HomeMy WebLinkAbout10/8/2013MINUTES OF THE CITY OF DIAMOND BAR
REGULAR MEETING OF THE PLANNING COMMISSION
OCTOBER 8, 2013
WTTTFIIIR��
Chairman Torng called the meeting to order at 7:05 p.m. in the City Hall Windmill Room,
21810 Copley Drive, Diamond Bar, CA 91765.
PLEDGE OF ALLEGIANCE: Commissioner Dhingra led the Pledge of Allegiance.
1. ROLL CALL:
Present: Commissioners Ashok Dhingra, Jimmy Lin, Jack Shah,
Vice Chairman Frank Farago, Chairman Tony Torng
Also present: Greg Gubman, Community Development Director; Dave DeBerry,
City Attorney; Grace Lee, Senior Planner; Natalie Tobon, Assistant Planner; and Stella
Marquez, Administrative Coordinator.
2. MATTERS FROM THE AUDIENCE/PUBLIC COMMENTS:
Vinod Kashyap owns a property at 3839 Castle Rock Road which gets a lot of noise
and shaking of the retaining walls from the freeway. In some instances people have
gone off the freeway, through the fence and ended up close to his back yard. The
traffic flow is very fast and there are a lot of heavy vehicles going through the area. He
fears that one day someone will plow into. his house. He asked the Commission to
address the safety issues in the area.
3. APPROVAL OF AGENDA: As presented
4. CONSENT CALENDAR:
4.1 Minutes of the September 24, 2013, Regular Meeting.
VC/Farago moved, C/Dhingra seconded, to approve the September 24, 2013,
regular meeting minutes as presented. Motion carried by the following Roll Call
vote:
AYES:
NOES:
ABSENT:
5. OLD BUSINESS:
6. NEW BUSINESS:
COMMISSIONERS
COMMISSIONERS
COMMISSIONERS
None
None
Dhingra, Lin, Shah, VC/ Farago,
Chair/Torng
None
None
OCTOBER 8, 2013 PAGE 2 PLANNING COMMISSION
7. PUBLIC HEARING(S):
7.1 Development Review No. PL2013-77 — Under the authority of Diamond Bar
Municipal Code Section 22.48, applicant Steven Phillips and property owner
Mei Deng, requested Development Review approval to construct a new single-
family residence consisting of 13,360 square feet of livable area; a 2,207
square foot garage, and 2,471 square feet of patio areas on a 1.21 gross acre
(52,707 square foot) lot. The subject property is zoned Rural Residential (RR)
with a consistent underlying General Plan land use designation of Rural
Residential.
PROJECT ADDRESS:
PROPERTY OWNER
24074 Falcons View Drive
Diamond Bar, CA 91765
Mei Deng
500-999 West Broadway
Vancouver, BC V5ZIKS
APPLICANT: Steven Phillips
23177 La Cadena Drive #101
Laguna Hills, CA 92677
CDD/Gubrnan recommended that the Planning Commission continue the matter
to October 22, 2013, to allow the applicant additional time to complete the
public hearing notification requirements.
Chair/Torng opened the public hearing.
There was no one present who wished to speak on this item.
C/Dhingra moved, VC/Farago seconded, to continue Development Review No.
PI -2013-77 to October 22, 2013. Motion carried by the following Roll Call vote-,
AYES: COMMISSIONERS: Dhingra, Lin, Shah, VC/ Farago,
Chair/Torng
NOES: COMMISSIONERS: None
ABSENT: COMMISSIONERS: None
7.2 Development Review No. PL2013-215 — Under the authority of Diamond Bar
Municipal Code Section 22.48, applicant Dan Wainwright, representing
America's Tire Co and property owner Larry Zerner, representing Diamond Bar
Plaza, requested Development Review approval to construct a 7,149 square
foot building for a new retail automotive parts and service establishment. The
subject property is zoned Community Commercial (C-2) with an underlying
General Plan land use designation of General Commercial.
OCTOBER 8, 2013 PAGE 3 PLANNING COMMISSION
PROJECT ADDRESS
PROPERTY OWNER
APPLICANT:
2875 S. Diamond Bar Boulevard
Diamond Bar, CA 91765
Diamond Bar Plaza
1801 Century Park East, Suite 2400
Los Angeles, CA 90067
Daniel Wainwright
America's Tire Co.
20225 N. Scottsdale Rd
Scottsdale, AZ 85255
AP/Tobon presented staff's report and recommended Planning Commission
approval of Development Review No. PI -2013-215, based on the Findings of
Fact, and subject to the conditions of approval as listed within the resolution.
C/Shah asked what is currently on the site and APfFobon reiterated that the site
is a vacant lot.
Daniel Wainwright, America's Tire Co., 20225 N. Scottsdale Road, Scottsdale,
AZ 85255, said he was before the Commission to request approval of a
Development Review application for a new America's Tire station on Diamond
Bar Boulevard at Cold Springs Road. He gave a brief background of the
company and talked about the proposed project, America's Tire Co. has been
in business for 54 years and there are Currently 865 locations in 24 states with
over 15,000 full time employees. America's Tire is the largest and most
successful retail tire company in the United States. The company does not
perform any mechanical work, there are no automotive fluids and there is no
hazardous waste. The business is strictly retail sales and service of passenger
car and light truck tires and wheels. All of the work is done inside of the
building; all of the storage is inside of the building; and, in this case the service
bays face to the north, away from the residential property. All of the work is
performed within a clean, modern and efficient environment. Hours of operation
are Monday through Friday from 8:30 a.m. to 6:00 p.m., Saturday from
8:30 a.m. to 5:00 p.m. and the shops are closed on Sundays. This project will
create about 10 full time new jobs for the community and those employees will
receive benefits, retirement plans, medical insurance, training, etc. In the 50
years the company has been in business it has never laid off any employees.
He thanked staff for their input and fine tuning to the project. He said his
company agrees to all of the conditions of approval which to him are
comprehensive and thorough.
C/Lin asked if the headquarters was in Ann Arbor, Michigan. Mr. Wainwright
responded that the company was started in Ann Arbor and there is still an office
in that City. The owner decided he would like to live in warmer climate and 30
OCTOBER 8, 2013 PAGE 4 PLANNING COMMISSION
years ago he and his wife moved to Scottsdale, Arizona. C/Lin asked why the
company was hiring only 10 employees in Diamond Bar when the average store
staffs 20 employees. Mr. Wainwright responded that 10 would be the initial
employment level to get the business going. As the store becornes established,
which usually occurs within a year, more staff would be brought on as the level
of business dictates.
C/Dhingra said that staff and the applicant were to be congratulated on a very
good project and design. He also spoke supportively of the site plan design
that eliminates the shared drive aisle with the neighboring car wash.
Chair/Torng opened the public hearing.
Natalia Baudin, 2904 Crooked Creek, said she retired from South Coast Air
Quality Management District where she worked in environmental justice. She is
concerned about the proposed tire company. When there was a service station
in the location, people would work on cars all night and compressors could be
heard at 2:00 a.m. With the shopping center, the building noises start at 5:30 to
6:00 a.m. in the mornings and after stores open, there were large 18 -wheel
transfer trucks in the neighborhood that would park along Cold Spring Lane
waiting to gain access to the shopping center area, trucks which sat along the
side of the fence bordering her yard and dump diesel fumes into the yard. Now
there are trucks delivering to the super market with half loads that when they hit
the speed bumps she is violently awakened. In addition, she has to contend
with lawn service at 6:00 a.m. for the daycare. She does not mind the
businesses being in her neighborhood but wishes they would realize there are
people who are retired and sleep later in the morning. Her concerns about the
tire store is: 1) that the noise be minimized during the building of the store by
limiting the hours from 8:00 a.m. to 7:00 p.m.; include in the occupancy permit,
no compressors, impact wrenches or other noise making tools be used prior to
8:00 a.m.; tire deliveries should be made by way of Diamond Bar Boulevard and
riot Cold Spring Lane; all tires left outside of the building should be covered;
and, no parking for the business along Cold Spring Lane; 2) no underground
storage of chemicals or vats larger than 50 gallons, no use of toxic chemicals
that can be released into the neighborhood; and 3) she is concerned about loss
of property values. Tire stores generate a lot of traffic and cars to be worked on
and all cars that are being worked on should be kept in the property boundaries
of the company. Mrs. Baudin said that she and her husband have worked hard
to build a pleasant life in Diamond Bar and she understands that the City needs
revenues. Tire stores in neighborhoods are not very pretty. She asked the
Planning Commission to reconsider this project or put limitations she has stated
on the occupancy permit.
