Loading...
HomeMy WebLinkAbout01/15/2002Tuesday, January 15, 2002 5:30 p.m. — Special Meeting Room CC -8 South Coast Air Quality Management District/Government Main Auditorium 21865 East Copley Drive Diamond Bar, CA 91765 Mayor Wen A Chang Mayor Pro Tem Debby O'Connor Council Member Carol Herrera Council Member Bob Huff Council Member Bob Zirbes City Manager Linda C. Lowry City ,4ttorney Michael Jenkins City Clerk Lynda Burgess Copies of staff reports or other written documentation relating to agenda items are on file in the Office of the City Clerk, and are available for public inspection. If you have questions regarding an agenda item, please contact the City Clerk at (909) 860-2489 during regular business hours. 1n an effort to comply with the requirements of Title 11 of the Americans with Disabilities Act of 1990, the City of Diamond Bar requires that any person in need of any type of special equipment, assistance or accommodation(s) in order to communicate at a City public meeting, must inform the City Clerk a minimum of 72 hours prior to the scheduled meeting. Please refrain from smoking, eating or drinking in the Council Chambers. The City of Diamond Bar uses recycled paper and encourages you to do the same. SPECIAL CITY COUNCIL MEETING JANUARY 15, 2002 5:30 P.M. SOUTH COAST AIR QUALITY MANAGEMENT DISTRICTIGOVERNMENT CE 21865 E. COPLEY DRIVE ROOM CC -8 1. CALL TO ORDER: PLEDGE OF ALLEGIANCE: Mayor ROLL CALL: Council Members Herrera, Huff, Z MPT/O'Connor, M/Chang 2, 2.1 DISCUSSION OF ISSUES AND DIRECTIONS TO STAFF REGARDING DEVELOPMENT OF THE COMMUNITY/SENIOR CENTER AT SUMMITRIDGE PARK: Recommended Action: It is recommended that the City Council tak the following actions: (1) Accept presentation of computer-generated animation of the new facility by Gonzalez Goodale Architects; (2) Select the appropriate finish materials for the facility (stone/carpet); (3) Accept a presentation by Calvin Abe Associates regarding the landscape plan; (4) Accept presentation of the updated project costs from Jay Los k of Analytical Planning Services, Inc.; (5) Accept presentation and provide direction regarding the inclusion of a donor wall in the project; (6) Authorize the architect to proceed with development of documents. Requested by: City Manager 2.2 BUSINESS EXPANSION AGREEMENT WITH SIGMAnet. Recommended Action: It is recommended that the City Council provie direction to the City's Negotiator. Requested by: City Manager 3. ADJOURNMENT: Agenda # 1 �2.1 Meeting Date: Januar 5 20 wFalwe"TIEW TO: Honorable Mayor and Members of the City Council VIA: Linda C. Lowry, City Manager TITLE: Discussion of Issues Regarding the Development of the Community/Sr. Cener at Summitridge Park RECOMMENDATION: It is recommended that the City Council take the following actions: 1. Accept presentation of computer-generated animation of the new facility by Gonzalez Goodale Architects; 2. Select the appropriate finish materials for the facility (stone/carpet); 3. Accept a presentation by Calvin Abe Associates regarding the landscape plan; 4. Accept presentation on the updated project costs from Jay Losak of Analytical Planning Services, Inc.; 5. Accept presentation and provide direction regarding the inclusion of a donor wall in the project; and 6. Authorize the architect to proceed with development of construction documents. BACKGROUND: For the last several years the development of a Community/Senior Center has been a strong desire of the community and the City Council. In September 2000 the City awarded the design contract ($745,400 including landscape architect) for the project to Gonzalez Goodale Architects ( GA). Since that time the Community Center Team members including City staff, the architects and civil engineers from Hunsaker and Associates ($274,353) have been working on this project. The project is an extensive, large scale under taking and involves many professional disc plines. In general the project involves significant site preparation work including extensive grading Work, slope stabilization, sheer key buttressing and development of a building pad for construction of a future library; construction of a new access road and two parking lots, construction of a 22,500 r, q. ft. Community/Senior Center including banquet and kitchen facilities to serve 500 patrons, a dedicated Senior Citizen Center (seniors will also be able to utilize the large banquet room), various classrooms, restroom facilities, and staff offices. In addition, the project includes extensive landscape and hardscape improvements on the entire site. The architects have completed the schematic design and design development phases of and are requesting authorization to begin construction documents. Prior to this authorize appropriate for the City Council and the community to receive information regarding the c project, select various finish materials such as stone work and carpet, and receive up -to - estimate information. Just last month, the City awarded a contract ($529,000) to Analytical Planning Services, for construction management services. In addition to performing construction managem APSI is responsible for preparing independent cost estimates for the entire project incluc expenditures incurred to date. These cost estimates will continue to be refined and upd, proceed through development of construction documents and as part of the value engin( analysis prior to release of the plans and specifications for bidding purposes. The projec estimates at 100% design development completion are provide below and will be preser Losak of APSI. DISCUSSION: e project in, it is sign of the to cost . (APSI) services, ea as we ,ring cost Sd by Jay There are a number of items for the City Council to receive information on and in some instances provide direction to the Community Center Team. Each of the different discussion issues are identified below. We recommend the City Council proceed through the issues in the following order: Computer -Generated Animation As part of the original contract, GGA was to provide the City with a 3-dimensional model c f the project at a cost of $18,000. In September 2001, the City Council authorized GGA to create a co puter- generated animation of the project and forego the 3-D model. GGA will present the animation to the City Council and provide City staff with a version of the animation for public display. We ere currently working with the animation creator to confirm compatibility with DBTV so we can broadcat the animation on the City's T.V. station. Selection of Finish Material David Goodale and Matt Blain of GGA will provide the Council with an overview of the building design, review the selected finish materials, and lead the Council through the selection of he remaining finish materials (Stone & carpet). The architects will provide Council with their recommendation for all finish materials including the stone and carpet. The City Council ill need to approve the recommended finish materials or provide other direction to the Community CE nter Team. The cost of all the finish materials presented to the City Council including the alternate opt ons are in conformance with the cost estimates presented later in this document. Landscape Plan Review In January 2001, the City Council approved an amendment to the contract with GGA, in th a amount of $73,600, to include a landscape architect on the Project Team. Calvin Abe, Landscape Architect will provide the City Council with an overview of the landscape and hardscape design fort the project site. 2 Project Cost Estimate As with any project, cost estimate information is crucial. Unfortunately it is difficult to esti ate costs for construction projects, and especially projects that are as extensive as this project, until the architectural design and civil engineering work has been completed and a thorough analysis has been conducted to understand all potential costs. Periodically throughout the preceding years, the City Council has been presented variouE cost estimates related to this project. The last cost estimates were provided to the Council in my 2001. At that time we were anticipating the project (Community Center and Site Prep only) would cost approximately $10,300,000. Since that time design development and the precise grading plans have been completed, a review of the required utilities and potential utility design has been initiated. Also, an independent cost estimator (APSI) has reviewed the grading plans and the architectural design documents and has provided a cost estimate based on this additional information. This detailed information and the inclusion of an independent cost estimator has allowed the City to refine the project cost stimates. The entire project costs are estimated at $12.6 million. This includes the cost of construct ng the building ($5 million) and site prep/soil remediation, landscape/hardscape/access road cosis ($5.4 million). Also included in the cost estimate are A&E, specialty consultant fees, utility design fees, furniture, fixtures and equipment costs, miscellaneous costs, contingencies, and permits a d plan check fees ($2.23 million). Of the $2.23 million, approximately $1.6 million has been committed to date to the various consultants assigned to the project. A cost breakdown for each compo ient of the project is attached for City Council review. Mr. Losak of APSI will review this information iri detail for the City Council. City staff will continue to work with the architects, civil engineers, and construction management firm through the development of construction documents to reduce costs wherever possible. We will ensure that any changes to reduce costs do not compromise the quality of the facility. EXCLUSIONS It is important to note that the attached cost estimates do not include the following element of the proposed project: • Relocation of existing restroom facility Relocation of existing play equipment • Any off-site improvements such as the median work and traffic signal installation propos 3d for Grand Avenue These improvements will either be done after the project is completed and/or utilize a funding source other than General Fund dollars. FINANCING 3 A few years ago, the City began identifying funds available for this project and setting those funds aside. As of FY 2001-02 the City had set aside $7.46 million for this project. Of this amount $1.6 million has already been committed for various consultant fees, as mentioned above. Therefore, approximately $6 million remains to complete the project. As part of the mid -year budget review, City staff will present the City Council with a finan ing plan for the facility. Certainly, the City has the required funds available in reserves; however, we are exploring multiple funding options including a federal CDBG loan, federal grant funds, etc. to reduce the demand on the General Fund reserves. Donor Wall Discussion: In an effort to raise funds, the Diamond Bar Community Foundation is requesting the City Council authorize a donor wall or other donor recognition program as part of the construction of & e facility. The architect is recommending a donor wall along the child play area with copper panels that would be etched with the name of the individual or corporation donating funds. A drawing of the architect's proposal is attached for Council review. This information was circulated to the Foundation members after their meeting on December 13th but as of Friday, Janual y 11th no response has tbeen received by City staff. Based on the minutes of the Foundation meeting of December 13 , it is unknown if the architect's recommendation meets with the Foundation members' desires. Also, it is unclear whether or not these funds would be contributed to the Commnity Center project or other Foundation projects. Construction Documents Authorization to proceed with construction documents will allow the project to remain on schedule. As shown on the project schedule provided by APSI, the construction documents will be completed by the end of March which should allow the project to commence construction in August 2302 and be completed by the end of December 2003. We are exploring options that may reduce the construction timeline. However, no recoi being made at this time. If feasible from a cost and timing perspective, staff will pursue aggressive timeline option. PREPARED BY: David A. Do le Deputy City Manager ATTACHMENTS 1. Project Cost Estimates 2. Donor Wall Sketch 3. Minutes of the Foundation Meeting of December 13, 2001 M !ndation is more Community/Senior Center at Summit Ridge Park Project Budget Construction Cost Miscellaneous Cost Material Testing & Inspection Furniture Fixtures & Equipment Total Miscellaneous Cast Consultant Fees EIR Consultant Fees Architectural Fees Geotechnical Engineer Fees Construction Management Fees Civil Engineer Fees Total Consultant Fees Miscellaneous Systems Telephone System CCTV Security System Data System Total Miscellaneous Systems PermWPlan Check & Utility Fees Permit Fees Plan Check Utility Fees Electrical Water Sewer Storm Drain Telephone Gas Total Permit/Plan. Check & Utility Fees TOTAL PROJECT COST $1 $10,423,29h.00 $50,000.00 $335,000.00 $385,000.00 $25,00(.00 $745,40(.00 $37,80(.00 $529,00 .00 $274,35 .00 $1,611,55 00 $15,00000 $000 $35,000 00 $20,000 00 $22,639. $33,417. $60,000. $6,000. $0. $10,000.1 $12,000.1 $169,056.1 ATTACHMENT ATTA CHMENT z -G70m ivOC)X N zfin-- rf N o�m0 �m�� N \ 0ODr o u" m nyn i ,moo =z n O z � n f'l S L�13 0 V] 'U r.. 0 O z O r r r MIN --q n M Z ATTACHMENT � 2 / I i ni I I I -J <m Z m m i DC7 AjTACNMENT "t]r V7 n O r C L3 CIDL rA z 4 -J <m Z m m i DC7 AjTACNMENT MINUTES OF THE DIAMOND BAR COMMUNITY FOUNDATION DECEMBER 13, 2001 1. CALL TO ORDER: The meeting of the Diamond Bar Community Foundation was called to order by Vice Chairman Wilson at 7:10 p.m. in Roo CC -8 of the South Coast Air Quality Management District Headq arters Building/Government Center, 21865 E. Copley Drive, Diamond Bar, CA 91765. 2. PLEDGE OF ALLEGIANCE: The Pledge of Allegiance was led by M Murshedi. ROLL CALL: Vice Chairman Wilson and Members inkin, Finnerty, Hatzfeld, Murshedi, O'Connor and Pagan. Members MacBri a and Oaxaca were excused. Member Lyons arrived at 7:27 p.m. Chairman Wong irrived at 7:38 p.m. Also present: Todd Strojny, Senior Administrative Assiltant. 3. PUBLIC COMMENTS: None Offered. 4. CONSENT CALENDAR: 4.1 APPROVAL OF MINUTES 4.1.1 Regular Meeting of October 18, 2001 Moved by M/O'Connor, seconded by M/Dinkin, to approve the Minutes as presented. C/Finnerty abstained from approval. 