Loading...
HomeMy WebLinkAbout06/25/2013 PC AgendaPLANNING COMMISSION AGENDA June 25, 2013 CORRECTED DATE FOR THE REGULAR MEETING AND STUDY SESSION OF THE PLANNING COMMISSION AND NOTICE OF SPECIAL MEETING Notice is hereby given that, due to an error in the original agenda of the Regular Meeting of the City of Diamond Bar Planning Commission posted on June 20, 3013, this Special Meeting Agenda is posted to correct the error and affirm that a Study Session is schedule at the hour of 6:00 p.rn. and the Regular Meeting is scheduled at the hour of 7:00 p.m. on JUNE 25, 2013, at City Hall in the Windmill Community Room, 21810 Copley Drive, Diamond Bar, California. The Agenda was previously posted with the incorrect date of June 23, 2013. Greg 'Gula an Secretary to the Planning Commission City of Diamond Bar Dated: June 24, 2013 Planning COMMISSION FILE COPY AGENDA June 25, 2013 STUDY SESSION — 6:00 P.M. City Hall, Windmill Community Room, 21810 Copley Drive Diamond Bar, CA 91765 June 25, 2013 7:00 P.M. City Hall, Windmill Community Room, 21810 Copley Drive Diamond Bar, CA 91765 Chairman Vice Chairman Commissioner Commissioner Commissioner Steve Nelson Tony Torng Frank Farago Jimmy Lin Jack Shah Copies of staff reports or other written documentation relating to agenda items are on file in the Planning Division of the Community Development Department, located at 21810 Copley Drive, and are available for public inspection. If you have questions regarding an agenda item, please call (909) 839-7030 during regular business hours. Written materials distributed to the Planning Commission within 72 hours of the Planning Commission meeting are available for public inspection immediately upon distribution in the City Clerk's office at 21810 Copley Drive, Diamond Bar, California, during normal business hours. In an effort to comply with the requirements of Title li of the Americans with Disabilities Act of 1990, the City of Diamond Bar requires that any person in need of any type of special equipment, assistance or accommodation(s) in order to communicate at a City public meeting must inform the Community Development Department at (909) 839-7030 a minimum of 72 hours prior to the scheduled meeting. llL1D10ND 0 Please refrain from smoking, eating or drinking in the Auditorium The City of Diamond Bar uses recycled paper and encourages you to do the same City of Diamond Bar Planning Commission MEETING RULES PUBLIC INPUT The meetings of the Diamond Bar Planning Commission are open to the public. A member of the public may address the Commission on the subject of one or more agenda items and/or other items of which are within the subject matter jurisdiction of the Diamond Bar Planning Commission. A request to address the Commission should be submitted in writing at the public hearing, to the Secretary of the Commission. As a general rule, the opportunity for public comments will take place at the discretion of the Chair. However, in order to facilitate the meeting, persons who are interested parties for an item may be requested to give their presentation at the time the item is called on the calendar. The Chair may limit individual public input to five minutes on any item; or the Chair may limit the total amount of time allocated for public testimony based on the number of people requesting to speak and the business of the Commission. Individuals are requested to conduct themselves in a professional and businesslike manner. Comments and questions are welcome so that all points of view are considered prior to the Commission making recommendations to the staff and City Council. In accordance with State Law (Brown Act), all matters to be acted on by the Commission must be posted at least 72 hours prior to the Commission meeting. In case of emergency or when a subject matter arises subsequent to the posting of the agenda, upon making certain findings, the Commission may act on item that is not on the posted agenda. INFORMATION RELATING TO AGENDAS AND ACTIONS OF THE COMMISSION Agendas for Diamond Bar Planning Commission meetings are prepared by the Planning Division of the Community Development Department. Agendas are available 72 hours prior to the meeting at City Hall and the public library, and may be accessed by personal computer at the number below. Every meeting of the Planning Commission is recorded on cassette tapes and duplicate tapes are available for a nominal charge. ADA REQUIREMENTS A cordless microphone is available for those persons with mobility impairments who cannot access the public speaking area. The service of the cordless microphone and sign language interpreter services are available by giving notice at least three business days in advance of the meeting. Please telephone (909) 839-7030 between 7:30 a.m. and 5:30 p.m., Monday through Thursday, and 7:30 a.m. and 4:30 p.m., Friday. HELPFUL PHONE NUMBERS Copies of Agenda, Rules of the Commission, General Agendas (909) 839-7030 email: info(cDci diamond-bar.ca.us Cassette Tapes of Meetings (909) 839-7030 CITY OF DIAMOND BAR PLANNING COMMISSION Tuesday, June 25, 2013 AGENDA STUDY SESSION: 6:00 p.m. Next Resolution No. 2013-15 (1) Basics of the California Environmental Quality Act (CEQA); (2) How to review an Environmental Impact Report (EIR); and (3) Tabletop exercise using the Draft EIR for the proposed rezoning and General Plan Amendment for a 78 -acre portion of Tres Hermanos that lies directly south of Diamond Ranch High School. The Zone Change proposes to change the zoning on 30 acres within the study area from Agricultural to Very High Density Residential (RH-30) Public Comments: Adjournment: REGULAR MEETING CALL TO ORDER: 7:00 p.m. PLEDGE OF ALLEGIANCE: ROLL CALL: COMMISSIONERS: Chairman Steve Nelson, Vice Chairman Tony Torng, Frank Farago, Jimmy Lin, Jack Shah 2. MATTERS FROM.THE AUDIENCE/PUBLIC COMMENTS: This is the time and place for the general public to address the members of the Planning Commission on any item that is within their jurisdiction, allowing the public an opportunity to speak on non-public hearing and non -agenda items. Please complete a Speaker's Card for the recording Secretary (completion of this form is voluntary) There is a five-minute maximum time limit when addressing the Planning Commission. I * * * . * * * 3. APPROVAL OF AGENDA: Chairman JUNE 25, 2013 4. CONSENT CALENDAR: PAGE 2 PLANNING COMMISSION AGENDA The following items listed on the consent calendar are considered routine and are approved by a single motion. Consent calendar items may be removed from the agenda by request of the Commission only: 4.1 Minutes of Regular Meeting: May 28, 2013 5. OLD BUSINESS: None 6. NEW BUSINESS: None 7. PUBLIC HEARING(S): 7.1 Development Review No. PL2013-123 — Under the authority of Diamond Bar Municipal Code Section 22.48, the applicant and property owner, Razgo Lee, is requesting Development Review approval to construct a 1,023 square -foot second story addition to an existing single-family residence on a 0.67 gross acre (29,138 square -feet) lot. The subject property is zoned Low Density Residential (RL) with a consistent underlying General Plan land use designation of Low Density Residential. Project Address: 24069 Gold Rush Drive Property Owner/ Razgo Lee Applicant: 24069 Gold Rush Drive Diamond Bar, CA 91765 Environmental Determination: The project has been reviewed for compliance with the California Environmental Quality Act (CEQA). Based on that assessment, the City has determined the project to be Categorically Exempt from the provisions of CEQA pursuant to Article 19 under Section 15301(e) (additions to existing structures) of the CEQA Guidelines. No further environmental review is required. Recommendation: Staff recommends that the Planning Commission approve Development Review No. PL2013-123, based on the Findings of Fact, and subject to the conditions of approval as listed within the draft resolution. 7.2 Tentative Tract Map No. 72067 Development Review and Parking Permit No. PL2012-455 — The applicant is requesting Development Review approval to construct a 21,794 square -foot, new two-story professional office building on a 42,333 square -foot (0.97 acre), Office Professional (OP) zoned parcel with an underlying General Plan land use designation of Light Industrial. A Tentative Tract Map is requested to subdivide air space for an 11 -unit office condominium JUNE 25, 2013 a En PAGE 3 PLANNING COMMISSION AGENDA and a Parking Permit to share driveway access and parking between the proposed development and lot to the north of the project site. Project Address: 650 Brea Canyon Rd. Property Owner: Peichin Lee 17582 E. Rowland Street, #200 City of Industry, CA 91748 Applicant: Brea Canyon Investments, LLC 17582 E. Rowland Street, #200 City of Industry, CA 91748 Environmental Determination: Pursuant to the provisions of the California Environmental quality Act (CEQA) Section 15070, the City prepared an Initial Study and Mitigated Negative Declaration for this project. Pursuant to CEQA Section 15105, the public review period for the Mitigated Negative Declaration begins May 31, 12013, and ended June 20, 2013. Recommendation: Staff recommends that the Planning Commission recommend approval of Tentative Tract Map No. 72067, Development Review and Parking Permit PL2012-455 to the City Council, based on the Findings of Fact, and subject to the conditions of approval as listed within the draft resolution. PLANNING COMMISSION COMMENTS / INFORMATIONAL ITEMS: STAFF COMMENTS I INFORMATIONAL ITEMS: 9.1 Public Hearing dates for future projects: SCHEDULE OF FUTURE EVENTS: PARKS AND RECREATION COMMISSION MEETING: CITY COUNCIL MEETING: PLANNING COMMISSION MEETING: Thursday, June 27, 2013 Diamond Bar City Hall Windmill Community Room 21810 Copley Drive Tuesday, July 2, 2013 - 6:30 p.m. Government Center/SCAQMD Auditorium 21865 Copley Drive Tuesday, July 9, 2013 Diamond Bar City Hall Windmill Community Room 21810 Copley Drive JUNE 25, 2013 PAGE 4 PLANNING COMMISSION AGENDA TRAFFIC AND TRANSPORTATION COMMISSION MEETING: 11. ADJOURNMENT: Thursday, July 11, 2013 - 7:00 p.m. Diamond Bar City Hall Windmill Community Room 21810 Copley Drive F1. r, -A T ua)b �]L�:r MINUTES OF THE CITY OF DIAMOND BAR REGULAR MEETING OF THE PLANNING COMMISSION May 28; 2013 CALL TO ORDER: Chairman Nelson called the meeting to order at 7:00 p.m. in the City Hall Windmill Room, 21810 Copley Drive, Diamond Bar, CA 91765. PLEDGE OF ALLEGIANCE: Commissioner Torng led the Pledge of Allegiance. 1. ROLL CALL: Present: Commissioners Frank Farago, Jimmy Lin, Jack Shah, Vice Chairman Tony Torng, Chairman Steve Nelson Also present: Greg Gubman, Community Development Director; Grace Lee, Senior Planner; Natalie Tobon, Assistant Planner, and Stella Marquez, Administrative Coordinator. 2. MATTERS FROM THE AUDIENCE/PUBLIC COMMENTS: None 3. APPROVAL OF AGENDA: As presented 4. CONSENT CALENDAR: 4.1 Minutes of the Regular Meeting of May 14 2013 - VC/Torng moved, C/Shah seconded, to approve the Minutes of the Regular Meeting of May 14, 2013, as presented. Motion carried by the following Roll Call vote: AYES: NOES: ABSTAIN: ABSENT: 5. OLD BUSINESS: 6. NEW BUSINESS COMMISSIONERS COMMISSIONERS: COMMISSIONERS: COMMISSIONERS: 7. PUBLIC HEARING(S): None None Farago, Shah, VC/Torng, Chair/Nelson None Lin None 7.1 Development Review No. PL2012-100— Under the authority of Diamond Bar Municipal Code Section 22.48, the applicant and property owner Ahdy Ayad, requested Development Review approval to construct a new 4,033 square foot single family residence on a 0.21 gross acre (9,320 square foot) lot. The MAY 28, 2013 PAGE 2 PLANNING COMMISSION subject property is zoned Low Density Residential (RL) with a consistent underlying General Plan land use designation of Low Density Residential. PROJECT ADDRESS: PROPERTY OWNER: APPLICANT: 23885 Minnequa Drive Diamond Bar, CA 91765 Ahdy Ayad 12162 Black Stone Drive Rancho Cucamonga, CA 91739 AP/Tobon presented staff's report and recommended Planning Commission approval of Development Review No. PL2012-100, based on the Findings of Fact, and subject to the conditions of approval as listed within the resolution. VC/Torng referred to Attachment 2, a letter received from Mr. and Mrs. Thomas Tobin, dated May 20, 2013. He said the neighbor's letter referred to Glendora's Code which calls for a 33 percent roof per 10,000 square feet of land and asked if Diamond Bar had such a code. AP/Tobon responded that the City's Development Standards state that within this zone there is a maximum of coverage of 40 percent footprint and the proposed project is 24.4 percent coverage. Chair/Nelson asked if it was a percentage of the footprint of the house or all hardscape and AP/Tobon responded that it is anything and everything with a roof so it includes the footprint of the house, patio covers and any other accessory structures. Chair/Nelson opened the public hearing. Yasmine Ahmir, 1105 North Golden Springs Drive, said the issue was that due to a landslide, the house became inhabitable and was demolished in 2012. His engineer submitted drawings according to the requirements and the City's Code which the City approved. This project does not change the character of the street of Minnequa Drive and there should not be any problem with traffic nor should it have a negative impact on future sales. This project will add beauty to the homes on Minnequa. He feels that the person who cited the Glendora code (Attachment 2) did not realize that Glendora is an old City and Diamond Bar is a fairly young City. Mr. Ahmir submitted to Chair/Nelson a letter in support of the project signed by the neighbors surrounding the project. Chair/Nelson asked for CDD/Gubman's recommendation on how the letter should be received and CDD/Gubman stated his recommendation was that the Chair pass the letter to the Commissioners and that the letter then be entered into the record. Chair/Nelson offered the following summary: The letter is essentially in support of the project with a number of residents within the same MAY 28, 2013 PAGE 3 PLANNING COMMISSION street and/or less than one mile radius of the property stating that the project will not change the character of the houses located in the area. The height will be the same as that of the previous house and the elevation conforms to the City's regulations and that the project will not have a negative impact on the value of homes in the area. The letter speaks against the nature of the Glendora restrictions indicating that those restrictions basically do not apply to this project; that from an engineering and architectural standpoint there are quality individuals involved; there is a certificate of compliance for the plans and development for the Ahdy Ayad single family home issued by the engineers and the letter contains a number of signatures. In essence, this is a letter of statement from neighbors who say they have no problem with the project under any means whatsoever. Chair/Nelson entered the letter into the record and continued with the public hearing. Lianbin Hou, 23900 Minnequa Drive, across the street from the proposed project, said that he was against the project because he believed the size of the house would be double that of the house that previously existed and that it was not in keeping with the houses in the area. Second, the house is a two story house and that the house was one story and the proposed project will affect the houses on the west side. Third, the house is big and has a two car garage so there will be lots of people living there and where will they park and probably will park on the street. ' Ms. Yung, 23891 Minnequa Drive, next to the proposed project, said her house is a one-story house and a two story house next to her is too big and will block the light from her house. Also, there is only a two -car garage for such a big house. When the applicant finishes the house he may sell the house and there will be a big family living in the house. With only a two car garage cars will be parked on the street so it will create more traffic in her neighborhood. Emad Nabih, 8715 Pradero Court, Rancho Cucamonga, contractor, stated that when he submitted plans to build this house, they were submitted according to location, specifications and building codes. In addition, all setbacks and soil stability has been done to code. The City has reviewed and approved those plans. The recommendation for the slope came from GMU, the geotechnical engineer responsible for the landslide repair. The foundation was designed according to the specifications with a high factor of safety. With respect to the two car garage and the family that lives in the house, the area will not be impacted with vehicles because a two -car garage is sufficient for this size house which accommodates a husband, wife and one child. There are already some cars parked overnight on the street and there are no restrictions for parked cars because they do not block the traffic. The applicant made every attempt to match the area in accordance with Building and Safety recommendations. There is no attempt to do anything that is outstanding or out of the norm for the area. In addition, this house will increase the value of MAY 28, 2013 PAGE 4 PLANNING COMMISSION homes in the neighborhood because it is brand new and the next door neighbor will benefit from this project that also adds to the City and the community. Ms. Yung returned to say that the slide mitigation was guaranteed for only 10 years and after 10 years it will happen again and they will not warranty it again. Also he said it is a beautiful house and she agrees. But the surrounding houses are small and suddenly when there is a big house next to a small house it does not add to the value of her home, it detracts from that value. Raf Madrid, 17840 Newbrook, Cerritos, Certified Inspector for Los Angeles County, said he was involved with looking at the house and the slope failure. In his opinion, this area is a very good area. He lives in a two story house and no other houses on his street are two story. His house was built in 1975 as the rules and regulations allowed and there was no restriction from the point of view of Building and Safety. The regulation for the City also allows for distance between the houses for fire safety and the proposed house meet those codes. The City of Diamond Bar has a very highly qualified staff and they know what they are doing. The engineer who submitted the plans knows the codes for single family homes and the rules were very carefully applied for this single family home for many reasons including insurance. Both sides of this home are safe for purposes of lighting. From a fire safety standpoint, the back of the house is an open area. The front line of the house matches all of the other houses in the street. Who will be living in this house is not the concern of anyone in this district because it could be one person with two cars or five people with only two cars. These plans were submitted to the City by a professional structural engineer under California Building Codes. The architect is certified and builds in accordance with California Building Codes. The City sends the plans to two consulting engineers to carefully study the plans, thus the recommended modifications which were done. After that the City made three revisions to the plans — plans do not pass through this City that easily and the Planning Division of this City is responsible about what will be built in their community. Anyone who objects to this house is dealing from an emotional standpoint and this house is being built to code. With no one else present who wished to speak, on this item, Chair/Nelson closed the public hearing. C/Lin asked what the footprint of the house is and CDD/Gubman responded that the square footage of the lot is 9,320 and the lot coverage as stated in staff's report is 24.4 percent (the footprint of the house) or about 3,000 square feet which is the area of the first floor, garage, covered patio, covered entrance which is 2,274 square feet. The 2,992 square feet does not include the garage. With the inclusion of the garage and balconies the square footage totals 3,723 square feet which is the gross floor area. C/Lin said that typically, garages and balconies are typically not considered "living space." MAY 28, 2013 PAGE 5 PLANNING COMMISSION CDD/Gubman said that C/Lin was correct and directed him to pages 3 and 4 of staff's report which contain four bullet points breaking down the square footage that comprises the structure. C/Lin said that the setbacks are to code and nothing that is proposed to be built is in contrast or violates the City's Subdivision Code and CDD/Gubman confirmed that C/Lin was correct. C/Lin said that in terms of how many members live in the house is not included in the criteria for approving or denying the project and neither does the blocking of light from the neighbor's property and CDD/Gubman confirmed that C/Lin was correct. CDD/Gubman said that when staff reviews projects, every effort is made to take into account compatibility with neighboring structures in terms of privacy, ensuring that bedroom windows do not face each other, etc. He showed the photo of the building that was demolished which was a two-story residence. The neighboring one-story house is shown on the right and that house is actually upslope from the project site so that even though it is one- story, the subject property is down slope and its pad is actually a few feet lower than the one-story house so that the proposed structure is not looming over the neighboring property and there will be no impacts in terms of creating shadows onto the neighboring property. C/Lin asked if the City had the landslide repaired and CDD/Gubman responded that the City had to review the structural engineering plan and the landslide had to be repaired to a minimum safety factor which is a technical term that gets into its geotechnical stability. The slope repair has been engineered so that it is not going to fail. This is a safe building pad and it has improved the safety for the surrounding properties as well. The slope repair went through an extensive engineering effort and has been vetted through the City's geotechnical consultants to ensure that it meets or exceeds the minimum safety factors required. C/Lin said it has a 10 year warranty and who paid for the repair and who is responsible for the failure of the construction. CDD/Gubman explained that the engineer of record is ultimately responsible and has liability insurance that covers the work. The landslide occurred on private property, not on public property. C/Farago asked if the house on the down slope to the west of the project site was a two story structure and CDD/Gubman responded yes as seen on the upper left of the slide. C/Farago asked the square footage of the project that was demolished and CDD/Gubman responded that the living area was 2093 square feet which is a net increase in square footage between the former and new structure of about 900 square feet. C/Shah said that it appears that according to the site drawing the square footage meets all of the requirements for the City. The slope and slide is a geotechnical issue and once it was fixed it was warranted for 10 years which surprised him. MAY 28, 2013 PAGE 6 PLANNING COMMISSION CDD/Gubman stated that any development project that goes through the Planning Commission for review, the Commission is reviewing it for use of the land and for the appropriateness of the way in which the building was designed. The Planning Commission's approval is subject to several conditions that must be complied with before the City issues permits. The Planning Commission is not looking at the structural plans for the house because that is something this approval is subject to — 'subject to going through the Building and Safety Division for verification that the structural plans comply with the building codes. There is the same requirement for the earthwork and for all of the grading that would be involved. Those structural safety building code requirements are mandated to go through the technical staff for verification that they meet the safety criteria. The Commission's approval, in this case and as always, is subject to the City's technical staff's ensuring that no permits are issued and no final inspections are signed off until staff has verified that all construction and all designs have been done in compliance with the relevant safety codes for the State of California. VC/Torng asked for a clarification of the balcony square footage on Page 1 of staff's report. C/Farago said that according to the plans, the square footage of the demolished house first floor was 1,280 and the first floor of the new building is only 1,465 which is a difference of less than 200 square feet. The second floor is 1,527 and the demolished building was 813 so the increase in the square footage can be found in the second floor. CDD/Gubman said that C/Farago made a good point. Chair/Nelson said that as long as he has served on the Planning Commission it has never rejected the idea of having families want to increase the size of their homes or move out of Diamond Bar. This is a very family friendly City and supports approval. He also believes that the rule of real estate does apply that if you want a good investment in real estate you buy the lesser valued home on the block and move up from there. C/Lin moved, C/Shah seconded, to approve Development Review No. PL2012- 100, based on the Findings of Fact, and subject to the conditions of approval as listed within the resolution. Motion carried by the following Roll Call vote: AYES: COMMISSIONERS: Farago, Lin, Shah, VC/Torng, Chair/Nelson NOES: COMMISSIONERS: None ABSENT: COMMISSIONERS: None RECESS: Chair/Nelson recessed the Planning Commission at 7:40 p.m MAY 28, 2013 PAGE 7 PLANNING COMMISSION RECONVENE: Chair/Nelson reconvened the Planning Commission at 7:50 p.m. 7.2 Development Review No. PL2013-104 — Under the authority of Diamond Bar Municipal Code Section 22.48, the property owner, Samson Family Trust, and applicant Federico P. Samson, requested Development Review approval to demolish an existing house and construct a new 7,401 square foot single family residence on a 0.84 gross acre (36,590 square foot) lot. The subject property is zoned Rural Residential (RR) with a consistent underlying General Plan land use designation of Rural Residential. PROJECT ADDRESS: 2442 Alamo Heights Drive Diamond Bar, CA 91765 PROPERTY OWNER: APPLICANT: Samson Family Trust 23810 Canyon Vista Court Diamond Bar, CA 91765 Federico P. Samson 2442 Alamo Heights Drive Diamond Bar, CA 91765 CDD/Gubman presented staff's report and recommended Planning Commission approval of Development Review No. PL2013-104 based on the Findings of Fact, and subject to the conditions of approval as listed within the resolution. VC/Torng liked the plan and staff's detailed report Chair/Nelson opened the public hearing. Federico Samson, property owner, asked the Commission to please approve the project which he feels will improve and upgrade the neighborhood. The current house is outdated. With no one else present who wished to speak on this item, Chair/Nelson closed the public hearing. C/Farago moved, VC/Torng seconded, to approve Development Review No. PL2013-104 based on the Findings of Fact, and subject to the conditions of approval as listed within the resolution. The motion was carried by the following Roll Call vote: MAY 28, 2013 PAGE 8 PLANNING COMMISSION AYES: COMMISSIONERS: Farago, Lin, Shah, VC/Torng, Chair/Nelson NOES: COMMISSIONERS: None ABSENT: COMMISSIONERS: None 8. PLANNING COMMISSIONER COMMENTS/INFORMATIONAL ITEMS: None C/Lin asked about the status of the potential Ralph's project. CDD/Gubman responded that the Walmart Neighborhood Market will open in that space when corporate elects to tell the City when construction will take place and when the store will be open for business. There is a larger rollout plan for several locations but staff is not privy to that information at this time. C/Lin asked if the plan would be submitted to the Planning Commission for approval and CDD/Gubman responded no, only if the exterior of the building were to be modified. If this project involves only an interior remodel with new signage it would not come to the Planning Commission. C/Lin asked if traffic and parking would be a problem and CDD/Gubman responded that if the square footage does not change and the property is going from a market to a market, it would be exempt from that type of review. 9. STAFF COMMENTS/INFORMATIONAL ITEMS: 9.1 Public Hearinq dates for future Proiects. CDD/Gubman stated that the June 11 Planning Commission will go dark since there are no scheduled agenda items and the next Commission meeting will be June 25. There are currently two items on the agenda: 1) addition to a single family residence and 2) a new office building at the corner of Brea Canyon Road and Washington Street. CDD/Gubman further stated that staff released the Environmental Impact Report (EIR) for a zone change for a portion of Tres Hermanos that lies directly south of Diamond Ranch High School. When the City adopted the current Housing Element it was obligated by the state to establish zoning in the City at a sufficient density to accommodate 490 affordable housing units which is simply defined as creating zoning that allows a density of 30 units per acre. It is not that the City is going to be subsidizing or providing any financial backing for a project, it is simply obligated to provide a zoning designation with sufficient acreage to accommodate that number of units at the given density. Staff anticipates coming to the Planning Commission on August 13 for the first hearing on the proposed zone change. The EIR has been released for a 45 - day public review period. If the Commissioners have any questions on the document feel free to contact him or SP/Lee. If the Commission would like to have a study session as it did when the Site D EIR was released, that can be scheduled for the June 25 meeting. MAY 28, 2013 PAGE 9 PLANNING COMMISSION Chair/Nelson asked that any Commissioner wishing to schedule a study session should contact CDD/Gubman for scheduling. VC/Torng said he would like to have a study session and asked for concurrence from his colleagues. CDD/Gubman said that staff would schedule a study session to discuss navigating through the EIR to obtain information which is provided in a summary form for 6:00 p.m. prior to the regular June 25 meeting. The rest of the document is the technical basis for the summary information. C/Lin asked if staff prepared the EIR and CDD/Gubman said that the City contracted with a consultant who assembled a team of specialists in the various disciplines such as air quality, noise, traffic and biology to collectively provide the basis for the EIR and the document went through a collaborative effort that included staff and attorney review. C/Lin asked if it would be prudent to invite the consultant to attend the study session. CDD/Gubman said he would work on that issue. 10. SCHEDULE OF FUTURE EVENTS: As listed in tonight's agenda. ADJOURNMENT: With no further business before the Planning Commission, Chairman Nelson adjourned the regular meeting at 8:11 p.m. to June 25, 2013. The foregoing minutes are hereby approved this 25th day of June, 2013. Attest: Respectfully Submitted, Greg Gubman Community Development Director Steve Nelson, Chairman .T, PLANNING COMMISSION v ri� AGENDA REPORT CITY OF DIAMOND BAR - 21810 COPLEY DRIVE - DIAMOND BAR, CA 91765 - TEL. (909) 839-7030 - FAX (909) 861-3117 AGENDA ITEM NUMBER: MEETING DATE: CASE/FILE NUMBER: PROJECT LOCATION: PROPERTY OWNER/APPLICANT: 7.1 June 25, 2013 Development Review No. PL 2013-123 24069 Gold Rush Drive Diamond Bar, CA 91765 (APN 8701-018-031) Razgo Lee 24069 Gold Rush Drive Diamond Bar, CA 91765 Summary The applicant is requesting approval of a Development Review application to construct a 1,023 square -foot second story addition at the front of an existing two-story single family residence. The existing residence consists of 6,623 square feet of living area and 853 square -foot four -car garage on a 0.67 gross acre (29,138 square -foot) lot. The architectural style of the existing residence is Mediterranean with Italian Renaissance Revival influences. The proposed second -story addition will maintain design consistency, an appropriate relationship in mass and scale to the site, and incorporate existing design elements compatible with the surrounding neighborhood. After evaluating the submittal, staff finds that the proposed project complies with the City's development standards, and that the required Development Review findings set forth in the Development Code can be made in the affirmative. Therefore, staff recommends that the Planning Commission approve Development Review No. PL2013-123, based on the findings of fact, and subject to the conditions of approval contained in the attached Resolution. BACKGROUND: Site Description The project site is located on the north side of Gold Rush Drive, west of Highcrest Drive. The property was developed in 2002 with a 6,623 square -foot two-story home and 853 square -foot four -car garage on a 29,138 gross square -foot (0.67 acre) lot. There are no protected trees on site. The property is legally described as Lot 4 of Tract No. 31977, and the Assessor's Parcel Number (APN) is 8701-018-031. Site and Surrounding General Plan, Zoning and Land Uses Review Authority (Diamond Bar Municipal Code (DBMC) Section 22.48) Development Review No. PL 2013-123 Page 2 of 6 General Plan Designation Zoning District Land Use Low Density RL Single -Family Residential Residential North Low Density RL Single -Family Residential Residential South Low Density RL Single -Family Residential Residential 11 East West Low Density Residential Low Density Residential RL RL Single -Family Residential Single -Family Residential Review Authority (Diamond Bar Municipal Code (DBMC) Section 22.48) Development Review No. PL 2013-123 Page 2 of 6 Additions that substantially change the appearance of an existing residence require Planning Commission approval of a Development Review (DR) application. Development Review approval is required to ensure compliance with the City's General Plan policies, development standards and design guidelines, and to minimize adverse effects of the proposed project upon the surrounding properties and the City in general. Proiect Description The existing garage is a one-story module located at the forwardmost portion of the house. The addition is proposed directly above the garage so that the existing building footprint is unaltered. The proposed addition is designed to blend into the existing house by using the same architectural elements and materials as the existing residence. The proposed roof will be integrated into the existing roof by using the same roof pitch and materials as the existing residence. ACJ. 9R Legend ACJ. STRUC,i. Outline of existing footprint i Proposed addition above �4 existing garage y{' 3150° -- O �o o o 0 0 0 a 296.27 rAPJ �IIRUi, Site Plan The proposed 1,023 square -foot second story addition to an existing single-family home consists of an exercise room, two walk-in closets, shower, spa, and storage room. The height of the proposed addition is 26'-2", measured from the finished grade to the highest point of the roofline. Development Review No. PL 2013-123 Page 3 of 6 ANALYSIS Development Review (DBMC Section 22.48) The purpose of a Development Review (DR) is to ensure that new development and additions to existing development are consistent with the General Plan "through the promotion of high functional and aesthetic standards to complement and add to the economic, physical, and social character" of Diamond. Bar. The process ensures that new development and intensification of existing development yields a pleasant living environment, and attracts the interest of residents and visitors as the result of consistent exemplary design. • Development Standards: The following table compares the proposed project with the City's development standards for residential development in the RL zone: Development Residential Development Existing Proposed Feature Standards Requirements 89'-10" 89'-10" Yes Front• • 20 feet 10 feet on one side and 6'-0" —east side 6'-0" —east side 5 feet on the other side. 10'-6" — west side 10'-6" — west side Yes 15 feet 164' — east side 16'-6" — east side Yes 43'-6" — west side 43'-6" — west side • 20 feet 105'-6" 105'-6" Yes • Maximum of 40% 16.9% 16.9% Yes • 35 feet 32'-5" 32'-5" Yes 2 -car garage 4 -car garage 4 -car garage Yes • Site and Grading Configuration: The proposed addition is located on the second story of an existing two-story residence. Therefore, there will be no grading on the site. • Architectural Features, Colors, and Materials: The architecture of the existing residence is Mediterranean with Italian Renaissance Revival influences, such as mission tile hipped roofs, arched windows, horizontal banding at the base, and Tuscan columns. The applicant is proposing to retain the existing building style. The proposed design will maintain architectural integrity by incorporating similar Development Review No. PL 2013-123 Page 4 of 6 fenestration patterns, and matching existing exterior colors and building materials. The roof of the proposed addition will be integrated with the existing roof by matching the existing hipped roof and 5:12 pitch. • Landscaping: Landscape plans are not required because the site is already developed, and because the project is exempt from the City's Water Conservation Landscaping Ordinance. The ordinance would only apply if 5,000 square feet or more of the existing landscaped area was being altered. However, landscaping that is damaged during construction will need to be restored upon project completion. This requirement is included as a condition of approval. Compatibility with Neighborhood The proposed project complies with the goals and objectives as set forth in the adopted General Plan in terms of land use and density. The project is designed to be compatible with and enhance the character of the existing homes in the neighborhood. The project incorporates the principles of the City's Residential Design Guidelines as follows: • The proposed building addition is visually integrated with the primary structure by using similar forms, colors, and materials; • The proposed roof type, pitch, and materials match those of the primary structure; • Window type and dimensions, and other architectural features, such as decorative bands, window trims, and columns, match those of the primary structure; and • Large wall expanses without windows or doors are avoided. Adjacent Property to West (downslope) Development Review No. PL 2013-123 Project Site Adjacent Property to East (upslope) Page 5 of 6 Additional Review The Public Works Department and Building and Safety Division reviewed this project, and their comments are included in the attached resolution as conditions of approval. NOTICE OF PUBLIC HEARING: On June 14, 2013, public hearing notices were mailed to property owners within a 500 -foot radius of the project site and the notice was published in the San Gabriel Valley Tribune and Inland Valley Daily Bulletin newspapers. A notice display board was posted at the site, and a copy of the notice was posted at the City's three designated community posting sites. Public Comments Received No comments have been received as of the publication date of this report ENVIRONMENTAL ASSESSMENT: This project has been reviewed for compliance with the California Environmental Quality Act (CEQA). Based on that assessment, the City has determined the project to be Categorically Exempt from the provisions of CEQA pursuant to the provisions of Article 19 Section 15301 (e) (additions to existing structures) of the CEQA Guidelines. No further environmental review is required. RECOMMENDATION: Staff recommends that the Planning Commission adopt the attached resolution (Attachment 1) approving Development Review No. PL 2013-123, to construct a second story addition to an existing two-story residence based on the findings of DBMC Section 22.48, subject to conditions of approval as listed within the draft resolution. Prepared �by: Reviewed by: Natalie Tob n Gr S. Assistant Planner Senior Planner Attachments: 1. Draft Resolution No. 2013 -XX and Standard Conditions of Approval 2. Site Plan, Floor Plans, and Elevations Development Review No. PL 2013-123 Page 6 of 6 PLANNING COMMISSION RESOLUTION NO. 2013 -XX A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DIAMOND BAR, CALIFORNIA, APPROVING DEVELOPMENT REVIEW NO. PL 2013-123 TO CONSTRUCT A 1,023 SQUARE -FOOT SECOND STORY ADDITION TO AN EXISTING TWO-STORY, SINGLE-FAMILY RESIDENCE WITH 6,623 SQUARE FEET OF LIVABLE SPACE AND 853 SQUARE -FOOT FOUR -CAR GARAGE, ON A 0.67 GROSS ACRE (29,138 SQUARE -FOOT) LOT LOCATED AT 24069 GOLD RUSH DRIVE, DIAMOND BAR, CA 91765 (APN 8701-018-031). A. RECITALS 1. The property owner and applicant, Razgo Lee, filed an application for Development Review No. PL2013-123 to construct a 1,023 square -foot second story addition to an existing 6,623 square -foot single-family residence, located at 24069 Gold Rush Drive, City of Diamond Bar, County of Los Angeles, California. Hereinafter in this resolution, the subject Development Review shall collectively be referred to as the "Project." 2. The subject property is made up of one parcel totaling 29,138 square feet (0.67 gross acres). It is located in the Low Density Residential (RL) zone with an underlying General Plan land use designation of Low Density Residential. 3. The legal description of the subject property is Lot 4 of Tract 31977. The Assessor's Parcel Number is 8701-018-031. 4. On June 14, 2013, notification of the public hearing for this project was published in the San Gabriel Valley Tribune and the Inland Valley Daily Bulletin newspapers. Public hearing notices were mailed to property owners within a 500 -foot radius of the Project site and public notices were posted at the City's designated community posting sites on June 14, 2013. In addition to the published and mailed notices, the project site was posted with a display board and the notice was posted at three other locations within the project vicinity. 5. On June 14, 2013, the Planning Commission of the City of Diamond Bar conducted a duly noticed public hearing, solicited testimony from all interested individuals, and concluded said hearing on that date. PLANNING COMMISSION RESOLUTION NO. 2013 -XX A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DIAMOND BAR, CALIFORNIA, APPROVING DEVELOPMENT REVIEW NO. PL 2013-123 TO CONSTRUCT A 1,023 SQUARE -FOOT SECOND STORY ADDITION TO AN EXISTING TWO-STORY, SINGLE-FAMILY RESIDENCE WITH 6,623 SQUARE FEET OF LIVABLE SPACE AND 853 SQUARE -FOOT FOUR -CAR GARAGE, ON A 0.67 GROSS ACRE (29,138 SQUARE -FOOT) LOT LOCATED AT 24069 GOLD RUSH DRIVE, DIAMOND BAR, CA 91765 (APN 8701-018-031). A. RECITALS 1. The property owner and applicant, Razgo Lee, filed an application for Development Review No. PL2013-123 to construct a 1,023 square -foot second story addition to an existing 6,623 square -foot single-family residence, located at 24069 Gold Rush Drive, City of Diamond Bar, County of Los Angeles, California. Hereinafter in this resolution, the subject Development Review shall collectively be referred to as the "Project." 2. The subject property is made up of one parcel totaling 29,138 square feet (0.67 gross acres). It is located in the Low Density Residential (RL) zone with an underlying General Plan land use designation of Low Density Residential. 3. The legal description of the subject property is Lot 4 of Tract 31977. The Assessor's Parcel Number is 8701-018-031. 4. On June 14, 2013, notification of the public hearing for this project was published in the San Gabriel Valley Tribune and the Inland Valley Daily Bulletin newspapers. Public hearing notices were mailed to property owners within a 500 -foot radius of the Project site and public notices were posted at the City's designated community posting sites on June 14, 2013. In addition to the published and mailed notices, the project site was posted with a display board and the notice was posted at three other locations within the project vicinity. 5. On June 14, 2013, the Planning Commission of the City of Diamond Bar conducted a duly noticed public hearing, solicited testimony from all interested individuals, and concluded said hearing on that date. B. RESOLUTION NOW, THEREFORE, it is found, determined and resolved by the Planning Commission of the City of Diamond Bar as follows: 1. The Planning Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct; and 2. The Planning Commission hereby determines the Project to be Categorically Exempt from the provisions of the California Environmental Quality Act (CEQA) pursuant to the provisions of Article 19, Section 15301 (e) (additions to existing structures) of the CEQA Guidelines. Therefore, no further environmental review is required. C. FINDINGS OF FACT Based on the findings and conclusions set forth herein and as prescribed under Diamond Bar Municipal Code (DBMC) Sections 22.48, this Planning Commission hereby finds as follows: Development Review Findings (DBMC Section 22.48.040) 1. The design and layout of the proposed development is consistent with the applicable elements of the City's General Plan, City Design Guidelines, and development standards of the applicable district, design guidelines, and architectural criteria for special areas (e.g., theme areas, specific plans, community plans, boulevards or planned developments); The design and layout of the proposed 1,023 square -foot second story addition to the existing single family residence is consistent with the City's General Plan, City Design Guidelines and development standards by meeting all required setbacks. The project maintains the existing height of the building. The project site is not part of any theme area, specific plan, community plan, boulevard or planned development. 2. The design and layout of the proposed development will not interfere with the use and enjoyment of neighboring existing or future developments, and will not create traffic or pedestrian hazards; The proposed addition will not interfere with the use and enjoyment of neighboring existing or future developments because the use of the project site is designed for a single-family home and the surrounding uses are also single-family homes. 2 Planning Commission Resolution No. 2013 -XX The proposed addition will not interfere with vehicular or pedestrian movements, such as access or other functional requirements of a single- family home because it complies with the requirements for driveway widths and is a continuation of an existing use. 3. The architectural design of the proposed development is compatible with the character of the surrounding neighborhood and will maintain and enhance the harmonious, orderly and attractive development contemplated by Chapter 22.48: Development Review Standards, the City's Design Guidelines, the City's General Plan, or any applicable specific plan; The existing architectural style of the home is Mediterranean with Tuscan and Italian Renaissance Revival influences. The applicant is proposing to add to the existing second story of an existing home while maintaining consistency with the current design. The project is designed to be compatible and complementary to the neighborhood by keeping similar architectural details of the neighboring homes. There is no specific plan for this area. 4. The design of the proposed development will provide a desirable environment for its occupants and visiting public as well as its neighbors through good aesthetic use of materials, texture, color, and will remain aesthetically appealing; The design of the existing single-family home is Mediterranean with Tuscan and Italian Renaissance Revival influences. Consistent building elements have been achieved through the utilization of similar architectural features and building materials. 