Vinod Kashyap said he appreciated the presentation. He asked if the tires were
American made and asked if the company had a provision for vocational
OCTOBER 8, 2013 PAGE 5 PLANNING COMMISSION
training for kids. He wanted to know if it was a LEED design based on zero
energy use. The previous speaker covered his other concerns.
Mr. Wainwright responded to speakers that with respect to noise the hours of
operation (as previously stated) are 8:30 a.m. to 6:00 p.m. Monday through
Friday and 8:30 a.m. to 5:00 p.m. on Saturday. The store is closed on Sunday.
Construction hours will be complied with in accordance with the City's
conditions. He will be personally involved with the project throughout the
construction phase and if there are any concerns about early morning starts, he
will address those and make certain everything is properly handled. With
respect to chemicals, he again stated that the store does not handle any
automotive fluids or any kind of hazardous waste, oil, antifreeze or brake fluid
and no fluids are stored on site or used in any of the store's operations. Some
of the tires are American made and many are "world source" tires. Tires are
made in a number of countries and the company does not discriminate against
any nation's products. The company looks very closely at the quality of the
tires. Any tire that the company sells is thoroughly tested by staff. The
company's poly chemist looks at the construction of every tire and works with
the manufacture to make certain the tire has the proper adhesives, tread
design, as well as steel and polymer ingredients to ensure that it is a safe tire.
The company also wants to offer customers good value for their tire and not
everyone can afford the most expensive tire so the company offers tires that are
good value at all market points throughout the range of products. With respect
to vocational training, the company absolutely welcomes young people. As he
previously mentioned, the company has an extensive training program and
loves to have young people after school that have an interest and a passion in
working for a really good company that promotes from within. The company
would love to partner with vocational instructors at the local high schools and
community colleges to bring folks into the organization. The company has
looked at the LEED design very closely. The building does not quite meet the
LEED criteria. The company has tried but the nature of the use of the building
makes it very difficult to create the energy envelope. However, what they have
done in the design is to include a number of skylights that are screened behind
the parapet walls to harvest natural sunlight. The building also uses occupancy
sensors and light level sensors within the building and an extensive number of
LED light fixtures to reduce the electrical demand. The roof is made from steel,
about 90 percent of which is recycled, and the remaining components are
masonry and concrete which can be recycled at the end of the useful life of the
facility. This site was formerly a gas station which closed due to leaking
underground storage tanks and were removed a number of years ago and
significant mitigation measures were performed to bring any toxic levels of
contaminant below the minimum thresholds. In fact, the report from the water
quality board verified that indeed, the contamination levels are below action
limits and the site case is closed. The store proposes to do a ground lease on
the site for 40 to 50 years. The company makes a long-term commitment to the
OCTOBER 8, 2013 PAGE 6 PLANNING COMMISSION
community. The construction costs for the building will be approximately $1.5
million. America's Tire Co. plans to be a long-term positive part of the Diamond
Bar community.
Mr. Wainwright said that customers will be on the property for 30-45 minutes
and cars are not kept offsite nor are they kept overnight. Generally, 85 percent
of the product is available on site and customers can be on their way in about
30 minutes.
C/Shah asked about the storage of used and new tires and if during
construction the project uncovers contaminant materials how will that be
handled. Mr. Wainwright responded that all of the new tires are stored within
the building and all of the used tires are stored within the building and picked up
by a licensed recycler that converts them to crumb rubber which is used to
make road beds (overtopping for asphalt) which reduces road noise and tire
wear. Tires do riot go to the landfill. Phase I and Phase II environmental site
assessment and technical evaluation have been conducted. Multiple borings
were done at the site to assess both the geostrategic analysis and structural
foundation designs. Samples were taken to validate that the environmental
contamination had decreased to below action levels.
C/Lin said that the property has 20 parking spaces with 10 spaces taken up by
employees. He asked if the remaining 10 spaces would be adequate to take
care of customer parking with no spill over onto the streets. Mr. Wainwright
said he believed the parking would be sufficient because customer vehicles are
turned over (bay turn) so quickly. There are four service bays which leaves
sufficient parking for additional customers.
C/Shah asked whether tire delivery and pickup would take place during working
hours. Mr. Wainwright responded that tire delivery takes place during normal
business hours only. Trucks deliver replenishment goods only to replace what
was sold the previous week.
Chair/Torng asked staff about the parking and whether there was a "no parking"
zone on the street. CDD/Gubman said he was not familiar with the history on
reviewing the parking situation or studying whether or riot to designate Cold
Spring Lane as a no parking zone because that is actually within the purview
of the Traffic and Transportation Commission, which is staffed by the City's
Public Works Department and any recommendation that would follow such a
review and analysis would be forwarded to the City Council for discussion and
possible action. This question can be directed to the Public Works Director and
staff would be happy to get in touch with Mrs. Baudin to provide her with a more
thorough answer about the traffic situation on her street and how her
request/inquiry can be responded to.
PAGE 7 PLANNING COMMISSIOil�
Vinod Kashyap felt that an influx of business from shopping center visitors
would create traffic flow and parking problems for the tire store and shopping
center.
VC/Farago asked staff to respond to Mrs. Baudin's concerns about construction
hours. CDD/Gubman stated that the City's Code limits hours of construction
and construction related noise to Monday through Saturday 7:00 a.m. to 7:00
p.m.
C/Dhingra asked if the delivery would be executed via Diamond Bar Boulevard
or Cold Spring Lane. CDD/Gubman responded that there is no stated
restriction on the delivery points of access. Since this is a use that is permitted
by right and not a conditional use, there are no use restrictions that could be
conditioned on the project. However, America's Tire Co. is a national credit
tenant that has a highly regarded reputation for being a good neighbor so this is
probably a more appropriate opportunity to have this discussion with America's
Tire Co. so that the company can reach out to the neighborhood residents and
address any issues with respect to the property and the availability of the
company representatives to the neighborhood to abate any potential and/or
future problems.
Chair/Torng closed the public hearing.
C/Lin said that typically, tire stores generate about half of the traffic of a service
station. With respect to more people visiting the store on Saturday, the
opportunity for service is limited by the parking and bays so generally, people
will be scheduled to return. He believes it is a good project and architecturally,
the project is very sound.
C/Lin moved, C/Shah seconded, to approve Development Review No. PL2013.-
215, based on the Findings of Fact, and subject to the conditions of approval as
listed within the resolution. Motion carried by the following Roll Call vote:
AYES: COMMISSIONERS: Dhingra, Lin, Shah, VC/ Farago,
Chair/Torng
NOES: COMMISSIONERS: None
ABSENT: COMMISSIONERS: None
7.3 Vesting Tentative Tract Map No. 72295, Development Review and Tree
Permit No. PL2013-229 — The applicant requested approval of a Vesting
Tentative "Tract Map to subdivide an existing vacant 30 -acre site known as "Site
D" into 63 lots for the development of 182 for -sale dwelling units and a minimum
two -acre neighborhood public park. Development Review approval was
requested for the proposed architectural and landscape design elements
associated with the proposed residential component of Site D. A Tree Permit
OCTOBER 8, 2013 PAGE 8 PLANNING COMMISSION
was also requested to remove 83 existing protected trees consisting of 75
Southern Black Walnuts, 6 Willows and 2 Coast Live Oaks; and, replace them
at a 3:1 ratio with 75 Coast Live Oak and 174 Sycamore trees. The property is
zoned Specific Plan (SP) with a consistent underlying General Plan land use
designation of Specific Plan.
PROJECT ADDRESS: Site comprised of approximately 30.36 acres located
at the southeast corner of Brea Canyon Road and
Diamond Bar Boulevard (Los Angeles County
Assessor's Parcel Numbers 8714-002-900, 8714-
002-901, 8714-002-902, 8714-002-903 and 8714-
015-001).
PROPERTY OWNERS: Walnut Valley Unified School District and City of
Diamond Bar
APPLICANT: Lennar Homes of California, Inc.