5. PUBLIC HEARINGS: None 6. OLD BUSINESS: 6.1 PRESENTATION BY A REPRESENTATIVE OF AYSO REGARDING FUNDRAISING PROJECTS — Continued to the January meeting. 6.2 CONSIDERATION OF EXPANDING THE DIAMOND BAR COMM> LAITY FOUNDATION BOARD OF DIRECTORS. M/Pagan felt that the Board should be expanded by at least four "comunity at large" positions. The Foundation needs more broad range expos re. M/O'Connor stated that expansion of the Board would require City Council approval. M/Pagan moved, M/Finnerty seconded to direct staff to draft appropriate by- law language for expansion of the Community Foundation Board ty four members for consideration by the City Council at its next meeting. Motion carried. ATTANMIENT 3 DECEMBER 13, 2001 7. NEW BUSINESS: PAGE 2 COMMUNITY FOUNDATION 7.1 CONSIDERATION OF RESTRUCTURING SUBCOMMITTEES—Continued to the January meeting. II 7.2 Chair/Wong said he proposed this discussion to see if there might bebetter way for the group to focus its efforts. al Members concurred that publicity is lacking and a plan for public speaking and fundraising needs to be in place. M/Murshedi volunteered to assist the Board in developing a strategy for public speaking/fundraising. M/O'Connor suggested the Board establish an ongoing slide presentation for broadcast on Channel 17. M/Finnerty reminded the Board that the Chair is the telephone person. Chair/Wong believed that the Foundation should establish a volt mail system. Members concurred. Chair/Wong said he would take responsibility for establishing the voice mail system. M/Pagan expressed concern that those who have donated funds to the Foundation have not received thank you letters. She requested that this matter be agendized for discussion at the Foundation's January meeting, DISCUSSION OF THE SALE OF TILES FOR FUNDRAISING PURP SES_ M/O'Connor reported that the architect recommended tiles for the following areas: 1) entrance to the Community Center — approximately 500 sq. .; 2) the west trellis area connection leading to the library — approximately 4E 0 sq, ft., and the tot lot area wall. The architect is scheduled to attend the Jai uary 8 Council meeting. Council will then choose the product to be used n the building and the architect will include samples of tile to match the proc acts. M/Pagan believed the most visible tiles would be the easiest to sell. M/O'Connor said that Council discussion on this subject would likely take place during a study session prior to the regular January 8 Council me ting. M/Finnerty thought it would be good to designate an area for veterans. She would like to have two sections — the entrance to the Community Cente and the steps leading to the Library. M/O'Connor reported that the City's newly hired grant -writer resides inj the ATTACHMENT DECEMBER 13, 2001 E� �i 10. PAGE 3 COMMUNITY FOUNDATION Sacramento area and is very aware of the Foundation and its goals. M/Pagan suggested the Foundation publicize its goal for tile fundraising in the Friends of the Library publication. M/Finnerty said her first choice would be the entrance, the second choicE would be the west trellis area leading to the Library or the first ands cond choice combined with the last choice being the wall on the tot lot play area. M/O'Connor suggested another area to be considered is the entrance to the banquet facility next to the west trellis area toward the east trellis area She stated that she would advise board members when the Council will be discussing this matter. It will likely be during a 4:30 study session in Room CC -8 on Tuesday, January 8. Members concurred to continue discussion of this item under Old Busin ss at the Foundation's January meeting. The Moved by M/Finnerty, seconded by M/Lyons to recommend that the City Council consider allowing the Foundation to sell tiles for the purp a of fundraising for the organization at one of the following locations (lis ed in order of preference): 1) east trellis area, 2) west trellis area, 3) both 1&2, 4) the area in front of the entrance to the banquet room and 5) wall in frnt of the tot lot play area. Motion carried. the SUBCOMMITTEE REPORTS: a) FUND-RAISING EVENTS — M/Dinkin reported that the Foundation made $191.75 on Veterans Day. The money has been given to the Treasurer. The Foundation netted $483.52 from the Winter Fest celebration. b) GRANT WRITING — M/O'Connor said she would schedule a teleconfer nce with the grant writer. c) GIFTS AND PLEDGES — None Offered d) COMMUNITY CENTER COMMEMORATIVE — None Offered FOUNDATION MEMBER COMMENTS: M/Finnerty said that the matter the November meeting date was not carried forward to this month's meeting age da. M/O'Connor suggested that a recommendation to schedule the November meeting for the second Thursday of the month instead of the third Thursday of the mnth could be included in a bylaws change along with expansion of the Board once that item is approved by Council. ADJOURNMENT: With no further business to conduct, Chair/Wong adjourned the ATTACHMENT DECEMBER 13, 2001 meeting at 8:26 p.m. ATTEST: Andrew Wong, Chairman PAGE 4 COMMUNITY FOUNDATION Lynda Burgess, Board Secretary ATTACHMENT 3 CITY COUNCIL Meeting Date: Jt AGENDA TO: Honorable Mayor and Members of the City Council VIA: Linda C. Lowry, City Manag TITLE: Business Expansion Agreement wi MAnet RECOMMENDATION: It is recommended that the City Council provide direction Negotiator. BACKGROUND: SIGMAnet is an information .technology and fulfillment services company providing tel professional services to businesses. Their headquarters has been located in Diamont 1986. They have received an offer to relocate its business to the City of Chino. As significant sales tax producer, it is in the City's interest to consider entering into an agrf SIGMAnet in order to retain and expand .the business within the City of Diamond Bar. SIGMAnet has been offered a significant sales tax rebate and other incentives to relocat of Chino. On December 6, 2001, the City Council received a report from City staff, discus and provided staff with direction to offer a business expansion agreement. On Decem staff met with Mr. Ahmed Al Khatib, the Founder and Chief Executive Officer of the cc December 17, 2001, the City Council met to discuss a revised proposal from SIGM, provide direction to staff. DISCUSSION: it is proposed that the City and SIGMAnet enter into a three-year agreement. Throughoi of the agreement, SIGMAnet is required to maintain and expand its company headquarte City of Diamond Bar. The City proposes to reimburse fifty (50) percent of all sales taxe by SIGMAnet and remitted to the City by the State Board of Equalization during the agreement over an established minimum tax receipts base. The Business operator h2 that the minimum base be set at $50,000.00. Should SIGMAnet relocate to another juris( the first year of the agreement, one hundred (100) percent of the sales tax receipts rece'. returned to the City of Diamond Bar. If SIGMAnet relocates to another jurisdictio remaining 24 months, fifty (50) percent of all sales tax receipts received by the busin returned to the City. a # 2.2 I5, 2002 RT the City's nical and Bar since iey are a ment with to the City ed options ;r 7, 2001, pany. On iet and to the length within the generated = of the requested .tion within .d shall be within the s shall be SIGMAnet intends to expand its 10,000 square foot, 50 -employee business, by leasing office space within the existing building. Because the facility has limited parking, the City i; the business with the acquisition of additional parking spaces, including the possibility of parking spaces immediately adjacent to the business along Diamond Bar Boulevard. The City Council has previously been provided with confidential information regarding the generated by SIGMAnet. Staff is preparing a Financial Impact Analysis for the City G provided in a separate report. The City Attorney is finalizing the detailed Agreement for rE City Council. The attached communication with SIGMAnet incorporates handwritten Mr. All Khatib in response to our proposal. Mr. Al Khatib's handwritten comments, received on January 8, 2002, requests a response from the City by January 18, 2002. Prepared By Ja° es DeStefa o Deputy City Manager Attachment: additional assisting providing Iles taxes ncil to be ew by the Dtes from rich were Correspondence to SIGMAnet dated December 19, 2001, incorporated with handwritten comments from Mr. Al Khatib. y 11)[VIOND Kai: z' Z December 19, 21)01 City of Diamond Bar 21825 E. Copley Drive • Diamond Bar, CA 91765-4178 (909) 860.2489 - Fax {909} 861.3117 www.City0foiamnndea3,.com Mr. Ahmed Al Khatib Vl1�PAC.SIMT1 E rounder and C:hie£ Executive Officer S1GMAnet. 732 Fourth Diamond Bar Boulevard Diamond Bar, CA 91765 Dear Mr. Al Khatib: Thank you, once again, for the opportunity to continue our discussion pertaining io the retention and expansion of SIGMAnet_ On December 17, 2001, we diSCUSSed the latest retention and expansion plan for your business with the City Council. IT is our understanding that you are considering an expansion of your offices within the building you presently oc:cul and acquisition of additional lease space for the purpose of relocating all or a portion of your assembly and warehouse functions. As a result of direction received from the City Council, we are prepared to craft a Rcimbursement Agreurrtcrtt, 10 l>e prepared by the City Attorney, containing substantially the following terms: rte, vC' U /t 0 The City of Diamond Bar proposes, ufzject to Coal approval by the City Council, to enter into a 36 -month reimbursement agreement with STGMAnct. Throughout the length of the agreement S1GMAnet is required to maintain its company headquarters within the City of Diamond Bar_ tr The City proposes to reimburse 50% of aM safes tax receipts generated by STGMAnet and remitted to the City by the State Board of Equalization during the term of the 36 month agreement over a tax receipts minimum base of By Ple,0uld3MMAne &CJ1 a tax receipts rty1� 111 retains ),U AlUt $500 0�� _�'� .'�les tax reccipts, iGMAnet she eceive of (he receipts g=cr tr o!*$25 . Should SIGMAnct rc:loeutc to another jurisdiction rrs within the t year of the ag►=mcnt,190%� of all sales tax receipts received shall be returned to the City of Diamond Bar. Should SIGMAnet relocate to another jurisdiction within the remaining 24 months, 50 % of all sales t:tx receipts received by SiGMAnct shall be returned to the City. v� r= , I'��� z� ►� Vit`' Mr. Ahmed Al Khatib SIGMAnct December 19, 2001 Page 2 The City will Lontinue to use its best efforts to provide addi€ional parking spaces at no cost to you. We hope you will find our proposal satisfactory. Again, we appreciate the opportunity to further out disecission with you regarding the expansion of your business in our City'/I';hl be away from the office, on vacation, December 19, 2001, through January 1, 2002., Shc)u]cTybu have any questions �_..__ cgarditig our prvpits71, please do not hesitate to contact Linda Lowry, City Manager at (909) 396-5666. 1 will contact you upon my veturn_ sincemly, James DcStefano Deputy City Manager cc_ City Manager City Council 1 of 1 Tommye Cribbins From: David Doyle Sent: Thursday, January 10, 2002 2:05 PM To: Tommye Cribbins Subject: Title Here is my staff report title: Discussion of Issues Regarding the Development of the Community/Sr. Center at Summitridgi Park David Doyle Deputy City Manager City of Diamond Bar 909-396-5666 1/10102 Tommye Cribbins From: David Doyle Sent: Thursday, January 10, 2002 2;01 PM To: Tommye Cribbins Subject: FYI I don't know if this helps you but here is what my recommendation will say on Community Center 15th, It is recommended that the City Council take the following actions: 1. Accept presentation of computer-generated animation of the new facility by I Goodale Architects, 2. Select the appropriate finish materials for the facility (stone/carpet), 3. Accept a presentation by Calvin Abe Associates regarding the landscape plan, 4. Accept presentation on the updated project costs from Jay Losak of Analytical Services, Inc., 5. Accept presentation and provide direction regarding the inclusion of a donor w project; and 6. Authorize the architect to proceed with development of construction documents. David Doyle Deputy City Manager City of Diamond Bar 909-396-5666 1110102 I of 1 for the lez fanning II in the TommYe Cribbins From: David Doyle Sent: Tuesday, January 08, 2002 8:52 AM To: Tommye Cribbins Subject: RE: Study Session for 1/15/02 I'll be writing a staff report - there may or may not be attachments (at this time I'm anticipating attachme contractors you never know). It will just be one item on the agenda - I'm not sure of the exact title just yet - but something like °Discussi Senior/Community Center Construction Issues" with a number of actions for the Council to perform such file construction cost estimates, select finish materials, provide direction regarding donor wall placement ; accept presentation of computer-generated animation. David Doyle Deputy City Manager City of Diamond Bar 909-396-5666 -----Original Message ----- From: Tommye Cribbins Sent: Tuesday, January 08, 2002 8:45 AM To: David Doyle Subject: Study Session for 1/15102 with Of receive and materials, Just checking on what type of documentation t might have for the 1115102 agenda. The topics I h ve are: Construction Budget Estimates, Finish Materials, Landscape Plan Review, Donor Wall Issues anComputer Generated Animation Presentation. Thanks! TC CITY OF DIAMOND BAR { SPECIAL CITY COUNCIL MEETING - JANUARY 15, 2002 1. CLOSED SESSION: ?:00 p.m., AQMD Room CC -8 Pending Litigation —Lanterman 6 3 Q CALL TO ORDER: PLEDGE OF ALLEGIANCE: 5:30 p.m., AQMD Room CC -8 Mayor ROLL CALL: Council Members Herrera, Huff, Zirbes, MPT/O'Con M/Chang CONSENT CALENDAR: 3.1 APPROVAL OF MINUTES: 13.1.1 Special Joint Meeting with Walnut Valley Unified Schoc District of December 15, 2001 -Approve as submitted. 3.1.2 Study Session of December 17, 2001 — Approve as submitted. 3.1.3 Adjourned Regular Meeting of December 17, 2001 — Approve as submitted. Requested by: City Clerk OLD BUSINESS: 4.1 DISCUSSION OF SENIOR tCOMMUNITY CENTER CONSTRUCTION ISSUES: Recommended Action: Receive and file construction estimates, select finish material, provide direction regarding c wall placement and materials, and accept presentatioi computer-generated animation. Requested by City Manager 4.2 CONSIDERATION OF BUSINESS EXPANSION AGREEME WITH SIGMA Recommended Action: Requested by: City Manager cost of JANUARY 15, 2002 PAGE 2 4.3 SECOND READING OF ORDINANCE NO. 01 (2002) — Development Code Amendment No. 2001-02. Recommended Action: Requested by: Planning Division 4.4 RESOLUTION NO. 2002 -OX: Co! -Am Properties, LLC (D.B. Honda) comprehensive sign program Recommended Action: Requested by: Planning Division 5. Adjournment: SPECIAL CITY COUNCIL MEETING o� JANUARY 15, 2001 5:30 P.M. SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT/GOVERNMENT CE 21865 E. COPLEY DRIVE ROOM CC -8 1. CALL TO ORDER: PLEDGE OF ALLEGIANCE: Mayor ROLL CALL: Council Members Herrera, Huff, Zir MPT/O'Connor, M/Chang 7 2. 