEVA1ION5 EIJVBfNI.W CJWO n EAJIt LIPEWWAA A-9 EXTERIORELE/AH.. SFp23 Fa SECTIONS ZERNME, A-3 AS BELTIOWI i®13 MC, ODOR/WINOOWOLHEOUIE Yl/'��� CONTACT: HMK XJNG 1 �44'Vo"H LAMSX.APE AMS LALOLAFES 11/41 ]91-5957 COMALT D2EW 5AAM Ls /lcy/�' p RA PROJECT DATA PROJECT TEAM BAEEMENTLEYF.L, OYINER/cLIENi, HEI DEN6 ApDAESA 24074 FALCON VFW . GRG AND CONSTA TION ACTNITIE. AND ME 240]4 FAL NEWDINE L E6AL LL'MLRIFTIOM LOT2MI, TRACT W. 375]1 TRANSPORTATION OP EONPMexT AND MATERIALS AHD OPERATION DF HGVY AMINO [WIPMET SHALL BE DlAM019 LA 41765 Agit LIMITED TD BETWEEN TME HWR. OF M.. AND L PN, MON. TxDUON .wi ... DCCT TOTAL L1VA5 SPAC6 I3,3G0 SF. ARLNITELr+ STEVEN PHILLIPS ARLNITKT CLOP Y. R3 AIAU ELECTRIC ROOM STOiNEE 23/07 LA LAGENA OR TI'gOFCONS]9A.PWL V -I` Lam t F, LAECHA NLLLS LAI./FOFNIA 9 S421NKLETb, YTi SEcoNo FtODR oELK: (114) ]66-]244 CONTACT, 5TEY MILLIF EIJVBfNI.W CJWO n EAJIt LIPEWWAA CIVIL E6L ASST'IAIES IML. 1/619 G'JLGRMS FOA ,, 4YTE A ZERNME, A-3 AFLADIA LA 4/006 /i� (626) 2633596 LOT AREA: L.D21 / Alli CONTACT: HMK XJNG LAMSX.APE AMS LALOLAFES 11/41 ]91-5957 COMALT D2EW 5AAM Ls APPLICABLE CODES MPG. M SEMS/ EEFINs WFALEI6N STREET NIT 'L' IT 6LENOHLE- G4 CITY OFD)MKH96V2 MNIWPAL COLE 30100 F£SlLtf?/AL LODE (CARL/ /76NRIE 0-1573 QVRKWA C.4LIFOFMA.INSLIOE rl6IC COMFALrrTE rOBIE LOOIIT XJp GWIF7RWAEt£GTRILAI LOLL (LEL, "A2 S5]05CNAEFER VE. SUITEN LDFNELLC(✓TCI9 AVE.,No CALI,,AQWA! CODECL1-Y.l 2pM L4.IFORAV LGFENUR, COL£/ '1�I 62 333310 T -L REMINDS AT ZLO9GA1/FAPNu T-39 DER6YCIXY4YAMMl RNfIATMNK AREA CALCULATIONS D MAY DR E. It HARD 1. THETRULTION N OPE SRU[OREG WHERE SITE REINVESTIGATIONS MLDIMS S'Y/AREF TAGS BAEEMENTLEYF.L, coHFl.W POTexTuI GEOLOGIC Ep_$ENT kpJR LININS SBALE+ 39655F. . GRG AND CONSTA TION ACTNITIE. AND ME FAN5T FLLG4P LMHY SPACR 5,469 SF. TRANSPORTATION OP EONPMexT AND MATERIALS AHD OPERATION DF HGVY AMINO [WIPMET SHALL BE SEC WM2 gLbF LMNS SPACE, 3931 SF. LIMITED TD BETWEEN TME HWR. OF M.. AND L PN, MON. TxDUON .wi ... DCCT TOTAL L1VA5 SPAC6 I3,3G0 SF. GENERATED BY GRADING . CONSTRUCTION Aoll PTPID STO AMALL OR RENO DVRI. DUCEDRE BY WTERIXe THE q IAVITIES THE IH ACCORDANCE WITH BOOTH NROUA-1 MANAGEMENT DISTINCT ME 403 AND RUL[ >. XRO.E0 CUTER HALL BE NAM. WNI NIDER P eE IN ADDITION, ALL CONSTRUCTION EQUIPMENT LL E PROPERLY M 11. TO REDDEOI ..BE LE.LS. 11.VAGI 1. SERVE LETTER. SHALL OD .OMITTED THAT BLE AD QUATE FACILITIES ARE ROR WILL S SERVE E PROPOSED JET SiR wu GE wB.I YES TO TND CITY FROM ALL WPTQN UTILITIEeLESUCH U1 ANO OASLE.BUT NOT LIMITED TS, pXOHE, OPS, 11. D .1 RE FACILITIE. SHALL NOT OUILD NO COOCUNTI ANO STATE SUCH FIRE AS AMRL UAL CALIFORNIA OST. THE BUILDINGS SHALL [ K.IECTEDNFEW CLMRI3RL[ PRO. TO OCCDPANCT 11 SVERY PERMIT ISSUED BY RE.YILCLLINO ING AND PWOWAUTHORIZED BBRINES YY SUCHST PERMIT NOT OR DATE Or SUCH PERMIT ORCOISHEPORD WITRWORK HAS W BEEN O 1. DAYS 1.ENT N ES RO NOT BEEN SIGNED-OPP ON THE JOB MAPS BY THE BNILOINO IX.PECTOR IS CONSRUCTION A.IE. CAUSING THE OPERATION OF ANY TOOLS OR EQUIPMENT USED IN CONOTRU.QW, DRILLNCU REPAIR ALTERATION, OR LITID WORK SMALL BE GO NDVTED MONDAY - SATURDAY BETWEEN THE HOU. OF 1.. AND .PM SHALL BE PROVICTED MY A C STTRUCTIONCFINES TO THE SATISFACTION OF THE BUILDING OFFICIAL ALL FENCING .HALL BE VRW OD UGTI.. WITH OPAQUE SURFACES. iw, ALL SRUCTR'S AND PROPERTY SHALL BE NTANU D NA SAYS AND CLEAR MAxxME NO. CT ID CONSTRUH. TH. PROPERTY... BE 'MGM OF , .M.. TRAM, AND UMSUG. IS ALL EQUIPMENT STAGING AREAS SHALL BE EITAINED IN R O UXUAl MRNCR AND ...IM.ED BEHIND A MINIMUM G HIM PENCE t7. SOLID WASTE ONMAJUEMENT W CONSTRUCTION MATERIAL SHALL INCORPORATE RETCLINO MATERIAL ..I.. PER .... SECTION GS OF ]RLE R I& ONLY THE IN GLE AMNLY DWELLERS PW CEO NT S ALLOWED ON THIS PROPERTY UNLESS SPECIFICALLY APPROVED DTHEMA.E. R ALL SITS AREA THAT HAVE A DROP OP OVER GW SHALL BE PROVIDED WITH A SURDRARL PER CBC ONS ADD A D AT ALL STC.I. MIR 4 OR MORE RISERS ANL IS DD SHALL MEET DR.I.M. GAFAS£+ 220)SF. hNINIXTFY: 3495F. LOVHIfD L0.lIA. 546 SF. PAVO/ , 752 5F.+236 5F. ♦ 427 SF. +1555F.= /1572 SF. LOTCOVERAGE, TOTAL YYO RCCA AREA = 43,3805E TOTAL DY8III,G FCbTPRIM+ Hp]O SF. _gym LO'�ilA: - 5395F. 6/XJ95.P /43,357= 19.84%LOTCOUERA6E (30Z PLWINUM LOT LOVERrVSFJ PROECT SCOPE L NEW TWD STWY XGNM PLUS NNIT BAWAMN . M. BASEMENT LEVEL 4 GAR PARKING GARAGE. TBRRnFIE ..0 . UP RECORD AND FEES, TO WI RLWFM MISCELLANEOUS NOTES: 1 OTHER P FSES RANDS.. TRUCTIBM.U ¢G REQUPATH,UIIREER. ANO SEPARATE EVIEWE AND PERMT4 ION APPROVAL NDW... T. 1550 JKG OP R wILONC PERMIT BY RE Cttt DES NOT RELIEVE TH. APPLOANK .1 LEGAL COVENAT$CO TIO. AND INSTRCTDMS WMICNMAY BE AGAENTS 1. wE ROIN AQUJIGOT TNM PROPERTY OR TO ..IN DNXUNIIY ASSDIATION APPROVAL OP PLANS AREA CAICUlATIONS J,y3A3BIB BAEEMENTLEYF.L, RAW �.rt FINSTFL . G,!L EELOND FLOOR, A- yDrt TOTAL LIVRIS AREA, HU ' `L 4 AR 6ARAG£, BASDENF LO651A, w Tyn ELECTRIC ROOM STOiNEE in sr; FIRSTFLOOROELK, Lam t F, COJEREDE Y, Bw sya SEcoNo FtODR oELK: vl • 6T.R PROJECT, MOT4 FALC9 :OMS VIEW DR VICWTY MAP NOT TO SCALE ,SBO MDy �_ Oy VUXEL<�JP N �fW pXi96 Op UyL\40 SP -1 I i i 3200' I I I i j [-40.93' , I I I I !'� WAIEft FEATUREIPW 'e'X 29&40�_ I1 N66'47'5YE R I I I m ' N m � 250' ^ a�£ WkA .........._.V........� iit I i I IANMEA rFE ❑ pm 73 nN O 2 RESrNICTED �usE AREa u` III ifi F I O o' 1jV _ I� I SPA >?f O 'IIII wW I i I N,1001 4'E I I9ao0' POOL It+p IIII 157.87'72'5II}II ?e q r U _-� I 39.22' PA NG 1 f Ill; tilt C F-yJ a ¢w� >77 cL' , ash llil I m II,il V . 1 Im ❑ S i\ GPRAG r-29.9 OYERED I 1 ' IIII ' 3.50' g 1'ItI m I 73.08 3 99' fl1 D AFC i OKI< UP TRASH STOR VI`4 A �) \' "\ AREA IN GARAGE BEIOW ACCES 00.0 1 u 1'wi IjI - C ,a No. C-ilyl� I POp. EW IPUK rim RESMICWM�0 IIII Iii', OF GPUf I m ______________ _____________ __________________________________T_ V'�Tl I I ❑ —c nia� 1O Sfip'56.37'\Y 32&20• 125.00' i / Os��$o i ri ARCHITECTURAL SITE PLAW <, 6LalE P.I�� J �Q Cy$ . UQ ON WJ �xs PAVER SCHEDULE ...l.l. w F=aW- DE c�rBe sfe L O A PWAL5! PAGE s FOR X.O 5 6 p KB21AW MC 0 RfFERENQ TO TO C°L°q B°ppD EE ITEMS 1B AND 30 YMBOL DESCRIPTION COLOR PpT TERNIFlNISX O PRpE-CPSTAPAVER 1>4 tty� %�13� BANG PAVFXS OHLOECFSS 3T RaNBLVBGENT 6RE1 IY Z W ° r D- Q Q J Q S P-2 GRADING GENERAL NOTES: I. ru rNAHa vwe mle.wm,Ir NWImarHm (ro na/uWMcvrs /mvm9 or of mr. 2 k1 A BrMYWM 9tl6NFAH5 n'IRA 9WL PMALLNL (lYmM'YaaAW/pW' iFINII I. .V1 �aeH49WlnHMACim W MrIfE W s 9srmrY5rs H9x NnmrcSemme smn 'IRJ A'D /PrQIRYIH IIFWiQ[G ft4IXli WE IA O'{0.YYM PEb19K YWaFA'/°S[lW£Aw 5n aw anm er cearrarrnY?w 6ae n. 6 nE. A4 u 61MAIrl9E5IXi Ab eSlfyIIMH9B p ': �rw nF rssvra Ammru ei llr n AWM.4TnFW61w# =(m]]} xvwr�uy uuruM rcxrm. xu,u xv v S amrmm rYsxe Ync+en a^,awls wrz 4 /FiMO flO. R4Z1E1E(4R3 NO NWFMY[NNAHfnV.@MS 4411BM4Y)m mM01[C/AYHC NrtIW/6iPWfEN3mY1HWItH4 aR.RR➢PM mil (1�ND N1P.Vl MA4S60MGMIKK J3 In /uHrs¢5.xnwnrs.ww HmelnmrorrrsnreAerwHxmrvAsem n. mwu/oeammwrt wsrHmm rosea ua H.n avmeAm AN.nYv er vrrm NSY<mema sv mmA�Haraa wmrrs R Ae arssvu Hresmm aramaYaeu rmoxrnnm auamvY/.wl wms mHrms uta w. w.a.r000oo M Aromun oae N.wS NmH fA /41A469hT 46i 1I1n VM'AHSVNq H95 AW nnW YtV{ SiR6 IS 9W ,YmM� Hd 9B.I1m eYY nE� ArtMPAW ARSC 16 rt!IItp 6WAAMM or£(QRSIFm IK3 nE DYiMXUf A4AN rr Af aHgWRHHWA 15. fXAWMafW SLHirl1F15 Nll (6OYR nY@.IML Ri aai .r.uramwrnom v¢aaa/nrsaw ran mx.n Ifl r. dH�/10%i d3EPJa HHMIHAtWI WS/ML LEGEND O m,mem" IJ -� a�,quviAH I aTo — — i1PICAL CONCH _ J 1 q NI 1 `(n q � croxsmucnox NOTES rp mmwHrrrc ran SY.uE HY Hru aon loan 00 p mmn.Wr Yma rtx ¢L'191mN ldEat / p HNman Irwr utam uw p oasmarr elc5a waa We J . ® maw. .m�vwlc Ar. mlalM4T c C M[ mwEIE YNKMAY. ®mmwmwY u9xnr xwrowlea svwAu war. � I ® omsirtar RrxYw Y.a.ra HvuArt wxr. ® marawrr arN S.sr. �I ®oamexrlr YDM �wlmw � //--_/ i Q mmwcro-r ramwrtWauan 9w mmmm we Q mmWar YArnwWHlw axs. '�rs i'na rp mISTTILf21 WiIIIL 9YE ®CISIMN:fI.iI YIlL iLL 9qF 11M HD'A0914H"ilLYr� as wameYR I N7 ® Hxsmar la lVIIfLLF£Y. W. mmainY RYAx aurlFP YxS 7�=--- �Y o9m S�H�r r IYPIGL CONC SWAIE ars AW /1®hY N Y8116er rq �o� ✓.w/�A nwr+wwN„umwvs uvr Aw m AIfO /M A04h0 M YIR.G BY AE 985 rsAdFAY M �re�'IC126�F�AVC/ l�H �99E1'1 m�11E um ma auwwSrxA mm erne orrmre I wu Hmr.l ewrH Msrxevc NAr aw x. 'sY I `G RWS I9bTENIKPffiNI rt ARSViWI RR9A I was aw 6 A, oxr�Hiw�xw°4EGmMM£UY wm°rcsruww I rcRV C<MIDmLL.WAGVN YAgYAY wi °ca Hawn ra ne neawemH ne camas Ar ma/uumll6suwlwwrsa+r1 . (saR ew-mW Mn-owr ((el WxRS N mvMu H V MIW 93I YAVMl91r RUeMS eAwmM A'D AE Nav lust! uaauwrs u xH¢wr. W�I I 1, o <1 I\ i� I �r m r _• OnI E"W'A6 IQo�iR O IJ i aTo — — i1PICAL CONCH _ J 1 q NI 1 `(n q � I ?'57'1 E' 00 / ND raq° w •art -�../ �n � /i""4n / �/°w ,� � //--_/ i ___ _____ '�rs i'na I sl� p W�I I 1, o <1 I\ i� I �r m r _• OnI E"W'A6 IQo�iR �h O i aTo — — i1PICAL CONCH 1 �h i aTo — — A q � FIR FF / / / CARgBE &YS i 5 / � �rna� afire. 