25 Enterprise, Suite 300
Aliso Viejo, CA 92656
CDD/Gubman explained that Site D is predominately surplus Walnut Valley
Unified School District property and has been surplus property for several
decades. The City, in partnership with the school district embarked on a master
planning effort around 2008 to establish a roadmap and set of goals, policies
and objectives for the buildout of the Site D property. Initially, over the 30 acre
site, the Specific Plan that was presented to the public and Planning
Commission when the public hearing process started consisted of half of the
site (about 15 gross acres) being allocated for up to two hundred residences
and the other half (about 15 gross and 10 net acres) would be a commercial
shopping center with a maximum intensity of about 153,000 square feet. The
public process that ensued resulted in neighborhood workshops and further
analysis of the market feasibility of the commercial, etc. and the outcome of the
public process was that the commercial component was eliminated from the
project and approved as a 100 percent residential development but still with a
unit count capped at 200. In addition, the Specific Plan included a requirement
for a minimum of a two -acre useable park that would be constructed by the
eventual purchaser and developer of the property and would then be dedicated
to the City in a turnkey fashion. The Specific Plan was ultimately approved with
those specifications in early 2012 and since that time, the property has been
placed for sale. Lennar Homes, one of the country's largest residential
developers, has entered into escrow with the school district as the majority
owner of the property and the City which is 4.5 percent owner of a small sliver
of the property. Since entering into escrow Lennar has followed through with
obligations to embark on a public outreach effort on the park design and
although the particulars of the park are not a part of tonight's approval, there is
OCTOBER 8, 2013 PAGE 9 PLANNING COMMISSIOZ
a park concept plan, provided in the Planning Commission packet, that is being
designed for presentation to the City Council at a later date. It should be noted,
however, that the conceptual plan is faithful to the neighborhood consensus that
was achieved through the neighborhood outreach process. What the
Commission is being presented with tonight is a residential development for 182
units and 2.5 usable acre neighborhood park that would be dedicated to the
City upon completion. The Commission's charge this evening is to review the
Tract Map, Development Review and Tree Permit and the Addendum to- the
EIR that addresses refinements to the actual project in comparison to the vision
for the development that was set forth in the Specific Plan, and to determine
whether or not what is being proposed is Substantial conformance with the Site
D Specific Plan. If so, staff Would recommend that the Planning Commission
adopt a Resolution that recommends approval of the project that is composed
of several entitlement components to the City Council for its approval.
CDD/Gubman further stated that the components of the park that the
Commission will be reviewing are in the Tract Map wherein the two parcels are
delineated that provide the location for the park. If the Commission
recommends approval of the Tract Map it will set in place the footprint in which
the park would be placed. As SP/Lee will explain, there is a part of the park
called "the rain garden." Under the Federal and State Water Quality
mandate/requirements, all of the stormwater runoff for this site needs to be
retained up to a specified storm event. The proposed rain garden satisfies that
stormwater retention requirement but it is being placed within the park and
similar to how a golf course is often designed within a flood plain, this feature is
being designed as a useable recreational amenity. As far as the concept of the
rain garden, it will be a necessary and integral component to this development
because it serves a stormwater retention mandate. Park amenities such as
benches and play equipment, tree species and other features are part of a
public park, which is outside the scope of the Planning Commission's review
authority. The Parks and Recreation Commission will review the park portion of
the project and provide its recommendation to the City Council.
SP/Lee stated that this project executes the Site D Specific Plan which was
approved in February 2012. The Specific Plan set forth criteria to guide the
development of this approximately 30 -acre vacant land to allow up to 200 for -
sale dwelling units and require that at least two useable acres be set aside for a
public neighborhood park. The project is located at the Southeast corner of
Brea Canyon Road and Diamond Bar Boulevard and consists primarily of
Walnut Valley Unified School District property, as well as an approximately one
acre strip of land along Brea Canyon Road west of the flood control channel.
The flood control channel and the portion of the channel that breaches the City
and school district properties is owned and maintained by the LA County Flood
Control District. Lennar Homes is proposing to develop a new master planned
gated residential community which consists of 182 for -sale dwelling units, as
OCTOBER 8, 2013 PAGE 10 PLANNING COMMISSION
well as a 4.7 gross acre -2.5 useable acre -neighborhood park to be dedicated to
the City. The following entitlements are being requested and the Planning
Commission will forward its recommendation to the City Council for a Vesting
Tentative Tract Map to subdivide the property into 63 lots for the development
of 182 units and a 2.5 net useable acre public park; Development Review of the
proposed architectural landscape design elements associated with the
proposed residential project; and, a Tree Permit to remove 83 existing protected
trees and replace them at a 3:1 ratio with 249 trees to be planted on site.
The project site can be described as a relatively flat plateau with steep slopes.
There are three types of protected trees that currently reside on the property
including 75 Southern California Black Walnut, 6 Willow and 2 Coast Live Oak.
There are three intermittent blue line streams which flow generally from east to
west. The site has unique planning challenges due to ancien! landslides on the
property and although the landslides are inactive, they have created layers of
weakness that require designing the site to achieve minimum code of factors of
safety.
There are two main building pads proposed which were designed around the
geotechnical constraints of the site. The site was designed to build the
southeastern portion of the site indicated as Pad #1 at a higher elevation in
order to establish grades that meet certain elevation targets to comply with the
minimum safety factors. Raising the pad levels resulted in the curvature of the
private streets. There are two 16 foot high retaining walls (highlighted in red on
the plan) that separate the two main building pads. The townhome and
detached single family neighborhoods are located on the lower pad which is
indicated as Pad #2 and the detached single family neighborhood is located on
Pad #1. The lower pad consists of two tiers, townhomes on the lower tier (far
western portion of the site) and the single family detached condos on the upper
tier (along the north side of the site). The design to build up the building pads
along the southeastern portion of the site also helps to stabilize the slopes of
the existing homes on Ambusher Street abutting the site.
The basic framework for development of the underlying Tract Map, the Vesting
Tentative Map, proposes to subdivide the property to accommodate the
following different uses: 62 townhomes; 73 detached condominiums (cluster
homes) on Pad #2; 47 lots for individual sale of production homes on Pad #1
along the southeast portion of the site; private streets, slopes, open space
areas owned in common by the HOA and a neighborhood park. Lennar
proposes to market the new community as Willow Heights and the development
will consist of the three distinct neighborhoods previously mentioned, each of
which will be defined by its own housing type. The project complies with the
Specific Plan Design Guidelines through a diversity of architectural styles and
smooth transitions between structures and landscape features.
#CTOBER 8, 2013 PAGE 11 PLANNING COMMISSION
One of the neighborhoods includes 62 townhomes. Each structure is three
stories high with a total of 11 structures. There are four different floor plans with
livable areas ranging from 1,491 to approximately 2000 square feet. The
townhomes have two architectural styles, Spanish and Italian. Buildings
provide articulation and integration of various textures, colors and accents on
walls, as well as variation of details around the entry doors to create
individuality between the units.
There are 72 units proposed for the cluster homes (detached single family
condos). Each home is two -stories high with a maximum height of 32 feet.
There are three different floor plans with livable areas ranging from
approximately 1,800 to 2,000 square feet. The homes have good streetscape
diversity facing Diamond Bar Boulevard and within the private streets. There is
individuality between each unit that faces street views. All of the front
entrances have alcoves. The Italian style has exposed rafter tails and stone
veneer incorporated around the building are the Tuscan style has detailed
cornices below the edges of the roof, trim around the corners of the exterior
walls and wainscoting on the base of the building.
There are 47 units proposed on 60 x 70 foot parcels which have two exterior
styles, Spanish and Tuscan. Lot sizes range from approximately 4,000 to 7,800
square feet. Each home is two stories with the maximum building height at 29
feet. There are two floor plans with livable areas ranging from 2,850 to 3,400
square feet. These detached traditional single family homes have a higher
caliber of design detail and materials such as simulated limestone around the
base of the buildings, entry doors with roof elements and varied window
enhancements that are thoughtfully arranged and balanced.
The conceptual park plan incorporates an approximately 4.7 gross area
neighborhood park which contains the City owned parcel along Brea Canyon
Road and 3.8 acres of land east of the flood control channel. The 3.8 acres
includes a rain garden and paseo along the southwest portion of the site, The
conceptual park plan was derived with input from the park design charrette
early January 2013. The precise plan of the park is not part of the Planning
Commission's review this evening; however, it is noteworthy that the Specific
Plan envisioned the neighborhood park site near Pasado Drive with vehicular
access through the park through a public street at Cherrydale Drive and
Diamond Bar Boulevard. At the time, the Specific Plan did not envision a viable
use of the City owned strip along Brea Canyon Road, therefore, was not viewed
to be a park site since the area did not meet the 2 -acre minimum requirement.