2.1 SECOND READING OF ORDINANCE NO. 01 (2002) — DEVELOPM NT CODE AMENDMENT NO. 2001-02 PERTAINING TO FREE AY ORIENTED SIGNS WITHIN THE C-3 ZONE Recommended Action: It is recommended that the City Council waivE full reading and adopt Ordinance No. 01 (2002) by title only. Requested by. Planning Division 2.2 RESOLUTION NO. 2002 -OX: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DIAMOND BAR APPROVING CONDITIONAL USE PERMIT NO. 2001-06 AND COMPREHENSIVE SIGN PROGRAM 2000-02 FOR A PROPERTY LOCATED AT 515-525 GRAND AVENUE Recommended Action: It is recommended that the City Councilado # a resolution approving CUP No. 2001-06 and Comprehensive Sign Prog am No. 2002-02. Requested by: Planning Division 2.3 DISCUSSION OF ISSUES AND DIRECTIONS TO STAFF REGARDI G DEVELOPMENT OF THE COMMUNITY/SENIOR CENTER �AT SUMMITRIDGE PARK: Recommended Action: It is recommended that the City Council take following actions: (1) Accept presentation of computer-generated animation of the new facility by Gonzalez Goodale Architects; (2) Select the appropriate finish materials for the facility (stone/carpet); (3) Accept a presentation by Calvin Abe Associates regarding the landscape plan; (4) Accept presentation of the updated project costs from Jay Losal, of Analytical Planning Services, Inc.; (5) Accept presentation and provide direction regarding the inclusio of � N 0 CD C -60 n on 89 tn w too O 00 p m m i N w n O N OBD O C- > a C- c z r CA) (0 n N yA i N 0 cn N cn E9 0 0 0 0 C CD @ N n m j 60 fie 0 c z NRa 1 roN) n coco m z cam, 4.9 I m N w N ou N tn 0.. a � O a N ou D I�qto co 00 V -� N N N N V1— Ln (p � A (AI -69 i w L n m o m CD m o n w a n O z n �_ cn 0 CD B a fa O m 0 m W n co a ?. C, 0 -Ga 7 N s � c d ~ m r N IU y Q o m CD 0 �- 0 c a Cr cn o� 0 V). U) n 0 n ur � v CD � O 69 W O � 0 O C--� c m N O —� O � O � Lm M a) 3 C) N O 31 N � O Z O O n on r - tn too O 00 p m m n O C- > a C- c z r n N ap o N 0 0 0 C CD @ N n m j 60 fie 0 c z NRa 1 roN) n coco m z cam, 4.9 I m N w N ou N tn 0.. a � O a N ou D I�qto co 00 V -� N N N N V1— Ln (p � A (AI -69 i w L n m o m CD m o n w a n O z n �_ cn 0 CD B a fa O m 0 m W n co a ?. C, 0 -Ga 7 N s � c d ~ m r N IU y Q o m CD 0 �- 0 c a Cr cn o� 0 V). U) n 0 n ur � v CD � O 69 W O � 0 O C--� c m N O —� O � O � Lm M a) 3 C) N O 31 N � O Z 0 n 0i� or a C. 0. ro� C71 N �. Z1 CD Cl- O W p O p O O O N Cr TaWle of Contents PROJECT BUDGET SUMMARY CONSTRUCTION COST ESTIMATE SUMMARY COMMUNITYISENIOR CENTER COST ESTIMATE CIVIUSITEWORK COST ESTIMATE SCHEDULES OUALIFICATIONS w,.rry w..,�in. Y� �.LLyB'X 1✓511 Analytical Planning Services, Inc. TOC City of Diamono Bar Community/Senior Center at Summit Ridge Park Project Budget Summary Construction Cost $10,423,29 Miscellaneous Cost Material Testing & Inspection $50,OC Furniture Fixtures & Equipment $335,OC Total Miscellaneous Cost $385,00 Consultant Fees FIR Consultant Fees $25,OC Architectural Fees $745,4C Geotechnical Engineer Fees $37,8C Construction Management Fees $529,OC Civil Engineer Fees $274,3,r Total Consultant Fees $1,611,55 Miscellaneous Systems Telephone System $15,OC CCTV $ Security System $35,OC Data System $20,OC Total Miscellaneous Systems $70,00 Permit/Plan Check & Utility Fees Permit Fees $25,OC Plan Check $22,62 Utility Fees Electrical $33,41 Water $60,OC Sewer $6,OC Storm Drain $ Telephone $10,OC Gas $12,00 Total Permit/Plan Check & Utility Fees $169,05 TOTAL PROJECT COST $12,658,90 00 00 00 00 III 00 M11 00 Community/Senior Center and Sitework $85,250 Construction Cost Estimate Summary $1,093,730 CommunitylSenior Center $96,701 Subtotal Construction Cost $3,617,864 General Conditions $253,250 Contingency $542,680 Escalation to Mid -Point $176,552 Bonds/insurance $54,268 Sub Total $4,644,614 Overhead & Profit $278,677 Total Community/Senior Center $4,923,291 Civi IlSitework Site Preparation & Demo $85,250 Site Grading $1,093,730 Slope & Erosion Control $96,701 Sanitary Sewer $55,708 Storm Drainage $121,016 Water Distribution $234,016 Dry Utilities $448,525 Roadway Improvements (Parking Lot) $374,401 Amenities & Special Construction $208,574 Access Drive $311,728 LandscapelHardscape $1,544,956 Total with 10% Contingency $4,574,605 General Conditions $340,779 Escalation to Mid -Point $196,615 Bondsllnsurance $76,680 Sub Total $5,188,680 Overhead & Profit $311,320 Total Sitework $5,500,000 Grand Total $10,423,291 Diamond Bar Community/Senior Center 100% Desian Development Estiamte - Summ Description Total Cost/Unit Total Amount 10. Building 542,680 Escalation to mid point 03.10 Concrete 6.88 155,422 04.50 Stone finish 0.63 14,192 05.50 Struc Steel 05.51 Steel deck 05.52 Miscl metals 05.81 Seismic expan. 18.901 1.68 0.06 0.21 426,869 37,932 1,271 4,166 06.11.2a entry 11.55 260,930 06.24 Fin Carpentry 06.41 Arch millwork 07.51 ThermlMst prot 7.06 4.04 5.47 159,414 91,211 123,458 07,60 Flsh j mt1 07.81 Fireproof! n 5.70 1.04 128,764 23,384 08.05 Doors 3.50 79,050 08.10 W1nd1Glz 6.41 144,703 09.23 Stucco 1.96 44,178 09.66 Flooring 09.91 Paintin 7.35 2.06 165,902 46,486 09.92 Frmg/dEMall 10.00 Section 10 6.18 1.31 139,502 29,592 10.65 Aco partitions 9.15 206,609 11.20 Kitchen equip 4.13 93,211 12.52 Window treatmt 4.78 108,000 13.93 Fire Sup res. 2.97 67,175 14.20 Elevators 0.89 20,000 15.41 Plumbin , bld 8.80 198,680 15.72 HVAC 19A9 440,060 16.41 Electrical 16AO 370,452 16.50 Telephone 0.59 13,388 16.70 Fire Alarm 1.03 23,265 10. Building 160.19 3,617,865 Estimate Totals 3,617,864 3,617,864 General Conditions 253,250 Contengency - Design/Construct 542,680 Escalation to mid point 176,552 Bonds Insurance 54.268 1,026,750 4,644,614 Overhead & profit 278,677 278,677 4,923,291 Date:112102 7.000% 15.000% 4.000% 1.500% 6.000% Total 4,923,291 217.989 !sf APSI Page Diamond Bar Community/Senior Center Date: 1/2/02 100% Design Development Estiamte - Detail Description Quantity Total Cost/Unit T A tal punt 10. BuildPn 03.10 Concrete Slab base, sand 4" 22,585.0 sf 0.71 16,124 Spread footings ____170.0 c 39,117 Spread footin s oath area 5.3 cy ___130.10 230.10 1,226 Continuousfoolings 134.0 cy 232,87 31,205 Concrete slab on grade 3", rebar 18" OCEW 22,585.0 sf 3.00 67,749 03.10 Concrete 22,585.0 sf 6.88 55,422 04.50 Stone finish Stone, irre alar shapes, pre -function 352.7 sf 23.18 8,176 Stone, irre alar sha es, latform 259.5 sf 23.18 6,015 04.50 Stone finish 22,585.0 sf 0.63 14,192 05.50 Struc Steel Columns is 5x5x0:5 5.4 ton 2,700.00 14,688 Columns is 10x10x518" 6.3 ton 2,700.00 16,902 Columns is 5x5x0.5, at oath area i.6 ton 2,700.00 4,212 Columns is 5x5x0.5, at slo a roof D5, l]8 0.1 ton 2,700.00 135 Columns is 8x8x0.5, at op up roof frame 2,1 ton 2,700.00 5,535 Columns is 8x8x0.5, at at senior conf meetin Ilobb 5.9 ton 2,700.00 15,822 Columns, W sha e, A36 steel 50.9 ton 2,500.00 127,200 Structural steel, banquet roof 67.7 ton 2,500.00 169,250 Structural steel,senior ctr roof 29.3 ton 21500.00 73,125 05.50 Strulc Steel 22,585.0 sF 18.90 26,869 05.51 Steel deck Metal deck 1.5" 20 GA12,430.0 sf 2.06 25,612 Metal deck 3.0" 20 GA 903.0 sf 2.73 2,468 Metal deck 3.0" 18 GA at senior conf meetin lobb 3,137.8 sf 3.14 9,852 05.51 Steel deck 22,585.0 sf 1.68 37,932 05.52 Miscl metals Wall rails at interior ramp 28.0 If 45.41 1,271 05.52 Miscl metals 22,585.0 sf 0.06 1,271 05.81 Seismic ex an. Ex ansion joint ass ,custom units, wall & cl , 2" space, aluminum 126.5 If 26.12 3,304 Expansion 'Dint ass ,custom units, wall 8 cl 2"space, aluminum 56.0 If 26.12 1,463 05.81 Seismic ex an. 22,585.0 sP 0.21 4,766 06.11 Car ent Opn web sts LH bolted cross brd 14" 1,006.0 If 13.88 13,958 Opn web 'sts LH bolted cross brd 16" 1,892.0 If 14.33 27,109 Framing holdown 27.0 ea 62.21 1,680 Framin , 'oists, 2" x 8", neumatic nailed 1.4 mbf 1,937.04 2,665 Framin , "oists, 2"x 8", oath area roof frm 0.4 mbf 1,937.05 852 Framin oisis, 2" x 10", pneumatic nailed 1.8 mbf 1,972.20 3,483 Framin joists, 2" x 12", neumatic nailed 2.4 mbf 1,807.37 4,376 Framin , 'oists, 2" x 12", west trellis 1.1 mbf 1,807.37 2,060 Framin Joists, 2" x 12", east trellis 0.9 mbf 1,807.36 1,572 Framing, joists, 2" x 12", Louth area trellis ---Framing, 0.5 mbf 1,807.35 868 joists, 4" x 12" 0.4 mbf 2,445.40 951 APSI w Diamond Bar Community/Senior Center 100% Design Development Estiamte - Detail Date:1 /2/02 Description QIjantity Total CoaiLl3nit T Am tal Dunt 06.11 Gar ent Framing, columns, 6" x 6" 1.2 mbf 3,227.70 3,922 Framin ,roofs, roof cants, split, 6" x 6" 4,637 Soffit framing, banquet room, 17.7 bf/If 19,014 Soffit framin , ceilin s, 10.25 bf/If E�� 2,625 Soffit framing, intermediate window, 9.24 bf/If 6.0 mbf 18,050 Soffit framing, top window, 8.45 bf/If 0.7 mbf 2,140 Framin , headerslbeams 2.0 mbf q4,478.553 9,069 Framing, headers/beam, youth area overhang0.8 mbf 3,404Wall framin 3x6,12'H 746.9 If 18,891 Wall framing 2x6, 15' H 176.9 If 24.36 4,308 Wall framing 2x6, 20'H 398.3 If 32.54 12,961 Wall framing 2x6, 23' H 380.8 If 37.42 14,250 Column fra iing 2x6, 12' H 3.0 ea 325.65 977 Column framin 2x6, 20` H 17.0 ea 543.75 9,244 Column framing 24, 23' H 29.0 ea 625.30 18,134 Column fir-4ming 24, youth area Sheathin , pl ood on roof, CDX, 51$" thick 12.0 ea 10,548.8 sf 227.34 1.01 2,728 10,608 Sheathing, plywood on roof, CDX, 5/8" thick youth area 1,049.2 sf 1.01 1,055 Sheathing, plywood on shear walls, 1/2" str 19,584.0 sf 0.97 18,951 Glue lam beams 6.3 mbf 4,208.83 1 26,389 06.11 Car ent 22,585.0 sf 11.55 60,930 06.24 Fin Carpentry Wood Mq exterior soffit 3,103.1 sf 5.27 16,347 Wood fascia, ext crown 945.0 If 18.20 17,201 Wood fascia, ext casin 600.0 If 16.201 9,721 Pan elin , pi ood, architectural GR, column exterior 342.0 sf 26.73 9,140 Panelin I ood, architectural GR, column interior 238.0 sf 25.54 6,078 Panelin , pl ood, architectural GR,wall interior, banquet 1,367.1 sf 25.54 34,915 Paneling, plywood, architectural GR,wall interior, re -function 1411 sf 25.54 3,602 Panelin , pl ood, architectural GR,wall interior, senior conf 155.0 sf 25.54 3,959 Panelin , pl ood, architectural GR,wall interior, Jobb 372.3 sf 25.54 9,508 Miscl finish panelin 1.01S 7,406.88 7,407 Wood paneling, exterior walls 1,600.0 sf 15.00 24,000 Copper veneer at crown fascia 2,362.5 sf 7.42 17,535 06.24 Fin garp2plry Carpentry 22,585.0 sf 7.06 159,414 06.41 Arch millwork Counter top w/backs lash 80.0 If 29.79 2,383 Counter to store at rest rooms 36.0 If 105.93 3,813 Reception counter 53.0 If 48.74 2,583 Exterior wall paneling 1,560.0 sf 12.01 18,733 Cabinets, base 80.0 If 191.26 15,300 Cabinets, upper 60.0 If 171.26 10,275 Cabinets, full ht 7' 85.0 If 231.26 19,657 Cabinets, bench 13.0 If 201.26 2,616 Cabinets, reception lower 27.0 If 30 8. 84 8,339 Cabinets,reception upper 26.0 If 288.84 1 7,510 APSI Page 2 Diamond Bar Community/Senior Center 100% Desitin Development Estiamte - Detail Date: 112102 Description Quantit Total Cost/Unit Rtai Amount 06.41 Arch millwork 22,585.0 sf 4.04 91,211 07.51 ThennlMst prot Wall insul, fbgls, foil faced, battlblkt, 6" thk, R19,15" W 11,469.0 sf 0.69 7,886 Clg instil., fiberglass, foil faced, 9" thick, R30, 15" wide 10,549.0 sf 1.02 10,791 Roof deck insulation, expanded poi re Re, 6" thick R30 16,471.0 sf 1.25 20,507 Built-up roofin ,deck 181.4 sq 316.18 57,346 Built-up roofin , arapit walls 48.5 sq 316.18 15,338 _____!Aalkway for BUR, asph impregnated, 3' x 6'x 112" thk 1,200.0 sf 1.85 2,223 Roof hatches, 2'-6" x 3', wlcurb,1" fb Is insul, galestl curbloover 1.0 ea 493.67 494 Caulking & sealants, ac [ic latex caulk, white, 1I4"x1/2" 5,000.0 If 1.78 8,874 07.51 ThermlMst prot 22,585.0 sf 5.47 23,458 07.60 Flsh ISht mtl Copper rootn ,batten seam, over 10 s 20 oz, 160 Ib er s 95.5 s 1,011.99 96,625 Perforated co er screeR 1,017.0 sf 13.54 13,774 Flashin ,aluminum, mill finish, .019" thick 2,317.5 sf 4.03 9,345 Metal band anels, baked enamel on steel, 18 au a 972.0 sf 9.28 9,020 07.60 Fish /Sht mtl 22,585.0 sf 5.70 128.764 07.81 Fire roofin Sprayed fireproofin ,min fbr or cementitions,l "thk,corr or fluted dks 13,362.3 sf 1.75 23,384 07.81 Fire roofin 22,585.0 sf 1.04 23,384 08.05 Doors Dt[nrextmtlmtl 2.0 ea 1,00003 2,000 Dint 6.0 ea 950.00 5,700 pint 1.0 ea 1,449.96 1,450 Do 6.0 ea 125000 7,500 Do 2.0 ea 1,750.00 3,500 Doors I lasswl anic 6.0 ea 1,200.01 7,200 Doordbl lasswlpanic 17.0 ea 1,800.00 30,600 Door dbl 45 min w/hol open 1.0 ea 2,400.04 2,400 Donr s 120 min 10.0 ea 1,250.00 12,500 Door dbl20min 4.0 ea 1,550.01 6,200 08.05 Doors 22,585.0 sf 3.50 79,050 08.10 WindlGlz Storefront windows 114" glz 1,259.0 sf 22.80 119,903 Storefront windows 114" temp 1,000.0 sf 24.80 24,800 0$.10 WindlClz 22,585.0 sf 6.41 144,703 09.23 Stucco STUCCO, 3 coats 1"thick, float finish, with lath _L1 45.1 sy 38.58 44,178 09.23 Stucco 22,585.0 d 1.96 ,178 09.66 F!SgK Stone, i- ularsha es, floor 1,837.0 sf49.79 36,741 Stone, irre ularsha es, base 1,073.0 If 16,094 Ceramic tile, cove base, 6" x 4.114" hiah 468.0 If 4,583Ceramic floor the 9,230.2 sf 10,481Ceramic tile, walls, restrooms 1,872.0 sf 11,450Ceramic tile, walls, kitchen 1,305.0 sf 7,982 Quarry tile, base, cove or sanitary, 2" or 5" hi h, mud set, 112" thick 203.0 if 10.22 2,074 APSI Page 3 Diamond Bar Community/Senior Center Date: 1/2/02 100% Design Development Estiamte - Detail Description Quantity iota) Cos Unit ItaI Amount 09.66 Flooring Quarry.tile, floors, brown tile, imported, 6" x 6" x 314" 938.6 sf 10.64 9,990 Woodfloorin 1,855.6 sf 9.42 17,476 Resilient, base, cove, rbr or vinyl, .080" thick, std colors, 4" hi 3,600.0 If 1.79 6,426 Resilient, vinyl sheetDods, backed, .125" thick 3,389.3 sf 3.57 12,093 Carpet, com gris, direct cem, n Ion, Ivl loo , 32 oz., medium traffic 1,165.4 s 26.181 30,512 09.66 Flooring 22,585.0 sf 7.35 65,902 09.91 Paintin Paint three coats, int walls 23,730.0 s€ 0.65 15,424 Paint three coats, stucco 10,305.0 sf 0.65 61698 Paint miscl 1.0 Is 2,500.01 2,500 Paint three coats, int ceilings/soffits 26,350.0 sf 0.65 17,126 Misc pntin , tr &cod frs, primer coat, stain, brushwork, wipe off 6,318.0 sf 0.75 4,738 09.91 Paintin 22,585.0 sf 2.06 46,486 09.92 Frm !d all Suspended ceilin framin , d ail 16,280.2 sf 2.82 42,691 Drywall, walls 518" finished, no paint 31,640.0 sf 1.07 33,877 Drywall, flnished 518", ceilin rid 16,280.0 sf 1.28 20,882 Drywall, finished 518", banquet soffitsi system 4,284.0 sf 5.00 21,418 D all, finished 518", rated