72 o I n/I I / GRADING & DRAINAGE PLAN SCLAE :1"=10'-0" FIRST FLOOR LEVEL GARAGE AT \ LE� ENT - BASEMENT \ \ \ F. F. FF SECnON A -A «rs AVERAGE PROPERTY SLOPE=14.07% EARTHWORK V. w=:am pf Ar zro � rn muv rime P� 4E WAVnlss arM lvEa A¢fvt 6w H9,f � ,aBY6V4 WAAS PIY ma msm�H a�imoa"W` 5> �6 a t _ ` ®w VICINITY killi � I 111 11 ' in iIm�j I To i m i lI o To z O I A ND __ e.l - •art -�../ �n � /i""4n / �/°w ,� � //--_/ i ___ _____ / �j9 1 a aha a S€k e� REFERENCE NOTES o � F V 8 t FLOOR PLAN NOTES aY •vsa I—I N mx � m:��Fvam66ixv"��wix �� 6 � Mw�nPwaca:rsw� � _ 3 ��huz�'A MAwt1�ET�rni�aestta b{a{'otwyn%I.ttaaas :tmxwaewlH /M' EMPm.0 Aiauw ne5qen ���Ne Z wWSiiMslo� Yai. a4'` [ U NWLeGNA1wIW ��':Ss •s p$ N41N41 e�`rtnvw vvvdrervm^M Of GN:F� 0 FLOOR PLAN KEY N m AK TW 2 WIMM AkEA CAI.CU.A7lON5 ,ey a.axi O BASEMENT LEVF1� a.^55 =+R FIRST FLOOR. sµ. •�y.R SELOND FLOOW Ta =i.a LLJ TOTAL LMN6 ARFJ.. Wpbs 5} R W 7—GAR 6ARPGE: aRm •x-R � U ra BA.�T�TIT LOEGIANE `{. P. O o �O EIFLTRIG ROOM. STORA6Evl 94R 6 3 FIRST FLOOR DECK: GOJERED QliF2Y: R YLONO FLOOR DEOK� R • Faa W :IEEi Ha. p BASEMENT - FLOOR PLAN A�1 N suLa wuT.o• o{� �•�:������ �_�___._�.___ � �u�L� o���ll`II11111111 �� ii III O �1 � r / O Eo it i I PAVER SCHEDULE cuxnxueD 6EE LWID6CAPE P(AM PAGE 6 FOR ITEMS A m 05590 �� 141M y 1150N F` ` -O E 8 F BELOW ME AL60 0.EFER¢N[E TO COLOR BOpftD s¢¢ IT¢Ms la FNO ao SrNBOL DESCRIPTION <OLOfl PATTERWFINI6H O PR¢-[p5T PpV[R bN IR` % IS` 6AHD 5 • E - _ }. = , ______ 1 — , y v v v ' O w' I I p5 I ' i 1 - 5T,1Kry L OLA55 PP SON OEGK 24 P.ORET se• v I a I ARr D•gUgy 1 > . _� ___ z •_ ____�___� _ �__ L__ ___�__� 4af.x I ,Ma° y __ 1 I I i i i i MAT Roan i i! u• -o• na ; i s i P REFERENCE NOTES aP i. rw sve mrsan a � �rNn xxw`�4uvr�wmvw a mwrx Pwv -a _ � TIE it-C'•2C__4 Oz m .___ _J z ------+ i I I I I I „ I I II t a lao•ac z I gAT � 'i' OO O _________t 0 14 x I 1160J1 PP � t r:p w,pgtppiw 5a I: sw.n sr nra3a,o z%�waeeexvua e�raw.azvw,r..a Iwn 'cuwR,wS �naaan ,4 „STN. rn+ P.re.,o evw""�'0z+w,e.�w'.,a•m'�"®`" �v/ r '�' n ux ooP Rnsexexr EL w °af4• � I I -_J u ° 5 ea 4,�, hzP _ _0_W__ o an,ssnse enww u.m+®wA.waO auow.wawMT`9r OfwoV' FLOOR PLAN NOTESi' H d. Y�-1 {YO] j�./y�rn k.1 V1 3Q zo 1{ axTnfRi Izw^ —Ll __ _ P ro l 96•�• 4 � O XI 1m;X-11 I a I ^ . ro x Pnj w<yw.a �xmuneeser. �mwa9.5ma m id,xiW.ma,�er w�ivar'i"memn avu rnannws rrr���Tlll1 µ.l L��y � x w O ! I I �j®R� fa•�p '� O I I I I . i __ _ _____—_____ __ —J q Ir !% ll� ' �1.�kiYi i{ � 1/HIT I i � mf.E Xn wvx H n�ww�.�miie m�w,e vawn•,cY l¢awmn m,.IL�aw�X„X i �zamsMx�ii�arm�vcm xwa mrm„w s � tB i I •• I– �a„aY.-�",e&' i i 1 ' I I evlav Po%w I I >a• x se- 111 \ \ :\��. I ' ' " � I uuAavT — ➢`Z+A'�10---_ r • -- ___ I ° � 1 I t € rvY FLOOR PLAN KEY slwc°wa = W ®>m Tm•o<Pw. A D A s B I G ® nrt�� J AREA CALCULATIONS ,Lyaf,aw O ensemlr l.e�i� apns �.n z FIRST FLmR, sfcs syn SECOND Fi.ODW Sd -9 W. � a E� QF 3F3 ¢ �p� { 3 OQOJ. �R� LLC' 3Q igu ,-•Q $§�@ �jwo L� � Ovs/ LL LL g __--_ w +) < e NN 1 f. I b'tf' ' ref, >dra}• i _-__ 4 b`rs• 4 zr9 14 I i bPex TD pave-- I I i 1; a 1 I _ I i i ti—_ i .' fY IN 1 i 1 I --- - _•l ------ ,!' Ii I I !! ii ✓� bN' I f x a A ; I; ' 4 -LAR 6ARA6Ev >2n s}a , BASEMBJT LOSs1Av sRe syn Z E'R.ECTwc R�DztsroRu aI sf n W INv D R � } � �� LWERED ENTRY. §n O SEG019 Fl.00.F DECK. Wi J n W FIRST FLOOR - FLOOR PLAN p A-2 6UIE IIY•p�0` REFERENCE NOTES a r is N' as Rin mn. AiwtnMol2ro OOR PLAN KEY ,uyxme BAS[i' rRIT LcVb� W%.4R FIRST FLWR� s� yH sEcolb FLoaa �R TOTP W. AREAS yxe R �aroame ®sHmw.�rssen 3Tm &FH n�uoa a.E.•Anoe+s BA5E14TT ItA:GIA� ue rt BPGiR1G Falx STORAF£. 91 NyfY P1. fl.OE Lbi b}R Y. CC/H3EO EMftY. SFLOtb M. ELK. 6i SqR •�R .�R mini milli SRIF D 1 ■, s� ,_ .0 TV aai4 xuu I I Mo . REFERENCE NOTES a r is N' as Rin mn. AiwtnMol2ro OOR PLAN KEY ,uyxme BAS[i' rRIT LcVb� W%.4R FIRST FLWR� s� yH sEcolb FLoaa �R TOTP W. AREAS yxe R �aroame ®sHmw.�rssen 3Tm &FH n�uoa a.E.•Anoe+s BA5E14TT ItA:GIA� ue rt AREA CALCULATIONS ,uyxme BAS[i' rRIT LcVb� W%.4R FIRST FLWR� s� yH sEcolb FLoaa �R TOTP W. AREAS yxe R 4GAR 6ARA6E� 3Tm &FH BA5E14TT ItA:GIA� ue rt BPGiR1G Falx STORAF£. 91 NyfY P1. fl.OE Lbi b}R Y. CC/H3EO EMftY. SFLOtb M. ELK. 6i SqR •�R .�R SECOND FLOOR • FLOOR PLAN SCALE V1•KN V�gvE(�Ap U q� 0.•yi .� QR �f OR CiYEEV Z Y_AC_R00.' M[I6N_T_--------------------- �w—, I unx RwF xe,bwr ---------------------------------------------w 1 mrwrax I wnoov ioPwwoP I1 1 3iA 6 12 i I R6or,�R,wrt__________ -__ 5 3 12 7 ioP or noa^ . vax tw noor rc 141\g3J1 {t�H iuuu El 11a 3 w q } ' 8 5 10 17 9 NORTH ELEVATION WEST ELEVATION "�`�""••�" - - sca� ve4,b• �.� �t�a, + s 6�ti W YL%AWF XP16M F 12 1 3 `— MP ------------- --------------- r— wvROA�X[IGN! W Qa ❑ ❑ \ J:: �1' 1 taP OF R60F N 3 U LA _16 / 4 U 0 e e 6 W c E ' 4 J e 4 tT TIT \O4 14 ___ U7 16 9 6 yys aatr y asu�ay r, e Na C-tta9@ s � OR Cab<t�2 m 1 11 7 13 s 6 H 4 1� $0 0 LJ6 12 SOUTH ELEVATION w� K w = FE 1 scare ve••o-o• < .0 , a"g���5 N 9 — --- 0��❑ -- m Ot _� a I8 y JIL YOM -- — — — — — u - LU a95g3sgo 4 In _ t4 Lu A-4 EAST ELEVATION = SCAM ve•.11w ,ri. ,re„ t-uraiv_ ,nn,uw.cnx.� cocoa w� co�oe Rer,tiz<s "..r6i wwm roP x.A ppXy� suuazn .wi 25�✓wrFurveswca[/.i o - o - 0 s'7 O = ROOF PLAN scA�c ve.aa TYPICAL ROOF MATERIAL M TERM. TRELLIS LVv'G'A'MINM -REDLA Tl` - MANIFAOTUFED'PLMAYNOD- ILBO. tERR-<9N LLAY TILE'ALPMO" 511'4A_AiPO YWD GRAIN FIHS INSTALL OVEf[ (I) IAIFt OF 90Y RNFlI14 FF1T. FER IMNIFAOTNaE¢S ^9EGIFILAnON9 _ FFOJIDE aw PELT cwF SHEET MTtl mLE alArso). INsiALL FOR m5HW./ W PATIO DECE FFDVIDE EAVE nLE ulRl A'fR0✓ vwiEEr'wzF TeeRA conA ntN& MASTIC FOR HIPS < ROOFS I N 1F OEGKIIIS. PftWIOE LLAY TO ILIN6 RAKE TILES, < FEILD NAIUN9 RECLIIE® l FOR EKM nLE. INSTALL FR 'A' FIFE PF9TEGTIXI. TEPFLS t PNNIED EXTERIOR SOFFITS IMTG INSTALLATIONIMI INSTRKnoNS. E%IERIOR 3LDATFL451Ht THICK FPO✓iDE RADIAN! MFRIER SiE.ATHIN3 AT ENTIRE RN' F H bJEi E#'AIIDEO METX LATH TOP IN2IXD 5`.W.NA &.ENDED 4GlOR5 PPN IO.Y60.D 9EOIXU BLEi9 STK.CO VRPPTN GLD`£D !AY .. CGF895 O {xw 0 F. I --------------------------------- WEST ELEVATION �----.�.---- , i —L_L l l� 7-1 lJittgtii ua xwv xesxr ww exue. eeanox SOUTH ELEVATION STYLE: ITALIAN VILLA 5" °""a EAST ELEVATION STALE 1I94M1W m CD MeH o kn. GM9< p p �3y.a3� � pPII' O" put a x 0 a c"ag gra S Ri? NRRARY2 A�9 H SL I _ ._._._.— _._._._._._._ . r a Ni ei, — I to I w y ffiY N.V�WAY ARTfJ y - nwdC,_._. �W) i—._._._._._._.—._._._._._ A w � w e 4�.GMAa HNIWAY W[H�] 4NNE ®IAR V1 W6 r 5v m� � ) SECTION •A N ua�c ur•ra W _._._._._._._._._._._._._._._._. o AReN o r V ib. b99Jf6� J OF pµR° L o ❑ ❑ i HALLWAY i -----_:_- Dp _ _________ 1 0 �g LL we N 3yg { Sgo 0 mt IMNG ROWA & 8 39$_ w __.______ ^ pH; m rGg�� 3 �Q�Y ■ a<� ....... p m _ill o Z Z Eby§§§3�.'£qq z cea iO �8 448rc W U EP_ MT A ci z _ yr 3 W o SECTION •B w A-8 F scow yr-wa � i ]tw—I IUN •U scu.c w*r-a A ommneee■■■■ems ommeoeeveom■�ee ommeoeveea�■�ee omm0000■■■■oma � .: . : „ .. , , , . ommeoeeeem�■wee ommooee■■■■e� . . .. , ,. ommeoeeeeo�■we . , :.. - 000eeee■■■■oma � .. ommeoeeveom■wa .: • :• .. •• ov00000■■■■oma - .. .,... , ..... - o�me©eaveom■wee ommoove■■■■ems ... , - ommeoeveeom■�ee ommneeo■■■■oma :. omme©oeeeom■�oe omm©eeo■■■■oma _ . ... .... .. , :._. ommeovaveom■�ee o®m©000■■■■o� ommeoeeevom■�ee ommneee■■■■ems :..: : . -- oeveaooee��■eve o®®0000■■■■o� _ ' " ' ' oeaeeaeee��■we o®m©eee■■■■ems • ommeoveeeom■�ee o®m0000■■■■oma = ommeoeveeom■wee ommoeve■■■■e� ommeoeveeom■wo - . , o®ma000■■■■oma �; �r ��;�'� " ommeoeaevom■�eo , .. . - o®m©voo■■■■oma � m � om�0000■■■■oma . ommeovaevom■�ee - o�memeeeeom■�ee . ommoeoo■■■■oma ommom.00■■■■e� o�me©veeemm■m■ae o®m®eee■■■■e o�me©eeevom■wee ommmeoo■■■■oma . o�me©eveeom■�ea ommeoeeoeom■wee omm0000■■■■oma ommeaeeeeom■�ee • -• • ooeovee■■■■ems _ � _ . ommeoaeeemm■�ea ommoeee■■■■ems _ omm0000■■■■oma - ommeoeveeom■�ao - o®m©eeo■■■■oma ommeoaeveom■we , . , ommoeoo■■■■oma - - ommeoveeeom■we omme000evom■�ee • omm0000■■■■oma - ommeoevevom■�ee o®mnoee■■■■oma omm0000■■■■oma -: o�me©aveemm■�eo omm0000■■■■oma � _ o�me©eaveom■�ee - ommm000■■■■e omma000000m■�ae • ommmeve■■■■oma ' ommeoveeeom■�ve : omm000a■■■■oma ommeoveaemm■�ve oveeaevae�m■�ee omm0000■■■■ems rniFl 000ee■■■■oma ' omm©000■■■■oma omm0000■■■■oma ommooee■■■■ems 0000eee■■■■oma . „ ... oeeeeoe■■■■oma ������i oe00000■■■■ems , 000000o■■■■ate 1 it , ii oZii ll 744 � �t�' � G. ri I ■� ■ • �� ---VIII ELM -------------------------------------- AS]I I I I I I I I LANDSCAPE DESIGN TU i , INC. I I I I PROJECT PJAME ANC ABBRESS� I I I I I 1 24e74 FALCONS VIEW DRIVE DIAMOND 5AR, GA. 91i(o5 I I TRACT: 30591 - LOT: 26 - APN: 5113-041-015 - ZONING CODE: 8140000 I