However, during the Specific Plan neighborhood workshops, the community
wanted a park where it is currently proposed near Brea Canyon Road and with
input from the park design charrette held early this year, Lennar came up with
creative use of the land along Brea Canyon Road by providing a link between
the two parcels via a pedestrian bridge.
OCTOBER 8, 2013 PAGE 12 PLANNING COMMISSION
The park is comprised of the following features- The rain garden which serves
a dual purpose as a public recreational amenity and a private stormwater
collection facility for the residential development. The rain garden is modeled
after a facility in Aliso Viejo, which is very similar to the one being proposed for
this project. The park also contains an approximately 600 foot long. 30 foot
wide pedestrian trail along the southwesterly boundary of the site. The
pedestrian access is at the end of Pasado Drive which leads to the rain garden
and pedestrian bridge that connects to the park. An entry feature will be
located in close proximity to the corner of Brea Canyon Road and Diamond Bar
Boulevard which will serve as a prominent landmark into the entrance of the
City and the precise location of the park entry feature will be determined when
the park plans are finalized. Parking for the park trailhead will be incorporated
along the Brea Canyon Road on the City owned piece of property. The
configuration and number of parking spaces will be finalized at a later date.
SP/Lee showed slides of the Glenwood Basin in Aliso Viejo which showed trail
access, native landscaping and water features.
Primary access to the project is at Diamond Bar Boulevard at Cherrydale Drive
which will serve as the spine road to the tract and terminates at the cul-de-sac
at the southeast corner at the uppermost portion of the property. The
development will be gated and the internal streets will be private roadways
maintained by the HOA. Secondary emergency -only access will be provided at
the cul-de-sac of Pasado Drive and will be gated to prohibit vehicular
ingress/egress. The access way from Pasado Drive will be an entrance into the
park from the adjoining neighborhood. Upon entering there will be a linear
paved trail along. the southerly boundary of the site.
The proposed development is designed according to the Development
Standards and Design Guidelines contained in the Site D Specific Plan and
incorporates the following features: it provides a green and sustainability model
requirement that looks at energy efficiency, as well as healthy indoor air quality,
water efficiency, and the landscape irrigation will be designed for a future
reclaimed water connection. Buildings will have 30 foot landscape setbacks
from Diamond Bar Boulevard and along the perimeter of the project site. The
building along street view will be articulated and diversified and in addition, a
dense stand of Sycamore and Oak trees to replace the protected trees on site
will be planted within the large slopes abutting the existing residences. All
retaining walls constructed along Diamond Bar Boulevard will be three feet high
with integral color -faced retaining walls and hedges to cover the face of the
walls to soften its visual appearance along Diamond Bar Boulevard. The two
16 foot high Verdura walls will be filled with live vegetation landscaping and
flowering evergreen vines will be planted at the top of the slope to provide for
cascading plants to further landscape the retaining wall. Canopy trees will be
planted along the private internal streets, as well as along Diamond Bar
OCTOBER 8, 2013 PAGE 13 PLANNING COMMISSIOI
Boulevard and special treatment and decorative textured pavement at the main
driveway. The table compares the proposed project with the development
standards in the Specific Plan and the Specific Plan assumes that there would
be modifications to these standards with a project -specific application and that
the appropriate setbacks would be determined at the project level.
Based on the traffic impact analysis prepared for the original EIR and updated
to address the proposed development, the proposed project will not cause any
intersections or street segments in the vicinity to operate at unacceptable levels
with the following mitigation measures and improvements: 1) At Brea Canyon
Road and Diamond Bar Boulevard the developer will be required to widen
and/or restripe the northbound Brea Canyon Road to provide second dedicated
right -turn lanes; 2) widen and/or restripe the eastbound departure on Diamond
Bar, Boulevard to provide a third through -lane through the project frontage;
3) modify the existing median and restripe the westbound approach on
Diamond Bar Boulevard to provide a second left -turn lane; 4) and maintain the
existing bike lane on Diamond Bar Boulevard along the entire project frontage.
At Cherrydale Drive and Diamond Bar Boulevard, the developer will provide:
1) an option left -through lane and a separate right -turn lane on the northbound
approach; 2) restripe the southbound approach to provide an option left -through
right -turn lane on Cherrydale Road; 3) widen the eastbound approach to
provide a third through -lane along the project frontage; and f) widen the
eastbound approach to provide a second separate right -turn lane. Additional
improvements will include modifying medians and restriping Diamond Bar
Boulevard to provide a single westbound left -turn lane and installing a traffic
signal. In addition, the developer will pay fair -share fees of construction costs
to implement additional traffic mitigation improvements.
The project is designed to conform to the City's Hillside Management
Regulations and the Specific Plan complements the character and topography
of the hillside areas with 16 foot high Verdura walls which are lower than the
maximum 18 foot high retaining walls prescribed in the Specific Plan. The
retaining wall supporting fill slopes along the perimeter of the property do not
exceed four feet. All finished slopes are not greater than 50 percent and earth
tone building materials and color schemes are used to blend in with the natural
landscape and landscaping is used to screen view of downslope building
elevations.
The project is designed to be compatible and complementary to the
neighborhood by providing a quality housing development that will be attractive
and serve as a visual gateway into the City; it is designed to minimize the
negative impacts on the surrounding homes by providing landscape buffers; it
creates minimal visual impact to the adjacent homes by building the new homes
downhill on a lower pad level than the existing homes in the vicinity in order to
retain view corridors; it creates a community environment with recreational
OCTOBER 8, 2013 PAGE 14 PLANNING COMMISSION
opportunities by incorporating a neighborhood park; and it incorporates a
community identity through a landmark entry feature at the corner of Brea
Canyon Road and Diamond Bar Boulevard. The project will include street
improvements along Diamond Bar Boulevard with street trees, sidewalk and
bike trails and will comply with the Streetscape Design Standards currently
being drafted by the City, which will incorporate tree wells, bus shelters, fencing
and walls within the public right-of-way.
Although there is no view protection standard in the City's Development
Regulations, staff required a viewshed analysis because the southeasterly
portion of the site is more elevated than envisioned in the Specific Plan. As
shown in the visual simulations, the proposed development will respect the
views of existing residential uses abutting the site. The key map illustrates the
viewsheds from the rear yards of five existing residences located on Ambusher
Street. These five homes were selected because the area of the site is
elevated due to geotechnical constraints of the site. These residences are
located approximately 120 to 190 plus feet away from the nearest buildings
within the development. The existing residences are located on an
approximately 10 foot higher building pad than the proposed homes. The
applicant lowered the building pads by approximately 10 feet for the lots that
most impact the lots on Ambusher Street.
The City certified the Final EIR for the Specific Plan in February 2012 and the
Final EIR analyzed the potential impacts resulting from the Specific Plan
approval from both programmatic and project level perspectives. It analyzed
development of the site for residential and recreational uses. With submittal of
the project, staff prepared an Addendum to the Final EIR which includes minor
technical changes in order to determine the project's consistency with the
Specific Plan and documents that no new environmental issues have been
identified. The project has been conditioned to include the mitigation measures
to address the site-specific conditions for the project in order to make the
project acceptable.
SP/Lee noted a typo on Page 16 of the Resolution under Tentative Tract Map
Condition of Approval #5 to include the following change to the last sentence:
"If the 100th dwelling unit is within a multi -unit building, the building permit for
the entire building shall be withheld until the park is completed." SP/Lee noted
that staff received a letter from a resident recommending that the project be
denied because the project will cause traffic to be worse than it currently is, a
copy of which has been presented to the Commission this evening.
Staff recommends that the Planning Commission adopt the attached resolution
recommending City Council approval of Vesting Tentative Tract Map No.
72295, Development Review and Tree Permit No. PL2013-229, based ori the
OCTOBER 8, 2013 PAGE 15 PLANNING COMMISSIO-J,
Findings of Fact, and subject to the conditions of approval as listed within the
Resolution.
C/Shah asked for an explanation of the proposed "optional" left turn.
Rich Barretto, PE, LLG Engineers, who prepared the traffic addendum for the
project, responded to C/Shah that it is an optional left through lane so the
project would require the addition of appropriate striping to indicate that on a
particular lane, a driver is permitted to make either a left turn or continue
through the intersection.
Chair/Torng asked for a clarification of the lot sizes on Page 5. He asked for a
clarification of the "Next Gen" home also referred to on Page 5. S P/Lee
explained that one of the floor plans in the 60 x 70 lots include a master suite.