5. The proposed development will not be detrimental to public health, safety or welfare or materially injurious (e.g., negative effect on property values or resale(s) of property) to the properties or improvements in the vicinity; and Before the issuance of any City permits, the proposed project is required to comply with all conditions within the approved resolution, and the Building and Safety Division and Public Works Departments requirements. Through the permit and inspection process, the referenced agencies will ensure that the proposed project is not detrimental to the public health, safety or welfare or materially injurious to the properties or improvements in the vicinity. 6. The proposed project has been reviewed in compliance with the provisions of the California Environmental Quality Act (CEQA). 3 Planning Commission Resolution No. 2013 -XX The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) as set forth under Article 19 Section 15301 (e) (additions to existing structures) of the CEQA guidelines. Based upon the findings and conclusion set forth above, the Planning Commission hereby approves this Application, subject to the following conditions: 1. Standard Conditions. The applicant shall comply with the standard development conditions attached hereto. The Planning Commission shall: a. Certify to the adoption of this Resolution; and b. Forthwith transmit a certified copy of this Resolution, by certified mail to the property owner and applicant, Razgo Lee, 24069 Gold Rush Drive, Diamond Bar, CA 91765. APPROVED AND ADOPTED THIS 25TH DAY OF JUNE 2013, BY THE PLANNING COMMISSION OF THE CITY OF DIAMOND BAR. M Steve Nelson, Chairman I, Greg Gubman, Planning Commission Secretary, do hereby certify that the foregoing Resolution was duly introduced, passed, and adopted, at a regular meeting of the Planning Commission held on the 25th day of June, 2013, by the following vote: AYES: Commissioners: NOES: Commissioners: ABSENT: Commissioners: ABSTAIN: Commissioners: ATTEST: Greg Gubman, Secretary 4 Planning Commission Resolution No. 2013 -XX I l I COMMUNITY DEVELOPMENT DEPARTMENT �v STANDARD CONDITIONS USE PERMITS, COMMERCIAL AND RESIDENTIAL NEW AND REMODELED STRUCTURES PROJECT #: Development Review No. PL 2013-123 SUBJECT: To construct an 1,023 square -foot addition to an existing single family residence on a 0.67 gross acre (29,138 square - foot) lot PROPERTY Razqo Lee OWNER/ 24069 Gold Rush Dr. APPLICANT: Diamond Bar, CA 91765 LOCATION: 24069 Gold Rush Dr., Diamond Bar, CA 91765 ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DIVISION AT (909) 839-7030, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. GENERAL REQUIREMENTS 1. In accordance with Government Code Section 66474.9(b)(1), the applicant shall defend, indemnify, and hold harmless the City, and its officers, agents and employees, from any claim, action, or proceeding to attack, set-aside, void or annul, the approval of Development Review No. PL 2013-123 brought within the time period provided by Government Code Section 66499.37. In the event the city and/or its officers, agents and employees are made a party of any such action: (a) Applicant shall provide a defense to the City defendants or at the City's option reimburse the City its costs of defense, including reasonable attorneys fees, incurred in defense of such claims. (b) Applicant shall promptly pay any final judgment rendered against the City defendants. The City shall promptly notify the applicant of 5 Planning Commission Resolution No. 2013 -XX any claim, action of proceeding, and shall cooperate fully in the defense thereof. 2. This approval shall not be effective for any purpose until the applicant and owner of the property involved has filed, within twenty-one (21) days of approval of this Development Review No. PL2013-123, at the City of Diamond Bar Community Development Department, an affidavit stating that the applicant/owner is aware of and agree to accept all the conditions of this approval. Further, this approval shall not be effective until the applicants pay remaining City processing fees, and fees for the review of submitted reports. 3. All designers, architects, engineers, and contractors associated with this project shall obtain a Diamond Bar Business License, and a zoning approval for those businesses located in Diamond Bar. 4. Signed copies of Planning Commission Resolution No. 2013 -XX, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 5. Prior to the plan check, revised site, grading and architectural plans incorporating all Conditions of Approval — if applicable — shall be submitted for Planning Division review and approval. 6. Prior to any use of the project site or business activity being commenced thereon, all conditions of approval shall be completed. 7. The project site shall be maintained and operated in full compliance with the conditions of approval and all laws, or other applicable regulations. 8. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and any applicable Specific Plan in effect at the time of building permit issuance. 9. All site, grading, landscape/irrigation, and roof plans, and elevation plans shall be coordinated for consistency prior to issuance of City permits (such as grading, tree removal, encroachment, building, etc.,) or approved use has commenced, whichever comes first. 10. The property owner/applicant shall remove the public hearing notice board within three days of this project's approval. Planning Commission Resolution No. 2013 -XX 11. The applicant shall comply with the requirements of City Planning, Building and Safety Divisions, Public Works Department, and the Fire Department. B. FEES/DEPOSITS 1. Applicant shall pay development fees (including but not limited to Planning, Building and Safety Divisions, Public Works Department and Mitigation Monitoring) at the established rates, prior to issuance of building or grading permit (whichever comes first), as required by the City. School fees as required shall be paid prior to the issuance of building permit. In addition, the applicant shall pay all remaining prorated City project review and processing fees prior to issuance of grading or building permit; whichever comes first. 2. Prior to any plan check, all deposit accounts for the processing of this project shall have no deficits. C. TIME LIMITS 1. The approval of Development Review No. PL 2013-123 expires within two years from the date of approval if the use has not been exercised as defined pursuant to Diamond Bar Municipal Code Section (DBMC) 22.66.050 (b)(1). In accordance with DBMC Section 22.60.050 (c), the applicant may request, in writing, a one-year time extension for Planning Commission consideration. Such a request must be submitted to the Planning Division prior to the expiration date and be accompanied by the review fee in accordance with the Fee Schedule in effect at the time of submittal. D. SITE DEVELOPMENT 1. This approval is for the site plan, elevations, and exterior materials for a 1,023 square -foot second story addition to be constructed at 24069 Gold Rush Drive, as described in the staff report and depicted on the approved plans on file with the Planning Division, subject to the conditions listed below. 2. The construction documents submitted for plan check shall be. in substantial compliance with the architectural plans approved by the Planning Commission, as modified pursuant to the conditions below. If the plan check submittal is not in substantial compliance with the approved Development Review submittal, the plans may require further staff review and re -notification of the surrounding property owners, which may delay the project and entail additional fees. 7 Planning Commission Resolution No. 2013 -XX 3. To ensure compliance with the provisions of the Planning Commission approval, a final inspection is required from the Planning Division when work for any phase of the project has been completed. The applicant shall inform the Planning Division and schedule an appointment for such an inspection. 4. The above conditions shall run with the land and shall be binding upon all future owners, operators, or successors thereto of the property. Non- compliance with any condition of approval or mitigation measure imposed as a condition of the approval shall constitute a violation of the City's Development Code. Violations may be enforced in accordance with the provisions of the Development Code. 5. Failure to comply with any of the conditions set forth above or as subsequently amended in writing by the City, may result in failure to obtain a building final and/or a certificate of occupancy until full compliance is reached. The City's requirement for full compliance may require minor corrections and/or complete demolition of a non-compliant improvement, regardless of costs incurred where the project does not comply with design requirements and approvals that the applicant agreed to when permits were pulled to construct the project. 6. The project site shall be developed and maintained in substantial conformance with the approved plans submitted to, approved, and amended herein by the Planning Commission, on file with the Planning Division, the conditions contained herein, and the Development Code regulations. 7. All ground -mounted utility appurtenances such as transformers, air conditioning condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berms, and/or landscaping to the satisfaction of the Planning Division. 8. All roof -mounted equipment shall be screened from public view. 9. All structures, including walls, trash enclosures, canopies, etc., shall be maintained in a structurally sound, safe manner with a clean, orderly appearance. All graffiti shall be removed within 72 hours by the property owners/occupant. 10. All landscaping, structures, architectural features and public improvements damaged during construction shall be repaired or replaced upon project completion. 8 Planning Commission Resolution No. 2013 -XX E. SOLID WASTE 1. The site shall be maintained in a condition, which is free of debris both during and after the construction, addition, or implementation of the entitlement approved herein. The removal of all trash, debris, and refuse, whether during or subsequent to construction shall be done only by the property owner, applicant or by a duly permitted waste contractor, who has been authorized by the City to provide collection, transportation, and disposal of solid waste from residential, commercial, construction, and industrial areas within the City. It shall be the applicant's obligation to insure that the waste contractor used has obtained permits from the City of Diamond Bar to provide such services. 2. Mandatory solid waste disposal services shall be provided by the City franchised waste hauler to all parcels/lots or uses affected by approval of this project. APPLICANT SHALL CONTACT THE PUBLIC WORKS DEPARTMENT, (909) 839-7040, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. GENERAL 1. An Erosion Control Plan shall be submitted concurrently with the grading plan clearly detailing erosion control measures. These measures shall be implemented during construction. The erosion control plan shall conform to national Pollutant Discharge Elimination System (NPDES) standards and incorporate the appropriate Best Management Practices (BMP's) as specified in the Storm Water BMP Certification. Please refer to City handouts. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION, (909) 839- 7020, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: 1. Plans shall conform to current State and Local Building Code (i.e. Currently the 2010 California Building Code, California Plumbing Code, California Mechanical Code, and the California Electrical Code but the 2013 version will apply if plan check applied after January 1, 2014) requirements and all other applicable construction codes, ordinances and regulations in effect at the time of plan check submittal. 2. Modifications and additions to the existing sprinkler system shall have Fire Department approval. 3. Every permit issued by the Building and Safety Division shall expire if the building or work authorized by such permit is not commenced within 180 9 Planning Commission Resolution No. 2013 -XX days from the date of such permit or work has discontinued and not been signed -off on the job card by the building inspector. 4. Construction activities causing the operation of any tools or equipment used in construction, drilling, repair, alteration, or demolition work shall be conducted Monday — Saturday between the hours of 7:00 a.m. and 7:00 p.m. 5. The project shall be protected by a construction fence to the satisfaction of the Building Official. All fencing shall be view obstructing with opaque surfaces. 6. All structures and property shall be maintained in a safe and clean manner during construction. The property shall be free of debris, trash, and weeds. The adjacent neighboring property shall be protected from any debris or dust from construction on this property. 7. Existing fencing shall remain in-place during construction including pool barrier fencing. Any alteration of the fencing may result in a discontinuation of construction until the fences are returned to its original state. Pool fencing shall be maintained at all times. 8. All equipment staging areas shall be maintained in an orderly manner and screened behind a minimum 6' high fence. 9. Solid waste management of construction material shall incorporate recycling material collection per Diamond Bar Municipal Code 8.16 of Title 8. 10. The minimum design load for wind in this area is 85 M.P.H. exposures "C" and the site is within seismic zone D or E. The applicantshall submit drawings and calculations prepared by a California State licensed Architect/Engineer with wet stamp and signature. 11. This project shall comply with the energy conservation requirements of the State of California Energy Commission. All lighting shall be high efficacy or equivalent per the current California Energy Code 119 and 150(k). 12. Prior to Building permit issuance, all school district fees must be paid. Please obtain a form from the Building and Safety Division to take directly to the school district. 13. Drainage patterns shall match the approved grading/drainage plan from the Engineering Department. Surface water shall drain away from building at a 2% minimum slope. The final as -built conditions shall match the 10 Planning Commission Resolution No. 2013 -XX grading/drainage plan or otherwise approved as -built grading/drainage plan. 14. All glazing in hazardous locations shall be labeled as safety glass. The labeling shall be visible for final inspection. 15. Special inspections and structural observation will be required in conformance to CBC 1704 to 1709. 16. A soils report shall be submitted during plan check, and all recommendations of the soils report shall be adhered to. The soils report shall address any upgrades necessary to the existing foundation system on the first floor garage. 17. The applicant shall contact Dig Alert and have underground utility locations marked by the utility companies prior to any excavation. Contact Dig Alert by dialing 811 or their website at www.di.galert.org. 18. The location of property lines and building pad may require a survey. 19. AQMD notification is required at least 10 days prior to any demolition. 20. All workers on the job shall be covered by workman's compensation insurance under a licensed general contractor. 21. Any changes to approved plans during the course of construction shall be approved by the City prior to proceeding with any work. 22. Carbon monoxide detectors are required in halls leading to sleeping rooms per CRC R315. 23. Shower doors shall all swing out and be tempered glass. 24. An occupancy separation shall be provided between the existing garage and new exercise room. END 11 Planning Commission Resolution No. 2013 -XX Attachment 2 n SITE PLAN scALe: vTs = r o^ N LEGENDS PROPOSAL ADDITIONAL FLOOR AREA 0 SECOND FLOOR ONLY E)(ISYG WALL TO REMAIN EXISTINGEE PLA TREE TREREMAIN YP SEE PLAN FOR TREE TYPE AND SIZE ol��Qaop�oo�m nofis m1n R uvn, Imo.,' WOO EE G9P65 I LEE LEGAL 31T2� lFOLL 3'2. GGMP L�i 3. CE4. CPo%)xl: TPACI j 4. ACYi550R ID N0: 8701-018-031 - ) 5. ORO55 l MFA 29,136 SF (Ob] ACRES) 8. NEf LOT AREI 25.390 IF (058 ACRES) 8. ZONING: RL ;Ir,,` .„ J. 8LKD010 HEIGHT. 32'-3' (EAISTIN4. NO CHAhGE)� 8. LOT COYFJ '. 4934/25390 =19.5% < 40% (EXIRMG. NO CHAN6 ): 8. PMNING. ONE 4 -CAR GARAGES 10. WDE: 2010 CBC. CEC. CMC, CPL, CGBC AND LOCAL WENDMEMS 11. TWE OF CONSTRU MON: V-8 WaN SPRINKLER 12 OCCUPANCY: R -3/e 13. FLOOR MFA 1) IST FL AREA (EXISTING): 38a2 SF 2) 2ND FL. AREA (EXISMG): 2761 5F 3) 2ND H- AREA (AODWN): IO23 SF TOTAL WABLE MEA(I+2+3): 7646 SF 4) FOUR -CARS GARAGE: 653 SP 5) MOM PORCH 126 OF 6) N. PORCH 113 5P LOT COVERAGE (1+41-546): 4934 SF lN000IX104V GS9AP N.T.S. Dlfi 'G METAL FFAMINC WITH METAL . TO RFMNN WSRNIG CONCRETE PAVEMENT TO AEW EXISTING MD$CME AREA TO RWAN EXITING CONCRETE ORNFNAT TO R." LXSHRIG P. TO P . . I ROTE PLAN HBTES� I PLL D6M1 DRIVEWAY AND CONC PAYFMLM TO ADA" 2. PLL VNOSCAPE ARM ANO EXOTNC TROY TO R0. N REVSIONS BY O 12 o 00 Q9 ®8= _.0 DATE ISSUED 02 01-13 SCALE DRAWN PROJECTNO. SHEET A1.0 OF SHEETS 60'-5" (E) 40'-6" (E) -------- 1 ---_---/ O ® BATH (E) O ® o !W.(E)I _ I.C. BATH (E) BEDROOM (E) I ® I ❑ 0 4 -CARS GARAGE (E) _ W.I.C.; ❑ z BEDROOM (E)LILI =M 1 1 I i 1 i I i I I I I4:�c � O / POWDER ( / / o (ro --- --- - 48,_5,. (E) o 11 - ---- - O 0 0 - w I I \ DINING (E) LOBBY (E) j IE I I � II r O ® ------ w J\ r \ FAMILY (E) ITCHEN (E) LIVING (E) 00 Oo i 57'-3" (E) WALL LEGENDS ® NEW 2 % SND WALL 1 1ST FLOOR PLAN N E_7 E%IM WALL TO 0E REMOVED SCALE: 1/4"= 1'-O" O EXISYG WALL TO REMAIN REMONS W E G a `laid 51J 0m a mho E SNc o' O O J LL 1— Z �3 LLa DATEISSUED M-01-13 SOME DRAWN PROJECTNO. SHEET A2.0 OF SHEETS BEVSIONS BY 100'—ii' (E) 56' 3" (E) 44'-8° (N) 13'-0' 2'-6' 3'-6' S-6" 2'-6" 13'-6' 6'-3" . 4. sw sea. I I —t ®i i �HQWE (_ W.I.C. E _ (PER ' .I � U U -Y6tab% �-Y6vb1C � I i I MASTER BATH — 8MASTER BEDROOM (E) 8-2 B -Y 6—" 3-10" 5-0 12-10� i fl TmAPFREO / ® ® Ycnb'Ic EXERCISE (N) a �' I fsToR� W.I.C. (E) O 6bM1S�4Y/�i (�) I'OYio9Y4 6'WIOY/W�) ri BAR (E) ------------ ----� 4'-1' ii'—" 6-11" r2'-6' 3' 6° F____ 1 49'-5" (N) I I I I I I [BALCONY (E) LOFT (E) j I I I I I I i co 1 ® ® s G \ � Ov9� LIBRARY (E) /~ B�H (E) ®$z c) K S J LL w.Icl (El Z ® - oz BEDROOM (E) z O BEDROOM (E) BEDROOM (E) H O_ ¢ DATE ISSUED m 02-01-18 SCALE -------- DRAWN ❑ PMMECT NO. 5Y-3' (E) � WALL LEGENDS SHEET n 2ND FLOOR PLAN N ® NEW 2 X SND WAt U SCALE: 1 4"= 1'-0" C=7 E.IST'G Wau ro BE ReuovEo �^ 0 L. E%ISYG Y(ALL TO NEMAM OF SHEETS 1 1 1 I I I I I \ asn2 (E) 5n2 (E)%, _--_�Os:t2(�4� ROOF PLAN/ NEW ADDITION) N SCALE: 1/4"= 1'-01/4"= 1'-0" I I I I I I I I I I I I F LEGENDS ® MCFO AO MP ROOF AISA ROOF ACCESSORY I o'.N vElmuiax srsml AIDOEL O'HkM'S 'Mi' STI£ NNP: 9i.s SI/FA xsrnlunox: . u1N. ]6' IV WI PIN MD OECK OR CEIusCOOR OR.PPR.%. 12' WIIHIX µ0 PROYE PLYM'WO OFLK OR CEN:G AIS! ATTIC VENTILATION COMPLIANCE 1. rx , tO m Ail: %,ORO AVE 8Vm PY 4G I`AS} p[ ilE FKipt f£ 14 FALL I6 ID] 0/ 1`A SF Alik: ASl RMF VfR4 N MIN CALCMFO PEWIflm: (O NEN/ 0.00E PAPA ONET) 1122 Sf./3 a.SF. ..m Sr. % faa = s66N so. w. PROVIOEO: iLF f 9. SO. O. % 8 VNRS - ORO W. IN. (I., So. IN. REWWEO) OX. ROOF PLAN NOTES I. I..F. ROOF: uoOl. ROOF nI .EFA ROO...o R (i0 wicH (E)) FRS -1697 OR EO, POOH: Ont WO. U.x.O. wwx+vcs u+E As Famnwc(wLo.): 23-. IMSFPW.AiOOF 0 F..00 wiLLcH eF1. RCG) ORRO.KIE VlANPY SPEiOAS, P OPR PVPRN LL ROOF Sfl�t4G SRLL RE WM R0WMPE PO FRRy OAFOS. wrzx Ex¢nxc) �2�EXSITING ROOF PLAN PLAN _ 0 SCALE:IN R PENSIONS DY G s EN LL Ila 6 CO2 0 O 0x 2 V Q9 ®80 o s z a LL 0 K DATEISSUED W-01-13 SCNE DPAWN PPOJECTNO. SHEET A2.2 OF SHEETS I E BESTING BUIWING NEW ADDITION BXTMpR lfigi iC!®IAS mP a ROGE ®D6R6 iwl eu�oNc a 3 1 4 z C MATERIAL FINISH COLOR MANUF. _ I ROOF Dt A.OmR 900 BRfNN/ TO HATCH (E) ER -1 6]E U O - 2 2- fX FASCW BOARO PAR"If0/)0 WILX (E) TO IMTCH IXIS¶NG OVNN EDWAROS 3 E%FERIOR CEI.IENF PV51ER UGM Y.YO/ 10 YARH (E) SHEET ffi0511NG/ TO VARN (E WNN EOWNEOS _ _ , _ 1P° a R®GC B lgY: NgRKKiC A. fV DO _ 3-1 k WOR TRIM PdMm/ N W1CN (E) MNEJ 10 VIJG1 (E) WNN EOYIMOS EXT CEM. PIAS=. - 3-� DECORATIVE fl4N0 TRIM PAMED/ i0 VAIGI (f) YMIIE/ 10 M9iCN (E) OUNN EOWAROS bibEXT CEM. P \�^ - >a 3-3 OELOFAIIVE COLUMN PANIED% TO VATLH (E) NHIIE/ 10 1WCX (E) OUNN EOWAROS 4 WINDODS ANN WHRE (TO IMTCH (E)) MUWD OR ED / .;8 •. .. w a PIAIE ®NfN MNYIgY Fx I I DECODA� pop -OUT TO MN - 3 aa.w. mr NEN ADDMON smo wa+- ___ HIM " - gawo (n?) 1 SOUTH ELEVATION SCALE: 1/4" = i'-0" IOP OF RAGE 0 DISTIG INN OMIOING I T EXKHNG BUILDING NEW ADDNION 4 4 3 1. I _ - _ - 1 iOP a RCGE 0 IIEN NgIXOY 17 I I LJ1 11 T HI Il -f I I OF NATE Ll Ll - ------ --- "a 4 'l > NRV ADDNION SECaN1 RaDR {Md 011 HH M-4 Doo oo©o DODD= 0000 s 2 WEST ELEVATION SCALE: i/4" = 1'-0" REVSIONS BY S ox� �U V Q =NN 0 Q W DATE 02-0-01-131-13 SCME DRAWN PROAECTNO. SHEET A3.0 OF SHEETS TOP of RIM o am% NAN BITMC 3 6 I - < - - NEW AIDDRION I ME= BUILDING ¶W C{ PGCE B kfW /llgilIXi _ _ N Li _ _ TY18,1A _ IN To, w PULE (11T.)- ?= "M i " wooRO nooV (m.) TOP a PDT (T W.1 NEP/ AMMON . - --- ---- - -- ' HH 0 Ll - - -- �I FlFST FlIXN LM (IYP.) n EAST ELEVATION EXTER ee MATERIAL FINISH COLOR MANUF. I ROOF ➢LE MADERA 900 BwNN/ To DTi (E) ERS 64 0 EF 2 2- 2X FASCN BOARD PWM/ TO WWI (E) 10 MICH EX1511NG DUNN E ../ 3 MERIOR CEIA M PIASTER OTT SVID/ TO YA" (E) YNOT IROSHAG/ TO VARH (E) DUNN EDWARDS 3-1 IXT CEA. P T. IYI DO PARTED/ To NATCU (E) WNHE/TO 6WCH (E) DUNN EDWARDS EASNF. AV WIDE & WOR iRIM }2 OECORAINE BAND TRIM PMTm/ TO MTCH (E) WHITE/ TO WTGI (E) DUNN EDWAR05 lOP CF REICE 0 IXRTLSC Y4V 6UIWPIG }-3 0M O.CEMP i" PANTED/ TO WICH (E) %RV TO A ]Di (E) DUNN MIAR05 4 WINDOWS AN"- 1YHHE (TO HUTCH (E)) Mkf.ARO OR E0. 5 CNUCE ODOR E%STING TO REAWN WHRE 6 (E) DECORATM POP -OUT i0 DE REMOVE➢ ID \\ — I I i I I I n NORTH ELEVATION SCALE: 1/4" = i' -D" SEVSIONS BY o s v a moi _.0 O Q w DATE ISSUED @-0t-13 SGAIE DRAWN PROJECT NO. SHEET A3.1 OF SHEETS DI1llHOND' BAR' PLANNING COMMISS1014 AGENDA REPORT CITY OF DIAMOND BAR - 21810 COPLEY DRIVE - DIAMOND BAR, CA 91765 - TEL. (909) 839-7030 - FAX (909) 861-3117 AGENDA ITEM NO. 7.2 MEETING DATE: June 25, 2013 CASE/FILE NUMBER: Development Review, Tentative Tract Map No. 72067, and Parking Permit (Planning Case No. PL2012-455) PROJECT LOCATION: 650 Brea Canyon Road (Los Angeles County Assessor's Parcel No. 8719-010-901) PROPERTY OWNER/ Peichin Lee of Brea Canyon Investments, LLC APPLICANT: 17528 E. Rowland Street #200 City of Industry, CA 91748 Summary The applicant is proposing to build a new two story professional office building on a vacant pad located at the northeast corner of Brea Canyon Road and Washington Street. This property was previously owned by the Alameda Corridor -East Construction Authority (ACE), and was disposed of as surplus property after the Brea Canyon Road underpass bridge construction at the railroad crossing in the cities of Industry and Diamond Bar. The following entitlements are being requested: 1. Development Review to construct a 21,794 square -foot, new two story professional office building on a 42,333 square -foot (0.97 acre) lot; 2. Tentative Tract Map No. 72067 to subdivide air space for an 11 -unit office condominium; and 3. Parking Permit to share driveway access and parking between the proposed development and the lot to the north of the project site. The building's architectural style is a contemporary modern style. The building is designed to incorporate principles of modern architecture by celebrating the capabilities of contemporary construction materials and technologies. After evaluating the application and related submittals, staff has determined that the proposed project complies with the City's development standards and the Subdivision Map Act, and believes that the Development Review, Tentative Tract Map, and Parking Permit findings set forth in the Development Code can be made in the affirmative. Therefore, staff recommends that the Planning Commission forward a recommendation to the City Council to approve the proposed Development Review, Tentative Tract Map and Parking Permit No. PL2012-455, based on the findings of fact, and subject to the conditions of approval contained in the attached Resolution. Background The project site is on a 0.97 -acre vacant parcel. It is on an elevated pad, approximately 13 feet higher than the centerline of Brea Canyon Road and Washington Street. The site was previously developed a 2,500 square -foot single family residence and garage. These structures were demolished around 2006, prior to the construction of the Brea Canyon Road Grade Separation project by ACE. The site was then used as a temporary access road to the Metrolink station. After completion of the grade separation project, the site was declared to be surplus property, and was then disposed of earlier this year when ACE sold it to the applicant. The project site is legally described as Parcel 1 of Parcel Map No. 16640, and the Assessor's Parcel Number (APN) is 8719-010-901. Proiect Description The applicant proposes to build a new two-story professional office building, with 11 units to be sold as office condominiums governed by an association. The unit sizes range from 1,268 to 2,108 square feet and two public restrooms are proposed on each floor. There will be 37 parking spaces provided on-site with additional parking spaces available on the existing lot to the north. The applicant is requesting a parking permit to share driveway access and parking between the proposed development and the existing lot to the north. Site and Surrounding General Plan, Zoning and Land Uses Site Light Industrial OP Vacant North Li ht Industrial I Warehouse and Offices Medium Density South Residential RM Multi -Family Residential East Li ht Industrial I Public Storage Facility West Light Industrial I Office Industrial Park Page 2 of 12 CD: Staff Reports PC/Brea Canyon Road 650 PC Staff Report 06-25-2013.docx ANALYSIS: Review Authority (Diamond Bar Municipal Code (DBMC) Sections 22.48, 21.20.080 and 22.30.050) The proposed project requires three entitlement applications for review. The Tentative Tract Map for the subdivision of land requires City Council approval. The Development Review for the site plan and architectural components of the project and Parking Permit to share parking and driveway access require Planning Commission approval. DBMC Section 22.48.030 of the Development Code requires all applications to be processed simultaneously by the highest review authority. Therefore, the Planning Commission's role in this matter is to forward a recommendation to the City Council for the three entitlements described below: Development Review (DBMC Section 22.48) The purpose of Development Review (DR) is to establish consistency with the General Plan through the promotion of high aesthetic and functional standards to complement and add to the economic, physical, and social character of the City. The process ensures that new development and intensification of existing development yields a pleasant living environment, and attracts the interest of residents and visitors as the result of consistent exemplary design. • Development Standards: The following table compares the proposed project with the City's development standards for commercial development in the OP zone: *The proposed project will provide adequate parking by means of a shared parking arrangement with the parcel to the north. The attached conditions of approval require a reciprocal parking and access agreement to be recorded with the final map. See discussion beginning on Page 8. Page 4 of 12 CD: Staff Reports PC/Brea Canyon Road 650 PC Staff Report 06-25-2013.doex c,�a ds � - o;.-. 20 feet 51'-8" feet Yes None 5'-5" — north side Yes tr_ 20 feet 20 feet None 160'-3" feet Yes . 35 feet 35 feet Yes _ .. i►b P is 60 spaces 37 spaces Yes* *The proposed project will provide adequate parking by means of a shared parking arrangement with the parcel to the north. The attached conditions of approval require a reciprocal parking and access agreement to be recorded with the final map. See discussion beginning on Page 8. Page 4 of 12 CD: Staff Reports PC/Brea Canyon Road 650 PC Staff Report 06-25-2013.doex ® Site and Grading Configuration: The site is on an existing pad. Although the pad is leveled, the applicant is proposing to lower it by one foot, requiring some grading and excavation. An ADA accessible ramp is proposed within the landscaped slopes along Washington Street. The existing driveway, that runs along the easterly property boundary is proposed to be retained and incorporated into the site plan. Architectural Features, Colors, and Material: The City's Design Guidelines have been established to encourage a better compatible building and site design that improves the vital quality of the surrounding area through aesthetically pleasing site planning, building design, and architecture. In addition, a primary objective is to promote compatibility with adjacent uses to minimize any potential negative impacts. The architectural style is a contemporary modern style. The building is designed to incorporate principles of the modern architecture by its simplicity of building form and windows with nonsuperfluous details. In addition, the massing of the entrance/lobby area is taller than the other parts of the building and incorporates an alcove to the building entrance, bringing this element down to a human scale. The tall glazing openings have mullions to break up the big glass panels, and reveals are added on the elevations to break up the flat walls. The project incorporates the principles of the City's Commercial Design Guidelines as follows: ➢ Monotony of building design.as well as busyness is avoided. Variation in wall place, roof line, detailing materials are used to prevent monotonous appearance in buildings; ➢ Parapet walls are treated as an integral part of the building design; ➢ The exterior building design, including roof style, color, materials, architectural form and detailing is consistent on all elevations of each building to achieve design harmony and continuity within itself; ➢ Articulation and accent color for identity and interest is provided for the building entrance; and Contains elements which transition to the human scale, particularly near the ground. The north and east elevations feature a whimsical, asymmetrical arrangement of circular windows. The seeming randomness of the window placements, together with the varied window diameters, give the illusion that the building has no structural framing, and celebrate how space frames can be used to span large areas with few interior supports. Page 5 of 12 CD: Staff Reports PC/Brea Canyon Road 650 PC Staff Report 06-25-2013.docx East (Front) Elevation — Facing Parking Lot West (Street Front) Elevation — Facing Brea Canyon Road South (Street Front) Elevation — Facing Washington Street Page 6 of 12 CD: Staff Reports PC/Brea Canyon Road 650 PC Staff Report 06-25-2013.docx North Elevation • Landscaping: A conceptual landscape plan was submitted with the application. Existing landscaping along the slopes located along Brea Canyon Road and Washington Street will remain. The landscape will be enhanced by adding more trees, shrubs, and ground cover around the south and east sides of the property. Four 36 -inch box Brisbane Box and four 24 -inch box Camphor trees are proposed along Washington Street. In order to screen the proposed retaining walls around the accessible ramp and existing transformer, tall shrubs are being proposed. The three Mexican pale verde trees proposed adjacent to the driveway is recommended to be replaced with another non-invasive species. See Condition of Approval No. B.5 of the Draft Resolution (Attachment 1). All other plant types proposed are non-invasive plant species. The project is also required to comply with the new water -efficient landscape requirements, which will be verified during building plan check. Tentative Tract Map (Diamond Bar Municipal Code Section 21.20.0801 Pursuant to DBMC Section 66424 of the Subdivision Map Act, a Tentative Tract Map is required for the creation of a condominium or other interest development simultaneously with the construction of a new structure. There are 11 units proposed within the new two story office building, to be sold as condominiums and governed by an association. The two public restrooms on each floor as well as the lobby, hallways, and elevator will be part of the building's common areas. The property will have 37 parking spaces on-site to share with the lot to the north. The project is conditioned to submit Covenants, Conditions, and Restrictions (CC&R's) that govern the 11 units within the building, and is subject to review and approval by the City Attorney prior to the issuance of building permits. Parking Permit (DBMC Section 22.30.050) Pursuant to DBMC Section 22.30.050 of the Development Code, where two or more commercial uses are developed as a professional center and those uses have distinct and differing peak parking usage periods, a reduction in the required number of parking Page 7 of 12 CD: Staff Reports PC/Brea Canyon Road 650 PC Staff Report 06-25-2013.docx spaces may be allowed through the approval of a parking permit, provided that the most remote space is located within 300 feet of the use it is intended to serve (as measured along the most direct pedestrian path). The amount of reduction may be up to the amount of spaces required for the least intensive of the two or more uses sharing the parking. Professional offices are required to provide 1 parking space for every 400 square feet of gross floor area, medical offices are required to provide 1 space for every 250 square feet, and warehouse and storage facilities are required to provide 1 space for every 1,000 square feet. The existing gross floor area of the one story industrial office/warehouse building to the north is 20,571 square feet, and requires 31 parking spaces. The proposed development is required to provide 60 parking spaces. There are 37 spaces proposed to be provided on-site and the lot to the north has 54 spaces. Therefore the proposed development will comply with the parking code requirement by providing 91 spaces for both lots with a reciprocal parking agreement between the two lots. Parking Requirement The applicant submitted a draft reciprocal parking and access agreement governing the use and access of all common roads, driveways, parking, and easement areas. The agreement also prohibits semi -trucks from accessing the site due to the narrow width of the driveway. This prohibition would only allow smaller service/delivery trucks to access the site. The agreement will be reviewed and approved by the Planning Division and City Attorney's Office prior to final map approval. See Condition of Approval No. D.2 of the Draft Resolution (Attachment 1). Based on the traffic analysis report, the intersection capacity analysis for the intersection of Brea Canyon Road at Currier Road, Washington Street, Lycoming Street, SR -60 West Bound ramp intersections, and Golden Springs Drive at SR -East Bound ramps indicates that the proposed project will not have a significant traffic impact and is forecast to operate at Level of Service (LOS) D or better during peak hours. LOS D is the minimum level generally considered to be acceptable for urban intersections. The Page 8 of 12 CD: Staff Reports PC/Brea Canyon Road 650 PC Staff Report 06-25-2013.docx City of Diamond Bar's General Plan calls for LOS D as the minimum acceptable service level at an intersection, while LOS C is the minimum for roadway segments. The proposed project would not cause any intersections or street segments in the vicinity to operate at an unacceptable level of service. All intersections and roadway segments will continue to maintain an acceptable level of service. Therefore, no mitigation measures or improvements are required for the proposed project. Compatibility with Neighborhood The proposed project complies with the goals and objectives as set forth in the adopted General Plan in terms of land use. The project will not negatively affect the existing surrounding land uses, and the design and appearance of the proposed office building is compatible with the surrounding community. There is an office industrial park to the west, industrial office and warehouse building to the north, and a public storage facility to the east. Therefore, operational characteristics are compatible with the surrounding uses. There are multi -family homes to the south built on a much higher pad than the proposed development. In addition, Washington Street separates the multi -family homes from the proposed development. Multi -Family Homes to the South (View From Brea Canyon Road) Additional Review The Public Works/Engineering Department and Building and Safety Division reviewed this project and included their comments in the attached resolution as conditions of approval. Page .9 of 12 CD: Staff Reports PC/Brea Canyon Road 650 PC Staff Report 06-25-2013.docx NOTICE OF PUBLIC HEARING: Public hearing notices were mailed to property owners within a 500 -foot radius of the project site on June 13, 2013, and the notice was published in the Inland Valley Daily Tribune and San Gabriel Valley Tribune newspapers on June 14, 2013. The project site was posted with a notice display board, and a copy of the public notice was posted at the City's three designated community posting sites. Public Comments Received At the time the staff report was published, staff had not received any comments from the public. ENVIRONMENTAL ASSESSMENT: This project has been reviewed for compliance with the California Environmental Quality Act (CEQA). Based on that assessment, staff prepared and filed an Initial Study/Environmental Checklist and Notice of Intent to Adopt Negative Declaration for the project on May 23, 2013, with the Los Angeles County Clerk and published in the Inland Valley Daily Tribune and San Gabriel Valley Tribune newspapers, and it is part of this report (Attachment 2). Pursuant to CEQA Section 15105, the public review period for the Mitigated Negative Declaration began on May 31, 2013, and ended on June 20, 2013. The Initial Study is a preliminary analysis to determine whether or not a Negative Declaration, Mitigated Negative Declaration, or Environmental Impact Report (EIR) is needed for a project. If the Initial Study concludes that the proposed project will not significantly affect the environment, a Negative Declaration may be prepared. If there are potential impacts from the proposed project that can be mitigated to a level of less than significant, a Mitigated Negative Declaration may be prepared. A Mitigated Negative Declaration is a written document that briefly describes the reasons that a proposed project will not have a significant effect on the environment by properly conditioning the project ("mitigation measures") to make the project acceptable. It is used to guide and assist the City staff, Planning Commission, City Council, and the public in the consideration and evaluation of potential environmental impacts that may result from the proposed project. Once the Initial Study and Mitigated Negative Declaration are prepared, a Notice of Intent to Adopt a Mitigated Negative Declaration is posted at the Los Angeles County Clerk and published in the Inland Valley Daily Tribune and San Gabriel Valley Tribune newspapers. The public review period must be no less than 20 days. Staff prepared the Initial Study/Environmental Checklist for the proposed project, which documents reasons to support the findings that the proposed project would not have any potentially significant impacts on the environment with the proposed mitigation Page 10 of 12 CD: Staff Reports PC/Brea Canyon Road 650 PC Staff Report 06-25-2013.docx measures included. The project is conditioned to include these mitigation measures as part of project approval. See Attachment A of Attachment 2: Mitigation and Monitoring Program. RECOMMENDATION: Staff recommends that the Planning Commission adopt the attached Resolution (Attachment 1) recommending approval of the Development Review, Tentative Tract Map, and Parking Permit for Project No. PL2012-455 to the City Council, to allow the construction of a new two story professional office building, based on the findings of DBMC Sections 22.48, 21.20.080 and 22.30.050, subject to conditions of approval as listed within the draft resolution. Prepared by: Grac . Lee Senior Planner Reviewed by: Greg Gubman, AICP Community Development Director Attachments: 1. Draft PC Resolution No. 2013 -XX and Standard Conditions of Approval 2. Notice of Availability and Intent to Adopt a Mitigated Negative Declaration, Initial Study, and Mitigation Monitoring Program 3. Traffic Impact Analysis Report Dated March 26, 2013 4. Architectural, Conceptual Grading and Landscape Plans, Tentative Tract Map Page 11 of 12 CD: Staff Reports PC/Brea Canyon Road 650 PC Staff Report 06-25-2013.docx PLANNING COMMISSION RESOLUTION NO. 2013 -XX A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DIAMOND BAR, CALIFORNIA, RECOMMENDING THAT THE CITY COUNCIL ADOPT THE MITIGATED NEGATIVE DECLARATION AND APPROVE DEVELOPMENT REVIEW, TENTATIVE TRACT MAP NO. 72067 AND PARKING PERMIT PLANNING CASE NO. PL2012-455 TO CONSTRUCT A 21,794 SQUARE -FOOT, NEW TWO STORY PROFESSIONAL OFFICE BUILDING, TENTATIVE TRACT MAP TO SUBDIVIDE AIR SPACE FOR AN 11 -UNIT OFFICE CONDOMINIUM, AND A PARKING PERMIT TO SHARE DRIVEWAY ACCESS AND PARKING BETWEEN THE PROPOSED DEVELOPMENT AND THE LOT TO THE NORTH OF THE PROJECT SITE LOCATED AT 650 BREA CANYON ROAD, DIAMOND BAR, CA 91789 (ASSESSOR'S PARCEL NO. 8719-010-901). A. RECITALS 1. Property owner, Peichin Lee of Brea Canyon Investments, LLC, filed an application for the following entitlements: (1) Development Review approval to construct a new 21,794 square -foot, two story professional office building; (2) Tentative Tract Map No. 72067 to subdivide air space for an 11 -unit office condominium; and (3) Parking Permit to share driveway access and parking between the proposed development and the lot to the north of the project site located at 650 Brea Canyon Road, Diamond Bar, Los Angeles. County, California ("Project Site"). 2. The Project Site is currently comprised of one parcel totaling 0.97 acres. It is located in the Professional Office (OP) zone and is consistent with the Light Industrial land use designation of the General Plan. 3. The legal description of the subject property is Parcel 1 of Parcel Map No. 16640. The Assessor's Parcel Number is 8719-010-901. 4. Pursuant to the California Environmental Quality Act, California Public Resources Code Section 21000 et seq. ("CEQA") and CEQA's implementing guidelines, California Code of Regulations, Title 14; Section 15000 et seq., an initial study was prepared and it has been determined that the proposed project qualifies for a Mitigated Negative Declaration as the proposed project will not have a significant effect on the environment by properly conditioning the project ("mitigation measures") to make the project acceptable. In accordance to the provisions of Section 15070 of the CEQA Guidelines, the City prepared and filed a Notice of Availability and Intent to Adopt Mitigated Negative Declaration for the project on May 23, 2013, with the Los Angeles County Clerk. Pursuant to CEQA Section 15105, the public review period for the Negative Declaration began May 31, 2013, and ended June 20, 2013. 5. On June 14, 2013, notification of the public hearing for this project was published in the San Gabriel Valley Tribune and the Inland Valley Daily Bulletin newspapers. Public hearing notices were mailed to property owners within a 500 -foot radius of the project site and public notices were posted at the City's designated community posting sites on June 13, 2013. In addition to the published and mailed notices, the project site was posted with a display board. 6. On June 25, 2013, the Planning Commission of the City of Diamond Bar conducted a duly noticed public hearing, solicited testimony from all interested individuals, and concluded said hearing on that date. B. RESOLUTION NOW, THEREFORE, it is found, determined and resolved by the Planning Commission of the City of Diamond Bar as follows: 1. This Planning Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. The Planning Commission has independently considered the Initial Study and Mitigated Negative Declaration that was made available for public review, and all other oral and written public comments received prior to or at the public hearing prior to adopting this Resolution. The Planning Commission finds that the Mitigated Negative Declaration reflects the City's independent judgment and analysis. The Planning Commission hereby determines on the basis of the whole record before it, including the Initial Study and comments received, that there is no substantial evidence that the proposed Project will have a significant effect on the environment, and on that basis, hereby recommends the City Council adopt the Mitigated Negative Declaration. The record of proceedings on which the Planning Commission's decision is based is located at the City of Diamond Bar, 21810 Copley Drive, Diamond Bar, California, Community Development Department/Planning Division. The custodian of record of proceedings is the Director of Community Development. 3. The Planning Commission hereby specifically finds and determines that, having considered the record as a whole including the findings set forth below, there is no evidence before this Planning Commission that the Proposed Project herein will have the potential of an adverse effect on wildlife resources or the habitat upon which the wildlife depends. Based upon substantial evidence, this Planning Commission hereby rebuts the presumption of adverse effects contained in Section 753.5(d) of Title 14 of the California Code of Regulations. C. FINDINGS OF FACT Based on the findings and .conclusions set forth herein and as prescribed under Diamond Bar Municipal Code (DBMC) Sections 22.48, 21.20.080 and 22.30.050, this Planning Commission hereby finds and recommends as follows: Development Review Findings (DBMC Section 22.48) 1. The design and layout of the proposed development are consistent with the general plan, development standards of the applicable district, design 2 Planning Commission Resolution No. 2013 -XX guidelines, and architectural criteria for special areas (e.g., theme areas, specific plans, community plans, boulevards or planned developments): The proposed office building is consistent with the applicable elements of the City's General Plan, City Design Guidelines and development standards by meeting all of the required setbacks. The proposed building has been designed in a contemporary modern style and incorporates principles of the modern architecture with its simplicity of building form and windows with nonsuperfluous details. in addition, the massing of the entrance/lobby area is taller than the other parts of the building and incorporates an alcove to the building entrance, bringing this element down to a human scale. The tall glazing openings have mullions to break up the big glass panels, and reveals are added on the elevations to break up the flat walls. The building is also consistent with the City's Commercial Design Guidelines Pages 8-13, which incorporates the following principles: ➢ Monotony of building design as well as busyness is avoided. Variation in wall place, roof line, detailing materials are used to prevent monotonous appearance in buildings; ➢ Parapet walls are treated as an integral part of the building design; ➢ The exterior building design, including roof style, color, materials, architectural form and detailing is consistent on all elevations of each building to achieve design harmony and continuity within itself; ➢ Articulation and accent color for identity and interest is provided for the building entrance; and ➢ Contains elements which transition to the human scale, particularly near the ground. The project site is not a part of any theme areas, specific plans, community plans, boulevards or planned developments. 