L---------------------------------------- -----J -------------------------------------------- PROJECT NOTES I I SHEET INDEX (I VICINITY MAP THIS PROJECT SHALL COMPLY WITH THE 2010 CAUFORMA RESIDENTIAL CODE, WHICH ADOPTS THE 2009 IRC, 2009 UMC, 2009 UPC AND THE 2008 NEG. SECTION R106.2 THE CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OF THE SEISMIC -FORCE -RESISTING SYSTEM SHALL SUBMIT A WRITTENSTATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL PRIOR TO THE COMMENCEMENTOF WORK ON THE SYSTEM." CBG SECTION 1109. OF APPLICABLE) COVER SHEET 1. SITE PLAN (FULL 4 ENLARGED v)EN5) 2. LANDSCAPE CONCEPT PLAN 3. DRAINAGE PLAN 4, CONSTRUCTION LAYOUT PLAN 5. CONSTRUCTION ELEVATIONS $ DETAILS 6. CONSTRUCTION ELEVATIONS a DETAILS 1. CONSTRUCTION SPECIFICATIONS 8. LIGHTING PLAN 5. PLANTING PLAN 10. PLANTING DETAILS II. PLANTING SPECIFICATIONS AMS LANDSAPE DESIGN STUDIOS, A.S.LA. A.M.S.) - ALL COPYRIGHTS ARE RESERVED. THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION BY AMS AND ITS CONTENT MAY NOT BE USED BY ANY OTHER PARTY, ALTERED, OR REPRODUCED WITHOUT THE EXPRESSED WRITTEN CONSENT BY AMS. THESE DOCUMENTS ARE INTENDED TO ONLY COMMUNICATE DESIGN INTENT AND SHALL NOT BE USED TO COMMUNICATE ANY CONSTRUCTION MEANS, METHOD5, TECHNIQUES, SEQUENCES OR PROCEDURES, OR FOR SAFETY PRECAUTIONS IN CONNECTION WITH THE PROJECT. GENERAL VICINITY MAP GENERAL SITE PLAN PERSPECTIVE VIEW I Ra I FEVIsa 116 I AT I 1 1 1 i 1 1 1 1 GE14RAlORYTR�CPGIbb1E$ lleu hdswpe Les�gntloaaneMsarelnleMetllo FaletleagredtlerA�renY eeM creb mtbeuuE ,� � S cwwr+suertw.�w Vl a'�2 v Iz�/ W �m0 rOP �m W U � Z E W Q 0 0 " a _ 3 Z /�, Qn — I W N 3 1 u i s O IJP V) O m m Z LLo o 9 ®� F p p o _ N W DRAxu oWu SHEET Amex, CREW PAM AW i4 mu OF THIS PROJECT SHALL COMPLY WITH THE 2010 CAUFORMA RESIDENTIAL CODE, WHICH ADOPTS THE 2009 IRC, 2009 UMC, 2009 UPC AND THE 2008 NEG. SECTION R106.2 THE CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OF THE SEISMIC -FORCE -RESISTING SYSTEM SHALL SUBMIT A WRITTENSTATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL PRIOR TO THE COMMENCEMENTOF WORK ON THE SYSTEM." CBG SECTION 1109. OF APPLICABLE) COVER SHEET 1. SITE PLAN (FULL 4 ENLARGED v)EN5) 2. LANDSCAPE CONCEPT PLAN 3. DRAINAGE PLAN 4, CONSTRUCTION LAYOUT PLAN 5. CONSTRUCTION ELEVATIONS $ DETAILS 6. CONSTRUCTION ELEVATIONS a DETAILS 1. CONSTRUCTION SPECIFICATIONS 8. LIGHTING PLAN 5. PLANTING PLAN 10. PLANTING DETAILS II. PLANTING SPECIFICATIONS AMS LANDSAPE DESIGN STUDIOS, A.S.LA. A.M.S.) - ALL COPYRIGHTS ARE RESERVED. THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION BY AMS AND ITS CONTENT MAY NOT BE USED BY ANY OTHER PARTY, ALTERED, OR REPRODUCED WITHOUT THE EXPRESSED WRITTEN CONSENT BY AMS. THESE DOCUMENTS ARE INTENDED TO ONLY COMMUNICATE DESIGN INTENT AND SHALL NOT BE USED TO COMMUNICATE ANY CONSTRUCTION MEANS, METHOD5, TECHNIQUES, SEQUENCES OR PROCEDURES, OR FOR SAFETY PRECAUTIONS IN CONNECTION WITH THE PROJECT. GENERAL VICINITY MAP GENERAL SITE PLAN PERSPECTIVE VIEW I Ra I FEVIsa 116 I AT I 1 1 1 i 1 1 1 1 AMSU Al fhsgnsl Im IAMs). lleu hdswpe Les�gntloaaneMsarelnleMetllo FaletleagredtlerA�renY eeM creb mtbeuuE wmm wmma:�mxmw � meare.. mewa,. le¢gsq�ei ¢e9�en¢ecapeaetlure4esfae Wely presauEors In wJved'an xM iM P�ejeq. S phi Vl a'�2 v Iz�/ W �m0 rOP �m W U � Z E W Q 0 0 " a _ 3 Z /�, Qn — I W N 3 1 u i s O IJP V) O m m Z LLo o 9 ®� F p p o _ N W DRAxu oWu SHEET Amex, CREW PAM AW i4 mu OF COVER SHEET DASHED ME IWICATES THE TOP OF SLOPE' LOCATION -NOTE: THE POOL @WATER LINE) SHALL REMAIN A/NN OF S-0' FROM THAT TOP OF SLOPE •9b"NNC REfPl NG WgLLH54M •SEE CNA F}IGNEEKS PVJJ FOR R�EFERE�YE A TESTN4RECOlA4F1lDER MAJESTIC POOL FREE FORM POOLVATH NATURAL STONE COPING & BOULDER OUTCROPPINGS, THERMAL SHELF -SPAT G. /POOL ENTRY AND HIGHUGHTED BY A RAISED REGAL SPA WITH INFINITY EDGE SPILUNG TOWARD THE RESIDENCE • STRUCNRN.EGWEIXTo atFATEBrzAWINC-5 AuocucwwnousmeP wur •THE POOL SHNL RE4NN A MPt aF 5'-O' FROµtXETOPOFSIDPE • OEPIH OF Po0. 51 W LL BE APPROK 6'-0' •Rgl5EO5Pq (QB') W/STONECOPNGb NpNP1BWLDE2' •FEANRE SI4W.BE5CREEVFAWIIN PIFNfNG 4ROMALLOFFSIIEVIEWS NATURAL FOUNTAIN FEATURE CONSISTING OF BOULDERS INTO THE SLOPE WITH CASCADING SPILLWAYS INTO A SHALLOW BASE - PLANTING TIX—KED INTO AND AROUND THE FEATURE TO BLEND THE FEATURE WITH THE SURROUNDING AREA & OBSCURE OFF-SITE VIEWS SIDEYARD ACCESS VIA STAIRCASE ALONG HOME HOUSE G WALKWAY SHALL BE OBSCURED FROM VIEW WITH TREE(S) & PLANTINGS LRRIGA�ONNOTFS. p, .. emw. : NOTE:- .�FSw wa.�r�asw..Ew�.rwxm�iOas.,o.�.xax� imiw. OPENGRASS EA CONSISTMG OFA DROUGHTTOL TURF SPECIES WITHACCE){T OF SMALL BOULDER OUt-CROzplAA.jND DENSE PLANTING STONE BANDING (18') WIDE WHERE SHOWN FIELD PAVING TO BE INTEGRAL COLORED CONCRETE WITH SEEPtD AGGREGATE & SAW-( NT 3b' ON CENTER STORMWATER POLLUTION PREVENTION NOTE ¢xew.unew�w¢rcsmwMwwa< w� tib ...,,..i.mu. •s E N=m�® sH4LLNOT UCEEO9'-0' W HEIGHT '„�a��11�(('RR'�l IE I�E31F�col+�ic LEGEND: OI fpNCRET6 W-Sta'OAVISSVJDIECOBNFF W/ ASN FwLSN-SEE PAVPIG sdLW {S CONS TORTOLL-PSLAPPR MPR MEP_4SRESTOHELPRFWAI, CRAC Q3 e3 REEAR34'0.G Ei41WAY,5WPORTRT ATALL ERO555KlIgJS ® V3'TOOIIDRAOR6<E-0GEOFPAVPIG pp FBWs+cRPnEra�tsNRuecRaurocovERaeP�s,rw 1LftFARFhs ©1' AIllJSANDBASE-CONFTOA W/SU¢'SREPORTRK © LOMPARED(90% µV3) SOBGRADE PER WI REPORT REFERTa..REPORTBY lAW50NLA55pG CONCRETE PAVING x�arvL� } 2 1 1 5 V 9/#K' 3/I6• 3A5• 'CVIIIIENIIII� 1--i Ed DECORATNE 54Y2UT.10 W { CONLRAciION�OVJr L mem LS OI ATION.W0 1£GEWa Qf f-0AYRETE PAVWG Q v4'roD}m RaDlus EDEr: O3 VVTNBEPh10F PAVIAG T-0LXIJESS ® aV SrEEICONII, 6'1ONGAT 24'0.c QS PLASIIL ObN6 PIlGNAIPITS(E6y6 © 2sD1arED.wwrFiuER Qi rAMIRB� Qe GLUU[INGBACKUP. 09 cURe, WPU-BtNDPIGOROlHE2 FIXED VERTIW.ETLE PAVING JOINTS swE r-rn' IEGFIID L 'DESERTWWO'-TwABIID-sOUARFSLRECR PATTEIUJ BY COIKJRSTONE AVIdAO}EAT, •1RSiDNE&nMJGL VNDSGPESTOAE S•r1NRo3E0R1uE M 9CEN}N G 9}Bi0.Vi1 2 WEINI'MLTI6FIEL➢WATERWI6TIlE-5B'%5/8” 4 OATIQ2 S9. lE0'PEeB1E5NE@t FiMSH 4 LOMPAcfFJ}SUB FADE PERCEOTELLWCLLREPORt -C WIGREOCONCRSTFi-OAV15 (O}OR 'SNI DIHdBNFF' 6 µASTIC.]OWi W E 'FAGWF RllJCFORPP.4^ REEAR,:OONJrr ETC BY urnsTRuciNRN.ENG • oL}E r0 THE lOOsfi AUD NAILRAL' DEsIGµ THE Ewrr W IDTH OFTNE COPVJG W ILL VARY POOL COPING s r•rc IEL6J6 µG L PREU. TSrEPI 1 .S REBM1Z B NOSE W / 3"CI£ARN1rE rW REBAR812'0.0 E60( WAYTYP. 4 WNCRfiIE BASE S 90S rgµPACTF 51}&GRgpE G IXPANs4XJ.lOMr. ]. PAV➢IG-sEE fgN5T2UCTlON PaML B FWL44GRADE NgE: L INAIBFROFSTEPSNAY VPfiY-SFP PUJJ PRE -CAST STEPS scNEr-ra SE-- — •/3LRNJDOMFIAGSTONETp DICTATE T}fEii PAI N OF STIXJE wcaswEu.ASTHEEDCEOF uLmNaeEIEBOARovzs 1 STd}ESTEPS VEEERr WAID'TRFADANOfEDG925iMYCRLSFR AVPdAB . SEFLLVEW 61FIDN4NN ER415 S8t9SFORBES ROAD IAGUNN40EL G sYSI amSeLq)b 2 rbNCREIEBASE S 90Y COMPACTEPSISB-CA}Ap6 Y IXPAN510N VWr ''i PAVWG=UMERON 6 9'LOµPACfEp SNJp BASfi T. KRFePR, YERiIN'0.c & MRFFAF.HORIZPEPOI RISER IgTF •NVµBEROF5TEP5MAY VPRY-SEEGRADVI6 FTAV • DIS TO rHE'}nosfi aFm uAT V RAl• DEvcµ TLL sTEvs =O NMTHk yVARY==T UJNTPACTOP. r0 E N SVRET}tATTHEvaRYPIGIWDTH DDEsuoruLLSEAuv SAFIeYCONEWIS STONE STEPS swsrr-0' GRP1P BTp PAD6 A WPL STq PADS PINI VIFU-NT.S. MEW -NTS. WM 1. ALL COLORS, TE%NRES, AND MATEWAL SHALL BE COMPN4EMART TO THAT � THE HOME AND IYS ms" .ENI. 3 KEEP PLANTING LEVEL T. STCTES O IATMPNDPIASTERFll. ® KFATNER-RESISTENTBMRIER © VIEEPSLRFFD-26Ga cONr. PAWTED6OTu sIDPs Q is'MW ATEAr3 }M1\FMFlAIG6 ® NPRDSfAFE/SLAB ® SOV.-F41L41 GRA0fi WEEP SCREED NTS v AVP U M Ar. 5E IOATING STgic PHOS LLVEDq YIDaY tLIERWS }eB9}F.I ROAD e%6 GiFl GA ]bT lnc 3O a II}' CLNCRETE BASE VV P] RESAR EACH WAY - 3O CLMPALTED SAND BASE -1e 191. 4O COMPACTED.. -GRADE -90Y Mt CCMPALl10N OS LdL PLAN6VO W pLANIR33 BENISfl18Tg86 -SEE IWG 1L4V FLOATING' FLAGSTONE STEP PADS SCALE: ..AT. W ICV t STpIE BUIM G L L V LJSG➢E SRNIE WTD SS59u Ro5EIXmE L ALLCgpR$TIXTNR6,ANOkATFRNLS SPNIBE PUCBIDSGv]e]0.911 COMPLIµFMARYTOTNATOFTIE4YJMEANDITS ]NsfS->.MO pESIGNMIFNE O 3Vl CplKRETEBPSE W/s3 REEVt TMm bmwx eeOEx aowo.m<:re w..aw 10 mm�maweoldryabdv xm.l..ewluev;m iommmwrFabxmwrWrufbnmex2,men W NNn"W.et kq�elces er pretNuee.9r br wlewly pmzwbrclnm<rvuNmxihlla PrejXd. 