These homes are called multi -generational homes marketed by Lennar as
"NextGen", The Home within a Home®. The intent of the suites is to provide a
flexible space that is connected to the main living areas of the home which
contains a separate space with separate entrance, living area, bedroom, wet
bar and laundry unit that could be used for a variety of uses or lifestyles
including a second master bedroom suite, entertainment area or guest suite.
These homes will be required as part of the CC&R's, as well as a condition of
approval to prohibit cooktop kitchen facilities and separate metered utilities. All
utilities serving the site will be common and dependent on the primary
residence.
Chair/Torng asked if a fire truck could go through the secondary emergency
access and SP/Lee said that the gate functions as a pedestrian access but also
serves as an emergency -only access that allows safety vehicles which will be
able to access the subdivision. CDD/Gubman said that neighborhood access to
the park would be allowed for pedestrians at Pasado Drive which would be
served by a pedestrian gate which would be locked during the hours the park is
closed. In the event of an emergency requiring emergency vehicles or if the fire
department mandates an evacuation, the gate would be opened LIP for such
purposes.
Chair/Torng asked if Sycamore trees were a proper replacement tree for
protected trees. SP/Lee explained that Sycamore trees are a protected trees in
the City's Tree Preservation Ordinance so the applicant will be replacing with
Sycamores and Oaks, both of which are protected trees.
Chair/Torng opened the public hearing.
Geoff Smith, Lennar Homes, applicant, said that Lennar Homes is very excited
to bring Willow Heights to the City and to the Planning Commission for its
consideration. When this project was first contemplated, Lennar Homes was
OCTOBER 8, 2013 PAGE 16 PLANNING COMMISSION
very happy to read the Specific Plan because it is really a great example of
modern master planning techniques and methods so Lennar simply used the
Specific Plan as its template for moving forward. Beyond the Specific Plan, the
company drew its inspiration from the rich character of the site, surrounding
area and the authenticity and rich character of the City. For example, Lennar
Homes took to its heart the Tree Protection Ordinance and will use Live Oaks
and Sycamores which are protected trees in Diamond Bar. These trees will be
used throughout the site as a street tree and in focal areas, open space areas,
etc. Lennar is using materials such as pavers and retaining wall in neutral earth
tones to blend the development into the hillside. Lennar is using decorative
luminaires in the streets that will provide a common design theme throughout
the community. And the community will boast sustainable building practices
such as high energy efficient homes, use of low VOC paint and drought tolerant
landscaping. The homes located in one of three neighborhoods offer a diverse
range of housing types for the City and will provide for a broad range of
lifestyles. Some homes will be designed to meet the needs of multi -general
households, which is a very common situation in today's society. With all of
that said Willow Heights will bring a wonderful amenity to the City, with the four -
acre public park which will offer new linkages to existing trails that will provide a
connection to the natural environment and promote a healthy lifestyle. He
introduced his design team and offered to respond to any questions the
Commissioners might have.
C/Lin said there was a specific reference to "the sufficiency of the project's
sewer storage" and it was very vague as to how it will be solved when the
sewage capacity is overrun. Mr. Smith responded that the EIR spoke in broad
terms about the site sewer being connected to a public system. As Lennar
moved forward with its technical studies there was a specific study done
generating sewage rates, etc. and through that process working through the
City and LA County Public Works Department, it was determined that the
storage capacity of the existing system for decades has been deficient when it
comes to emergency storage. So during this process which is still ongoing as
to how the City, as the owner of the system, and how LA County as the
maintenance purveyor of the system, can work together to increase the
emergency capacity or the safety of the system during power outage and other
emergencies. Willow Heights was somewhat caught in the middle of that
situation so Lennar"s solution to that tonight is that Lennar will be paying a fair -
share fee to the City that is related to this project's fair -share of the ernergency
storage. At a later date, the City and LA County will address the deficiency.
C/Lin said it was a very costly undertaking and was surprised that the sewage
capacity was deficient and in case of a major power outage after two hours the
sewage would spill back.
C/Lin said that neighbors are very concerned about the traffic. He read the
traffic report this evening which states that this project will generate about 1,800
OCTOBER 8, 20113 PAGE 17 PLANNING COMMISSIO1
cars per day which is not a lot in the scheme of things except during a.m. and
p.m. peak hours when Diamond Bar Boulevard usually spills back to the
proposed project entrance. The report says that both today and in the horizon
year of 2030 when everything is built out, the level of service will be E and F for
those intersections under analysis. Furthermore, there are recommended
improvements but he did not see the resulting analysis after implementation of
the recommendations. Also, it was not quite clear that upgrading street facilities
at a cost of about $6.1 million would meet the horizon years' traffic demands.
And, the project share is only $158,000 which seems to be a very small portion.
He lives in a newer gated facility and he wanted to know how far the gate would
be located from the street. He presumes that the project does not want to have
a guardhouse at the gate in the future. In fact, his neighborhood did not intend
to have a guardhouse but later put one in. A guardhouse is usually 20-25 feet
further toward the street from the gate which means that at times, the tail of the
third car might be sticking out into the street. Mr. Smith said he understood
about the stacking distance behind the gate. Lennar asked the traffic engineer
to look at that to ensure that a reasonable number of cars could stack behind
the gate while it opened and Lennar felt comfortable with the design. He said
he would check to see the exact distance between the gate and the street. He
knows that the LA County Fire Department has definite requirements for that
issue. C/Lin said that 50 feet is required. Mr. Smith said that in terms of level
of service questions were best left to his traffic engineer. Rich Barretto stated
that with respect to project impacts to the surrounding street system that yes,
Diamond Bar has congested intersections and interchanges which are most
likely due to bypass freeway traffic. The report identified locations of impacts at
Diamond Bar Boulevard and Brea Canyon Road, Cherrydale Drive at Diamond
Bar Boulevard and the southbound ramps at Diamond Bar Boulevard. With
respect to the impacts at the southbound ramps and Diamond Bar Boulevard,
the mitigation has been completed. That area has been signalized to take care
of the bad service level. With respect to Diamond Bar Boulevard and Brea
Canyon Road, the report calls Out what the resulting service level would be at
that intersection if the mitigation measures as identified were implemented and
the result is a good service level. At Cherrydale Drive and Diamond Bar
Boulevard, the result of implementing the mitigation measures is a good service
level. Tables call out the result of implementation of recommended mitigation
measures. He referred to Table 6, intersection 16 which looks at a buildout
scenario. Regarding the project's fair -share of only $154,000 of the total $6.9
million projected for mitigation measures, it is relative to the project's
contribution from a volume standpoint to the intersection. Table 6, ICU
increment barely gets more than 2 percent at any of the intersections and in
most cases, the report is down to the third level before any project impacts can
be identified which is the primary reason the project's share is so small — it is
because the measurable impact resulting from the added volume from the
project is so small to everything else that is going on in the area. 1,500 trips
during peak hours in comparison to what the original traffic study looked at with
OCTOBER : 2013 PAGEPLANNING COMMISSION
a mixed-use commercial with 150,000 square feet of retail resulted in over 9000
daily trips and under that scenario that project's impact resulted in a much
higher fair -share contribution. Because this project looks at residential units
based on peak hour volumes it actually lowers the volume. If all of the
improvements are implemented along the frontage at Diamond Bar Boulevard
and Brea Canyon Road the project's impacts are more than offset. In fact,
more capacity will be added for the traffic making its way through the City and
not traffic that is generated by the project. Relative to the gate location, the
document reports on the LA County Fire Department requirements for access
and location and beyond that the analysis looked at a queuing assessment.
Figure #14 calls out the dimensions including the location of the call box which
is 50 feet in from the property line and frorn the curb face it is probably closer to
60 feet. The critical issue for most gated communities is not what the
residential queue would be, because the remote gate opener in the driver's car
would have been used and the gate would be open by the time the driver
reached it. The guest queue demand for a community of this size would most
likely be no more than one guest car during the peak period. He said he felt
confident in saying that there would not likely be an issue of visitor vehicles
backing up onto Diamond Bar Boulevard. C/Lin asked for confirmation that the
$158,000 fair -share fee was a fee in addition to completion of the mitigation
measures. Mr. Barretto responded "absolutely" and that includes the supposed
share for the Diamond Bar Boulevard and Brea Canyon intersection for which
the City is making improvements beyond the project's recommendations. On
top of that, the signal is already installed at the southbound ramps but because
the starting point on this project was pre -signal it made sense to do an apples -
to -apples comparison and consider how the street may have changed from that
standpoint.