ceilin 2,470.7 sf 1.15 2,839 DrVwall, finished 518", ceiling/window soffits 5,786.0 sf 1.28 7,421 Suspended clg 2x2 314" file 3,433.2 sf 3.02 10,375 09.92 Frmg/drywall 22,585.0 sf 6.18 39,502 10.00 Section 10 Partitions, toilet, cubicles, floor & ceilin anchored, ainted metal 20.D ea 511.28 10,226 Ptn,toilet,cubs,ffr mtd,for handicap units,Inc[ 52" grab bars,add 4.0 ea 250.00 1,000 Partitions, toilet, urinal screen, 18" wide, clq braced, painted met 4.0 ea 223.67 895 Si ns 1.O is 8,500.01 8,500 Fire a ui cabs, not equip, on ext, S"x12"x36", SS door & FR 6.0 ea 231.65 1,390 Fire extin uishers, d chem, std t e, ortable, painted, 20 Ib 6.0 ea 90.00 540 Bathroom accessories, mir with stainless steel, 314" sq FR, 36" x 24" 11.0 ea 134.05 1,475 Bathroom accessories, mo holder strip, SS, 5 holders, 48" Inn 2.0 ea 79.54 159 Bathroom accessories, na kinitampon dispenser, recessed 2.0 ea 346.05 692 Bathroom accessories, robe hook, sin le, r ular 21.0 ea 21.70 456 Bathroom accessories, soa dis ,chrome, surf mounted, li uid 11.0 ea 59.04 649 Bathroom accessories, toilet seat cov disp, SS, surface mtd 20.0 ea 51.05 1,021 Bathroom accessories, toilet tissue disp, surf mounted,sst,double roll 20.0 ea -31.48 630 Bathroom accessories, towel dispenser, sst, flush mounted, recessed 5.0 ea 173.07 865 Bathroom accessories, waste recpts, stainless steel, with to , 13 al 5.0 ea 219.071 1,095 10.00 Section 10 22,585.0 sf 1.31 29,592 10.65 Aco partitions Partitions, fldg leaf, acoustic, wood, VF, to 18' hi, 6 psf, a)Lq 1,122.0 sf 58.36 65,485 Partitions, f ld2 leaf, acoustic, wood, VF, to 18' hi, 6 psf, ay9 1,122.0 sf 58.36 65,485 Partitions, fldg leaf, acoustic, wood, VF, to 18' hi, 6 psf, av 544.5 sf 58.36 1 31,779 Partitions, fldg leaf, acoustic, wood, VF, to 18' hi, 6sf, avg 544.5 sf 58.36 F 31,779 Partitions, fldg leaf, acoustic, wood, VF, to 18' hi, 6 psf, avg 207.0 sf 58.36 12,081 10.65 Aco partitions 22,585.0 sf 9.15 06,609 11.20 Kitchen equip APSI Page 4 Diamond Bar Community/Senior Center 100% Design Development Estiamte - Detail Date: 1/2/02 Description_ Quantity total CostfUnit Total Am Dunt 11.20 Kitchen equip Resi appliances, microwave oven, maximum 1.0 ea 1,803.26 1,803 Appliances, icemaker, automatic, 51 Ib. per day 1.0 ea 1,068.27 1,068 Comm. kitchen a pliance, bake oven, qas, one section 1.0 ea 3,554.97 3,555 Kitchen equipment, bake ovenas, two sections 1.0 ea 7,500.02 7,500 Food service eqpt, cabinet, heated, mobile 2.0 ea 2,100.00 4,200 Food service e9pt, coffee urn, twin 6 gallon urns 1.0 ea 5,908.27 5,908 Kitchen aqui mart, dishwasher; semi-automatic 38 to 50 racks per hour, 1.0 ea 5,595.97 5,596 Kitchen equipment, food warmer, counter, 1.6 KW 4.0 ea 1,150.00 4,600 Kitchen equipment, freezers, reach -in, 68 C.F. 1.0 ea 8,579.92 8,580 Food service eqpt, ice cube maker, 1 000pounds per day, wlbin 1.0 ea 8,039.76 8,040 Food service eqpt, refri erator, reach -in, 2 compartment 1.0 ea 2,563.581 2,564 Food service eqpt, refrigerator, reach -in, 3 compartment 1.0 ea 3,583.78 3,584 Food service egpt, galvanized shelvin , louvered 4 -tier, 24" x 4' 8.0 ea 491.16 3,929 Food service eqpt, tray & silver dispenser, mobile 1.0 ea 614.19 614 Water filters 2.0 ea 750.00 1,500 Counter tops, not incl base cabinets, stainless stl 320.0 sf 70.53 1 22,569 Kitchen Hood w/ Exhaust FansFBO w! FP Sys.Allow 1.0 ea 4,000.00 4,000 Kitchen Ventilation Make-up Air Unit Allow 1.0 ea 1,200.00 1,200 Fly Fans at Doors Allow 2.0 ea 1,200.00 2,400 11.20 Kitchen a ui 22,585.0 sf 4.13 93,211 12.52 Window treatmt Shade screens automatic, allow 5,400.0 sf 20.00 108,000 12.52 Window treatmt 22,585.0 sf 4.78 08,000 13.93 Fire Su res. Fire Risers wl alarm, test & drain 1.0 ea 3,500.00 3,500 Automatic Fire Sprinkler S s. 22,500.0 sf 2.60 58,500 Sprinkler System Test & Fire Stop Penetrations 22,500.0 sf 0.08 1,800 Sprinkler System Seismic Control 22,500.0 sf 0.15 3,375 13.93 Fire Su res. 22,585.0 sf 2.97 67,175 14.20 Elevators Elevators, residential, wheelchair, stair lift, maximum 1.0 ea 19,999.95 20,000 14.20 Elevators 22,585.0 sf 0.891 20,000 15.41 Plumbin , bld High Low Dual Drinking fountains 2.0 ea 1,400.00 2,800 Water Closets 21.0 ea 750.00 15,750 Urinal 4.0 ea 675.00 2,700 Lavatories 11.0 ea 650.00 7,150 Service Sink 1.0 ea 900.00 900 Sink w/ GD 1.0 ea 950.00 950 Plumbing fixtures incl, rough -in: 40.0 ea 435.00 17,400 Portable Air Compressor w/ separator & controls Allow 1.0 ea 900.00 900 A/C Unit Condensate Drains w/ P -trap & Pipin 10.0 ea 375.00 3,750 Planter Drains Allow 12.0 ea 300.00 3,600 Roof Drains 14.0 ea 325.00 4,550 Over Flow Roof Drain 14.0 ea 325.00 4,550 Electric EWH-1 Hot water Heater 30 Gal. 1.0 ea900 00 900 WHA's wl Access Panels 18.0 ea 135.001 2,430 APSI Page 5 Date: 1/2/02 Total Quantity CostlUni Diamond Bar Community/Senior Center 100% Design Development Estiamte - Detail 125.00 6.0 ea 300.00 12.0 ea 165.00 \ Description 15.41 Plumbin , bld Hose Bib's FCO's WCO's VTR Kitchen Sfnk wl GD FBO Rou h -in &Conn. Allow Hand Sink CFCf Allow Vegetable Wash Sink w/ GD FBO Rou h -in &Conn. Allow Pot Sink (FI30) Ro h -in & Conn. Cook Sink FBO Rou h -in &Conn. ■ Table Sink FBO Rou h -in &Conn. Allow Floor Sinks CFC( Allow Floor Drains wl TP Conn. Trap Primer wl AP Inderect Waste Conn's and Drain to Floor Sinks Allow Gas Fired HWH 60 al wl Circ Pump &VTR Allow . Domestic Hot Water Tank, Lined & Insulated Allow Water Softener, Dual Tank w! Brine Tank, Complete Allow Water Stations & Ice, Rou han & Conn. Allow Mixin Valve at Trash Area Allow A/G Fuel Oil I Gas 5 stem w/ Tank, Pumps &Controls Allow. 4" 1 ipe & fittin s 3" €NHCI i e & fith'n s 2" NHCI i &fittin s 4" perofrated PVC foundation Drain Splash Blocks for Storm Water Trenchin & backfill 1 112" T pe L Copper 1" Type L Co er ■ 3/4" T pe L Co er 112" T e L Co er Hot water pipin insulation 2" Connection to Gas Co. (Neter & Re ulator 2" Main Gas Pi in Shut off Cock 2" Seismic Shut off Valve Gas Connections to AIC Units & HWH wl SOUS Gas Connections to Boiler wl SOC 2" S 40 BIk Steel Pi 1 1/2" SAO Blk Steel Pipe 1" <: S-40 Blk Steel Pipe Plbg sys test & Inspections C & H Water Pi ing S em Flush /Chemical Treat Plb s identi / to s P[ s s fire sto s netrations Plb s s seismic control PI mise items Plb s s clean -u Plbg sys hauling & dumping debris APSI t Date: 1/2/02 Total Quantity CostlUni 8.0 ea 125.00 6.0 ea 300.00 12.0 ea 165.00 4.0 ea 1.0 ea 1.0 ea 1.0 ea 1.0 ea 1.0 ea 1.0 ea 4.0 ea 6.0 ea 5.0 ea 3.0 ea 1.0 ea 1.0 ea 1.0 ea 3.0 ea 1.0 ea 1.0 ea 800.0 ea 120.0 ea 500_ _ _ _O ea 760.0 ea 14.0 ea 420.0 ea 200.0 ea 100,008 260.0 ea 300.0 ea 360.0 ea 200.0 ea 1.0 ea 1.0 ea 1.0 ea 10.0 ea 1.0 ea 240.0 ea 100.0 ea 160.0 ea 1.0 ea 1.0 ea 1.0 ea 1.0 ea 1.0 ea 500.0 sf 1.0 ea 1.0 ea E 40.00 400.00 275.00 150.00 200.00 900.00 22.00 8.00 35.00 8_00 30.00 22.00 20.00 16.00 250.00 18.00 16.00 600.00 600.00 250.00 1,000.00 1,500.00 025 1.500.00 1,80a 1,980 40 1.600 490 300 600 250 1,000 1,500 5,625 1,500 600 Page 6 Diamond Bar Community/Senior Center Date: 1/2/02 100% Desiqn Development Estiamte - Detail Description Quantity Total Cost/Unit Total ArrQMjLt 15.41 Plumbing, bldg Gas Ran a rou h -in & Conn. Allow 2.0 ea 200.00 400 15.41 P1qMk!9gj_Wdk 22,585.0 sf 8.80 98,680 15.72 HVAC AC -1 Pkg. Multizone AIC Unit, 70.0 TIC w/ Filters & Trim 1.0 ea 92,000.00 92,000 AC -2 Pkg. Gas 1 Elec AIC Unit, 3.0 TIC wl Filers & Trim 1.0 ea 3,750.00 3750 AC -3, 5, 6, 8 & 9 5.0 ea 3,750.001 18,750 AC -4 Pkg. Gas I Elec Alt Units 5.0 TIC wf Filters & Trim 1.0 ea 6,25Q.00 6,250 AC -7 Pkg. Gas 1 Elec AIC Units 6.0 TIC wl Filters & Trim 1.0 ea 1 7,500.00 7,500 AC -10 P .Gas 1 EIec.A1C Unit, 4.0 TIC wI Filters &Trim 1.0 ea 5,000.00 5,000 B-1 Boiler, Gas Fired wl Flue &Trim 30 HP 1.0 ea 16,000.00 16,000 HHW Pump wl Valves, Flex Conn's & Trim 100 m's 1.0 ea 3,600.00 3,600 ...Expansion Tank wl Support, Valves & Trim 14 gaJ 1.0 ea 800.00 800 VAV-1 & 2, 5,000 cfm's 2,0 ea 3,750.00 7,500 VAV-3, 4, 6, 7 & 8 2,000 cfm's 5.0 ea 1,500.00 71500 VAV-5 3,500 cfm's 1 0 ea 2,625.00 2,625 EF -1 -1,600 cfm's 1.0 ea 640.00 640 EF -2, 1,200 cfm's 1.0 ea 560.00 560 EF -3 & 5, 900 drn's 2.0 ea 520.00 1,040 EF -4 & 6, 150 cfm's 2.0 ea 180.00 360 EF -7, 1,000 cfm's 1.0 ea 700,00 700 Linear Diffusers & Lined Plenum 5'0" Sections 52.0 If 320.00 16,640 SA diffusers 56.0 ea 140.00 7,840 RA registers 32.0 ea 120.00 3,840 Exhaust gFilleS 16.0 ea 90.00 1,440 Boot boxes 86.0 ea 65.00 5,590 Volume dampers su I & return air 118.0 ea 120.00 14,160 Flex duct 860.0 If 12.00 10,320 Galvanized sm duct 19,600.0 Ib 5.60 109,760 Duotlinin 1,200.0 sf 2.60 3,120 Duct insulation 9,000.0 sf 3.00 27,000 Smoke /Fire dam ers 12.0 ea 180.00 2,160 Smoke Detectors, Duct Mounted 10.0 ea 325.00 3,250 HHW Re -Heat Coil Conn's Face Pipin wl2 wa control valves &Trim 8.0 ea 500.00 4,000 1" <: Heatin Hot Water Pi ing, T pe L Cu wl Insulation Allow 400.0 If 22.00 8,800 Electronic Controls, T -Stats, Rela sl Transmitters I Zone 88.0 ea 250.00 22,000 HVAC Start-up Test I Balance 136.0 ea 65.00 8,840 Seismic control Equip. Ductwork & Piping 1.01S 6,000.00 6,000 HVAC fire sto Penetrations 1 A Is 2,000.00 2,000 HVAC identify 1.0 Is 600.00 600 HVAC mist items 22,500.0 sf 0.25 5,625 HVAC clean u 1.01S 2,500.00 2,500 15.72 HVAC 22,585.0 sf 19.49 440,0601 16.41 Electrical "MSB" 1,200 Amp Main Switch Board 2771480 V 1.0 ea 8,000.00 8,000 1.201OAmp Meter & Main Breaker 1.0 ea 1,200.001 1,200 1,20OAmp Distribution Section 1,0 ea 4,$00.00 4,800 500 A 1400 A / 150 Main Breakers 3.0 ea 2,200.00 6,600 APSI Page 7 Diamond Bar Community/Senior Center 100% Desiqn Development Estiamte - Detail Date: 1 /2102 Dgwription Quantity Total Dost/Unit Total Am ount 16.41 Electrical Main Ground Fault Protector 1,200 Amp's 1.0 ea 5,000.001 5,000 Bld Ground 314" Conduit w1310 CU WirE to Wtr. Pipe 1.0 ea 400.00 400 "TBB" Main Tele hone Backboard 1.0 ea 300.00 300 "TI" 150 KVATransformer 1,0 ea 5,000.00 51000 Childrens Outside Play Yard Li htin & Outlets Allow 1.0 ea 4,000.00 4,000 GRS Conduits, PVC Ductbanks, Conc. Encased AllowL 200.0 If 12.00 2,400 Feeders & Wire, Pull & Terminate Allaw 800.0 If 3.00 2,400 6QOAmp distribution Board 120l208V116 Circuts wI Breakders 1.0 ea 4,600.00 4,600 Main Switch Panel Board 60OA277/408 -16 Br's 1.0 ea 3,200.00 3,200 "DP" Panel Boards - 400A 2081120-16 Br's Nema 313 1.0 ea 3,200.00 3,200 "HA" Panel Board - 225A 2081120 42 Br's Nema 3R 1.0 ea 2,600.00 2,600 "LC" Panel Board 2771408 42 Br's 2.0 ea 2,800.00 5,600 "LA" Panel Board 2771408 42 B?s 1.0 ea 2,800.00 2,800 "LB" Panel Board 2771408 42 Br's 1.0 ea 2,800.00 2,800 Dimmer Control Panel Allow 1.0 ea 7,500.00 7,500 Clock Control Panel 1.0 ea 2,400.00 2,400 Li htin control s stem 1.0 Is 10,000.00 10,000 4" UIG Conduits w1 Conc, Trench & Backfill 420.0 ea 16.00 6,720 3" UIG Conduits w/ Conc, Trench & Backfill 70.0 ea 12.00 840 1 112" U/G Conduits w/ Conc, Trench & Backfill 420.0 If 10.00 4,200 500 KCMILw/# 110 qr. Wire 360.0 If 3.12 1,123 #2 Wire wl # 8 r. 2,240.0 If 2.60 5,824 Termination's & Rin -out 256.0 ea 16.00 3,840 AIC -1 Unit Power w/ Starters & Disc. Switches 1.0 ea 1,200.00 1,200 HVAC Equipment DCS & Connections 17.0 ea 450.00 7,650 HVAC Zone VAV's w/ Connections 8.0 ea 200.00 1,600 Plumbing Equipment HWH's I Pumps I DF's wl DS's & Outlets 4.0 ea 400.00 1,600 Electrical Rela s 2.0 ea 13o.00l 260 Fire Alarm Panel & Ann 1.0 ea 250.00 250 GFI Breaker Outlets 4.0 ea 120.00 480 Duplex Rece tacles w/Wall Boxes & Connectors 22,500.0 sf 0.30 6,750 110 V Outleis Plu w! Ground &Plate 22,500.0 sf 0.20 4,500 J -Boxes & RTERs-_ 22,500.0 sf 0.35 7,875 Conduit w/ s 22,500.0 sf 1.25 28,125 Wire # 12 & 14 w/ Termination's 22,500.0 sf 0.50 11,250 Electrical Power Seismic Control 22,500.0 sf 0.25 5,625 Electrical Power Fire Stop Penetrations 22,500.0 sf 0.20 4,500 BIdq Ground 314" Conduit w/ 2/0 CU Wire to Structure 1.0 ea 50D,00 500 Panel Boards B-1, S-1, 2 & 3, 100A 1201208 w/ 42 Br's 1.0 ea 2,800.00 2,800 Kitchen Equipment, Hoods, Fans, GD'S & Refri .Allow 7.0 ea 650.00 4,550 20 Amp Outlets Incl. GIF Receptacles w/ Back Boxes 14.0 ea 54.00 756 120 V Outlets at Kitchen Equipment 16.0 ea 30,00 480 Conduit, Fittings, J Boxes & Supports 9,400.0 sf 4.00 5,600 #12 & # 14 Wire 1,400.0 sf 1.25 1,750 Circuits & Termination's 46.0 ea 25,00 1,150 TeM ination's &Rin -0ut 1.0 Is 1,800.00; 1,800 A Cellin 2 x 4' Fluorescent 2 lamps Allow 116.0 ea 266.00 30,856 B Cellin 4 x 4' Fluorescent 2 lamps AIIowL����� 112.0 ea 300.00 33,600 APSI Page 8 Diamond Bar CommunitylSenior Center 100% Desian Development Estiamte - Detail Date:1 !2102 Description Quantity Total Cos nit To Annount tal 16.41 Electrical B 1 Fluorescent Dawn Li tits 2 lam s 56.0 ee 320.00 17,920 C- Fixtures Tx 4' Troffers 10.0 ea 300.00 3,000 D -Fixtures Fluorescent 1 lam 8.0 ea 180.00 1,440 F- Fixture 1' x 4' Fluorescent 2 lam s 7.0 ee 320.00 2,240 G- Wall Pack 1.0 ea 450.00 450 E- Exit Li tits 28.0 ea 560.00 15,680 Inserts wl Unistrut Incl. Clams B & N's 180.0 If 14.00 2,520 Back Boxes 256.0 ea 6.00 1,536 J -Boxes wl Fittin s 46.0 ea 42.00 1,932 Li ht Switches &Cover Plate 52.0 ea 45.00 2,340 Fixture Whi s 256.0 ea 25.00 6,400 Condu t w! Couplin s 22,500.0 sf 0.60 13,500 Wire -# 14 WI Termination's 22,500.0 sf 0,301 6,750 Photocells Li titin and Time Clocks 4,0 ea 250.00 1,000 Individual Bane Backu at Fixtures 28.0 ea 125.001 3,500 Li titin stem Seismic Control 22,500.0 sf 0,201 4,500 Li titin Fire Stop Penetrations 22,500.0 sf 0.10 2,250 Kitchenlstora a Ii ht fitures 40.0 ea 266.00 10,640 16.41 Electrical 22,585.0 sf 16.40 370,452 16.50 Telephone Tele hone Backboard 2.0 ea 250.00 500 Back Boxes 46.0 ea 5.00 230 Wall Outlets 46.0 ea 18.00 828 2" Conduit CA To Stree &Gable Allow 260.0 If 8.00 2,080 Tele 1 Data Conduit & Cable 46.0 ea 160.00 7,360 Coaxial Terminabon's & Connections 92.0 ea 20.00 1,840 112" C w/ 1 # 6 Ground at Backboards 2.0 ea 275.00 550 16.50 Tele hone 22 585.0 sf 0.59 13,3881 16.70 Fire Alarm Flre Alarm Annunciator Panel 1 Fan Shut Down and Supervision 1.0 ea 51000.00 57000 Monitor Interface Module 4.0 ea 500.00 2,000 Manual Pull Station 5.0 ea 130.00 650 Heat Detector 1.0 ea 135.00 135 Ceiling Smoke Detectors 18.0 ea 120.00 2,160 Duct Smoke Detectors 2.0 ea 400.00 800 Audible Alarm Horn 1 Strobe 10.0 ea 140.00 1,400 Audible A[arm Strobe 15.0 ea 180.00 2,700 Fire Fi titer Telephone Outlet 1.0 ea 220.00 220 Conduit wl Couplings 1.0 Is 3,400.00 3,400 Wire w/ Termination's 1.0 Is 4,800.00 4,800 16.70 Fire Alarm 22,585.0 sf 1.03 _23,265 10. Building 22,585.0 sf 160.19 3,617,865 Estimate Totals 3,617,864 3,617,864 APSI Page 9 MM Diamond Bar Community/Senior Center Date: 1/2/02 100% Design Development Estiamte - Detail Estimate Totals General Conditions 253,250a 7.000 /o Contengency - Design/Construct 542,680 15.000% Escalation to mid point 176,552 4.000% Bonds insurance 54,268 1.500% 1,026,750 4,644,614 Overhead & profit 278,677 6.000% i 278,677 4,923,291 Total 4,923,291 217.989 /sf r APSI MM ■ ■ w Analytical Planning Services, Inc. . Preliminary Cost Estimate for Budgeting Purposes w Project Name: Diamond Bar Community Center Gross Acreage: 11.000 Location: Diamond Bar, CA Clearing Acreage: 11.000 Product Type: Commericai Minimum Lot Size 0 ■ 11 Density (Unit IAcr 484000.00 DESCRIPTION TOTALS w TOTA SITE PREPARATION $85,250 w TOTA GRADING $1,093,730 w TOTA SLOPE & EROSION CONTROL $96,701 TOTA SANITARY SEWERS $55,708 • TOTA STORM DRAINAGE $121,017 ■ TOTA WATER DISTRIBUTION $234,016 ■ TOTA ROADWAY IMPROVEMENTS $374,401 TOTA UTILITIES $448,525 w TOTA AMENITIES & SPECIAL CONSTRUCTION $208,574 ■ TOTA MAINTENANCE -EXCLUDED $0 w TOTA CONSULTANT FEES & SERVICE - EXCLUDED $0 TOTA PERMITS, FEES, BONDS - EXCLUDED $0 w TOTA MISCELLANEOUS $0 w TOTA ACCESS ROAD $311,728 ■ TOTA LANDSCAPINGIHARDSCAPING $1,544,955 SUB TOTAL W110°/ CONTINGENCY $4,574,605 w GENERAL CONDITIONS 7.45% $340,779 w ESCALATION TO MID POINT 4.00% $196,615 BONDSIINSURANCE 11.50% $76,680 ■ SUB TOTAL $5,188,680 w OVERHEAD & PROFIT 6.00% $311,321 w GRAND TOTAL. $5,560,000 ■ ■ ■ w w ■ w wPrepared by: Analytical Planning Services, Inc. (949) 7075956 W.O. DaCCSite R3xls wPage 1 of20 01111/02 3:57 PM Analytical Planning Services, Inc. Preliminary Cost Estimate for Budgeting Purposes SUB -TOTAL SITE PREPARATION 10 %CONTINGENCY TOTAL SITE PREPARATION Prepared by: Analytical Planning Services, Inc. (949)707-5S56 W.O. DBOCSite R3.xls Page 2 of 20 .11.1-- $7,750.00 1 -$7,750.00 $85,250,00 01/11/02 3:57 PM Gross Acreage: 11.000 Project Name: Diamond Bar Community Center Clearing Acreage: 11.000 Location: Diamond Bar, CA Minimum Lot Size 0 Product Type: Commerical Density (Unit IAcr 484000.00 11 QUANTITY UNIT PRICE AMOUNT 1. SITE PREPARATION 11.00 AC $2,500.00 $27,500.00 CLFARING & GRUBBING 0 SF $0.00 $0.00 SITE PREP. PER SOILS REPORT 1 AL $50,ODO.00 $50,000.00 DEMOLITION EMOVAL 0 LF $0.00 $0.00 CONCRETE DRAIN 0 LF $0.00 $0.00 FENCES 0 LF $0.00 $0.00 WATER LINE 0 SF $0.00 $0.00 PAVEMENT -ASPHALT D SF $0.00 $0.04 SIDEWALK 0 SF $0.00 $0.00 BUILDING 0 EA $0.00 $0.00 TREES 0 AC $0.00 $0.00 SPEC. TRBAT. CROPS 0 AC $0.00 $0.00 ORCHARDS R ELO CATI ONIRFST DRAT I ON 0 LF $4.00 $0.00 WATER LINE 0 EA $0.00 $0.00 POWER POLES 0 LF $0.00 $0.00 GAS 0 LF $0.00 $0.00 TELEPHONE (BY OTHERS) LF $0.00 $0.00 SANITARY SEWERS (SLURRY FILL) 0 $0.00 WATER MAINS 0 0 LF $0.00 LF $0.00 $0.00 FENCING 0 SF $0.00 $0 .00 COMMON ACCESS ROADS LF $0.00 $0.00 IRRIGATION 0 0 LF $0.00 $0.00 DRAINAGE FACILITIES 0 SF $0.00 $0.0C SLOPES SUB -TOTAL SITE PREPARATION 10 %CONTINGENCY TOTAL SITE PREPARATION Prepared by: Analytical Planning Services, Inc. (949)707-5S56 W.O. DBOCSite R3.xls Page 2 of 20 .11.1-- $7,750.00 1 -$7,750.00 $85,250,00 01/11/02 3:57 PM Analytical Planning Services, Inc. Preliminary Cost Estimate for Budgeting Purposes Project Name: Diamond Bar Community Center Gross Acreage: 11.000 Location: Diamond Bar, CA Clearing Acreage: 11.000 Product Type: Commerical Minimum Lot Size 0 11 Density (Unit /Acr 464000.00 2. GRADING QUANTITY UNIT PRICE AMOUNT MASS EXCAVATION 54,000 CY $1.50 $81,000.00 BUILDING PAD OVEREXCAVATION 7,200 CY $1.50 $10,800.00 ALLUVIUM /ARTIFICIAL FILL 0 CY $0.00 $0.00 STREET & PARKING LOT OXEREX. 9,800 CY $1.50 $14,700.00 FILL KEY & DAYLIGHT SHEAR KEY 143,805 CY $3.25 $467,366.25 STRIPPING (TOP SOIL) 0 CY $0.00 $0.00 LANDSLIDE REMOVAL & COMP 143,805 CY $1.50 $215,707.50 IMPORT 14,000 CY $5.00 $70,000.00 EXPORT 0 CY $0.00 $0.00 FILL KEY 0 CY $0.00 $0.00 SHEAR KEY 0 CY $0.00 $0.00 6" CANYON SUBDRAIN 0 LF $0.00 $0.00 8" CANYON SUBDRAIN 0 LF $0.00 $0.00 PERFORATED PIPE 1,700 LF $20.00 $34,000.00 SOLID OUTLET PIPE 200 LF $15.00 $3,000.00 BORING 0 LF $0.00 $0.00 CUT GRADE CURB & GUTTER 8,772 LF $3.00 $26,316.00 SLOPE FINISH 82,000 SF $0.15 $12,300.00 LOT FINISH &ACCEPTANCE 431,104 SF $0.10 $43,110.40 ROUGH LOT PULLS 2 EA $1,000.00 $2,000.00 HOUSE RETAINING WALL 0 SF $0.00 $0.00 LOFFEL WALL 0 LF $0.00 $0.00 CONSTRUCTION WATER 1 LS $4,000.00 $4,000.00 MOBILIZATION 1 LS $10,000.00 $10,000.00 SUB -TOTAL GRADING 10 % CONTINGENCY TOTAL GRADING Prepared by: Analytical Planning Services, Inc. (949) 707-5956 W.O. DBCCSite R&As Page 3 of 20 $99,430.02 $1,093,730.17 01111!02 3:67 PM Analytical Planning Services, Inc. Preliminary Cost Estimate for Budgeting Purposes Project Name: Diamond Bar Community Center Gross Acreage: 11.000 Location: Diamond Bar, CA Clearing Acreage: 11.000 Product Type: Commerical Minimum Lot Size 0 11 Density (Unit /Acr 484000.00 3. SLOPE & EROSION CONTROL QUANTITY UNIT PRICE AMOUNT TERRACE DRAIN 1,250 LF $18.00 $22,500.00 BENCH DRAIN 0 LF $0.00 $0.00 DOWN DRAIN 402 LF $35.00 $14,070.00 UTILITY"V"DITCH 1,120 LF $12.00 $13,440.00 TOE DRAIN @ RET. WALL 0 LF $0.00 $0.00 INTERCEPTOR DRAIN 0 4F $0.00 $0.00 4" PVC DRAIN PIPE 400 LF $7.50 $3,000.00 8" PVC DRAIN PIPE 0 LF $0.00 $0.00 12" PVC DRAIN PIPE 0 LF $0.00 $0.00 "PIPE 0 LF $0.00 $0.00 AREA DRAIN 0 EA $0.00 $0.00 CURB CORE 0 EA $0.00 $0.00 DOWN DRAIN INLET 0 EA $0.00 $0.00 DOWN DRAIN TO PIPE TRANS. 0 EA $0.00 $0.00 $0.00 SPLASH WALL 180 LF $55.00 $9,900.00 SAND BAGGING 1 LS $25,000.00 $25,000.00 $0.00 $0.00 $0.0 $0.00 SUS -TOTAL SLOPE & EROSION CONTROL $87,910.00 10 % CONTINGENCY $8,791.00 TOTAL SLOPE & EROSION CONTROL $96,701.00 Prepared by: Analytical Planning Services, Inc. (949)707-5956 W.O. DBCCSite R3.xN Page 4 of 20 01!? 7'102 3:57 PPA Analytical Planning Services, Inc. Preliminary Cost Estimate for Budgeting Purposes Project Name: Diamond Bar Community Center Gross Acreage, 11.000 Location: Diamond Bar, CA Clearing Acreage: 11.000 Product Type, Commerical Minimum Lot Size 0 11 Density (Una/Acr 484000.00 . 4. SANITARYSEWERS QUANTITY UNIT PRICE AMOUNT 8" (E) Sewer Conn In Street, RIR Asphalt & Traffic Control 1.00 EA $ 6,500.00 $6,500.00 8"x 4" Sewer Cann, WI 2 way Clean Out & Box 1.00 EA $ 450.00 $450.00 Sewer Man Holes w! Traffic Covers 5.00 EP $ 3,000.00 $15,000.00 8" PVC Building Sewer Line 727.00 LF $ 22.00 $15,994.00 6" PVC Building Sewer Line 159.00 LF $ 20.00 $3,180.00 4" PVC Building Sewer Line 0.00 LF $ 14.00 $0.00 Pot Haling 1 Trenching & Backfill 870.00 LF $ 8.00 $6,960.00 Remove & replace pavement 320 If $8.00 $2,560.00 0 SF $0.00 $0.00 0 EA $0.00 $0.00 0 LF $0.00 $0.00 0 LF $0.00 $0.00 0 LF $0.00 $0.00 0 LF $0.00 $0.00 0 LF $0.00 $0.00 0 EA $0.00 $0.00 0 EA $0.00 $0.00 0 E4 $0.00 $0.00 0 EA $0.00 $0.00 0 EA $0.00 $0.00 0 LS $0.00 $0.00 0 LS $0.00 $0.00 0 LF $0.00 $0.00 0 EA $0.00 $0:00 SUB -TOTAL SANITARY SEWER $50,644.00 10 % CONTINGENCY $5,064.40 TOTAL SANITARY SEWER $55,708.40 Prepared by: Analytical Planning Services, Inc. (949)707-5956 W.O. DECCSIte R3.x1s Page 5 &20 01/11102 3:57 PM 01/11/02 3:57 PM ■ Analytical Planning Services, Inc. Preliminary Cost Estimate for Budgeting purposes ■ Project Name: Diamond Bar Community Center Location: Diamond Bar, CA Gross Acreage: 11.000 ■ Product type: Commerical 11 Clearing Acreage: Minimum 11.000 Lot Size 0 Density (Unit IAcr 484000.00 5. STORM DRAINAGE QUANTITY UNIT PRICE AMOUNT Stormdrain Man Holes ■ Area Drains 1 EA $ 3,000.00 $3,000.00 Catch Basins 0 EA $ 350.00 $0.00 ■ Dissapator/Riprap 3 EA $ 675.00 $2,025.00 4" UAG Storm Water Conn. W/ CO's & Box at Bldg. 0 EA $ 51000.00 $0.00 ■ 5' x 15' Inlet Structures 0 EA $ 300.00 $0.00 3 EA $ 5,500.00 $16,500.00 42 x 66" 0 EA $ - $0.00 ■ 60" RCP 0 EA $ 11800.00 $0.00 54" RCP 0 LF $ 128.00 $0.00 ■ 48" RCP 0 LP $ 118,00 $0.00 42" RCP 0 LF $ 108.00 $0.00 ■ 24" RCP 0 LF $ 88.00 $0.00 8"RCP 440 LF $ 48.00 $21,120.00 ■ 4" PVC 0 LF 363 $ 14.00 $0,00 Trenching, Shoring & Backfill LF $ 10.00 $3,630.00 ■ Anchors 440 LF Engery dissipators 38 EA $ 8.00 $3520.00 $500.00 $19,000.00 2 EA $15,000.00 $30,000.00 ■ 0 EA $0.00 $0,00 D EA $0.00 $0.00 ■ 0 CF $0.00 $o.Da o � $0.00 $0.00 0 EA $0.00 $0.00 ■ 0 EA $0.00 $0.00 0 EA $0.00 $0.00 ■ 0 EA $0.06 $0.00 0 EA $0.00 $0.00 ■ 0 EP. $0.00 $0.00 0 EA $0.00 $0.00 SUB -TOTAL STORM DRAINAGE (Pg. 7) $98,795.00 Note: These quantities are based on a preliminary storm drain design which was calculated without ■ the availability of a hydrolcgy study. Since pipe djameter is teased on rates Of grade and area of drainage these quantities are subject to change when a hydrot❑gy study is provided. These ■ quantities and this budget is for rough Preliminary budgeting purposes only. Itis highly recommended that a hydrology study be prepared as soon as possible. 3 CFS per acre was used tc estimate the capacity of the system. i f M ' Prepared by: Analytical Planning Services, Inc. (949) 7075956 W.O. pBCCSite R3.xls Page 6 of 20 01/11/02 3:57 PM Analytical Planning Services, Inc. Preliminary Cost Estimate for Budgeting Purposes Project Name: Diamond Bar Community Center Location: Diamond Bar, CA P Product Type: Cummer cal Gross Acreage: 11.0O0 Clearing Acreage_ 11.000 11 Minimum Lot Size 0 5. STOR(Continued) M DRAINAGE Density (Unit /Acr 484000.00 QUANTITY UNIT PRICE AMOUNT DROP STRUCTURES SPECIAL BACKFILL OR COMP. 0 EA $0.00 RIP RAP 0 LF $0.00 $0.00 $0.00 SAWCUT &REMOVE EX. C&G, AC 561 SF $20.00 $11,220.00 REMOVE & REPLACE PVMT. 0 LF $0.00 ADJUST MH TO GRADE 0 SF $0.00 $0.00 BRICK & MORTAR PLUG 0 EA $0.00 $0.00 INCLUDED W! ROADS BREAK INTO & JOIN S.D. 0 EA $0.00 0 EA $0.00 $0.00 $0.00 SUB -TOTAL STORM DRAINAGE (THIS PAGE) SUB -TOTAL STORM DRAINAGE (LAST PAGE $11,220.00 & THIS PAGE) 10 % CONTINGENCY $110,015.00 TOTAL STORM DRAINAGE $11,001.50 $121,016.50 Prepared by: Analytical Planning Services, Inc. (949) 707-5956 W.O. DOCCSite RS.xls Page 7 of 2a FINI Analytical Planning Services, Inc. Preliminary Cost Estimate for Budgeting Purposes Project Name: Diamond Bar Community Center Gross Acreage: 11.000 Location: Diamond Bar, CA 10" HOT TAP, RIR ASPHALT AT STREET CONN W/ EX 1.00 Clearing Acreage: 11.000 Product Type: Commerical $5,600.00 8" DOUBLE DETECTOR CHECK VALVE ASSEMBLY W/ SOV'S Minimum Lot Size 0 11 10,000.00 $20,000.00 Density (Unit /Acr 484000.00 6, WATER DISTRIBUTION QUANTITY 750.00 UNIT PRICE AMOUNT 2.00 EA $ 600.00 $1,200.00 DOMESTIC WATER 2.00 EA $ 1,200.00 $2,400.00 4" DUCTILE IRON FIRE LINE W1 FLANGE FOR RISER 1096.00 LF $ 6" RPBFPWI SOWS 1,00 EA $ 7,600.00 $7,600.00 3" PRV-1 PRIES REGULATOR VALVE W1 BY-PASS & SOWS 1.00 EA $ 3,200.00 $3,200.00 1 1/2" FREE STANDING HOSE BIBB W/ VB, TRUCK FILL 1.00 EA $ 600.00 $600.00 WALL HYDRENTS 4.00 EA $ 250.00 $1,000.00 12" PVC PIPE & FITTINGS 1875.00 LF $ 48.00 $90,000.00 4" PVC PIPE & FITTINGS 903.00 LF $ 18.00 $16,254.00 6" PVC PIPE & FITTINGS 0.00 LF $ 22.00 $0.00 2" TYPE K COPPER 0.00 LF $ 24.00 $0.00 TRENCHING & BACKFILL 2778.00 LF $ 8.00 $22,224.00 FIRE PROTECTION 10" HOT TAP, RIR ASPHALT AT STREET CONN W/ EX 1.00 EA $ 5,600.00 $5,600.00 8" DOUBLE DETECTOR CHECK VALVE ASSEMBLY W/ SOV'S 2.00 EA $ 10,000.00 $20,000.00 POST INDICATOR VALVE Wl TAMPER SWITCH 2.00 EA $ 750.00 $1,500.00 2 WAY FIRE DEPT. CONNECTION WI CHECK VALVE 2.00 EA $ 600.00 $1,200.00 6" FIRE HYDRANTS W/ BERRY FITTINGS & SOV 2.00 EA $ 1,200.00 $2,400.00 4" DUCTILE IRON FIRE LINE W1 FLANGE FOR RISER 1096.00 LF $ 26.00 $28,496.00 10" PVC WTR. MAINS 0.00 LF $ 12.00 $0.00 8" PVC WTR. MAINS 0.00 LF $ 10.00 $0.00 6" PVC FIRE MAINLINE 0.00 LF $ 8.00 $0.00 AIR/ VACUUM RELEASE W/ VALVE BOX 3.00 EA $ 460.00 $1,380.00 CONC ANCHORS & THRUST BLOCKS 8.00 EA $ 250.00 $2,000.00 TRENCHING & BACKFILL 1096.00 LF $ 8.00 $8,768.00 2" IRRIGATION WATER TEE W/ SOV 2.00 EA $ 260.00 $520.00 " PIPE 0 LF $0.00 $0.00 SUB -TOTAL WATER DISTRIBUTION $212,742.00 10 % CONTINGENCY $21,274.20 TOTAL WATER DISTRIBUTION $234,016,20 Prepared by: Analytical Planning Services, Inc. (949)707-5956 W.O. DBCCSi e R3.xL Page 8 of 20 01111/02 3:57 PM 01 it 1102 3:57 P?vl Analytical Planning Services, Inc. Preliminary Cost Estimate for Budgeting Purposes Project Name: Diamond Bar Community Center Gross Acreage: 11.000 Location: Diamond Bar, CA Clearing Acreage: 11.000 Product Type: Commerical Minimum Lot Size 0 11 Density (Unit /Acr 484000.00 7. REMOVE & REPLACE CURB 0 LF $0.00 $0.00 6" CURB & GUTTER 2,882 LF $11.88 $34,238.16 8" CURB & GUTTER 0 LF $0.00 $0.00 6" CURB ONLY 4,914 LF $8.8) $42,702.66 0" CURB ONLY 0 LF $0.00 $0.00 MOW STRIP @ METER BOXES TO " CURB & 10 EA $75.00 $750.00 GTR. TRANS. 0 LF $0.00 $0.00 "TO " CURB ONLY TRANS. 0 LF $0.00 $0.00 SIDEWALK, COLLORED 0 $F $0.00 $0.00 DRIVEWAY APRONS 0 SF $0.00 $0.00 CONCRETE CROSSGUTTER 0 SF $0.00 $0.00 COMMON ACCESS DRIVEWAY 0 SF $0.00 $0.00 REDWOOD HEADER BASE UNDER 0 LF $0.00 $0.00 SIDEWALK 0 SF $0.00 $0.00 BASE UNDER CURB & GTR. 0 LF $0.00 $0.00 BASE UNDER ROADWAY 0 SF $0.00 $0.00 LOCAL DEPRESSIONS 0 EA $0.00 $0.00 . CONCRETE APRON 0 SF $0.00 $0,00 ALLEY GUTTER - W =3' 0 LF $0.00 $0.00 a) 3" ACI 6" AB 137,986 SF $1.60 $220,777.60 a) VARIABLE AC OVERLAY 0 SF $0.00 $0.00 . 