24'O.q EApIWAY 2 KEEP PVJRAGNIXTTOSrgJc IEVFl z (55'-60"FOR UT3VEYAY-SEESOILS REPORTI N ® rusPPclEn vNDeasE-4'µVL y esLH ® COMPAGSFD SUZGRADE-90Y A\VI GOMPALTipN STONE PAVING O �'""L"E}Tr^W"fDL°REDGRour-n'xAz w1DTH 7U® LU N W W 1 '�' REVLsAAJ/ISSUE 1 DATE 1 i' 1L I l 1 1 1 / LT / ANE IaMsspe Oesgn SY W ies, lm uLemreN=+...e.reee. TMm bmwx eeOEx aowo.m<:re w..aw 10 mm�maweoldryabdv xm.l..ewluev;m iommmwrFabxmwrWrufbnmex2,men W NNn"W.et kq�elces er pretNuee.9r br wlewly pmzwbrclnm<rvuNmxihlla PrejXd. V z og _ o N '-'pFFjy� nj 11!510 WNm y esLH Q V H }n W LU 7U® LU N W W �G/ ce xo O Ill/II 1��\ zr N a v/ > 4 o Lu O p U <Z N o Z LL o 0 O N _ W CFANM OMLA SHEET 14 RE E h DREW DAtE GGfn•3mE .1.L OF II SULLEr r=e'o CONSTRUCTION FEATURES i I 6 3 IecFan O SF£sGEWc4lrAilO SFOR WFORAIATON EDILS O3 � ABE�� �AAINAGE WMPOSITE O3 14' SQi. W [E DRAINAGE O PDN lm WSIDEOFPOT POT DRNN bTtIUWTON OPFNWG OBACNFILLPE2 PLWi1AG5PccIFICpTONS O6 RRR .S ORTW}RIDRAWPIPEdN0p2RIWTON FWIS4 GRADE -Y£ H4RDSUPErDNSTAUCTON flANS- WTE COrC}RN PIPNTING SEE P WJT4G RhV POTTI=RY PLANTING srALE:r-ro' ,»s THE STRUCTURE SHALL REMAIN A MIN. OF 5'-0" FROM BUILDING PAD s-aEr•zo SOLID ROOF CABANA - SWIM UP BAR 4 vuuvlEw f£GEND L NLASPECTS OFTHEPROPOSEpRWFSW.N-kATW TXE uDME IXACILY LF, TnE, vrza4 EevEm, BTc i PREYlST r-0WMN W/DAKOTAIEGG VENEER PBA. LER BASE s. caAunscaWrvtrovwi BULu+DseEtt:EDEnw.- RECOMMEND ro MAra nREftIORCRNJDE-a-�vrrD vER¢roFsmE x BBDANeau-PROPOSEDEoumMENr roBE SEiECTEDALm vuRaasFD By aWNER 5 PEBBtE-'(EC-7A B w -CU WTO CON£1A1! 4 POd.COPDIfec,M-W LS -PLIES (li'W[3-//}�THi}i-i/6'y BY PAOFC STOIF pIG L. PREfdST SLEp5:�5TAp-L35ERIF3 (l3'Wii-1/}'THi}t-5/d'/J BY PgtliN;5tD1.E PIG B DESERTWWp'NMBIEDSqupRFSpNp REC(pNGLES R.ORT) PEPAV4,GoNPROPE(( .-,W(pEQ 50p.'S REpORTI BY Gq}GgRSTONE-f]W.993->36D1 9. pPl1pNL CE6pY FNJ-TOBECIXIFIXMEp BY WEM p. t'•n TPE'NENW i'%e -GIDSS'-M441INSRIES BY WAIICEKLWf$L WATO@G W/PW^LT6EI n sMmru pusLFRFWLsuro MATw NousEExacLu' V- RAISED'SORIT CE4Wi WRHLWE/ROPfiLIGNiIIJG- C£4L.K:TOB6IXPOSF�STAW®'g1EFRYBEW. W/ PISET098MIB00' sTRucTueALE,�Ew se TO vRovmEemvexawnwasn}m pRAW Wes FOR THE Sptle ROOF slTtuc(LLQE MIp ppDL /SPA ewe eT-T-0' DAi 1 1 I AMS Ia Nce 4e'MNntSI m�l� wYM TlerehMatape OeYBntlatvneMete lNeMetlle wmm�sbletlecbnNMON/ aMalaBmlbe seed to wmmui4ale ap te2Ntlbn mearc, me W Ls. IedWpee.seggrceee p:pwduee, oektakly pie®w'ansinw, wm:llz pmka en'eetsm V z o� _ o 0 om �r 8 mz Lu U Z w &` >N Lu ^ ce NO o z I� �fff Q W V) N Q V I z W W ®a m z U az Q a W < 7 1, N O ® LL O R} W J R ^ �� n N a ® W DRARN: DMLA SHEET REVhIW DRCII MlE OCLn, }(n2 OF Y.B•y CONSTRUCTION FEATURES 2 y cLNERN a rolrzpwcWALREunoxswe Ix Lk p=Rmuwv[biamovax{Coe4vuvrs4illbWCma¢ape Buigmraza OxrcrAvmlx¢r�ommYma Jllirhilily,mvx mdxhmgmmaxsowo(wmxommuoaxixr4 wo¢ulon=md^Yw;orifiacgm<s meLs=xm.omlrmw.=mrs H. EP,RORSOR CONRICIS Ifmt max er xex0ixu me tliiwatrtd in Ih dwx orwlei day xdil14 ivkgsM m az w xsomplirM1 de sal purge e(8ms Plaxwwlu. C. AOOInON3,OEVIpTpN5A11DALRRAT10N9 Nedvvia4xword¢Nlom WmlkpWxvM CPxi6e4umxill k Kx^:nW mJe¢wWnuJhY rh vaazrarde Lvmiwl= wdpa. smdeaewa=nrmnpW, mdmuxkmmexvamyawbwxme4•sam.oxd6om,ow.rmaLw¢,W DeRewr vWlmyrv.wk MnarmY [mhe«;a4om No>mre=mlawrkw:nk.olmdwamlmmuaemre¢xRM.xdaea6aewmde oxm.. D. MTERPRETATION Tmcue¢azwrxhdlmmPQrewidlM1cobvuwivknlmdmrarvc6v(dcs plwmJaRxiOntivmxNxhxhillNwaWyb :«IWC JI6bimRriil, Ixma wuipmevlmxaarybwmd=ude xnrk aKciGedkrzinioaxndmanlitenwnuu RnT[ ¢,ad=ne=widdv^=mero¢x. smwemrgaw'ommix.xmD.ix¢mmaim=grtwoaofldargmxmaw¢[Pon¢amr vhillxWbOnttrxW LedaaK Dcri6auxA=xdud6v DsrenxAill EeGVL E. O83ERVATIONANOHFhCT OFMATEMA MDWORI:A Jup ABmxkiidxmlxaM1memNp NmislrtdarKrfomiW byGn¢xrurxHBhmdjexlb Geilabs¢oGenmeaspmmehyOxx xvaludsaRrmaewrupewmplx4coe[illmn4W nnrkaklhxpmivWypdd fewrrot ArvO'wdJl6muacnegdc Rrkrmmmuf8u"xmebav4[bvrrcloshilimak=xvJlvblx wub¢rvv4ogkXmavyprvval.val=eak W vnammxdip, iulurt ofxmhn#ssnnrsb matt abwNogkaM1urapyraaalvemllwxprtjWirsdenghblWJsrycperiemorOxaronlnil q6mn4on Cn=LwlerahillpumplY rtplssemY w'IJlwlxdd; xarlamnckTudwWpmenlxW=hdmrmlwn(=rmblm ,maaam¢x NlmauridxuuauxuaswnuW,DJI D: my vddehnmvtrd 9xililyuNeugsiGedelmmixe F. SAMPLES W4nwrtquirtd hyOe OxmrorLaMsapc Raieneifmnbulm e#w rvbmillorvpPevJ empkxerrk vmivmmaWiiliad xpaih4dddaun O. LOCALCODF9 Allmv.4xuimshillwMmwJlbul4oilai=gwhxmdordmarx X'¢GnuMof[rtipvdNTitybvmf'dlwkxPdarb wmmwin. xert H. Unl]nES ConumbrtlWlhxs oribk (aravd4 delmaaen6[JImA wwdmil'N"c daNewDlx vwAi 'vV=r punma Jl u4lihercv ro 'g ; 4 4Nv pMrwwyx6vnrr4v¢ I. REMOVALOFOESMSNIOQFANi1P ConwelolddlrFwo N xlem mdks Rin[dehasWxYew¢rW=olimwMimaonwbdc WiRu4oeeflm Oxar. os v v 1. GENERAL Tk gmcrcN med4rnx cad mY sRviil xuMNom tml0xar maY r W uirt xbn8 ePP1Y xid IM ame fora cad =Rml u lmrvph xn iriHBM1eaivforJlwnNwtivvxeh'am. SIR IXGVp'11HN N6D ROUGN GRAOINO BmKutxnrk-Pmndedlbbimakdil;ret. WJpmm4 ¢+vgoRuooamm«sayivcNvndlsfar W wmgw'vn D[JldwinE Mpp=g.e¢wW ny DssIGIEnEFrcEogeMrtbxd xvhmrmununlbedvxierySimlu$rybmmllimiW b tln fvlbxiry: A Prv¢cuvve(dlcwb; wlb,xills c¢rcDnexmiolma¢ exwkwNxpixmsmvv 8. Ckadoy mivNppvgxilea[brash.dx4i5 eadcllurfoxignntlmilxuauNrcainlmLrv;vgx G Eww4mfordlfourvhlionxeWrw4ry1v16edimxvgevmd JepA Woxnov Nedmxivgi Wllomiofeaaea4=mshJlm wwdmelwX. NXwxmv¢nJxhJl knmm'm lka4am. D. Swgm4x xhillbwamsNwawmpxkdbartbaa<wmparionef95•h E. SubyaJ¢urA ill PviKxha11k4rtbgsdcudxmm¢=4aq M1¢a.urvfeimaMamwd Pderb Plcmevmrma makriil. E 0ackfdlivEafellame4oexmdNmhmaflerplxe ml vlfomda4ox;xLl; xa1W u41i4gelc.uovtlircaovlberrvivy. Lamp¢Hevefhssl411 xdJlbeigvuvpu[exi0E=gim=h ry=xi[cN'Ow. e GMiugofvsssixeiNed i't, M,a xMm ng Myiv6eda4og ydcswxiJdxw0f dmormmm Fml hrieaemhx uinai=Yedenlm MniMx. N. ]Y9�[`ivg ofxww4onmamdJorirvWJbpmBGDmWydxWlhmwJircdoolk Mwingacruappmv=d bylam¢aq L Clwupudumwtdlhbdvadnupluxma¢riileMrtmav<fmmnk. $RAMAOE pc lxark-emvihe114mq mJ=dxylm4%Wpmw4HampreWvxdxsxssayi«i FstJxbrlhwmdx4onofvpdnimW prvmx u rmxn w uY dnxiy; irclxLvg ba ml limnxd Iv Ik bllvxivp: A MATEMNS I. Axrylonile RUWeu-81M«(pHSlBxhrdde40 drdnpiR RRonkd orwo-ryHiPeain&wxleuamxnxe W Mxivy. 2 HaximutlOnim-IGehimpYplub'e SQwmdilebeximxaMbtim^idgNeehighimpazlpl¢DCSQnwhekdnint .ed'orp«w mmrtmddxm;oW auhbdxxmamim.gmmmexmekm.mdnxnxmwemnmemw:eg; mJJe¢ N.Ielhmw dck GdwivhvduvRuslwxnov W Mxivgi B. TRENCw MDUYMGPoe¢ 1. Tawhsbpimhcmirimme [IA'Rrfmlwk¢ahemiaivixarMevrk Mx;egv, Cmeubrbaeriydliovendma4om mtllrtnEdepAPe^rbuxava4am 3. polbmofRm6AdlmmeadmawW"mqusb Bewdsxaeq Ablbwdapb:madebrtveiae kllof" m1A: o'ml xip rolAwuBagJvxvhgo4. Mjmusv(xblinceNeMxRmBDe mX b)'mnPo6 axaywOdngiemdbekfiliuee«rk 6vx nflk piR.mmlk/xW'x6 wmmm.f. S. Trtmh mlleislxmll Eeu¢dbrbukflL Hoxevei mrm6orlumpslullhu¢d WxlhajmeHehJl beghieJkaXlf minvkxxbph(axlxealing. pmav delntlafiu4d6aclflLdernwAmaYdxbxkGlldaid¢emhmaedJ. t Cnmpvripq. Compµontyumpv{dwlmlmdwinlq�mvawedmgeiFAlircmxbiwxhg5wideazhlpnlmmugxy mmp¢LLdknxem G clrwN.NPANORmxc E IINNApdgdktyfLKT.QxbAPA0.f4'BDi✓XYBriQtl{kiiSMSeSlllFNd�[$HYetAa(dkf PHgR[aiorGm,PearbivaJ 3. M dd^6mkmxxwl xwxnmmaxk.xaPd.rmwma4agmmm"agaWnpm.wmnmdanmmrma¢ie.k,¢m; 1. Uwvwmpkbnefxnrkrtmove kbdsrely W rwplmmasaJ6omnre CONCRETE 3xnpea(wxh-PmvihdllaMinmkndi bW; woipawlkvxWRtiovmW marayieriamhk lvrdemmPleaona[dixewrt¢ OaMokusMunavNe Mwingxiwlutingdmm(BmBmblkfnllvnivg- A MATERW9 1.4mev1-BYvdvd PolJ.W Cww{R=den6^r6w GlgDafde A511[TYPRBLm V,bw Jkil[JngkkmeJveugmW Rckrl=SVBEe®arhBepXbr RsommeMa4m4 2 Aryrtgffi-ASINSRvi8m4"ex W51d'mmmvmun. Dsors4vx egesgaW wlsamxtudepx oxemxingi Frm m4W aµ xt118rdW wnbrmlmbASRAGIM. >. Wmvr-We¢rmm[IullmofmNNeYvofity� 4. Sleet-Reiv(esin4x¢dfwdrttrmdxal6bhlv¢rmN:Rc ervd:acfoxxcaLmiwntvmlogla ASIMAdIS md�vr[ ie dQ AtW NnA AJPS.ae xier=eimxnvndnxingx. 5. E+pxmionkin4-ArplJlimprtyuW felt PoI)RIIEdRweuinBmlNmpvan^;rge g. C'onWllabu-gaw6Njoinl lMa[[Iah Wkltt¢ HW k=Immrtj=iv4 Vd'hepminim®x3:n tlnun ondmxivg; ]. CnMbin[s-p WlnTybdrrypcxiAdawd4 StvalxYFimuiMinmdmlmdnMng4 g. Ixivl Smlml-TxnlmHPolysW4kadwumwofiwrW b)Thi=ln4 GaYA$ slflntlivg wmbayw ptyortdmx wnMt4onxdml6)LMgwG=IQ W mYMvgmb; 9. Mica Ma=rW-Xmlcpmm¢A83]c. 'LidixMm='wbrwx fof evbx xvv64emdwn=wwhyLM6m4eld,ioma¢Wvg wbw(wrcrtl=uiMiNW w dedn¢;ngs. ID CobreoNibwaQnrYe= LMmiC rdmuMvx OximegNwlmedwarc¢bjLMSmfxNGnp+vY, 11. HnXoxcolor-•ulhmhmmdwbxkrdamryLALsmr mPompnr. 12 51Rx FeladaW.•LlJmxx"bpsuRxn rttvduumwofxbMbyLM.SwGXdCompny,ci Si6a'rvRixrtWdm[ex 'Rug<ml' u mwNa4wtl by gila CerRnGvv B. BVBGIUDE 1. GmdeillrvAFbd=swawifomdep0 W mmpe4uv Rlmr¢o Wl rvbgavkxpurbpvunv8ofwmrtx. z Gnaur 4egxmxndRakao.wmpRmwil. C. O I. Ga wdy4dsbelunhcr. sn Jl gem.x4xvw grdcmawai6on. 1 Mnixndtlurmxpdarb Wmi=sofwmrtmerusvgpevd (amrulmavgwle. B. PKPANs1oN101Nis 1. nmeewmdmkm¢mwx=rzmmimmwx6=e efmmmevedf«mmmNrt;k-gaaE;xWl; m¢o(neW eml Maa mmmindmwwrmamWxg. 