C/Dhingra said the plans show 6,000 cubic yards more of cut than the 2013 EIR
indicates. He asked how the impacts of the truck traffic would be mitigated
during grading and construction. Mr. Smith said that he is concerned about
truck traffic on the City streets as well, and one of the conditions of approval is
to prepare a traffic control plan for any construction traffic that would be
required on City streets. In terms of the 6,000 yards, there may or may not be
that amount by the time all of the grading activity and soil shrinkage occurs.
There may not be any export or there may be more export. The odds are that
there will be some export from the site and plans will be implemented to keep
the City streets safe and proper demarcation of sidewalks and bike lanes will be
done. C/Dhingra asked if this was intended to be a mitigation measure and Mr.
Smith said he believed it was a condition of approval prior to grading permit.
Jeanette Ulrich, Assistant Superintendent of Business, Walnut Valley School
District, stated that the district is very excited to be involved in this project with
Lennar Homes. The Walnut Valley Unified School District is a very desirable
district for schools to attend as the areas within the district are very sought after
OCTOBER 8, 2013 PAGE 19 PLANNING COMMISSIOJ
with respect to property and property values. Should the district succeed with
the closing of escrow in this project the district can continue to provide a
superior educational program for students within Diamond Bar and the City of
Walnut and to continue updating its facilities and keep its facilities in the
condition they are matured to at this time with the support of the constituents in
the issues of Measures S and 'Y which moves modernization of facilities
forward. She thanked the Commission for its consideration.
Chair/Torng repeated that the public hearing was open for comments.
Taylor Luan, 20955 Gold Run Drive, felt the project would negatively impact an
already difficult traffic Situation, especially during peak hours and wanted to
know if that issue was addressed in the report. He complained that mature
trees would be replaced with smaller trees.
Vinod Kashyap, 21452 Chirping Sparrow Road and 3839 Castle Rock Road,
said he went to the City Council meeting and expressed his concerns that the
EIR was flawed for the following reasons: 'The EIR was based on as if one was
doing a room addition on a cul-de-sac. He asked if he could have a list of
people who were mailed notices because he lives within 300 yards and from
what point is the distance measured for notices. He did not believe that anyone
is living within 300 yards. CDD/Gubman touched on the history. This land was
given to the school district in 1970 when the SR 57 was built, specifically for
educational purposes. He is personally going to have Supervisor Knabe
investigate the City Council and this entire process because the City paid for
the EIR and said he believes fraud is being perpetrated on the citizens of
Diamond Bar. He stated that this project is not going to happen.
RECESS: Chair/Torng recessed the meeting at 9:08 p.m.
RECONVENE: Chair/Torng reconvened the meeting at 9:20 p.m.
Taylor Luan, 20955 Gold Run Drive expressed concerns about removal of
mature trees and traffic in the area.
Nick Prokop, 20909 Gold Run Drive was upset that this was a "done deal" and
wondered why he was here this evening. He was concerned about traffic and
other issues. He commented that when the City was unincorporated the
citizens were promised that incorporation would never happen and look at
where we are today.
John Jones, 20925 Ambushers, stated he is a woodshop teacher and walnut
trees make great furniture. He understands the EIR and Specific Plan are
approved and will move forward and wondered if the trees that were being
removed could be used for class projects. He was also concerned about
OCTOBER 8, 2013 PAGE 20 PLANNING COMMISSION
construction relocating wildlife into nearby neighborhoods. He was also
concerned about traffic but believed traffic would be a problem in the City
whether or not this project was built. He further added that he visited a new
park in the City of Brea and would like to see one here too. He asked if the
wetlands (rain garden) was designed to address mosquito problems.
Octavio Colon, 3101 Crooked Creek Drive, asked why the fire fighters and
police were not present tonight and was curious to know how the proposed
development would impact the response time. He was also concerned about
wildlife, and the trees that would be removed. He stated that he lives on a
curved street and it was designed incorrectly. He asked who would be
responsible if a car ends up on his yard.
Ryan Farsai, Laguna Hills and owner of the Diamond Bar Arco station said he
understands the neighborhood's concern however he was in favor of the project
and believed it would beautify the corner and rid the area of trespassers and dirt
bike riders.
Darcy Gunter, 3427 Castle Rock Road said they told her that she could not
attend any meetings (she did not clarify who "they" were) and pointed out the
location of her house and how she thought the project would affect her. She
stated that this was the first she heard of these meetings and did not know they
were going on for as long as has been mentioned this evening. She believes
the City did not do a good job in notifying the residents and she is very upset.
She went to the board and identified her home and wanted the Commission to
know how this development would affect her neighborhood. She believes it is a
bad development that would lower the value of homes around her
neighborhood. After hearing Ryan Farsai speak in favor of the project she said
she would no longer buy her gas at the Arco Station and would persuade her
neighbors to do the same.
Lew Herndon, resides on Rio Lobos, spoke on behalf of Pastor Mark Hopper of
the Evangelical Free Church located across the street from Site D. Pastor
Hopper had to leave the meeting due to another commitment. The church
wants to know if this project would cause the City to withdraw its permit for
street parking on Diamond Bar Boulevard in front of the church on Sundays.
David R. Busse, 21455 Ambushers Street attended all of the meetings.
Unfortunately, when the applicant was responding to comments people were
speaking from the audience and he missed the response about how high or low
the new houses would be compared to his house. He still has not received an
answer to that question. He has listened to the applicant but still no direct
answer how high or low the homes will be as it relates to his property. He said
he did not want to live in Irvine or Aliso Viejo or sit in traffic for 40 minutes. He
added that there should be access to the park from the development. He was
OCTOBER 8, 2013 PAGE 21 PLANNING COMMISS10a,
upset that this appeared to be a done deal with a lack of transparency and it
greatly concerns him.
Fara Lou, resides on Gold run. She stated that she has concerns with the
planting of Sycamore trees causing allergies. She asked if adequate visitor
parking is provided on-site and whether it complies with the development code.
Mike Perez, 3241 Castle Rock, stated there was lack of transparency and
information was not on City's website.
James Eng, 20935 Running Branch Road, expressed concerns about traffic
patterns at the intersections of Diamond Bar Boulevard at Brea Canyon Road
and at Copper Canyon Road on work days.
Salim Akbany, 21179 Chirping Sparrow Road, said he was ignorant about this
project until today and now finds it is progressing toward conclusion and
questioned the notification process.
Brenda Ashraf, 3407 Crooked Creek Drive said that until today she knew
nothing about this project and did not understand the concept of protected trees
if the trees were going to be removed.
Chair/Torng closed the public hearing.
Mr. Smith responded to Mr. Busse that in working with staff, existing home sites
were selected because they represented the "worst case" of the viewshed. The
way the topography works is that these homes climb higher further away from
Willow Heights so the viewshed becomes better and better as one moves up
Ambushers Drive. He provided a visual to show Mr. Busse that at a certain
point his home is 74 feet above the homes and over 335 feet away. The
Tentative Tract Map establishes grades and the rear yard of the home pointed
out on the visual is 74 feet above the grade established on the Tentative Tract
Map. Mr. Busse asked if that grade was higher or lower at that point than the
present elevation of the ground. Mr. Smith responded that the proposed grade
is roughly 10 feet above natural in that area. Mr. Smith explained that the
viewshed analysis is based on proposed and not existing so the analysis is
reflecting the future condition.
Mr. Smith responded to speakers concerned about tree replacement that there
are a number of problems with the Black Walnuts. The landscape architect
explained that he attempted to work within the confines and outline of the
replacement trees that were dictated by the City and while the Black Walnut is
certainly a candidate tree, in his experience it tends to have a weak branch
structure and is susceptible to breakage during windstorms. And while this is
no longer an open space situation and more of a rural suburban development,
OCTOBER 8, 2013 PAGE 22 PLANNING COMMISSION
his team sought a tree that was more respectful of those exposures and leaned
toward the Sycamore. While there have been comments about the allergy
consideration of the Sycamore, there are considerations with different cultivars
of Sycamore and he is not sure that the tree replacement that the City has
provided allows for that interpretation but it may be a consideration. The same
is true of Oak Trees. There are smaller varieties of oak trees as opposed to
Live Oak that would allow for planting of more oaks and less Sycamores which
is also a consideration. Mr. Smith stated that as the project moves forward with
its final design they will work with staff to choose the correct variety and number
of Sycamores versus Live Oaks to create a good balance. As part of the
permits with the Fish and Wildlife Agency they are mitigating at a 3:1 ratio Black
Walnut habitat offsite.
