MINUTES OF THE TRAFFIC AND TRANSPORTATION COMMISSION MEETING
FEBRUARY 14, 2008
CALL TO ORDER:
Chairman Shay called the meeting to order at 7:00 p.m. in the South Coast Air Quality
Management/Government Center Hearing Board Room, 21865 Copley Drive, Diamond Bar,
California 91765.
PLEDGE OF ALLEGIANCE: Commissioner Lin led the Pledge of Allegiance
ROLL CALL: Commissioners Kevin House, Jimmy Lin, Liana
Pincher, Vice Chairman Kenneth Mok and
Chairman Michael Shay
Also Present: David Liu, Public Works Director; Rick Yee, Senior
Engineer; and Marcy Hilario, Senior Administrative
Assistant.
APPROVAL OF MINUTES:
,C/House referred to a question he asked at the previous month's meeting regarding
the requirements (if any) of the school district to consult with the City before building a
new school. He asked if the City has any say as to traffic patterns or parking spaces
that would impact the residents. PWD/Liu stated that we do not. The school district
works directly with the State of California Architecture's Office and commonly retains
a professional development team that performs traffic studies in regards to access
and circulation. With that said, whenever we learn of a proposal for a new school,
staff makes efforts to meet with the school district to discuss their concepts and make
suggestions. Again, the school district is not required to work with the City as a
typical private developer would.
C/House also asked if we have received any feedback from residents regarding the
Diamond Crest Lane/Emerald Lane Traffic Measures (Item VI — 1). PWD/Liu
responded that Tony Torng, resident, called to thank the City and staff for being
responsive.
Chair/Shay asked staff to update the Commission on the topic of Lorbeer Middle
School Access onto Diamond Bar Boulevard (Item VI — K). SE/Yee stated that staff
presented our concerns to our traffic engineer to address. A prior report was pulled
from the late 1990's, when a City-wide Traffic Safety Study for Schools was
conducted, to obtain background information as to why the restriction was
implemented.
FEBRUARY 14, 2008
PAGE 2 T&T COMMISSION
IV
V.
Staff is still in the process of investigating this item as there are long lead-times for
obtaining traffic accident histories. Once the information is received, staff will have a
better informed update to provide the Commission.
A. Minutes of the January 10, 2008 Regular Meeting.
VC/Mok moved, C/House seconded to approve the minutes of the January 10, 2008
meeting as presented. Motion carried by the following Roll Call vote:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
ABSENT: COMMISSIONERS:
PUBLIC COMMENTS: None
ITEMS FROM STAFF:
Pincher, VC/Mok, Chair/Shay
None
Lin
None
A. Received and Filed Traffic Enforcement Update:
1. Citations: November and December 2007, January 2008
2. Collisions: November and December 2007, January 2008
3. Street Sweeping: November and December 2007, January 2008
ChairlShay asked if there was more enforcement this year over last year
during the same period. PWD/Liu responded. VC/Mok asked if the street
sweeping program took place everyweekday and PWD/Liu responded thatthe
street sweeping program is in effect every week during the months of
December and January. The rest of the months are on a bi-weekly sweep in
accordance with the program.
STATUS OF PREVIOUS ACTION ITEMS:
PWD/Liu referred the Commissioners to staff's report and indicated that the
homeowner's association had responded favorably to the City's efforts at the
intersection of Diamond Crest and Emerald Lane.
ITEMS FROM COMMISSIONERS: None Offered.
VI. INFORMATIONAL ITEMS
A. ACE Grade Separation on Brea Canyon Road — SE/Yee reported that the
project continues to move forward with completion scheduled for Fall 2008.
The Washington Street/Brea Canyon Road closure took place the weekend of
February 2" . Currently, there is no access to the Metrolink Station from the
south.
FEBRUARY 14, 2008 PAGE 3
T&T COMMISSION
B. Various Traffic Signal Improvements on Golden Springs Drive — SE/Yee
reported that the City is currently working on the final of three intersections at
Golden Springs Drive and Racquet Club Road. Underground work has been
completed. However, delays have occurred due to Edison's schedule.
C. NTMP/Sunset Crossing Road and Prospectors Road Traffic Calming
Improvements - SE/Yee reported that the final design of this project has been
delayed to the end of March due to a desire to consider water -saving
technology with the irrigation system.
D. Industry's Grand Avenue Bridge Widening/Interchange Project — PWD/Liu
stated that there was not a lot of movement on the project. However, the City
of Industry is promoting the project and desires to move forward as quickly as
possible. The City's position is that improvements to the location must fit into
the results of the SR57/60 Feasibility Study. PWD/Liu updated the
Commission on the feasibility study. Discussion ensued. C/Lin propounded
and PWD/Liu responded with aspects of the feasibility study proposals.
Chair/Shay propounded.
E. Lemon Avenue On/Off Ramps Project — PWD/Liu reported that the second
neighborhood meeting was held last night. Staff continues to collect
comments and prepare responses to move forward with the project.
F. SR57/60 Feasibility Study— PWD/Liu updated the Commission under Item D.
G. NTMP Pilot Project/Palomino Drive — SE/Yee reported that a proposal for the
cost of the design is being reviewed by staff and a presentation will be made to
City Council for approval during March.
H. Prospectors Road Rehab. Project — SE/Yee stated that the project is underway
with work on the northbound segment anticipated for completion by
Wednesday of next week for opening at which time the southbound lanes will
be closed for construction. Completion is anticipated for mid-March.
Diamond Crest Lane/Emerald Lane Traffic Measures — Update given during a
prior agenda item.
"Rocket Launcher" SCE Tower Relocation — SE/Yee stated that traffic control
plans were submitted and reviewed by staff. Corrections are required prior to
permit issuance for the substructure. Completion is anticipated by the end of
April.
k:. Lorbeer Middle School Access onto Diamond Bar Boulevard — Item was
previously addressed during discussion of minutes.
FEBRUARY 14, 2008
PAGE 4 T&T COMMISSION
L. Diamond Bar Boulevard Red Curb Installation — SE/Yee reported that parking
is allowed during designated times between Cherrydale and Crooked Creek to
accommodate the church's parking needs. However, due to the line -of -sight
issue, the City's traffic engineer determined that it would be in the City's best
interest to red curb the entire segment between Cherrydale and Crooked
Creek and continue to allthe northerly dpveway of thw permitted arking on e church. St ff will take
ar Boulevard
south of Cherrydale up to
this matter to Council for consideration on February 19th.
VII. SCHEDULE OF FUTURE CITY EVENTS: As listed in the Agenda.
ADJOURNMENT: There being no further business to come before the Traffic and
Transportation Commission, Chair/Shay adjourned the meeting at 7:50 P.M.