2 Plxe ronWljdJinmartxovlbua«tivmmnnW rpxivg exxP'rifxd byamikcryiavr. ]. Plxewnruvvwv]oinbivwvsen xhwmrvq{vuwmrtbubdXagedamm65wmoxeavtivgisbka+rled. E CONCRE(8 1. elaaAmartl<shdlwnWnwllesdm5s�bofamwr Krwbie)iN W kpmpN+rcdbaM1Jvemsmvurylindvr Lm 0.of;OW PSlin]Bdpz Gmpmuixt RrtryDuxb 5ch¢miadlnrwNrrccxrd ASLM W8. ikd®pda8 mlmadd'. }. Cao=rt¢midng-w¢wilmi>Nwmrtly A¢IlbmixW exlhlixead'w woWanrtw;dlmrtge'mmenb[Suvtnd Hpni4xNem 6r rzmy mivd romsle ASTM F W. H CONCRERFMI818NG 1. HrwnFinir#-Tamp frcr5wncmmwiNhmymeW gn'd &sed ailhNu'ghl mgebrtmmidllrrtW4aGex. M.1 ba amrorSrvRxS Ral4uwtL mddpbmn'eo6vdaw4e SwrtssiedrcaYduvhvxinry Vxemwrnvilakmp#nNe boom earnmamegwodaebmakrm WNonm.maaxnalkdax%. L yatSdt F]iA-Tvmy fsdwartbxirh#maimewgdd Snadu;da4vglnelFClomnmatcB:anFvSaau FleYme maolhwfaz4xlcelwnxl,and W W bmn'eo6vdemGn SmrtuiMxWavnMnie64 NW SwWxvlrmk¢Ilinn'w d LmbooedbmPiv WW exwmrtle xidwwg#pxmnvbdaWaxxkNlelluwrcrtle#ss s4 3. Pm HmtRemded FixxA-Tamp(rtshwmxmw;dMgmeW gdd &rzdxil5xhaiphl m♦;obuuumdlin=rylui6a xl mmWw4vy[rtwmmecA4ow,L.N5m6e1dw;eEryn]RP�^vidine xnnaix4iDmion Rer[il aFErtgvc Aynon6 xan ielaaawmmfimrexa4b.emaertWdmr pRaeGamwRaaxa,iaguaro.gelY.mn.mramknw.xax�axorte mmpkmmduoiform t xmasxWeaA Ye Fidh-tun fxx mm r:d Sgrt6 A a k mcW ad Rmvtlxidxhu'Mm vedl ^vY m Wuide4}]oYbvxrmodwfazS NavdudmAs=buniformfgirNvva' m va kc un rtm I."Bx ma 1R'minwum4em WE¢xaMnpmbojoiou. Tamp vg6rtVubewJ nudepd E:lowwnartmsoRxw g, gumpd CorcMe-➢mpfadwv[a¢xidhavymcW Edd Seined xidavilgmadKbrtmeredlimgdvifiu. Fleavbs mwdmRmv.APolY mbrhademr•WMMami AyLMSm4eHlrydeby sAnFs exWNmi6FemwmwofdOpVNs pzlW xquv^fat Applylularmorta#akexWCvarafleax5xbt<imnd odyaBUGxlBuavB^#Jemmem"v II Iu¢'e miv6impdv4gbelxbmal<plmmaa4oxnae Nednwirgi ppplymlw=onngwmpud•litivhmmf mlorwu b/LM&aGJd Cempoyxrinemlleroxxpyee N'H6mumv ppxrvr4ce to dwpn DV AxinryartlsxvgegmvRh vdimpierme;NdeglmwmWe. Cebwm;vgmmRmamarmavPonwmimt.¢eondeamxiogx. E. SwdFdx#-hmp4edwxalewilS May mRJFdd Snerd xid ttraiFN W6cbrzmoaaO imgWaaax FloJb osmwW mrf ,HIe15ax4 vdmgcb mmea AndmRxe. Aierb st lighUyrpagewfanbmeJrw11wr4af xxtilerel my8ryeggaym. AHrnRvmxdeddkx biddtAmRclDmxaaANxidedm¢dmbavvefmmL6emidavawwa.ud SmdAbrtveJmRaalivs SmGw munmwvrbwuxly anbvaaduitlbum G. CLFANLP 1. Upnmmpledono[xertnmea<dl6mShbn; mYsid vJmvk Wm J¢, HLOCKAIASONRY SmRutxnrt-Pmvidewlob;mkail; IwliwWlmw{uvm8aM4ovmdnutxuyimdeeWvxerl8evumd=aenofJiblm[ mssvrryu[MxaoorbdmaivB;imGv0ng6mmrlimibdmtle (olbxing: A MARRW3 1. 9xmPMoetxrvlemmax66radxAA31NCA0. mmrzm blwkm4l.ertmAnandep4. x femml.slaMaNPoNam RmwlASihiderypx4oxGI3IITyP=Imn.lawdbx I. Santl-ClwgxJl B�+IW pSTMdmi6m0onUM. d. Wamr-Wabrxudekil hotPobdc4uilily, S. Slal-Ruin(rvdxlxlforaJlmm 6aledOhfarmW hvxpSfAl hd6m4anA-143. 4 ConNe-GvSxAavnerzbmivimm S,Wp%1e138aay4 ; A1oRm-hywlmnt GeddY pnpued ov'JemJY m'vedinndv I paRamen{ IRpNlime Wlh,il/1 P¢vav4wv(urmigb 0.TTRI G3M.Omillime WIIYifplmdesmed'Y m -d L fwN-lryanlumtxmsAlYPalsad mu'(MYmirtdlpNameµ3pu4oed3phPc8nw1. e. urwpoFMAsoulty 1. krJlmwmywdgmxnauwmrnx;uar4wlolxuelxmbwerembomex xoamawiaiox>wJlhxl.r=L xemxm.m wmerm4 Aw'Gvirkdxxaxiertexpa¢d b6keMmnd Wrkixw kssdnxaon0edmingr. C. REwFoxcwG 1. almrsixmwarY aDJIm IaPRdcmiJmmxo(w E,rsma=4w. ooxarkrxdkmemlmnmbbxvma»nmxw rtMortiog Re(nb SNrwy E=eimfa apaifiu4wrGx JISIW w.reed lua4vw. 0. GR(MOOF MASONRY I. Ne euEing=(muemyuJRxhdlhdluxW rale¢xMxnendedmx%; E GROUTMOOFMASONRY L UxmJl xelkx;darGW Mlmliawxmxnwlk Mx;egv x. cmN.vmmmMx"E�W mIN I. Prmihmivlmum YE'klweev4vlydebrtigwd Nucl2 F. WE0,pO I.OKnjvulxavEvlu Wn•O.O.mmimw,wmmmwmaoratuuixS xdkx;W Iwbic Oolgmvvl Nxm,voaoHrvvgxa eppmatddsiny<ryhmpu3W[Nnl EggimchvRNce4onx G E%PAN810NMMIS I. Pwa'iMveNulmyam:anjvivblvwll RtlnJwd:wdS4ucmy Eryiv:elx apuSiw4ovv N. WATERPRCLFMO L WYeRmvCillnwtinB Halla WowpaivwidupHllemWxie0.3ma(s. 3 CLGNHIG L Llmwmaarmy xeh,rtmow JlmoRvxwv; z VWvwmldv4vnvfxwF ammo JlmvdudroppvgAkln; makiWiml6olsfmm Ne. SMCKMASONRY 6wRo[wert-Pmvide JlleAxr, meWJ;bol[wWpmev; WmmXwev W an¢aryimldenWvCerdvwmPle6vvefdl Mivter Mrrc®mvrrmrmxnovl6v Mning; ioclu&og bneol GmilMmde fWlvn;rg: A MARR4L5 1. Rrickw Renwnfvm4ngb A3MAd3grsh MW ucmwnenpe dmn%i 2 Qmnr-SWaud PNaMCemwlAglMdrgwGov GI50, T)yeR w.erV Ivx'aVwxivgm6nM drvvgPout Rekrb Svib Pngim/x rtgR fol rcwmmenAGenv 3. sma-elw xingred-eAmdaeYEmwmclaa J. WYa-WYervadxhJlbevfPolaN<4wliQt S. 6mc1-RaiobaW Xedfnvxdl bh Orak <OdJ m.W mxp3TM dexigm4eo A-Idf. 6. #IarW-b.'valum;Rdlypepsd unibmjvmivdiontiv i pNamenl lrzpv(limepoly, 3pHsviwv(aroingm ASNACS]O. OmillimepNh Vplsx4enmmluuM ]. Grad -by aolomtfrexNyPrcpaebluWfomJYmisdivnfio I pNsmevt3puxmdarl PNemwnl3pNmmd azd3 Pyu W Nnl. 0. IAYM60FBNCC I. Izyill maamyMishlvMrmvloliwxiW DnvkvxNciljviobplumDDatrwholkc Naimvwjvinm dNlb lmtl. xrmeamdeomxownmxmwGJrhed Baxxk..mPmee. Ixb4mu mm wamrbkmemxanxutamabp�. G REMNALBIG (. Nibasbmamnar6dl h1,PPxd.mlWmmnv(aObv 6am=Wc Bextm GrxaD mdwlcmmbkxvacxia.xaNl adedrtiv6.RxferNsmamMByircdxgceiGn4enxbrJl R=I rinsmdlvxaWn; D. CVR(NOOFAfA30NRY 1. Vmmamay ox foxhaxtw4unic¢xpeu6vdudw;re Baxtrwllnxdm Vtlmgdxkllmrhvsd sloncbmwl xi0 exxlma hammer. E. OROVNNOOF MABONRY 1. UvulmxwilkmliduxMxnaeldx dmx%; 1, iRnacmirtimwna(3-1/t'fr=N apxxhxaev Muble baRxdl; Provide muimum L<'kMwXalrcm(om:remd Dmt F. WAT£RPROOfwG B. WJegme(dlrtwdn6 xLlshlavgrdcx0#upWlxmdnon oraMurRxiBm bg 3oik Enyn¢`. a cLwlwGAxosGLwG 1. Llwdlmemrry vnrk RemoveJlmaMN'nc R=movedblixi0min6=vo[mutlxdemiJmtlmkx ppPIY=3<aaJmb cay¢d nu(vs'J2exn on nc� dnx;ry; 3. VWpCampkWvo[wn$ rzmoveNmorwAopp'µgiddn'; mYxnilvmdlwk Wmsi4. CARPENBY 8ropo(anh-Pmvih Jllaba;mYuW; bol4egaipvenl4rmWrk6ov W mxmayinbmWrdrmmpkdmafwmrKv4yss slwxnavrh Mm'nE;imlW:gdum(limildbdeblkxiv; A R(ASE31,\Ls 1. wom-rvafnmxnrtmxnrvRrcmgdam x#xrtmaxnoadxdmxiag; xwgnt mmd,Ea Eammmt;rxtrmnmyw yxhl[xlir'ertaMxkxks. 3JG8macvrkuxrxficmxAoxnandcd«xv6v. 2 Oovgla P[ RWmamt Wvxkev ReaGGr6ruJuxvmtlwdmJogi 1 Poxl; pldamdodntlgrkwnrcmonxbkRxdxwAlVn¢mRdUa¢urlwmneaed Bou Jazfiruxbmvnevlk dmmn6x d. N¢dax-wluwbans.•Slmpmn S4anaTie'wwvd. PORxapx WSDapfixr-'SimpunBW.y nc'exequd, binhmgux mdkv calor-'Sw mvs4o Tie•m xd. aysx N mil bl Waatbs. NlDarhruam.leridm[a Jvmued vY 6 p vC y i o64 R K e s. sWx.md dW .axbnmmaJmmwmx; a. Gmrcm �CluxAvfu:uxm] 4W P81e1]eLY B. ROUGHCAAPENIRY g. &IdIpm4Dcvm[rJkmd( 'ry plmbaMxmlvliwaxmanuv Jedmxiyi 3. Gmsavm-vu(s Jlmmial:vmmdwxnvvuvdmvixe; sgis bmDxrY Wnxvwv. DWiw JI VJlmdbrmhhdexbrvV hudart. 3.Fi¢JlmPedE�a(cvpsdlvmkrfvrkmM1 blgbw xal4 =m.xM.rz wnrolirPmriH6 d. PORDaa-¢IpRwlumvhuuxmanevJnx;n6;pmvidiv8 muimxm l'dsrJlridcx(mm Ev4hed WRDambbpo( pvinE f Cowmmnk mil[mtlmlmin Jlbs4oaaMnmRvemNss[upmvihdlx.kx5bptiv- G PAMIINGAM)BTAM L Fd Jlsvmmf avcksxiW laln mvltm.4orxwd Muahly ivwxmmavwfin 3. Saadm Alx dmr(a-N,:BmuMS. 3. M -W 4.. m.-idan xval pnmxr. a..Pwl xidmim- inn Gnhd mxb br PJxW ; S. 6wn x;d Ww-inn OM.mYx (uralilvxwLsx. B. PAORCTONAND CLEANVP I. flvmvldlexu4nf unh8amp"N m'e¢pnY. 3. VPovwmpk6eno[nnrtxmwew ¢npxov>, hbn,mileddsaMrek Wm J4 METNWORK S[oW efxvrt-Pmaide Jllamx.mW.rial; Wl;eµipmwl EuuWN4mmdesusryircidevWrformmpeGoeefJlmeW aerk xka smm ov Ih dnwivy, ial�eg 6N ml Gmikd b rk SMxivg: A M4RRIAL9 8, fist NMngins'vadmxnov JndnxioExA5T1.Idexigmtivo3W mdnrlvd (u B=dmldrvtlxdamugdrimxmass[uJunn ua4¢Mx:eBc 3. N¢dxx-Wege;le4k;mlttmrh=q¢rtx; xlc.b mhsy'duh. S. Caartk-GsaAwxYRxmlrvmvm WSPSIY1g mWai PorRm uxmxnverk dnxi r q� d. Pdv(-Zivctkumal<prima.-rmbkmvfnls6smfucwrsorwmt'Lkblioµ'wedrm'viv6m Wxhrwa4vgif Juw mlkdaxivgx B. FABMGRONANDMSTALLATION L CanvaeNrr#dlmdidl mcamvmenufnafahrkL:nvb GdaP^+rmela4e6xurk 2 HerimnW Daeb 4perx;d6radeaxmPx;d6raivuxbxnuvrkdnxiog; Ver6W kx m4plum# G WEIDMG 1. weuegbwmdrxd Jcrt4virtmeeu=txwinaem=fape mle^+wadvg 1 Neldmonhdawra($<wRme 3 All xnarbhmedvuexxmd hsofemkgcmkumdpmdly. ixtxtlGwlvvemNc d. uiMxmnnlhdlegpxwxaaxrmkhmidWeg xmfim.. s. PlugJlnpeoemkeMbR ud weld D. PAwIMO 1. MmeapmeW nnxxdnmwYx�n awmR mer I Pdd WlmcW wvkwiN3wau'R ukum'wamr i�gb¢a Nlusbxn endeMxingi Pidbh<mila Mrvnmm dry WxkwxevL 3. Rive W IdWprebwSJl BeNxelde E. PROTECTION ANBCLEAw1P I. Rvu(Jlc>tigaaswk8ompiJewnpry. 206Wvnnp '1x6naquirtd65oxakxeldvg. 3. Upvwmdedcvx(xvh, rtmevewsnpimgde6ri; malewlxavibvlx(mmak. IANDSCNBLIGHIMG 1 ¢de gxfemxmnne dednairySWlmmil�E mwil'wWbl v(xlkm��swylwiknWsfmwmek6onvfJllmaaaEc A MAIEMALS I. lip#Gry firJurtx-IaM¢q.eupyghk Wkmvwled(Wrx; wullremJed4Wrt; uM bw volm6=Ii6E4v6urbxnevlk Mxivgx W Gwm ¢tad=. x. GSMdI-Sek&Iedv Oxkr4r Relailel«Nslmk, xuevvdassx Rrdmxing mdxhdWumNorrovmempiedxa( dm(ilrdnddmbic wrlwxnovlhdmxinem 3. ParcltbualxrymnxryelaWxJarv:s pMexdS4me aximdc; pbballsadrtiYcdSudxxua4oxnovdvdnninge d. Cercrtb-Cia¢Awrcrtmminimme;W]PSIY38 Lyx. e. ucxnNc{DtIVREwsrALunDN 1. PovidevliliEdO'egfiM.e xilSUnkwrikrs LmNanalah4Kmdatartxgoedb^Nhr'dwpved kbelinE. Pmav'de Jl6vmrtimk;eW wiSR�>MnlimtlerRge� ul¢mppRand6�sloswYiviliBnvmlbre Rnodofvmyw vurvmum PoRmmdralhmiJormexvkdm YmplambarcdlufMnvoxAaativgt W fiMorc¢bdula C. UNOEROROUNO BISRJBIRION L 14xvi6plvN=mvdwxaxlevMnbrtin Ni4tyRmMxperlmJmdr. Thumafmv.mWliexkadrvmWe Wed Wr uMngmwduaiivppmtd(ifilbxad DyXxilwtlwaN):lmiuMypolWed(Ie.:ve4enr5 nidodmpping xi0nwrcrtic3' cap m wid kora A=exxM dwuw. B. f] ISRIBUTIONPANELPEO8. L Pmaidepvrcl; brtakeryda4ixalwrspedevWxu[Mxn wdmvb8so,Wl MA aS*kL pbb ¢Ilc maxlal,d Muvngumquiad Id V, I x6VIEbN11S `t\ 1 I L 1 ANS UMsave DeeDnsWiesx,ImfAM.sJ' N CopyayMvere rvW. Theo HMuape deegn aowmeNs ere McMN b caval tlnFvnkNeNPeM Wlmlhe4aed bwmmmimleanywmb44�vn meWds. le[FSd31¢i,eequveeewprxNuns, w(olsu(ely peolNorsbmnre[OanvMhlM Pwk0. d5 F DP Z F ' .x U' �p1 pP P W li E q2 m zz� Lu U O Z Lu ® V I W n w % U ,^Lu ` � �•marR � �t 2 N O W V u V) Q Lu > N ,,/^k Z V) Is i W W 0 m CA a u f2i Q V <Z N Z U. O g Lu N _ W [R$AWNr DATA BHEET RF3[W. P2EW DAM .Am CONSTRUCTION. SPECIFICATIONS. IFLDID WAL w� 10 ENCA6E E AROI:D �fll PW1169HNL BEE ew� l6E£m. WR�? - TRtlNK61N BIACK RUBBER V .uw MRAPART /rllsr AIID PldNf 9PAfiNG T- � � W. FETM1SYM.,,SSI£ 0.iT6 a OTYFIAMIW M•.REViEW AVR.12IDB !.