4" AC! 12" AB SUBGRADE PREPARATION 0 SF $0.00 $0.00 137,986 SF $0.15 $20,697.90 PAVEMENT STRIPING 137,986 SF $0.10 $13,798.60 ■ ysv�DE) $0.00 $0.00 ■ $0.00 $0.00 $0.00 SUB -TOTAL ROADWAY IMPROVEMENTS (THIS PAGE) $332,964.92 a) This is an assumed section. Acfual thickness to be determined by a soifs engineer ' ■ ■ Prepared by: Analytical Planning Services, Inc. (949) 707-5956 W.O. DBCCSite R3-xls . Page 9 o'r 23 01 it 1102 3:57 P?vl ■ Analytical Planning Services, Inc. ■ Preliminary Cost Estimate for Budgeting Purposes Project Name: Diamond Bar Community Center Location: Diamond Bar, CA Gross Acreage: 91.000 Product Type: Commerical Clearing Acreage: 11.000 11 Minimum Lot Size 0 Density (Unit /Acr 484000.00 7. ROADWAY IMPROVEMENTS (Continued) QUANTITY UNIT PRICE AMOUNT STAMPED CONCRETE ■ ADJUST MH TO GRADE 0 SF $0.00 $0.00 ADJUST VALVE TO GRADE 0 EA $0.00 $0.00 SPECIAL CONCRETE 0 EA $0.00 $0.00 MATCH TO EX. PAVEMENT 0 SF $0.00 $0.00 FEATHER AC 0 EA $0.00 $0.00 STREET NAME SIGN W/ BASE 0 LF $0.00 $0.00 ADVANCE ST. SIGN W/BASE 0 EA $0.00 $0.00 WARNING SIGN WBASE 0 EA $0.00 $0.00 REFLECTORS (RPM) 0 EA $0.00 $0.00 GUARD RAIL 0 EA $0.00 $0,00 BARRICADE W/REFLECTORS 1 LS $5,000.00 $5,000.00 REMOVE BARRICADE 0 LF $0.00 $0.00 SURVEY MONUMENTS 0 LF $0.00 $0.00 SAWCUT $ REMOVE EX. C$G, SW, AC 0 FA $0.00 $0.00 STREET TREES 0 LF $0.00 $0.00 FIRE STRIPING 0 EA $0.00 $0.00 STRIPING 0 LF $0.00 $000 PARKWAY CULVERT 0 LF $0.00 $0.00 THRU CURB DRAIN 0 FA $0.00 $0.00 PARKWAY DRAIN 0 EA $0.00 ■ ACCESS RAMPS 0 6 EA EA $0.00 $0.00 $400.00 $2,400.00 SUB -TOTAL ROADWAY IMPROVEMENTS (THIS PAGE) $7,400.00 SUB -TOTAL ROADWAY IMPROVEMENTS (LAST PAGE & THIS PAGE) 10 Vo CONTINGENCY $340,364.92 $34,035,49 TOTALROADWgyIMPROVEMENTS $374,401.41 ■ ■ ■ r ■ ■ ■ ■ ■ Prepared by: Analytical Planning Services, Inc. (949) 7075956 W,O. 06CMIte R3.xk Page 10 of 20 01/11/02 3:57 PM r r Analytical Planning Services, Inc. Preliminary Cost Estimate for Budgeting Purposes Project Name: Diamond Bar Community Center Grass Acreage: 11.000 Location: Diamond Bar, CA Clearing Acreage: 11.000 Product Type: Commerical Minimum Lot Size 0 11 Density (Unit /AGr 484000.00 8. DRY UTILITIES QUANTITY UNITPRICE AMOUNT . UNDERGROUND POWER $0.00 PRIMARY CONDUIT (NO CONDUCTORS) 1,383 LF $60.00 $82,960.00 PRIMARY STREETWORK & CONN 1 LS $30,000.60 $30,000.00 ELECT/PHONE VAULTS 4 EA $5,000.00 $20,000.04 TRENCHING ONLY 0 LF $0.00 $0.00 CONDUITS 0 LF $0.00 $0.00 JOINTTRENCHING 0 LF $0.00 $0.00 STREET LIGHTS 25 EA $3,000.00 $75,000.00 CONDUCTORS 0 EA $0.00 $0.00 POLE & SINGLE LUMINARIA 0 EA $0.00 $0.00 ■ POLE & DOUBLE LUMINARIA 0 EA $0.00 $0.00 ENERGY CHARGES 0 MO $0.00 $0.00 CABLE TV 948 LF $15.00 $14,220.00 TELEPHONE CONDUIT (NO WIRING) 1,383 LS $50.00 $69,150.00 TELEPHONE STREETWORK & CONN 1 LS $25,000.00 $25,000.00 GAS 1,300 LF $18.00 $23,400.00 GAS STREETWORK & CONN 1 LS $25,000.00 $25,000.00 CABLE TV STREETWORK & CONN 1 LS $40,000.00 $40,000.00 CABLE TV VAULT 1 LS $3,000.00 $3,000.00 SUB -TOTAL UTILITIES $407,750.00 10 % CONTINGENCY $40,775.00 TOTAL DRY UTILITIES $448,525.00 r r r r ■ ■ ■ ■ ■ r r rPrepared by: Analytical Planning Services, Inc- na(949) (949)707-5956 W_0. DBCCSife R3.xls aPage 11 of 20 01111102 3:57 PM 01111!02 3:57 PM ■ Analytical Planning Services, Inc. ■ Preliminary Cost Estimate for Budgeting Purposes ■ Project Name: Diamond Bar Community Center Location: Diamond Bar, CA Gross Acreage: 11.000 Product Type: Commerical Clearing Acreage: 11.000 11 Minimum Lot Size 0 Density (Unit /Acr 484000.00 9. AMENITIES 0 -SPECIAL CONSTRUCTION QUANTITY UNIT PRICE AMOUNT CONCRETE STEPS . TRELLISES 486 LF $12.00 $5,832.00 SITE WALL FOOTING 1,500 SF $15.00 $22,500.00 SITE WALL 714 LF $42.00 $29,988.00 WALL CAP 2,043 SF $15.00 $30,645.00 RETAINING WALL (BLOCK) 714 2,980 LF $9.00 $6,426.00 BACKCUTBACKFILL WALLS SF $20.00 $59,600.00 DEEPENED FOOTING- RETAINING WALL 456 CY $5.00 $2,281.48 770 LF $42.00 $32,340.00 SUB -TOTAL AMENITIES & SPEC. CONSTRUCTION 10 % CONTINGENCY $189,612.48 $18,961.25 TOTAL AMENITIES & SPEC. CONSTRUCTION $208,573.73 ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ Prepared by: Analytical Planning Services, Inc nc.(949)707-5956 - (949) 707-5956 W.O. DBCCSite R3.xfs Page 12 of 20 01111!02 3:57 PM Analytical Planning Services, Inc. Preliminary Cost Estimate for Budgeting Purposes Project Name: Diamond Bar Community Center Gross Acreage: 11.000 Location: Diamond Bar, CA Clearing Acreage: 11.000 Product Type: Commerical Minimum Lot Size 0 11 Density(Unit/Acr 484000.00 10. MAINTENANCE QUANTITY UNIT PRICE AMOUNT STREET CLEANING 0 LS $0.00 $0.00 DEBRIS REMOVAL 0 LS $0.00 $0.00 DRAIN PAC INSERTS 0 YR $0.00 $0.00 LANDSCAPE MAINTENANCE 0 LS $0.00 $0.00 SUB -TOTAL MAINTENANCE $0.00 10 °/6 CONTINGENCY $0.00 TOTAL MAINTENANCE $0.00 Prepared by: Analytical Planning Services, Inc. (949)707-5956 W.O. DBccska R&AS Page 13 of 20 Q 1111102 3:57 PM Analytical Planning Services, Inc. Preliminary Cost Estimate for Budgeting Purposes Project Name: Diamond Bar Community Center Location: Diamond Bar, CA Gross Acreage: 11,000 Product Type: Commerical Clearing Acreage: 11.000 11 Minimum Lot Size 0 Density (Unit /Acr 484000.00 11. CONSULTANT FEES & SERVICES QUANTITY UNIT PRICE AMOUNT PRELIMINARY SOILS REPORT FINAL SOILS REPORT 0 LS $0.00 $0.00 TRENCH BACKFILL CONTROL 0 DU $0.00 $0.00 COMPACTION/GRADING CNTRL, 0 LF $0.00 $0.00 PRELIMINARY PLANNING 0 CY $0-00 $0.00 MASTER PLAN 0 LS $0.00 $0.00 CIVIL ENG. & FIELDWORK 0 LS $0.00 $0.00 OTHER CIVIL ENGINEERING 15%0 DU $0.00 $0.00 TOPOGRAPHIC SURVEY 0 LS $0.00 $0.00 AERIAL PHOTOGRAPHY 0 LS $0.00 $0.00 PRELIMINARY STUDIES 0 LS $0.00 $0.00 TENTATIVE MAP 0 LS $0.00 $0.00 SPECIAL STUDIES 0 LS $0.00 $0.00 A.L.T.A. SURVEY 0 LS $0.00 $0.00 MISCELLANEOUS 0 LS $0.00 $0.00 ENVIRONMENTAL IMPACT 0 LS $0.00 $0.00 HYDROLOGIST-NPDES 0 LS $0.00 $000 ARCHEO/PALEONTOLOG)ST 0 LS $0.00 $0.00 LANDSCAPE ARCHITECT 0 LS $0.00 $0.00 UTILITY CONSULTANT 0 LS $0.00 $0.00 ACOUSTICAL STUDY 0 LS $0,00 $0.00 ARCHITECT 0 LS $0.00 $0.00 ATTORNEY 0 LS $0.00 $0.00 BLUEPRINT & DELIVERIES 0 LS $0.00 $0.00 0 LS $0.00 $0.00 SUB -TOTAL CONSULTANT FEES & SERVICES 10 % CONTINGENCY $0.00 $0.00 TOTAL CONSULTANT FEES &SERVICES $0.00 Prepared by: Analytical Planning Services, Inc. (949) 707-5956 W.O. DBCCSite R3.x1s Page 14 of 2D 01/11/02 3:57 PM Analytical Planning Services, Inc. Preliminary Cost Estimate for Budgeting Purposes Project Name' Diamond Bar Community Center Location: Diamond Bar, CA Gross Acreage: 19.000 Product Type: Commerical Clearing Acreage; 11.000 11 Minimum Lot Size 0 Density (Unit /Acr 484000.00 12. PERMITS, FEES, BONDS QUANTITY UNIT PRICE AMOUNT BONDS PERFORMANCE LABOR & MATERIAL 0% LS $0.00 $0.00 WARRANTY 0% LS $0.00 $0.00 MAINTENANCE 0% LS $0.00 $0.00 TAX 0% LS $0.00 $0.00 PERMITS 0% LS $0.00 $0.00 PRE -CHECK DEPOSIT 0% $0.00 GRADING 0% LS $0.00 $0.00 PRECISE GRADING 0% LS $0.00 $0.00 ENCROACHMENT 0% LS $0.00 $0.00 FISH & GAME 0% LS $0.00 $0.00 RETAINING WALLS 0% LS $0.00 $0.00 PLAN CHECK & INSPECTION 0% LS $0-00 $0.00 GRADING (ESTIMATE) 0% $0.00 M.N.W.D SEWER 0% HR $0.00 $0.00 STORM DRAIN 0% LS $0.00 $0.00 STREETS 0% LS $0.00 $0.00 M.N.W.n WATER 0Y LS $0.00 $0.00 PRECISE GRADING 0% LS $0.00 $0.00 RETAINING WALLS 0% HR $0.00 $0.00 MONUMENTATION 0% LS $0.00 $0.00 LANDSCAPING 0% EA $0.00 $0.00 TENTATIVE TRACT MAP 0% LS $0.00 $0.00 EIR STUDY 0% LS $0.00 $0.00 VARIANCE FEE 0/ LS $0.00 $0.00 REZONING FEE 0% LS $0.00 $0.00 FINAL MAP (ASSUME 35 DU/MAP) 0% LS $0.00 $0.00 DRAINAGE FEE 0% EA $0.00 $0.00 SEWER PERMIT FEE 0% AC $0.00 NOT INCLUDED 0% LS $0.00 $0.00 SUB -TOTAL PERMITS, FEES, BONDS (THIS PAGE) $0.00 Prepared by: Analytical Planning Services, Inc. (949)707-5956 W.O. Dsccsita P3.xls Page 15 0£ 20 01111/02 3:57 PM 01111102 3:57 PM Analytical Planning Services, Inc. Preliminary Cost Estimate for Budgeting Purposes Project Name: Diamond Bar Community Center Location: Diamond Bar, CA Gross Acreage: 11.000 Product Type: Commerical Clearing Acreage: 11.000 11 Minimum Lot Size 0 Density (Unit /Acr 484000,00 12, PERMITS, FEES, BONDS (Continued) QUANTITY UNIT PRICE AMOUNT SEWER CONNECTION FEE WATER CONNECTION FEE 11 DU $0.00 WATER METER INSTALLATION FEE DU $0.00 $0.00 WATER SYSTEM CAPACITY FEE 0 DU $0.00 $0.00 WATER METER INSTALLATION FEE 0 DU $0'00 $0.00 WATER SYSTEM CAPACITY FEE 0 DU $0.00 $0.00 SCHOOL FEE 3,000 D DU $0.00 $0.00 PARK & REC. FEE CAA#63 SF 0 DU AC $0.00 $0.00 SCHOOL FEE"0 0 $0.00 $0.0D FCPP FEE PROGRAM SF 0 DU $0.00 $O.OD FCPP FEE PROGRAM 0 DU $0.00 $0,00 FCPP FEE PROGRAM 0 DU $0.00 $0.00 FCPP FEE PROGRAM 0 DU $0.00 $0.00 SAN JOAQUIN T.C.A. FEE -ZONE A 0 DU $0.00 $0.00 SAN JOAQUIN T.C.A. FEE -ZONE A 0 DU $0.00 $0.00 COASTAL AREA RJ.T.S. FEES 2p 0 DU $0.00 $0.00 COASTAL AREA R.I.T.S. FEES 20 0 DU $0.00 $0.00 FIRE STATION FEE 0 DU $0.00 $0.00 NORTH ALISO VIEJO LIBRARY FEE D DU $O.OD NO FEE SHERIFF FEE 0 DU $0.00 $0.00 CHILD CARE PEE 0 DU $0.00 $QA0 AFFORDABLE HOUSING FEE 0 DU $0.00 $0.00 ENDANGERED SPECIES FEE 0 DU $0.00 $0.00 0 DU $0.00 $0.00 SUB -TOTAL PERMITS, FEES, BONDS (THIS PAGE) $0.00 SUB -TOTAL PERMITS, FEES, BONDS (LAST PAGE & THIS PAGE) 10 % CONTINGENCY $0.00 $0.00 TOTAL PERMITS, FEES, BONDS ■ $0.00 Prepared by; Analytical Planning Services, Inc. (949)707-5956 W.P. DBCCSite R3.7ds Page 16 of 20 01111102 3:57 PM 01/11102 3:57 PM t Analytical Planning Seirvices, Inc. ■ Preliminary Cost Estimate for Budgeting Purposes Project Name: Diamond Bar Community Canter Location: Diamond Bar, CA Gross Acreage: 11.000 Product Type: Commerical Clearing Acreage- 11.000 11 Minimum Lot Size 0 Density (Unit /Acr 484000.00 13. MISCELLANEOUS QUANTITY UNIT PRICE AMOUNT REPAIRS / BOND RELEASE 0% LS $0.00 $0.00 $0.00 $0.00 SUB -TOTAL MISCELLANEOUS 10 % CONTINGENCY $0.00 $0.00 TOTALMISCELLANEOUS (.M.__ $0.001 ■ ■ ■ ■ Prepared by: Analytical Planning Services, inc. (949) 707-5956 W.O. DSCCSite Rl ds Page 17 of 20 01/11102 3:57 PM 01111/02 3!57 PM ■ Analytical Planning Services, Inc. Preliminary Cost Estimate for Budgeting Purposes Project Name: Diamond Bar Community Center Location: Diamond Bar, CA Gross Acreage- Product Type: Commerical Clearing Acreage: 11.000 11 Minimum Lot 11,000 14. Size Density (Unit /Acr 0 484000.00 ACCESS ROAD QUANTITY UNIT PRICE AMOUNT �ITARY EWER 12" PVC SEWER MAIN 6" PVC FORCE MAIN 0 LF $0.00 $0.00 ■ STANDARD MANHOLE 0 LF $0.00 $0.00 REMOVE & REPLACE PVMT, 0 EA $0.00 $0.00 SLURRY BACKFILL 0 SF $0,00 $0.00 CONNECT TO EXISTING ZINE 0 LF $0.00 $0.00 TAP IN 0 EA 0 $0.00 $0.00 LS $().00$0.00 STORM BRAIN 36" RCP 48" RCP 0 LP $0.00 $0.00 m 60" RCP 0 LF $0.00 $0.00 MANHOLE 0 LF $0.00 $0.00 REMOVE & REPLACE PVMT. 0 EA $0.00 $0.00 0 SF $0.00 $0.00 WATER DI TRISUTION $0.00 ■ IRRIGATION $0.00 10" PVC WATER MAIN 1 LS $12,000.00 $12,000.00 . FIRE HYDRANT ASSEMBLY 0 LF $0.00 $0.00 REMOVE & REPLACE PVMT. 0 EA $0,00 $0.00 n PRESSURE REDUCING STA. 0 SF $0.00 $0.00 SLURRY BACKFILL 0 EA $0.00 $0.00 10" HOT TAP ASSEMBLY 0 LF $0.00 $0.00 0 EA $0.00 $0.00 ■ Prepared by_ Analytical Planning Services, Inc. (949) 707-5956 W.O. DBCCSite R3.xls Page 18 & 20 01111/02 3!57 PM 01111/02 3:57 PM x Analytical Planning Services, Inc. tPreliminary Cost Estimate for Budgeting Purposes Project Name: Diamond Bar Community Center Locatiam Diamond Bar, CA Gross Acreage: 11.000 Product Type: Commerical Clearing Acreage: 11.000 11 Minimum Lot Size 0 Density (Unit /Acr 484000.00 ROAQ WAY 6" CURB & GUTTER SIDEWALK 1,516 LF $11.88 $15,010.08 3" ACI 6" AB 3,690 SF $3.50 $12,915.00 SUBGRADE PREPARATION 17,116 SF $1.77 $30,295.32 MATCH TO EX. PAVEMENT 18,632 SF $1.00 $18,632.00 REMOVE AND RELOC CL FENCE 1 LS $10,000.00 $10,000.00 CURB ONLY 459 LF $9.15 $4,197.56 GRASS CRETE 207 LF $8.69 $1,798.83 RETAINING WALL 11,640 SF $6.00 $69,840.00 RETAINING WALL FTG 230 SF $20.00 $4,600.00 TREES 115.00 LF 40,00 $4,600.00 DEMO/ROUGH GRADING 28 EA $1,500.00 $42,000.00 STREET LIGHTING -ALLOW 1 LS $22,000.00 $22,000.00 TELEPHONE 10 E.4 $3,000.00 $30,000.00 LINE EXTENSION FEE 0 NIC $0.00 $0.00 GAS MAIN EXTENSION FEE 0 LP $0.00 $0.00 GAS STUB DEPOSITS 0 LF $0.00 $0.00 REFUNDABLE 0 EA $0.00 $0.00 STRIPING 0 LS $0.00 $0.00 1 LS $2,600.00 $2,500.00 SUS -TOTAL ACCESS ROAD 10 % CONTINGENCY $283,388.79 $28,338.88 TOTAL ACCESS ROAD $311,727.66 ■ w Prepared by: Analytical Planning Services, Inc. (949) 707-5956 W.p, pBCCSite R3xls Page 19 of 20 01111/02 3:57 PM ■ n n n x n i Analytical Planning Services, inc. Preliminary Cost Estimate for Budgeting Purposes Project Name: Diamond Bar Community Center Location: Diamond Bar, CA Gross Acreage: 11.000 Product Type: Commerical Clearing Acreage: 11.000 11 Minimum Lot Size 0 15 Density (Unit /Acr 484000.00 LANDSCAPINGIHARDSCAPfNG TREES 15 GAL QUANTITY UNIT PRICE AMOUNT TREES 24" BOX 189 LF $180.00 $34,020.00 TREES 48" BOX 241 LF $230.00 $55,430.00 GROUND COVER 23 EA $1,500.00 $34,500.00 IRRIGATION 157,704 SF $3.00 $473,112.00 LANDSCAPE AREALIGHTIING 157,704 SF $1.00 $157,704.00 a) LANDSCAPE MAINTENANCE 157,705 SF $1.00 $157,705.00 BROKEN CONIC SEAT WALL 1 LS $1,950.00 $1,950.00 SIGNAGE 334 LF $65.00 $21710.00 SIDEWALK, COLORED 1 LS $12,000,00 $12,000.00 COLORED FOUNTAIN PAVEMENT 14,752 SF $4.79 $70,660.31 FOUNTAIN GRAVEL 770 SF $5.50 $4,235,00 FOUNTAIN 220 SF $25.00 $5,500.00 DECOMPOSED GRANITE SURF 1 LS $25,000.00 $25,000.00 EDGE FORMS 32,071 SF $1.50 $48.106,50 STONE PAVING 10690 , LF $6.00 $64,140.00 BOLDERS 3,698 SF $23.18 $85,719.64 START CASE FROM BALL FIELD 51 EA $120.00 $6,120.00 PLAY GROUND SURFACE 1 LS $5,000.00 $5,000.00 MAILBOX STANDARD 1,600 SF $8.00 $12,800.00 SITE WALL STONE 1 LS $500.00 $500.00 ENTRY MONUMENTS -ALLOW 4,936 SF $22.00 $108,592.00 DONOR WALL 1 LS $10,000.00 $10,000.00 1 LS $10,000.00 $10,000.00 (a) This cost is based $650 per month per acre for a Iota 3 months. SUB -TOTAL LANDSCAPE/HARDSCAPE 10 % CONTINGENCY TOTAL ACCESS ROAD Prepared by; Analyticaf Planning Services, Inc. (949)707-5956 W.D. 0BCCSite R3..k Page 20 of 20 $1,404,504.45 $140,450.44 $1,544,954,89 avtt�o2 3:57 PN I ■ 4 i � II ISI � ■ I LL I Z ■ S��__ .__...__ _ - III .. o � I Z � 1 � � I C', ;.CL � o 0 0 0 N O p Q IZ IZ �a j LL � I N co epi CO LLL r N cu ■ N Cl 25, jo to I ■ ti w! Z Q dy, N O Lu to I oq:r w I cu cv [A N I _ p l i l 0 O SLI o m �Isn co 0 0 � F j ■ 00 I I II II c ° m E r'z: r .I Fzll d c W �I im ■ N .0 3 n Q ■ asvsO U �(}It j �j p j �' ��, I p i-6 12 t3 o U Ia � r a m CD a W E m ca co a o 0 m E w m m ❑ U Em C !� E o E -F- a W �t4 X10 "- E a O ■ Cost Estimate 1111 100% Design Development Drawings ■ Diamond Bar Community/Senior Center ESTIMATE QUALIFICATIONS: ■ Introduction ■ This cost opinion of the 1.00% design development drawings have been prepay ■ to reflect the probable cost for the proposed Community/Senior Center in the C ■ of Diamond Bar, California. ■ This cost opinion is based on the following: 1. 100% design development drawings provided by the office of Gonzalez ■ Goodale Architects dated 1213101 2. Outline specifications by Gonzalez Goodale Architects dated 1216101. ■ 3. Preliminary Geo -technical Investigation by Leighton and Association dated6/29/01. 4. Reasonable assumptions 5. Visit of existing park location. 6. On site visit. The unit rates relevant to subcontractor work include the ■ subcontractors' overhead and profit unless otherwise stated. ■ The documents used in the preparation of this cost opinion are as described above ■ and bid document drawing sheets per GO.01, 1213101, with the following exceptions: 1-1.01-1-4.02 from progress set 12/20101, Precise grading plan C -P P- ■ 1, 2, 3, 4, 5 stamp dated 12/27101. Dry utilities from hand marked up from Grading Concept sheet received date stamped 1/2102. ■ ■ Specific Exclusions: 1. Unforeseen sub -surface / unidentified hidden existing building and site conditions that may impact the proposed design and/or affect constructio ■ work, sequence and schedule. 2. Design and permitting costs. ■ 3. All other consultant fees and services. 4. Inspection and testing costs. ■ 5. Hazardous material abatement. ■ 6. Any non-competitive bid situation. 7. Bid delays beyond the construction schedule, projected at approximately ■ months from the dates of this cost opinion. 8. Project phasing. ■ 9. Work performed other than normal working hours and days. . 10. Dewatering of excavations. 11. Security system. 12. Playground equipment. ■ ■ Page I of 3 ■ ■ ■ Cost Estimate 100% Design Development Drawings 1/11 ■ Diamond Bar Community/Senior Center ■ Specific Inclusions: ■ 1. Quantities and costs of items per estimate item descriptions. ■ ■ Bulldin (Site Work Divisions of Scope: The building opinion of cost dated 12119/01, and the pending site work opinion c cost divisions of scope are as follows: ■ Building (1/2/02: ■ . 