2. The design and layout of the proposed development will not interfere with the use and enjoyment of neighboring existing or future developments, and will not create traffic or pedestrian hazards: The proposed building will not interfere with the use or enjoyment of neighboring existing or future developments because the use of the project site is designated for commercial uses and surrounded by commercial uses to the north, east and west. The proposed building will not interfere with vehicular or pedestrian movements, such as access or other functional requirements. A traffic analysis report concluded that the proposed project would not cause any intersections or street segments in the vicinity to operate an unacceptable level of service. All intersections and roadway segments will continue to maintain an acceptable level of service. in addition, the project site is prohibited from semi -trucks 3 Planning Commission Resolution No. 2013 -XX accessing the site due to the narrow width of the driveway. This prohibition would only allow smaller service/delivery trucks to access the site. The project is conditioned to include this prohibition in the Covenants, Conditions, and Restrictions as well as the reciprocal parking and access agreement, subject to review and approval by the Planning Division, Public Works/Engineering Department and City Attorney. 3. The architectural design of the proposed development is compatible with the character of the surrounding neighborhood and will maintain and enhance the harmonious, orderly and attractive development contemplated by this chapter, the general plan, or any applicable specific plan: The architectural style is a contemporary modern style and is designed to be compatible with the character of the neighborhood and further enhances the visual quality of the neighborhood. There is no specific plan for the project area. 4. The design of the proposed development will provide a desirable environment for its occupants and visiting public as well as its neighbors through good aesthetic use of materials, texture and color, and will remain aesthetically appealing: The design of the new proposed building is a contemporary modern style of architecture. Variation in the building elements has been achieved through the utilization of varying architectural features such as higher parapet walls for the lobby entrance, tall storefront glazing at the rear corner of the building, reveals on the elevations, and different use of building colors and materials. The project has a sense of balance, involving well-proportioned masses and composition. The incorporation of an alcove for the entrance/lobby area brings the building to an intimately scaled, human level. 5. The proposed development will not be detrimental to the public health, safety or welfare or materially injurious (e.g., negative effect on property values or resale(s) of property) to the properties or improvements in the vicinity: Before the issuance of any City permits, the proposed project is required to comply with all conditions within the approved resolution, and the Building and Safety Division and Public Works Departments, and L.A. County Fire Department requirements. The referenced agencies through the permit and inspection process will ensure that the proposed project is not detrimental to the public health, safety or welfare or materially injurious to the properties or improvements in the vicinity. 6. The proposed project has been reviewed in compliance with the provisions of the California Environmental Quality Act (CEQA): Staff prepared an initial study and determined that the proposed project qualifies for a Mitigated Negative Declaration as the proposed project will not have a significant effect on the environment by properly conditioning the project ('mitigation measures') to make the project acceptable. In accordance to the 4 Planning Commission Resolution No. 2013 -XX provisions of Section 15070 of the CEQA Guidelines, the City prepared and Ned a Notice of Availability and Intent to Adopt Mitigated Negative Declaration for the project on May 23, 2013, with the Los Angeles County Clerk. Pursuant to CEQA Section 15105, the public review period for the Negative Declaration began May 31, 2013, and ended June 20, 2013, Tentative Map Findings: Pursuant to Subdivision Code Section 21.20.080 of the City's Subdivision Ordinance, the Planning Commission makes the following findings: 1. The proposed subdivision, together with the provisions for its design and improvement, is consistent with the general plan and any applicable specific plan: The proposed project involves the condominium subdivision of the site with 11 office units, and approximately 0.72 acres of parking areas, driveway easements, and landscaping. The General Plan land use designation for the site is Light Industrial (I). The proposed project is consistent with the General Plan land use designation. The project site is not a part of any specific plan. 2. The site is physically suitable for the type and proposed density of development: The proposed condominium subdivision will be consistent with the General Plan land use designation of Light Industrial, which allows for the development of 11 office units in a 21,794 square -foot building. The building will have an approximately 52' setback from Brea Canyon Road and 20' from Washington Street and is located within an urbanized area adequately served by existing roadways and infrastructure. Therefore the property is physically able to accommodate the proposed development. 3. The design of the subdivision or the proposed improvements will not cause substantial environmental damage or injure fish or wildlife or their habitat: The design of the subdivision or the proposed improvements will not cause substantial environmental damage or injure fish or wildlife or their habitat because the existing site is located in an urbanized area that does not contain habitats or would otherwise injure fish or wildlife or their habitat. 4. The design of the subdivision or type of improvements will not cause serious public health or safety problems: The proposed subdivision or type of improvements are not likely to cause serious public health or safety problems because the existing site is located in an urbanized area and is consistent with other similar improvements in the area. 5. The design of the subdivision or type of improvements will not conflict with easements, acquired by the public at large for access through or use of, property within the proposed subdivision: 5 Planning Commission Resolution No. 2013 -XX A condition of approval is added to the project requiring a reciprocal parking and access agreement with the existing lot to the north of the project site for the use and access of all common roads, driveways, parking, and easement areas, prior to final map approval. 6. The discharge of sewage from the proposed subdivision into the community sewer system would not result in violation of existing requirements prescribed by the California Regional Water Quality Control Board: The project site shall be served by a separate sewer lateral which shall not cross any other lot lines. In the event that it is determined that each lot is not serviced by a separate independent sewer lateral, joint sewer maintenance and sewer line easements which cross the lot lines shall be identified in the joint agreements between properties. Therefore, no further environmental review is required. The applicant shall construct the sewer system in accordance with the City Building and Safety Division and County Sanitation District Standards prior to building occupancy. 7. A preliminary soils report or geologic hazard report does not indicate adverse soil or geologic conditions: The existing pad was previously improved with buildings. Further grading will be constructed, operated, and maintained in accordance with the recommendations contained in the preliminary geotechnical investigation to assure that geotechnical stability is maintained or increased. 8. The proposed subdivision is consistent with all applicable provisions of the City's subdivision ordinance, the development code, and the subdivision map act: The proposed subdivision is consistent with the City's subdivision ordinance, subdivision map act, and applicable development code. The proposed building complies with all required setbacks and development code regulations. Parking Permit Findings (DBMC Section 22.30.050) The intent of the parking regulations, which is to ensure that sufficient parking will be provided to serve the use intended and potential future uses of the subject site, is preserved: The proposed professional office building is 21,794 square feet, and requires 60 parking spaces. The existing gross floor area of the one story industrial office/warehouse building to the north of the project site is 20,571 square feet, and requires 31 parking spaces. There are 37 spaces proposed to be provided on the project site and the lot to the north has 54 spaces. Therefore, there will be 91 spaces, and will comply with the requirement. A parking permit is approved in compliance with Section 22.30.050 (Reduction of off-street parking requirements for shared uses): 6 Planning Commission Resolution No. 2013 -XX When reviewing parking impacts, the various uses and peak business hours for those uses are taken into consideration. The existing industrial office and warehouse building and the proposed office building have different uses which results in a range of peak business hours and parking demands. In addition, the proposed parking spaces as well as the existing parking supply to the north of the project site are adequate and can accommodate shared spaces. Due to this, staff does not foresee any parking issues resulting from the proposed use. In addition, the property to the north of the project site is not heavily congested or utilized. Based on the findings and conclusions set forth herein and as prescribed under DBMC Sections 21.20.080 and 22.30.050, this Planning Commission hereby finds and recommends that the City Council adopt the Mitigated Negative Declaration and approve the Development Review, Tentative Tract Map and Parking Permit, subject to the following conditions, and the attached Standard Conditions of Approval: A. GENERAL 1. The subdivision shall comply with the Conditions of Approval attached hereto and referenced herein. 2. The applicant shall comply with the requirements of Planning and Building & Safety Divisions, Public Works/Engineering Department, and the Los Angeles County Fire Department. 3. This approval shall not be effective for any purpose until the applicant/owner of the property involved has filed, within twenty-one (21) days of approval of this Development Review, Tentative Tract Map No. 72067 and Parking Permit No. PL2012-455, at the City of Diamond Bar Community Development Department, an affidavit stating that the applicant/owner is aware of and agree to accept all the conditions of this approval. Further, this approval shall not be effective until the applicant pay the remaining City processing fees. 4. The applicant shall comply with Diamond Bar Municipal Code Section 22.34.050. A permanent landscape maintenance program shall be implemented ensuring regular irrigation, fertilization, and weed removal. All landscaping shall be maintained in a healthy, neat and orderly condition, free of weeds and debris and with operating irrigation at all times. B. DEVELOPMENT REVIEW 1. This approval is for the site plan, elevations, exterior materials,. and conceptual landscape plans for a new 21,794 square -foot, two-story professional office building to be constructed at 650 Brea Canyon Road, as described in the staff report and depicted on the approved plans on file with the Planning Division, subject to the conditions in this Resolution. 7 Planning Commission Resolution No. 2013 -XX 2. The construction documents submitted for plan check shall be in substantial compliance with the architectural plans approved by the City Council, as modified pursuant to the conditions below. If the plan check submittal is not in substantial compliance with the approved Development Review submittal, the plans may require further staff review and re -notification of the surrounding property owners, which may delay the project and entail additional fees. 3. Within five (5) days following approval, the applicant shall submit a $2,156.24 Department of Fish and Game filing fee pursuant to Section 711.4(c) of the Fish and Game Code. 4. The Mitigation Monitoring and Reporting Program outlined in the Mitigated Negative Declaration and approved by the City shall be implemented and complied with. 5. Prior to building permit issuance, landscape and irrigation plans shall be submitted for review and approval by the City's Consulting Landscape Architect and shall comply with the Water Conservation Landscaping Ordinance. 6. The final landscape plans shall show that the three Mexican pale verde trees are replaced with a non-invasive species, and additional groupings of a more transitional plant layout shall be added along Washington Street and the corner of Washington Street and Brea Canyon Road in order to blend into the existing landscape. These items will be verified during landscape plan check. 7. All existing landscaping and public improvements damaged during construction shall be repaired or replaced upon project completion. 8. Prior to plan check submittal, submit catalog cut sheets of the parking lot light poles for review and approval by the Planning Division. C. TENTATIVE TRACT MAP 1. The development shall comply with the specific requirements of Chapter 21.30 (Subdivision Design and Improvement Requirements) and Chapter 21.34 (Improvement Plans and Agreements) of the Subdivision Ordinance, as applicable. 2. The approval of Tentative Tract Map No. 72067 expires within three years from the date of approval if the recordation of the map has not been exercised as defined per Diamond Bar Municipal Code (DBMC) Section 21.20.140. The applicant may request in writing for a time extension if submitted to the City no less than 30 days prior to the approval's expiration date, subject to DBMC Section 21.20.150 for City Council approval. 8 Planning Commission Resolution No. 2013 -XX 3. Prior to final map approval, the Covenants, Conditions, and Restrictions (CC&R's) that governs the 11 -unit condominium building shall be submitted for review and approval by the City Attorney. D. PARKING PERMIT 1. Prior to final map approval, a reciprocal access and parking agreement for the use and access of all common roads, driveways, parking, and easement areas shall be reviewed and approved by the Planning Division, Public Works/Engineering Department and City Attorney, and recorded with the Los Angeles County Recorder's Office. The Planning Commission shall: (a) Certify to the adoption of this Resolution; and (b) Forthwith transmit a certified copy of this Resolution to the City Council of the City of Diamond Bar. APPROVED AND ADOPTED THIS 25TH DAY OF JUNE 2013, BY THE PLANNING COMMISSION OF THE CITY OF DIAMOND BAR. M Steve Nelson, Chairman I, Greg Gubman, Planning Commission Secretary, do hereby certify that the foregoing Resolution was duly introduced, passed, and adopted by the Planning Commissions of the City of Diamond Bar, at a regular meeting of the Planning Commission held on the 25 day of June 2013, by the following vote: AYES: Commissioners: NOES: Commissioners: ABSTAIN: Commissioners: ABSENT: Commissioners: ATTEST: Greg Gubman, Secretary 9 Planning Commission Resolution No. 2013 -XX COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS USE PERMITS, COMMERCIAL AND RESIDENTIAL NEW AND REMODELED STRUCTURES PROJECT #: Development Review Tentative Tract Map No. 72067 and Parking Permit Planning Case No. PL 2012-455 SUBJECT: A Development Review to construct a new 21,794 square - foot professional office building Tentative Tract Map to subdivide air space for an 11 -unit office condominium, and Parking Permit to share driveway access and parking between the proposed development and the lot to the north of the project site. PROPERTY OWNER/ APPLICANT: Peichin Lee of Brea Canyon Investments, LLC, 17528E Rowland Street #200 City of Industry, CA 91748 LOCATION: 650 Brea Canyon Road, Diamond Bar, CA 91789 ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DIVISION AT (909) 839-7030, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: 9. GENERAL REQUIREMENTS In accordance with Government Code Section 66474.9(b) (1), the applicant shall defend, indemnify, and hold harmless the City, and its officers, agents and employees, from any claim, action, or proceeding to attack, set-aside, void or annul the approval of Development Review, Tentative Tract Map and Parking Permit No. PL2012-455 brought within the time period provided by Government Code Section 66499.37. In the event the city and/or its officers, agents and employees are made a party of any such action: 10 Planning Commission Resolution No. 2013 -XX (a) Applicant shall provide a defense to the City defendants or at the City's option reimburse the City its costs of defense, including reasonable attorneys fees, incurred in defense of such claims. (b) Applicant shall promptly pay any final judgment rendered against the City defendants. The City shall promptly notify the applicant of any claim, action of proceeding, and shall cooperate fully in the defense thereof. 2. This approval shall not be effective for any purpose until the applicant and owner of the property involved have filed, within twenty-one (21) days of approval of this Development Review, Tentative Tract Map and Parking Permit No. PL 2012-455 at the City of Diamond Bar Community Development Department, their affidavit stating that they are aware of and agree to accept all the conditions of this approval. Further, this approval shall not be effective until the applicants pay remaining City processing fees, school fees and fees for the review of submitted reports. 3. All designers, architects, engineers, and contractors associated with this project shall obtain a Diamond Bar Business License, and zoning approval for those businesses located in Diamond Bar. 4. Signed copies of City Council Resolution No. 2013 -XX, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all partied involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency proper to issuance of City permits (such as grading, tree removal, encroachment, building, etc.) or prior to final map approval in case of a custom lot subdivision, or approved use has commenced, whichever comes first. , 6. Revised plans incorporating all Conditions of Approval shall be submitted for Planning Division review and approval during plan check. 7. Prior to any use of the project site or business activity being commenced thereon, all conditions of approval shall be completed. 8. The project site shall be maintained and operated in full compliance with the conditions of approval and all laws, or other applicable Federal, State, or City regulations. 9. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and any applicable Specific Plan in effect at the time of building permit issuance. 10. Property owner/applicant shall remove the public hearing notice board within three (3) days of this project's approval. 11 Planning Commission Resolution No. 2013 -XX 11. The applicant shall comply with the requirements of Planning and Building and Safety Divisions, Public Works/Engineering Department, and the Los Angeles County Fire Department. 12. These conditions of approval shall run with the land and shall be binding upon all future owners, operators, or successors thereto of the property. Non- compliance with any condition of approval or mitigation measure imposed as a condition of this approval, shall constitute a violation of the City's Development Code. Violations may be enforced in accordance with the provisions of the Development Code. 13. To ensure compliance with the provisions of the City Council design approval, a final inspection is required from the Planning Division when work for any phase of the project has been completed. The applicant shall inform the Planning Division and schedule an appointment for such an inspection. 14. Failure to comply with any of the conditions set forth herein or as subsequently amended in writing by the City, may result in failure to obtain a building final and/or a certificate of occupancy until full compliance is reached. The City's requirement for full compliance may require minor corrections and/or complete demolition of a non-compliance improvement, regardless of costs incurred where the project does not comply with design requirements and approvals that the applicant agreed to when permits were pulled to construct the project. B. FEES/DEPOSITS 1. Applicant shall pay development fees (including but not limited to Planning, Building and Safety Divisions, and Public Works Department and Mitigation Monitoring) at the established rates, prior to issuance of building permits, as required by the City. School fees as required shall be paid prior to the issuance of building permit. In addition, the applicant shall pay all remaining prorated City project review and processing fees prior to final map approval. 2. Prior to final map approval, all deposit accounts for the processing of this project shall have no deficits. C. TIME LIMITS 1. The approval of Development Review, Tentative Tract Map, and Parking Permit shall expire within three (3) years from the date of approval if the use has not been exercised as defined pursuant to Diamond Bar Municipal Code Section 21.20.140 and 22.66.050(b)(1). In accordance with Diamond Bar Municipal Code Section 22.60.050(c), the applicant may request, in writing, for a one-year time extension for City Council consideration. Such a request must be submitted to the Planning Division prior to the expiration date and be accompanied by the review fee in accordance with the Fee Schedule in.effect at the time of submittal. 12 Planning Commission Resolution No. 2013 -XX D. SITE DEVELOPMENT 1. The project site shall be developed and maintained in substantial conformance with the approved plans submitted to, approved, and amended herein by the City Council, on file with the Planning Division, the conditions contained herein, and the Development Code regulations. 2. All ground -mounted utility appurtenances such as transformers, air conditioning condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berms, and/or landscaping to the satisfaction of the Planning Division.. 3. All roof -mounted equipment shall be screened from public view. 4. All structures, including walls, trash enclosures, canopies, etc., shall be maintained in a structurally sound, safe manner with a clean, orderly appearance. All graffiti shall be removed within 72 hours by the property owners/occupant. 5. No occupancy permit can be granted, until all improvements required by this approval have been properly constructed, inspected, and approved. 6. Prior to issuance of a building permit, the location, size, and screening of all building utility service connections, including water, gas, and electric service, fire service, and irrigation connections shall be approved by the Community Development Director. All changes to building utility connections shall be approved by the Community Development Director prior to construction. Building utility connections shall be located, sized and screened in such a manner that they have the least possible impact on the design of the building and site. The architect of record shall be directly involved in the design and placement of all site and building service connections and shall sign all plans submitted to the City which locate, size and/or screen utility connections. 7. Additional plant materials may be required by the Community Development Director and shall be planted prior to final occupancy in order to screen utility connections, valves, backflow devices, and all above ground appurtenances, etc., to the satisfaction of the Community Development Director. This determination shall be made in the field after all screen utility connections, valves, backflow devices, and all above ground appurtenances, etc. have been installed and inspected. E. SOLID WASTE 1. The site shall be maintained in a condition, which is free of debris both during and after the construction, addition, or implementation of the entitlement approved herein. The removal of all trash, debris, and refuse, whether during or subsequent to construction shall be done only by the property owner, applicant or by a duly permitted waste contractor, who has been authorized by the City to provide collection, transportation, and disposal of solid waste from 13 Planning Commission Resolution No. 2013 -XX residential, commercial, construction, and industrial areas within the City. It shall be the applicant's obligation to insure that the waste contractor used has obtained permits from the City of Diamond Bar to provide such services. 2. Mandatory solid waste disposal services shall be provided by the City franchised waste hauler to all parcels/lots or uses affected by approval of this project. APPLICANT SHALL CONTACT THE PUBLIC WORKS DEPARTMENT, (909) 839-7040, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. GENERAL REQUIREMENTS 1. In accordance with Government Code Section 66474.9(b) (1), the applicant shall defend, indemnify, and hold harmless the City, and its officers, agents and employees, from any claim, action, or proceeding to attack, set-aside, void or annul, the approval of Tentative Tract 72067 brought within the time period provided by Government Code Section 66499.37. In the event the city and/or its officers, agents and employees are made a party of any such action: (a) Applicant shall provide a defense to the City defendants or at the City's option reimburse the City its costs of defense, including reasonable attorneys fees, incurred in defense of such claims. (b) Applicant shall promptly pay any final judgment rendered against the City descendents. The City shall promptly notify the applicant of any claim, action of proceeding, and shall cooperate fully in the defense thereof. B. SOLID WASTE 1. The site shall be maintained in a condition, which is free of debris both during and after the construction, addition, or implementation of the entitlement granted herein. The removal of all trash, debris, and refuse, whether during or subsequent to construction shall be done only by the property owner, applicant or by a duly permitted waste contractor, who has been authorized by the City to provide collection, transportation, and disposal of solid waste from residential, commercial, construction, and industrial areas within the City. It shall be the applicant's obligation to insure that the waste contractor utilized has obtained permits from the City of Diamond Bar to provide such services. 2. Mandatory solid waste disposal services shall be provided by the City franchised waste hauler to all parcels/lots or uses affected by approval of this project. 3. Trash receptacles are required and shall meet City standards. The final design, locations, and the number of trash receptacles shall be subject to Planning Division review and approval prior to the issuance of building permits. 14 Planning Commission Resolution No. 2013 -XX 3. If no centralized trash receptacles are provided, all trash pick-ups shall be for individual units with all receptacles shielded from public view. 4. Central trash enclosures shall be equipped with recycling receptacles. C. GENERAL 1. A title report/guarantee showing all fee owners, interest holders, and nature of interest shall be submitted for final map plan check. An updated title report/guarantee and subdivision guarantee shall be submitted ten (10) business days prior to final map approval. 2. A permit from the Los Angeles County Public Works Department shall be required for work within its right-of-way or connection to its facilities. 3. Prior to final map approval, written certification that all utility services and any other service related to the site shall be available to serve the proposed project and shall be submitted to the City. Such letters shall be issued by the district, utility and cable television company, within ninety (90) days prior to final map approval. 4. Prior to final map approval, applicant shall submit to the City Engineer the detail cost estimates for bonding purposes of all public improvements. 5. Prior to final map approval, if any public or private improvements required as part of this map have not been completed by applicant and accepted by the City, applicant shall enter into a subdivision agreement with the City and shall post the appropriate security. 6. Prior to final map approval all site grading, landscaping, irrigation, street, sewer and storm drain improvement plans shall be approved by the City Engineer, surety shall be posted, and an agreement executed guaranteeing completion of all public and private improvements. 7. Prior to issuance of grading permits, surety shall be posted and an agreement executed guaranteeing completion of all drainage facilities necessary for dewatering all parcels to the satisfaction of the City Engineer. 8. Easements for disposal of drainage water onto or over adjacent parcels shall be delineated and shown on the final map or addressed in the CC&R's, as approved by the City Engineer. 9. Prior to any work performed in the street right-of-way, fees shall be paid and a construction permit shall be obtained from the Public Works Department in addition to any other permits required. 10. Applicant shall label and delineate on the final map any private drives or fire lanes to the satisfaction of the City Engineer. 15 Planning Commission Resolution No. 2013 -XX 11. Easements, satisfactory to the City Engineer and the utility companies, for public utility and public services purposes shall be offered and shown on the final map. Permission shall be obtained from each utility company for any grading or construction over existing easements. 12. After the final map records, applicant shall submit to the Public Works/Engineering Department, at no cost to the City, a full size reproducible copy of the recorded map. Final approval of the public improvements shall not be given until the copy of the recorded map is received by the Public Works/Engineering Department. 13. Prior to occupancy, the applicant shall provide to the City as built mylars, stamped by appropriate individuals certifying the plan for all improvements at no cost to the City. 14. Applicant shall contribute funds to a separate engineering trust deposit against which charges can be made by the City or its representatives for services rendered. Charges shall be on an hourly basis and shall include any City administrative costs. 15. Applicant shall provide digitized information in a format defined by the City for all related plans, at no cost to the City. 16. All activities/improvements proposed for Tentative Tract 72067 shall be wholly contained within the boundaries of the map. Should any off-site activities/improvements be required, approval shall be obtained from the affected property owner and the City as required by the City Engineer prior to issuance of grading permits. 17. A lot line adjustment between Lot II and Lot I as shown on the proposed site plan shall be approved and fully executed prior to grading permit issuance. Additionally, conforming deeds shall be submitted to the Public Works/Engineering Department prior to issuance of grading permits. 18. Addresses for each unit shall be submitted for review and approval by the Public Works/Engineering Department prior to issuance occupancy. D. GRADING 1. No grading or any staging or construction shall be performed prior to final map approval by the City Council and map recordation or grading permit issuance, whichever comes first. All pertinent improvement plans shall be approved by the City Engineer prior to final map approval by the City Council. 2. Prior to beginning any grading activities, appropriate rodent barriers shall be installed around the perimeter of the project site to prevent the migration of 16 Planning Commission Resolution No. 2013 -XX rodents to existing residential and commercial sites. A plan detailing the proposed rodent barriers to be used by the developer/contractor shall be submitted to the Public Works/Engineering Department for review. 3. Retaining wall location shall be shown on the grading plan and submitted with a soils report to the Public Works/Engineering Department for review and approval concurrently with the grading plan check. 4. Exterior grading and construction activities and the transportation of equipment and materials and operation of heavy grading equipment shall be limited to between the hours of 7:00 a.m. and 5:00 p.m., Monday through Saturday. Dust generated by grading and construction activities shall be reduced by watering the soil prior to and during the activities and in accordance with South Coast Air Quality Management District Rule 402 and Rule 403. Reclaimed water shall be utilized whenever possible. Additionally, all construction equipment shall be properly muffled to reduce noise levels. 5. All equipment staging areas shall be located on the project site. Staging area, including material stockpile and equipment storage area, shall be enclosed within a 6 foot -high chain link fence. All access points in the defense shall be locked whenever the construction site is not supervised. 6. Grading of the subject property shall be in accordance with the California Building Code, City Grading Ordinance, Hillside Management Ordinance and acceptable grading practices. 7. At the time of submittal of the 40 -scale grading plan for plan check, a detailed soils and geology report shall be submitted to the City Engineer for approval. Said report shall be prepared by a qualified engineer and/or geologist licensed by the State of California. 8. Prior to issuance of grading permits, storm drain improvement plans shall be approved by the City Engineer and surety shall be posted and an agreement executed guaranteeing completion of all drainage facilities to the satisfaction of the City Engineer. g. Final grading plans shall be designed in compliance with the recommendations of the final detailed soils and engineering geology reports. All remedial earthwork specified in the final report shall be incorporated into the grading plans. Final grading plans shall be signed and stamped by a California Registered Civil Engineer, registered Geotechnical Engineer and registered Engineering Geologist and approved by the City Engineer. 10. A Standard Urban Stormwater Management Plan (SUSMP) conforming to City Ordinance is required to be incorporated into the grading plan and approved by the City Engineer. The applicant shall incorporate Structural or Treatment Control Best Management Practices for storm water runoff into the grading plans for construction and post -construction activities respectively. 17 Planning Commission Resolution No. 2013 -XX 11. All slopes shall be seeded per landscape plan and/or fuel modification plan with native grasses or planted with ground cover, shrubs, and trees for erosion control upon completion of grading or some other alternative method of erosion control shall be completed to the satisfaction of the City Engineer and a permanent irrigation system shall be installed. 12. An erosion control plan shall be approved by the City Engineer. Erosion control plans shall be made in accordance to the City's NPDES requirements. 13. Submit a stockpile plan showing the proposed location for stockpile for grading export materials, and the route of transport. 14. A pre -construction meeting shall be held at the project site with the grading contractor, applicant, and city grading inspector at least 48 hours prior to commencing grading operations. 15. Rough grade certifications by project soils and civil engineers and the as - graded geotechnical report shall be submitted for review and approval prior to issuance of building permits for the foundation of the residential structure. Retaining wall permits may be issued without a rough grade certificate. 16. Final grade certifications by project soils and civil engineers shall be submitted to the Public Works Department prior to the issuance of any project final inspections/certificate of occupancy respectively. E. DRAINAGE 1. All identified flood hazard locations within the tentative map boundaries which cannot be eliminated as approved by the City Engineer shall be shown on the final map and delineated as "Flood Hazard Area." 2. Storm drainage facilities shall be constructed within the street right-of-way or in easements satisfactory to the City Engineer and/or the Los Angeles County Flood Control Districts. 3. Prior to the issuance of a grading permit, a complete hydrology and hydraulic study shall be prepared by a Civil Engineer registered in the State of California to the satisfaction of the City Engineer. 4. A comprehensive maintenance plan/program shall be incorporated into the CC&R's. F. STREET IMPROVEMENT 1. The applicant shall replace and record any centerline ties and monuments that are removed as part of this construction with the Los Angeles County Public Works Survey Division. 18 Planning Commission Resolution No. 2013 -XX 2. Prior to the issuance of any City permits, the applicant shall provide written permission to the satisfaction of the City from any property owners which will be affected by offsite grading. 3. All parking lot improvements shall be completed prior to issuance of any occupancy for the building. G. UTILITIES 1. Easements, satisfactory to the City Engineer and the utility companies, for public utility and public services purposes shall be offered and shown on the final map or addressed in the CC&R's. 2. Prior to final map approval, a water system with appurtenant facilities to serve all lots/parcels in the parcel division designed to the Walnut Valley Water District (WVWD) specifications shall be provided. . 3. Prior to final map approval, the applicant shall construct or enter into an improvement agreement with the City guaranteeing construction of the necessary improvements to the existing water system according to Walnut Valley Water District (WVWD) specifications to accommodate the total domestic and fire flows as may be required by the City Engineer, WVWD and Fire Department. 4. Prior to final map approval or issuance of building permit whichever comes first, written certification that all utility services and any other service related to the site shall be available to serve the proposed project and shall be submitted to the City. Such letters shall be issued by the district, utility and cable television company, if applicable, within ninety (90) days prior issuance of grading permits. 5. Prior to recordation of final map, applicant shall provide separate underground utility services to each parcel per Section 21.30 of Title 21 of the City Code, including water, gas, electric power, telephone and cable TV, in accordance with the respective utility company standards. Easements required by the utility companies shall be approved by the City Engineer. 6. Applicant shall relocate and underground any existing on-site utilities to the satisfaction of the City Engineer and the respective utility owner. 7. Underground utilities shall not be constructed within the drip line of any mature tree except as approved by a registered arborist. H. SEWERS 1. Applicant, at applicant's sole cost and expense, shall construct the sewer system in accordance with the City Building & Safety Division and County Sanitation District Standards prior to occupancy. 19 Planning Commission Resolution No. 2013 -XX 2. Easements for the existing sewer line which crosses property lines shall be offered in the CC&R's. I. TRAFFIC MITIGATIONS 1. Access for full-sized (WB -40 or larger) trucks to the development shall be restricted/prohibited as identified in the LLG report dated March 26, 2013. The CC&R's shall include the restriction/prohibition. This prohibition shall be applied to all tenants of the existing building and proposed project. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION, (909) 839-7020, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: 1. Plans shall conform to current State and Local Building Code (i.e. Currently the 2010 California Building Code, California Plumbing Code, California Mechanical Code, and the California Electrical Code but the 2013 version will apply if plan check applied after January 1, 2014) requirements and all other applicable construction codes, ordinances and regulations in effect at the time of plan check submittal. 2. Provisions for Cal Green shall be implemented onto plans and certification provided by a third party as required by the Building Division. Specific water, waste, low VOC, and related conservation measures shall be shown on plans. 3. Occupancy of the facilities shall not commence until such time as all California Building Code and State Fire Marshal regulations have been met. The buildings shall be inspected for compliance prior to occupancy. 4. Every permit issued by the Building and Safety Division shall expire if the building or work authorized by such permit is not commenced within 180 days from the date of such permit or work has discontinued and not been signed -off on the job card by the building inspector. 5. Construction activities causing the operation of any tools or equipment used in construction, drilling, repair, alteration, or demolition work shall be conducted Mon. — Sat. between the hours of 7:00 a.m. and 7:00 p.m. 6. The project shall be protected by a construction fence to the satisfaction of the Building Official. All fencing shall be view obstructing with opaque surfaces. 7. All structures and property shall be maintained in a safe and clean manner during construction. The property shall be free of debris, trash, and weeds. 8. All equipment staging areas shall be maintained in an orderly manner and screened behind a minimum 6' high fence. 9. Solid waste management of construction material shall incorporate recycling material collection per Diamond Bar Municipal Code 8.16 of Title 8. 20 Planning Commission Resolution No. 2013 -XX 10. The minimum design load for wind in this area is 85 M.P.H. exposures "C and the site is within seismic zone D or E. The applicant shall submit drawings and calculations prepared by a California State licensed Architect/Engineer with wet stamp and signature. 11. This project shall comply with all Accessibility Code requirements including accessible parking, path of travel, elevators, restrooms, drinking fountains, etc. Provide compliance with van accessible parking, path of travel, etc. Reception counter shall comply with the Title 24 accessibility requirements. 12. Submit Public Works Department approved grading plans showing clearly all finish elevations, drainage, and retaining walls locations. 13. "Separate permit shall be required for all wall and monument signs, light poles, and retaining walls" and shall be noted on plans. 14. A height and setback survey may be required at completion of framing and foundations respectively. 15. Prior to Building permit issuance, all school district fees must be paid. Please obtain a form from the Building and Safety Division to take directly to the school district. 16. Provide exit analysis showing occupant load for each space, exit width, exit signs, etc. 17. Indicate the proposed addition and existing building on the plans. Submit code analysis and justification showing the following: a. Each building square foot b. Each building height C. Type of construction d. Sprinkler system e. Each group occupancy f. Property line location in relation to each building (side yard) g. Exit analysis for each building (occupant load/corridor rating/exit width/exit signs, etc.) h. Accessibility analysis for the entire site and for each building i. Shaft rating/ exterior walls construction/ opening protection 18. Guardrails shall be designed for 20 load applied laterally at the top of the rail. 19. Indicate all easements on the site plan. 20. All retaining walls shall be submitted to the Building & Safety and Public Work Departments for review and approval 21 Planning Commission Resolution No. 2013 -XX 21. Submit grading plans showing clearly all finish elevations, drainage, and retaining wall locations. No building permits shall be issued prior to submitting a pad certification. 22. The project shall be protected by a construction fence and shall comply with the NPDES & BMP requirements (sand bags, etc.). 23. Check drainage patterns with Engineering Department. Surface water shall drain away from building at a 2% minimum slope. 24. Specify location of tempered glass as required by code. 25. Private property sewer system shall be approved by the Los Angeles County Sanitation District. 26. Special inspections and structural observation will be required in conformance to CBC 1704 to 1709. 27. A soils report is required and all recommendations of the soils report shall be adhered to. 28. The applicant shall contact Dig Alert and have underground utility locations marked by the utility companies prior to any excavation. Contact Dig Alert by dialing 811 or their website at www.digalert.org. 29. The location of property lines and building pad may require a survey. 30. AQMD notification is required at least 10 days prior to any demolition. 31. All workers on the job shall be covered by workman's compensation insurance under a licensed general contractor. 32. Any changes to approved plans during the course of construction shall be approved by the City prior to proceeding with any work. 33. All handrails for accessible features shall be continuous with no jogs or skewed areas. They must remain straight. 34. Landings for ramps in the public way shall be verified prior to permit issuance that they are level with at most 2% cross -slope. Any modification to the ramp shall obtain Public Works approval. 35. Number of plumbing fixtures shall be in compliance with CPC T-4-1. CBC Chapter 29 shall not be used for calculations for plumbing fixtures. 36. Slope setbacks consistent with California Building Code Figure 1805.3.1. Foundations shall provide a minimum distance to daylight. The Footings adjacent to Washington and Brea Canyon shall have the appropriate slope setback. 22 Planning Commission Resolution No. 2013 -XX 37.- Fire Department approval is required. 38. The use shall not be for medical office. If used for medical office, a covered entry and additional accessible parking will be required. 39. The path of travel from accessible parking to the entry at the v -gutter shall be 2% slope in any direction and shall maintain drainage path to the satisfaction of Public Works and the Building Inspector. APPLICANT SHALL CONTACT THE LOS ANGELES COUNTY FIRE DEPARTMENT, (323) 890-4243, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. SUBDIVISION 1. Access shall comply with Section 503 of the Fire Code, which requires all weather access. All weather access may require paving. 2. Fire Department Access shall be extended to within 150 feet distance of any exterior portion of all structures. 3. Where driveways extend further than 150 feet and are of single access design, turnarounds suitable for fire protection equipment use shall be provided and shown on the final map. Turnarounds shall be designed, constructed and maintained to insure their integrity for Fire Department use. Where topography dictates, turnarounds shall be provided for driveways that extend over 150 feet in length. 4. Private driveways shall be indicated on the final map as "Private Driveway and Firelane" with the widths clearly depicted and shall be maintained in accordance with the Fire Code. All required fire hydrants shall be installed, tested and accepted prior to construction. 5. Vehicular access must be provided and maintained serviceable throughout construction to all required fire hydrants. All require fire hydrants shall be installed, tested and accepted prior to construction. 6. Provide Fire Department or City approved street signs and building access number prior to occupancy. 7. The final map shall be submitted to our office for review and approval prior recordation. B. WATER SYSTEM REQUIREMENTS 1. Fire hydrant requirements are as follows: Install 1 public fire hydrant. 23 Planning Commission Resolution No. 2013 -XX 2. All hydrants shall measure 6"x 4'k 21/2" brass or bronze, conforming to current AWWA standard C503 or approved equal. All on-site hydrants shall be installed a minimum of 25 feet from a structure or protected by a two (2) hour rated firewall. • Location: As per map on file with the office. • Other location: See attached map. 3. All required fire hydrants shall be installed, tested and accepted or bonded for prior to Final Map approval. Vehicular access shall be provided and maintained serviceable throughout construction. 