� RIGc91Y6iWE}HERW PD xy DFTdIL FVR 6PACRJG) iB1zpN 4i ND3E 0ENIE8/ m xe CZ+ �4 LEADERA 30 )' SHREDDm NdRdLbJ M&LN ) E 4 5 I O iM31.91KK1F5 G°LV. WRE W/ P • IY3 FMGH OIER 6 I I eRIREBmwuor y� `Ti _ LOJER CRDIBB6 40�1 RWB°L. I I I I PlMT6 �O� P 3 I 1 1 IJ 6AUCER 11'1'IGM3E09ABLER� l 1/ I O Fi I O I 11 SET iRFE 6D'dBOlEFlN9N I I I 1 _� Ol P}AMPJi.wML 1'1X'6££ •. �.1�1 �� I I 1� F iFNC4JGBm � LEGENR PWIYIFLI v / / ' 6PE4 ..a.•. Q 6Eil1IN31KTMD IEGEND: ® - _ I BE PKARmW109tT GRdIIALOVERS dNO PERBNdLSNbiAGGERD1 RPll64T __� }p,Ey 101,SM915 GdL PWJiO � 111 ACKFlLL � 5�1FLIm SPddNA.IMLH 6J11REBm W1 ]•SNRmDm HARW.bdJ 3 ° 1 IRI [ - - L�-cNdRAC}ER PRWEil3 Ot ]•tL311N YMGH1 _ I- 6 nlYa FdJAGE W{LLE RN,BA12 6VBGRADE -III-III-III-I'III'-IIII- _ �I1-III: O EIEAVATE FIR4¢EBED TOA DFPT)/%e'A)D FLACE PIAMPY6IYDC OFKHHIRFACE ANSIaMvpe0ex4{n5�a.lrc.(AM.HJ- NCaPYMFhaeevvrvM P�ER6V.i(FCRMAA9CH°RAEtB2 O6AVLER I-1-ILII-Ijy-IyII-III-L -r IN QPIAMINC SdL IY%-6EE 8PEGRLAtKA4. 0,u 6NaaaMdes¢ntlauneryx ele LteMMb Wwletl WeM IYaM xNIM0el5etl }. iREE 6iAKE6 To BE'WCmw (D GRADE -A I=lI -II I-Ilii I _ _ EAR}N AICxKRS BTM PRDd1ETS I I'��II-III-TIC VIII-B � © )GCATE FM1/JIf6 WTN mVAL 9PAfJaG A9 AACATm NINE ¢{In bwmmur'eaNanywlNlWbnmvn.mellntlz _ ry 614613-IYB © PLANING id BlET3 _ _ PLAMPG IEGFlt0. OO wnve saL GRASS/PERENNIAL PLANTING © 1/l aPCEIRER SFnu+G. IecMtryeise46'waanpm Nu25olbxvfeM P1evWnsmwrcee0enxxAlk Plcka '..I AKEle rna BEIwl BN9N OB P44NIPY SOL K%-9EEePmE Ol PAVMG WRB. BIIIDN'. LR NEADEP.'91pYNG PLAMPG ARFd 111M1f. "xx B •34'EOX dNOIAWER O BETTING tNAM➢. COLOR AND GROUND COVER PLANTING •BAT6 d.D.•wB TREE GUYING (MULTI-TRUNK) SHRUB PLANTING 6Gr1LB NLS. ECALS ni.& 6cd1E HLA In � I � UJb E s 3 LL„ PR1A4IN[t-111-11 -11 I�III-JIT-II�IIFIII-IIi� PLAN vm } A 1 ) 3 coRDm nE 6EE 6PEL'9_ � a Q' £r4iT°r`%wlH RomNG NAns { IIT •'l}O}'W XIT ft&Fd PE u W VL B 6 .1k G ITP.) KEEP f1EAR G _ e r - SII - 6 • ' • F } WAIM fl { 03 BA633 3' HN DEP)H AFTER M a 3 WATER p}AERING BT Fb3E REIW!-BAEN • BTIMOBEA ED�IAB�dREElED 6 W )- 4 04 FN6Ht9 GP1DE - I 1 �� 'F 3 oAMBmED BACKH16EE 6PEC5. IEGEa6x III- II III=HT1-_. 1 4 FGR M%dM PR SVE O BNCdIE NN']N41YME rA86. SPAfJNC 4591V1R1 1ECd0: ' n�awwW3 ©}I GRAM PL°NF TABLE. 6EE fl�� OI PRmAbi MIEGRAL Cd.LT2m COFCREfE URN - 6PEGFIEAIWl6. ]Q 14 GA 6TAN.E..68TEF1 WRE BEIWE@I P09TS 6ECYRE 6EE bPE4FIEAlVSki {512 MFGR1Mllpl 3E 6 O WREWAWI9LM TAB ETEIEI. I VWE B EF TEP OF ROTBALL I'ABOIE BURRMIDIIY O GRADE dW 91R'E FQ2 BRNNAGE OBO 6CAWFlHDE4 MO BOIiOfI W 09 FItD DF WALL O )• DEQ wdtERPW BAWL 6B) ePF ilEA1W5. SREFABWLAim DRlJ1ldGE fAW03IEE EE SPEOACd1KTG I� PI4NIIYa Fi. O VNE PIACEMENF LSE£ PLYIUNG PLNII LADIES' ET iCP W RNIBALLJ dHOJE PLASH GRADE ; OSUR��ERADE AND 6}GPE (DFMSH GRADE O A 6ET VMEA8 CtD6E TO BACK 611RFAEEOF O3 IB'6WdRE DRdMdGE FdBRIE t�... it � � dDNERE tO NZDE6 P0} �I QAMEF9EO BALKRLL 6E£9PKIFIGAPR!3. PR AS PE5401E W y O4 DRAIN a IRRIGAnW GPBING VINE PLANTING 6 PIAMNG tABI£fA PLALE W PR L3 UP FRg1 Pli B' °N' VNE6611°ILBE N01 i0 &IPPERING FmB OBo„ui wAub Alo FEvcNG. EdmuETOR BIuII. BEE x,Ecs. OS BACKftl1 PER PLAMPY SPELWEAMA+ �m.0 TREE iRITIK F 3• CIFAR FRQ'1 6C°� 1"-O• ©9cdRl6r SIDES dl%a 6mion LF PL6NTWG PR VBEI wIPGRr9. WNL N9 FEKES WI q/ p © PJNru9wPozrWluDRaNPwEArouzwGAlld+ TREE GUYING - DBL STAKE OO ItrOT'bTw9EDNAmESDI_ a E6PAllERYJIEa+rowAwFENCE FNS. GRADE- 6EE HARDEGdPE taG1R1IEl'AN PIANv' Z ; µT6 ' Ln m Wk.°E°`E VINE PLANTING (91DE VIEW) ER IIR}J PLAMN3 SEE PVW}WG f°LILA LU 00U PREVN4Y vW.W� BCdLB Nib. /'� ` POTTERY PLANTING ¢cd1F Ni.S 3El 3 W 0.NJ NBB 1 ,/' N 103I•CGTtDm TIE BFE 8PK 3.. T y-wd.m•weun ]•BFIREDDm 1'4GN RLOIB BIRLLP FF'QtTG Q M a R4 WTH R0.iPW NAL4 I 5 F'EI4TE PRGBNMwA� m �4Ta Q A ��---�jjjj I )•DI4%1110?'£ P0.£PNE nPLBACBAKHWI°MYa� 6�PAEVJ°i�MI.GN E®NIIRE BED ObTAKEG iTP)KEFP ELEM OF LEGEUd r�l IIF I 6Ef SHRU9 LEVLL W(N WTNY 6NRmOm IWiD' RPJtBALL EE 8PEG 8. �^ GDEK 6TEEP �.•�u V) IV) p 1-L � � E GPHE WP'V MA<H 03 ATEA BdZH 3'tW DEPN AFfQt IO PNeX GRADE V RADFS � � @j ) ff� aTAMGBTHCE RE]»�E B4EIN Oj SNRW'LEMERNPII. PWIGN'6PLMX O IxPL w 1=1 9' N\ALLNMIl AlA A5dRELTED :. 9PEG5 BT W W9EAPE ARG-0IELT. Q Y DEEP WATERMG BASN 8FE 6PKIFlEAT1Ti3 EXCAVATE EMIREBm { OFNSHED GRADE _ - •... f- B LO AMB1Dm BAEKFN_9EE SPEGFIGAtIQS. Z• (T, Q Q OA DEPTH OFB d3A PIAEE PVJR@Ka AMENJm BAWF BEE SPCEE o ~ 3 FOR M%M'D flT fill£ FROM PR BORGIt L y` z xp 6JL MX OS PLANTING TdBLEI6. PLACEM%i ]13 LP .6dECEA © ]t GRN'I LANI TABLET. 9EE SEE 6PEGFlEAIIENB LU ,( �J LL N -> Lf.. Q 1- RsPEaRcAnoHs ©6cdwFY SIDES Aw BononwPwnWG nT. gBE°51OES dID Borid+cF OO LWdslue6m MAINE 501 �I a �- S L y ICI IE6 OB OPoCdIALGRADE BEYLTD O GRADE A3b 6WNE F°LLGRI•DRAWAGERR 9ERIkK YOtJD a MEI 1 ®SIFIR TRGRADE E Q ce•IGNALGRADE BETQID 0. }� A 'O` p 10` .VVy� M _ BAS F'EEIHEAi1GNi 1E31P 1 D""W"GE SHRUB PLANTING ON SLOPE SHRUBS ON SLOPE - MASS PLANTINGS � I' •r „D,p �, Y✓ewldM tURF 3'ELEAR iR01'1 bGALE Hi.S. SCdIF NTS TREE GUYING ON SLOPE -DBL STAKE p wa6AEEPdwIGTOBEREI�Im. LU GROUNDCOVER ON SLOPE 6cALE Ntfl BENE`NT.A 4qi l OO 51BB46EtNTEPoAL TO BE RFIYNED. g�L �•e PWIf Rf rO BE RCdJD. 09 NFdV4Y CLiTAETED EBBBOL TORE dQtdtm dND IMPRWm. Q GPJ(WAL PN6N GRADE f'EEE dBavE FOR dnexlaB. PLANTING TABLET SCHEDULE . RCVFBALL dGRIFPiMfLJRPIG idBLEi6 iCR GdJTAWH2-GROIN PIAN fS EMB1PIf CQ�1� Q PRPARE SOL Wi10J 5-B'CF PREP03FD TREE OR 0NR119 PLVTNG I GN1G1!•.••._ }-3 TA.L . 4 © REIVNE SW2FAEE IMTEWAL Ih1m TO BE OBYU6HED AND SUBBAOE 3 WIILN •._.�...__.._.._�._......_ 3-6 TABlEf6 Ov I OS 4 1 HdiE T. PiON11W 2ENm REPIALE RBtOVED MATEWdL9 Wttl :::::::•:: SGAIION ..... ... A .. ..........._........._ 6-B fm. 1 I f TOPS�MF£i PREPO6EO FWEH GRADE r ( I1 t NRNWiGP60246 NEEE56ARY tO ME£E PNBXm GRADE NC 4'LF Ibt tABLE10 !11111 !! ILII 11 111111 1 OCL MATERIAL dND l' w E0AR9E 6dND TO EX15nIL'- cENPAcfED x.140 pyp}y yIEEF DNAA A B IO GALLg1 _.......___..._ ._- �._ [ 12-IS TABLETS ,e v di 14-16 TAlkfl EE lviu O MOM+FNRIN3 BEDS TO CQMB15AlE FGR ANCtAiED 6ETMY.r DREW �e 3B• BO%1618 TABlET9 O ORGdNC MATEAAL DAIS .............. ....._.._..._....._ } G411M IB IC' 36.80% ......_ IB-]O tABt£]9 501 PRB'dFtd11W -91£PI Nf0 NE fGP IY PARTEPIIY PRFPARm 5qL NA✓)L ]BTT )_....... 3 GALIGN 4' IB' {l.. _.....-._..__..... ........ ]B-R TABLEIB 6GAl]RI )6' )]' 468 BOX.__........_.._.._.._....._.._.._ Y114 iABM = 9 AblC' LA PNALT MD/ NER 4ARD9LME&TF'~FeF-0NRE6 ARE BPEGFlFD OBE DEMOI6Nm. X _._..._.._..-._. 15 GALid %• )4• LARGH29IES FOR EAGII/3'C°NPER LL963JM TADLER "`•T`ln `�` y flllllljil�V`1III(,11111 5 2iNE 5118534 bNNL BEiESim FOR 114F3NE dAYNED(FIMLO6Tti6i SITES DE}ERMJED tt`� SCALE �� OF IB BOX 4Y l4' Itlll (11(lH 7Ilk 1111/1 IIIIl1 (1111( �� �1l ltll!I lllfMlllll BTI.EOC}IiRALTNG GFIEFR W106NALL BE NTRiFD WT�i RFSLLiS PWIXL TO PLdNFBA'v ]4'BOX 48' }e' O 1d�d�d W RE FMB VEREOALG RFALEM L 8KWRS.nLLWH PPRPm ai G•BDX i d TW 6OL W EQL4tJETL 1 WIN 9Ql.dNENDNE"ES TO MEET W39H® GRADE PLANTING BOX 66' 44• 6OL PREPARAIKFJ-BTEP} AWXFN NRNNG bOl AMQbMBJ]61MO S1p5OL. FIALT WfEGRAIE ALL MATERWS. DETAILS PLANT PIT DIMENSION PLANTING TABLET SCHEDULE PLANTING IN DEMOLITION ZONE: TYPICAL SOIL PREPARATION BO/al£ NT.S. SLALE: Ni.S SLALE` HL.S. OHNERAL srtY PLANMNO TheaxttrxNllNvearoilatdyaismaMeflerwmpletioa0[IlnwuShpadivs. TbcmntrvebraHll ivwspmale ell wlammdmmis mdhdi&enpamdENherti¢ Themilpvpretimsprailedhlavv'Aanbe adjmkdvevN'ugb Weawlysisafterappwval fiom ladvap amldkct A WEED CON LFOR LAWN, gIDHIB B OROtMO COVER ARPAS(EXCOPT SLOPES) I. Rers-lieaidluesde Ramemface. RemoveallwalsofHemuda-IOMson Orazs,ely mdd"upv¢vfaRAk. 