1. Building complete. 2. Utilities to 5' out from building ■ Site work (01108/02): ■ 1. Trellises and trellis site work ■ 2. Site walls including trash enclosure walls adjacent to building . 3. Site paving including sidewalks adjacent to building 4. Site and landscaping lighting allowances ■ 5. Over excavation and recompaction at civic center building only foundation to 4' per soils report ■ Escalation: ■ ■ Escalation at 4% has been included for the project construction duration. ■ Design/Construction Contingency: Due to the current stage of design, and the uncertainty of the local construction economic conditions, we recommend and have included a 15% design / ■ construction contingency on the building, and 10% on the site work. ■ Probable Opinion of Cost Basis: ■ Since APSI has no control over the cost of labor, materials, or equipment, or over ■ the contractor's method of determining prices, or over competitive bidding or market conditions, the opinion of probable construction cost provided for herein is ■ made on the basis of professional experience and qualification. This opinion ■ represents APSI's best judgment as a professional construction consultant familiar with the construction industry. However, APSI cannot and does not guarantee tha� proposals, bids, or the construction cost will not vary from opinions of probable cos prepared by them. ■ ■ Page 2 of 3 Cost Estimate 160% Design Development Drawings Diamond Bar Community/Senior Center This cost opinion is developed utilizing the Timberline Construction Cost Estirr software, version 6.1 extended edition, and reference to R.S. Means Facilities Construction cost Data electronic cost database, 2001, and other historical co Reports are printed from the Adobe pdf format. Rick Hentschel Estimator Analytical Planning Services, Inc. Page 3 of 3 Agenda # Meeting Date: CITY COUNCIL__'..-" AGENDA RE ORT yh2PORa' j989 TO: Honorable Mayor and Members of the City Council VIA: Linda C. Lowry, City Manager TITLE: Discussion of Issues Regarding the Development of the Community/Sr. Censer at Summitridge Park RECOMMENDATION: It is recommended that the City Council take the following actions: 1. Accept presentation of computer-generated animation of the new facility by Gonz lez Goodale Architects; 2. Select the appropriate finish materials for the facility (stone/carpet); 3. Accept a presentation by Calvin Abe Associates regarding the landscape plan; 4. Accept presentation on the updated project costs from Jay Losak of Analyti al Planning Services, Inc.; 5. Accept presentation and provide direction regarding the inclusion of a donor wall i the project; and 6. Authorize the architect to proceed with development of construction documents. BACKGROUND: For the last several years the development of a Community/Senior Center has been a strong desire of the community and the City Council. In September 2000 the City awarded the design contract ($745,400 including landscape architect) for the project to Gonzalez Goodale Architects ( GA). Since that time the Community Center Team members including City staff, the architects and civil engineers from Hunsaker and Associates ($274,353) have been working on this project. The project is an extensive, large scale under taking and involves many professional disc plines. In general the project involves significant site preparation work including extensive grading work, slope stabilization, sheer key buttressing and development of a building pad for construction of future library; construction of a new access road and two parking lots; construction of a 22,500 q. ft. Community/Senior Center including banquet and kitchen facilities to serve 500 patrons, a dedicated Senior Citizen Center (seniors will also be able to utilize the large banquet room), various classrooms, restroom facilities, and staff offices. In addition, the project includes extensive landscape and hardscape improvements on the entire site. The architects have completed the schematic design and design development phases c project and are requesting authorization to begin construction documents. Prior to this authoriz it is appropriate for the City Council and the community to receive information regarding the in of project, select various finish materials such as stone work and carpet, and receive up-tc the estimate information. Just last month, the City awarded a contract ($529,000) to Analytical Planning Services, . (APSI) for construction management services. In addition to performing construction managem services, APSI is responsible for preparing independent cost estimates for the entire project incluc expenditures incurred to date. These cost estimates will continue to be refined as we and upd proceed through development of construction documents and as part of the value engine analysis prior to release of the plans and specifications for bidding cost ;d purposes. The projec estimates at 100% design development completion are provide by Jay below and will be preser Losak of APSI. DISCUSSION There are a number of items for the City Council to receive information on and in some in tances provide direction to the Community Center Team. Each of the different discussion issues are identified below. We recommend the City Council proceed through the issues in the following order: Computer -Generated Animation As part of the original contract, GGA was to provide the City with a 3-dimensional the project model at a cost of $18,000. In September 2001, the City Council authorized GGA to create a c generated animation of the project and forego the 3-D model. GGA will on to the present the anin City Council and provide City staff with a version of the animation for currently public display. We working with the animation creator to confirm compatibility with the DBTV so we can broada animation on the City's T.V. station. Selection of Finish Material David Goodale and Matt Blain of GGA will provide the Council with an overview of the bui design, review the selected finish materials, and lead the Council through the selection of remaining finish materials (Stone & carpet). The architects will provide Council with their recommendation for all finish materials including the stone and carpet. need to The City Council approve the recommended finish materials or provide other direction to er the Community C1 The cost of all the finish materials presented to the City Council Team. including the alternate op conformance with the cost estimates presented later in this Landscape Plan Review In January 2001, the City Council approved an amendment to the contract with GGA, in 1 amount of $73,600, to include a landscape architect on the Project Team. Calvin Abe, Landscap will provide the City Council with an overview of the landscape and hardscape design for project site. Project Cost Estimate As with any project, cost estimate information is crucial. Unfortunately it is difficult to esti ate costs for construction projects, and especially projects that are as extensive as this project, un I the architectural design and civil engineering work has been completed and a thorough anal sis has been conducted to understand all potential costs. Periodically throughout the preceding years, the City Council has been presented variou cost estimates related to this project. The last cost estimates were provided to the Council in my 2001. At that time we were anticipating the project (Community Center and Site Prep only) woul cost approximately $10,300,000. Since that time design development and the precise grading plans have been completed, a review of the required utilities and potential utility design has been initiated. Also, an independent ost estimator (APSI) has reviewed the grading plans and the architectural design documents nd has provided a cost estimate based on this additional information. This detailed information a d the inclusion of an independent cost estimator has allowed the City to refine the project cost stimates. The entire project costs are estimated at $12.6 million. This includes the cost of construct ng the building ($5 million) and site prep/soil remediation, landscape/hardscape/access road cos 's ($5.4 million). Also included in the cost estimate are A&E, specialty consultant fees, utility desi n fees, furniture, fixtures and equipment costs, miscellaneous costs, contingencies, and permits a-5 plan check fees ($2.23 million). Of the $2.23 million; approximately $1.6 million has been cot fitted to date to the various consultants assigned to the project. A cost breakdown for each compo ent of the project is attached for City Council review. Mr. Losak of APSI will review this information i detail for the City Council. City staff will continue to work with the architects, civil engineers, and construction manag ment firm through the development of construction documents to reduce costs wherever possible. Iqe will ensure that any changes to reduce costs do not compromise the quality of the facility. EXCLUSION It is important to note that the attached cost estimates do not include the following element of the proposed project: Relocation of existing restroom facility Relocation of existing play equipment Any off-site improvements such as the median work and traffic signal installation propos d for Grand Avenue These improvements will either be done after the project is completed and/or utilize a funding source other than General Fund dollars. FINANCING A few years ago, the City began identifying funds available for this project and setting th se funds aside. As of FY 2001-02 the City had set aside $7.46 million for this project. Of this am unt $1.6 million has already been committed for various consultant fees, as mentioned above. 7 refore, approximately $6 million remains to complete the project. As part of the mid -year budget review, City staff will present the City Council with a finan ing plan for the facility. Certainly, the City has the required funds available in reserves; however, we re exploring multiple funding options including a federal CDBG loan, federal grant funds, et . to reduce the demand on the General Fund reserves. Donor Wall Discussion: In an effort to raise funds, the Diamond Bar Community Foundation is requesting the Cit Council authorize a donor wall or other donor recognition program as part of the construction of t e facility. The architect is recommending a donor wall along the child play area with copper panels hat would be etched with the name of the individual or corporation donating funds. A drawing of the architect's proposal is attached for Council review. This information w circulated to the Foundation members after their meeting on December 13th but as of Friday, y11thno Ig Jam response has been received by City staff. Based on the minutes of the of Foundation me December 13th, it is unknown if the architect's recommendation meets i members' with the Foundal desires. Also, it is unclear whether or not these funds would be inity contributed to the Com project or other Foundation projects. Construction Documents Authorization to proceed with construction documents will allow the project to remain on u1 As shown on the project schedule provided by APSI, the construction documents will be by the end of March which should allow the project to commence construction in August and be completed by the end of December 2003. We are exploring options that may reduce the construction timeline. However, no recom endation is being made at this time. If feasible from a cost and timing perspective, staff will pursue th more aggressive timeline option. PREPARED BY: David A. Doyle Deputy City Manager ATTACHMENTS 1. Project Cost Estimates 2. Donor Wall Sketch Minutes of the Foundation Meeting of December 13, 2001 4 Community/Senior Center at Summit Ridge Park ueotecnnicai tngineer Construction Cost $10,423,29.00 Miscellaneous Cost Construction Management Fee $52 Material Testing & Inspection $50 Furniture Fixtures & Equipment $335 Total Miscellaneous Cost $385 Consultant Fees Civil Engineer Fee $27 EIR Consultant Fees Consultant Fees $1,611 iscellaneous Systems to System $1 CCTV System $: Data System $- $25,000, Total Miscellaneous Systems $i Permit/Plan Check & Utility Fees Plan Checll $22,639 Permit Fees Utility Feel I Total Permit/Plan Check & Utility Fees TOTAL PROJECT COST Electrica $33,417 Wate $60,000 Sewe $6,000, Storm Drain $0. Tele hon $10,000 Ga $12,000 AT -OCno v v v n t y t 6 0 nt v 0 0 0 r 7S r 0(-)0 DZ 0 0 0 D m-- Nr n- 0 v O O 1 10 1 D 00 OO z it a x m z jc)v:m NOC]X NzrD'm ODmO m N-, c5 cyo m D i.- D m00 =Z D ;i7 0 O -7 2 -] n m 2 r O Lf) (n Clip rrl D r ACHM ENT 2 MINUTES OF THE DIAMOND BAR COMMUNITY FOUNDATION DECEMBER 13, 2001 1. CALL TO ORDER: The meeting of the Diamond Bar Com unity Foundation was called to order by Vice Chairman Wilson at 7:10 p.m. in Roo CC -8 of the South Coast Air Quality Management District Headq arters Building/Government Center, 21865 E. Copley Drive, Diamond Bar, CA 91165. 2. PLEDGE OF ALLEGIANCE: The Pledge of Allegiance was led by Murshedi. ROLL CALL: Vice Chairman Wilson and Members inkin, Finnerty, Hatzfeld, Murshedi, O'Connor and Pagan. Members MacBri a and Oaxaca were excused. Member Lyons arrived at 7:27 p.m. Chairman Wong rrived at 7:38 p.m. Also present: Todd Strojny, Senior Administrative 3. PUBLIC COMMENTS: None Offered. 4. CONSENT CALENDAR: 4.1 APPROVAL OF MINUTES 4.1.1 Regular Meeting of October 18, 2001 Moved by M/O'Connor, seconded by M/Dinkin, to approve the Min es as presented. C/Finnerty abstained from approval. 5. PUBLIC HEARINGS: None 6. OLD BUSINESS: 6.1 PRESENTATION BY A REPRESENTATIVE OF AYSO REGARDING POINT FUNDRAISING PROJECTS -Continued to the January meeting. 