Mr. Smith responded to a question about traffic on Pasado Drive. This project
will not be using Pasado, Crooked Creek or Castle Rock as construction
entrances. The construction entrance will be off of Diamond Bar Boulevard and
will have a traffic control plan implemented for construction traffic.
Mr. Smith responded to a question about rodent control prior to grading and
Lennar has agreed to a Condition of Approval prior to grading that would
involve rodent control. This is a concern that the company has had in the past
that as soon as the machines are fired up the rodents move into neighbors
yards so there will be a rodent control measure implemented.
Mr. Smith responded to a question about a timeline and stated that Lennar is
planning to break ground in January 2014 and should have model homes open
in the fall of 2014.
Mr. Smith stated that with respect to mosquitoes in the rain garden, Lennar will
be working with the LA County Vector Control. Most important is that the park
maintenance plan will be critical and Lennar will work with City staff on an
adequate maintenance plan that will ensure that any plants that are grown in
the pond do not take over the pond and become a mosquito habitat. Regular
maintenance will be provided to ensure that mosquito fish are kept alive and the
ponds can be adequately accessed to keep them maintained which will be part
of the strategy going forward.
Regarding comments about the pictures of the Aliso Viejo Glenwood Basin, Mr.
Smith indicated that tonight the design details of the park are not being
addressed but it will be the City's unique opportunity to help Lennar design the
park that meets the City's and community's needs. In no way is Lennar
attempting to copy a landscape palette from Aliso Viejo, this park will be the
City's own and Lennar will be working with the Parks and Recreation
Commission and CSD/Rose and his people to ensure development of a park
that meets the needs of the City.
OCTOBER 8, 2013 PAGE23 PLANNING COMMISSION'
Mr. Smith responded to comments about emergency access, traffic and the fire
department review. The Tentative Tract Map was reviewed by the LA County
Fire Department and was approved as part of the process.
Mr. Smith stated in response to a comment about construction hours that the
City Ordinance calls out hours of 7:00 a.m. to 7:00 p.m. Monday through
Saturday and the project hours will typically not go until 7:00 p.m., rather
typically to 3:00 p.m. There are times when extended work is necessary but by
and large construction will go from 7:00 a.m. to approximately 3:00 p.m.
Monday through Friday.
C/Shah asked Mr. Smith to comment on visitor parking for the park. Mr. Smith
said that this project far exceeds the visitor parking requirement called out in the
Specific Plan. Visitor parking is distributed throughout the site and generally for
the single family detached homes and the detached condos the parking will be
along the backbone streets which are wide enough to accommodate parking on
both sides. For the townhomes, parking stalls will be spread throughout the
area. C/Shah asked about access points for the park area. Mr. Smith said this
is a very important consideration that Lennar has given a lot of attention.
Certainly, there will be pedestrian public access from Pasado Drive. From
inside the community there will be points of connection for pedestrians and
obviously, the entrance will also have pedestrian gates. Other access points
are under consideration.
C/Lin asked the distance between the intersections of Diamond Bar Boulevard
and Cherrydale Drive and Brea Canyon Road. Mr. Smith responded that the
distance is approximately 900 feet. C/Lin asked if the traffic engineer tested the
queuing to see if the overall coordination would work during the pm peak hours.
Mr. Barretto responded that the 800-900 feet meets the stacking requirement
for the project. Cherrydale is a non -issue. The project is adding a second lane
southbound on Brea Canyon which extend +220 feet. The critical movement is
the westbound left to go southbound and bypass traffic to northbound right.
The project improvement is the second northbound right.
With respect to comments about traffic, Mr. Barretto explained that from a traffic
standpoint and a modeling standpoint, the general belief is that when projects
like these are built, traffic generally gets worse which may be the case in some
instances; however, when the project is actually putting in capacity enhancing
improvements like a second westbound left and a second northbound right, the
post project condition is actually better.
C/Shah said that the City and residents are very concerned about cut through
traffic and 2030 projections. Mr. Barretto said that as these improvements are
installed the traffic gets to a good service level and the project is actually
OCTOBER 8, 2013 PAGE 24 PLANNING COMMISSION
implementing one of the most important improvements in the City because of
the congestion in the area. C/Shah said the report did not project cut through
traffic. Mr. Barretto said that C/Shah is correct. One of the modeling
expectations when looking at forecasting volumes in the future is to either use a
model that tries to consider what is happening on the freeway, or whether it is a
straight line growth or compounded growth. What the report does take into
consideration is what is happening in terms of planned improvements so the
forecast volumes take into consideration the project, freeway, proposed
improvements and Caltrans proposed improvements. Is it to the point one
could actually predict that all of this growth that is happening between now and
2030 is X amount of cut through traffic and that cut through traffic will double or
triple? No, the report does not get into that level of specificity.
C/Dhingra said that earlier it was stated that the distance between Brea Canyon
Road and Cherrydale Drive was about 900 feet. He asked what kind of
stacking Cherrydale Drive can take to make a left turn exiting the development.
Mr. Barretto reiterated that the gate is 80 feet back and will accommodate four
cars. There has been a lot of talk about cut through traffic but when people
come off of the SR57 to make a right turn on Grand Avenue it is the portion of
roadway that is generally most congested. One of the mitigation measures is to
put pressure sensors on the extension of Cherrydale Drive which would give a
driver the prior right to make a left turn. This is a City of Diamond Bar issue, not
a project issue, and is probably not within the purview of the Planning
Commission but more likely within the purview of the Traffic and Transportation
Commission to see how the arterial and cut through traffic that has to sit at
traffic lights will quit cutting through. His point to the designers is that four cars
to make a left turn is not adequate because traffic will begin to stack up on
Cherrydale Drive. Mr. Barretto responded that this project deals with less than
200 homes. C/Dhingra said that what is not acceptable is that during peak
hours only four people can make a left turn.
Chair/Torng said he believed that the City had been open and transparent
about this project and he has complete confidence in City staff. The audience
seems to have concerns about the issue of transparency and he asked staff to
tell the audience where they can get the information pertinent to this project.
Chair/Torng also asked staff to comment on the notification procedure.
CDD/Gubmari stated that the notification boundary is 1000 feet from the
perimeter of the project. He used an overhead to show the perimeter and
indicated that all properties touched by the 1000 foot radius would receive a
notice. In addition to properties within 1000 feet of the exterior boundaries of
the project site a mailing list was maintained for individuals that had contacted
the City in response to other notifications, either in the City's newsletter or the
City's website. When the EIR was out for public review and when public
workshops were being held there was information on the homepage of the
OCTOBER 8, 2013 PAGE 25 PLANNING COMMISSIOZ
Diamond Bar website. There is still information on Site D under a search bar on
the home page. In addition to the radius and people who asked to be notified,
through the four workshops that were held during the entire Specific Plan and
Park effort, anyone who attended those workshops and signed in were added to
the mailing list. There were several efforts to publicize this project during the
Specific Plan process and through the notification process, while state law
requires a 300 foot radius Diamond Bar goes out 1000 feet and adds to its
mailing list when requested to do so. In addition to the numerous contacts
received by the City when the Draft EIR was released for public review, those
individuals were added to the mailing list. In terms of transparency, the City
makes every effort to go as far as possible to notify people. Unfortunately, no
matter how genuine the attempt to provide public notification, staff always hears
it has fallen short. The reality is that the City takes extra efforts to reach out to
the public about its projects.
Chair/Torng asked about a speaker's concern regarding the Church parking
issue and CDD/Gubman said he had no response other than if the Church is
currently permitted by the City to park on the street it is a Public Works approval
and a matter for that department. He said he did not see a nexus between
development of this project and continuing the on -street parking along the
Church frontage. The Church is looking at doing some improvements. In fact,
CDD/Gubman has met with Pastor Hopper about plans being envisioned for the
site which include opportunities to add off-street parking and parking within the
Church campus. He said he did not believe there would be anything as a result
of this project that would preclude an ongoing practice with respect to on -street
parking to serve the Church.
C/Dhingra asked if the Tree Ordinance contains a blanket 3:1 replacement ratio
or is it based on tree damage which evolved into a ratio of 3:1. CDD/Gubman
said the Ordinance calls out a 3:1 ratio and there is a minimum diameter and
the caliper for a protected tree has to be eight (8) inches and if it is at that
threshold or larger it would have to be replaced at a 3:1 ratio. With the 3-1 ratio
there is a proportion of a 24 -inch box and 15 gallon trees that have to be
provided for.