2 Wlallitngatic¢ 1. Ferti ¢e vHsbmWgmmltvw,o- Apply 1014of I6E0-0wmvu<ial ferlil'vsrper 1,000x9 R mvndirstd by foilx repaR 4. Wakrall alwNgamdwwruws for Sues 0) xxekuo gemfinele weed rcM. Apply w,teretlowrab 1, evaideradom 5. Liavxdepplimlm sAallapplyryskmieweedkillerb all pfantivgvav pumvnWxhaelsapwi6wlioua B, MM PREPARATION&FHJISH GRArWO 1. Raub rub, sit, to he received by Lvdswpe C Ssurrrerto wiYtin 1110 feet plus or minus by oxner based up, Out E'eure'Orodieg Plm 2 FweA pare: Finish grading N wneiel ofgMing nodal, and bud eatkasessm5 to ssbicva dubed wvlam andfnw live ptkme, baud upon Civil le' 'lare, swine, in nxoly finished untruss he< of dues and litre. I. S rWovu Jllau sbwbmd mdrova emendmentamdkrtiliur re� bedinmitsse R yM1owu P R @n arzr, P p PNysu soilmde to vfc arauraod(e she momdsasabovmun Inns. ConwMrtaim nmilrrcce PN erode Fe P W aarY baRaivo desipgradesaN6erms, all impRwil sha116e Raufss'eedydekizvvdbar<balarcNPh, gmovNmleceo grading WilhaW dfcwb.'Revnwfemllxlsi kraH sbrcs wva3 es've Blore PmpuGoimse. Firulpade JUHbe I'6elou'xalkXop G PLAN Phottw, shwMevdsmmdwv'uv<alledforuSerc AWimkdmYlanfv)q PlmmdashkiledonPlant'ug IXlaH Shu[ Suhslitntiomofplmk vvillrotAesuFkdudvsappovdbY Lmd+wlx. Mltito-A I. Grotmd Cawr-M. aodsm Cmwige All plant motorists aleuried as rookd century, oafir, MIX on Planlwg Plan shall mvuin in the Hats mW fine of wrts'.Q. IDs fit sail SNu wobiw sut(ciest moiRwe as that soil door rat ill alert vaMo lifting plant firmor MI. Ommd .atPbntsdall ml sit w m vn to dry our refart orxi le bewgpladcd Rontsrleliuse beeepaued b 0e mar exce,nine xtoillybeing Pdmted Wi@dplad oNllvotbeevepkd Attie timeafpm m�, Wesailuaudw<6 plmisfivllba unlourd Wftcieory b(rne aN au'clus. PWtr b h planta in Naegdasspmmg an enfsd OC.(On C adsul. AH wltugsh+HEe mwmumuf6°long raskHPlanlsivd•X6•plaotiogpib. WvterimmrdiatelyaflereeAPlanting uNiranciWr ofemes Pewroueaioulsisxd Carcafulih<xacivd rtall timvla pmkct NeplaotsellerPlantirig AsedavagebPlmhby hampliriSvroNvopmGemo[Nin rvnhacl ihdl L<rtpvdimmed'akly. 2 slew Tree PIaN ou wnh'uer yovm Pimb is pirating Pio tuo ([) t"wv snider and two (2) limn doeper Nan the wnbiter, vs d'ualed o0 Planlhgfhkn3hut. IAomupflymu IA orgmic HcLYip (NiteolvedRdwxod shvvingsaretpull aodNenmendmevls ryxifidmfberoieamtysin uiNtbe ate soiLpnarlobac6TJlingvfPhvotlnBPik. fnstnll Planlehlebper Ne manuGchae2a nw0utlions sada klaildanPlmWrgRWlSbxt ConhxlOrsAallmlaxvedlaPOCrmlbalimnxn 3. Top turning Top drew 01 Sour waxr and sNub meas anti 2• thick I aYa of OGC (Orgmic (lwwul Caner), b be spet5d vv JI Plmtiy Plan. 4. SkPin' g S1dxv11 traxuhlwidmPlmtivgDeLaif SHeI. 0. spECtpLHACKFILL AaO�S 1. Amlcta-UvgoXwmv PuslMos,20%.1to. Pwit 2. Cwevuo@Ferro-Use50APatldan, 25XFosesllfumtnmd 25'/. giln3oiL 3. PokadP�tm-Ux}aiinBl;s WomPlaabrMix - H SOD-MPLA MDETAMSSFIEUMRSODTWE L ArssrhallNwesmmNavd watiaaal®.debeMxm<ruling are rind matrvls.wcbas: xalks,wrhs.aawkAHaiw. Roll, Scarei[p,N'smdleveimmamryenbbiawSeveosoil ntmcNte. 2 APP1Y fet1J"nemuspxifidovPlantuy IXklSMetandtnuinlolhe son. 3. Sd Asn beiv+WldNeamv Myitis Jehwred Sdddlmtbeleftovpanefsintbolel n¢ CmMcbrslanbs rcspmLle for avv and au daauge to cad cal Awikd on day of Mliwry. 4. Umoilsdwrefulh mdplom ivsaaggcrtdpncmafsbpa. SdaNll beiumilWvgausfndlacmtslrip Netimwateloints avdWg<s. 5. Limmdla wvfotmblaun zlapeshai8mkdinlhe PlmtiRgPla¢ 6. ARu sdiveid itrNRbe ierigatdtWrauFWYNProvihvwimuepountionm arks<6•iWopmparedroil. ]. Maul,jobe,,eadwls ehsllfit tipblly eotNl Nertvremwidsvvd We fwlvppwrmvis oveo(v eoWwmus laza SectiomvfmdlevlNa lg•long m9' xsMrmu mfbetnad 8. No wdmeavv;llMouepledmtJapproved by We Lmdttvpe Dedpttr. F. HYDIiO3P.EDTfIRF Hldraaedanovurdsugmkdu•HydeneddT .su Planlinglh1vn31eel fin typemdgea4ty vfseedmu, fednnermd Wdukratiameareands. I, Application v. Equ Burne HvrNWioegwryoenlmW for the appliutiunoflhe hstiliaegsad, and fhrpolp, zM1ail6e of WvSuper HVJra+SeehrNpem appwve46y Ilwlvedsv pe@siFmr. "DW aquipmmtrbaHhaveabuill-inagibbrryMmvMapemting vynty zuRBient b ogible, uzpcvd vM Iwmvgenwml3' nim v alwry w nmAdng rat lav Nan 4016x. of (hr mWcM1 plw v wtvb'vutiono[]Ibs. feNf rsohdx Wres<h lW gallonso[xntu. The dmry tliseibutiovlinessNR be Wge rnougAlo mitlin sbp[aee newtohebe seeded MNaze[ofAyJmWiespsaytm¢lesxlu<h slullplau Ncslmr lmk and rynymvle uiNin sv(licienl pmximiN to be xwkd K Frerym4an: The door preparation dull rake pbea of the sib ofxarkand sball ,us b, adding uakzm Ue lank x'Aen Ne sa8inc h alhWCllmnh, WAen NenWer lewd NarveF dNebeipL4ofNe o8imwrsAaft FOW <hwlationsMHte zlabludmdat NlstimetM zeedsNll bearded FeJJ"verzM1aH Nenhadded follm'dbtlHber mWlh. ared hsWba sba116ea1dedto JtemiatweaflvlM1eseN aM vvhev Ne WkisaNwsrox-N'vd (IledxiN xaan Alt EbumWchsballbe aeddby Ne time NefmkianwaNwmwee-bmWarwl. spraYi„grAanwmmenwimmdiatehwner,knklafnn. c. AMliWion: Apply hydromWcb in Ilse form eta slurry eonisfmgoferand ceuWott fb,cW, cleared addilivxs, menuesiferLTnamdxnlu. VlhenhyNaWiuHy spvyedm We roilsW'w.e, NchyAomW<hArg sluH(rmeblall<r-IJa geamdwecimprzgnafednrti(atrvly xiNvedmdferlil'ver mdshell allow Nz absorytianofmoietwemdnin Yallmd perwlatiovb NeuMvlying mit Ruoone wtzNuuioa Cwwaik imam<leau GENERAL SLOPE PLANT O Th oxwslWl MveemRamlyzismvdea0uwmpletionalmughgMirg. ILe CovleavorsNllwcaryanb ellroRweodmenkand futJvers prtttn 'ba-0heri¢ Thwil a radon: cildbclow Ee ' pep pe zAall vtlrynedazwNinglrmNevwlyzisaflvappmwl form Ne ' LovdmPe Dznigw. A PLANFMOPRSPARATION 1. allapeTemuing s. MSlapen: ThmsmfeuzsAallbewugM1enedivehorimobldirutim Fcuaxing Ne waWorofdoor e. The wugAeved kxUv<sAaHbewhbj bandre6"ngarsimilemechvdedmwrs A Fivere-f:Tste,c. acvsballtrwmpaGedaM[m'sbedoMolmmu(penMmeAadmn4l duectionfolloxing Ne cmmmofNesbpe. TMwupfenedbwweahellhonudebYAavdrakingorsimilumeclwiicaltnwru. 1 WeadEndiw4on PwcNurts a, Maotellyrumve allexistiug vegebtiwmd Jispseafito6ai¢. b. FMRissvllplaWiogvrtavnviW ferWiurbattdav SoilLbs eewnmxodatiovx (Sx PludinglesbilSMp. Addmyad ell zoilpoccentasstivate fetid"vunMadditivechmd<ats. ¢ \ValrillplmtingareazlhowugAly adwnlWwmly bra}eriodaf Wn(E)wmwuliw nos, no Lout Oedgee rlmu,ppma<aptiraerakringumaganandfiequemypwgamdaip,Mbgenvimban residuilxwl:sea:. d Disroatim ewkringpsoaa brteen Q) dry; Wen apply rwtmmrcJatiov by liavrzdappliwenr,ifpevamialxxW oppenvvruaspsc rfmm I -a& apWr me Aaitin rorr-thekiddeasper Ne pest sanbuiedv'voh ruommedetiew. Na wvknM116cvppGM(orom'udmumoffom(4)Jvys follaxingapp4wtionofmn4dpudkuer. v. AlbwzWseimlpdodoflimebimtne Nelallxvds arched C w,W auplmtiogveu Nomx%Jymdwntinnauzh breperidnhWm P)xxeia. Azlroull ral,orl drozy Le pumivblaal Hn CascreliovafAe Landuap: Dedpnrmd/or Ne pestwnvol Wv'voe Dismn nue Wexakringpmcesfor ov (I) dryPriorb We zewd oPPliwtiovofNeberbicide spm)'irg. Reapply Nesp•ey'vgo[u tiers iNasou'lAreaueU wasduller.nspvlh:psteontroladsvo2srvummeMationv Allowam'wmumo[Wm(q)days xiJwuliniga40q for e1RClnx fwlevxedliLL g Cleardldesiccakduuds fined We zlopeslo He Mish®ade. 6 WalerallplantiogavazonWeregWminigatianwntralluzchdWe hr Juee Q)tunsewtivedayzpriarty We Aydrvedirig operatio¢ L TAcv dlox'plaeol avasod sufose to&Tout for use(1)day only, priori see ATdmseeding applicalian Cessundh u Buil a bsse,b rel sesule d w b hevupuaatmaW wiWxakrptiarlo Ne Aydmzesdmg inzkllalion Al Nesame tint INroJ zmlau shoWdmthe dry, TfiereeAoWdbemmvvzWudmoutme cantina NefuR 12' afmilsurfaze. j. Degiv NehgLoseedityopemtian ineHmeaz, eerywi6ed 3. plural PlmtlrvsadshmbxvwlddoW avAert i¢tiwledanPlaMiog PlavandezhbiledonPlmNµ DeUJ SMeL Substifutivwof plasm evW mf AeawepdtWess Opprovadwxritigq bylandmap Dvipper. LZRou'leo tablusesvnedi rinlegeM PlmtdlwMioerlpoxnplmOinplantiq•, Piv Rv'a(2)timez vvihrmd Rao Q)timv darperlhm NewWvircr. T,aanywy mixlMzpecihWmetvidsfotmdinlFeeoilenilyzizaedllmsespmifdinlhePlmlivgIXbi16Ar4xiNUe site sail prim IOW YHIIivBo[Pb'tming%tr. 4. Planing TablAs(See Plmtiag Delad Sher). S. HrGoseedivg Speeifcalions ForgWpe Arun v. HydwsudMOl HYdmudmu[vnd mukh shaHbegmeddlosuilryecifiOzib ea.Ltium. Verify hYdmvedmixasirh Nv LmMwpe tAsi,nrmd SoilrRepoli, uponrtsWlzoflhosoilatWysis. Them&shaHbe oppGedba11 v1op ueudivcltyafler Ne iMallatioan[vHrsort. lerinlsss Fad Aessivg &e Pentiog CeYil SM1vt[or typadquanfityofacedmix, feNlnetmd vd6Homlvmedment:. 6 Appnoubm, Refute HyAouW lsvnNokz forhydmuelr,,di r. OENERALNOTHS A CLEANIR L Muill iaPSllenmopemtionx Aevnkwwmpl<kartmvveatlrvbbisb, exasawi. ell plmlwabivermd tsazhfmm Ne sde Mny. Allttars, rvtr arolAu muksb emmeavtuedbY rlJsnah aNllbe repivdad Ney:oundleRuaneal, oshsly condition LwesibiabaomeelemtotWiliov WlheednfeaeAewrkday. Hasedvxnall pawdayss, wLWingxaW ad paiov,vpnwmpletimofilNwh B. A4AINIhNANCH I. TAvins'ec Pluralist- uraliimtallatiavesu(ticimtnmvberofineoadedegvfeequiyvrolfoprfom Wcvaoh herein silt's d PlarSmainlemmuxeeiagtHwosistafapplvin6rater,vmJing,earmgo(ylmis,ineludivg 6mmWa n7dl Beduin v'innvod4cc;Neio6vndmawing hwailvlil'viv8.wnlmla(pcstsaMdiswsv.andmvinm'mu',gxaR fres cfJcbrie aNd'ut Upontompletimafveeb uvof'uskllaOaRNe Covkazbr,LenN[ape M[igverevdgmershallwnduclm impectivna(warylefdares,dangxiW Ne Uvne2tmawkcznce repreunktiva, MNiztime,a Ez1 ofrortatimv,ifmy, zN11 be ma@ esiddt rve the rtsyomibiliy of Ne Conlmclae 2. AflvaRxohhai6cmwmplcled iv*PeGed andvacpledallvrcasx5116ewwwAW brapn'oda(ninry (S%wlmdssdayx rave Ivv6ve izceeesmty loeslnblish Wivinghua, slwba, lw(md gsotudwwexiNOW AneryvLL I. Keepoluw weed-hv,ade0uatetyxaleted mdtwYyeWtivafed fm Ne twtery (N)daypetiod Remmxalldebmtrutaife aMkeeplh<eMitesikbtaamel¢v L nv Mfaaeazvvlpe. HYJzvudtdlwfueaxsb116eimlpW aperthe sluvymWchhaz Les,applisdavdalbwedmalforove(l)&y. TLeeoJstufa¢must6e kcplmoisf stall times Aubig YmgemwalionptriaJm mniddeziecatio,of.uun'. 