4. Additional water system requirements will be required when this land is further subdivided and/or during the building permit process. 5. Fire hydrant improvement plans shall be submitted to our office prior to clearance of the Final Map. END 24 Planning Commission Resolution No. 2013 -XX Attachment 2 DIL�lO�D Bi11C ORIGINALFILED NOTICE OF AVAILABILITY �, 1 INTENT TO • .' DECLARATION CopleyCity of Diamond Bar, 218110 )839-7030 NOTICE: Pursuant to the provisions of the California Environmental Quality Act (CEQA — Public Resources Code, Section 21100 et. Seq.), the City of Diamond Bar has determined that the project referenced hereinafter will not have a significant effect on the environment. A draft Mitigated Negative Declaration has been prepared for review and approval in connection with project approvals and conditions of approval that the City proposes to impose on the project. PROJECT TITLE: Tentative Tract Map No. 72067, Development Review and Parking Permit (Planning Case No. PL2012-455) PROJECT ADDRESS: 650 Brea Canyon Road, Walnut, CA 91789 PROJECT DESCRIPTION: The applicant is requesting Development Review approval to construct a 21,794 square -foot, new two-story professional office building on a 42,333 square -foot (0.97 acre), Office Professional (OP) zoned parcel with an underlying General Plan land use designation of Light Industrial. A Tentative Tract Map is requested to subdivide air space for an 11 -unit office condominium and a Parking Permit to share driveway access and parking between the proposed development and lot to the north'of the project site. PROPERTY OWNER: Peichin Lee of Brea Canyon Investments, LLC, 17528 E. Rowland Street #200, City of Industry, CA 91748 APPLICANT: Brea Canyon Investments, LLC, 17528 E. Rowland Street#200, City of Industry, CA 91748 A copy of the Initial Study, documenting reasons to support the findings that said project would not have a significant effect and contains mitigation measures in the project to avoid potentially significant effects, is attached hereto for public review and available at the Planning Division. An Environmental Impact Report is not required for this project. Environmental Determination: Pursuant to the provisions of the California Environmental Quality Act (CEQA), Section 15070, the City prepared an Initial Study and Mitigated Negative Declaration for this project. Pursuant to CEQA Section 15105, the public review period for the Mitigated Negative Declaration begins May 31, 2013 and ends June 20, 2013. The Diamond Bar Planning Commission will consider whether or not to recommend approval to the City Council to adopt the proposed Mitigated Negative Declaration at the following regularly scheduled meeting: TIME OF HEARING: 7:00 p.m. (or as soon thereafter that the matter can be heard) DATE OF PUBLIC HEARING: Tuesday, June 25, 2013 LOCATION: Diamond Bar City Hall — Windmill Community Room 21810 Copley Drive Diamond Bar, California 91765 CASE MATERIALS are available for review between the hours of 7:30 a.m. and 5:30 p.m. Monday through Thursday and 7:30 a.m. to 4:30 p.m. on Friday, at the City of Diamond Bar, Community Development Department/Planning Division, 21825 Copley Dr., Diamond Bar, CA 91765. OATentative Maps\Brea Canyon Rd. 650 TTM PL2012-455\Notice of Intent.doc INITIAL STUDY/ ENVIRONMENTAL CHECKLIST FORM CITY OF DIAMOND BAR - 21810 COPLEY DRIVE - DIAMOND BAR, CA 91765 - TEL. (909) 839-7030 1. Project title: CGM Brea Canyon Business Center (Planning Case No. PL2012-455) 2. Lead agency name and address: City of Diamond Bar, 21810 Copley Drive, Diamond Bar, CA 91765 3. Contact person and phone number: Grace S. Lee, Senior Planner, 909-839-7081 4. Project location: 650 Brea Canyon Road, Walnut, CA 91789 (Assessor's Parcel Number 8719-010-901) 5. Project sponsor's name and address: Peichin Lee of Brea Canyon Investments, LLC, 17528 E. Rowland Street #200, City of Industry, CA 91748 6. General Plan Designation: Light Industrial 7. Zoning: Office Professional (OP) 8. Description of project: (Describe the whole action involved, including but not limited to later phases of the project, and any secondary, support, or off-site features necessary for its implementation. Attach additional sheets if necessary) The applicant is requesting a Development Review approval to construct a 21,794 square - foot, new two-story professional office building on a vacant 42,333 square -foot (0.97 acre), Office Professional (OP) zoned parcel with an underlying General Plan land use designation of Light Industrial. A Tentative Tract Map is requested to subdivide air space for an 11 -unit office condominium and a Parking Permit to share driveway access and parking between the proposed development and lot to the north of the project site. 9. Surrounding land uses and setting: (Briefly describe the project's surroundings) North: Office/warehouse building (Light Industry) zone. South: Multiple -Family Residence in RM (Medium Density Residential) zone. West: Office Industrial Park (Light Industry) zone. East: Public Storage Facility (Light Industry) zone. 10. Other public agencies whose approval is required (e.g., permits, financing approval, or participation agreement): Department of Transportation ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact" as indicated by the checklist on the following pages. Agricultural Resources X Air Quality AestheResources tics Cultural Resources GeologylSoiis Biological Greenhouse Gas Emissions Hazards & Hazardous Materials Noiselogy�ater Quality Land Use/Planning Mineral Resources Recreation Population/Housing Public Services Mandatory Findings of X TransportationlTraffic Utilities/Service Systems Significance DETERMINATION: (To be completed by the Lead Agency) On the basis of this initial evaluation: iuponthat the proposed project COULD NOT have a significant effect on the environment, and a ATIVE DECLARATION will be prepared. that although the proposed project could have a significant effect on the environment, there will not significant effect in this case because revisions in the project have been made by or agreed to by the ct proponent. A MITIGATED NEGATIVE DECLARATION will be prepared. nd that the proposed project MAY have a significant effect on the environment, and an IRONMENTAL IMPACT REPORT is required. y g p otentiall si nificant unless d that the proposed project MAY have a "potential) si nificant im act" or' p y 9 gated" impact on the environment, but at least one effect 1) has been adequately analyzed in an earlier ument pursuant to applicable legal standards, and 2) has been addressed by mitigation measures ed on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT e uired, but it must analyze only the effects that remain to be addressed. nd that although the proposed project been have a analyzed gnificant ad adequately inoanthe earlierr EIRent, because all or NEGATIVE entially significant effects (a) CLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that rlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed on the proposed project, nothing further is required. Date: 05123(2013 Signature: Printed Name: Grace S. Lee, Senior Planner For: City of Diamond Bar EVALUATION OF ENVIRONMENTAL IMPACTS: mpact" answers that 1} A brief explanation information gsourdces alead agency citanswers es inithelparentheses following each question• supported byif the A "No Impact" answer applygto projectsP e referenced is adeuately kehe one involved(e.g., the tproje tufalls outs deka the impact simply s Id be explained where itis based on project -specific factors rupture zone). A "No Impact" answer shou as well as general standards (e.g., the project will not expose sensitive receptors to pollutants, based on a project specific screening analysis). Page 2 2) All answers must take account of the whole action involved, including off-site as well as on-site, cumulative as well as project -level, indirect as well as direct, and construction as well as operational impacts. 3) Once the lead agency has determined that a particular physical impact may occur, then the checklist answers must indicate whether the impact is potentially significant, less than significant with mitigation, or less than significant. "Potentially Significant Impact" is appropriate if there is substantial evidence that an effect is significant. If there are one or more "Potentially Significant Impact" entries when the determination is made, an EIR is required. 4) "Negative Declaration: Less Than Significant With Mitigation Incorporated" applies where the incorporation of mitigation measures has reduced an effect from "Potentially Significant Impact" to a "Less than Significant Impact." The lead agency must describe the mitigation measures, and briefly explain how they reduce the effect to a less than significant level (mitigation measures from Section XVII, "Earlier Analyses," may be cross-referenced). 5) Earlier analyses may be used where, pursuant to the tiering, program FIR, or other CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration. Section 15063(c)(3)(D). In this case, a brief discussion should identify the following: a.) Earlier Analysis Used. Identify and state where they are available for review. b.) Impacts Adequately Addressed. Identify which effects from the above checklist were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such effects were addressed by mitigation measures based on the earlier analysis. C.) Mitigation Measures. For effects that are "Less than Significant with Mitigation Measures Incorporated," describe the mitigation measures which were incorporated or refined from the earlier document and the extent to which they address site-specific conditions for the project. 6) Lead agencies are encouraged to incorporate into the checklist references to information sources for potential impacts (e.g., general plans, zoning ordinances). Reference to a previously prepared or outside document should, where appropriate, including a reference to the page or pages where the statement is substantiated. 7) Supporting Information Sources: A source list should 'be attached, and other sources used or individuals contacted should be cited in the discussion. 8) This is only a suggested form, and lead agencies are free to use different formats; however, lead agencies should normally address the questions from this checklist that are relevant to a project's environmental effects in whatever format is selected. 9) The explanation of each issue should identify: a) The significance criteria or threshold, if any, used to evaluate each question; and b) The mitigation measure identified, if any, to reduce the impact to less than significance. Page 3 QUESTIUN: Potentially Potentially Significant Less than No significant unless Significan impact Impact Mitigation t Impact ISSUES Incorporated t nFGTHFTICS. Would the project: Impact Discussion: There is no scenic vista around the subject property. The project site is located on a vacant lot and the surrounding area is located in an urbanized area. b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? X Impact Discussion: No officially designated State scenic routes or highways occur near the project site. The project site is near the SR 60. The existing site is a vacant lot. There are no scenic resources, trees, rock outcroppings and historic buildings within the vicinity of the project site. the character or quality of 051 the site and its surroundings e Impact Discussion: The project site is located on a vacant lot and the surrounding area is urbanized. The proposed project will be consistent with the City's Development Code and Citywide Design Guidelines. As such, the proposed project will not degrade the existing visual character or quality of the site and its surrounding. d) Create a new source of substantial light or glare which would X adversely affect day or nighttime views in the area? Impact Discussion: The project site is located on a vacant lot. The surrounding area is currently urbanized. As part of the proposed project, parking lot lighting will be included. To reduce the impact on adjacent properties, any new exterior lighting will be directed away or shielded from adjacent properties and confined within the boundaries of the property pursuant to the development code. With compliance with the Development Code, any significant impact of light and glare will be reduced to a level of insignificance. Page 4 IL AGRICULTURE RESOURCES. In determining wnener unpaus w dyucuuuidi IcSOUICUS c significant environmental effects, lead agencies, may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Dept. of Conservation as an optional model to use in assessing impacts on agriculture and farmland. In determining whether impacts to forest resources, including timberland, are significant environmental effects, lead agencies may refer to information compiled by the California Department of Forestry and Range Assessment project and the Forest Legacy Assessment project; and forest carbon measurement methodology provided in Forest Protocols adopted by the California Air Resources Board. Would the project: a) Convert Prime Farmland, Unique Farmland, or Farmland of Potentially Statewide Importance (Farmland), as shown on the maps Potentially Significant Less than No =ISSUES Significant Unless Significan Impact Program of the California Resources Agency, to non-agricultural Impact Mitigation t Impact use? Incorporated IL AGRICULTURE RESOURCES. In determining wnener unpaus w dyucuuuidi IcSOUICUS c significant environmental effects, lead agencies, may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Dept. of Conservation as an optional model to use in assessing impacts on agriculture and farmland. In determining whether impacts to forest resources, including timberland, are significant environmental effects, lead agencies may refer to information compiled by the California Department of Forestry and Range Assessment project and the Forest Legacy Assessment project; and forest carbon measurement methodology provided in Forest Protocols adopted by the California Air Resources Board. Would the project: a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps X prepared pursuant to the Farmland Mapping and Monitoring X Program of the California Resources Agency, to non-agricultural use? Impact Discussion: The project site is not designated as Prime Farmland, Unique Farmland or Farmland of Statewide Importance. There are no agricultural activities on or near the proposed project site. Project implementation would not result in the conversion of farmland to non-agricultural use. Therefore the proposed project would have no impacts to farmlands. b) Conflict with existing zoning for agricultural use, or a X Williamson Act contract Impact Discussion: Implementation of the proposed project would not conflict with existing zoning for agricultural use, or a Williamson Act contract. Therefore no impacts would result from the construction or operation of the proposed project. c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code Section 12220(g)), timberland (as defined by Public Resources Code Section X 4526), or timberland zoned Timberland Production (as defined by Government Code Section 51104(g))? Impact Discussion: There are no forestland, timberland or timberland zoned Timberland Production uses that are occurring on-site or in the immediate vicinity. Thus, the proposed project does not involve changes in the existing environment that could conflict with existing zoning or cause of rezoning of forestland, timberland, or timberland zoned Timberland Production. d) Result in the loss of forest land or conversion of forest land to X non -forest use? Impact Discussion: There are no forest land uses that are occurring on-site or in the immediate vicinity. There is minimal amount of vegetation within the area, and no protected trees are located on-site. Thus, the proposed project does not involve changes in the existing environment that could result in loss of forest land or conversion of forest land to non -forest use. Page 5 ISSUES e) Involve other changes in t to their location or nature, Farmland, to non-agriculti e existing environment which, due could result in conversion of ral use? Potentially I Significant significant Unless Impact Mitigation Less than I No Significan Impact I Impact X Impact Discussion: There are no farmland uses that are occurring on-site or in the immediate vicinity. Thus, the proposed project does not involve changes in the existing environment that could result in conversion of Farmland to non-agricultural uses. ISSUES Potentially Potentially Significant significant Unless Impact Mitigation Incorporated Less than I No Signiflcan Impact t Impact III. AIR QUALITY. Where available, the significant criteria established by the applicable air quality management or air pollution control district may be relied upon to make the following determinations. Would the project: a) Conflict with or obstruct implementation of the applicable air X quality Ian? b) Violate any air quality standard or contribute substantially to an X existing or projected air quality violation? c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non -attainment X under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors ? rl) Expose sensitive receptors to substantial pollutant X Impact Discussion for a -d: The proposed project does not involve long-term changes to land use or other growth -inducing actions that could impact compliance with or implementation of the Air Quality Management Plan. The construction of a 21,794 square -foot commercial office building will exceed the thresholds for maximum daily construction emissions for pollutants and therefore mitigation is required and included below. After the completion of the construction activities, it is not anticipated that there will be an increase in emissions from operational activities of a 21,794 square -foot commercial office building. A 21,794 square -foot commercial office building falls well below thresholds for maximum daily operation emissions of 96,221 square feet as defined in Table 6-2 of the South Coast Air Quality Management District CEQA Air Quality Handbook for criteria pollutants. Therefore, impacts from operational activities would be less than significant. Mitigation Measures The following mitigation measure will be implemented during demolition and construction activities, consistent with South Coast Air Quality Management District Rule 403 in order to reduce PM10 and PM 2.5, emissions. The project will be conditioned to include these mitigation measures, and the developer shall be required to include in contract specifications, indicate on project grading and construction plans, and post at the jobsite. Compliance with these measures will be subject to periodic site inspections by the City. Page 6 AQ -1 Prior to the issuance of grading permits, the applicant shall develop and submit to the City of Diamond Bar a Comprehensive Construction Dust Control Program. The Program components shall include but not be necessarily limited to the following: • Trucks shall not idle while awaiting or during loading or offloading operations, or when left unattended, or for more than two minutes when not actively engaged in earthwork operations; • Water exposed surfaces frequently (as necessary) to prevent fugitive dust, at least twice daily; • Cover all stockpile of soil/fill with tarps; • Securely cover loads of soil/fill on trucks hauling dirt with tarps before traveling on streets and highways; and • Sweep streets at the end of the day if visible soil material is carried onto adjacent public paved road (recommend water sweepers with reclaimed water). e) Create objectionable odors affecting a substantial number of X people? Impact Discussion: The proposed project will result in the development of a 21,794 square -foot office building. The proposed project is therefore not expected to generate objectionable odors affecting a substantial number of people. Construction activity associated with the proposed project may generate detectable odors from heavy-duty equipment exhaust. However this impact would be short- term in nature (only during construction activities) and cease upon project completion. - Potentially habitat modifications, on any species identified as a candidate, Potentially Significant Less than No sensitive, or special status species in local or regional plans, Significant Unless Significan Impact p policies, or regulations, or by the California Department of Fish Impact Mitigation t Impact ISSUES Incorporated e) Create objectionable odors affecting a substantial number of X people? Impact Discussion: The proposed project will result in the development of a 21,794 square -foot office building. The proposed project is therefore not expected to generate objectionable odors affecting a substantial number of people. Construction activity associated with the proposed project may generate detectable odors from heavy-duty equipment exhaust. However this impact would be short- term in nature (only during construction activities) and cease upon project completion. - Potentially habitat modifications, on any species identified as a candidate, Potentially Signcant Less than No sensitive, or special status species in local or regional plans, Significant Unless significan Impact policies, or regulations, or by the California Department of Fish Impact Mitigation t Impact ISSUES Inco orated IV. BIOLOGICAL RESOURCES. Would the project. a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, X sensitive, or special status species in local or regional plans, X policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? Impact Discussion: The project site is in an urbanized area, surrounded by commercial development and multi -family residential to the south. There is minimal amount of vegetation within the area, and no species that are candidate, sensitive or special status species are known to exist in the local vicinity. The proposed project would not result in significant adverse impact to Federal or State listed or other designated species. b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional X plans, policies, regulations or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? Page 7 Impact Discussion: As previously stated, the project site is in an urbanized area, surrounded by commercial development and multi -family residential to the south. No riparian habitat or sensitive natural communities exist on-site. According to the Resource Management Element of the City's General Plan, the project site is not identified as having environmental resources. Potentially Potentially Significant Less than No significant Unless Significan Impact Impact Mitigation t Impact ISSUES Incorporated lave a substantial adverse effect on federally protected wetlands as defined by section 404 of the Clean Water Act X (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or Impact Discussion: No federally protected wetlands occur on-site. Therefore implementation of the proposed project would not result in any impacts in this regard. d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? 04 Impact Discussion: No migratory wildlife corridors or native wildlife nurseries exist in the project area. Therefore implementation of the proposed project would not result in any impacts in this regard. e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or Impact Discussion: The project site does not include protected habitat a vegetaion within the area. The proposed project does not conflict with any protecting biological resources, such as tree preservation policy or ordinance. f) Conflict with the provisions of an adopted Habitat Con: Plan, Natural Community Conservation Plan, or other nnnroved local, regional, or state habitat conservatior 0 nd has minimal amount of local policies or ordinances X Impact Discussion: There are no adopted Habitat Conservation Plan, Natural Community Conservation Plans or other approved local, regional, or state habitat conservation plans applicable to the project area. Therefore the proposed project would not result in impacts in this regard. �e V. CULTURAL RESOURCES. Would the project: a) Cause a substantial adverse change in the significance of a Potentially X historical resource as defined in Section 15064.5? Potentially Significant Less than No [ISSUES Significant Unless Signlfican Impact archaeological resource pursuant to Section 15064.5? Impact Mitigation t Impact c) Directly or indirectly destroy a unique paleontological resource Incorporated X V. CULTURAL RESOURCES. Would the project: a) Cause a substantial adverse change in the significance of a X historical resource as defined in Section 15064.5? b) Cause a substantial adverse change in the significance of an X archaeological resource pursuant to Section 15064.5? c) Directly or indirectly destroy a unique paleontological resource X or site or unique geologic feature? Impact Discussion: The project site is located on a vacant lot. It is not located in an area likely to have historical, archaeological, or paleontological resources. The proposed project may have a significant adverse impact if it would cause a substantial adverse change in the significance of a historical resource as defined in Section 15064.5 of the CEQA Guidelines. This section of the CEQA Guidelines defines a historical resource as one listed in or eligible for listing in the California Register of Historical Places (per state law), included in a local register of historical resources (as defined by state law) or identified as significant in an historical resource survey (meeting the requirements of state law) or determined by the lead agency (City of Diamond Bar) to be historically significant or significant in the architectural, engineering, scientific, economic, agricultural, educational, social, political, military, or cultural annals of California, provided the determination is supported by substantial evidence in light of the whole record. Generally, a resource shall be considered by the lead agency to be "historically significant' if the resource meets the criteria for listing on the California Register of Historical Places. In this case, the existing site is not listed in nor eligible for listing in the California Register of Historical Places, not listed in a local registrar of historical resources or identified as significant in an historical resource survey, nor has it been determined to be historically significant by the City because it does not meet the criteria for listing on the California Register of Historical Places. Therefore, it does not meet the definition of a historical resource contained in Section 15064.5 of the CEQA Guidelines and is therefore less than significant impact. d) Disturb any human remains, including those interred outsideof X formal cemeteries? Impact Discussion: It is not anticipated that human remains exist within the project site. However, should any human remains be encountered during any earth removal or disturbance activities, all activity shall cease immediately and the Los Angeles County Coroner must be notified within 24 hours of the discovery, in accordance with Public Resources Code Section 5097.94. If the coroner determines that the remains are not recent, the corner shall notify the Native American Heritage Commission for consultation in accordance with PRC Section 5097.98. Page 9 ISSUES AND SOILS. Would the project: Potentially I Significant I Less thanI No Significant Unless Significan Impact Impact Mitigation IImpact Expose people or structures to potent�ial substantial adverse affects, including the risk of loss, injuiry, or death involving: i) Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map x issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42. Impact Discussion: No active faults are known to traverse the project site and the project site is not located within, or immediate adjacent to an Alquist-Priolo Earthquake Fault Zone. Therefore, rupture of a known earthquake fault would not occur within the project area. Adherence to standard engineering practices and design criteria relative to seismic and geologic hazards in accordance with the 2010 California Green Building Standards Code (CALGreen) is required. Conformance to these requirements would be applied to the proposed project as standard conditions of project approval. ii) Strong seismic ground shakin ? X Impact Discussion: Southern California has numerous active and potentially active faults that could produce strong ground shaking that could impact the project site. The City of Diamond Bar is in proximity to the San Andreas and Sierra Madre Fault zone. The 2010 California Green Building Standards Code (CALGreen) requires structural design and construction methods that minimize the effects of strong seismic ground shaking. The CALGreen requirements would be applied to the proposed project as standard conditions of project approval. Impact Discussion: The project area is located within a portion of the City that is not subject to liquefaction. Therefore project implementation is not anticipated to result in the exposure of people or structures to potential impacts related to seismic ground failure or liquefaction. Impact Discussion: The proposed project required the submittal and approval of a preliminary geotechnical investigation report. This report indicated that the project site is suitable for the development of a two-story commercial office building with the recommendations in the report incorporated into the project's design and job specification. Therefore, the potential for seismically - related landslides is less than significant. n substantial soil erosion or the loss of Impact Discussion: The largest source of erosion, particularly in an urban environment is uncontrolled drainage during construction. Erosion potential during construction would be managed to the maximum extent practicable with Best Management Practices (BMPs). The proposed project is required to be covered under the National Pollutant Discharge Elimination System (NPDES) General Construction Permit; therefore construction BMPs would be implemented on the project site during demolition and construction activities to minimize erosion impacts. Implementation of the construction -related BMPs would reduce potential construction -related impacts to the maximum extent feasible. The operation of the project site would not cause the loss of topsoil or erosion because the site would be landscaped and paved. Page 10 c) Be located on a geologic unit or soil that is unstable, or that Potentially would become unstable as a result of the project, and Potentially Significant Less than No FImpact Significant Unless Significan Impact ISSUES Impact Mitigation tlmpact for the purpose of reducing the emissions of greenhouse Incor orated X c) Be located on a geologic unit or soil that is unstable, or that Potentially would become unstable as a result of the project, and Potentially Significant X X potentially result in on- or off-site landslide, lateral spreading, Significant Unless Significan Impact subsidence, li uefaction or collapse? Impact Mitigation tlmpact Impact Discussion: Soil under the project site has been analyzed in the geotechnical investigation report. The report indicates that with the recommendations in the report incorporated into the project's design and job specification, the subject site is suitable for the development of a two-story commercial office building. The potential of an on-site and off-site landslide, liquefaction, lateral spreading or collapse is not likely. Therefore, the proposed project would result in less than significant impacts related to development on an unstable soil unit. d) Be located on expansive soil, as defined in Table 1804.2 of theF= Potentially California Building Code (2007), creating substantial risks to Potentially Significant X I X life or property? Significant Unless Significan Impact Impact Discussion: As described above, the project site is stable. Soil under the project site was investigated and the geotechnical investigation report indicates that the incorporation of recommendations into the project's design and job specification, the subject site is suitable for the development of a two-story office building. Therefore, potential impacts from expansive soils would be less than significant. e) Have soils incapable of adequately supporting the use of Potentially septic tanks of alternative waste water disposal systems Potentially Significant Less than X where sewers are not available for the disposal of waste Significant Unless Significan Impact water? Impact Mitigation tlmpact Impact Discussion: The project site is not located on unstable soil. The project would be served by the public sewer system, thus there is no impact on soils inadequately capable of supporting the use of septic tanks or alternative waste water disposal systems. VII. GREENHOUSE GAS EMISSION. Would the project: a) Generate greenhouse gas emissions, either directly or Potentially indirectly, that may have a significant impact on the Potentially Significant Less than No environment? Significant Unless Significan Impact ISSUES Impact Mitigation tlmpact for the purpose of reducing the emissions of greenhouse Incorporated X VII. GREENHOUSE GAS EMISSION. Would the project: a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the X environment? b) Conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing the emissions of greenhouse X ries? Impact Discussion for a and b: Many of the world's leading scientific experts agree that greenhouse gases (GHGs) generated by human activities affect climate by increasing the "greenhouse effect." The gases concentrate in the Earth's atmosphere and trap heat by blocking some of the long -wave energy the Earth normally radiates back into space. Human activities that produce GHGs are the burning of fossil fuels (coal, oil and natural gas for heating and electricity, gasoline and diesel for transportation); methane from Page 11 landfill wastes and raising livestock, deforestation activities; and some agricultural practices. These activities are increasing the greenhouse gases in the Earth's atmosphere and could be accelerating global climate change. _ Long-term environmental consequences in California could potentially include a reduction in water supply from the Sierra Nevada snow pack, which could result in a reduction in imported water, and public health problems due to degraded air quality and more intense summer heat. In 2006, Governor Schwarzenegger signed AB 32, the California Climate Solutions Act of 2006. AB 32 requires that statewide GHG emissions be reduced to 2000 levels by the year 2010, 1990 levels by the year 2020, and to 80 percent less than 1990 levels by year 2050. These reductions will be accomplished through an enforceable statewide cap on GHG emissions that will be phased in starting in 2012. To effectively implement the cap, AB 32 directs the California Air Resources Board (GARB) to develop and implement regulations to reduce statewide GHG emissions from stationary sources. AB 32 specifies that regulations adopted in response to AB 1493 should be used to address GHG emissions from vehicles. However, AB 32 also includes language stating that if the AB 1493 regulations cannot be implemented, then CARB should develop new regulations to control vehicle GHG emissions under the authorization of AB 32. AB 32 requires that CARB adopt a quantified cap on GHG emissions representing 1990 emissions levels and disclose how it arrives at the cap; institute a schedule to meet the emissions cap; and develop tracking, reporting, and enforcement mechanisms to ensure that the state achieves reductions in GHG emissions necessary to meet the cap. In 2007, CARB adopted the statewide 2020 emissions cap at 427 million metric tons (MMT) equivalent carbon dioxide (CO2e) greenhouse gas emissions. CARB estimated that 2020 'business -as -usual' emissions (meaning, emissions of greenhouse gases without consideration of climate change) would be 596 MMTCO2e; therefore, emissions will need to be reduced by 169 MMTCO2e (28 percent) statewide to meet the 2020 threshold. AB 32 also includes guidance to institute emissions reductions in an economically efficient manner and conditions to ensure that businesses and consumers are not unfairly affected by the reductions. A numerical threshold to determine the significance of greenhouse gas emissions has not been established by the City or SCAQMD. Global climate change is not confined to a particular project area and is generally accepted as the consequence of global industrialization over the last 200 years. A typical project, even a very large one, does not generate enough greenhouse gas (GHG) emissions on its own to influence global climate change significantly; hence the issue of global climate change is, by definition, a cumulative environmental impact. The State of California, through its governor and legislature, has established a comprehensive framework for the substantial reduction of GHG emissions over the next 40 -plus years. This will occur primarily through the implementation of AB32 and Senate Bill 375 (SB375), which will address GHG emissions on a statewide, cumulative basis. Nevertheless, the currently proposed project is not expected to generate potentially significant greenhouse gases by developing a 21,794 square -foot commercial office building. Therefore, no new significant impacts are anticipated and no mitigation measures are necessary at this time. Page 12 VIII. HAZARDS AND HAZARDOUS MATERIALS. Would the project: a) Create a significant hazard to the public or the environment X through the routine transport, use, or disposal of hazardous materials? t D m The proposed project would not create a significant hazard to the public or I ,ie Impac Iscusslo environment from the routine transport, use, or disposal of hazardous materials. 'Small amounts of hazardous materials may be found in solvents and chemicals used for cleaning, building maintenance, and landscaping. The materials would be similar to those found in common household projects or pesticides. Hazardous materials used in construction and operation of the proposed project would be subject to City, State, and Federal regulations, reducing impacts to a less than significant level. b) Create a significant hazard to the public or the environment through reasonable foreseeable upset and accident conditions X involving the release of hazardous materials into the environment? Impact Discussion: The proposed uses are not anticipated to result in the creation of health hazards following compliance with health and safety regulations. The proposed uses would not use, generate or dispose of hazardous materials in large quantities. As stated above, hazardous materials used in construction and operation of the proposed project would be subject to City, State, and Federal regulations, reducing impacts to a less than significant level. [c) --Emit hazardous emissions or handle hazardous or acutely X hazardous materials, substances, or waste within one-quarter mile of an existingor proposed school? Impact Discussion: The proposed project would not involve the transport, use, handling, or disposal of notable quantities of hazardous materials, aside from normal household chemicals and landscaping applications. Therefore, the proposed project would not pose a health risk to nearby schools, and no significant impacts to schools would result from the construction and operation of the proposed project. d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code X Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment? Impact Discussion: The project site is currently a vacant lot. The existing uses do not use, handle, or store hazardous materials. Development of the proposed project would not create a significant hazard to the public or to the environment. Therefore no impacts would occur in this regard. Page 13 Potentially Potentially Significant Less than No Significant Unless Significan Impact Impact Mitigation t Impact ISSUES Incorporated VIII. HAZARDS AND HAZARDOUS MATERIALS. Would the project: a) Create a significant hazard to the public or the environment X through the routine transport, use, or disposal of hazardous materials? t D m The proposed project would not create a significant hazard to the public or I ,ie Impac Iscusslo environment from the routine transport, use, or disposal of hazardous materials. 'Small amounts of hazardous materials may be found in solvents and chemicals used for cleaning, building maintenance, and landscaping. The materials would be similar to those found in common household projects or pesticides. Hazardous materials used in construction and operation of the proposed project would be subject to City, State, and Federal regulations, reducing impacts to a less than significant level. b) Create a significant hazard to the public or the environment through reasonable foreseeable upset and accident conditions X involving the release of hazardous materials into the environment? Impact Discussion: The proposed uses are not anticipated to result in the creation of health hazards following compliance with health and safety regulations. The proposed uses would not use, generate or dispose of hazardous materials in large quantities. As stated above, hazardous materials used in construction and operation of the proposed project would be subject to City, State, and Federal regulations, reducing impacts to a less than significant level. [c) --Emit hazardous emissions or handle hazardous or acutely X hazardous materials, substances, or waste within one-quarter mile of an existingor proposed school? Impact Discussion: The proposed project would not involve the transport, use, handling, or disposal of notable quantities of hazardous materials, aside from normal household chemicals and landscaping applications. Therefore, the proposed project would not pose a health risk to nearby schools, and no significant impacts to schools would result from the construction and operation of the proposed project. d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code X Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment? Impact Discussion: The project site is currently a vacant lot. The existing uses do not use, handle, or store hazardous materials. Development of the proposed project would not create a significant hazard to the public or to the environment. Therefore no impacts would occur in this regard. Page 13 Potentially I SignificantI Less than I No Significant Unless Significan Impact Impact Mitigation t Impact ISSUES e) For a project located within an airport land use plan, or where such a plan has not been adopted, within two miles of a public X airport or public use airport, would the project result in a safety hazard for people residin or workin in the project area? Impact Discussion: The project site is not located within an airport land use plan or within two miles of an airport. Therefore, no impacts would occur in this regard. f) For a project within the vicinity of aprivate airstrip, would me project result in a safety hazard for people residing or working in the project area? FA Impact Discussion: The project site is not located within an airport land use plan with within two miles of an airport. Therefore, no impacts would occur in this regard. Impair implementation of or physically intertere wan an adopted emergency response plan or emergency evacuation X Impact Discussion: Emergency vehicles would have access to the project and surrounding roadways upon completion of the proposed project. The proposed development of a 21,794 square -foot commercial office building would not impact access to emergency response. In addition, the proposed development would not place temporary or permanent barriers on . existing roadways or reconfigure existing roadways. Therefore, no impacts would result from the construction and operation of the proposed development. Eeo le or structures to a of loss, h) xpose p p - or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands? X Impact Discussion: The project site and surrounding areas are predominantly built out and no wildlands occur within or adjacent to the project site. Future development as a result of project implementation would introduce ornamental landscaping, which is not anticipated to create hazardous fire conditions. Potentially Potentially Significant Less than No Significant Unless Sign�can Impact Impact Mitigation t Impact ISSUES Incorporated IX. HYDROLOGY AND WATER QUALITY. Would the project: any water quality standards or waste discharge I I I X Impact Discussion: The proposed project will not be allowed to violate any water quality standards or waste discharge requirements. The State Water Resource Control Board (SWRCB) has adopted a National Pollutant Discharge Elimination System (NPDES) General Permit for storm water discharges associated with construction activity. Compliance with Statewide NPDES General Permit for Strom Water Discharges Page 14 associated with construction activity which would prevent storm water pollution from impacting waters of the U.S. in the vicinity of the project area, will be required. Potentially Potentially Sigm�rMnt Less than No Significant Unless Significan Impact Impact Mitigation t Impact ISSUES ncor orated b) Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there wouIM X be a net deficit in aquifer volume or a lowering of the local groundwater table level (e.g., the production rate of pre- existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been ranted)? Impact Discussion: The level of the proposed excavation will not reach the aquifer, thus the proposed development will not substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or lowering of the local groundwater table level. c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream X or river, in a manner which would result in substantial erosion or siltation on- or off-site? Impact Discussion: There are no streams or rivers nearby. The Public Works/Engineering Department is requiring that, prior to approval of a grading plan, the applicant shall prepare and submit a drainage study, including supporting hydraulic and hydrological data to the City for review and acceptance. The proposed development will not substantially alter the existing drainage pattern of the site or area in a manner which would result in substantial erosion or siltation on- or off-site. There will also be specific use guidelines for water conservation in the irrigation of planted areas. These guidelines include but not limited to water sensors, programmable irrigation timers, differing water quantity zones, and drought tolerant plants. d) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream X or river, or substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off- site? Impact Discussion: There are no streams or rivers nearby. The Public Works/Engineering Department is requiring that, prior to approval of a grading plan, the applicant shall prepare and submit a drainage study, including supporting hydraulic and hydrological data to the City for review and acceptance. The proposed development will not substantially alter the existing drainage pattern of the site or area or substantially increase the rate of amount of surface runoff in a manner which would result in flooding on - or off-site. e) Create or contribute runoff water which would exceed the X I capacity of existing or planned stormwater drainage systems or rovide substantial additional sources of polluted runoff? Impact Discussion: See Response c and d above. Page 15 Potentially Potentially Significant Less than No Significant Unless Significan Impact Impact Mitigation [impact ISSUES Incorporated fN l Ihstantially dearade water quality? I I X I Impact Discussion: See Response a and b above. g) Place housing within a 100 -year flood hazard area as mapped on a federal Flood Hazard Boundary or Flood Insurance Rate X Ma or other flood hazard delineation map? X h) Place within a 100 -year flood hazard area structures which X would im ede or redirect flood flows? I) Expose people or structures to a significant