C/Lin said that there has been a lot of discussion about traffic issues and the
purpose of this agenda item has been lost, one of which is to review the
architectural landscape design elements. He asked if the building color is set in
stone and CDD/Gubman responded that part of the Commission's design
authority is to comment on the colors and make recommendations. C/Lin said
that the color on the Tuscan home A 21 is not really earth toned. He would not
buy a home with this color on the exterior, Mr. Smith provided the color charts
to the Commissioners. Allen Scales from KTGY Group said he recognized that
color output sometimes shifts on copy process and from one computer to the
next. There is no intent to go with "blue" color schemes and the colors are
OCTOBER 8, 2013 PAGE 26 PLANNING COMMISSION
trying to conform to a warmer and richer earth tone. Certainly, the color design
is very subjective and they are open to making changes and finding a palette
that is acceptable to the City. The goal of the project is to provide variety to the
street scene. The cluster home colors are provided six different color schemes
to meet that objective — three are for the Spanish architecture and three
additional color schemes for the Tuscan architecture.
C/Lin said that when the plan is approved, the sequence of the color scheme
will be set and homeowners will not be allowed to stray from those colors. Mr.
Smith said Lennar would work with the architect, design team and the City to
create a plotting of colors so that they are distributed in a way that makes sense
and remains in overall harmony with the project. C/Lin is correct that the
developer does not allow the homeowner to pick and choose colors because it
could potentially create a "scatterboard" effect. The developer takes a holistic
approach to the community in making sure that everything is in harmony and all
of the design works together.
C/Lin read from Item C on Page 5 with reference to selling a portion of a unit.
He felt there was no way that the HOA would find out if a cooktop kitchen was
installed because the best CC&R's would not prevent people from doing so.
Mr. Smith said the intent of those conditions is to discourage the NextGen
component of the horne to be sold or rented. One could not sell the NextGen
piece separately because the property is not being subdivided in that manner.
Regarding the metering, the developer will be processing meter plans with the
City and utility agencies and these homes will not have two meters and two
services to each home. With respect to the cooktop, in any situation a
developer can only control what it builds and a developer can set up CC&R's
that it trusts and hopes will maintain the integrity of the community down the
road. Ultimately, the developer does not have much control after that. He felt it
would be prohibitive for a homeowner to put in a cooktop because it would
result in a major remodel and at that point the City would not allow a building
permit.
C/Dhingra stated that with respect to this project, the scope of the Planning
Commission is very narrow because the EIR has been certified and the Specific
Plan has been adopted and approved. He is frankly very surprised that people
have said tonight that they have not heard about this project. When one
considers how long this project has been in the works and in his opinion, staff
has done a tremendous job. There were four workshops and residents within
1000 feet of the project were notified even though the state requires only 300
feet. The Planning Commission's scope is the Tree Permit, Development
Review (architecture and color schemes, etc) and Vesting. Vesting is
essentially the right of the property owner to develop the property. The
Commission's scope is to determine that this project complies with the Specific
Plan and that the EIR has been certified. If people feel strongly about a
OCTOBER 8, 2013 PAGE 27 PLANNING COMMISSIOZ
developer being able to drive a tractor through the area they need to challenge
CEQA on the matter. From his vantage point he is satisfied that the Tree
Permit complies with the City Ordinance. The applicant made concessions to
look at a different blend of Sycamores and Oaks for a better balance in the
event that some of the species produce more allergies and 75 of the trees are
Black Walnut which will be mitigated under a California Fish and Game Wildlife
Permit. Someone asked why the City would destroy protected species and if
they are being destroyed at a 3:1 ratio those trees are being planted elsewhere
in accordance with the state agency's requirement. With respect to the
Development Review, there is room to figure out the final color panels and there
are at least one half dozen schemes that have been shown to the Commission.
Regarding the Vesting Tract Map he understands that traffic is an issue but
traffic is an issue not because of this development, it is because of the people
using Diamond Bar Boulevard as an alternative to the freeway which is not
within the purview of the Planning Commission. Perhaps people who are
present tonight could attend one of the Traffic and Transportation Commission
meetings and ask them to alleviate those concerns. The Traffic and
Transportation Commission would provide a more appropriate forum for those
particular concerns.
C/Shah said he agreed with C/Dhingra's summary of the project. The
community has some good ideas about the traffic and believes these issues
should be aired in front of the Traffic and Transportation Commission which has
the authority to respond to such concerns. What he observed is that the
developer has shown good faith in his estimation of this project. He is and will
remain concerned about traffic but that issue is not within the purview of the
Planning Commission.
C/Lin echoed C/Dhingra's comments that the scope of tonight's meeting is
limited to those three items. He understands that traffic and other issues are
very emotional issues for residents. He believes the developer is doing the , ir
best to mitigate the 1,500 daily vehicle trips and spending a substantial amount
to alleviate the traffic issue. The big problem is 50,000 or so cars a day on
Diamond Bar Boulevard that will not go away whether a piece of property is
developed or not.
Chair/Torng thanked residents for attending tonight's meeting and understands
their concern for Diamond Bar. He thanked staff, his colleagues and the
developer for addressing all of the questions and concerns. Tonight's decision
will be based on the facts and what the Planning Commission is challenged to
do at this time. Chair/Torng advised Mr. Herndon to contact staff about parking
on Diamond Bar Boulevard in front of the Evangelical Free Church.
C/Dhingra moved to approve staff's recommendation that the Planning
Commission recommend approval to the City Council of Vesting Tentative Tract
OCTOBER 8, 2013 PAGE28 PLANNING COMMISSION
0
91
Map No. 72295, Development Review and Tree Permit No. PI -2013-229, based
on the Findings of Fact, and subject to the conditions of approval as listed
within the resolution. C/Shah seconded the motion. Motion carried by the
following Roll Call vote:
AYES: COMMISSIONERS
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
Dhingra, Lin, Shah, VC/ Farago,
Chair/Torng
None
None
PLANNING COMMISSIONER COMMENTS/INFORMATIONAL ITEMS:
C/Shah said this was an interesting meeting that was handled very well by Chair/1-orng
and his colleagues. Of course staff put a great deal of effort into tonight's presentation
and he thanked staff and Lennar Homes.
C/Dhingra thanked staff for doing such a wonderful job and preparing the Commission
as it did. He said he was very pleased to see the participation by the public on a
project like this. If nothing else it not only voices their concerns it shows their concern
for the community in which they live and in the City as a whole.
VC/Far-ago thanked staff for doing a great job preparing the Commission for tonight's
meeting. He thanked C/Dhingra for so eloquently stating the Commission's charge to
the public which really moved things along.
Chair/Torng felt C/Dhingra did a very good job tonight and the City is very fortunate to
have such an experienced individual join the Planning Commission. He just learned
that four of the five Commissioners are engineers. VC/Farago said he was a
construction manager. Chair/Torng thanked staff and his colleagues for a very smooth
meeting. The Commission does its best to do its job as it is charged to do for the
benefit of the community.
STAFF COMMENTS/INFORMATIONAL ITEMS:
9.1 Public Hearing dates for future projects.
CDD/Gubman thanked the Commissioners for their compliments to staff for
supporting them for their charge as Commissioners. He highlighted SP/Lee's
exemplary efforts in preparing a very difficult staff report and putting together a
very densely packed and information filled presentation and delivering it to the
Commission. It was not an easy task and was made even more difficult
because she had to turn in her work to him to be reviewed because lie is not
the shiest person with a red pen.
*CTOBER 8, 2013 PAGE 29 PLANNING COMMISSION
The next Planning Commission meeting is October 22. He will be on vacation
that week and the meeting will be staffed by SP/Lee. The October 22 agenda
consists of the matter that was continued tonight, the new residence on Falcons
View. In addition, there is an addition to an existing residence on Birdseye.
The continuance for the addition on Ridgeline to address the retaining wall
issue, the applicant is ready and the item will be heard on November 12, the
only item on the November agenda at this time.
10. SCHEDULE OF FUTURE EVENTS:
As listed in tonight's agenda.
ADJOURNMENT: With no further business before the Planning Commission,
Chairman Torng adjourned the regular meeting at 10:47 p.m.
The foregoing minutes are hereby approved this 22nd day of October, 2013.
Attest:
Respec-Liully Submitted,
"GcV G u b m
Community Development Director
Ton orng, Chairnian