4. Re-awd Wlbvezpakin NRueas.lmn(2)xtekmknalamdmainbinwiilmme,zlana,flw[avllhvutbea spat:, iz obrybed Rnueldid.,on. tM(fail b Sununu - - - 1, Repir all salad sature and to Ne Umu. 5. Drma6e be mil pWtiv6 ars shill be lobed imine ia'si, re's -nam vvud by eshiclssor fool 4aRealuH be SIM with bpsoil,IneledmdrePlanled Fatennitaik gophvs, wlvmdrryudamege. G. TAe pmjubNll6eza orM for NalvtraLdemwedNon xillh prtsevledotvllfwoto NemtizWttivmfNe UvnuvvJ Lvvdzwpe Dcsi6aa The Lvvdsvpe ConoretoraM1alltx<xpetkd lomakeemwmum ofvrcwatly visilformainkoarwe puryosev ]. Al Necndo[tbemilnluu,x ore illaeaztNt Nve hm Wfeds1a11M fedilvedxiNw pe" d p mmewial fetGl'vegwlysir eMmteo1'appliwtioviM116e pu NezoikrcpaR e. TAe Canhazlarshellaegnes[a(wlsil<vuitttvu (1)dayrpwr W NeendofNemainlenurcep'dod. Tl rsloRzNObe serinivaMdvuleJbNCOevLvduapepeeigner. UponxaitdnauplvvwafNvpmjen, the CvnhvdarzNH 6e relicv'MOCe,Y fvtNvmaivlrmvsurna m C, GUARANIES AVtmfi M1aMplmtedeM bYdwxWedgmwdwve, mJSlwbrshaHbegearmtteMlolive aMgowrvepuwdafnineq'(90) Jay+aperwSallvlivnvndurepGnw Ly tM Umv. Tre+rha116el;mvvleed fvrorcywa My malsrielNmfail+lo grain Nrough Ne epaaJidmaivkneee andgusraulee pedadsAall6erep4sedby Ne ConUa<IorRno wRblM1e Weer. M OBSERVATION 1. ON<resbur vid. souped herein shall he made by the Lardwp: Ossiprrm ma rtpr ssani , The Mob starslnll vgout obtttvamv.f 1-1 Mn (E) ooraldngdaya in Wrerce of the lime Nat the oba,xunn issegvuled 2. Obsemtiov vi n0 are suggwd far Ne fallaxing poly of Hr xmL a Upanwnplatioovf®WinBvndmiltaditivewig PrivrNplmting b. Whcn4cesvvspndforPlunliag, bW before PlaWragholesareexmvvlW. e. W�iftm a<ez tmuo[Ne ro aGloreleere We Covwcbrhomr m p p f mNtrvmine vwaNlloamoflvFieW Obssrvatiovwith Ne OmtervrbiertPrezentativx vltAeedv[Namain¢vevicepaivd H. WMlCATIONOFWAffNS(ONS 1. All aided Jimemaaua.,,ran male. EUore pmrtMingeviW my xvtk, llw GolragvrsMllwefWly ahvkadaxrJy vH dimensivu and gmtitiee, and ri W I ivmedaklY mafifY We Ismtzcape Desigrcr of my diw+qury Adzwen Ne dmvivy eMavr apziGvtivnaaMawdeonditians. Na xv3s1u116e dvmivmy muxlxre lNee;s svfiadivrtpamY m^til approval foeewe Ns Oen 8ivm by Ibe Lvndmape Desigvv. F. MILUIig 1. Tk CmntvabrslWlbvrryvmible farnrJyiug Nebutiavofellmdegmtmduliliry licezpriorbmy vays4uvlioq w WI ampere prtrautivtu enay be bkem rat b aumage lute++M plmt lmtidns, pmrmpHy ratify Ne Ladrzape IXzigov who wJl rmrge farrelvwtiovofvmaae NaoNae FailunsresobCallmr WisPmaeaurcp6mmpon Ne Can WalarlhervPomtllnlily for.vl M1ivaxn<xpemSmaliog mil adalirpus(ordarnagu vmllingfmm hisxnh G. RMSTMO TREES 1. Cun4ucesieb wsue Ne ptacrvativnofvny existing treesonlM1e rile. Daers,subvvflhuebousxignandtw seplaumeW afegailsim 6y Nv Wdswpe Contr+utnr. H SOM.REPuRT - 1. uNamrclxsiaxafmughgadirrgmagwmmia mil+.epr1dW11e Prepuea by Ne Ovnerma Nrwshedla We Gmtrazmrma vllrewnuneeda(wmsfamsuc6rcpJ+Wlbeiitwrpankdby lAe Cantraelmiolo wMlUtionofJl Plmling mtae 2. CavbmNrm eerily xithwL,awtysis, Nemnamendmmladmnmctthe l.aMetaa DaiSvuifNermearry imdequak anomalies. L SEEPLAN[MGDHCAMsMlrTMRADDITIONALNO'NS. hV. REIgSVNitSSW DAl6 fJ1YptAKJ1JG M. REVIEW M42u LN ia \` r ` \ f PMSIa Maps Deagn .11.a. Ina (IM..) - l na.Me(AN.5)- AlceA.ae eeme. Ab reA. sa, Thoselearses',daugushousecoulamenearded. rescan Wars areailrat6euee muwaia . . use " eany .n mined, mtlMds, k W 1\ua aequrea es pru-zdmeq m bt Wet) ptews- a nnaMlha Pmjau, 5 V) W p oo E � LLN P ar ZF Wing ❑ lY FP re P N K 11 W E 'Z ra an Q0Z J F� V o Z LU K Ln W 0.{ to O A � U asseasse V• Z Q, n w < N �/I eC , N (WJn /�C. F LU 4 z UUQ a J Z W A Z LL o 0 p 0. LU i� o O ® M N sessesse W C)Syk L OM[A SHEET RENEYh DREW DATE uAYREO\i OF I� 5(.OIF PLANTING. SPECIFICATIONS. PLANNING COMMISSION AGENDA REPORT CITY OF DIAMOND BAR - 21810 COPLEY DRIVE - DIAMOND BAR, CA 91765 - TEL. (909) 839-7030 - FAX (909) 861-3117 AGENDA ITEM NUMBER: 8.1 MEETING DATE: October 22, 2013 CASE/FILE NUMBER: Development Review and Minor Conditional Use Permit No. PL 2013-147 PROJECT LOCATION: 21955 Birds Eye Drive Diamond Bar, CA 91765 (APN 8293-042-019) PROPERTY OWNER/APPLICANT: Dr. Umesh Shah 21955 Birds Eye Drive Diamond Bar, CA 91765 RECOMMENDATION: As the result of an error by staff, the public hearing notice published for this matter was defective. As a result, a corrected hearing notice will need to be published and distributed before this matter can be heard. The City, not the applicant, will incur the costs associated with re -noticing this item. Staff recommends that the Planning Commission table this matter so that it can be re - noticed with a corrected project title and description. The revised notice will set the matter for public hearing on November 12, 2013. Prepared by: Natalie Tobon Assistant Planner Reviewed by: C4=;;ZP—?t G S. Lee Senior Planner F - z W Q a Q o m oZ LU 02 QO O J Lu LL OLU h U W O } F' Z O (V M U, m`-o.QCN�oomccc�mmECQa m`-.QCN�oo`0mc�Qc�mmEUCdN m CU�o0rnccCQ0 0 0 0 0 0 0 0 - a-aCN�omccvmmE❑CTCdO a'n0 U 0 0 o o o o O o 0 c�m0 S U) U ce mE0C-0 U O O O O O O O O O 0 0 0 0 0 0 00 CmOC O O O O O O CL @ m @ m@ mm CO mm @ m @dCCcl E f O E p E E E E p E d N d O O O U Q Q Dp VC- vG- Q WCG- QOO wO rU N Q Q 0 N O O . U j U� in a = U U V) f > F rn F- as z z z 0- o C7 U Q Q Z Z Z Z a N M M W o U: rp d O O O O O O : N N J a yi 'm: N LL J J N N N Um a nJ. C) o a a a n. LL a a a W ❑ K ❑ O a _W > W O U O O U c c C o65 O U a 0 a o N U) 0: Q C C C E J J: J E m K 4 o m d v ! U 42 ami O U a3i _ — a� W a"i 'p W a'i 'p -- T U T@ m C L E E m a) T C C J > -.. N C C mp C X @ U m m C Q'y F E F @ E�-- o U` d c o UJ -r, m F a O a:. �`.N U o U m e ._ mE E�-° o o N m m 'O a a N� m� o m- m- c o `� w w Z N- YO F N m O LL �' C N Z LLS m C G In (9 Z m C 2 C m C C VJ '� m m L C L w Z 7 N M e Z w - m 2 m Q r3 u�-o N -o z z o -o o" M.L- c m o -o 'p M3 a7 03 O.. U Yi J O N V Z O 'O Q N U M Q O O: W '6 i O Q a N Q N m O a o@ N� Mm c y N N' Q N Z m N Z 0 (L N N N - Q Z'� d N N M N ❑ z W w W J U i DA zw Dw vN DN Dw DA Ko zm w `'D T WN nw mm n0,_ o -<o QA o Qo vrn M.P. m T p :E A -w Qrn ' z( (oO OO o T O ( C) 0O J c OO J = OO 0 0 o0 m orN C/)m Q 00 I (nN 0 CL 0 o n G> n c 7J U T C: V N N N N N N N N N (7 T N N N O O N N O O O o O > O o CD _ O N G) Z z z D D z Z D D D D z z z z T G) G) 0 G) O T O 7J -0 N d O O nm, 3 � N ' n Do y C J 71 < 0 0 0 O D. r0 n y N N J 3D c D 3D c SD D D c C T D D SD SD D - a oa oa oa Oa Oa Oa a oa oa Oa Oa Oa n 0 n n n mm vm my mm mm mm s mm mm vv v v o. 0 '�. o < o 0 J J O J J O J O J J J J 3 J N -� J J J J J J J J J J O O � � � O O O O O (D (D (D N (U (D n (D (D (D (D (D n n Q n n n O n Q n n n O O O O O O M O O O O O J J J J J J C J J J J J n 0 n 0 0 0 m 0 0 0 0 0 0 0 0 0 0 o n o o O o 0 3 3 3 3 B 3 a a a a a a a a a o m 0 0 m 0 m v m m m m m m m m m m m o m m m m m v v v v v v v m v v v v v a a a a a a a a a a a m 0 0 0 0 0 0 v v v v v v v v v v v v v v v v v v v v v v Q Q n Q n n Q n Q Q n n n n n n Q n Q n n Q o 0 0 0 0 0 0 0 0 0 0 -- J -- m v m v v v m 23 v v v U i a d � o m c w c a 0 m U 0 N F- rn U c o W m u Q O 3 I C m o' d U: O N 0 U p� N Z @ o. o Z W O m a N a` O a UJ Q O U C w O N O G C' r- Z W' U Q o• Q 'r Q a. 0] LLIZ W' O Q O Q m O W LL % O o ! U a d c w c 0 U N F- o U w o W m '> u Q O N a � a m o' d U: o N 0 p� N Z o Z ujo _ O U a a` O a CITY OF DIAMOND BAR NOTICE OF PUBLIC MEETING AND AFFIDAVIT OF POSTING STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES ) CITY OF DIAMOND BAR ) I, Stella Marquez, declare as follows: On October 22, 2013, the Diamond Bar Planning Commission will hold a regular session at 7:00 p.m., at City Hall, Windmill Community Room, 21810 Copley Drive, Diamond Bar, California. Items for consideration are listed on the attached agenda. I am employed by the City of Diamond Bar. On October 18, 2013, a copy of the agenda of the Regular Meeting of the Diamond Bar Planning Commission was posted at the following locations: South Coast Quality Management District Auditorium 21865 East Copley Drive Diamond Bar, CA 91765 Diamond Bar Library 21800 Copley Drive Diamond Bar, CA 91765 Heritage Park 2900 Brea Canyon Road Diamond Bar, CA 91765 I declare under penalty of perjury that the foregoing is true and correct. Executed on October 18, 2013, at Diamond Bar, California. Stella Marquez Community Develo CD VstellaW idavitposting.doc Department