risk of loss, injury or X death involving flooding, including flooding as a result of the failure of a levee or dam? Impact Discussion for g -i: The project site is not located within a flood zone. Additionally, the City of Diamond Bar is not subject to any major flood hazards, or potential inundation due to nearby dam failures. Furthermore, the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Map designated the entire City as within a Flood Zone 'W'. Flood Zone "X" is identified as an area of 0.2 percent annual chance of flood. The proposed project would not involve the placement of structures within a 100 -year flood hazard area. Inundation by seiche, tsunami, or mudflow? X Impact Discussion: The proposed project site is approximately 40 miles inland from the Pacific Ocean and there are no large bodies of water within the vicinity of the project site that would cause inundation by seiche, tsunami, or mudflow. Therefore no impacts would result from the construction and operation of the proposed project. Potentially Potentially Significant Less than No Significant unless Signiflcan Impact Impact Mitigation tlmpact FISSUES Incor orated X. LAND USE AND PLANNING. Would the project: f nl Phvsicaliv divide an established community( I 1 Impact Discussion: The proposed project site would not disrupt or physically divide an established community. The project site is a vacant site, surrounded by an office/warehouse building to the north, office industrial park to the west, public storage facility to the east, and multi -family residential to the south. b) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but to limited to the general plan, specific plan, local coastal X program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect? Page 16 Impact Discussion: In accordance with Title 21 of the City of Diamond Bar's Subdivison Code, the project applicant has requested the approval of a Tentative Tract Map to subdivide air space for an 11 - unit office condominium building on an existing vacant 42,333 square -foot (0.97 acre) lot. The applicant has also submitted a Development Review application for the approval of the project's architectural and site design. With the approval of these entitlements, the development of the proposed project would be in compliance with all applicable City of Diamond Bar's land use plan, policy, and regulations. Potentially Potentially Significant Less than No Significant Unless Significan Impact ISSUES Impact Mitigation tImpact or Incurated c) Conflict with any applicable habitat conservation plan or natural X community conservation plan? Impact Discussion: The proposed project site is not included in any habitat conservation plan or natural community conservation plan. XI. MINERAL RESOURCES. Would the project: a) Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the IX state? Impact Discussion: The project site is not identified as a site with known mineral resources that would be of value to the region and the residents of the state. Therefore, the proposed project would have no impacts to mineral resources. b) Result in the loss of availability of a locally -important mineral resource recovery site delineated on a local general plan, X specific plan or other land use Ian? Impact Discussion: The proposed project will not result in the loss of availability of a locally -important mineral resource recovery site delineated on a local general plan, specific plan, or other land use plan, because the site contains no known mineral resources. Potentially Potentially Significant Less than No Significant Unless Sigmfican Impact Impact Mitigation t Impact ISSUES Incorporated XII. NOISE. Would the projectresultin: a) Exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise X ordinance, or applicable standards of other a encies?I T Impact Discussion: There will be a temporary increase in noise levels during construction of the project, but it will not be substantial and must remain within noise limits established by the City. The City of Diamond Bar's Municipal Code, Chapter 8.12 Division 3, Section 8.12.720 prohibits construction -related Page 17 Potentially Potentially Signcant Less than No Significant Unless Signifcan Impact "' Impact Mitigation t Impact ISSUES Incor orated XI. MINERAL RESOURCES. Would the project: a) Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the IX state? Impact Discussion: The project site is not identified as a site with known mineral resources that would be of value to the region and the residents of the state. Therefore, the proposed project would have no impacts to mineral resources. b) Result in the loss of availability of a locally -important mineral resource recovery site delineated on a local general plan, X specific plan or other land use Ian? Impact Discussion: The proposed project will not result in the loss of availability of a locally -important mineral resource recovery site delineated on a local general plan, specific plan, or other land use plan, because the site contains no known mineral resources. Potentially Potentially Significant Less than No Significant Unless Sigmfican Impact Impact Mitigation t Impact ISSUES Incorporated XII. NOISE. Would the projectresultin: a) Exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise X ordinance, or applicable standards of other a encies?I T Impact Discussion: There will be a temporary increase in noise levels during construction of the project, but it will not be substantial and must remain within noise limits established by the City. The City of Diamond Bar's Municipal Code, Chapter 8.12 Division 3, Section 8.12.720 prohibits construction -related Page 17 noise between the hours of 7:00 p.m. and 7:00 a.m. Construction activity is prohibited on Sundays and holidays. Noise from the short-term (less than ten days) operation of mobile construction equipment may not exceed a maximum of 85 dB. Additionally, the proposed development of a 21,794 square -foot commercial office building is compatible with the surrounding uses that surround the project site, since it is located to the east of an office industrial park, west of a public storage facility, and south of an is not expected to exceed noise levels set forth in the office/warehouse building. The proposed use Municipal Code for commercial uses. Potentially Potentially Significant Less than No Significant Unless Significan Impact Impact Mitigation timpact ISSUES D) Exposure of persons to or generation of excessive I I I X I J groundborne vibration or groundborne noise levels? Impact Discussion: .Construction activities have the potential to create groundborne vibration and/or groundborne noise levels. However, any impacts would be temporary and of minimal duration. Additionally, implementation of the construction hours would restrict these activities to daytime hours only. c) A substantial permanent increase in ambient noise levels in the X project vicinity above levels existing without the project? Impact Discussion: The ambient noise levels will not substantially increase and will be compatible with the noise levels in the surrounding area. d) A substantial temporary or periodic increase in ambient noise X levels in the project vicinity above levels existing without the project? Impact Discussion: Construction activities would require the use of trucks to bring construction materials to the site, which would contribute to ambient noise in the project area. The truck noise would be temporary and between he hours of 77ta.my odto istributed p m. daily throughout exccept Sundays and leand would be limited to gal holidays. e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public X airport or public use airport, would the project expose people residing or working in the project area to excessive noise Impact Discussion: Construction of the proposed project would have no impact with regards to airports. The project area is not located within 6 miles of any public airport or within an airport land use plan. Therefore, no impacts would occur. f) For a project within the vicinity of a private airstrip, would the X project expose people residing or working in the project area to excessive noise levels? Impact Discussion: The construction of the proposed project would have no impact with regards to private airstrips. The project area is not located within the vicinity of a private airstrip. Therefore, no impacts would occur. Page 18 Potentially Potentially Significant Less than No Significant Unless Significan Impact Impact mitigation t Impact ISSUES ncur orated I ." nl a ATlnkl APIs Wnl ISIMr Wntild the nroiect: nal. rvr.,...r....... r...� ..___..'-. ---- nduce substantial population growth in an area, either directly for example, by proposing new homes and businesses) or X ndirectly (for example, through extension of roads or other nfrastructure)? [b'):Displace substantial numbers of existing housing, X necessitating the construction of replacement housing elsewhere? c) Displace substantial numbers of people, necessitating the X construction of replacement housing elsewhere? Impact Discussion for a -c: The increase of office space is not significant in the context of the City as a whole or substantial for the area. The project site is an existing vacant lot. There is no housing and therefore will not displace housing or people as a result of this project. Page 19 Potentially Significant Significant Less than No Unless significan Impact Impact Mitigation t Impact ISSUES Incorporated XIV. PUBLIC SERVICES. a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically the of which could altered governmental facilities, construction cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: X 1) Fire protection? X ii) Police protection? X iii) Schools? X IV) Parks? X 0 Other public facilities? Impact Discussion: The marginal increase of office space from the proposed project are well within those anticipated in the City's General Plan, and would not require the provision of new or altered governmental facilities for fire protection, police protection, schools, park, or other public facilities. rict However, the applicant is required to Paylin ordees � toehelplmeet the potential fundngWanut VallUnified SchoolDnleeds (WVUSD) as part of the building permit process created by the proposed increase in population. Potentially Significant Less than No Signcant Unless significan Impact Impact Mitigafion IImpact Incor orated ISSUES XV. RECREATION. a) Would the project increase the use of existing neighborhood X and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? b) Does the project include recreational facilities or require the X construction or expansion of recreational facilities which might have an adverse h sical effect on the environment? Impact Discussion for a -b: The proposed project would not trigger the new construction or expansion of recreational facilities. It is not expected that there would be use of the existing neighborhood recreational facilities by employees of the businesses on-site. Therefore no impacts would occur. Potentially Potentially Significant Less than No Significant Unless Significan Impact Impact Mitigation t Impact ISSUES Incor orated Yvl TRANRPnRTATION / TRAFFIC. Would the prosect: a) Conflict with an applicable plan, ordinance or policy establishing measures of effectiveness for the performance of the circulation system, taking into account all modes of X transportation including mass transit and non -motorized X travel and relevant components of the circulation system, including but not limited to intersections, streets, highways and freeways, pedestrian and bicycle paths, and mass transit? Impact Discussion: A traffic impact analysis (TIA) was prepared for this project. The study found that the proposed project would not result in significant impacts to the Brea Canyon Road at Currier Road, Washington Street, Lycoming Street, SR -60 West Bound ramp intersections, and Golden Springs Drive at SR -East Bound ramps. These intersections are projected to operate at Level of Service (LOS) D or better during peak hours. LOS D is the minimum level generally considered to be acceptable for urban intersections. The City of Diamond Bar's General Plan calls for LOS D as the minimum acceptable service level at an intersection, while LOS C is the minimum for roadway segments. According to CMP Guidelines, the minimum acceptable service level at CMP intersections is LOS E. A project would be considered significant if the LOS changed from D or better to and E or F. b) Conflict with an applicable congestion management program, including, but not limited to level of service standards and travel demand measures, or other standards established by X the county congestion management agency for designated roads or highways? Impact Discussion: The TIA found that the proposed project would not exceed, either individually or cumulatively, a level of service standard established by the County Congestion Management Agency for designated roads or highways. The proposed project will not adversely impact the Congestion Management Program arterial monitoring intersections including freeway on and off -ramp intersections and mainline free -way monitoring stations because the added AM and PM peak hour project generated trips to the adjacent street system does not require a CMP analysis. As there is not a significant impact at these intersections, no traffic mitigation measure/improvement is required or recommended. c) Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in X substantial safety risks? Impact Discussion: The proposed project will not result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks because there is no airport nearby. Page 21 Potentially Potentially Significant Less than No Significant Unless Signiflcan Impact Impact Mitigation IImpact ISSUES ncur orated d) Substantially increase hazards due to a design feature (e.g., X sharp curves or dangerous intersections) or incompatible uses (e. ., farm equipment)? Impact Discussion: The proposed project would not create any hazards due to design features or incompatible uses. Access to the project site would be required to comply with all City design standards, which would reduce potential impacts to a less than significant level. Full-sized WB -40 and WB -50 trucks (semi -trucks) are prohibited from accessing the site and is included in the Covenant, Conditions and Restrictions (CC&R's) for the proposed condominium building. This prohibition would only allow SU -30 trucks and smaller for service/delivery trucks to access the site. el Result in inadequate emergency access? X Impact Discussion: The proposed project would not significantly impact the adequacy of existing and future emergency services. The roadways and driveways are existing and will not be relocated. The proposed project would be constructed according to City of Diamond Bar and County of Los Angeles requirements for emergency access. Therefore significant impacts would not result from the construction and operation of the proposed project. f) Result in inadequate parking supply? � � X � ( I Impact Discussion: The proposed project will provide adequate parking with shared on-site parking spaces with the parcel to the north to meet the City's parking code requirements. Demand for parking created by the proposed project will be provided on-site, with reciprocal parking spaces shared with the lot to the north of the project site. The project will be conditioned to require that a reciprocal parking and access agreement be recorded with the final map. Mitigation Measures The project will be conditioned to include the following mitigation measure: T-1 A reciprocal access and parking agreement for the use and access of all common roads, driveways, parking, and easement areas shall be recorded with the final map. -Ta g) Conflict with adopted policies, plans, or programs regarding X public transit, bicycle, or pedestrian facilities, or otherwise decrease the performance or safety of such facilities? Impact Discussion: The roadways are existing. The proposed project would be constructed according to City of Diamond Bar and County of Los Angeles requirements. Therefore significant impacts would not result from the construction and development of the proposed project. Page 22 XVII. UTILITIES AND SERVICE SYSTEMS. Would the project. a) Exceed wastewater treatment requirements of the applicable Potentially X RegTonal Water Quality Control Board? Potentially Significant Less than No b) Require or result in the construction of new water or Significant Unless Significan Impact wastewater treatment facilities or expansion of existing mpact mpact ISSUES ncornnr'ated XVII. UTILITIES AND SERVICE SYSTEMS. Would the project. a) Exceed wastewater treatment requirements of the applicable X RegTonal Water Quality Control Board? X b) Require or result in the construction of new water or X wastewater treatment facilities or expansion of existing X facilities, the construction of which could cause significant environmental effects? Impact Discussion for a -b: The proposed project would not result in significant impacts and would not exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board, and would have a less than significant impact on the need to construct new water or wastewater treatment facilities or expansion of existing facilities. c) Require or result in the construction of new storm water X drainage facilities or expansion of existing facilities, the X construction of which could cause significant environmental X effects? Impact Discussion: The proposed project would not result in significant impact on the need to construct storm water drainage facilities or expansion of existing facilities. sufficient water supplies available to serve the project X rdY)­Ha­ve from existing entitlements and resources, or are new or X expanded entitlements needed? X Impact Discussion: The proposed project would develop 21,794 square feet of commercial use and would create an incremental increase in demands for existing and future water supplies. However, neither a Water Supply Assessment nor -Water Supply Verification, as required by Senate Bill 610 (Costa) and 221 (Keuhl), are required for the proposed project since the proposed commercial space is well below 500,000 square feet of commercial space. e) Result in a determination by the wastewater treatment provider X which serves or may serve the project that it has adequate X capacity to serve the project's projected demand in addition to X theprovider's existing commitments? Impact Discussion: The project would not trigger the need for new construction or expansion of existing facilities. f) Be served by a landfill with sufficient permitted capacity to X accommodate theproject's solid waste disposal needs? g) Comply with federal, state, and local statutes and regulations X related to solid waste? Impact Discussion for f -g: The City of Diamond Bar is served by Valley Vista. The company hauls nonrecyclable solid waste to the Puente Hills Landfill. This facility has enough capacity to accept solid waste until the year 2020, according to the disposal company. All solid waste materials generated at the Page 23 project site regulations. ISSUES be disposed of in accordance wltn XVIII. MANDATORY FINDINGS OF SIGNIFICANCE. a) Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or state, federal, and local statutes and Potentially Potentially Significant Less thanFoSignificant Unless Significan Impact Mitigation t Impact FA Impact Discussion: The project site does not contain the habitat of a fish or wildlife species and therefore construction of the proposed project would not cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, or reduce or restrict the range of a rare or endangered plant or animal. Likewise, approval of the proposed project is not anticipated to eliminate examples of major periods of California history or prehistory. Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumulatively considerable means that the incremental effects of a project are X considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects)? Impact Discussion: The cumulatively considerable impacts of the individually limited project are not expected to be significant and are in keeping with the long-range considerations of the City's General Plan. With the conditions of project approval and proposed mitigation measure, the cumulative impact of the individually limited project impacts will not be considerable. c) Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly? X Impact Discussion: With the conditions of project approval and proposed mitigation measure, no substantial direct or indirect adverse environmental effects on human beings can be expected from this project. Grace S. Lee 05/23/2013 Name Date Senior Planner Si re Title Page 24 SOURCES CITED IN THE EVALUATION OF ENVIRONMENTAL IMPACTS Planning Case PL2012-455 1. General Plan of the City of Diamond Bar adopted July 25, 1995 2. General Plan of the City of Diamond Bar, Environmental Impact Report and Addendum dated July 25, 1995 3. Municipal Code, City of Diamond Bar 4. Architectural and Grading Plan 5. Hydrology Study and Hydraulic Calculation Prepared by Cal Land Engineering, Inc. Dated February 6, 2013 6. Geotechnical Engineering Investigation Report Prepared by Cal Land Engineering, Inc. Dated September 28, 2012 7. Traffic Impact Analysis Report Prepared by Linscott, Law and Greenspan Dated March 26, 2013 8. Environmental Mitigation and Monitoring Program — Attachment A 9. All documents cited above are available for review at the City of Diamond Bar, Community Development Department, 21825 Copley Drive, Diamond Bar, CA 91765. The office hours are Monday through Thursday between 7:30 a.m. and 5:30 p.m., and Friday between 7:30 a.m. and 4:30 p.m. Page 25 LO U) d' N O N 0. V Z OW n a U Z U iR Z_ OZ I— Z J Q a Z O W a W C9 U P U) U) W a Z ' U) Z LU m G Z 20 U >- Z Q Q U W CD J Q F Z W Lij F- oa 0 0 U Y o c W C7 U m W y U OZ Q -<..- W J � Q ~ .0 C T J nm EL N ro p C U 0 3 c m m E m o o 0@ ro 3 w o E k`_ E w O C n L @$ E Q U t9 O L O 3 N U O Q D o m m '� °' :a on'i rn E3 fn y. N m E tp Q w w O@ O U N C ypj N U E o 2E d c� c .Y '> 3 N Q E rn 4..p t9 o_ oo F- 3 3 m m ui E ,2 v @ o r ro o rn c o m E °� - 0~aci� 2U m 60 O Q is mwaEvai L- `o@� mE crp c °u m m w 3 0 N o m m o C N ro@ N O Uri C Y N V N O 9 N S N o- oo ooo—o O o Ons @ F' O U U U F d u K v o U p U @ W .> Q K 0� oS =u: ce1'- ■ 0 0 w CL 0 z FY 0 z 0 :5 z 0 F- 0 z w .1 ui F- !\ \ LU < 00 o w z ui < m a - w z z LU > LU P: U) 0 E \\\ \�\\I0 of \�\ z \�\ .\\� .0 p })§( i,mt,l < E E ''%, Em .1 Attachment 3 REVISED TRAFFIC IMPACT ANALYSIS REPORT BREA CANYON BUSINESS CENTER PROJECT Diamond Bar, California March 26, 2013 Prepared for., BREA CANYON INVESTMENT, LLC. 17528 EAST ROWLAND STREET CITY OF INDUSTRY. CA 91748 and CITY OF DIAMOND BAR 21825 E. Copley Diamond Bar, CA 91765 LLG Ref. 2-12-3332-1 RECEIVF JUIN 12 2013 CITY OF DIAMOND Prepared by: Under the Supervision of. Shane S. Green, P.E. Richard E. Barretto, P.E. Transportation Engineer III Principal Linscott, Law & Greenspan, Engineers 2 Executive Circle Suite 250 Irvine, CA 92614 949.825.6175 t 949.825.6173 v wwwllgengineers.cout TABLE OF CONTENTS SECTION PAGE 1.0 Introduction................................................................................................................................. 1 1.1 Study Area................................................................................................................................ 2 1.2 Study Scope.............................................................................................................................. 2 2.0 Project Description.....................................................................................................................3 30 Existing Conditions..................................................................................................................... 4 3.l Regional Access........................................................................................................................ 4 '3.2 Existing Traffic Volumes................................................................................................... 5 3.3 Existing Intersection Conditions............................................................................................... 5 3.3.1 Intersection Capacity Utilization (ICU) Method of Analysis ........................................... 5 3.3.2 Highway Capacity Manual (HCM) Method of Analysis (Unsignahzed Intersections).... 7 3.4 Existing Level of Service Results............................................................................................. 7 4.0 Traffic Forecasting Methodology 10 5.0 Project Traffic Characteristics................................................................................................ 11 5.1 Project Traffic Generation......................................................................................................11 5.2 Project Traffic Distribution and Assignment.......................................................................... 11 5.3 Existing Plus Project Traffic Conditions................................................................................ 14 6.0 Future Traffic Conditions........................................................................................................ 15 6.1 Ambient Traffic...................................................................................................................... 15 6.2 Cumulative Projects Traffic Characteristics...........................................................................15 6.3 Year 2034 Traffic Conditions................................................................................................. 18 6.4 Year 2014 and Year 2034 Traffic Volumes............................................................................ 18 6.4.1 Year 2014 Traffic Volumes............................................................................................ 18 6.4.2 Year 2034 Traffic Volumes............................................................................................ 18 7.0 Traffic Impact Analysis Methodology....................................................................................19 7.1 Impact Criteria and Thresholds: .............................................................................................. 19 7.1.1 City of Diamond Bar....................................................................................................... 19 7.2 Traffic Impact Analysis Scenarios.......................................................................................... 19 8.0 Peak Hour Intersection Capacity Analysis............................................................................. 20 8.1 Existing Plus Project Traffic Conditions................................................................................ 20 8.1.1 Existing Plus Project Traffic Conditions........................................................................ 20 8.2 Year 2014 Traffic Conditions................................................................................................. 22 8.2.1 Year 2014 Cumulative Traffic Conditions..................................................................... 22 8.2.2 Year 2014 Cumulative Plus Project Traffic Conditions ................................................. 22 8.3 Year 2034 Traffic Conditions................................................................................................. 24 8.3.1 Year 2034 Cumulative Traffic Conditions..................................................................... 24 8.3.2 Year 2034 Cumulative Plus Project Traffic Conditions .................................................. 24 LlNscou, LAW & GREENSPAN, engfoOM I LLG Ref. 2-12-3332 Brea Canyon Business Center Project, Diamond Bar V'IC10'I 112-t t ,,11, e-_-,, D'. maid H, R.ptRbS-R,,,,d8m lv H vi.1-1l TIA32e-R.dna TABLE OF CONTENTS (CONTINUED) SECTION PAGE 9.0 State of California (Caltrans) Methodology........................................................................... 26 9.1 Highway Capacity Manual (HCM) Method of Analysis (Signalized Intersections) .............. 26 9.2 Existing Plus Project Traffic Conditions................................................................................ 26 9.3 Year 2014 Cumulative Plus Project Traffic Conditions.................................................... 29 9.3.1 Year 2014 Cumulative Plus Project Traffic Conditions ............................................ 29 10.0 Site Access Evaluation.............................................................................................................. 32 10.1 Level of Service Analysis For Project Access.................................................................... 32 10.2 Internal Circulation............................................................................................................. 34 11.0 Area -Wide Traffic Improvements........................................................................................... 35 11.1 Year 2012 Existing Plus Project Recommended Improvements ........................................ 35 11.2 Year 2014 Plus Project Traffic Conditions......................................................................... 35 11.3 Year 2034 Plus Project Traffic Conditions......................................................................... 35 12.0 Congestion Management Program Compliance Assessment ................................................ 36 12.1 Traffic Impact Review........................................................................................................ 36 12.1.1 Freeways.....................................................................................................................36 12.1.2 Intersections................................................................................................................ 36 13.0 Summary Of Findings And Conclusions................................................................................ 37 APPENDICES APPENDIX A. Scope of Work and Existing Traffic Count Data B. ICU Level of Service Calculation Worksheets C. HCM Level of Service Calculation Worksheets D. Business Park Trip Generation Worksheets LINSCOTT, LAW & GREENSPAN, engineers jl LLG Ref. 2-12-3332 Brea Canyon Business Center Project, Diamond Bar N -IGD_^^ ['3334 H, C::mlt,Bu,' 111 i r, Di= I Be I IRaPntl 331 11,1.,,d 6rza CaH roes, CentI1 A 26 1% Jov LINSCOTT, LAW & GREENSPAN, engineers 111 LLG Ref. 2-12-3332 Brea Canyon Business Center Project, Diamond Bar N i0mze1iJ2.1 nu,u 6LLu�_:_eii-, b',1and B.' R,ort3312-R '. dB,­Cn B,,.- C ­1l. I IA 12"'J 1.1 LIST OF FIGURES SECTION -FIGURE # FOLLOWING PAGE 1-1 Vicinity Map.....................................................................................................................2 2-1 Existing Aerial Photograph...............................................................................................3 2-2 Preliminary Site Plan ........................................................................................................ 3 3-1 Existing Roadway Conditions and Intersection Controls..............................................4 3-2 Existing AM Peak Hour Traffic Volumes......................................................................5 3-3 Existing PM Peak Hour Traffic Volumes......................................................................5 5-1 Project Traffic Distribution Pattern..............................................................................13 5-2 AM Peak Hour Project Traffic Volumes......................................................................13 5-3 PM Peak Hour Project Traffic Volumes.......................................................................13 5-4 Existing Plus Project AM Peak Hour Traffic Volumes...............................................14 5-5 Existing Plus Project PM Peak Hour Traffic Volumes...............................................14 6-1 Location of Cumulative Projects...................................................................................16 6-2 Year 2014 AM Peak Hour Cumulative Traffic Volumes............................................18 6-3, Year 2014 PM Peak Hour Cumulative Traffic Volumes............................................18 6-4 Year 2014 AM Peak Hour Cumulative Traffic Volumes With Project......................18 6-5 Year 2014 PM Peak Hour Cumulative Traffic Volumes With Project ......................18 6-6 Year 2034 AM Peak Hour Cumulative Traffic Volumes............................................18 6-7 Year 2034 PM Peak Hour Cumulative Traffic Volumes............................................18 6-8 Year 2034 AM Peak Hour Cumulative Traffic Volumes With Project......................18 6-9 Year 2034 PM Peak Hour Cumulative Traffic Volumes With Project ......................18 10-1 SU -30 Inbound Truck Turning Analysis........................................................................34 10-2 SU -30 Outbound Truck Turning Analysis.....................................................................34 10-3 Fire Truck Inbound Turning Analysis............................................................................34 10-4 Fire Truck Outbound Turning Analysis.........................................................................34 LINSCOTT, LAW & GREENSPAN, engineers 111 LLG Ref. 2-12-3332 Brea Canyon Business Center Project, Diamond Bar N i0mze1iJ2.1 nu,u 6LLu�_:_eii-, b',1and B.' R,ort3312-R '. dB,­Cn B,,.- C ­1l. I IA 12"'J 1.1 LIST OF TABLES SECTION -TABLE # PAGE 3-1 Level of Service Criteria for Signalized Intersections.......................:..............................6 3-2 Level of Service Criteria for Unsignalized Intersections.................................................8 3-3 Existing Peak Hour Levels of Service........................................................................ 9 5-1 Project Traffic Generation Forecast.......................................................................... 12 5-2 Project Directional Distribution Pattern .........................................................................13 6-1 Location and Description of Cumulative Projects..........................................................16 6-2 Cumulative Projects Traffic Generation.........................................................................17 8-1 Year 2012 Peak Hour Intersection Capacity Analysis...................................................21 8-2 Year 2014 Peak Hour Intersection Capacity Analysis ........ ..................... I ........ I............ 23 8-3 Year 2034 Peak Hour Intersection Capacity Analysis...................................................25 9-1 Level of Service Criteria for Signalized Intersections....................................................27 9-2 Year 2012 Peak Hour Intersection Capacity Analysis - Caltrans..................................28 9-3 Year 2014 Peak Hour Intersection Capacity Analysis - Caltrans..:...............................30 9-4 Year 2034 Peak Hour Intersection Capacity Analysis - Caltrans..................................31 10-1 Project Driveway Peak Hour Intersection Capacity Analysis.....................................33 LINSCOTT,LAW& GREENSPAN, engineers Iv LLGRef. 2-12-3332 Brea Canyon Business Center Project, Diamond Bur N 3330U2123a32 -Bray, Cu911. Nuvinc==Cmlaq DIOIIIOvd Nw,R,Ift,3332 Raisd n�a, Cmn»n e,uiues: Centtt Tl,A 3-2b1}doe REVISED TRAFFIC IMPACT ANALYSIS REPORT BREA CANYON BUSINESS CENTER PROJECT Diamond Bar, California March 26, 2013 1.0 INTRODUCTION This Traffic Impact Analysis addresses the potential traffic impacts associated with the proposed Brea Canyon Business Center Project (hereinafter referred to as Project) in the City of Diamond Bar, California. The project site is a rectangular -shared 2.68 -acre vacant parcel of land that is located on the northeast corner of Washington Street and Brea Canyon Road This report documents the findings of a traffic impact analysis conducted by Linscott, Law & Greenspan, Engineers (LLG) to determine the potential impacts associated with the proposed Project. The traffic analysis evaluates the existing operating conditions at five (5) key study intersections within the project vicinity, estimates the trip generation potential of the proposed Project, and superimposes the project -related traffic volumes on the circulation system as it currently exists. In addition, the analysis forecasts future near-term and long-term operating conditions with and without the Project, and where necessary, identifies appropriate intersection improvements/ mitigation measures. The Project site has been visited and an inventory of adjacent area roadways and intersections was performed. Existing peak hour traffic information has been collected at five (5) locations on a "typical" weekday for use in the preparation of intersection level of service calculations. Information concerning cumulative projects (planned and/or approved) in the vicinity of the Project has been researched at the City of Diamond Bar, City of Walnut, City of Pomona, City of Industry and County of Los Angeles. Based on our research, eight (8) planned projects were considered in the cumulative traffic analysis for this Project. The Scope of Work for this Project was coordinated with City staff and satisfies the City of Diamond Bar requirements as outlined in the Tiaffie Impact Analysis Guidelines (Remised October 2009) and is consistent with the current Congestion Management Program (CMP), for Los Angeles County and the State of California Department of Transportation (Caltrans) Guide for the Preparation of Traffic biipact Studies. Appendix A contains a copy of the Scope of Work that was approved by the City of Diamond Bar. LINSCOTT, LAW & GREENSPAN, engineers 1 LLG Ref. 2-12-3332 Brea Canyon Business Cenler Projeol, Diamond Bar N 330Y'191i12-r (`� i5nrinv..nl.4Di', naa [f 'Relutl�RL-I ,,:ed btufac H ,a.(e(,. I'IA 1-2i,Bd,n 1.1 Study Area The five (5) key study intersections selected for evaluation in this report provide both regional and local access to the study area. The study locations were identified using the City's "16 trip threshold criteria" and discussions with City staff. In addition, an assessment of the project driveway has been prepared. They consist of the following: 1. Brea Canyon Road at Currier Road 2. Brea Canyon Road at Washington Street 3. Brea Canyon Road at Lycoming Street 4. Brea Canyon Road at SR -60 WB Ramps 5. SR -60 EB Ramps at Golden Springs Drive Figure 1-1 presents a Vicinity Map, which illustrates the general location of the Project and depicts the study locations and surrounding street system. Level of Service (LOS) calculations for the AM and PM peak hours at these three study intersections were performed to evaluate the future potential traffic impacts associated with anticipated area growth, related projects, and the proposed Project. 1.2 Study Scope Included in this traffic and parking analysis are: • Existing traffic counts, • Estimated project traffic generation/distribution/assignment, • Estimated cumulative project traffic generation/distribution/assignment, • AM and PM peak hour capacity analyses for existing conditions (Year 2012) and existing plus project conditions, • AM and PM peak hour capacity analyses for future (Year 2014 & 2034) conditions without and with project traffic, • Caltrans Analysis • Area -Wide Traffic Improvements, and • Congestion Management Program Compliance Assessment LJNSCOTT, LAW &GREENSPAN, engineers 2 LLGRef. 2-12-3332 Brea Canyon Business Center Project, Diamond Bar V MOO 2121232 J311111. ,- 1 C leq Diemonl Iiv IItqunU3,3 R- %.ed Wea C. , B :' iz�, CYOf,O I[A t-26 11,4e (NO SCALE SOURCE: THOMAS BROS. KEY STUDY INTERSECTION PROJECT SITE FIGURE 1 -1 VICINITY MAP BREA CANYON BUSINESS CENTER PROJECT, DIAMOND BAR 2.0 PROJECT DESCRIPTION The project site is a rectangular -shared 2.68 -acre vacant parcel of land that is located at 650 Brea Canyon Road. The subject property is located on the northeast comer of Washington Street and Brea Canyon Road in the City of Diamond Bar. The site is currently developed with a surface parking lot and is located adjacent to a 20,571 square -feet (SF) industrial building with surface parking that is now occupied with a mixture of warehouse/office space as now allowed under its current approvals and zoning. The existing industrial building contains eight (8) suites ranging in size from approximately 1,400 SF to 3,500 SF. Based on information provided by the project applicant, the current mix of "business park" uses consists of Carpet Wholesaler, CPA firm and Accounting Office, Structural Engineering Firm, Ethnic Education, Medical Equipment, Textile Wholesaler, Engineering and a Vacant Unit. Figure 2-1 is an aerial of the proposed Project site, including the existing adjacent industrial building. The proposed Project includes the development of a two-story building consisting of 18,351 square - feet (SF) of office use and 3,443 SF of medical office use for a total of 21,794 SF. Project access to the subject property is now provided via a "full access" driveway on Washington Street. The Project is expected to be completed by late 2013/early 2014. Figures 2-2 illustrates the proposed site plan for the Project. LINSWTr, LAW& GREENSPAN, engineers 3 LLGRcr 2-12-3332 Brea Canyon Business Center Project, Diamond Bar \:33G019i D?i2 BaiCm_.n Bu i _ �'q DinmeW Bm Vtq on ix] R.eJ Bna f'o - B amu CeuY� l'IAt26-11he vopn6n £IOZ-GZ-£0 09.80:60 d01 6xp'Z-ZIZCC£\6np\isq p--" •.eluso ssemsnq mFuoo oe.q - Z£££ZIZ\00££\:u v x a•. . . . . . . . . . I_ i`• v JAtlM13AItltt 9`ll1SI%3 9 rlo P Q 6 _.. . _ . •u im w R n a , I _ I :a J i Ic— I e n G 9 l I t' •••�•�,•� w 4VVN NW a ON 3.0 EXISTING CONDITIONS 3.1 Regional Access The Orange Freeway (State Route 57) and the Pomona Freeway (State Route 60) provide regional access to the City of Diamond Bar. The two freeways intersect one another in the northwest quadrant of the City. Primary access to the Project site is provided via the Golden Springs Drive/Brea Canyon Road/SR-60 Freeway Interchange. The local street network within the City of Diamond Bar that services the project includes Valley Boulevard, Currier Road, Brea Canyon Road, Washington Street, Lycoming Street and Golden Springs Drive. The following discussion provides a brief synopsis of these key area streets. The descriptions are based on an inventory of existing roadway conditions. Valley Boulevard is a five -lane, divided roadway located north of the project site and is oriented in the east -west direction. The posted speed limit on Valley Boulevard within the vicinity of the project site is 45 mph. On -street parking is not permitted along this roadway. Currier Road is a four -lane, divided roadway located north of the project site and is oriented in the east -west direction. This roadway provides a direct connection between Brea Canyon Road and Lemon Avenue. The posted speed limit on Currier Road is 40 mph. On -street parking is not permitted along this roadway. Brea Canyon Road is generally a four -lane, divided roadway located west of the project site and is oriented in the northeast -southwest direction. The posted speed limit on Brea Canyon Road is ranges from 40 - 50 miles per hour (mph) in the vicinity of the project. On -street parking is not permitted along this roadway in the vicinity of the project. Traffic signals control the study intersections of Brea Canyon Road at Currier Road, Washington Street, Lycoming Street, and SR -60 Westbound Ramps. Washington Street is a four -lane, divided roadway located south of the project site and is oriented in the east -west direction. The posted speed limit on Washington Street east of the project site is 35 mph. On -street parking is permitted along this roadway. Lycoming Street is a two-lane, undivided roadway located south of the project site and is oriented in the east -west direction. The posted speed limit on Lycoming Street is 35 mph west of Brea Canyon Road in the vicinity of the project. On -street parking is permitted along this roadway. Golden Springs Drive is a four -lane, divided roadway located south of the project site and is oriented in the east -west direction. The posted speed limit on Golden Springs Drive is 40 mph. Traffic signals control the study intersections of Golden Springs Drive at SR -60 EB Ramps. Figure 3-1 presents an inventory of the existing roadway conditions for the arterials and intersections evaluated in this report. The number of travel lanes and intersection controls for the key area intersections are identified. LINscon, LAW & GREENSPAN, enginoorS 4 LLG Ref. 2-12-3332 Brea Canyon Business Center Project, Diamond Bar \ JIAfJ.l13}R B+�'v- Y, vi+.. n�e�dnnn lH +It.pttFo3]-2 'imJ Hrwtac ❑ +ewa Cenlu TL+.}2.+-I LAn, KEY - = APPROACH LANE ASSIGNMENT 0 - AS FIGURE 3-1 = TRAFFIC SIGNAL, STOP SIGN P = PARKING, NP = PARKING DI U = UNDIVIDED, D = O PAR N2 = NUMBER OF TRAVEL LANES (XX)= POSTED SPEED LIMIT (MPH) EXISTING ROADWAY CONDITIONS OL= RIGHT TURN OVERLAP AND INTERSECTION - CONTROLS :r PROJECT SITE BREA CANYON BUSINESS CENTER PROJECT, DIAMOND BAR v2 O I r \ 3 PHASE SIGNAL •�1��' \ 6 PHASE SIGNAL E/W SPLIT `F1'oy 2 yo \ X02 / M. i �p o 4D CURRIER RD NP J 40) NP 9 WASHINGTON ST ..4D (35) Y m \\ \ (35) P LYCOMING ST 3 PHASE 2U SIGNAL _ s 5 PHASE SIGNAL M \ 6 PHASE \ SIGNAL i N/S SPLIT o i KEY - = APPROACH LANE ASSIGNMENT 0 - AS FIGURE 3-1 = TRAFFIC SIGNAL, STOP SIGN P = PARKING, NP = PARKING DI U = UNDIVIDED, D = O PAR N2 = NUMBER OF TRAVEL LANES (XX)= POSTED SPEED LIMIT (MPH) EXISTING ROADWAY CONDITIONS OL= RIGHT TURN OVERLAP AND INTERSECTION - CONTROLS :r PROJECT SITE BREA CANYON BUSINESS CENTER PROJECT, DIAMOND BAR 3.2 Existing Traffic Volumes Manual counts of vehicular turning movements were conducted at the five study locations during the weekday morning and evening peak commuter periods to determine the AM peak hour and PM peak hour traffic volumes. The traffic counts of the three study intersections were conducted in June and October of 2012 and February 2013 by Transportation Studies, Inc and Pacific Traffic Data Services. Figures 3-2 and 3-3 depict the existing AM and PM peak hour traffic volumes at the key study intersections, respectively. Append& A contains the existing intersection turning movement traffic count data. 3.3 Existing Intersection Conditions 3.3.1 Intersection Capacity Utilization (ICU) Method of Analysis In conformance with the City of Diamond Bar and LA County CMP requirements, existing AM and PM peak hour operating conditions for the key signalized study intersections were evaluated using the Intersection Capacity Utilization (ICU) method. The ICU technique is intended for signalized intersection analysis and estimates the volume to capacity (V/C) relationship for an intersection based on the individual V/C ratios for key conflicting traffic movements. The ICU numerical value represents the percent signal (green) time, and thus capacity, required by existing and/or future traffic. It should be noted that the ICU methodology assumes uniform traffic distribution per intersection approach lane and optimal signal timing. The ICU calculations use a lane capacity of 1,600 vehicles per hour (vph) for left -turn, through, and right -turn lanes, and dual left turn capacity of 2,880 vph. A clearance adjustment factor of 0.10 (101/6) was added to each Level of Service calculation. The ICU value translates to a Level of Service (LOS) estimate, which is a relative measure of the intersection performance. The six qualitative categories of Level of Service have been defined along with the corresponding ICU value range and are shown in Table 3-1. The ICU value is the sum of the critical volume to capacity ratios at an intersection; it is not intended to be indicative of the LOS of each of the individual turning movements. According to the City of Diamond Bar, LOS D is the minimum acceptable service level that should be maintained during the peak commute hours. Consistent with this standard, the City of Diamond Bar's General Plan and Traffic Impact Analysis Guidelines (Revised October 2009) specifies LOS D as the minimum acceptable service level at intersections. LINscoTT, LAw & GREENSPAN, en9iWerS 5 LLG Ref 2-12-3332 Brea Canyon Business Center Project, Diamond Bar \_10 )-'1]J312-k r. puxui :'J 1¢DlumnnJ H'Ityoh'J33�-2 �aBmCmm Ht�pcCe le?IA }2dlidoe 75-" 66� } \ Nat 0�l 105\ r 81 1J�Jr� O= / J / / / ST / LYCOMING ST \ PROJECT SITE FIGURE 3-2 EXISTING AM PEAK HOUR TRAFFIC VOLUMES BREA CANYON BUSINESS CENTER PROJECT, DIAMOND BAR M /maw 29 PROJECT SITE FIGURE 3-3 EXISTING PM PEAK HOUR TRAFFIC VOLUMES BREA CANYON BUSINESS, CENTER PROJECT, DIAMOND BAR TABLE 3.1 LEVEL OF SERVICE CRITERIA FOR SIGNALIZED INTERSECTIONS' Level of Service (LOS) Intersection Capacity Utilization Value (V/C) Level of Service Description EXCELLENT. No vehicle waits longer A < 0.600 than one red light, and no approach phase is fully used. VERY GOOD. An occasional approach phase is fully utilized; many drivers begin B 0.601 — 0.700 to feel somewhat restricted within groups of vehicles. GOOD. Occasionally drivers may have to wait through more than one red light; C 0.701 — 0.800 backups may develop behind fuming vehicles. FAIR. Delays may be substantial during portions of the rush hours, but enough D 0.801 — 0.900 lower volume periods occur to permit clearing of developing lines, preventing excessive backups. POOR. Represents the most vehicles intersection approaches can accommodate; E 0.901 — 1.000 may be long lines of waiting vehicles through several signal cycles. FAILURE. Backups from nearby, locations or on cross streets may restrict or prevent movement of vehicles out of the F > 1.000 intersection approaches. Potentially very long delays with continuously increasing queue lengths. ' Source: Transportation Research Board Circular 212 -Interim Materials on Highway Capacig). LiNScerT, LAW & GREENSPAN, engineers 6 LLG Ref 2-12-3332 Brea Canyon Business Center Reject, Diamond Bar N'.MU2123ID G C rryou Milm,,,. -A, Dao—d B. R, bed B,. 