6.2 CONSIDERATION OF EXPANDING THE DIAMOND BAR COMMI—INITY FOUNDATION BOARD OF DIRECTORS. M/Pagan felt that the Board should be expanded by at least four at large" positions. The Foundation needs more broad range s M/O'Connor stated that expansion of the Board would require City approval. M/Pagan moved, M/Finnerty seconded to direct staff to draft appropri to bylaw language for expansion of the Community Foundation Board y four members for consideration by the City Council at its next meeting. otion carried. E DECEMBER 13, 2001 PAGE 2 COMMUNITY FOUNDATION ing 7. NEW BUSINESS: 7 • CONSIDERATION OF RESTRUCTURING SUBCOMMITTEESto the January meeting. Chair/Wong said he proposed this discussion to see if there might be better way for the group to focus its efforts. Members concurred that publicity is lacking and a plan for public and fundraising needs to be in place. M/Murshedi volunteered to assist the Board in developing a strategy for public speaking/fundraising. M/O'Connor suggested the Board establish an ongoing slide presentation for broadcast on Channel 17. M/Finnerty reminded the Board that the Chair is the telephone person. Chair/Wong believed that the Foundation should establish a voic mail system. Members concurred. Chair/Wong said he would take re spon ibility for establishing the voice mail system. M/Pagan expressed concern that those who have donated funds the Foundation have not received thank you letters. She requested th t this matter be agendized for discussion at the Foundation's January mee ing. 7 • DISCUSSION OF THE SALE OF TILES FOR FUNDRAISING PU M/O'Connor reported that the architect recommended tiles for the foll M/O'Connor said that Council discussion on this subject would likely take place during a study session prior to the regular January 8 Council meting. M/Finnerty thought it would be good to designate an area for veterans. She would like to have two sections -the entrance to the Community Center and the steps leading to the Library. M/O'Connor reported that the City's newly hired grant -writer resides inj the reas: 1) entrance to the Community Center - approximately 500 sq. .; 2 he west trellis area connection leading to the library -approximately 4 D sq. I., and the tot lot area wall. The architect is scheduled to attend the a jary Council meeting. Council will then choose the product to be used 1 the Ruilding and the architect will include samples of tile to match the ro cts. /Pa an believed the most visible tiles would be the easiest to sell. fl DECEMBER 13, 2001 PAGE 3 COMMUNITY FOUNDATION area and is very aware and its M/Pagan suggested the Foundation publicize its goal for tile fundrai$ing in the Friends of the Library publication. M/Finnerty said her first choice would be the entrance, the second hoice would be the west trellis area leading to the Library or the first and s cond choice combined with the last choice being the wall on the tot lot plan area. M/O'Connor suggested another area to be considered is the entrance to the banquet facility next to the west trellis area toward the east trellis area She stated that she would advise board members when the Council ill be discussing this matter. It will likely be during a 4:30 study session in oom CC -8 on Tuesday, January 8. Members concurred to continue discussion of this item under Old Busin ss at the Foundation's January meeting. Moved by M/Finnerty, seconded by M/Lyons to recommend that th City Council consider allowing the Foundation to sell tiles for the pure a of fundraising for the organization at one of the following locations (lis ed in order of preference): 1) east trellis area, 2) west trellis area, 3) both 14.2, 4) the area in front of the entrance to the banquet room and 5) wall in fr nt of the tot lot play area. Motion carried. SUBCOMMITTEE REPORTS: a) FUND-RAISING EVENTS - M/Dinkin reported that the Foundation ade $191.75 on Veterans Day. The money has been given to the Treasurer. The Foundation netted $483.52 from the Winter Fest celebration. b) GRANT WRITING - M/O'Connor said she would schedule a teleconfer nce with the grant writer. c) GIFTS AND PLEDGES - None Offered d) COMMUNITY CENTER COMMEMORATIVE - None Offered FOUNDATION 9 MEMBER COMMENTS: M/Finnerty said that the matter -f the November meeting date was not carried forward to this month's meeting age da. M/O'Connor suggested that a recommendation to schedule the November n for the second Thursday of the month instead of the third Thursday of the could be included in a bylaws change along with expansion of the Board on item is approved by Council. 10 ADJOURNMENT: With no further business to conduct, Chair/Wong adjourned the ME DECEMBER 13, 2001 PAGE 4 COMMUNITY FOUNDATION meeting at 8:26 p.m. Lynda Burgess, Board Secretary ATTEST: Andrew Wong, Chairman ATTAC HMENT Vity Council Tuesday, January 15, 2002 5:30 p.m. - Special Meeting Room CC -8 South Coast Air Quality Management District/Government Main Auditorium 21865 East Copley Drive Diamond Bar, CA 91765 Mayor Wen P. Chang Mayor Pro Tem Debby O'Connor Council Member Carol Herrera Council Member Bob Huff Council Member Bob Zirbes City Manager Linda C. Lowry City Attorney Michael Jenkins Copies of staff reports or other written documentation relating to agenda items are on file in the Office of the City Clerk, and are available for public inspection. If you have questions regarding an agenda item, please contact the City Clerk at (909) 860-2489 during regular business hours. In an effort to comply with the requirements of Title fl of the Americans with Disabilities Act of 1990, the City of Diamond Bar requires that any person in need of any type of special equipment, assistance or acoommodation(s) in order to communicate at a City public meeting, must inform the City Clerk a minimum of 72 hours prior to the scheduled meeting. Please refrain from smoking, eating or drinking in the Council Chambers. The City of Diamond Bar uses recycled paper and encourages you to do the same. SPECIAL CITY COUNCIL MEETING JANUARY 15, 2002 5:30 P.M. SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT/GOVERNMENT 21865 E. COPLEY DRIVE ROOM CC -8 1. CALL TO ORDER: PLEDGE OF ALLEGIANCE: Mayor ROLL CALL: Council Members Herrera, Huff, MPT/O'Connor, M/Chang 2. 2.1 DISCUSSION OF ISSUES AND DIRECTIONS TO STAFF REGARIING DEVELOPMENT OF THE COMMUNITY/SENIOR CENTER AT SUMMITRIDGE PARK: Recommended Action: It is recommended that the City Council talk the following actions: (1) Accept presentation of computer-generated animation of the new facility by Gonzalez Goodale Architects; (2) Select the appropriate finish materials for the facility (stone/caret); (3) Accept a presentation by Calvin Abe Associates regarding the landscape plan; (4) Accept presentation of the updated project costs from Jay Los k of Analytical Planning Services, Inc.; (5) Accept presentation and provide direction regarding the inclusi n of a donor wall in the project; (6) Authorize the architect to proceed with development of documents. Requested by: City Manager 2.2 BUSINESS EXPANSION AGREEMENT WITH SIGMAnet. Recommended Action: It is recommended that the City Council direction to the City's Negotiator. Requested by: City Manager 3. ADJOURNMENT: CITY COUNCIL -rssg.- TO: Honorable Mayor and Members of the City Council a# 22 15, Meeting Date: 2002 AGENDA REPORT VIA: Linda C. Lowry, City Manag TITLE: Business Expansion Agree -MAnet RECOMMENDATION: It is recommended that the City Council provide direction to the CIPMegotiator. BACKGROUND: SIGMAnet is an information technology and fulfillment services company providing to hnical and professional services to businesses. Their headquarters has been located in Diamon Bar since 1986. They have received an offer to relocate its business to the City of Chino. As they are a significant sales tax producer, it is in the City's interest to consider entering into an agre ment with SIGMAnet in order to retain and expand the business within the City of Diamond Bar. SIGMAnet has been offered a significant sales tax rebate and other incentives to relocat to the City of Chino. On December 6, 2001, the City Council received a report from City staff, discus ed options and provided staff with direction to offer a business expansion agreement. On Decem er 7, 2001, staff met with Mr. Ahmed Al Khatib, the Founder and Chief Executive Officer of the co pany. On December 17, 2001, the City Council met to discuss a revised proposal from SIGM net and to provide direction to staff. DISCUSSION It is proposed that the City and SIGMAnet enter into a three-year agreement. Througho t the length of the agreement, SIGMAnet is required to maintain and expand its company headquarte s within the City of Diamond Bar. The City proposes to reimburse fifty (50) percent of all sales taxe generated by SIGMAnet and remitted to the City by the State Board of Equalization during the erm of the agreement over an established minimum tax receipts base. The Business operator ha requested that the minimum base be set at $50,000.00. Should SIGMAnet relocate to another juris fiction within the first year of the agreement, one hundred (100) percent of the sales tax receipts recei ed shall be returned to the City of Diamond Bar. If SIGMAnet relocates to another junsdictio within the remaining 24 months, fifty (50) percent of all sales tax receipts received by the busin ss shall be returned to the City. SIGMAnet intends to expand its 10,000 square foot, 50 -employee business, by leasing additional office space within the existing building. Because the facility has limited parking, the City i assisting the business with the acquisition of additional parking spaces, including the possibility o providing parking spaces immediately adjacent to the business along Diamond Bar Boulevard. The City Council has previously been provided with confidential information regarding the ales generated by SIGMAnet. Staff is preparing a Financial Impact Analysis for the City Cc taxes ncil provided in a separate report. The City Attorney is finalizing the detailed Agreement for re to be ew City Council. The attached communication with SIGMAnet incorporates handwritten Mr. Al by the Khatib in response to our proposal. Mr. Al Khatib's handwritten comments, received on )tes from January 8, 2002, requests a response from the City by January 18, 2002. Prepared By Ja' es DeStefa o Deputy City Manager Attachment Correspondence to SIGMAnet dated December 19, 2001, incorporated with handwritten comments from Mr. Al Khatib. City of Diamond Bar 21825 E Copley Drive • Diamond Bar, CA (909) 8602489 • Fax (909) 861.3117 December 19, Mr. Ahmed AI Khatib VIA FACSIMTLE Founder and Chief Executive Officer SIGMAnet 732 North Diamond Bar Boulevard Diamond Bar, CA 91765 Dear Mr. Al Thank you, once again, for the opportunity to continue our discussion pertaining to the retention and expansion of SIGMAnet. On December 17, 2001, we discussed the latest retention and expansion plats for your business with the City Council. It is our understanding that you are considering an expansion of your offices within the building you presently occup anti acquisition of additional lease space fur the purpose of relocating all or a portion of your assembly and warehouse functions. As a result of direction received from the City Council, we are prepared to craft a Reimbursement Agrectnunt, to be prepared by the City Attorney, containing substantially the following terms: I LC- Yf f-7 Vi.-, f -7V If r701 The City of Diamond Bar proposes, .'Subject to final approval by the City Council, to enter into a 36 -month reimbursement agreement with STGMATtca. Throughout the length of the agreement SIGMAnet is required to maintain its company headquarters within the City of Diamond Bar. 1 The City proposes to reimburse 50°k of all sales tax receipts generated by STGMAnet and remitted to the City by the State Board of Equalization during the term of the 36 month agreement over a tax receipts minimum base of <7 U U V Hyrtpleh»utdS7rjMAnet getttra $4H10,$89AA-ins4lCSwx receipts _ (pity sT--tall retain 1,90.HT—Sh d , ente-"' p $500, .les tax rceci ts, 3GM.Anet sha eceive of the recei is gent $25 year &.00 . Should SIGMAnct rcloeutc to another jurisdiction within the trst year of the agTCCmcnt,190% of all sales tax receipts received shall be returned to the City of Diamond Bar. Should SIGMAnet relocate to another jurisdiction within the remaining 24 months, 50 % of all sales tax receipts received by STGMAnct shall be CO "o Q 'I Mr. Ahmed AI Khatib SIGMAnct December 19, 2001 Page 2 The City will continue to use its best efforts to provide additional parking spaces at no cost to you. We hope you will find our proposal satisfactory. Again, we appreciate the opportunity to further og discussion with yqu regarding the expansion of your business in our City,lfwill be away firm the office, on vacation, from -: December 19, 2001, through January 1, 2002.; Shoulzryou have any questions " i'cgardirig our proposul,'pleaie"do not hesitate to contact Linda Lowry, City Manager at (909) 396-5666. 1 will contact you upon my return" Sincerely, JP-A-'1/..C-'-IrMC3 James DeStefano Deputy City Manager cc: City Manager City Council 1 oft Tommye Cribbins From: David Doyle Sent: Thursday, January 10, 2002 2:05 PM To: Tommye Cribbins Subject: Title Here is my staff report title: Discussion of Issues Regarding the Development of the Community/Sr. Center at Summitridg-- Park David Doyle Deputy City Manager City of Diamond Bar 909-396-5666 1/10/02 1 oft Tommye Cribbins From: David Doyle Sent: Thursday, January 10, 2002 2:01 To: Tommye Cribbins Subject: FYI I don't know if this helps you but here is what my recommendation will say on th Community Center 15th. It is recommended that the City Council take the following actions: 1. Accept presentation of computer-generated animation of the new facility by Goodale Architects, 2. Select the appropriate finish materials for the facility (stone/carpet), 3. Accept a presentation by Calvin Abe Associates regarding the landscape plan, 4. Accept presentation on the updated project costs from Jay Losak of Analytical Services, Inc., 5. Accept presentation and provide direction regarding the inclusion of a donor H project; and 6. Authorize the architect to proceed with development of construction documents. David Doyle Deputy City Manager City of Diamond Bar 909- lannin I in the From: David Doyle Sent: Tuesday, January 08, 2002 8:52 AM To: Tommye Cribbins Subject: RE: Study Session for 1/15/02 I'll be writing a staff report - there may or may not be attachments (at this time I'm wit anticipating contractors you never know). It will just be one item on the agenda - I'm not sure of the exact title just yet - but something like "Discussion of Senior/Community Center Construction Issues" with a number of actions for the Council to perform such s: receive and file construction cost estimates, select finish materials, provide direction regarding donor wall placement d materials, accept presentation of computer-generated animation. I David Doyle Deputy City Manager City of Diamond Bar 909- -----Original Message ----From: Tommye Cribbins Sent: Tuesday, January 08, 2002 8:45 AM To: David Doyle Subject: Study Session for 1/15/02 Just checking on what type of documentation 1 might have for the 1/15/02 agenda. The ive are: topics I Construction Budget Estimates, Finish Materials, Landscape Plan Review, Donor Compute Wall Issues a Generated Animation Presentation. Thanks TC