6m, Bn,in,s 1' aW TLA 3-2,, P, d- 3.3.2 Highway Capacity Manual (HCM) Method of Analysis (Unsignalized Intersections) The 2000 HCM unsignalized methodology was utilized in the analysis of stop -controlled intersections. For all -way stop -controlled intersections, this methodology estimates the average control delay for each of the subject movements and determines the level of service for each movement. The overall average control delay measured in seconds per vehicle, and level of service is then calculated for the entire intersection. The HCM control delay value translates to a Level of Service (LOS) estimate, which is a relative measure of the intersection performance. For one-way and two-way stop -controlled (minor street stop -controlled) intersections, this methodology estimates the worst side street delay, measured in seconds per vehicle and determines the level of service for that approach. The HCM delay value translates to a Level of Service (LOS) estimate, which is a relative measure of the intersection performance. The six qualitative categories of Level of Service have been defined along with the corresponding HCM control delay value range, as shown in Table 3-2. 3.4 Existing Level of Service Results Table 3-3 summarizes the existing peak hour service level calculations for the five key study intersections based on existing traffic volumes presented in Figures 3-2 and 3-3, current street geometry, and intersection traffic control. As shown, all of the five key intersections currently operate at satisfactory levels of service (i.e., LOS D or better) during the AM and PM peak hours. Appendix- B contains the ICU/Delay/LOS calculation worksheets for the key signalized study intersections. LINSCOTr, LAW & GREENSPAN, engineers ] LLG Ref. 2-12-3332 Brea Canyon Business Center Project, Diamond Bar \930LQ['1132-b al nn �$rt+a ..n ar_IYi 11112, i.dov TABLE 3•Z LEVEL OF SERVICE CRITERIA FOR UNSIGNALIZED INTERSECTIONS2 Level of Service (LOS) Highway Capacity, Manual Delay Value (sec/veh) Level of Service Description A < 10.0 Little or no delay B > 10.0 and < 15.0 Short traffic delays, C > 15.0 and < 25.0 Average traffic delays D > 25.0 and < 35.0 Long traffic delays E > 35.0 and < 50.0 Very long traffic delays F > 50.0 Severe congestion 2 Souroe:Highu,a),Capaciry,ddarnwI2000, Chapter 17(Unsignaaed Intersection). LINsceir, LAW & GREENSPAN, eogineerS 8 - LLG Ref. 2-12-3332 Brea Canyon Business Center Project, Diamond Bar s:;,e0m212iu2-15111(w ., B1. amen. Dm..... s.�uiworr5s,x-a..;�au,w�rv�>o��oca��as r�mo�n.as�i a.n,.� TABLE 3.3 EXISTING PEAK HOUR LEVELS OF SERVICE Key Intersections Time Period Jurisdiction Control Type ICU LOS Brea Canyon Road at AM 30 Traffic 0.511 A l Industry Currier Road. PM Signal 0.738 C Brea Canyon Road at AM 60 Traffic 0.438 A 2. Diamond Bar Washington Street PM Signal 0.421 A Brea Canyon Road at AM 50 Traffic 0.764 C 3. Diamond Bar Lycoming Street PM Signal 0.831 D Brea Canyon Road at AM Diamond Bar/ 30 Traffic 0.625 B 4. SR -60 WB Ramps PM Caltrans Signal 0.661 B Golden Springs Drive at AM Diamond Bar/ 60 Traffic 0.695 B 5. SR -60 BB Ramps PM Caltrans Signal 0.767 C Notes: Bold ICU/L.OS values indicate adverse service levels based on City LOS standards. 3 Appendix contains the ICiJ/Delay/LOS worksheets for key study intersections. LMSCeTT, LAW & GREENSPAN, engiM&M 9 LLG Ref. 2-12-3332 Brea Canyon Business Center Project, Diamond Bar 1,111,'133212-R;I ,. i6u�.u¢ oAm,dn ,ary.an]an-R -.MMII rin1TI312oJid- 4.0 TRAFFIC FORECASTING METHODOLOGY In order to estimate the traffic impact characteristics of the proposed Project, a multi -step process has been utilized. The first step is traffic generation, which estimates the total arriving and departing traffic on a peak hour and daily basis. The traffic generation potential is forecast by applying the appropriate vehicle trip generation equations or rates to the project development tabulation. The second step of the forecasting process is traffic distribution, which identifies the origins and destinations of inbound and outbound project traffic. These origins and destinations are typically based on demographics and existing/expected future travel patterns in the study area. The third step is traffic assignment, which involves the allocation of project traffic to study area streets and intersections. Traffic assignment is typically based on minimization of travel time, which may or may not involve the shortest route, depending on prevailing operating conditions and travel speeds. Traffic distribution patterns are indicated by general percentage orientation, while traffic assignment allocates specific volume forecasts to individual roadway links and intersection turning movements throughout the study area. With the forecasting process complete and project traffic assignments developed, the impact of the Project is isolated by comparing operational (LOS) conditions at selected key intersections using expected future traffic volumes with and without forecast project traffic. The need for site-specific and/or cumulative local area traffic improvements can then be evaluated. LINSCOTr,LAW& GREENSPAN, engineers 10 LLGRef. 2-12-3332 Brea Canyon Business Center Project, Diamond Bar �N, b306�2133332- Brea Cnmon BitsInes I Dinmmul Bm Vigio,e3332-Rai-,ed Brea Cxnpn Busing -s C'evlef I 1 3-26-13. dic 5.0 PROJECT TRAFFIC CHARACTERISTICS 5.1 Project Traffic Generation Traffic generation is expressed in vehicle trip ends, defined as one-way vehicular movements, either entering or exiting the generating land use. Generation factors and equations used in the traffic forecasting procedure can be found in the 9t1i Edition of Trip Generation, published by the Institute of Transportation Engineers (ITE) [Washington, D.C., 2012]. Table 5-1 summarizes the trip generation rates used in forecasting the vehicular trips generated by the proposed Project and presents the forecast daily and peak hour project traffic volumes for a "typical" weekday. The trip generation potential for the proposed Project was forecast using ITE Land Use Code 710: General Office Building and ITE Land Use Code 720: Medical -Dental Office Building. As shown in Table 5-1, the proposed Project is forecast to generate 326 daily trips, with 37 trips (32 inbound, 5 outbound) produced in the AM peak hour and 39 trips (8 inbound, 31 outbound) produced in the PM peak hour on a "typical" weekday. 5.2 Project Traffic Distribution and Assignment The general, directional traffic distribution pattern for the proposed Project is presented in Table 5-2. Project traffic volumes both entering and exiting the site have been distributed and assigned to the adjacent street system based on the following considerations: • location of site access points in relation to the surrounding street system, • location of parking areas, and ingress/egress availability at the parking areas, • the site's proximity to major traffic carriers and regional access routes, • physical characteristics of the circulation system such as lane channelization and presence of traffic signals that affect travel patterns, • presence of traffic congestion in the surrounding vicinity, and • input from City staff. Based upon these considerations, the Project traffic distribution pattern at the key study intersections are presented on Figure 5-1. The anticipated AM and PM peak hour Project volumes associated with the proposed Project are presented in Figures 5-2 and 5-3, respectively. The traffic volume assignments presented in Figures 5-2 and 5-3 reflect the traffic distribution characteristics shown in Figure 5-1 and the Project traffic generation forecast presented in Table 5-1. LINScou, LAW & GREENSPAN, engineers 11 LLG Re£ 2-12-3332 Brea Canyon Business Center Project, Diamond Bar l00:,IZM2 -'.f' Linin alegNI—I ilN 'It°tr[FJ:)] TI— ­1 B,,,, Cg.�1,1o.', es.+e­(c'IIdi-ze-I3.d- TABLE 5.1 PROJECT TRAFFIC GENERATION FORECAST'. ITE Land Use Code! Daily AM Peak Hour PMPeakHour Enter Exit Total Enter Exit I Total Project Description 2 -Way Trip Generation Rates: 710: General Office Building 11.03 1.37 0.19 1.56 0.25 1.24 1.49 (TE/1000 SF) 720: Medical -Dental Office Building 36.13 1.89 0.50 2.39 1.00 2.57 3.57 (TE/1000 SF) Project Trip Generation Forecast • General Office (18,351 SF) 202 26 3 29 5 22 27 • Medical Office (3,443 SF) 124 6 2 8 3 9 12 Total Brea Canyon Office Project 326 32 5 37 8 31 39 Trip Generation Forecast Notes: TE/1000 SF= Trip end per 1000 SF of development d Source: Trip Generation, 9th Edition, Institute of Transportation En inem, (ITE)[Washington, D.C. (2012) 7. LiNscoTT,LAW&GREENSPAN, engineers 12 1,LG Ref. 2-12-3332 Brea Canyon Business Center Project, Diamond Bar k:3300 219Jai2-ercn C:mson Bu±u1a11 Coiter, IFm—d amAReryvM9b12-Re%iecd Bw aneino„CodecTIA 3-N, lido- TABLE 5.2 PROJECT DIRECTIONAL DISTRIBUTION PATTERN Distribution Percentage Orientation/Direction 15% To/from the east via SR-57/SR-.60 Freeway 20% To/from the Avest via SR -60 Freeway 15% To/from the south via SR -57 Freeway 20% To/from the northeast via Valley Blvd to Grand Avenue 10% To/from the northwest via Carrier Road to Lemon Avenue 10% To/from southeast via Brea Canyon Road to Grand Avenue 5% To/from the southwest via Lycoming Road to Lemon Avenue 5% To/from the south via Brea Canyon Road 100% Total LINscorr, LAW & GREENSPAN, engineers 1$ LLG Ref. 2-12-3332 Brea Canyon Business Center Projeut, Diamond Bar N Mu" _1"',12-n I �',W—D1,, uIR-pon:Id32, R '..d Hru U n', n M.,-,, Lwly IJ,k321,.111n 3 p 1oe}e o� °ao A• ��' / o \ 00 N u` CURRIER RD / \— � o WASHINGTON ST LYCOMING ST, z� � ��o e h N M a— = INBOUNDY PERCENTAGE FIGURE 5-1 �— = OUTBOUND PERCENTAGE =PROJECT SITE tNO SCALE PROJECT DISTRIBUTION PATTERN BREA CANYON BUSINESS CENTER PROJECT, DIAMOND BAR PROJECT SITE CI ��CpLTKEYFIGURE 5-2 GR�e�77rAf� AM PEAK • - PROJECT Y U7t7f del a sBREA CANYON BUSINESS CENTER PROJECT,DIAMOND :.. �P vy 0 J} I 4 oy'1}r1 / 32-J / 0— / S CURRIER RD -4P��� / — WASHINGTON ST0 J / X10\\ vG w fn \� LYCOMING ST / \ 0° \ m o / a 0 PROJECT SITE CI ��CpLTKEYFIGURE 5-2 GR�e�77rAf� AM PEAK • - PROJECT Y U7t7f del a sBREA CANYON BUSINESS CENTER PROJECT,DIAMOND :.. PR SECT SITE FIGURE 5-3 PM PEAK HOUR PROJECT TRAFFIC VOLUMES BREA CANYON BUSINESS CENTER PROJECT, DIAMOND BAR �2 0 / 22 a1 of 1 f ( 1 1 0 / U \ \ / / a- 1 \ / / o— / n CURRIER RD— �P��y/ \.......WASHINGTON STIn D LYCOMING ST \ ---� / 0 \ / 0 GQ� \ / C71ONA/O � � O / N \ M PR SECT SITE FIGURE 5-3 PM PEAK HOUR PROJECT TRAFFIC VOLUMES BREA CANYON BUSINESS CENTER PROJECT, DIAMOND BAR 5.3 Existing Plus Project Traffic Conditions The existing plus project traffic conditions have been generated based upon existing conditions and the estimated project traffic. These forecast traffic conditions have been prepared pursuant to the California Environmental Quality Act (CEQA) guidelines, which require that the potential impacts of a Project be evaluated upon the circulation system as it currently exists. This traffic volume scenario and the related intersection capacity analyses will identify the roadway improvements necessary to mitigate the direct traffic impacts of the Project, if any. Figures 5-4 and 5-5 present projected AM and PM peak hour traffic volumes at the five key study intersections with the addition of the trips generated by the proposed Project to existing traffic volumes, respectively. LINSCOTT, LAW & GREENSPAN, engineers 14 LLG Re£ 2-12-3332 Brea Canyon Business Center Project, Diamond Bar V IOUU111132-1 1 1 ,Di o....I - P--' ola y.. D11-11 ' t. UNr TINA 3 Zed 3 d IL ki �/ w - 107 \ _I f— 85 }( /1 / / / Z Q / 1, -- 186 :-iL WASHINGTON ST / LYCOMING ST \ C:,]= PROJECT SITE FIGURE 5-4 ®N EXISTING PLUS PROJECT AM PEAK HOUR TRAFFIC VOLUMES BREA CANYON BUSINESS CENTER PROJECT, DIAMOND BAR LGNsCOTTKEY mFIGURE 5-5 PROJECT EXISTING PLUS GReEN�PAN PROJECT PM PEAX HOUR TRAFFIC VOLUMES BREA CANYON BUSINESS CENTER PROJECT, DIAMOND BAR e re l-F� eir ' 0 9L� 38 J� I J�Lr70 148-j1 } 3oJ } IF 300 20--- Nmm/ 1 / \� n 0 R 77 723- / CURRIER RD A \ WASHINGTON ST / 9 a N y \\ M LYCOMING ST 5g6 1 LGNsCOTTKEY mFIGURE 5-5 PROJECT EXISTING PLUS GReEN�PAN PROJECT PM PEAX HOUR TRAFFIC VOLUMES BREA CANYON BUSINESS CENTER PROJECT, DIAMOND BAR e re l-F� eir ' 6.0 FUTURE TRAFFIC CONDITIONS 6.1 Ambient Traffic For the horizon year, background traffic growth estimates have been calculated using an ambient growth factor. The ambient traffic growth factor is intended to include unknown and future related projects in the study area, as well as account for regular growth in, traffic volumes due to the development of projects outside the study area. Background traffic in the study area has been estimated to increase at a rate of approximately 1% per year in the near term. For the Year 2014, the existing (Year 2012) traffic volumes were increased by 2% to reflect area -wide regional growth in traffic. 6.2 Cumulative Projects Traffic Characteristics In order to make a realistic estimate of future on -street conditions prior to implementation of the proposed Project, the status of other known development projects (cumulative projects) within a two-mile radius of the proposed project has been researched at the City of Diamond Bar, City of Walnut, City of Pomona, City of Industry and County of Los Angeles in November 2012. With this information, the potential impact of the proposed Project can be evaluated within the context of the cumulative impact of all ongoing development. Based on our research, there are eight cumulative projects within the vicinity of the project. These cumulative projects have either been built, but not yet fully occupied, or are being processed for approval. These eight related projects have been included as part of the cumulative background setting. It should be noted that given the trip generation potential of the Industry Business Center (IBC), identified as cumulative project no, 4, is greater than that of the IBC/NFL Stadium altematives, the IBC project was considered in the cumulative analysis under long-term conditions. Table 6-1 provides a brief description for each of the eight related projects. Figure 6-1 graphically illustrates the location of the eight related projects. These related projects are expected to generate vehicular traffic, which may affect the operating conditions of the key study intersections. Table 6-2 summarizes the trip generation potential for all eight cumulative projects on a daily and peak hour basis for a typical weekday. As shown, the cumulative projects are expected to generate 87,104 daily trips, with 6,356 trips (5,003 inbound, 1,353 outbound) anticipated during the AM peak hour and 8,891 trips (2,990 inbound, 5,901 outbound) produced during the PM peak hour. Table 6-2 identifies that all of the eight cumulative projects are anticipated to be operational sometime after near term -year 2014 and before long-term Year 2034. 5 Source: Trcffic InipactAiial)sisforindttsn-),Bnsiness Center SEIIL prepared by LLGEngineeis, dated August 2008. LINscoTr, LAw & GREENSPAN, engine srs 15 LLG Ref. 2-12-3332 Brea Canyon Business Center Project, Diamond Bar @'13(102123332 -B111 Bam,11 kfiu111c1C2nieq Dims d➢vMiginrlN?ll-Ra ,,dBr.. Qugou B,uin...",ni- TLk 3-26-13.d— TABLE 6.1 LOCATION AND DESCRIPTION OF CUMULATIVE PROJECTS No. Cumulative Project Jurisdiction Location/Address Description 1. Commercial Retail Walnut Lemon Avenue at Valley 5,965 SF retail Boulevard 2 W VUSD Site D Mixed -Use Diamond Bar Diamond Bar Boulevard East of 200 DU condominium Project Brea Canyon Road 3 Kaiser Permanente Medical Diamond Bar S. gegae 1336 SBridtDrive 33,590 SF medical Office Building - Phase II office 4. Industry Business Center Industry Grand Avenue north of SR -60 4,779,000 SF mixed- use 5. Industrial Park Industry SW comer of Grand Avenue and 125,000 SF industrial Baker Parkway park 6. Industry East -Area A-2 Industry South side of Garcia Drive, east 198,000 SF industrial park, 15,000 SF Fire of Grand Avenue - Station 7. Industry East - Area A-3 Industry West of Grand Avenue, south of 189,000 SF shopping Valley Boulevard center 8. Industry East - Area A-4 Industry West of Grand Avenue, south of 99,000 SF shopping - Valley Boulevard center LINscorT, LAW & GREENSPAN, engine= 16 LLG Ret 2-12-3332 Brea Canyon Business Center Project, Diamond Bar N: 1IU:]I3aa;2-! U,sin-- e, lv oin, o,dH dt.Imn:RL_ R,1 'I'd Brea I 11.1I, TIA Y 26-11d- TABLE 6.2 CUMULATIVE PROJECTS TRAFFIC GENERATION FORECAST Cumulative Project DailyAM Peak Hour77_ PMPeakHour In Out TotalTn Out Total No. Description Two -Way INCLUDED IN YEAR 2034 CUMULATIPE COAlDI77ONS 1. Commercial Retail 256 4 2 6 11 11 22 2. WVUSD Site D Project 1,162 14 74 88 70 34 104 3. Kaiser MOB Phase IT 1,214 63 17 80 34 86 120 4. Industry Business Center 67,993 4,460 1,086 5,546 2,362 4,965 7,327 5. Industrial Park 1,368 100 22 122 29 109 138 6. Industry East — Area A-2' 2,040 180 36 216 57 234 291 7. Industry East —Area A-3' 9,245 126 80 206 309 335 644 8. Industry East — Area A-4' 3,826 1 56 1 36 92 1 118 1 127 245 TOTAL CUMULATIVE PROJECT TRIPS 87,104 5,003 1,353 6,356 2,990 5,901 8,891 6 Source: Traffic LnIpact SatdJ,iorb,dnaG-J) Business Centerprepared by LLG En meet, dated March 2004. LINSCOTT, LAW & GREENSPAN, engl0eers 17 LLG Ref. 2-12-3332 Brea Canyon Business Center Project, Diamond Bar N.43oocf'_3332-8 ri , .0:,,,,,,, lno ,a.t,a 3,32 a..:tee B".i Cl , o I,<., n,m. 114 3 -2a -r. d.., 6.3 Year 2034 Traffic Conditions Year 2034 cumulative traffic volume forecasts utilized in this report are developed based on the finding presented in the traffic analysis for Industry General Plan Update EIR, dated November 2011 prepared by LLG Engineers. Future buildout traffic conditions take into account shifts in traffic to reflect the construction of a new 3/4 diamond interchange (excludes westbound off -ramp) at the SR-60/Lemon Avenue Interchange and removal of the SR -60 eastbound ramps at Golden Springs Drive (Brea Canyon Road). Specifically, a westbound on-ramp and eastbound on- and off - ramps will be added at Lemon Avenue and both will be signalized intersections. In conjunction with the construction of the SR-60/Lemon Avenue Interchange, the existing SR -60 eastbound on- and off - ramps at Golden Springs Drive (Study Intersection 5) will be removed/eliminated. 6.4 Year 2014 and Year 2034 Traffic Volumes 6.4.1 Year 2014 Traffic Volumes Figures 6-2 and 6-3 present the AM and PM peak hour cumulative traffic volumes (existing traffic + ambient growth + cumulative projects) at the five key study intersections for the Year 2014, respectively. Figures 6-4 and 6-5 illustrates Year 2014 forecast AM and PM peak hour traffic volumes, with the inclusion of the trips generated by the proposed Project, respectively. 6.4.2 Year 2034 Traffic Volumes Figures 6-6 and 6-7 present the Year 2034 AM and PM peak hour cumulative traffic volumes at the five key study intersections, respectively, except Golden Springs Drive at SR -60 EB Ramps, which is assumed to be removed with the planned construction of the SR-60/Lemon Avenue Interchange. Figures 6-8 and 6-9 illustrates Year 2034 forecast AM and PM peak hour traffic volumes, with the inclusion of the trips generated by the proposed Project, respectively. LINSCOTT, LAW & GREENSPAN, engimem 18 LLG Ref. 2.12-3332. Brea Canyon Business Center Project, Diamond Bar N:63DD 2123332 -Brea Cm1vn 14nsin 's -leq Dim, 1 B.1R,,&3132 Remi d Drz. 11,rsn,e-s Center TIA 3-26-13 d- KEY PROJECT SITE FIGURE 6-2 N® YEAR 2014 AM PEAK HOUR CUMULATIVE TRAFFIC VOLUMES BREA CANYON BUSINESS CENTER PROJECT, DIAMOND BAR v2 0 p M v� Y \ Y JI ` 837 \ 77--' j oY11�i \ V / N \ / n / M CURRIER RD / 1 9 WASHINGTON ST / 26" in LYCOMING ST / � a �1055 5 i KEY PROJECT SITE FIGURE 6-2 N® YEAR 2014 AM PEAK HOUR CUMULATIVE TRAFFIC VOLUMES BREA CANYON BUSINESS CENTER PROJECT, DIAMOND BAR PROJECT SITE FIGURE 6-3 ®N YEAR 2014 PM PEAK HOUR CUMULATIVE TRAFFIC VOLUMES BREA CANYON BUSINESS CENTER PROJECT, DIAMOND BAR v2 0 q� \ x300 1 151J 30:' 1 } i I 305 20-1 � 0 / a CURRIER RD - WASHINGTON ST % n 9 (\92 w� / \ \ s LYCOMING ST \ / w alb \ GS °' B3 E v> I ) J1\ l 92 i PROJECT SITE FIGURE 6-3 ®N YEAR 2014 PM PEAK HOUR CUMULATIVE TRAFFIC VOLUMES BREA CANYON BUSINESS CENTER PROJECT, DIAMOND BAR N" PROJECT SITE FIGURE 6-4 N® YEAR 2014 AM PEAK HOUR CUMULATIVE TRAFFIC VOLUMES WITH PROJECT eREA CANYON BUSINESS CENTER PROJECT, DIAMOND BAR 92 log\ 87 77f r 70-1 0- 0 190 57--" 83— CURRIER RD WASHINGTON ST < Lb fn LYCOMING ST N" PROJECT SITE FIGURE 6-4 N® YEAR 2014 AM PEAK HOUR CUMULATIVE TRAFFIC VOLUMES WITH PROJECT eREA CANYON BUSINESS CENTER PROJECT, DIAMOND BAR /rnwrn 1`39 \ r 71 34: } 20---�Qi / \ 79 / / / / 125- / WASHINGTON ST /LYCOMING ST \g5--\ I a/ KEY PROJECT SITE FIGURE 6-5 ®N YEAR 2014 PM PEAK HOUR CUMULATIVE TRAFFIC VOLUMES WITH PROJECT BREA CANYON BUSINESS CENTER PROJECT, DIAMOND BAR 151 } \ 306--,%� � 1 ey /rnwrn 1`39 \ r 71 34: } 20---�Qi / \ 79 / / / / 125- / WASHINGTON ST /LYCOMING ST \g5--\ I a/ KEY PROJECT SITE FIGURE 6-5 ®N YEAR 2014 PM PEAK HOUR CUMULATIVE TRAFFIC VOLUMES WITH PROJECT BREA CANYON BUSINESS CENTER PROJECT, DIAMOND BAR rstarr' . PROJECTFIGURE • • YEAR yaw & ntl0 �iNEENSPAN ; 034 AM PEAK • • CUMULATIVE TRAFFIC• G) 912 0 49 \ J 166 ) 30 1 } r I 230 v a`ro 20--� ro.m/ � g / \ _ / M \ / N CURRIER RD WASHINGTON ST % 9 i w LYCOMING ST \ cal i N N m KLY PROJECT SITE FIGURE 6-7 YEAR 2034 PM PEAK HOUR CUMULATIVE TRAFFIC VOLUMES BREA CANYON BUSINESS CENTER PROJECT, DIAMOND BAR KEY 92 0 / M2 r879\ �J1f r1 \ C / \\ Q N 190 \ / 57" r a \ \ 83— / CURRIER RD � d \ WASHINGTON ST 9 a \ O'b LYCOMING ST \ '.. - 10— 44 0 (N�r�rT• PROJECT • • ry �II© CrIiF.E,fJSIAtr,� YEAR 2034 A PEAK O 4: -,E fl ij`I LIFE X5 VOLUMES • •• ki 1 301.1}f'I / % 20� I / ` 166--41 } 231 \ :?%i, WASHINGTON ST ki / LYCOMING ST \ \ ntT _ E=PROJECT SITE FIGURE ®N YEAR 2034 PM PEAK HOUR CUMULATIVE TRAFFIC VOLUMES WITH PROJECT BREA CANYON BUSINESS CENTER PROJECT, DIAMOND BAR 1 301.1}f'I / % 20� I / 'o \ i`79 125- /I :?%i, WASHINGTON ST / LYCOMING ST \ \ ntT _ E=PROJECT SITE FIGURE ®N YEAR 2034 PM PEAK HOUR CUMULATIVE TRAFFIC VOLUMES WITH PROJECT BREA CANYON BUSINESS CENTER PROJECT, DIAMOND BAR 7.0 TRAFFIC IMPACT ANALYSIS METHODOLOGY The relative impact of the proposed Project during the AM peak hour and PM peak hour was evaluated based on analysis of future operating conditions at the key study intersections, without, then with, the proposed Project. The previously discussed capacity analysis procedures were utilized to investigate the future volume -to -capacity relationships and service level characteristics at each study intersection. The significance of the potential impacts of the Project at each key intersection was then evaluated using the following traffic impact criteria 7.1 Impact Criteria and Thresholds: 7.1.1 City of Diamond Bar The significance of the potential impacts of the Project at each key intersection was then evaluated using the following criteria. The Project is considered to have a potentially significant impact if the following criteria are met: For Signalized Intersections: ❑ the ICU value under "with project" conditions is 0.91 or greater (LOSE or F), and ❑ the ICU increase attributable to the project is 0.02 or greater For Unsienalized Intersections: Based on the HCM/LOS method of analysis, this report identifies a significant traffic impact when the Project causes a change from LOS D to LOS E or F, or the Project causes an increase in delay of 2% or more at an intersection operating LOS E or F. 7.2 Traffic Impact Analysis Scenarios The following scenarios are those for which LOS calculations have been performed: A. Existing traffic; B. Existing plus Project conditions; C. Existing plus Project conditions plus mitigation (as required), D. Existing traffic plus ambient growth to the year the project will be completed plus cumulative project traffic; E. Traffic in (D) plus proposed Project traffic; F. Traffic in (E) plus mitigation (as required); G. Long -Term (Year 2034) Future Traffic Conditions; H. Traffic in (G) plus proposed Project traffic; and I. Traffic in (H) plus mitigation (as required). LINSWTT, LAW & GREENSPAN, engineers 19 LLG Ref. 2-12-3332 Brea Canyon Business Center Project, Diamond Bar \IWD 2151.,12-I1,1 1_ anr_ IhR,c(3J, 12-R iRw(ap' D ixe2rataTLAi21,I11- 8.0 PEAK HOUR INTERSECTION CAPACITY ANALYSIS 8.1 Existing Plus Project Traffic Conditions Table 8-1 summarizes the peak hour LOS results at the five key study intersections for existing and existing plus project traffic conditions. The first column (1) of ICU/LOS values in Table 8-1 presents a summary of existing AM and PM peak hour traffic conditions'(which were also presented in Table 3-3). The second column (2) lists existing plus project traffic conditions based on existing intersection geometry. The third column (3) shows the increase in ICU value due to the added peak hour Project trips and indicates whether the traffic associated with the Project will have a significant impact based on the LOS standards and the significance impact criteria defined in this report. The fourth column (4) indicates the forecast LOS with implementation of recommended improvements to mitigate the Project's traffic impact. 8.1.1 Existing Plus Project Traffic Conditions Review of Columns 2 and 3 of Table 8-1 indicates that traffic associated with the proposed Project will not significantly impact any of the five key study intersections, when compared to the LOS standards and significant impact criteria specified in this report. The five key study intersections currently operate and are forecast to continue to operate at an acceptable service level during the AM and PM peak hours with the addition of Project generated traffic to existing traffic. LINSCOTT, LAW & GREENSPAN, engiMOM 20 LLG Ref. 2-12-3332 Brea Canyon Business Center Project, Diamond Bar Ni 33004_2334 -Brea Dinmm..I Bm'R ,01333] - R,,—d Brsa Coy'en Bneim=sl',W, TL\ 3-26-1- d,, s y O w a N � � a F-1 z z z z z z z z z z Kg iii M h o 0 0 0 0 0 0 0 0 0 W o¢ U¢¢ v a w m w U N naso y y v � 0 0 0 0 0 0 0 0 0 0 y � W U � y C W U ti � CMO 1p ll� I'D r O O O O O O Og O. O O F m C m m m m j T P+ ❑� �q � q p ��11 � � 3 4 W U W CQ r' N M d Vl 8.2 Year 2014 Traffic Conditions Table 8-2 summarizes the peak hour LOS results at the five key study intersections for Year 2014 cumulative traffic conditions. As shown, column one (1) presents existing traffic operating conditions (as detailed previously). Column two (2) presents future Year 2014 cumulative traffic conditions. Column three (3) reports the forecast Year 2014 traffic conditions with the addition Project traffic. The fourth column (4) shows the increase in ICU value due to the added peak hour project trips and indicates whether the traffic associated with the Project will have a significant traffic impact based on the significance impact criteria defined in this report. The fifth column (5) indicates the forecast LOS with implementation of recommended improvements to mitigate the Project's traffic impact. 8.2.1 Year 2014 Cumulative Traffic Conditions An analysis of future (Year 2014) cumulative traffic conditions indicates that the addition of ambient traffic growth and cumulative projects traffic ivill not adversely impact any of the five key study intersections. The five key study intersections are forecast to continue to operate at acceptable levels of service during the AM and PM peak hours with the addition of ambient traffic growth and related projects traffic. 8.2.2 Year 2014 Cumulative Plus Project Traffic Conditions Review of Columns 3 and 4 of Table 8-2 indicates that traffic associated with the proposed Project Wil not significantly impact any of the five key study intersections, when compared to the LOS standards and significant impact criteria specified in this report. The five key study intersections are forecast to continue to operate at an acceptable LOS with the addition of project generated traffic in the Year 2014. LiNscou,, LAW & GREENSPAN, engimers 22 LLG Ref. 2-12-3332 Brea Canyon Business Center Projeot, Diamond Bar X?3300�R3t32-5rev❑n9'mi GLLu�a�a Cenieq Dimrond 6ai Jieyoct6332-Re�i�eA nrc, Cmp..n 6uruieo 2o 13d— li y Y O N z z z z z z z z z z o O O O o O O O O C O O O O O O O O O O as 0 d U d d U a m 4 U U 9' y � L O V� N Vl q� F n O'J V1 M W O C^ O m � Y W U H O O O O O O O O O O O a a a a y i3 yN �N N > G o o b b b o 0 j o P: d Pi b0 •• � � U o ani o N M d Vl 8.3 Year 2034 Traffic Conditions Table 8-3 summarizes the peak hour Level of Service results at the five key study intersections for Year 2034 cumulative traffic conditions. The structure of this table is similar to that of Table 8-2. As shown, column one (1) presents existing traffic operating conditions (as detailed previously). Column two (2) presents future Year 2034 cumulative traffic conditions. Column three (3) reports the forecast Year 2034 traffic conditions with the addition Project traffic. The fourth column (4) shows the increase in ICU value due to the added peak hour Project trips and indicates whether the traffic associated with the Project will have a significant traffic impact based on the significance impact criteria defined in this report. The fifth column (5) indicates the anticipated level of service with implementation of recommended improvements to mitigate adverse cumulative traffic conditions and/or achieve an acceptable LOS. 8.3.1 Year 2034 Cumulative Traffic Conditions Review of column 2 of Table 8-3 shows that projected long-term (Year 2034) cumulative traffic will not adversely impact any of the key study intersections. As noted earlier, with the planned construction of the SR-60/Lemon Avenue Interchange, the Golden Springs Drive/SR-60 EB Ramps intersection will be demolished and therefore service level projections for this key intersection are not necessary under Year 2034 cumulative traffic conditions. 8.3.2 Year 2034 Cumulative Pius Project Traffic Conditions Review of Columns 3 and 4 of Table 8-3 indicates that traffic associated with the proposed Project will not significantly impact any of the key study intersections, when compared to the LOS standards and significant impact criteria specified in this report. All key study intersections are forecast to continue to operate at an acceptable LOS with the addition of project generated traffic in the Year 2034. LINscon, LAW & GREENSPAN, engineers Z4 LLG Ref. 2-12-3332 Brea Canyon Business Center Project, Diamond Bar k'\1aDUM',331 6+ea �'nn�m+ 6nsin�T=i; apeq Diamo+W Ba,\IhgeeP3332- Revi=ed bre.+ Cvpw, ❑i�ine�=Center TIA 2-1 Id— r�77 z z z z z z z z €�s�p�yyooN�000a O O O C O O O O O O O O 0 d U d d U U w m, Ra M O d U d Q U U Pa pa M F C a d N �+ U o 0 0 0 0 0 0 0 9� O d U d Q U a w ro m U Y pq U H w w w a�a m y id iC i6 itl v o o C o o U,�FQT7 ogCD ) U C U p aCi O 9.0 STATE OF CALIFORNIA (CALTRANS) METHODOLOGY In conformance with the current Caltrans Cniide for the Preparation of Traffic Impact Studies, existing and projected peak hour operating conditions at the two (2) state-controlled study intersections within the study area have been evaluated using the Highway Capacity Manual 2000 (HCM 2000 for signalized intersections) operations method of analysis. These state-controlled locations include the following two study intersections: 4. Brea Canyon Road at SR -60 WB Ramps 5. Golden Spring Drive at SR -60 EB Ramps Caltrans "endeavors to maintain a target LOS at the transition between LOS "C" and LOS "D" on State highway facilities"; it does not require that LOS "D" (shall) be maintained. However, Caltrans acknowledges that this may not always be feasible and recommends that the lead agency consult with Caltrans to determine the appropriate target LOS. According to City of Diamond Bar, LOS D is the minimum acceptable condition that should be maintained during the morning and evening peak commute hours on all City intersections. 9.1 Highway Capacity Manual (HCM) Method of Analysis (Signalized Intersections) Based on the HCM operations method of analysis, level of service for signalized intersections is defined in terms of control delay, which is a measure of driver discomfort, frustration, fuel consumption, and lost travel time. The delay experienced by a motorist is made up of a number of factors that relate to control, geometries, traffic, and incidents. Total delay is the difference between the travel time actually experienced and the reference travel time that would result during ideal conditions: in the absence of traffic control, in the absence of geometric delay, in the absence of any incidents, and when there are no other vehicles on the road. In Chapter 16 of the HCM, only the portion of total delay attributed to the control facility is quantified. This delay is called control delay. Control delay includes initial deceleration delay, queue move -up time, stopped delay, and final acceleration delay. In contrast, in previous versions of the HCM (1994 and earlier), delay included only stopped delay. Specifically, LOS criteria for traffic signals are stated in terms of the average control delay per vehicle. The six qualitative categories of Level of Service that have been defined along with the corresponding HCM control delay value range for signalized intersections are shown in Table 9-1. 9.2 Existing Plus Project Traffic Conditions Table 9-2 summarizes the peak hour level of service results at the two state-controlled study intersections within the study area for Existing plus Project traffic conditions based on the HCM method of analysis. A review of this table indicates that both state-controlled study intersections currently operate at an acceptable LOS during the AM and PM peak hours. Further, a review of Table 9-2 indicates that traffic associated with the proposed Project will not significantly impact Brea Canyon Road at SR -60 WB Ramps and Golden Springs Drive at SR -60 EB Ramps as both are forecast to continue to operate at an acceptable LOS with the addition of Project generated traffic to existing traffic. L1NScrru, LAw & GREENSPAN, engiree6 Lb UG Ref. 2-12-3332 Brea Canyon Business Center Project, Diamond Bar _ A^1MO1 123'+32- Dlea Cmpnn ntdne., I ,AlDlomm11J DIVR11otl9332-Re. TABLE 9.1 LEVEL OF SERVICE CRITERIA FOR SIGNALIZED INTERSECTIONS (HCM METHODOLOGy)14 Level of Service (LOS) Control Delay Per Vehicle (seconds /vehicle) Level of Service Description This level of service occurs when progression is extremely favorable and most vehicles arrive A < 10.0 during the green phase. Most vehicles do not stop at all. Short cycle lengths may also contribute to low delay. This level generally occurs with good B > 10.0 and < 20.0 progression, short cycle lengths, or both. More — vehicles stop than with LOS A, causing higher levels of average delay. Average traffic delays. These higher delays may result from fair progression, longer cycle lengths, or both. Individual cycle failures may C > 20.0 and < 35.0 begin to appear at this level. The number of vehicles stopping is significant at this level, though many still pass through the intersection without stopping. Long traffic delays. At level D, the influence of congestion becomes more noticeable. Longer delays may result from some D > 35.0 and L 55.0 combination of unfavorable progression, long — cycle lengths, or high vle ratios. Many vehicles stop, and the proportion of vehicles not stopping declines. Individual cycle failures are noticeable. Very long traffic delays. This level is considered by many agencies (i.e. SANBAG) to be the limit of acceptable delay. These high E > 55.0 and < 80.0 delay values generally indicate poor progression, long cycle lengths, and high v/c ratios. Individual cycle failures are frequent occurrences. Severe congestion. This level, considered to be unacceptable to most drivers, often occurs with over saturation, that is, when arrival flow rates F > 80.0 exceed the capacity of the intersection. It may also occur at high v/c ratios below 1.0 with many individual cycle failures. Poor progression and long cycle lengths may also be major contributing factors to such delay levels. 14 Soume: Higlnvcry Cal acitydLanucrl2000, Chapter l6 (signalized Intersections), LINscott, LAw & GREENSPAN, engineers 27 LLG Ref. 2 -12 -3332 - Brea Canyon Business Center Project, Diamond Ba,' s¢auo:^ 1 zs32 - Irrn m<a,.,. c -ma om.,d n.mRzlnrznl;l, . ae, TABLE 9.2 YEAR 2012 PEAK HOUR INTERSECTION CAPACITY ANALYSIS — CALTRANS's 15 Bald ICUILOS values indicate adverse service levels based on City LOS standards. LINSCOTT, LAW & GREENSPAN, engineers BudZ,,a3332 Rmieci firm Cm— Bmbix, Caaell IA 3-2613Ac LLG R.I. 2-12-3332 Brea Canyon Business Center Project, Diamond Bar V'. 13100,2111312. Brra C1111n Rnine-.rn C -,c, D6wiond (2) Year 2012 (1) (3) Existing Plus 2012 Existing Project Traffic Significant Traffic Conditions Conditions Impact Time HCM LOS HCM LOS Yes/No Key Intersections Period Brea Canyon Road at AM 25.0 C 25.1 C No a. SR -60 WB Ramp PM 25.0 C 25.1 C No Golden Springs Drive at AM 27.8 C 27.8 C No 5. SR4 EB Ramps PM 27.3 - C 27.5 C No 15 Bald ICUILOS values indicate adverse service levels based on City LOS standards. LINSCOTT, LAW & GREENSPAN, engineers BudZ,,a3332 Rmieci firm Cm— Bmbix, Caaell IA 3-2613Ac LLG R.I. 2-12-3332 Brea Canyon Business Center Project, Diamond Bar V'. 13100,2111312. Brra C1111n Rnine-.rn C -,c, D6wiond 9.3 Year 2014 Cumulative Plus Project Traffic Conditions Table 9-3 summarizes the peak hour level of service results for Brea Canyon Road at SR -60 WB Ramps and Golden Springs Drive at SR -60 EB Ramps for Year 2014 Cumulative Traffic Conditions without and with Project Traffic based on the HCM method of analysis. A review of Table 9-2 indicates both the Brea Canyon Road at SR -60 WB Ramps and Golden Springs Drive at SR -60 EB Ramps are forecast to continue to operate at LOS C during the AM peak hour and PM peak hour under Year 2014 cumulative traffic conditions without Project traffic. 9.3.1 Year 2014 Cumulative Plus Project Traffic Conditions Table 9-4 summarizes the peak hour level of service results for Brea Canyon Road at SR -60 WB Ramps for Year 2034 Cumulative Traffic Conditions without and with Project Traffic based on the HCM method of analysis. As noted earlier, with the planned construction of the SR-60/Lemon Avenue Interchange, the Golden Springs Drive/SR-60 EB Ramps intersection will be demolished and therefore service level projections for this key intersection are not necessary under Year 2034 cumulative traffic conditions. Review of. Columns 3 and 4 of Table 9-4 indicates that traffic associated with the proposed Project will not significantly impact Brea Canyon Road at SR -60 WB Ramps as this key intersection is forecast to continue to operate at LOS C with the addition of project generated traffic in the Year 2034. Appendix. C presents the existing plus project and Year 2014 and Year 2034 plus project HCM/LOS calculations for the two state-controlled study intersections. LINscoTr, LAW & GREENSPAN, engineers 29 PLO Ref 2-12-3332 Brea Canyon Business Center Reject, Diamond Bar \3300'12",12 11-W .. . .. D —,," I Mr,,Ild 111, Rei aU0,32 - R Via.d Nnnl ..... ias tr-,nci Tld f -x. I4d.,. / \ � \ \ ( !t £ 6 5 -■/ ^2A�q � \ § o 0 0 6)ij . »- u 2 m m m e ! a a o 0 E)) k §) § § [\ \j m, 0 Gz \ \ ( k u , u� u u , , �) U § ! u u u u fq° /})§ )§ #a \/ \ \{ ƒ» In 10.0 SITE ACCESS EVALUATION 10.1 Level of Service Analysis For Project Access Access to the project site will be provided via an existing full access driveway located along Washington Street which provided access to an existing industrial building. It should be noted that given the current tenant mix reflects "business park -type" uses, the existing driveway volumes have been forecasted using ITE Land Use Code 770: Business Park trips rates. As noted earlier, the existing 20,571 SF industrial building contains eight (8) suites ranging in size from approximately 1,400 SF to 3,500 SF that is now occupied by a Carpet Wholesaler, CPA firm and Accounting Office, Structural Engineering Firm, Ethnic Education, Medical Equipment, Textile Wholesaler, Engineering and a Vacant Unit. According to the applicant, the tenant mix or uses are not expected to vary from what is now allowed under the site's current zoning. To provide a conservative assessment, the existing building is assumed to be fully occupied. Appendix D presents the ITE trip generation rates for a business park. Table 10-1 summarizes the intersection operations at the project driveway along Washington Street under near-term (Year 2014) and long-term (Year 2034) traffic conditions at completion and full occupancy of the proposed Project. The operations analysis for the project driveway is based on the Highway Capacity Manual 2000 (HCM 2000) methodology. Review of Table 9-1 shows that the proposed project driveway along Washington Street is forecast to operate at acceptable LOS A or better during the AM and PM peak hours for near -tern (Year 2014) and long-term (Year 2034) traffic conditions. In addition, due to the relatively low level of volume along Washington Street the project driveway is expected to have a maximum queue of one (1) vehicle both entering and exiting the site. As such, project access will be adequate. Motorists entering and exiting the Project site will be able to do so comfortably, safely, and without undue congestion. Appendix B presents Year 2014 and Year 2034 level of service calculation worksheets at the project driveway. LINSCOTT, LAW &GREENSPAN, engineers 32 LLG Ref. 2-12-3332 Brea Canyon Business Center Project, Diamond Bar N_930(Y3123339 -0r•;. Cm,ym, Hne$iHr Ceu1a5 Dnnnoni nnPlt ry�otllt3t2- 2e,vzd Hren Cvnwn Rneu,a� CeNtr Id 2. 13,b, TABLE 10.1 PROJECT DRIVEWAY PEAK HOUR INTERSECTION CAPACITY ANALYSIS" 19 Bold ICIULOS values indicate adverse service levels based on City LOS standards. s/v = seconds per vehicle LINSCOTT, LAW & GREENSPAN, engineers 33 LLGRef. 2-12-3332 Brea Canyon Business Center Project, Diamond Bar V`'OtOR �I�A3 p-,Wa., n-ttnloq[11; ipadRy,..ri "I -..yixJ""Ui'—Fl"' o.,�--"TlPxt. 2n-B.lec (1) (2) Year 2014 Year 2034 Plus Project Plus Project Time Intersection Traffic Conditions Traffic Conditions HCM LOS HCM LOS Project Driveway Period Control Project Driveway at AM One — Way 8.8 s/v A 8.8 s/v A A. Wasldn on Street St PM Stop 8.7 s/v A 8.7 s/v A 19 Bold ICIULOS values indicate adverse service levels based on City LOS standards. s/v = seconds per vehicle LINSCOTT, LAW & GREENSPAN, engineers 33 LLGRef. 2-12-3332 Brea Canyon Business Center Project, Diamond Bar V`'OtOR �I�A3 p-,Wa., n-ttnloq[11; ipadRy,..ri "I -..yixJ""Ui'—Fl"' o.,�--"TlPxt. 2n-B.lec 10.2 Internal Circulation The on-site circulation layout of the proposed Project has been tested using the Turning Vehicle Templates, developed by Jack E. Leisch & Associates, and AnfoTURN for AutoCAD computer software that simulates turning maneuvers for various types of vehicles. The internal circulation layout for the Project has been reviewed and is adequate to accommodate service/delivery trucks, trash trucks (SU -30) and fire trucks (Platform 87ft) that would service the proposed site. Figures 10- 1, 10-2, 10-3 and 10-4 illustrate the turning movements for a small delivery/trash truck and a fire truck, respectively. An evaluation of the truck turning requirements of full-sized (WB -40 and W13-50) trucks indicates that accessing the site and circulating throughout the entire property would be difficult unless modifications to the parking layout of the industrial building were made (which could result in a loss of parking), the driveway was modified to provide a 40 -foot to 50 -foot "curb -return" and the existing median nose on Washington Street was shorted by up to 15 -feet. However, given the existing or future tenants of the industrial building are only likely to receive deliveries via small trucks (SU -30) similar to the proposed Project, the need to accommodate the turning requirement of full-sized (WB - 40 or W13-50) truck is not necessary and hence site modifications would not be required. To ensure adequate truck access and circulation is maintained and vehicular conflicts are minimized, it is recommended that access for full-sized (WB -40 or larger) trucks be restricted/prohibited. It recommended that the project applicant adopt this restriction in owner/tenant Conditions, Covenants & Restrictions (CC&R). The CC&R prohibition will be applied to all tenants of the existing building and proposed Project. LINscm, LAW & GREENSPAN, engioeets 34 LLGRef. 2-12-3332 Brea Canyon Business Center Project, Diamond Bar C-1,TIAs- 360.0 8.0 240.0 SU n hes Wldt ;96.0 T.<k 96.0 Lock to Lock Time : 6.0 Stee6, Myle :31,8 FIGURE 10-1 ®scale: 1^=so' SU -30 INBOUND TRUCK TURNING ANALYSIS BREA CANYON BUSINESS PARK, LA HABRA {III 3613.0 1 48.0 240.0 SU inches .Width : 96.0 Track :96.0 Lock to Lack Tme : 6.0 SteeH' M91e : 31.0 FIGURE 10-2 �scALe: 1'=50' SU -30 OUTBOUND TRUCK TURNING ANALYSIS BREA CANYON BUSINESS PARK, LA HABRA FIGURE 10-3 ®scale i -=w• FIRE TRUCK INBOUND TURNING ANALYSIS BREA CANYON BUSINESS PARK, LA HABRA J FIGURE 10-4 �cAic: r=so' FIRE TRUCK OUTBOUND TURNING ANALYSIS BREA CANYON BUSINESS PARK, LA HABRA 11.0 AREA -WIDE TRAFFIC IMPROVEMENTS For those intersections where future traffic volumes are expected to result in poor operating conditions, this report identifies recommended roadway improvements that change the intersection geometry to increase capacity. These capacity improvements involve roadway widening and/or re - striping to reconfigure (add lanes) to specific approaches of a key intersection. The identified improvements are expected to: mitigate the impact of area -wide deficiencies, and/or improve Levels of Service to an acceptable range. 11.1 Year 2012 Existing Plus Project Recommended Improvements The results of the intersection capacity analysis presented previously in Table 8-1 shows that the proposed Project will not significantly impact any of the five key study intersections under the "Existing Plus Project" traffic scenario. Given that there are no significant project impacts, no improvements are required under this traffic scenario. 11.2 Year 2014 Plus Project Traffic Conditions The results of the intersection capacity analyses presented previously in Table 8-2 shows that the proposed Project will not significantly impact any of the five key study intersections under the "Year 2014 Plus Project' traffic scenario. Given that there are no significant project impacts, no improvements are required under this traffic scenario. 11.3 Year 2034 Plus Project Traffic Conditions The results of the intersection capacity analyses presented previously in Table 8-3 shows that the proposed Project will not significantly impact any of the five key study intersections under the "Year 2034 Plus Project' traffic scenario. Given that there are no significant project impacts, no improvements are required under this traffic scenario. LINSCOTT, LAW & GREENSPAN, englneem 35 LL3 Ref. 2-12-3332 Bran Canyon Business Center Project, Diamond Bar N %1101Q] 13. pien Cant 8 sCcnln, Dri JIY.irtRep^[}1a2 2u�=.dY•iahpnn.uafCeiicrl'IA_4- 26-I'd— 12.0 CONGESTION MANAGEMENT PROGRAM COMPLIANCE ASSESSMENT The Congestion Managemeht Program (CMP) was created statewide as a result of Proposition 111 and has been implemented locally by the Los Angeles County Metropolitan Transportation Authority (LACMTA). The CMP for Los Angeles County requires that the traffic impact of individual development projects of potential regional significance be analyzed. A specific system of arterial roadways plus all freeways comprise the CMP system. 12.1 Traffic Impact Review As required by the current Congestion Management Program for Los Angeles County, a review has been made of designated monitoring locations on the CMP highway system for potential impact analysis. Per CMP TIA criteria, the geographic area examined in the TIA must include the following, at a minimum: • All CMP arterial monitoring intersections, including freeway on and off -ramp intersections, where the project will add 50 or more trips during either the AM or PM weekday peak hours. • Mainline freeway -monitoring stations where the project will add 150 or more trips, in either direction, during the AM or PM weekday peak hours. 12.1.1 Freeways The CMP freeway mainline monitoring stations in the vicinity of the study area are as follows: CMP Station No. 1031: SR -60 at Brea Canyon Road CMP Station No. 1032: SR -60 east of SR -57 The proposed project will not add 150 or more trips (in either direction) during the weekday AM and PM peak hours at CMP mainline freeway monitoring locations as stated in the CMP manual as the threshold for a traffic impact assessment. Therefore a CMP freeway traffic impact analysis is not required. 12.1.2 Intersections The CMP arterial intersection in the vicinity of the study area includes the intersection of Diamond Bar Boulevard at Grand Avenue. As stated earlier, the CMP guidelines require that arterial monitoring intersection locations must be examined if the proposed project will add 50 or more trips during either the AM or PM weekday peak hours (of adjacent street traffic) at CMP monitoring intersections. Based on the proposed project's trip generation potential, trip- distribution and trip assignment, the added AM and PM peak hour project generated trips to the adjacent street system does not require a CMP analysis. LlNscoT7, LAw& GREENSPAN, engineers 36 LLG Ret 2-12-3332 Brea Canyon Business Center Project, Diamond Bar NIMD0 21218?-Brrn Cvpv„enaLraa Cuilnq DlonwW Ft r'd4porr1332.Re.vxJ e,m Cvrym, n�«in�c=Center TLA8- 26-1 t J 13.0 SUMMARY OF FINDINGS AND CONCLUSIONS Project Description —The project site is a rectangular -shared 2.68 -acre vacant parcel of land that is located on the northeast comer of Washington Street and Brea Canyon Road. The proposed Project includes the development of a two-story building consisting of 18,351 square -feet (SF) of office use and 3,443 SF of medical office use for a total of 21,794 SE Access to the subject property is now provided via a "full access driveway on Washington Street. The site is currently developed with a surface parking lot and is located adjacent to a 20,571 SF industrial building with surface parking. • Stur13P Scope —The following intersections were selected for detailed peak hour level of service analyses under Existing (Year 2012) Traffic Conditions without and with Project Traffic, Year 2014 Cumulative Traffic Conditions without and with Project Traffic, and Year 2034 Cumulative Traffic Conditions without and with Project Traffic: 1. Brea Canyon Road at Currier Road 2. Brea Canyon Road at Washington Street 3, Brea Canyon Road at Lycoming Street 4. Brea Canyon Road at SR -60 WB Ramps 5. Golden Springs Drive at SR -EB Ramps The analysis is focused on assessing potential traffic impacts during the morning and evening commute peak hours (between 7:00-9:00 AM, and 4:00-6:00 PM) on a typical weekday. Please note that the study locations were identified using the City's "16 trip threshold criteria". Level of Service (IIS) Standards and Significant ingmet Criteria - Impacts to local and regional transportation systems are considered significant if For Signalized intersections: ❑ the ICU value under "with project" conditions is 0.91 or greater (LOSE or F), antic ❑ the ICU increase attributable to the project is 0.02 or greater For Unsignalized Intersections: Based on the HCM/LOS method of analysis, this report identifies a significant traffic impact when the Project causes a change from LOS D to LOS E or F, or the Project causes an increase in delay of 2% or more at an intersection operating LOS E or F. • Existing Traffte Conditions — All of the five key intersections currently operate at satisfactory levels of service (i.e., LOS D or better) during the AM and PM peak hours. Project 'Trip Generation — On a "typical" weekday, the proposed Project is forecast to generate 326 daily trips, with 37 trips (32 inbound, 5 outbound) produced in the AM peak hour and 39 trips (8 inbound, 31 outbound) produced in the PM peak hour on a "typical" weekday. LINscou, LAW & GREENSPAN, engimers 37 LLG Ref 2-12-3332 _ Brea Canyon Business Center Project, Diamond Bar o„ 6nx> R11-11 H1,1 C-11Its?- 2o-13.d", Cunadative Projects Trip Generation - Eight (8) cumulative projects were considered in the cumulative traffic setting. These cumulative projects are expected to generate approximately 87,104 daily trips, with 6,356 trips (5,003 inbound, 1,353 outbound) anticipated during the AM peak hour and 8,891 trips (2,990 inbound, 5,901 outbound) produced during the PM peak hour. All of the eight cumulative projects are anticipated to be operational sometime after near-term year 2014 and before long-term Year 2034. Year 2012 Existing Traffic Cond ifions Plus Project— The proposed Project will not significantly impact any of the five key study intersections, when compared to the LOS standards and significant impact criteria specified in this report. The five key study intersections currently operate and are forecast to continue to operate at an acceptable service level during the AM and PM peak hours with the addition of Project generated traffic to existing traffic. Year 2014 Cumulative Traffic Conditions Plus Project — The proposed Project will not significantly impact any of the five key study intersections, when compared to the LOS standards and significant impact criteria specified in this report. The five key study intersections currently operate and are forecast to continue to operate at an acceptable service level during the AM and PM peak hours with the addition of Project generated traffic in Year 2014. Year 2034 Cumulative Traffic Conditions Plus Project — The proposed Project will not significantly impact any of the five key study intersections, when compared to the LOS standards and significant impact criteria specified in this report. The five key study intersections currently operate and are forecast to continue to operate at an acceptable service level during the AM and PM peak hours with the addition of Project generated traffic in Year 2034. State of California (Caltrans) Methodology — The results of the intersections capacity analysis using the State of California (Caltrans) Methodology indicates that traffic associated with the proposed Project will not significantly impact either Brea Canyon Road at SR -60 WB Ramps or Golden Springs Drive at SR -60 EB Ramps when compared to the LOS standards and significant impact criteria specified in this report. Both state-controlled study intersections are forecast to continue to operate at an acceptable LOS with the addition of project generated traffic to existing traffic and under Year 2014 and Year 2034 Cumulative Plus Proj ect Traffic Conditions. • Site Access and Internal Circulation Evaluation —The site access and internal circulation layout for the Project has been reviewed and is adequate to accommodate service/delivery trucks, trash trucks and fire trucks that would service the proposed site. Full-sized WB -40 and WB -50 trucks have difficulties accessing the site and circulating the property. Therefore, the project is proposing that CC& R prohibition be applied to all tenants that take access from the project driveway. This prohibition would only allow access by SU -30 trucks and smaller. CMP Compliance Assessment: The proposed Project will not have an impact on the Los Angeles County Congestion Management Program roadway network. LINSCoTr, LAW & GREENSPAN, englneem 38 LLG Ref 2-12-3332 Brea Canyon Business Center Project, Diamond Bar N 1330082121332 -Brca C119m1 Bn1111.x€ Cenle, Dlm,,ud Ba,R,.0332 _ Re1izd Bm, Can}. n 8..Lmv=C-1, TIA 3- 26I3Ado 650 CGM BREA CANYON BUSINESS CENTER DIAMONAD CANYON R, CA91O789 ------------ QF/RE"EPT NOTES WE mMARS°. AU. WL' FOR P EgSnMC R Oi .AEC ,G, RO a.S.Y� Y WY °E USED i0 ME XNJIRw FWD ROW R VAG M MC FJLSOMN, mm. EE.11. TE ..A CODE 11 ME dM .1. ED .1 PA. RMR AAFA Of u N,MR IEH15 WON 1XE IXNWLYt WN 39 IND UN°FA RGGG.R°JRT 0'.. OI IND AI - ME SPRXKUBO I. SDR): ].DOL iOTIL ME . REgAPNFM: X. ' 1.2. PGY AT CO 19 PESPAN. PROURRI a. ANE51RLT. Fro BE VBE]m As "ONE ARE,, ' ... £IPC VX...1 TO 0.4 OWED APPROVED CP MEN MPR02 NOIK£5 P9 .... MR I... . 'H0 '.. - C., RIE. 96X0 S. fiE Pf EOR EIRE MPAPANE ..PMO. m CIfMIY IN. M FMM4CE TO SAN RAD. ON PROPreD WE OPsiPUOT01f GCRGO.. As REODwEO Oi ULD FIFE P6PECIgt EXISTING P T Z P I LON o- 1 BY LA COUNTY N I. '' '79�4'SIDEIS LAIN. FRONLSEBBACK ' EXISUNG TRASH- / ' ENCLOSURE AS IS , TO BE SNARED NOR ' IAT I AND LOT II I` FISEMEM I I A 1_� ® 313'-11 1/4' 1 _ �I,j'- DISTANCE B/IIW�FEN FNH. IEIR.$C SITE PLAN OF TWO NEIGHBORING P�ARC�IE'LS L IA/A CIJ Ili/" \ S aY✓x` PARKING COUNT \ ' PARKING REWIRED 91 PANRIN. PG.UfA 91 " LOU 1 7 NEW PROPOSED BLDG LOT I 21,]94 BE MANtAA0 3] MEdGL OffICC 3,93 SF NWgCM (PER TABLE 118-6) 2 p 1/2 ED SG 14 DESIGWOM (PEP WC 5.1°6.52) ] BUSINCSS OFFICE 18}51 SF LOT 11 - E.E. WON LENT EXISTING 12' a 1/4W SF 45 STNIDARD u 1. LOL II - E%ISNXC WARFN0l5E BCYCIE PPAK NG PEW PCO 4 �I 20.571 SF ORI A. /SR DF TOTAL PARKING) 2 °ECCE $PACE 6.BC0 Sf LONG UK" (50. OF LOTK PARKING) 2 �j o 1..ED SF n BICYCLE WKING FRONDED 4 W...ED}1111{II SPARE 13.>]I $f SAWON TEAM 2 ® 1/1000 $F 14 ILNG iEBN 2 OORARE S - PROJECT SUMMARY SHEET INDEX PARTICIPANTS GP°SS AS -10° OSTAPIL SITE PW! k PROJECF bXNFR CRUTTUO, :u BGW GRO55 Ib]flF$S 6N BgSp PAy1gN FO]D, DATA B)526 FAST IRbMINO SMEEI� PRESENT CHR, PE 4439 GMIGMSS CT. AREA DAEAM DAN. AA 91]89 AS -101 PROJECT SNE PIAN (LM 1) CRY OFI .... G 91140 CwxW HILLS. G 91]09 AP FA AM 8719,11.1 H 8]19-010-9DE AS -102 SNE DaAls PMOHE: (626) 913-0939 PNUE, () EKISTING ' tM`OSCM[ QAS-10] SIZE DECALS 3DO'Y" o -P SURVEY FUG BEST 91]-1911 EµUI p ESTONCWN9]BGAVILCON AA GNANR 0 COMPLY: REGW T4➢ CBMPLE: PRESTON CNW ' d ] LOi APR 42,333 3 5E (S 0.97 AIDE) WE 10 LOL UNE MNS T-1 lEMAr TRACT M^PNOMETE Q( TMFM) 2 1 OF ] GRADING PND DR>INAGE PVH pRCPo$m NEE 1 OGE (YFDIGL1 OF 3 GRADING IND °PIJHAGE PLCO CRFAINE OESlfdl PSSMNTFS xYC fAN511LPXG ENGIXEEflS. INC. 1.8 E ROWJND URER, 556 N. BARONS BNL BLVD.. /]04 a \ I \� . / \ ($f£ RWR AAFA FBR DF1M5) 2 OF 3 EROSION COMROL TIDE C£ COIISfflW110H: 11PE 48 2QL-1 IRPIGIgN <NY Oi INWSIPY. G 91>46 WyOND FAO. G 91]65 PHG.E. (6a6) 913-0101 PHONE (909) ]69-0168 ME I. 91108 1 FI%: (909) ]69-G169 2.1 \ 6 1[\ t-2 PLANING UA., DOUG CW CA-MC.CDN FNNL HYUNA( CDAIKA£RC011 \ \ \ NAE 5%tlKKIFRS: YE$ NEPAL I3 - L-3 EASTNIG TREE PVN ] Q (SVAHAF PLRUM A 401 1. AND 2X0 FLOOR PVN [ ,NO., ANMnFfT \ a16/�201 FIRE PAIRS BSC NO) WNL_MEED A-102 'WEPLAN INC pPXp 1PNOSGPE MYNOECrs EDIAVGEIrt 19PSi. / EIEVAWNS OCLIRNILT CARP: B 56] B. 2911 E. CIR.PM.W AVE G 92821 NLLERTON. G 92&11 S.NOiF. �T_ 201C COLOR ELEVAl'DNA IHBU PNO"E ("A 6)1-1050 PHONE (]14) H9 -9]q1 1,]68SR L9]]SF.I].91O5.f. PRDPOSM µFA 2 )94 SF A -SDI WIN00W N!0 WOR SCHEDULE FAY: pl4) sn-1o90 Fes: (]141 N9-9 CO2 ESWL: IEECC VXDENGCON / / ISE FLCOfl: ID,9T9 SF. E-2 SNE PIAN OR LIGHTING CONTROL OM . WWACG .4 LEE IW SR 2X0 FLOOR: IOA1S S.F. SYSTEM O EAACUVMAUPGACIIIIECI.COY 6oN1AGF: GRLT ORmc 130SF. E-8 PxOTONETwc Pw4 MFNBA]I ../ . FAR: YA% H ONFO PPKOSm O.zS - TOO 0.52 CODE SUMMARY ]3 SF. SCOPE OF WORK iIPEPISERPM B.B." j 8MDNG HI IGx ED ALM EM, °mrs To�O u PRRm15�F ...... 35'-o' NEN C°NSTRNCTON OF 2 STORY OFFICE u1O COY%I�Op ..NRVPwI�ni° S ,D.E° Ix ME C.1. WCUv1M0 AYD . Ill M%1CA91E Am 35SF. ,FLORIDA. M BUILDING ON A VACANT BUILDING PAD. ONIII pEdMWx3 AID ONgWHCES cAAINU AGUR IXCwWIG. &N NOT ITIS, 935E FPONF (WG GM'ON) 51-8' MINIMAL CxANGE M THE EXISTING PARKING REEDDABAY ..1D INOSE OF: VAOIII (WASNINGTH, DR) 2v-0' VC 9' LOT. 2. ]-z4 sce N0R'�) v_EC i�5�'':3- LEGAL DESCRIPTION ;°D°,°D euluvc coO 9]GS.F. L368SF. c`°"„IOR"""mA (E'A cfic) VUD f311F°Nxw NNE - E DIS Y HSLo _LR[o SOW o PMCEIS 1 k z OF PPACR 1/PP ND. ARDSWE (a 10» �2DR 21.4 R 1.640. IN THE CITY OF DIAMOND Bµ. Wro UUNCC) zo10 cGYwiox w ylEnpc ccOE aEc> AGUAND1 . VBAC) _ (1159] SE) COUNTY OF LOS ANGELES STATE OF GAVAGAK AS PER NAP RECORDED IN 20G Pw.. n°wmW COLE (CPL) NN COPY AVOIOYCUTE i PARKING W10.SGPE uV MW RFD pgOWSED COOK 101, PAGES 74 TO 75 OF PARCET 6µgXOFIP619110NR (OF MtHNG ARG) SR 124ECOWS, IN WE COUNTY RECORDER OFFICE (RAS SF of I8.]60 SE) BE .0 CA"FY. 2 PARKINGANALYSIS Q 5 PLUMB/NGF/XTURECOUNT ADJACENT BUILDING AND PROJECT BUILDING BUSINESS ARU = 21.794 IF - SHOWING ENTIRE PARKING COUNT WcUVNi Low VGEOR MR 'BUSINESS ALEX \ e 200 SF/PERSON (PER CFC TABLE A) L - TOGA °coup GEM 21,794 / BAD) IM9fi5 UN PERSON D) FEA A 1_� ® 313'-11 1/4' 1 _ �I,j'- DISTANCE B/IIW�FEN FNH. IEIR.$C SITE PLAN OF TWO NEIGHBORING P�ARC�IE'LS L IA/A CIJ Ili/" \ S aY✓x` PARKING COUNT \ ' PARKING REWIRED 91 PANRIN. PG.UfA 91 " LOU 1 7 NEW PROPOSED BLDG LOT I 21,]94 BE MANtAA0 3] MEdGL OffICC 3,93 SF NWgCM (PER TABLE 118-6) 2 p 1/2 ED SG 14 DESIGWOM (PEP WC 5.1°6.52) ] BUSINCSS OFFICE 18}51 SF LOT 11 - E.E. WON LENT EXISTING 12' a 1/4W SF 45 STNIDARD u 1. LOL II - E%ISNXC WARFN0l5E BCYCIE PPAK NG PEW PCO 4 �I 20.571 SF ORI A. /SR DF TOTAL PARKING) 2 °ECCE $PACE 6.BC0 Sf LONG UK" (50. OF LOTK PARKING) 2 �j o 1..ED SF n BICYCLE WKING FRONDED 4 W...ED}1111{II SPARE 13.>]I $f SAWON TEAM 2 ® 1/1000 $F 14 ILNG iEBN 2 OORARE S - SITE KEY NOTES 4 GP°SS x' 1 SITE ENTRY GRO55 O LANDSCAPE (SEE L NDS[ PEI 1� AREA ❑3 EXISTING PARKING LOT PAVING O AP FA NEIME MFDOEKE IM Z 0]ISF.2A13SE ® EXISTING CURB °ffICF2W L K35E ❑5 NEW CURB (SEE CIVIL FOR DETAIL ) ME D.11" 300 1A805F ]93° SS EXISTING FIRE "YORANTS C.• 3,3 63SF. L ❑j PROPERTY LINE L930S pFNCE]58 I,98E5F PROPOSED NEW FIRE HYDRANT l]8 TUCKSf. 1.]60SF. MMEEM BE OUGS 4 GP°SS 10 ADA APPROVED MATE COVER EVER a GRO55 1W XOOM NO. &USE AREA NEi APER PWMND.&IISE AP FA NEIME MFDOEKE IM Z 0]ISF.2A13SE °ffICF2W L K35E )3835£. ME D.11" 300 1A805F ]93° SS OFHCE300 1 3]Sf. , 3,3 63SF. OFfRECTRAKE]WF. S. sEPPZN^' sE TE P°I°° suu DE u01'wm E L930S pFNCE]58 I,98E5F ]A]65.F. l]8 TUCKSf. 1.]60SF. L]N ".0(PCE]f8 19PSi. ].AIDS£. 0 iWfE]Bfi S.NOiF. 3,03650. OFFKE2]8 OFFICE 300 1,]68SR L9]]SF.I].91O5.f. ].]]ASF. L°sGY 4105.£. 9105.£. WOMENG]N IW SR WOMENBAtX 130SF. MFNBA]I ]615.fi MAILPODM ]3 SF. iIPEPISERPM B.B." I'll 93SF. EINA]ORDI AM 35SF. FIAERISfPflM ITIS, 935E ...UC POGOC PUBLIC SPACfTMISC) 9]GS.F. L368SF. 3PAC£1M1SG) ],159SF 1.9505E ttl]AL 1D.BISSF. TO]AL LUBEF. 6µgXOFIP619110NR ❑9 FIRE RISER IOIu 1¢M ASA fl11&6V1 4 TOL4 0[(6PAtt WN 3l0 PE[A[ 10 ADA APPROVED MATE COVER EVER a THE V GUTTER (V GUTTER REFER TO CIVIL] 1W 61. . AP.1. FlPE SPPWRER ENOWN SIWL fiE LEGEND" Fan READY AM WEAP:si06,t"SN s 4 i FM1 M P. Br mnFxS ♦ i ! • 2CML ENII.EF k SIE IYPROYMEM D6WN t° .4'-0'ME KKOS•eE PAM A• . BNX WMWW ll z' w MXAX, sa uV w llUm W4<KH ' >IaDY N" AT DO]. MIIUK DE SVBYRIED N1 cNl ONXEE0.-PPIRCE. LTO DWPgXAiE PEAYID PROCDSS /5 PEWIPED. _ MG TRU . WT AGGER aK SVAE W unIII 3 ... TO AEU... D DY omERS NDCIUX DDR^P�DC PAPEwrtwwx R.nY AVD BOB xu ED FAEcm ➢X M Acnut .) .. RTNS, PWDNu GRUBBS, W0'PGW WU OE SIuvR TR ME PJOC. GO➢DWW.tl 4, NL4 DOUnW ALIOWG.1 IVXD.`UA. wmm - --- PROPERTY UNE 5�°AAA i wmA.,PCC N'DTNDNS ------ EXISTING, TO BE REMOVED S. sEPPZN^' sE TE P°I°° suu DE u01'wm E WFEiNXWO WnNS 9W. CONT Pd£S A4 �nPrvFS4� PHF 4-1) MN[0 ARE RWLE 4 W a P 1W a LR.vN RX 4 i FM1 M aME SM 3 ROTE: TENANT SMCC MRL BE PRGNDED SON PLUMBING MRIRE WGROANING 10 CPC TABLE 4-1 -GRECS ON PUBLIC BUILDING -FOR ENP.E' ALLOWABLEAREA OF OPENING CALCUGTED ELEVATION: NORM DURATION SPRIKAEB------------------ YES ORSEPARATOR INSTANCE --5'-V RAN ALUMMILE ARU OF OPENING ICON 25% PER TABLE 705.8 PRONGED AREA OF OPENING: IST ELWR 14.78 14.7 x < 25 %, THEREFORE OKAY MOORS u40 OPENING ARG 193 7 TOTA MATCH AREA 1309 SF IRS BOOR: 8.52 8.5 R < 250.; THEREFORE MAY RAINBOWS AND OPENING ARTS, 135 SF TOTAL ELEVATION AREA ING SF OPEN STAIRCASE DY. W LI omfw IG rlWlxa6nm.-rm onvxn r m�. ®ampt auw uX� Is IW CONG. PA - AAR.Lsw r PPO "0"0 IF ISE�6.. mus) W xwuE mu mWm L uYanvA tm P,NAMlg m 2ND FLOOR N.IN m1 ai -urw 1MN mu.L n - sr -Y M-1. I �°s�u II•IN't mwLmuvE R- VY 1STFLOCR CD/A ZREATIVE DESIGN ASSOCIATES AN1BWwe.lGUMS DPSNG. Pinta 1.8891861. P.emmELARG C9yN IMaGy.U01M8 ."tpligYOB/OedahplAix�.'[[. Yc ".l.0: BREA CANYON BUSINESS CENTER NAGARGGAGENGRID DALgNRAGASIM DIIa01: BREA CANYON INVESTMENT, LLC BOTENEWAVSP'Fl Cl'O'E AGE"Ct1110 ...... )1fle: OVERALL SITE PLAN &PROJECT DATA CDA Pe[)e[I Nn 1114 Dm. rtnl, and vn[[e: Suxom D58e1!ERY: O:[en G➢: P7aL eola:t fte: A1 " CHECK CORRECTION WIED GCE. Ii, 2012 2QPLA CMCK CORRECTION ANTED OEC. 20, 2012 APIAN CHECK CORRECTION s MUD FEB. Ii, 2013 AsPVN CHECK CORRECTION RATED RAR. 8. 2013 DraYI6a AS -M: 100 LEGEND •ee♦ . 11iv9.L PAM CE 1. gIIX VAmW N IN WAIWYI]Z X04 9.[PE PAM Ai�OM'6 waLIM�YE 5nnxcicx N. REPmzvnmwx�axr�illEo PA. — - - — PROPERTY LINE ------ MSENG, TO BE REMOVED a AR NOTES- - - -P - PP 8CAvo 1. OLWPNttT DE FdLY11E5 $'A" ROE PoMNENCE BADE AOO 2E OR, AR WRSNLL. PEGVICRAipN0 IE .1) FACNN.ealW io 3. ON MYIP4.WIXDPP£➢ OR,l 11 ME U.I. 5.. IMOR Dom¢ AAM X D IDNYED A4DUP OT E. SWXEO-ME OX ME J]P fMD BY 1XE CO. WSPEMOR J.CO OCTOX GO EWIPYFMOVBED Ix OPEPAlIL1i XS�IPICIIOX. DXIWND. REPNR. N1EM110R OR R COXSiPV I,M NICE TOPINDESiTSi/ . OF MEE BUIL0316 CiM 4S ALL FE.GxD SNVL BE OBSIRUCTHO NTN OPIINE SVPf/t[5. I AF N1D AR. MGI.. ROME5. , CRMW lM NO. 01W1 M MEE 07 oCERE a. MED NEEDS WASHINGTON STREET I. AM IREADPOGLYWLLWIER . MA, O SCNE&1 .00 A 00, 1 NOR FF1 I EdM WASTE uaX,LEpFM N CE.I.. E"rnon PERI... em uwnC.PAL AMI B.IF OF 11RE R. 6 .PECE .FENCE RANDP5OL1E0 Di A M4E C00 PIEt MEIPRS k CVP PECUREYFNR 9. 0 ux�Om' 6Pl.BNI coMACF vc uml .wo UIel1Y M. MREED R! ME URT' WNPAM6 PRWFA l0 AN( Ewy. . CRNA �WBFNEAA e, pwxc OR MRMG .NW£AT.O.Po. M DAYROGNI S 10 M.. MY o[xIX�11Wt AT tf/Si [OIEA BtkN'ORWAUCU EEGE '0 MNPEI. OE 1xS0R+YCE ENDER A MCI CEHFPM C.R. ix. COO EE RIF 0fFNR GEA. BE A .. Br 11¢ MY I.R 10 PMATIDIx. NTRI ARr WOOR SITE KEY NOTES ❑I SNE ENTRY �2 LANDSCAPE (SEE 1ANDSCWE) ❑3 EXISTING PARKING LOT PANNG ® CRISPING CURB NEW CURB (SEE CML FOR DETAILS) © EaRNC FlRE NYDRAMS PROPMFY BNS © TO BE REMI EDSTANDARD PARKING SPACE 9' X 19' RIN. iD ACCESSIBLE PARKING SPACE e 9'X 19 MIN, I I DESIGNATED PARKING SPACE 9'K 19. MIN. 12 WHERE STOP (ITP.) 13 MANSPoRMER (SEE MEP) Iq SHORT TERM BICYCIE BACK (U BIKE WK) 15 LONGTERM BICYCLE PARKING PARK -A -BIKE j301V LOCKERS 16 ENTRY SIGNAGE As IJ FlRE RISER IB NEW PROPOSED PRE RADIANT 19 ADA UREC1YJNAL SCIMICE (ARROW TOWAGO MAN ENTRANCE) 2� BCM - TO BE SCREENED ON U (SEE CML FOR MORE INFO1)) 21 (BEE CMLRMR MOREEIN, LS ROARING WALL e SLLAN n 1 Rc.IE,.,>� C D/A CREATIVE DESIGN ASSOCIATES amTrenDre. Nrt.Nero.BTVD. PwDln9 F.BM81381@ NBREMi4M8t O[yd�Wu0y,GB591R oYmmn CWi^NO%OehWT4w%§zYe ".IW: BREA CANYON BUSINESS CENTER ROAPEAGM'M. IXLVG1OflW,G9116 WWI: BREA CANYON INVESTMENT, LLC Xyv"OSY-ERGMA`lAIcl` S—'. OeeeleBTitla: SITE PLAN (LOT I) CDA P'.).".. 1'11 Oele: Fffii. fl11 PReee: 0 Gl—E,fG %. .: P.o10:c rA: R.:. P..raam: IPIAN CHECK CORRECTOR MUD DCT. 11, 2012 QPUN CHECK CORRECTION 2 SIRED DEC. W1, 2012 Q3PUN CHECK CORRECNON MTED IAB. Ii, 2013 A" CHECK CDRRECIgN s DOTED LMR. B, 4013 A—I, m: AS -101 PP 8CAvo SLLAN n 1 Rc.IE,.,>� C D/A CREATIVE DESIGN ASSOCIATES amTrenDre. Nrt.Nero.BTVD. PwDln9 F.BM81381@ NBREMi4M8t O[yd�Wu0y,GB591R oYmmn CWi^NO%OehWT4w%§zYe ".IW: BREA CANYON BUSINESS CENTER ROAPEAGM'M. IXLVG1OflW,G9116 WWI: BREA CANYON INVESTMENT, LLC Xyv"OSY-ERGMA`lAIcl` S—'. OeeeleBTitla: SITE PLAN (LOT I) CDA P'.).".. 1'11 Oele: Fffii. fl11 PReee: 0 Gl—E,fG %. .: P.o10:c rA: R.:. P..raam: IPIAN CHECK CORRECTOR MUD DCT. 11, 2012 QPUN CHECK CORRECTION 2 SIRED DEC. W1, 2012 Q3PUN CHECK CORRECNON MTED IAB. Ii, 2013 A" CHECK CDRRECIgN s DOTED LMR. B, 4013 A—I, m: AS -101 GROOOO PAWN DOW 70 DETECTABLE STRIPS @ CROSSWALK R4' M. iPPERED AT GTE NNERE EXPOSED ® YOKEL CECPOx B -B OWKX p I`T THE SO' %A L BE ODOM W A CgdPOSOUS FU[[ AF COM ENNNOCE TOME CFF -S PER PNWXG SINL 1HE Sl4POt SEEMEDA 9W]. COW OF A XNR FWCRE ON A WC B1C EHOTID. IK SOURS BXk 5443 DE EOU& i0 MOR W 1. N FFDFPet SC..S sss0 O HANDICAP PARKING SYMBOL M. THESE DOOMS LLU 1 TE ME SPECIFIC REMIREWENTR or MESE RECUMO S M9 ME INTENDED ONLY AR PH An FOR BUILOING DESIGN AND DPS. CONSIRUCnON. CETT U�. 'ARKIN( ONLY MINIMUM VAN ACCESSIBLE PF:i[CIOBItD SINN KNCNIx GD.00EMNI(D a REELM1M DEWED lai aR Eaw. C D/A CREATIVE DESIGN ASSOCIATES lvAnecNre.IMerlor OOnIDII. NOntSp L 6;Da1901a1 E®del9af@ 1]veEPaWM9[ ClryglNntly,G81]H vnnvuYenPm GgAyy0Dy0u5a LFtl/iAa�!e(Ye Pro)eEl: BREA CANYON BUSINESS CENTER W AKEAPIMSWRND W4p49PAj.SH" NOTES, A1.0; I. W4 TO F NRflSD END OF F CKC i,FAT sN,v T. A BREA CANYON s, BKNES. INVESTMENT, LLC x DES%MATE FM NAM ILC ENME'WHERE PPPRCPRLITE 4 USE WYL YW M. SYN N31]EADN!Fi642i n51UD NFREE STIAgW6 931 f A arCr.• 451M.us;e 1PP.IESEE 5WHi LL AVMAWL N PPDwc fW DETECTABLE O DETECTABLE DOMES @ CROSSWALK O HAND WARNING sa.sufa , x4cxns s DOMES SEE e wva.E ANui 9a. DETAIL WAJ_WMFUGHTTOLSWUP 9nss smma INELIXIOTERMG[QLWtFAO •-�- '� ee�aE sw:.s DETECTABLE SLERCPFORLECOMClANEW ETAAS DETAIL STRIPS BEEFORCONNECTONI e eL¢wirstDDETAILLaxO1ERr.I SIREPAwsw °�-4C tl'i BIXELOGtERIFNSI EACNI PPLIXA81KE8101VL0'K. ERS _ $ W.IB'in¢ Ys m(attdo3rz 9mi¢s 15E Way 0 o E'-0' 094E SINL B B � 6'b'O W]9E SIIll MCLS1 NOflL Xt6510` (pKWCRR 'cUa1f NkSSYR " ttK U][ WM 1S ENLARGE PLAN ACCESS. ENTRY FROM HAND. STALL O LONG TERM BIKE PARKING ELEVATION O PRECAST WHEEL STOP S^. A ew 11 I mmm mlm mmmmmommmmmmm Al A 91 TYPICAL CMU BLOCK (RETAINING) WALL ( AllBR(EIdY.ER IfI151 FIGD PPAKA.BIFEH30NLCCNEPO lA1F ME M900 DNES pA MCNN TO 1,-1-1 I eF I L L V I I I I l l I" 1 1 1 1 1 I I I I I 1 I I I 1 1 1 1 1 1 1 1 1 1 1 I i M I 11 O LONG TERM BIKE PARKING PLAN NNE THE MID t LINES AR[ man TO CIf/R S^, NO SNDNI SORT, REPINED /— ON., R L _J 1 6' IB' DR W J I L_ DR 1R. YdK Wb. D'Q I O SHORTTERMBIKE PARKING 2) U iounwis�sEFsnE NNfORLCGMNS) O HANDICAP PARKING Sttuy: �p� * a 44}yp i D% GlR Or.�l.a Fltle: SITE DETAILS CJAPm)eUNn RII W.: PM1eee: P.LNp GM1..3Etl DY: EC REIEEm(.: Ret',v.na. QPLO CHECK WRREC1pN 1 RATED OCT. Ii, 2014 A2PVR MEN CORRECTION NOTED DEC. 40, 2012 QPVH CHECKCORRECTION 3 MILD FM I1, 2013 PENN CHECK CORREMOX 5 LATIN W. S, 2013 Drexlnp M: AS -102 RAMP AND HANDRAIL GENERAL NOTES HANDRAIL PRODUCE DESIGNRNL-RAIUNG SYSTEMS 6. DIGRPI LEVEL NOTE FOR ALL ADA PAVING: RAILING WITH HORMOWTAL CABLE INFILL COMPLIANCE OF ADA SLOPES ON CONCRETE AND ASPHALT AS STATED ON THE PLACE SHALL BE VERIFIER BY THE STATE:$ 1. ALL HANDRAILS SHAIIALWAYS BE CONTINUOUS AND THE REPRESENTATIVE UTIPEINGA 24 INCH DIGITALLEVEL. THE 24 ENDS OF HAN DRAMS SHSL BE TURN ER ROUNDED OR INCH DIGITAL LEVEL WILL BE SUPPLIED BY THE STATE AND RETURN ED SMOOTHLY TO THE FLOOR, WALL OR POST(OBC SHALL BE CALIBRATED BY THE STATE'S REPRESENTATNE 1mRs.&H PRIOR TO THE TAKING OF ANY MEASUREMENTS. MEASUREMENTS HALL BE TPNEN IN ANY DIRECTION WITH THE 2 THE GRIP PORTION SHALL NOT BE LESS THAN 1114 -NOR MORE 241 HCH DIGITAL LEVEL AND MEASUREMENTS TAKEN SHALL THAN I' IN CROSS SECTIONAL NCMMAL DIMENSION, OR THE COMPLY WITH THE SLOPE SPECIFIED ON THE PW4S SPACE MM PROVIDE AN EQUIVALENT GRIPPING SURFACE, CONCRETE OR ASPHALT WORE THAT DOES NOT MEET THE ANDALL SURFACESSHALLBEBMOOTNWRHNOSHANP REONREIENTS SHALL BE CONSIDERED NONCOMPLOWIT CORNERS, HANDRNLS SHALL NOT ROTATE WRHINTHEIR AND WILL NOT BE ACCEPTED BY THE STATE. ANDY AAEAWHICH FRTIlOS(CBC1133BbM) IS NON'COMPIANT SHALL BE REMOVED AND REPLACED AT THE CONTRACTORS ENSE U. HANDRAILS PROJECTING FROM A. SH4I HAVE A SPACE OF 11R' BETWEEN THE WALLANDTHE HANDRAIL(CBC 1133B.GG1) A. HANDRAILS MAY BE LOCATED IN A RECESS IETTIE RECESS ISA MMIMUM OF S' DEEP ANDE%TENDS ATLEAST 1 E ABOVE THE TOP OF THE RAIL (CBC 1133B.6.6.1) B.M WALL OR OTHER SURFACES ADJACENT TO HANGNAILS SHALL BE FREE OF SHARP OR ABRASIVE ELEMENTS. EDGES SHALL HAVE MIN. RADIUS OF IW (CUR 1133RU.1) 4. MERE THE RAMP SURFACE IS NOT BOUNDED BYAWALL. THE RAMP SHALL CO%IPLY EITHER FV HAVE A GU IDE CURB A MIN. Y IN HEIGHT SHALL BE PROVIDED AT EACH SIDE, OR NOT HAVE A W HEEL GUI DE RAIL (CBC I I=4.6) 6. RAM PS MORE THAN 30' MOVE THE ADJACENT GROUND SHALL BE PROVIDED WEEK OTHERS THAT COMPLY WIN CBC 1013. SUCH GUARD SHALL BE CONTINUOUS FROM THETOPOFTHE (aEEVAE mNb7 RAMP TO THE BOTTOM OF THE RAMP. (DEC I MBS?) ' SEECNIL FOR ELEVATION HEIGHTG © TYP. RAMP SECTION �— W61PWM 1 dc4Tl W@R-IWNMLL .'8YR Mvut4GU Szen I 2 1 2 WAa R,«N,NB .wF slasnmawx M9hite ® LEFT. ELEVATION/SECTION-ACCESSIBLE RAMP O RIGHTELEVATION/SECTION-ACCESSIBLE RAMP O VIEWFROM PARKING LOT- ACCESSIBLE RAMPACCESSSIBLE RAMP C D/A CREATIVE DESIGN ASSOCIATES T.Bm8 P�UI'KxNIaISOMISObsI6n.WMkq MB1% RBNBMBIM D®EhxYNR CM�IMvtrK.fABTMB vYuemn Gy{gY6B/GeefieDegiAssse�4ic "IJ."! BREA CANYON BUSINESS CENTER WWI: BREA CANYON INVESTMENT, LLC IMee F:d:uDsa=✓ DJyO�e,TA„^IRrr`_5Yr<5 de.nP: 0 D-., n3.: SITE DETAILS COAProptlNn INf DAI.. .LMD 16 a.a: flllfIDp czea.aer: SE..Fd mt:al Y, Favie:one: QPVN CHECK CORRECTION 1 CARD OCT. 11. 2012 D NCHECK CORRECTION 2 DATED DEC. 20. 2012 QPVN CNECK CORRECTION 1 DATED FEB H. 2313 PVN CHECK CORRECTOR E DATED W. 6, 2011 D, ­m, M: AS -103 O VIEWFROM WASHINGTON STREET- ACCESSIBLE RAMPACCESSSIBLE RAMP (aEEVAE mNb7 � _ �_ Y —� . _a• � / v — S —� ._ � — Z — y .� — � _ Z — Y .ti _ V: — Z — Y —� — �• — Z .— S —Y— J• J• .V J• V• �V .V �!• J• v J• W J• w v v W J �h L— W yITy TOP LANDING INTL RMEOW2Y W V W v y d 6 d . UP__.. DING_ TERMEDIARLANDINGW •. w R A_MP UP @ IN2 J W Jli• —RAMP— _IN b J• �v J• W Jv J• J. y W J• 4 �• V• u• W L V• L W Y w v W ✓ w c v v t K-a'¢a vn N'-0' TX #-0' • V/ . W -I. W ,L w J� VIU IlgSO " W L r Y V -Y W -n uu v W vV L v "'Y v W � Y J• J• Q• W J• J• L v 'L J• L DISMAL 0 V L W u w L W L W L v TACH SALE OF d W L \• v W L y THE WILE 4 1M W GUM W BOTTOM j LANDING Al R4ua MVE 6 TO g �a 4 BE STABLE, HRV, FAO SLIP r row mua R@6TNf, er Iw Me WE NREM SURTXE IS FIGHT DAY RO WATFA R4(dflftllRiAlq 1 °yn F6m YBLL� BILL BE KCUNLUIEB O ENLARGE PLAN OF ACCESSIBLE RAMP FROM WASHINGTON STREET C D/A CREATIVE DESIGN ASSOCIATES T.Bm8 P�UI'KxNIaISOMISObsI6n.WMkq MB1% RBNBMBIM D®EhxYNR CM�IMvtrK.fABTMB vYuemn Gy{gY6B/GeefieDegiAssse�4ic "IJ."! BREA CANYON BUSINESS CENTER WWI: BREA CANYON INVESTMENT, LLC IMee F:d:uDsa=✓ DJyO�e,TA„^IRrr`_5Yr<5 de.nP: 0 D-., n3.: SITE DETAILS COAProptlNn INf DAI.. .LMD 16 a.a: flllfIDp czea.aer: SE..Fd mt:al Y, Favie:one: QPVN CHECK CORRECTION 1 CARD OCT. 11. 2012 D NCHECK CORRECTION 2 DATED DEC. 20. 2012 QPVN CNECK CORRECTION 1 DATED FEB H. 2313 PVN CHECK CORRECTOR E DATED W. 6, 2011 D, ­m, M: AS -103 SURVEY MAP' ttussx 8(554.9 D� I O 8'. NWN iHLLV TIMI EFIME M � Wlf n f C `�� SN2Vh f/[NIY (558. w32'9W 121]G' 6' 116110.0CN wW. TWE. VKVE 65A63 �(� N 0 -C -Te' -p a' wax auw u're mrcc �`................\ xoa2'zrw aux... .\ 7 �. U+'°s�'ce Xi ) (35uoe1 o Mssa.m }y`Y:.:..l3i`-"-"-"=`---'.� `.iY`����Yl].l`3` ��` 31Y?3'�T3T}1`1]11UY1Y111Y ` _ _ c I U V c O L�J40 1>rABI 4WA'/PE 18491 �y�� `,} •• n c / % i501 cjjl /x O W X \ luT+.68) �W��� �T� _g111E1x ♦ 0 04 1 - _____ - _ 1 �,� ^]c P9lxin �♦ ��a - is u4>6 a ussz ossa / ♦ Sax \ �/ /nJ (�� o 1'=20� \ FI(55436 555A6 �g,/ ..1W PM" \ s6.03 / ♦ W6 VLLl4 �i )u IIII V a N 'Nu 61) s 13Y (556..6 ------------ ________ ________ __ _ _______________ 6.91) va�. s� a M55Ra6 55699 " •l''�� � -- - 5 u+A1 I �- /Rlsslmr-f?jSs.asT- m - \ -A- \ ttsez.90 I I •g>.�S�r � = m ssa sx i ' ls) (� w - 6• ncN awN uNl FDiCE \ \ ^Ac P+Rw I I ix IR16 vulc Rcufi.m esu vxvc us.9z '� i I uSNr sac 1 \ M ux.w \ \'� (u6n s6w TD I'I / ".s Iwfi. \uv6 Ms1.9N sfi.u� uaAp \ / ` a)I 558.91) / 'S 8(555.64 I dI� I BUILDING IS 20,577 S.F. j ) IId �J, 41 �� B \ - `\ RELE I ASED 1t .-M 1 (su.t6 t) 1 I 1 O i W 1 fi.w) i i {) Imo) Y® I II i I1jI \\ I 58.92) wuxwnr _3) i ; . vavc -•c Peso- 1 1 Pui w � /I, I I wN. vasa \ w reP a NET. esu \ \ \ �n�s'r I.wowvE is ss6u Tc 5se.e. 6AO) s. I I 11 '('.Ss.+s) v� I (AgE . Z I cart '\UCNx Tat ••TT� \ \+N y' ].ER) _ - tz•e (Ssfiss) I ' I Maw.i] I GENERAL NDTES: \c��Iq.� 161 1. SURJEI. OF THE SIIE IS PROVIDED TO VERIFY \ ` \ \ va\c„'""• 'is)4 r .ss)' I+' AF` (555.91 THAT THE ExISRNG BUILDING IS 20.57) S.F. PER \ v 1.. 7) I I 1�"i'jl '� RMSIONS I \ I II 1 �� REQUEST OF THE CRY Of DMMOND BAR PLANNING\IMRR \ �---------------� DEPAmMENL "�\\ \\ 1 I�, e+a6 \\ dap on i 11 \\ \ 1ssu16 II IIII IIII 1 I 4.A) \ 8 55569 1 EASLIAEM NOTES: \ \R(5w.]a) \ s6s.aa) 1 lL'R•�i� I 1 \ � 4� I \1 P� �6.YALVE nwPwr^ 1®'b1 II II 1. CENTERLINE OF 15' WIDE EASEMENT TO WALNUT VALLEY WATER DISTRICT, PER AIM_ Ts ss6tf I If 1�(s+v°°1 INST. NO. 85-1124534• RECD SE OER 26, 1985. O.R. \ �+p\ \ I 14' I 2. 10'WIDE F/SEIAE10 TO SCG COMPPtiY, PER INV. 20111174009, RECD 1 I 1 wx / 1e°Of9 AUGUST 23, 2010, O.R. \ \ \ \ I 1 1 I I l i 111 I ® I\ .,,c cavo- I yyy I 1 I I 1 8 I III I I I 1 1 I I 1 3. 5.5' WIDE EASEMENT TO CRY OF INDUSTRY. PER INST. NO. 20110483144, RECD \\\ \\\ 1• 6 i I / i i i I I 1 I MARCH 31, 2011. R) C IIill1�1 \ " ,20 xr. ws ..0. Pxxr ax vwxo I z»sq 1 / gl I I 1 i l i@I f •I"I I I Y g i I1 I �Y ,'t \\ s0 - r asses I j Ak(su.ul I I „¢ 1944• 11 1 I �� � i 11j1 I I I I I I I I I R(EMO) 1 ussfi) j / I I x}6.40 - � 11 I I141111j I I w� wrtPaA\ \ \ MEMO) s) 11 I �\ I I�Il�illiiili� � U \` \ \I itt5(350.19 ul SSzo 'TFlssc%i1 I I I� 1 \ I 1111 T I 1 I1 1 1 •-7 rMuzie l v+ 1 tt sssA9 ) 21) \ u is sst.n L 1 N'q I I I i w I \ 6M1P. t h9i° 1�554a SS13)M1x05VA6T555. ) 554A9 I \ WR 1j1 +' xxal cal R1KE� s'�' (sss_w) +.]9)tt Sss.14 1 I II �1R R u4]z) X61 . vu\c \ 111 11111 11 I T sssx4 II 1� Ijlll'=II�� \ ox i6P a Lev w•M. � 5sa vx � � I vx\a _ \ '1�stwO Rluesz --------__--- � --_ \ 1 1 it I 1x.16>� \ "VC Peso-35'4AH'___ 5sa�e>�® / \\ II it 11 111 1 a 8881 \ rvLL aox w � 1 N 1 \ ss eo _ _ _ .., wsrawzT9ee• - -enol u - _ __ _ \\ \ i I � I1 �� � i I � 1 I I I 1 � ` _ _ -- ------------=_-_-__-=--._rum _ �ssrA--_-___ -_-_- __ �o _ 7 111 I PI'up I c SUPVEYOR'S NOTES: - _--_ _-_- $__ __=Z= _ Q C 1.W ALL INFORMATION SHOWN ON THE DRAWINGS IS GIVEN AS THE BEST PRESENT KNOWLEDGE AND PERFORMED_______-_--- _ _-- _ -_--V __ JJ // /♦ I n(saa]9 I (D WITHIN GENERALLY ACCEPTED ENGINEERING PRACTICE BUT WRHOM GUARANTEE OF ACCURACY. WHERE ACTUAL �__1- _ _ ---- -------_-_ _----- wx Q U COMMONS CONFLICT WITH THE DMWINGS. THEY SHALL BE REPORTED TO THE ENGINEER SO THAT lHE PROPER \ b1 _--_ _ _-_------- _ - -- -__� -_---- -__-__ �� iy� 16bv) U 01 U -® -_-_====maK_=mcw.ui.36>s _-� / A:. I m NAM- . -3w 5516.08 WOULD REPRESENT SUCH PRECISE CONDITIONS, WHICH OBVIOUSLY ARE NOT POSSIBLE \ 9 418 +1 R +az) us.0 rs ve.o -�- ro 6n.lz c c 9.+N U (n +. 4.9 .w Y smexalc suss G THE NUMBER OF SUCH FIELD MEASUREMENTS ME THEREFORE LIMITED TO THE SCOPE AND IMENT OF THE --- � - a' w IMvv I W O O RESULTING MAP. \ _ _ _ - _ ) - - - - - c v _1 6.6 -13 e Tc wo.xl xa�ix 'z3Wi6L1!' - - - - s a�.�fi - .�� 94,y\\bu res lc uart Q E 3. THE BOUNDARY SHOWN HEREON HAS BEEN ESTABLISHED BASED ON THE RECORD DATAMfiw.sl T¢ivu9p w.w. - tta I a' O YfiK RWM3 -= ArFA Yf1FR 516.06 a (1J \ SJ].43 LL wx LEGN. DEMRIPRON: RR PARCELS 1 k 2 OF PARCEL MAP NO. 16640, IN THE CRY OF DIAMOND BPR, COUNTY OF LOS ANGELES. STATE OF CkIFORNVI, AS PER MAP RECORDED IN BOOK 181, PAGES 74 TO 75 OF PARCEL MAPS, IN THE COUNTY \ s DATE RECORDER OFFICE OF SAID MUM.1122051-O01 ue MN: 8719-010-901 & 8719-010-902 - _ - �REEI C�INYON ROAD Fl\E4fTNNE:"2-051 -C------ x�---_---------------- 6Co T BENCHMARK: IA COUMY SM G 4738 OPW BM TAG IN N CB IFF W/O BCR NW COR BRFA CYN RD & LYCOMING ST \ a v7 ro. s SHEET`\1/ OF i SM. E ARON: 562.852' .93 PREPARED BY, JACK LEE, RCE 40870 CAL LAND ENGINEERING, INC. 576 E LAMBERT ROAD, BREA, CA 92821 TEL (714) 671-1050 FAX: (714) 671-1090 OWNER. BRG CANYON INVESTMENT. LLC 17528 E ROWLANO STREET. /288 CVY OF INDUSTRY, CA 91748 (626) 913-8939 PROPE 20NE: 0-P RN INFOft1A4T1ON: "N: 8719-010-901 LOT SIZE 42,333 t. 80. FT (0.97 AC) NO. OF EMSTINO UNR(5): 0 NO. OF PROPOSED UNR(S): 11 N0. OF STORY(IES): 2 N0, OF PARKING(S): PROPOSED 37 IX, SEWERAGE DISPOSAL BY GRAVITY SEWER PIPES TO SEWER MAIN INDL�"�'ES, WATER - WALNUT VALLEY WATER DISTRICT SEWER COUNTY COUNTY OF LOS ANGELES SANITATION DISTRICT ELECTRICAL - SOUTHERN CALIFORNIA EDISON CO. T UEPHONE - GENERAL TELEPHONE COMPANY (VEMZON) GBS - THE GAS COMPANY FIRE --LOS ANGELES COUNTY FIRE DEPARTMENT SHERIFF --LOS ANGELES COUNTY SHERIFF BENCH MARK: U COUNTY BM G 4738 DPW BM TAG IN N CB 1FT W/O BCR NW COR BREA CYN RD k LYCOMING ST ELEVATION: 562.852' ABBREWAPONSAEGENO: LBW....... CONC aOCK WALL GM......... GAS MM OA:G........ CURB AND LURER MH......... MAN H" 0/.6.._...... DR'LEWAY APRIXI SMH....- SMER MANNpE DWI:....... p,WYEWAY 9 ........_ S FP...,....... D)ISL1V PDE $.......... SmTCRu GRAIN IX....,..... EUBDmR........m A PEMOVEB RA........... FlRE NNGIDRINT TG.._...... TOP DF CUA EIEYAVON LR ............. UNDSCAPWG WY....._... WATER VALVE -- PROPERTY LINE — — — — EXISTING STRUCTURES S PROPOSED SEWER (102) - — - EXISTING CONTOURS NEW STRUCTURES - DRAINAGE PATTERN Hb EXISTING FIRE HYDRANT _ _-_ --- UMIT OF GRADING DRAINAGE PIPE I TENTATIVE TRACT N0. 72067 DRAINAGE CONCEPT/SUSMP I I I I °7' 1 1 1 1 1 1 � 4 � �I muss cllIXrm:E I 1 1111 1 1 0 " �a- Y �'� 6K6"Im, Nx Ix6n eaE IN 7HE CITY OF DIAMOND BAR, COUNTY OF LOS ANGELES r�I I i I I I B�-vm •N STATE OF CALIFORNIA I IIIIII IIIIIIII� �� 1 „ Y PARCEL 1 OF PARCEL MAP N0. 16640, IN THE CITY OF DIAMOND BAR, COUNTY OF LOS ANGELES. STATE OF i l l l1111 111 II I I I 1 v K 1 m B CALIFORNIA, AS PER MAP RECORDED IN BOOK 181, PAGES 74 TO 75 OF PARCEL MAPS, IN THE COUNTY RECORDER IIII I I I I I! I I I II I I I I IW' M r OFFICE OF SAID COUNTY. I in III IIIIIIIII IIII I n 111 1111 Iil I I I l l l ' O2- �zOzQED--iI�Ixiar, n°nIXn6RTvAm•uaxRnn`.WuIXoTx , .I III�II'�3"t�ozenPya]�6 2p+ae1�I 1I Iil1IIlIll�1 IxI' -NI1xplIII �I1i1IaIIIIII1 I111 zImIIIli1 lI IIIII pIlIYII, 'lIXIIIFGIrI{Il- N /Iv�W,JIiIgg�5IIII IIII�III�y1 M�II)I1I�jRIl.'•hIIII'1III�i ; I ' I Ij-_TM EIII� 1 Ili ( IIIIIpiiiIlIIhI�I1I II� I1l '7'II II // // /_iJx m_axtwc o�•Iv%S�eIXa9vaN�ce) 2.a_ .m(smR`)-I, __ 9- -' -5\xvtu.w-\ D2 v®YYYYII�jYYY �-_RNm(R;'o'or -b•••• I ImImaSnmr(x+n 5�ma0s'ssra55sFpiukv,s�1kSe90 u.s.n5.)m�]r]F>w9�15ssixIX9F.))n))�u]vEm B/rOx6�R D/aRAC�vEORx(fv N�rsSlEvr_DY2ly-d_aO(9M/�uN. v/a U_A.M PURPOSES URPOSES IIlIII16 au--- rr------s — I if N IIIIIIQIIIIIII�I C 55]UNmTQElf °d nN—tixs ."xrmssss5uaI.w5ss65—rcz.�rvue�)-)) /}Ide^v+tl- _=J N'O.i 1 J IIjI�sLL\zss- St9�I�EuX0s',m] n(sn.rI96s>I1�>�zrw1J iCrII ra -s `705rsz 5l`5�s9a 9s 5 I0I I O N893655E 312.004 %)N893655E 103.5�Lm ..AA 2lZ' N8976'55 32 2.0 7 aar (117(117A) /0 #188 E IIII�i W #178 55D62) #100 (DI I 'ISIN 0mS69)ifFF 55585 PAD 555.1 #168l12q [i #�g+I If wqrmne B.Ju s iq 6Y I44PIXsMx1wx11 xl B -Ga-)1 a - Msi0n4xG9nR FVRIWS6 NE. mm fflRMT IIWMW41-;` IiR1%N6IAA nenAc RR➢1! I4Mpin PGoWSIWM1nAS NEA ny IC Vf�If IWAMtlRRRMWS IAA: n5t An R P—S R ---^-_ — -�- — — gm,Is - r mii0 n(s x601 — — — — — — i5su60)J — — — —a s i4s,9.,x VZL ssuN na(ssz: B IXxrov�BA7 y 3 _ ) i[( f]99 x16Hi )1(510]]) (5� (551.)6) Nsan7 RBt arx rzreram S R=146p.00 n wASm N8S4 12"E 75.11' nRE xsmuO a L=97.13 uErzR �L60 RNRR LVE a w096xC]P9 MIT � A =3'48'43" WASHINGTON STREET STREET SECOND FLOOR LEVEL FIRST FLOOR LEVEL T4 Q 2 EXTRE£ NCum AQSWEET GUM TO REMAIN MRNTNN DOSBNG p3NNNE PPRBN 2Q EMsnrc ttrm m I£ ATJDAn 3p RiTT6D erFw EufaNc © O[EbTRA:T O:e Q RATUaFD Sd6t CIDNOfR ® RNID C A95 EQVEN IgDUL Q R� V-0JTIER 08 �1 Q fliFVgD IXYNNYE RPE ® Rd]FO3D G1C21 G9N RdAK6D 516E FlL1Ai ® RNCffD PNMWY qWN ® fl� RW2MT Yl°M_ QYbTI81UT (A.F� k 0.2TIB2 ® ODlST. PC PAVDAAf ® EcsnNc TIEFB ro ff r&MD,m ® RgY6D RAIINTED RF£ I TENTATIVE TRACT N0. 72067 DRAINAGE CONCEPT/SUSMP I I I I °7' 1 1 1 1 1 1 � 4 � �I muss cllIXrm:E I 1 1111 1 1 0 " �a- Y �'� 6K6"Im, Nx Ix6n eaE IN 7HE CITY OF DIAMOND BAR, COUNTY OF LOS ANGELES r�I I i I I I B�-vm •N STATE OF CALIFORNIA I IIIIII IIIIIIII� �� 1 „ Y PARCEL 1 OF PARCEL MAP N0. 16640, IN THE CITY OF DIAMOND BAR, COUNTY OF LOS ANGELES. STATE OF i l l l1111 111 II I I I 1 v K 1 m B CALIFORNIA, AS PER MAP RECORDED IN BOOK 181, PAGES 74 TO 75 OF PARCEL MAPS, IN THE COUNTY RECORDER IIII I I I I I! I I I II I I I I IW' M r OFFICE OF SAID COUNTY. I in III IIIIIIIII IIII I n 111 1111 Iil I I I l l l ' O2- �zOzQED--iI�Ixiar, n°nIXn6RTvAm•uaxRnn`.WuIXoTx , .I III�II'�3"t�ozenPya]�6 2p+ae1�I 1I Iil1IIlIll�1 IxI' -NI1xplIII �I1i1IaIIIIII1 I111 zImIIIli1 lI IIIII pIlIYII, 'lIXIIIFGIrI{Il- N /Iv�W,JIiIgg�5IIII IIII�III�y1 M�II)I1I�jRIl.'•hIIII'1III�i ; I ' I Ij-_TM EIII� 1 Ili ( IIIIIpiiiIlIIhI�I1I II� I1l '7'II II // // /_iJx m_axtwc o�•Iv%S�eIXa9vaN�ce) 2.a_ .m(smR`)-I, __ 9- -' -5\xvtu.w-\ D2 v®YYYYII�jYYY �-_RNm(R;'o'or -b•••• I ImImaSnmr(x+n 5�ma0s'ssra55sFpiukv,s�1kSe90 u.s.n5.)m�]r]F>w9�15ssixIX9F.))n))�u]vEm B/rOx6�R D/aRAC�vEORx(fv N�rsSlEvr_DY2ly-d_aO(9M/�uN. v/a U_A.M PURPOSES URPOSES IIlIII16 au--- rr------s — I if N IIIIIIQIIIIIII�I C 55]UNmTQElf °d nN—tixs ."xrmssss5uaI.w5ss65—rcz.�rvue�)-)) /}Ide^v+tl- _=J N'O.i 1 J IIjI�sLL\zss- St9�I�EuX0s',m] n(sn.rI96s>I1�>�zrw1J iCrII ra -s `705rsz 5l`5�s9a 9s 5 I0I I O N893655E 312.004 %)N893655E 103.5�Lm ..AA 2lZ' N8976'55 32 2.0 7 aar (117(117A) /0 #188 E IIII�i W #178 55D62) #100 (DI I 'ISIN 0mS69)ifFF 55585 PAD 555.1 #168l12q [i #�g+I If wqrmne B.Ju s iq 6Y I44PIXsMx1wx11 xl B -Ga-)1 a - Msi0n4xG9nR FVRIWS6 NE. mm fflRMT IIWMW41-;` IiR1%N6IAA nenAc RR➢1! I4Mpin PGoWSIWM1nAS NEA ny IC Vf�If IWAMtlRRRMWS IAA: n5t An R P—S R ---^-_ — -�- — — gm,Is - r mii0 n(s x601 — — — — — — i5su60)J — — — —a s i4s,9.,x VZL ssuN na(ssz: B IXxrov�BA7 y 3 _ ) i[( f]99 x16Hi )1(510]]) (5� (551.)6) Nsan7 RBt arx rzreram S R=146p.00 n wASm N8S4 12"E 75.11' nRE xsmuO a L=97.13 uErzR �L60 RNRR LVE a w096xC]P9 MIT � A =3'48'43" WASHINGTON STREET STREET SECOND FLOOR LEVEL FIRST FLOOR LEVEL T4 Q 2 EXTRE£ NCum AQSWEET GUM TO REMAIN ®14'-16' SHEET GUM, AND WILL BE REMOVED ©10'-12' LONDON PLANE (PLATANUS ACERIFOUA); WILL BE REMOV 612'-14' LONDON PLANE (PLATANUS ACERIFOUA); WILL BE REMOVED ©10'-12' LONDON PLANE (PLATANUS ACERIFOUA); TO REMAIN (E)IO-12' CALIFORNIA SYCAMORE, TO REMAIN qw DEODAR CEDARS CEDRUS GEMARA, TO REMAIN 612'-14 SWEET GUM, UOUIDAMBAR STYRACIFUfA. TO REMAIN "Pr k s"s6 ary moa TENTATIVE TRACT NO. 72067 RELEASED RENSIONS 0 o� ED O(Q)0 } 13) 0 Um - 0 WZ� mow iDO O0- 0 0- T-1 T-1 GRADING GENERAL NOTES We co so Wage hind Code (3010) mE ms�m0 n swadroled ey We Citr effis d of 2 M bend. qmI.,Mn Ines fn excess of IDR sail amply siib in.HIM.Monagamet Ordironw and pool typisMy not exceed 11. 1 1 No mdm, sail cunmence unto a ,sting psMt has been bad by We CRY of Dlanond Her. 4. All m popes and! be Impeded to not less nen 0 pa ant of We 4. mammum density. S. Salbust Vesta al wi pmpulies, bdudag su 11. sed chem Inult. Mu S be mile among g'odng m mations to wnfy senplianw nn design aiterw. The rafts A wM both, slut be Wanted In no find me -,add reed (prepmed by the Applicant at his eemaim), or upon request of nee Gly. A mnimum 6. a mba If fldd density tesla as to be made as fatless One lest for wail do -foot a,listl IS. b. One test for'mM 1000 Mao }ads of mutant plaMi I. A Moment member of fn e, gape tests to senly sou pashe of use dale .W- 7 6. No fit Wool be placed anti slapWg of mabitim..1 of msultade was, and* ut hstdla0on of wbdans (if nmdd) is testified by We wit wgbea a monsoons,'141., 7. No Of Wel be dosed unto We placement of rasion mnbd measure for We pmkal Is ocWted by be My. R The Wavenned Cid Engineer hem, sides that these Aims vase pmpmM B by him a ander his smarsono end but to pleas canfere to 00 patnenl ,in., i i Glil Cast. B.MRS. Coda memo), Wing. and FB end Append d, Owdng 1 If U1 RCE 40810 2122/20 3 Re owed in9Laem R.CE Date 1 9. ApPod pra.na mwwres and income" cl...... values shall be Ronal sopa lett MIAMI, PlweNes Ran deposition of al a stated! shoes bon dreg end after all phases of Momnom x. i 10. A0 oM11e kuproYem ob shill be completed to %e sonfactlan of We Gly Gotham. 11. Rough Gndng call mud be told by SMa end LTi enghems of mesad and .ppm ad by We City Nspeclm prior to Issuance of Building .amps, 11 M sale shoo be Wserwd by to angweeiq geuagiA dlMg grading so that 1 my ml end usen can be mwgaleed and smmle& 11 My mea! alms of, a dinged I. WimM ling Alms must be Wproced by nee Gty. 1 14. Al ended alias must M1ow Woklage Beales, hams, end enr dranwe 1 desices mond at nee rough g'adng stage. RIssues rrxammnda0me W mals!outh N meW new t•hma them admitted faceder so be We cab engnea and appsosed h MAMM by be dty. 16. Lading Wmatione must be wndested Was, We m.Wwma sesemna, of nee sola mgner omd/a We .0meng Ivenlot of smad. 0 i]. EMMadmB for stemBY kays ond Islevtl of unnilmle sus met be 1 dewed and Inseam h ening by We mos en baso, a enteemng Cool of Imeal pia to nee deco of fit. I& yUs saud�hs9rmapms- and/a ao91n ' g geuhm,ot of mad must dowment and must Howie m V-9imd 9eMost 'dor to momal map �prOw' by fie City.The Pod report 19. to wee amine. and/or agmeMng gashab t a1 rased must make a 4 fndnt h accrdoom win Section 0 of be Los MgalPs County BAd'ng We fa be graded ole Ada to Wprmd by be Gly. 20. Foundation and/or mad acawliws must be lard cad eccepled'n mon, by WeWeengneer a unmeaht maoSTM of rewrd dar to pMm9 steal a useare. 21. A RIummad Clod Imposer sad MIMA a NIM 9 Catiflwte to No CRY Cogbea no mesa ohm 10 ening days upon sensation of And catling mewticna. Gammie of nompmey Mm be iced subject to be aty Fngbasis Vanessa of sold Engna's Cedfiwm Find grading most be Mprared by no Gty telae ocwP.uy of WidWo NI be d1oea. 22 The sou d BMyy Report mal by CAL LAND INGNFFAwG INC/ QUARM CURB, ANTS d data FST WAR 28 2L 2 Wd1 becwne a Pan of His ladsg Alm mut an lou mnenddmn, wnmod Roden Mm be slash, amaed la 21 A espy of be lading .rout and approd lading dans must be b We possavas of a respmsNe person end awsda at We site at a9 ones 24. Nul lading mash be appm d bdee sessi of bMdnge e21 be Moved. 23. these N s naw been amlad b to My of Diamond Ba my (a cwftabase fchat,Sandaf Standard, nia Gra oapmmt condimn, end rum cou PRa 9e anP , aImanness A. rural No Maisel ammnollW Mak ens made W be mama, of be eNdhg r pmpoad dwesManA Co. a lades sham Hieing dl sending still. Mom a not Mom. "WRTED mom CONTRA. PIAN RM In case of ma'arty, add NICK SUN al (626) 216-8315 A stand-by am fa emwgmey x.dl Aae be asepAle at all fie during No reh's.sm ( OIL 15 to ZHI 15). N='1 moivida #,all be aweade on at, and stiod bd at Mmea ant localgana to faNitate rsgid wnabaabsn of emergency dent. when rah la knlnlamt. Emden madrd den,. Ahem m Nu pial may be rammed A. approved by the Godel Ins. la if the grading opratim hen progressed to We point ware Hey aro be Imgr nai waded arena aapcmt to 0 dopa IGoatd at nee site pobmetes meat arms mop had Use lop of dope at the c.ndudm of mash wain, day. At it and debris MIA be Tanana hon dl denca v0s. 24 hangs after mail rainstorm and be dispmed of proopply_ A goad shall Wo pastil an We site xhmar the depth of wale In my dance excels bo feel The dans Ail be drained or pampa dry within 24 hours after each madam. Pumpbg and dambg of dl bade and *.be,. dean. must wmpiy In apprapriate BMR prmtic. to deealcelg opaallans. Eeapt m onerwla opposed by he Grading ngmter, dl WIVVAa ma,bodive Missiles Man shall be M place at nee and of eaeh eakng day or an residents Men be 5 -day Sm Val abilty farm saums 401 $ All loon If and dd)rk whish may Mosta a potential hunard to art -site pwprty AIR We rammed ham the Ae m dixtd by the Grading Inanectem The Macwmanl of ad&Nand desk. to red.. rasion danlage wiUF the Ae is left d We dieaeUon of ne Hdd EngMe r, 0. Owdting bash, may ml be remised or mods neared. beNsed November 1 and April 15 of We fellowgng ler, winout We apposed of We Grading lapealor. 1. Fmehal canW daaicea Me to be modoAd as needed m We purled progress. and plans of nese change, meal be, wbmlNd far ..Prowl as man a. I Add no folloxhg Wot.(or Maker) to no Pow to dofes its, commit state of emp u.Om. a. Storm amines and mtdl badns Bob (mt) mwbuoW, Is Shad ore (not) paced, except m mtd m to modm antro plan. a orange dent. ase (mit) msaWcted, except m mtoo m plana. 1 Stmmeotr WAUthe sui r7boanmts must be IntWStd nto We Erosion Canal Wo and n Too 6, Se.imn 7010 of We County Cave for my censbuclkn bedew Oaiabr 4. Every Wat should be made to admnde We diumarge of ren-stameatr froom the AojWL Wile at dl UV . 5. Dundee oa/mniraclave are rrpmaMe d WRmct m Eveefm Cmifd Dabove and mode sole BMWs ase WaBd Sash funotkn ng Wopdy at ON Bonds ESMMAI0 PERIOD FOR COMPLETION OF GRADING: GRADING WILL STAR: MAY 15, 2013 TO BE COMPLETED BY. OCTOBER 31, 2013 FURNACE KOM Floe Ina an Wed axfa. hdl ban a mnlnwm is, daps and Por Ines m landampe .dose shm be a mFkmum 2S daps 2 Concrete and Landumpe arm, od)ocmt to the building Ado M at a M mtn dope and mm 20% dope dranng may hem the buANlg. ( See noted WAS 3. Sheat flow an ammet. anima Mall horn a mFMum dope of 1% and What flow as Iand mope mrma Mao haw a minimum dope of n The Aow one shall be laid It a mFbnum 3' ham We side of the biding and S m e. from the bad of We budding. 5 Drahing to ad ,.t a.,rty 1, not permitted. wR MBI, aagfWN Rao S. 26. CmRoster Adl may the CRY Evilmefe offlce al (!T) W9 -]Oto mM a., u2 R IMy-dlQot (48) boors h dce meof ntnum to begin ladN9. 22. Ceb,acW Met -AY win be Ctlifamn Stamp Water Bert Mana9anwt Wba rILTER Was. o msmc Ta PDalq / / Practices HwdwAs mod nee'rebat's Stendmd Um. Stam Mata Mltigatnm Plus 1 R eRJn'm PA 555.18 (SUSUP) ammo ments as maser, cad - F 1 a [West d imftep.9 to Pmsfeas ase. R'FaA Nom. a _-cV61WG S. ]Lfncimt test of RI we$ Moll be made aumg We goading to am, that the sot prapalka amply eon no dedm requbanmt$ as determined by nee Cmtedmise Engineer Ban&, sola 1,m Mea don9n memselve and sommudng unit weighs. J0. R-wiue tesla Atli be emNcd W ad peMk Md pnwle roadway 'amonmenm to IEenUfy We mnknum hasvmwmd en ent aalesa . regmemm Is, be site, unions .metes not reMkM by We City. 31. Tpe V ..I Mel be eM fe, ao omcnm eofw cwninR In contort wish Me load whom, unci. ImWatd by We project's wi Ms.. 32 Cradle, ad sonmmea n amAW. and no bonwados of orleant and oaken end opmetian al he.W gdng madvionl MU be beat to between to hen' of 7:m om. ono 5,00 p.m., Moody nrmgM1 Smumay. Dust 9memtd by gnuk, end consbushe ..Unies Mu be Iduod by mown nee sot Ada I. and Wing be mUAWM and h mcadonw Mn Sawn Coast Ak Quality Menagenml Distant Rule 402 sed Rule 10.1 Rdobd mass Mall be used Mwesa possNa Adheaft al smaWcOon sediment Mdl be pai oni to rM.lce ales lases FF 555.85 PAD 555.18 GRADING AND DRAINAGE PLAN � Real Q MUNWN ENSibE SadR4E PAT(DN Q ElDSRNG CUB A"D/GR UiRER ro ff rEW.ED © R6L�D FETY EUNpD. PER AR:HIGOILNi RAV ® pRi1TTA CLPS,, PFR Bull SRA RAY 120-2 At -6 (150). Q PROR'YGED gaol wSARCUR, BY pD3 GR EQAVAFNr. WISIRUCRN RN SR1C SIU. 201-2 VAIN ECO Eh E.ENr AND SLRLRr. © ofirocisfifif C Fes sabot Laust. WTH RLTRR BAYET RYRELTIat RR SPPWC SIU. 2222 QiTPOPOESEI 4' WC Soft. 40 MoNVE RPE 1s, SLOPE AN. ® S7. DETAILS � RR SEPARMITE PERMIT. N S151DA RR SlfdGiLAW. RtN ® WIE RUCT 127X12' GRH BARN VATH N TRAFRC GRATE bal 4}WE C4WTE WITH RMS BLAME CATCH BASIN ($1201)$ 10m OR EtANA ® MM NFD & GRRR ro RMAN ® OMERUCT 24 ft. NICE WJfY£TE V-OUTIER PER DEfNIS FBEU1 ® OXSIWYA AM PMP. RR sRVD SM RAY 111-,6 CARE B. TYPE 1. ® IIEINL CER CfA VIsANC SUf"= RA sovoic S@ MAN 111-f, SEEr 10 NOIE $ AD PFR AaA TipAR).4AT ® D]SRfD 1RES TO ff RMOIFD ® MRS, rc RaaExr ro EE Rx4a'En ® Np6TRUCf NETT CCfIfYETE WVMWY, RR ASCHIa:RPA1 PVN PoRKE a RDF AWN CURET CINUGHr EXACT IDG ION <!D ffrA95 RR RUBBING RAI ® RWSPOIED Mobaces PARGAD seri sRfiolm AO behand, PARKING S(Yy PER ARYNECIUYI. RAY AS -102 ® BSCRU. NEW DOUBLE CHECK VALE ASSEMBLY AND 1 1/2' DOMESTIC YKER BITER ® PROPOCROD 2-C PAC SH 40 UWMVE RR; 1% S1EPE MR SCALE : 11'=10'-0'I ® SECTION A -A SPECIFlER[IWei x1a PRaVA➢ a., u2 xIIKRAY xa9mwTm slRm Wba rILTER Was. SECTION C -C man FF 555.85 _____O(mCE Ds cam _ R eRJn'm PA 555.18 t� cad - F 1 / ma R'FaA Nom. a _-cV61WG SOB 3 A 4 m uax eau SECTION B -B � aCA1L r -Sal FF 555.85 PAD 555.18 GRADING AND DRAINAGE PLAN � Real Q MUNWN ENSibE SadR4E PAT(DN Q ElDSRNG CUB A"D/GR UiRER ro ff rEW.ED © R6L�D FETY EUNpD. PER AR:HIGOILNi RAV ® pRi1TTA CLPS,, PFR Bull SRA RAY 120-2 At -6 (150). Q PROR'YGED gaol wSARCUR, BY pD3 GR EQAVAFNr. WISIRUCRN RN SR1C SIU. 201-2 VAIN ECO Eh E.ENr AND SLRLRr. © ofirocisfifif C Fes sabot Laust. WTH RLTRR BAYET RYRELTIat RR SPPWC SIU. 2222 QiTPOPOESEI 4' WC Soft. 40 MoNVE RPE 1s, SLOPE AN. ® S7. DETAILS � RR SEPARMITE PERMIT. N S151DA RR SlfdGiLAW. RtN ® WIE RUCT 127X12' GRH BARN VATH N TRAFRC GRATE bal 4}WE C4WTE WITH RMS BLAME CATCH BASIN ($1201)$ 10m OR EtANA ® MM NFD & GRRR ro RMAN ® OMERUCT 24 ft. NICE WJfY£TE V-OUTIER PER DEfNIS FBEU1 ® OXSIWYA AM PMP. RR sRVD SM RAY 111-,6 CARE B. TYPE 1. ® IIEINL CER CfA VIsANC SUf"= RA sovoic S@ MAN 111-f, SEEr 10 NOIE $ AD PFR AaA TipAR).4AT ® D]SRfD 1RES TO ff RMOIFD ® MRS, rc RaaExr ro EE Rx4a'En ® Np6TRUCf NETT CCfIfYETE WVMWY, RR ASCHIa:RPA1 PVN PoRKE a RDF AWN CURET CINUGHr EXACT IDG ION <!D ffrA95 RR RUBBING RAI ® RWSPOIED Mobaces PARGAD seri sRfiolm AO behand, PARKING S(Yy PER ARYNECIUYI. RAY AS -102 ® BSCRU. NEW DOUBLE CHECK VALE ASSEMBLY AND 1 1/2' DOMESTIC YKER BITER ® PROPOCROD 2-C PAC SH 40 UWMVE RR; 1% S1EPE MR SCALE : 11'=10'-0'I ® ewsc rY WHIRS) SPECIFlER[IWei MT_-- 21NI a a., u2 FS I -EY PYfaE Wba rILTER Was. SECTION C -C - is L PN(^Assume. some. _____O(mCE Ds cam _ PSS VEIP PnV[KH! aaRfPLE SECTION D -D g51U,®FB AREA CLM AM - F R'FaA Nom. V-WsaA 3 A 4 1, b � imae WiIET, 91 e " L ...,..,.,aRN „e saumvwwamm m.aaev. w., is, ES PKKRCOHIPAm maSfAgi mrw(aWNa (i oE1aLA I mxtN 6E Is �s�� yaawP6,� y I- - R rE ...m wwA.u,s.q +gn'av xn M ss a, � aas -m (aT msAlmNERi1 same We _ - - P, avarvrv(mepnrapMuan SRW cavae. pldA.lon.' rua.eeLwe'uswnwm,ame- NAKR WS%Ei. BENCH MARK �enW�.a�m.w,wrvv�m>,v pRa� ®LRA'NA0. a IREr Hurt OPW SITID N N CB IRW/o BLP NX Cm RiFA manm,e.o+xs. DETAII 'B' OF NEVH BASIN IN V-GIIIIER Cm R A LNYl1em A m le -in. .III, os^ pour m ane : -Gra s-sve.�wwwu> aMem., PWiCR 1 L 1• sx'� CAL IAD WNWCRD III: CAL LWp BMYIDRAIG ING amm zxulm cmmaTE Ms. In I. nm coax ural. nasus as. mar a n gin? IrsamssrvimBlrvw:EEsalon.a.`. mm ra,a,k.a,m ® TN ,0216WLoPro SHALLOW CATCN BASIN KrlStar Enterprises, Inc. m` 0 d LoProTa SHALLOW CATH BASIN fr [Star Enterprises, Inc. FlLTERINSERT FILTER INBERT CONSTRUCT NW 4 UA.ETER X 4' MOVARE SCULA`D TO PRORCT THE TPA430MB cadfifiodar AO:FI. flA i fSWN]3lE ADA RN15 RR P. PFR fDA IEAART4IF. FEfa ® 100. oDf USD ® m1STRlcr Row PFR RTARs Faire, ® NOT USES ® whisal 6D ROTES WCE coNSiIE V-0JfiIX RR DERets IEIRIXL ® RE3YSD C RC SaL 40 PFydeW1ED Rf£ ' ® aSTR CT Inuit cooddi1 BJROM GRH &SIN Tom NON-RNFflC (ROTE Wm FltYHan FG -143636 FILTER OR EOUNALEM. STERCRED OR IABELED WITH THE 'NO DUMPING -DRAINS TO OCEAN', LOGO OR EQUINA -ENT. ® caNSRLCr is xiw CATCdI BARN YAM TRAFFIC fi li: STENCILED OR LABELED WITH WE NO DUMPING -DRAINS TO OCEAN', LOCO OR EOUNALENT. (D CBSTRUCT Jr AC/Y AGGREGATE EASE Meat EASING ELVATKN ® CONSTRUCT 36' PARKWAY DRAM, PER SPPWC STD PUN 151-2, AND RECONSTRUCT THE CURB &GUTTER AND SIOEWAII( TO THE SATISFACTION OF THE CITY. ® pR'sal cus as WITM RR SP1C sax FLAY 12O -z n2-6 (IM). CONSTRUCT M4E FORDEN OF CONCRETE V -GUTTER TO MAKE A PUL S[ZE ® V-GUITIR PER CETAgS iBEUI ® 0.YSTRJLT VARnaE FIXNIS.EBI ® CONSTRUCT 12' PARKWAY (IRAN, PER SPPWC SID PUN 161-2, AND RECONSTRUCT WE CURB & (WIRER AND SIDEN i( TO THE SATISFACTION OF WE CRY. ® CONSTRUCT DRANAGE PIPE CLEANOUT ® CONSTRUCT 241NC16 WTE WINE V-PP1FR PER TENNIS 1BEPIl =I �s b L'Ijy F ..$ tate, ITAM TICYp TV -GUTTER® (Mi -M=* GEOTECHNICAL ENGINEER'S STATEMENT OF Ca1PLMM TMS PLAN HAS BEEN REaTil By- T.Su By- Bw. p ca 'a I\wvws �� aL La5N 2 ren M elePE 9mov ed W.gNC PUB antAACPGN Q 219 us vrw1"1 1"S TYPICAL BERM.. per mpoor m a4 Is ol jou STORM DRAIN SYSTEM STENCILING AND SIGNAGE (NTS) Underground Service Alert ab OPE Call: TOLL FREE 1-800 422-4133 TWO WORKING DAYS BEFORE YOU DIG BREI CANYON INVEMENT. LLC 17520 E, ROWIAND STREET. 1288 CITY OF INDUSTRY. CA 91748 TEL' (626) 913-8939 1 650 BREA CANYON ROAD, DIAMOND BAR H GRADING AND DRAINAGE PLAN (IN THE CITY DF DIAMOND BAR> In axon m i scalae cuvlW ra ut fswmr _m 1aaE�-mit 1_DLi FF 555.85 "Ota MT_-- 21NI a a., u2 FS SMmaS.PANrO1r Fit - SO CY SECTION C -C _____O(mCE Ds cam _ 6$a--- mm) __ L --lis ss1.N) 9 ' 0 SECTION D -D g51U,®FB AREA CLM AM scats "IV =I �s b L'Ijy F ..$ tate, ITAM TICYp TV -GUTTER® (Mi -M=* GEOTECHNICAL ENGINEER'S STATEMENT OF Ca1PLMM TMS PLAN HAS BEEN REaTil By- T.Su By- Bw. p ca 'a I\wvws �� aL La5N 2 ren M elePE 9mov ed W.gNC PUB antAACPGN Q 219 us vrw1"1 1"S TYPICAL BERM.. per mpoor m a4 Is ol jou STORM DRAIN SYSTEM STENCILING AND SIGNAGE (NTS) Underground Service Alert ab OPE Call: TOLL FREE 1-800 422-4133 TWO WORKING DAYS BEFORE YOU DIG BREI CANYON INVEMENT. LLC 17520 E, ROWIAND STREET. 1288 CITY OF INDUSTRY. CA 91748 TEL' (626) 913-8939 1 650 BREA CANYON ROAD, DIAMOND BAR H GRADING AND DRAINAGE PLAN (IN THE CITY DF DIAMOND BAR> In axon m i scalae cuvlW ra ut fswmr _m 1aaE�-mit 1_DLi MT_-- 21NI a Fit - SO CY TOTN Rob nal ACRE g51U,®FB AREA CLM AM R'FaA Nom. V-WsaA PO PIAAAIOA11 NOIfW .Yi f0R 1, b � PfANf Ad B[NRNG 0.(4025 My. VF7SYWARBF Sa " L vAG� pANBGa% is, ES PKKRCOHIPAm maSfAgi mrw(aWNa (i I mxtN se �Inx e_ - BASIS OF BEARING ...m •• _ - - axion aE a IAEA uxYGx R01D pldA.lon.' Pn �'"O1 WA9N BENCH MARK xxx.�® pRa� ®LRA'NA0. moor c 7N OPW SITID N N CB IRW/o BLP NX Cm RiFA DETAII 'B' OF NEVH BASIN IN V-GIIIIER Cm R A LNYl1em A pour m ane DBAMN: miest � 1 L 1• sx'� CAL IAD WNWCRD III: CAL LWp BMYIDRAIG ING =I �s b L'Ijy F ..$ tate, ITAM TICYp TV -GUTTER® (Mi -M=* GEOTECHNICAL ENGINEER'S STATEMENT OF Ca1PLMM TMS PLAN HAS BEEN REaTil By- T.Su By- Bw. p ca 'a I\wvws �� aL La5N 2 ren M elePE 9mov ed W.gNC PUB antAACPGN Q 219 us vrw1"1 1"S TYPICAL BERM.. per mpoor m a4 Is ol jou STORM DRAIN SYSTEM STENCILING AND SIGNAGE (NTS) Underground Service Alert ab OPE Call: TOLL FREE 1-800 422-4133 TWO WORKING DAYS BEFORE YOU DIG BREI CANYON INVEMENT. LLC 17520 E, ROWIAND STREET. 1288 CITY OF INDUSTRY. CA 91748 TEL' (626) 913-8939 1 650 BREA CANYON ROAD, DIAMOND BAR H GRADING AND DRAINAGE PLAN (IN THE CITY DF DIAMOND BAR> In axon m i scalae cuvlW ra ut fswmr _m 1aaE�-mit 1_DLi IX IN fi4 ° i GR I c¢.) ADING AND DRATNAG„� 'A -N---- l i l 1 Imiwkf rl `Ita I � D III I I I - � - 1 (REI �bbA"1yx9 lakkohh"9 y \ - - - - �Nn mesi y. g NO'22'23"W 5.00' SgLE 1��=10'-0i1 \ `l ® to ACCESS ROAD )- - ' III IIII III my°Si31f°I HaL sox Ex MRrz vmE Inmw cm5x0 IX-wnY Dc ss5nf N89'4807 °E 167.73' 1c m1.5p / m nEr> N89'48'07"E 103.55' 'il I 111 111111 I I' \\` _\ �_Oss9.m) _>_e IOa - _ 1oaz� la w1Gvx ut as Loa R¢aA1tM alum 157.73' L�mv (m5x3) 10 �'vfs l I IN69'418� 7"� ,. 21 I I - - - - - - -- - @----- - - ---------�^___ m_ _ _ H+ a ----------- ----- --- -- ---- LI I 3��Q� pR? � s ------ 11 Ell I I III I I I I I"' 11 II rvaia'000 Ra'. ml°V01u 1 1 1 1 1 � I I I v I 10 B 1¢acArz� �5 — �III IIIII IIIII 111, I T. 1• II III]I filll 1111 Ru 1 III'IIII�IIIIIII��II / II;1111:111191111 e' 191 l 11 I D it Rdo I I I wiY I I I i t 11 �m, 'x 1 1 1 �6 11 II l I 311I I�Y IE1 I I I 111�11 �1 l 1161 1 1 1 111 I I A u Y I 171 I I III I P / dt6Jx.fz) I I I I I #178 I I 9. I I rytsla6�l ( I I I I I I)k I `li I I IIII I I I I 1 (Im I I I I I I I I I I I Iwlid 41 II li j IIII I I ISI 'N I II I IIII 1 1 1 1 1 1 1 11 II h� / +III !IIII IIII 111 I1 !g� / 111 f III 1 1 1 Im 1 111 ! JIII I I I I I pIR {ISII'4W°IIII �II 1 IIII Ixluo{mi25, �°11, °plit #168 II16J1111111111 11111 III�f IIIII 1 1 1 I 1 I IIIII >I/ I I ! II�Y L �1� 1 1 1 IIII 1 1 4 k ggL__vv I I I�a.t`.1.,I I ISI NI 1 ppppi IIIII' Ir � am' --_--- I 1X�Es�a11 I I III 1 1 1 � I�, INswr —�"`— mesYalt eam Ini 1 I 1 I elo I' I 1Ll r- 1 AFM ��� m-�I --31 ____________�"m ` �\) \\ \\ 1� (515)—l_ ____•.� _— 54]5) SH.AI AWEN II fS 55SOY 1 I `ER 551.94) / RSY 10 RmAm \ vuK II rs \ jeA a / SA'Mlli wE -E%AC P1Lr+ 1° Rio. #100 e -y l is .) a D. N 1 .i6 ; 2 f � Gfifi) FF 555.85 i' �- 0 �."„® D.ma-asua ta4q PAD 555.18 Oa ft'diN le i 1 rs m5n ms]s O i� g • fi8S69® ft• R mao6) (R sx0] IR swo�\ � (IX 7 !./G wr rf If5 5Y: °E &11°THD \I�•i5)Sal4) I ii n ® £ • n sexy of I V-tl1�IlERry %` tIN6fME 10 11 ',1i }} (R SSS°�� IXiUFJ��-%6,/ �fI SK1Q l[ NI f ©' Iwi ar\ roH wumm � / o-�i DUN, sAwR IID£ \ sw.fs) �wH ss6�e #158 11 • I Old \'�(fs rc mam9rs \ SIMM wE / I I rs ,a ft5s4 _._.i • Y- ___ II5f°.W'—r61F--(SSx) =�a1.5 .� �--•� --_!— � —� (55D _ — — r--tsLae�)�a'W" Tf355i6 R-1460 00' 4951j a (r6 NI.m s®EwW( 19! 3q xv Q N89 -48'07'E 113.12' " L=96.93' Mai s y B tigssn6l IXI0.+filC _–q,_ ..a l 2 pN11 _ ------ N _ _ _ _ _ _ 31 ___ ____ __ ____ _ �A% — — — IL(S166o _ �y a iXN).99 Fl{51B]])_ _ — Sty n(4aap ., \1f{41395 y, 19rvw2ae u _ 1 O 'u ) r � _ _ _ _ _ _ _ _ _ — _ SIGD9 _ _ _ _ _ _ _ _ _ -- - — — — — — GWTECHNIUF ENGINEER'S STATEMENT Fl(N2 IXNfN p OF [6VPLINILE C — — —7—RW —d___--�-----"—^—�---------- —- ----------------I----------.— TOPS PLAN HAT BEEN REVIEVEB BY. —�tW —RW —RW RW —RW RW —RW RW —RW —RWy- SPRI RW —RW —RW —RW !—RW .__RW _—RW -- IND DDMDI RIG I N OUR REPORT DAM INE RERVOISEDAnONs IN OUR NT K DAIOI wA1M _ dao rzxRw°2 a wwmmw smfn_ _ —EARlHWORK I RIVER, w te• Z01P IG THE G N0. iHMIX rol REMEW WAs UMitm ro nE ¢artawulEstl9 — Soo OIL_— xW LYflFPRESFNTAlitl1 AS TO 11E AINNRACY OF iNE BIL-.- 10CY DIVEN9eIX MFASRREME m CN.WUIKNR OR WASHINGTONSTREET mMN� as """R°RR" "E°e419 DGRE- � � ! Underground Service Alert ®R. N CONCRETE SLABS AND A MINIM E OF NO. IEARS A BE A MINIMUM OF 4 INCHES 1HICK ATTENTIONAND RONFCRCEO W1H A MINIMUM OP No. 4 BMS AT 10 -INCHES W CENTER BDRI Ail uttllUea shown on Mfla pian are based an ava9able TME ewBlMlaa�� KBrsaMm- Call: TOLL FREEWAtS OR EWIVAIFRi. ALL SLM flEiNFORCEMQIT 91W1D BE SUPPORTED TO ENSURE rewrdn It eh it be theadsePROPER P09RMING WRING PLACEMENT OF CONCRETE CONCRETE SUBS IN MOISTURE to tarify all etlaling uUliliea byBASIS OF BEARING I 1-500 SENSIIIVE MEAS SHOULD BE UNDERWN WITH A VMOR BARRIER CONSIST OF A and to avoid damaging exlelMg 0111 a d.dn, exmwU.. MINIMUM OF 10 ML POLYNNY- CHLORIDE MEMBRME WIN ALL LAPS SEALED. A FOR UNDERGROUND SERVICE AuDRT CALL: I MINIMUM OF ONE NCH OF SMD SHOULD BE PLACED OVER THE MEMBRANE TO NO IN 1_Bg0_422_aiDD mli➢R 1YE OF BEA IAHIRi ROM I 422— V:E MutE�O. Ba UNIFORM WRING OF CONCRETE �J'' uLJ .t.�-�x/ W — W ]H EI�UIE�t1O mTTNB Nc W — W — W — W W — W W — W W W — W IX I,- W — W — W CtlJNfI" D' V�"n TWO WORKING DAYS BEFORE YOU 010 "RSRE&R W5OO' RUES BYy RB TM N H LB in W/0 DA Ra OMR BEA rlfxlgV? a.. WI Ne USA Nat . Wy CM fDGLEpN1&yT IAow W111w Nwggbme anla.Rm w/Ab e1M1M EllVATU]G 552&51' uIFLLe pamx al Pn wk uls The mlx'A Fbm pa M qe Nm' >/ / exs Nm�MSrA IXdIH \� (D fam nln 0 I / 0. 73) \ v J.In msn) _ m mm6,rm]O I sxalr .le v I II & I ns m) li I 4YAfE ¢AE4 Egg �9 IIII I ftR H i°IY.%:f51. �4'0 I —�1 ICCryI J0.WY IS Al10 1 I 11 Q I T^ HSfA151n. pEcll 11"^•w yu�winr is xmaiofx I I I Q I \ ' ! ISI IT'(��la�l• I x ' } N ml MM¢BBMCCCCccbbbbbb iI 1 I3 _moi i I AVHtat IS x°IjO _ ! � �I IIS � la (I to axn fi Z4 II (fc�i6}laa* ,7I, IIi x6• I �l �I 11 CD I 'i t- I I I I MI'dwxa a (1 ]tl mS99 mliWelmO `�'l1S 13319) fS YG]° I II I v 4 6m95 ©IfDS m1�°9a II a 555x1F 49 x5u1 I I 4 \ SYMV IM III m 1 ,ice I 1 1 I Nor BE i 'I I I 4 1 1 II I1CIY6pyy,,�� IS i m1Nb� VII la II I M1SS I 55a O 59 R�K�d� �' Ifi�� � aattlaep4xH1"7 iil ������ffflll Q IX \ 9XssAn) IfXs4. 1185'5 '53"E 75,19' 1 r SmsO ' V ------------ BREA CANYON INYESTMEM, ILC I. 4� all— 17528 E ROWLAHD STREET, /288 CITY OF INDUSTRY, CA 91748 BAR So 1„ I TEL (626) 913-8939 650 BREA CANYON ROAD, DIAMOND BAR A� GRADING AND DRAINAGE PLAN u (IN THE CITY OF DIAMOND BPR) I Nen � a val an ¢ awo arv,9, xxn `1¢ PWvac Iw \EpNl45 MID 2pJS R`n^^ A Ih]C��l u EROSION CONTROL NOTES ATTACHMENT A NOTES 1, nm„N.paE.ey vF 6FASBda]FSIt224i z �wW, w nwa 1 m ama/aea to q, wn...a .a+m 1 Rdwt tln nvwl Mm4vm abd MXd aM qvA ml. wA AVAva/etr ape A QN M1pc ptl wW 6[iu nudbwtWrl dN qmi by bMT (1) ax Ma. N vA fwl dNq d dM af.dT Zak S FMd tlnnbW 4A. µtomb nudbwldMm Am! °d�a mA.d adapd m.n ¢.Ld dapnw. p,aM we & 564pM d¢M WdMwn.6WJm,Ml pd� Aan 6iq bmpald tan NNA, ft 1Aa M¢caMd r m dvrin mN.a Mtli BnP Wp ��mamtmlp tlx q� q ufm MnNWcpM Idu,mbm {pn lM mNw. $ic mwl b aaM ip mMdaY wa 6 Fasa.a,lE cauda mrlMbgW top lM PAie aalw mi%amW lAry b8p�l�d Yo'a R. T. °M mNuelYn chlJrM vlw mnbagwtld nlpa a...f n-9mf m Prml m,lan{M6i d Mwl. aq aw.A Ay WA 16 SYnnb vA dbe,mlM mry mlb NSK Brn tld Wly �m tn'Bron'I".•�.,e i °an e.r°�'� n°We. e�HRe�°.y. HKaN lgNma,M b wgl,p im+Ny oq Amy M b n. Ml+,m ommta x•wawaaadvgxpvm nada ddEd rorun.pMm hdd W.d.. Iz rqd WF. mMGpd Itl dk lltr tdak wA PM Av LEGEND (414.58)....E11SRHO MAIM W.__FHU OF CBIMEIE 520.w.—PI(W0.5D EEEYABON W.. --.MD OF PAV T __ Sb D]6RIC CMMM ( )-- IX.__....USING TO —.—.FFP LRNE --_OMNA x: PATTERN INV_.—_pIWAT MA➢ON _ESSIIXG SRNCNPE IS _„._PNISI SURFACE .RRWERIY TWE EP_.___NONBI OF MP PR .tBE XIOR.Wf 1C..._„_TOP OF DAM ❑ ...CATCH BASN OR SUMP --D—➢--...OA1lkN1IBE F.S_._.M%WWAM --_^-LifiT OF MA➢ON FF_...SINSI FLOUR �'IX” AID • • • • _NA PARI OF 1RAVfl HP -_JOSH FSM ) xre'aSafB tater xos'zsR so01 xN'Nbrt tarn m aw xm'NO &iz DO WASHINGTON STREET AnIAYNr. B BW. FC _._.JW91 GVAOE T .„.„.„„TOP A g1IS MINING U O o9A___.IXUBE ETECIOR BAOOLOX NIDIB.Y T• 1 � 1 n00 • I / n xsu vN Bsste I •I I •I •I { :1 1 nsa • I � Y I SMIRCH mTMx Nom OA CORMOT GRAVEL BAG MOSON CONTROL ALONG BOMOMES OF OMMSCRON NFA ME GRAVEL BASS SHOULD BE 2 ➢AGB WOE AND 2 BAGS HIM, PER BYP R: -B BO owsmuCT mm No EDISON CONTRA NWND ATM BARN. ME (RAMI BAGS ROAD BE 2 BATS WDE AND 2 BAGS HIGH. PER BAP ME ATTACHMENT C NOTES EROSION CONTROL PLAN SCALE : I"=20' -0'I INv &icS Mwvr g_) 9A(S WK A'Ok�13 >xo z 6PA(A6N'lFsrmalr NO J NN9r GPAC£ n'Aw (rnoc IRxw uwDE 8 waAsx SECTION A -A A� SECRQ48-8 nPVL SECR� A B GRAVEL BAG AROUND CA ICN BA IND I flmmnalec]WiManagemmtlXetleaC�eaxpa \ Ii Sac M('pomvalwA.NMa \\\! ,, I➢v°)a1N,s nc .m [xivm rvaa. °," W 'y�➢nSvFPu¢3a Y � °Ea° vMc IGar. celmay. fipL An J.«a Iw14¢--•a]> om,mPma U -pa]s Bvga..m'r°�ram:.� vasa.ormn<.apwiwL�.yM.MaY.tsmm.,e.YmenBspPspp. cns0wa0l ma¢NwOr.uz).m;mwm�m,�„nm,aa®t.wwt.aaaw.¢maapam¢mwm,m.;u. p°dmm°eaalmmnabpdrtdk . Tvsbpukv.'[Mfdlorigomil°'w•rOAeeweawpanbl Npawamebeamma�Wp,ad .vm.muor/na W y:,ot aeawWv.mimtmnme,rc mtvLpfpaimmYsslvFs?1¢A mxtbaivpt¢myamap Andwpmagmrennm m RnreaAa,m¢m.pasdmapLmwPpdam Bpax,rom,.m, emp.x.lmBw¢, .ewiaaAmdmpa wwat Fmn•naw ArOEma w.oepx, sim.dCpmoi:. �%am -Gaya,.une,mwnwmap�sadvap,�rsYwu�;a ° P w0.IInrm16m.w�mmawmmpcmmamnaw..wq,,.,amp,.p,mJ.a�we¢. p'��IPy.�e�Ypatkx-^ Wamw,wmw.s®maar'tb.mmmwaaa.. ma.av�rzm,emwmmu.bmmroncammapmA.myaaYpmaa(�umT:,bnm..y. . °°6a��WP�olUw�muah.w.pip6mpNiu<4'mimrvabpw4ido.aBrsamuui,aY rcL��rpss®tu pNuka.fi: wtipaaahr. o �s �p.¢Ppw.m<peniauAa�pawwwArM�awPmm'aepm�sp°mm .'CbuwmmMJMa(bwN:CweacNm.mW�4lJxwumAWaltaxtlAea.taN te>umeau mW%,duR ° wcnaeamwch,myrat<wubW ldpdelabBcwry¢mya„b°yq.tw.Yndamcbx m°.mmwkwmde,a,mamw,az,rzgmYcmbp.,pambtligomap(mw)elrA Yawum l<wcJe..mwmoP. a 4yd�amen�6-nN.Ipyq➢paypBg�l6edTgriydaaawwW mrtplatlemn,ermt mn ':Nmo4eipmtrr tligw,elMw1A n.ew.e� Mbeni���,wdmam,W la pymae,.`p yjp, 4xylip"og Wan cNb ° wpmmWmOasdlmrmxbeer,uv AE rypvrt3lWesbye wptepgawcmMpdulul fiemmxea•¢ SPIDc®(beeTmetuplwvyb,etYspd Ti,poW pri°.PWm,mv+.. Sp.T•srtuy ,KK6ewWNmemAmngeryNm leeti°gquitm.�ymunkertyheaimailyJy. Sal Pe{ara0mtlp0apwTxbomtl,kameyisk,wtlrtppl¢4a trgaM1e'v.gmiupa(et ° 4aW 1YNabYpTd N+'a¢awlapNEprormdwiY,m7s¢pngrys . xmsroemwmrrnuaprt:tlm.l¢mwc.weasnmegpipm_nmtivikbwy,ae�a,nyumcwb atoll%avlebAptWtpyutdm AS THE OWNER OF THE PROJECT, I HAVE REVIEWED THE BEST MANAGEMENT PRACTICES HANDBOOKS (BMP'S), CALIFORNIA STORM WATER GUAUTY TASK FORCE, SACRAMENTO, CA AND HAVE PROPOSED THE IMPLEMENTATION OF THE BEST ACTIVITIES ON THE SURROUNDING WATER OUAUTY. THE SELECTED BMP'S WELL BE INSTALLED, MONITORED AND MAINTAINED TO ENSURE THBR EFFECTIVENESS THE BMP'S THAT I HAVE NOT CHOSEN FOR IMPLEMENTATION ARE REDUNDANT OR DEEMED NOT APPLICABLE TO THE PROPOSED CONSTRUCTION ACTIVITIES IF AT ANY TIME, SITE CONDITIONS AND/ OR TIME CITY OFFICIAL WARRANT REEVALUATION AND REVISIONS OF THE CHOSEN BMP'S, THE APPROPRIATE CHANGES WILL BE MADE WITHOUT UNNECESSARY DELAY. I AM AWARE THAT FAILURE TO PROPERLY IMPLEMENT AND MAINTAIN, WHILE UNDER CONSTRUCTION, THE BMP'S NECESSARY TO PREVENT THE DISCHARGE OF POLLUTANTS FROM THIS PROJECT GOULD RESULT IN SIGNTICANT PENALTIES AND/OR DELAYS SIGNATURE.- PRINT IGNATUR&PRINT NAME: PEC I��EE OAT& PROJECT DESCRIPTION: CONSIRUCI A OFFIE2 BUILDING WITH WALKWAY ON A VACANT LOT PROJECT ADDRESS: 650 BREA CANYON ROAD, DIAMOND BAR 6=1MICAL MMMJER'S STATEMENT OF CONFLIANCE THIS PLAN HAS BEEN REVIEWED BY, OF m (wrtEr) lAa,-Sph T. er 2 BMP &nnplC 6„rom MwlmvdM)nevmpnhot&aY, k.ma6 irocat¢mmruaJw.s.®bmemnmmtsmm. AaaltlmJRyWrmmm pminnlmvrsityvticB6Y�abxmem¢m(�a1wL °+Nme@W[allodwptWW(N091p@eAeJaW w,m.OwvwcwwiBwmwmeu m.m m,.Ynnai,.awA...a..ulmpy P<cm,ww¢,vw.,.l Pwmhtvd Femu)waWprN[m6trwxhaapruf0eN6ma,ix:t Alpwl&m]WvrcYaMlmYmrnBm Mm Wlp¢dmb>Malrt°imm0'p�¢b�JmgpamiryppwLta¢m'mdt wm,e'm®ilwMebalrca B,mmbtivwa,x,p®ampwt Lmle,papm Av Npuffi4dm6A,�,omh,c9r�pp,'wlan¢p[¢:adl MifyBmaesal�lB6llt�tbnmYalla4 mat;lm<4mamipawLmw,mmarar(crirwslawrz.aepawa°naam,epio®xvcmtr.B¢e. ,wc+e:ymea'uv)epr vNwPMmxmBm¢um�, eaim,mawamv,.bmswtlaty, walmuymuwm McJm:VEpim r° Cssvt¢eLWmtllfine w 'Rh - (MpgdiwNQ IeSJlmbxn¢}kvx sztmla ec .� nn._ IF&tIndwmcS,�M1t_” mu .'f... P.m.�O�.�J amAap,waiTaOm BREA CANYON INVESTMENT, LLC NEma: m¢ EROSION CONTROL PLAN F f - G HG c i� (IN THE CITY BP DIAMOND BAR) ILTNNS Ix o �dr' YD l \ I\ °fd” mI � vwm¢ a«v rn.i cxn �� mvoc la rs m /1�'s / m kffili ¢vnm .m waPffisa 3_OF rxavTR RQ NIDSJ cart 17528 E. ROWLAND STREET, X288 CLIP OF INDUSTRY, CA 91748 )R,Rw Ixc TEL (626) 913-89J9 RALE 200 SITE "DRESS, I 650 BREA CANYON ROAD, DIAMOND BAR 03 rn D z 00 2,020 53. BRUCE DB 1.224 V. 6ssGy,rroplee m Imt rd u ea •lope plaMug vee sto room aM be proxered. OI.W 1,986 S.F. OFUCE Fi—ml 6401 S.F. L==3 1 2 3 4 5 ® 6 ZUK ® 7 atrwerw.nNneno pe, ocTefe rew, eat. 15 14 13 12 11 10 1 9 8 � \ ? F ______rz ____ 1 iV� INa yq WASHINGTON STREET A2 vaemae4.a..mnnbu VaAe we Gallons pu,nme 6vaYe Imgatwn Heads Table -Contractor musk venfy head count iwmour. NOTES REQUIRED PER W.V.MA. 4103113 L..ganon P:p=Tau= 5Pnnxv Heade 37 0 TORO 51. M..M Frtuptatme,4 4B5 oPetrone 55T P,Pe c TOTAL SQUARE FOOTPGE OF IAN05CLPE ABPA SEWED BY METER; I I, I GO SODARE LEFT SJ C -- PJC Ppemrp:::74tua6.Pwp=rdv P, O iORD5"lO MatNed PrapRalm Uke ltl4nee xRF l2 deg TnyctorylBLe1 O50 4 O _ 1'Sd:Wde 40 PVC Ppe Mara lx. Pepe cbr l-5ehe 40 PV 41, MP%IMUM DEMAND SERVED BY METER: 18.0 GAUON5 PER MINUTE 2 Ira Mn a [Table ga qu,pmen TOM 570 Matched PrapRab'n Utrs lV Senn roY 120eq TnJea true)270 2 E WanMy 5ynbd Eep.pmeR O MTMATEQ WATER USAGE SERVED BYMETER: 11 0 4 0 Tao 29J-05-011'Pkxtrc Cmtrd Vahe: I:oJl n.gcuNnpugle nNe aoaer 0 57. 100 GAUDNS PER YEAR 29 O PJC PCH 80 NIPPLE © Ra..Lva ETd aetatm.re:rtrofu:uWalimwall oboe mann. s' cox. T 6 RwalE WNIRtI vuve Rcerued c... between potable aM rerydedvnW law s 101-1 All 0I5TING VAU T5 ARE TO BE REMOVED, ALONG WITH ALL EXISTING 5PWNKLERS AND PIPING e THAT IS IN IN PREA95HOWN TO HAVE NEW IRRIGATION. ALL NEI4 VALVES ARE T00E (LENGTH A5 RPOUIRED) INSTALLED IN PUNTERAREAS: VALVES SHOWN ON iHLS PIAN IN NON -PUNIER LOCATIONS PRF R IOD 155H LY; ALL PIPING THAT 15 SHOWN UNDER PAVING AREAS 15 TO BE INSTPLED IN SOH 40 NO PIPE OF FILING 34 31 (2—tAy 5 5Pnnxv Heade 37 0 TORO 51. M..M Frtuptatme,4 4B5 oPetrone 55T 4 c TORO 570MHFad PreupGbw: Rates 4' 5,ecoI Patt MT SJ C TOR0570 MatrJvd rruarytouo Uses I Y 5n:a vnt1: 12 dy Traprkwy(Dee) I e0 B O iORD5"lO MatNed PrapRalm Uke ltl4nee xRF l2 deg TnyctorylBLe1 O50 4 O TOB0570 Nox1reel Preu%Ftvm Mee (a rM1: 12 def Tn¢efe:y(1120 30 41, NPA YIOluo`ed Pmcpbtw. Urea TO Senn xrth 12 drg Dquuuy l0'W 360 2 E TOM 570 Matched PrapRab'n Utrs lV Senn roY 120eq TnJea true)270 2 E TOM 570lvlu MA FeeptrtmRute5195enee mth 12 deg Tra)ectpy(OuN 240 5 O T0203005N,em Rdcr lSCmn M)usGtWRM.w NOCe 030 11 0 TOR03OO BA—R 15 Oen MpstAle-No. Nock iGO 12-LYLN SP£ 6 GUSN Own p w Rum 0 e5 29 O PJC PCH 80 NIPPLE a4 sy y4 s' cox. T 6 RwalE WNIRtI vuve Rcerued c... between potable aM rerydedvnW law s 101-1 7 G e .•FL. •• (LENGTH A5 RPOUIRED) CONTROL WIRE R 0 MM f/a4fa 2 9eua'rOO' 64 oA teuq � cm test: and 3) above-ryouM:n�eclwF 2 dry mhhotwe. _ L.P. CauMy must also dual prczsure Os dye tot He system before albnmg m pe:'maronL comecnon. Nan pop -ups oeo PVC SLH 40 ELL a 0 E,c ON to Eu A4 38 street ells, also. 5 PVC SLH 40 STREET ELL '¢ ac 1Aav icE�OP mx(xouEx 4 ©PVL 5LH 40 TEE OR ELL 10 80. KK OF Q (1 11 RC (I v %PE -PURPLE 27 (D PVC IATEPAL PIPE O 1©2CN RO NPM: (2-IHGH IS IS 14 12 1 11 EEIpTH. NOpw) AND S. 40 Eu f] 0.0 — Bt —OR ELL 26 SLEEVE 1.4 M Sp110 V.VE MVIw (2—tAy SymMl 5Pnnxv Heade 14 0 TORO 51. M..M Frtuptatme,4 4B5 oPetrone 55T 4 B TORO 570MHFad PreupGbw: Rates 4' 5,ecoI Patt MT SJ C TOR0570 MatrJvd rruarytouo Uses I Y 5n:a vnt1: 12 dy Traprkwy(Dee) I e0 B O iORD5"lO MatNed PrapRalm Uke ltl4nee xRF l2 deg TnyctorylBLe1 O50 4 O TOB0570 Nox1reel Preu%Ftvm Mee (a rM1: 12 def Tn¢efe:y(1120 4 41, NPA YIOluo`ed Pmcpbtw. Urea TO Senn xrth 12 drg Dquuuy l0'W 360 2 E TOM 570 Matched PrapRab'n Utrs lV Senn roY 120eq TnJea true)270 2 E TOM 570lvlu MA FeeptrtmRute5195enee mth 12 deg Tra)ectpy(OuN 240 5 O T0203005N,em Rdcr lSCmn M)usGtWRM.w NOCe 030 11 0 TOR03OO BA—R 15 Oen MpstAle-No. Nock iGO 12-LYLN SP£ 6 GUSN Own p w Rum 0 TONQ MO stream .l5 Qmm fdl'A..mmRw..rs Naofe 2]O 3' DIA. NOTE ON IRRIGATION HEAD5: ALLN0221E5LOCATEDADJAMNT TO WAIkWAY5 OR VEHICUIPRTRPFHCAM TO BE IN5TALLED ON G' POP-UP BODIES; ALL OTNER NO" ARE TO BE INSTALUM ON 12'A55 ROER5. NO=5 IN LAWN AREAS ARE TO BE-IN5TALEO ON 4' FORM BODIES, ALL HEAD5 AND PJ5FIR5 ARP TO BE I1,15TA11ED WUH DOIIBIE 5WNG JOINT5. vxwem mw 6mm �30-N&E BR.m uERmOF U LNl valve braes -4 be pople,IWW rot 1.M xerde'Regded Wa4l restmN CAP OP NOnw 15 TO BE PURPLE. Hee m. 2. All mnbd valves must nave a plxtw label eU drd cots a:rylae tee xnp vnlh No Water Not DnW n EglJI aM 5Pareh. P1 O2 NA PROOK HOJr PM• IECIIOH i N 2 W151pE N.VY O NHB�IA Pp.'O O z 4. All nwh. pW.ur ,m er hearts must be made Of purple pbsba. m 5. All bebw grade p'p:ng must be purple 0, w.tn ftuvrds'Recyded Water -0o 1 2 3 4 BOB DtlNN' w wwsli�µo SAN. 1 2 UNFRAT v. M. Ja Oj FINI5H GRADPIPOP OF MULCH LATERAL LINE W1 PURPLE ALERT UNE 6 B.Noon-zete WarawpN ueFu,n,ssmby still be encored w aM recd. vrutu O Q"N'STe... mxnml vans Zen O POP-UP SPRAY SPRINKLER: MAIN UNE OR 5LEEVE HNISH GRADE W/PURPLE ALERT UNE QvuvE POy coral cwER: �' 6 12-LYLN SP£ 6 GUSN Own p w Rum 12. Ar, uire peen W to be completed aM vgaeo beelue ed 'Fuge Of 4 .1VIKxpN p41f �6 _RUN P.c acN ao 13. InsGllatan of recycled watw ungabon ztaA caryRy cotsthe requmeme,els of O PJC PCH 80 NIPPLE a4 sy y4 s' cox. T 6 RwalE WNIRtI vuve Rcerued c... between potable aM rerydedvnW law s 101-1 ry ANORR SUPe v nonzontalN aM I I., vertvelly (vnN eatable ware, bn erosw,g pe:peMwfvy .•FL. •• (LENGTH A5 RPOUIRED) CONTROL WIRE R 0 MM f/a4fa 2 9eua'rOO' u,'alley rmat observaFons aM msperisons: U erspest PPe prcx W bxH®; PJ ramal presswe teuq � cm test: and 3) above-ryouM:n�eclwF 2 dry mhhotwe. �. SELL m xRP12 (CIBSE) L.P. CauMy must also dual prczsure Os dye tot He system before albnmg m pe:'maronL comecnon. Nan pop -ups oeo PVC SLH 40 ELL IX 3 Wa 0 E,c ON to Eu flKE g5MIC1 P�,ION 3 street ells, also. 5 PVC SLH 40 STREET ELL lO Op WG SCN W Nla%E (IENOIN As xanRm) 1Aav icE�OP mx(xouEx 4 ©PVL 5LH 40 TEE OR ELL 10 80. KK OF Q (1 11 RC (I v %PE -PURPLE (D PVC IATEPAL PIPE O 1©2CN RO NPM: (2-IHGH IS IS 14 12 1 11 EEIpTH. NOpw) AND S. 40 Eu f] 0.0 — Bt —OR ELL 5 3 6 5 7 O SLEEVE 1.4 M Sp110 V.VE MVIw p 15 Pvc Ll PRO -Pur. 3 CLEAN BACKFLL ib x .0 . N, 3/4N -IN-INLM 0. LABEL FOR RECLAIMED WATER ON WALL -MOUNTED CONTROLLER POP-UP SPRINKLER TRENCHING DETAIL REMOTE CONTROL VALVE a ) A2 r 1° 13.0 '4d w t:•1MIXMaN mwmw. LANDSCAPE IRRIGATION PLAN RECYCLED WATER NOTE5: 0 U LNl valve braes -4 be pople,IWW rot 1.M xerde'Regded Wa4l restmN z O Hee m. 2. All mnbd valves must nave a plxtw label eU drd cots a:rylae tee xnp vnlh No Water Not DnW n EglJI aM 5Pareh. K Q C vpMs:'Reryded -Do 3, M above -grouts nFer, shall be labeled vnth a self-aAwsne 66e1:vAr the vme J Z 1-� armng as 1.M (abet for w:hd vahez. O z 4. All nwh. pW.ur ,m er hearts must be made Of purple pbsba. m 5. All bebw grade p'p:ng must be purple 0, w.tn ftuvrds'Recyded Water -0o Z O Q eMP-R.Br:sappless Ne both'—ereM aM .—R. prewxe p. pe. Be, "-ement d-. et.'N, Ne mu:, a:ed:oers. W U G. No lase bibs are al.. on F D Bo sWi sysrsms. Ja J, peak_,ors are allowed, but must me rage for rccyded watu systems. LL ek oplen must also be placed. plasbe valved bsw. (Mm U B.Noon-zete WarawpN ueFu,n,ssmby still be encored w aM recd. vrutu O 95grsendragtengdtne uss olrc ed wa�terare regwed aew x96e'brad A Zen the du>N10A of the)Otnet wpeetx. 10. Error Wprc �re .He AOI vets am approvd rcdxed prevwe bn tempaaMy to TMs arrest O N m }� z pnnaPk dews mry used esGblJe'baby. bedFu,,ed Per, rmssrgmecbons be(orc comeM1vy to_1ekJ wale, Q 0 z 11. POwwu xater:e r,.,m dur'..1ul preware tesheg. 12. Ar, uire peen W to be completed aM vgaeo beelue ed 'Fuge Of Q Q 13. InsGllatan of recycled watw ungabon ztaA caryRy cotsthe requmeme,els of LLJ d. Q furUal Me OeStnct's RtesaM P.egNatews aM wu'M1yal(m Pagdes a4 sy y4 Depa,rtment of Puble HONn. D] 1.0 0 Rcerued c... between potable aM rerydedvnW law s 101-1 nonzontalN aM I I., vertvelly (vnN eatable ware, bn erosw,g pe:peMwfvy rrcryled water lee), Ufa recycled watu ix nv3sezwuapoGbk rater We, there e a sle veto Seem ser be ea ed euF nd el wntrrM we, the poGbk waternrc and uteMMat least 10 Feel cn boW odes. fluwaterNe a MM f/a4fa Y/ Water Us[rwt at (9099595-12681a Fs Nchty Joelu 9eua'rOO' u,'alley rmat observaFons aM msperisons: U erspest PPe prcx W bxH®; PJ ramal presswe teuq � cm test: and 3) above-ryouM:n�eclwF 2 dry mhhotwe. L.P. CauMy must also dual prczsure Os dye tot He system before albnmg m pe:'maronL comecnon. �t �� y NCG1y Joe Y.1,1 EtW.V.W.D. aM Dan Basan ®LA. COWY g (G2G) 430-5290, kw fires m5re FM -2 day a efradom. IX 3 Wa M.I INN.I 71 II u 1 15 PM yu x� MEx �w 2 14 WOMEN e.IGp O E 3 13 FUN -1 o 2,020 S.F. 4 12 119 5 11 omcE ® 6 B 1�E 1,224 S.F. S@5 1,906 S.F. 9 ® 7 T- 11B�G� 166 uns.Gr 1,910 iF. WfiC ;,2�,°' o)s 6 5 1:101 S.F. 1 17 18 19 2 22�aa2� 24 SL925 4 WASHINGTON STREET 0 34 33 32 31 30 29 28 -27 26 a+•n R b �Pn�w. wt wmPn w ••a^i wµ mrpaWe pru aw 4ea 36 37 38 0 O2 SOS >>� ca ZR U U Q u. 0 U W O m C 5- m m U Z O Q 4 x n en9nvGsrcnGlw � � rQ. m lO D r:.L— Nom-I•=LANDSCAPE PLANTING PLAN PLANT LEGEND alun y icy Sae M..Fxiuwclranmo: � a m S:nW C®nmxa=e fnm)Ir:e Fuwy X6: r. Wb l9 Gsllax 4 +wmwa•ia^'v GaN•T iru 2'.&n P� WDfvfD. Wb Za•09%2oX%'&IX a 9 FM,2ma aY-sa P+'^,em 29.2m SXW95: y a &uWz &alm in wn 3C�ba zEOUPMN2 PIlMCE➢BSYpA1N%-'JOi54Vld:3vb i4NIM) PF.vL - 49LNIONI 6%ILNIIXI ' � $t! , gyµy 9pM aiwr,xv Cocnnc Nax G+Y Na:e Prey Src GedxlofAVzxFWaAN�l W3COvmPGE 1112'VAsv PWrtm PAPrtSTIN. $g yrrt Na'gnS Vamyx mivypvv IyarzA 9Gi � a4 M••:,ue.w s:wany... yaau y G" a'e u cwa s..,c G. wauneNOMvn Pswvnuvnrwx9: bvdePlM1 drsv Mes: bzxabe iteldM4dvrvs w9vcan Mivt(a eqW w9v::e'stl p .Y 99 ywrea sr gb 4u — yr IGtl S I :Wnertr: FdNJ at P4:F,q anus mad)vAoeaµwv huWreG squa2lee[davAy a+� � vg� 9'/ v frmvn v em')Mel A6levuz FM1a• 94 Ba Nd mu: My mPah vN2xlaM we paR N[mMnmrs'IwbarLAmai pbrtmRUW. weg2m vew4qu. g`! FeRJw:^.Kzµv µe fobncq hR:baµ:v+ghN Wdiy artvsaM hnn lahw mtMA+fi at4Y rMdIWIyv I.NJstaveaut d.ytl w: GPSNNvmYK ry»)9 Pe:kbed iwmd)Wber rmn xdduea.lam Mvqu stl wgar,[Iwnedn4ovvm. w9vc Ply. 'vsaM pYssw MA an N.PF ufyd py;ya. Foram Naze foa Na.e Pvnq Src 6-10.10. Fw bvOl:6g meya6an aM br9erp:Is:5vP4eFwe'PgnlcmFweqidleRlver46'et pvw[hws yon faCllmr Wv+tl: Me Y>:^ lj V$ v,nav,magvmc Dvmm,Y Damnw x.9vb p+:R. Me Poeacl i,Reen Ylw'WNand lOpea of. 24'lm tree. Mez MYe6et sea�q.. 1.20J yk. ".'s srs0. uvRwvnP^IM SPeaYglFry}.wvn 1Fp Pr a -W WMwewss ».1.MN ural xaFirg 6vmu apyd �A g+Mn aM b9wnvve aM:rcWet anerbrc4m g:cnq 9 Mw,:e.n,v p,wa.,ue vire 9mb�la., M.I INN.I 71 II u 1 15 PM yu x� MEx �w 2 14 WOMEN e.IGp O E 3 13 FUN -1 o 2,020 S.F. 4 12 119 5 11 omcE ® 6 B 1�E 1,224 S.F. S@5 1,906 S.F. 9 ® 7 T- 11B�G� 166 uns.Gr 1,910 iF. WfiC ;,2�,°' o)s 6 5 1:101 S.F. 1 17 18 19 2 22�aa2� 24 SL925 4 WASHINGTON STREET 0 34 33 32 31 30 29 28 -27 26 a+•n R b �Pn�w. wt wmPn w ••a^i wµ mrpaWe pru aw 4ea 36 37 38 0 O2 SOS >>� ca ZR U U Q u. 0 U W O m C 5- m m U Z O Q 4 x n en9nvGsrcnGlw � � rQ. m lO D r:.L— Nom-I•=LANDSCAPE PLANTING PLAN 1t1190NE iREf IS A 12'-145W GV UOUIDAMBAR SIYRACIFLUA PND 1NLL RETNNEO. TEOD fOUR(4 .CEO 5 DEODh .MD¢S,CfDPJ15 DEODARA. PND WILL BE RTTNNfD. ci 70 rn n D z O z 51YAMOREPNDWILL9ER MNED. FROM RIGM-TO-fREMOVED WRING TEE fANSTRUCNON OFVTHrW EPNDICAP RAMP. EXI5TING TREE LOCATION PIAN 0 z� j °za 0 z mz� 0 UU.LL� LL LO m 00< ai m Z Q Z v4 Z z auj ¢E ce N m 0 0 ewe I- - la, ssw L-3 M3 sem Q Q (P \m O O v I I. O I -r Iill � III U§ I b 4 D t gar b RM fi L_ MEN - LOBBY WOME e WOMEN © ^ OFFICE •.♦ JAN. R / I • p k Q -___ `188 __ -F- - 4 _ Q © OFFICE Q ( v • 1 ,dl Q Q sa OFFICE 778 y k Q OFFICE � Q OFFICE 100 I - b I a O Q ------——--—---�--y OFFICE O OFFICE EMU' Q O O F a 158 � y OFFICE a L O i I C . 4 I I Q Q Q 0 0 O' 4 K,�i . 0 ➢ FAIR p es' ax et \m O O v I I. O O O 0 lJ C D/A CREATIVE DESIGN ASSOCIATES NNIbcOm.IlrtabtDrlDn. PWv,Yq ®nmol fi .CH 1]mHEMWMR tl]ydlN,.pCGFMB wiwNn:ean Cro09`JOB/�hbnMq.A.mY[4 E>< ".I...: BREA CANYON BUSINESS CENTER . K,EACAMW ND Lllen,: BREA CANYON INVESTMENT, LLC ]rn;Emnuasa:] D...mv na.: IST 8 2ND FLOOR PLAN coAPI.).al Nn lar Oele: IH f.MO Pbe. e: flA�L6A CM1est.tl0i: QRAN CHECK CORREMN I DATED 007. 11, 2D12 QPVH CHECK WRREETON 2 MRD CEC. 20, 2012 0A1 CHECK WRRECOON 3 DRO T8, 11. 2013 M CHECK WRREM" 5 DAZED M. 8. 2013 O2ND FLOOR PLAN (� O IIT FFLOOR PLAN G� oe.x.e N+: 2 A-101 Iill � III U§ I b JANROR L- t gar RM fi LOBBY e WOMEN © nr' ?i R OFFICE m I • p k Q -___ `188 __ -F- - 4 _ Q Q sa OFFICE 778 y k OFFICE � Q 100 I - b ------——--—---�--y OFFICE O OFFICE a 158 � y a L O i I C . I Q O O 0 lJ C D/A CREATIVE DESIGN ASSOCIATES NNIbcOm.IlrtabtDrlDn. PWv,Yq ®nmol fi .CH 1]mHEMWMR tl]ydlN,.pCGFMB wiwNn:ean Cro09`JOB/�hbnMq.A.mY[4 E>< ".I...: BREA CANYON BUSINESS CENTER . K,EACAMW ND Lllen,: BREA CANYON INVESTMENT, LLC ]rn;Emnuasa:] D...mv na.: IST 8 2ND FLOOR PLAN coAPI.).al Nn lar Oele: IH f.MO Pbe. e: flA�L6A CM1est.tl0i: QRAN CHECK CORREMN I DATED 007. 11, 2D12 QPVH CHECK WRREETON 2 MRD CEC. 20, 2012 0A1 CHECK WRRECOON 3 DRO T8, 11. 2013 M CHECK WRREM" 5 DAZED M. 8. 2013 O2ND FLOOR PLAN (� O IIT FFLOOR PLAN G� oe.x.e N+: 2 A-101 n n MTe► O u' -e• I s -r s. 1 r -s. i Aaki o -»n Z� } � Q 9r'b,:m-yN� D O PAGRi HEIGHT 31,-v ROOFPLAN TP. PARWET HEMHI 3S -r 29. MII!' b a O a29 MIN. I I 2% MIN. 2% MIN. 2% MIN. L p : b ❑ P I aPwB:c m 29 MD. 0 a2% MIN. 29. MIN. 4 0 b 2% MIN. = O I 2%MIN. _ _____ .7_ I ❑ 2% MIN. E ❑ 1 } A I HWE AWL55 1 O O O ' O 2% MIN. lana' ROOF PLAN n C D/A CREATIVE DESIGN ASSOCIATES NAItecCve. YMNor Duan. P6nnD,p r.melsnol Eemmvlaz 96)BEhxW $ dryGlydubyGellN x-.vxt4a2a„n C ryd}YD%OeC.s RSyiAm.�µAC ".J"l: BREA CANYON BUSINESS CENTER .MW RLW tt4D4VOBARGMM DG wl.nl BREA CANYON INVESTMENT, LLC F ED nu:Ex-.,�IA1asr�Ner C)YQ'Rb51fl, fAPli6 CDA P,o],,Imn 1111 Oele: {E8 FE1! Peae: nAn°ac cn,n.eR): sn P.els,eete: Npri,i9n,: QPIM' CHECK CDRREUON i DATED OCT. 11, 2012 QPVN CHECK WHREMON 2 MTED OEC. 20.2017 QPVN MEM CORREUIIM 3 DUED FEE. 11, 2013 PIAN CHECK WRREGTON 5 6UED W. B, 2013 C—M, w: A-102 �f➢ N1O C 2le„ Aaki o -»n Z� � Q 9r'b,:m-yN� D O,e�Ing )I)le: ROOFPLAN CDA P,o],,Imn 1111 Oele: {E8 FE1! Peae: nAn°ac cn,n.eR): sn P.els,eete: Npri,i9n,: QPIM' CHECK CDRREUON i DATED OCT. 11, 2012 QPVN CHECK WHREMON 2 MTED OEC. 20.2017 QPVN MEM CORREUIIM 3 DUED FEE. 11, 2013 PIAN CHECK WRREGTON 5 6UED W. B, 2013 C—M, w: A-102 KEYNOTES OWRQYD MM D L%IERIOP CEYENT P ffi — ME WO NOSH 1 ME ATM W1RN EDARM PMI¢NG (FDNFR SNDRT m Lona 1ERN) E056 FM YN 9 (SIE DDDR SNEOWE A—WI) WMR MM F115TER — ME WD MM Z COLOR VAN WIN EDMA9M PANELS REM NrE1R0 W PUIYNN W 46 C1EXR Aomm NOVMIY DAIVECNNM.N SEORIFw wDDAS — DPER & DRUM PAYE. LOM—E MW O9WDD0MD NWEMWIE CWL �] %IRDW ISM WHDDW SCIDWY£ A-501) O$PNMMiR tWRND O%NR (INSIDE) OWEST ELEVATION (BACK) FACING BREA CANYON ROAD ONORTH ELEVATION (RIGHT) 10 OWRQYD MM D ON msumUMB O6'mE PMI¢NG (FDNFR SNDRT m Lona 1ERN) A (SIE DDDR SNEOWE A—WI) �] %IRDW ISM WHDDW SCIDWY£ A-501) O$PNMMiR tWRND O%NR (INSIDE) OWEST ELEVATION (BACK) FACING BREA CANYON ROAD ONORTH ELEVATION (RIGHT) 10 EOFRNM uumxe 13 EX m WDR (SIE DDDR SNEOWE A—WI) 11 RfiEN<8>11ECIRMN PANELS C1EXR Aomm NOVMIY DAIVECNNM.N SEORIFw wDDAS — DPER & DRUM PAYE. LOM—E ]S VER) (SIF YEP FOR MOLD) OO O NA EMS. A �NW—REFLEOW Wam PROWCT SIYAAR TO UXW /72W CW )300) O OEAST ELEVATION(FRONT) n n n n n <P4> n n OSOUTH ELEVATION (LEFT) FACING WASHINGTON STREET CD/A CREATIVE DESIGN ASSOCIATES P)WIx1uR.IMeNatDapn. Pk006ro r.rmslvtol E®HMR 9@OEhMeAR IXPNIrdNpGe419 avMVNaam¢m LyfyY®B/Le&+ep1y,AYc P,q.a: BREA CANYON BUSINESS CENTER 6b BYGGIAWIpND IXlllY9Gq G911tl LRem: BREA CANYON INVESTMENT, LLC lTnF. P'J.Y.Ah9StRFI sneP �W Fmni� or..me ewa: ELEVATIONS LOAProl.aixn D. Oale: {f$f.MiJ Pbeae: IGNb9� Lhetlftl By: Dnm RY: LAG P.elea! Ma: feieranoe: ReviJona: WRRE WED MT. 1,, 2012 A2D PVN CHEN EWRECDWI AED DEC. 20, 2012 QPLW NECK CDRRECiIW b RATED FEB. 11,2013 Graxlne Ma: ,/ A-201 _ o O OO O t I i i �O O o R p§ § OSOUTH ELEVATION (LEFT) FACING WASHINGTON STREET CD/A CREATIVE DESIGN ASSOCIATES P)WIx1uR.IMeNatDapn. Pk006ro r.rmslvtol E®HMR 9@OEhMeAR IXPNIrdNpGe419 avMVNaam¢m LyfyY®B/Le&+ep1y,AYc P,q.a: BREA CANYON BUSINESS CENTER 6b BYGGIAWIpND IXlllY9Gq G911tl LRem: BREA CANYON INVESTMENT, LLC lTnF. P'J.Y.Ah9StRFI sneP �W Fmni� or..me ewa: ELEVATIONS LOAProl.aixn D. Oale: {f$f.MiJ Pbeae: IGNb9� Lhetlftl By: Dnm RY: LAG P.elea! Ma: feieranoe: ReviJona: WRRE WED MT. 1,, 2012 A2D PVN CHEN EWRECDWI AED DEC. 20, 2012 QPLW NECK CDRRECiIW b RATED FEB. 11,2013 Graxlne Ma: ,/ A-201 O*R VIEW FROM PARKING LOT OMEW GIA2WG OSENR GEAST IS S10REFItGNt mmm - �, WUEIE PANE, IOW -E KEYNOTES mo uw-mECIM GIASS. I 1"Em PWOWi smD i0 USW IN /7200 OR ]SW) CFNGT PIAt1ER - FlNE SWD fNi16H AUIWEbN JIM OIXIFNM CCIORIMTW DUNK E0WNd5 4 mum BUCK KM NFOG HERD W 9 OOR PINE SVID FlNSX Mffiwcmm O gam& PNtlIRIG (ENRR 9fON MG TEIGI) IMP EMED W NAT LR! 46 ONUGD&UIE EkR MDIEm 4CM Q O . 2 O*R (SEE %vm SCWM0.E A -`AI) OMEW GIA2WG OSENR (v151DE) WEST ELEVATION BACK FACING BREA CANYON ROAD ° nlAAr-/n 3 NORTH ELEVATION RIGH s WEST VIEW ON BREA CANYON ROAD 10 Ea7EPoPN WMWc 1 �'Ert <9>EIFL ELM NID W AIIIYWUN TNN IS S10REFItGNt mmm - �, WUEIE PANE, IOW -E Q1 mo uw-mECIM GIASS. I 1"Em PWOWi smD i0 USW IN /7200 OR ]SW) 2 EASTELEVATION FRONT? 1 SOUTH ELEVATION (LffD FACING WASHINGTON STREET CD/A CREATIVE DESIGN ASSOCIATES �.1m �PWNy T.. .0" F.®➢IiG10[ 96MEh,xYtdX pryJIMNAGiIX wxxuY �T.bT Cg5ryYOBYae6n P.iylAwaffike P/[]en: BREA CANYON BUSINESS CENTER uoAvu(FM9YNY0 p4lUtB AlQGB11d .11.0: BREA CANYON INVESTMENT, LLC PSdEAOilUAnSlRfi anmomusnn.GNIN V—, nue: COLORED ELEVATIONS COA Pro]B[I X¢ 1311 Oele: H81. ]JIJ PAe[e: flAN.WG C6[ehOBP � Onrn AY: L01 Aela/en[e: Aevi[loei. PIAN CMCH WRREEMN WED CO. 11. 2012 GNECH WRRECNDN s PLA4 WTED OEC. 20.2012 QPUN CHECK CORRECMIN 3 mm FE& 11, 2013 APUNb1EM MMMION s MM NAR. & 2013 m.rmB nc: A 2410 Em N m 3 (SEE WGP. StYEgli£ A -EDI) <9>EIFL m Bums IS NFCHMIGL Wlf (SEE YEP M EuALS) 2 EASTELEVATION FRONT? 1 SOUTH ELEVATION (LffD FACING WASHINGTON STREET CD/A CREATIVE DESIGN ASSOCIATES �.1m �PWNy T.. .0" F.®➢IiG10[ 96MEh,xYtdX pryJIMNAGiIX wxxuY �T.bT Cg5ryYOBYae6n P.iylAwaffike P/[]en: BREA CANYON BUSINESS CENTER uoAvu(FM9YNY0 p4lUtB AlQGB11d .11.0: BREA CANYON INVESTMENT, LLC PSdEAOilUAnSlRfi anmomusnn.GNIN V—, nue: COLORED ELEVATIONS COA Pro]B[I X¢ 1311 Oele: H81. ]JIJ PAe[e: flAN.WG C6[ehOBP � Onrn AY: L01 Aela/en[e: Aevi[loei. PIAN CMCH WRREEMN WED CO. 11. 2012 GNECH WRRECNDN s PLA4 WTED OEC. 20.2012 QPUN CHECK CORRECMIN 3 mm FE& 11, 2013 APUNb1EM MMMION s MM NAR. & 2013 m.rmB nc: A 2410 DOOR SCHEDULE DOOR NOTES xci�i. Genn uwone�aw,�¢rvRuteeu%nom nom• iV miammv r mem n[nAf t niavt mcm imprtw�Wv�ivpxv/nRiK © CDD� WMDOW SCHEDULE DODD — FWJAE FawF NO toMvom tYPf /talEFL1t SRE GLASS LMTFRIRL FPIASN FIRE SaD(AMW S?E MMAWESS H10M HCiGM FUiFRV1 F4lW ski iHIL RFI,WtI(3 SFEWJIODwwm Ytl f I]N ra ra - DOOR NOTES xci�i. Genn uwone�aw,�¢rvRuteeu%nom nom• iV miammv r mem n[nAf t niavt mcm imprtw�Wv�ivpxv/nRiK © CDD� WMDOW SCHEDULE VnxarR xmEs a eev,a¢revanes wi waun v ��wp om, auwe)� iww wewpa,ua/nOrvfan C D/A CREATIVE DESIGN ASSOCIATES Nauzxw,e.InlxW oubn. PW.W vme3velol E@GHf]61R 1)vnE Wml,Ah qry WiMapy,GBp19 —w.oLuevan nPPyvDeyown a:r�xuwxssHn P,oleel: BREA CANYON BUSINESS CENTER tlMdS9BV{G91]@ CIIBPI: BREA CANYON INVESTMENT, LLC nvaelmalx�.vsw�t mrneumagcemn! OrenlvB sill e: DOOR SCHEDULE UA PeolnnlNn t}11 Pel,: fA1.Al) c;edtevar: � pap—A" P.e:a Revi510nd: QPUN "ECK CDRRECIM)N 1 DATM OCT. 11, 2012 QPVN CHECK CORRECRON 2 DATED DEC. 40, 2014 QPLD CHECIt CORRECRON 3 UTED F& 11, 2013 %N1 -ECK COMECDON 5 MRD NAR. B, 2013 OfavinB M: A-501 vnxoow FawF cLuxic Do LOGPON TYPE S?E NAIFFW. HIMSH GY#OR FUiFRV1 UVNUE mwTYPE iHIL RFI,WtI(3 SFEWJIODwwm Ytl ra xo A DAAAYcee5 6d4 - - - ra erss mo -aro a.e - - 4 bnt caa � GIR VnxarR xmEs a eev,a¢revanes wi waun v ��wp om, auwe)� iww wewpa,ua/nOrvfan C D/A CREATIVE DESIGN ASSOCIATES Nauzxw,e.InlxW oubn. PW.W vme3velol E@GHf]61R 1)vnE Wml,Ah qry WiMapy,GBp19 —w.oLuevan nPPyvDeyown a:r�xuwxssHn P,oleel: BREA CANYON BUSINESS CENTER tlMdS9BV{G91]@ CIIBPI: BREA CANYON INVESTMENT, LLC nvaelmalx�.vsw�t mrneumagcemn! OrenlvB sill e: DOOR SCHEDULE UA PeolnnlNn t}11 Pel,: fA1.Al) c;edtevar: � pap—A" P.e:a Revi510nd: QPUN "ECK CDRRECIM)N 1 DATM OCT. 11, 2012 QPVN CHECK CORRECRON 2 DATED DEC. 40, 2014 QPLD CHECIt CORRECRON 3 UTED F& 11, 2013 %N1 -ECK COMECDON 5 MRD NAR. B, 2013 OfavinB M: A-501 `XMINC LNDC APE i 3s 137 m �,',• �I _� W Y�•N� _ 1 � to 13 �• .'I a Fr j 1 as-'-'•'• •'••-'-'-'--�j� u1r a"A"ronw�iHMr eum A 1 ( I re 15 11- ! IxX±v ro i2txanu,A�As ----------� WASHINGTON STREET SITE PLAN PLAN sas,Elnrro KEY NOTE5 a�wan�x w��vpno w,wxfacmeanaoxonromnv OI RLLUh WM: WELWINI[11NGiM I \ `y OM 01MO.TRE Iunn LO3�IIW Oa PJM4Y iRE W1f [61PAPIN 9J "I I I 3s 137 m �,',• �I _� W Y�•N� _ 1 � to 13 �• .'I a Fr j 1 as-'-'•'• •'••-'-'-'--�j� u1r a"A"ronw�iHMr eum A 1 ( I re 15 11- ! IxX±v ro i2txanu,A�As ----------� WASHINGTON STREET SITE PLAN PLAN sas,Elnrro KEY NOTE5 C D/A :REATIVE DESIGN ASSOCIATES AIM m.Innllo!M Il RnW-q i.mG Dl of i.®N98102 I1mlEMlYtlst �IYWI�G61M8 wxxAYwD.m�l xomyal%beX»hgiAvuffitic Prol.Lb BREA CANYON BUSINESS CENTER LV84lAGMMlMkH IXUUWM4GpIiPo 611-1 BREA CANYON INVESTMENT, LLC Prv0•MY.Grt.!.GvMiS NYCGONSYLIWGFNGWEBi;Yu s'—' SITE PLAN CCA P!aP.t Na li/I oele Fptt /LM11 veue HlnHrc HC KK lta: cifMt fl !: L� MID IC15 Hr..lop w: E-2 a�wan�x w��vpno w,wxfacmeanaoxonromnv OI RLLUh WM: WELWINI[11NGiM I ©m°m'.w.LNO1fa6 rw�w1z�1°IDm vsmvpo +s OM 01MO.TRE Iunn LO3�IIW Oa PJM4Y iRE W1f [61PAPIN 9J "I I I C D/A :REATIVE DESIGN ASSOCIATES AIM m.Innllo!M Il RnW-q i.mG Dl of i.®N98102 I1mlEMlYtlst �IYWI�G61M8 wxxAYwD.m�l xomyal%beX»hgiAvuffitic Prol.Lb BREA CANYON BUSINESS CENTER LV84lAGMMlMkH IXUUWM4GpIiPo 611-1 BREA CANYON INVESTMENT, LLC Prv0•MY.Grt.!.GvMiS NYCGONSYLIWGFNGWEBi;Yu s'—' SITE PLAN CCA P!aP.t Na li/I oele Fptt /LM11 veue HlnHrc HC KK lta: cifMt fl !: L� MID IC15 Hr..lop w: E-2 IUMIM. SCNEM E wxm ❑ ♦ pu[c.w w A on Y atioe3e - ,vmanrwi rwry^ u pximx,n unu �V- A I/s iwonurti g� CmTIN� LFNDSfAlt -�L-�'Y♦'♦6e"-"1 �:� 10� i �`�iY`�\ v u _u71�._u !,/ .v 9 . .. zs 27 k .°j. . —' , ry i it uL I id t9 23.. �� D H'¢ +n if ���.00,,�.".".". •. .". •. •. _ '�a'•L �/�QAC F-1Y-ia.�-'I-��T.-� _ {�{� "�'�� WASHINCUTON STI REE T C D/A CREATIVE DESIGN ASSOCIATES MMx'L�a. InLM Pxipn. RxuJq { L®91g81m E IROYI]8102 f]6ldEhxYdR ah�ma.a,;umw mR�a 2PP•lY®ByQeF.a R3�Pt9Ya(fR1c vropee BREA CANYON BUSINESS CENTER wmew,mq WlgW8l4GNi� I BREA CANYON INVESTMENT, LLC I !)a oEFJYi.A1DSlt;i prvYt1V-G[Y.4. M.fE iM'CGDNSN.NiGFNGNEFAs.Irc muevm, n=9 xfx a � � fsOtiLlt ✓, Qgn:Y � aow� n °I PHOTOMETRIC PLAN v v 9 n 1 0.1.: kbq,l'g11 Cksc([d 6p: HC y I i [:vsnt. \ M[ CLCK2fl!14.1341Y�Y �4.'ED :uf. „ PHOTO.11111�METRIC PLAN E-6 I - Z W (Y CL Q w m r) 0Z Z a- <0 Q0 W LL }Ow I- } OF Z D 5 2i O U m 3 U a Qlei °- I °- O N _ _ m u) C u) � -Fu C N C C ch O C 'ice i. O J O kN n r N a O O O r M N J a 0 N o J d a a M N J a CK o Y N M N J a o O N d Y W , O W �v m m m m m m m -��-_. .. O O IL o 0, R: 0 0 •E LU LU 'oOf U L m m m m m N FE 0 0 N N U m @O a c ': •2 O J ':. E r a U cEo w I 0 (D r @ c U .p 3 c_ 0a_ 0 N @ Z_ 0 o U 0 N N r z z iJ 0 N Z z z m r CD Q z .a .aa @ O O U N Q O CL 'a -a .a O N _ _ m C au -Fu C C C C C C C O O O = O O O O O r M N J a 0 N o J d a a M N J a CK o Y N M N J a o O N d Y t O W m m m m m m m m O O o 0, 0 0 0 •E LU 'oOf m m m m m m m FE m 0 o E m @O a c @ c r a o I I I I I 1 i I 0 0 0 0 0 0 0 r 0 N N r r z U` C7 z z z z z z Z z z .a .aa @ O N •aa (� Z 'a -a .a m Co � R U N U N z w: o Lo:�- r,v m m m m m m m m m a 'O N a @ Y 7 Q m N N z m 'O N Q ZI d N Q NQ �Q N �Z •- NQ NZ E E E E E E E E C C C C C C C C O O O O O O O O N N N d N N N N 6 6 6 3 N 0 0 0 0 0 C C C C C C C C C C C C C C C C p -.2 O S O O C O C O G O C G C G -L)E 2E 2E�E 2E E �E 2E ao ao ao vao ao ao a`o aV- Q nw nw c n.- Q C nw Q S a.E- <C n..- <.s; a`o Q -S C O N _ _ m 76 N J@ N = = O O J r M N J a 0 N o J d a a M N J a CK o Y N M N J a o O N d Y t O W f/1 @ s d O O O •E LU 'oOf - U j r c L c FE 0 o E m @O a c @ c r a o N a U) a = > D� p J J r C O N N r r z U` C7 z z z z z z Z z z O N _ _ m 76 J@ N = = O O J r M N J a 0 m N N J a 0< o J d a a M N J a CK o m ONN J a o v N N J a a M N J a o O N d N ON J a o W f/1 @ O N _ _ 76 J@ = = O O J X @ > W f/1 @ m d N w •E LU 'oOf >, c L r FE a°ii E a.. w N @O c r a o F -'a p O O C O N N d `c N @ m@ @ @ O N (� Z m o @ m m Co � R U N U N z w: o Lo:�- r,v ov m W m oa m 3 0 3 m'o 3 QW m a 'O N a @ Y 7 Q m N N z m 'O N Q ZI d N Q NQ �Q N �Z •- NQ NZ Z W O� c�a<nw zwcna z 2 Q � > K=<C)QV 5 ::10 � D U�wZZO QQ y j 0-0 Z J 0 - a0aaQU p Z II II II 11 = 11 2E U K U aXa n.QU Z U w J m a UL N 2 s m m m m m m m m m m m m m m m ,R O O O O O O O O O O - O 'o 000000000000.0.0 O `o O 'v O 'o v 'a �o v a a a YO a a a a a a a a m a m a m a m a m m m m m m m m m m m 0 0 0 o 0 0 0 0 0 0 0 0 o 0 0 = m m m m m m m m m m m m m m m O O O O -= O O O O O _ O .� O .m O .� O O O m m m d d m m m m o d d o m o d d 0 m ma "a a d m d d m m m a a a E E ' E E E E E E E E E E E 0 E 0 E 0 0 0 z o o O O o 0 0 0 0 0 C C G C C C C C C C C C C C C O O O O 0 O O O O O O O O O O ` a a a a a a a a a a a a a a a 0 3 0 C G 0 C C 0 C C 0 C C 0 C C 00 G C G C 0 C CC 0 C 0 C C 0 C C 00 C C G G 0 C C C C p '> O O O O O O O O O —0 O O O O v mm mm mm mm mm mm mm '=�„-. 1; z'_'E mm mm �E mm of mm of mm .2E mm of mm �E mm �E o€ .'-'E �E of 2E u€ o€ a° a� a2 aR aR a4 ao ao ao a� a� Qo Qo QS QS Q Q Q Qo 1 r3.;: Qc ❑ QS QS QS QF- QF- Qo iT-u N O N O m E m 0 a! t U a ❑ c J. c s a @ c o (D N p. O NNn MJa OJa N0 O ❑ N M Na Nn. Na Na ❑ N U O -twNN N O Ja. 7 a' a IL v EL Cc) I �a o cr 0 o F o ❑ ❑ ❑ o ❑ o 0 �a d � � C C O p U a C m C N 01 m m C N -p C O p m m a _ _ O N Om m m d LL LL N m a m> mZ > o= �� j0 U'w o E E �0 c m m o m LL m O Co'm O N .m a. LL. �T o aNmN-C IL m O EO m m mEa o m o s m m0 m0 'Ei _ _mO3) C— O mm U o 8 o Jg t O o o ° N o o 3 o m Z t0 O Z N Z O 7 Z 7 Q cO,Q m M Q M Q M Z N Z N N Z N N IL d O N N N N N N N N CITY OF DIAMOND BAR NOTICE OF PUBLIC MEETING AND AFFIDAVIT OF POSTING STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES ) CITY OF DIAMOND BAR ) I, Stella Marquez, declare as follows: On June 25, 2013, the Diamond Bar Planning Commission will hold a Study Session at 6:00 p.m. and a Regular Session at 7:00 p.m., at City Hall, Windmill Community Room, 21810 Copley Drive, Diamond Bar, California. Items for consideration are listed on the attached agenda. I am employed by the City of Diamond Bar. On June 20, 2013, a copy of the agenda of the Regular Meeting of the Diamond Bar Planning Commission was posted at the following locations: South Coast Quality Management District Auditorium 21865 East Copley Drive Diamond Bar, CA 91765 Diamond Bar Library 21800 Copley Drive Diamond Bar, CA 91765 Heritage Park 2900 Brea Canyon Road Diamond Bar, CA 91765 I declare under penalty of perjury that the foregoing is true and correct. Executed on June 20, 2013, at Diamond Bar, California. Stella Marquez Community Development Department CDAzstelIaW idavitposting.doe Stella Marquez From: Greg Gubman Sent: Monday, June 24, 2013 12:21 PM To: James DeStefano Cc: Stella Marquez Subject: FW: Planning Commission Meeting Jim, The PC agenda had a clerical error, stating that the meeting was scheduled for June 23rd (yesterday). City Attorney recommends reposting the agenda as spelled out below. If you have any concerns, please contact me as soon as possible. Thanks. Greg Gubman, AICP I Community Development Director City of Diamond Bar I Community Development Department 21810 Copley Drive I Diamond Bar, CA 91765 909.839.7031 1 909.861.3117 (f) www. DiamondBarCa.Gov From: David A. DeBerry [mailto:DDeBerry@wss-law.com] Sent: Monday, June 24, 2013 12:03 PM To: Greg Gubman Cc: James H. Eggart Subject: Planning Commission Meeting Greg, As a follow up to our conversation concerning the PC agenda being posted with the wrong date, I suggest the following: 1. Post a corrected notice with the right date immediately and make sure it is correct on City's website, which it appears to be. 2. Post a notice of a special meeting. Since special meetings only require 24 hours notice, then the City will have complied with that posting requirement and this should cure any Brown Act violation, especially since we understand that the notices of the public hearing were correct as published in the newspaper. To comply, written notice must be sent to each member of the Planning Commission and to each local newspaper of general circulation by whatever method is necessary to make sure it gets to the members and the newspaper at least 24 hours prior to the meeting. My recommendation is to change out the current posted agenda, with an agenda that has the right date. The title of the agenda would be "Corrected Date for Regular Meeting of the Planning Commission and Notice of Special Meeting." Somewhere on that first page it should state something to the effect that the previously posted agenda incorrectly noticed the date of the regular meeting as June 23rd. This agenda corrects this clerical error. The corrected agenda should then be sent to the Planning Commission and the newspaper at least 24 hours before the meeting as noted above. We did not find anything which would preclude the City from calling a special meeting and suggest this as a belt and suspenders approach to complying with the Brown Act and to ensure the Planning Commission's actions will not be voided should they be challenged. If the City substantially complies with the Brown Act, which we believe it will by following these recommendations, a court generally will not void the City's actions. For someone to prevail in an action challenging the Planning Commission's decision, they would have to bring a challenge within 90 days of the decision, show they did not have actual notice and show they were prejudice by the erroneous posting of the date. You were going to discuss with the City Manager, as he should make the final call on this. The Planning Commission should be made fully aware of this issue as well as they are the ones who would be charged with a Brown Act violation. Let me know if you have any questions. ' WJDavid A. DeBerry woodruff, spradlin & smart 555 Anton Boulevard Suite 1200 Costa Mesa, CA 92526-7670 ' (714) 415-1088 Direct (714) 415-1188 FAX ddeberry@ws.4aw.com www.wss4aw.com CONFIDENTIALITY NOTICE — This e-mail transmission, and any documents, files or previous e-mail messages attached to it may contain information that is confidential or legally privileged. If you are not the intended recipient, or a person responsible for delivering it to the intended recipient, you are hereby notified that you must not read this transmission and that any disclosure, copying, printing, distribution or use of any of the information contained in or attached to this transmission is STRICTLY PROHIBITED. If you have received this transmission in error, please immediately notify the sender by telephone at 714.415.1088 or return e-mail and delete the original transmission and its attachments without reading or saving in any manner. Thank you.