HomeMy WebLinkAbout1/12/2006CITY OF DIAMOND BAR
MINUTES OF THE TRAFFIC AND TRANSPORTATION COMMISSION MEETING
JANUARY 12, 2006
CALL TO ORDER:
Chair Pincher called the meeting to order at 8:05 p.m. in the South Coast Air Quality
Management/Government Center Hearing Board Room, 21865 Copley Drive, Diamond Bar,
California 91765.
PLEDGE OF ALLEGIANCE: Commissioner Shay led the Pledge of Allegiance
ROLL CALL:
Present: Chair Pincher, Vice -Chair Shah and Commissioners Mok, Shay and Virginkar
Also Present: David Liu, Public Works Director; Sharon Gomez, Senior Management
Analyst; Kimberly Molina, Assistant Engineer and Michelle Chan, Senior
Administrative Assistant.
I. APPROVAL OF MINUTES:
A. Minutes of September 8, 2005
C/Virginkar moved, C/Shay seconded, to approve the September 8, 2005
minutes as presented. Motion carried by the following Roll Call vote:
AYES:
COMMISSIONERS:
Shay, Virginkar, Chair/Pincher
NOES
COMMISSIONERS:
None
ABSTAIN:
COMMISSIONERS:
Mok, VC/Shah
ABSENT:
COMMISSIONERS:
None
g. Minutes of November 10, 2005
VC/Shah moved, C/Mok seconded to approve the minutes of the November
10, 2005 minutes. Motion carried by the following Roll Call vote:
AYES: COMMISSIONERS: Mok, Shay, VC/Shah, Chair/Pincher
NOES COMMISSIONERS: None
ABSTAIN: COMMISSIONERS: Virginkar
ABSENT: COMMISSIONERS: None
ll. PUBLIC COMMENTS: None Offered.
Ill. CONSENT CALENDAR: None
IV. ITEMS FROM STAFF:
A. Traffic Enforcement Update - Received and filed on the following items:
JANUARY 12, 2006
PAGE 2 T&T COMMISSION
1. Citations: November and December 2005
2. _". Collisions: November and December 2005
3. Future Deployment of the Hadar Trailer
V. OLD BUSINESS: None
VI. NEW BUSINESS: None
VII. STATUS OF PREVIOUS ACTION ITEMS: None
Vlll. ITEMS FROM COMMISSIONERS:
C1Shay thanked staff for quickly filling the reported pothole on Diamond Bar
Boulevard near Sunset Crossing
CNirginkar said that after serving on the Commission for a number of years he would
be leaving the group. He reminisced about various important items and projects that
had come before the Traffic and Transportation
ang his tenure far their support.
commended staff on the excellent job they do and thanked them
he
VC/Shah thanked CNirginkar for his service tall does on behalf o the City and the
reed with
CNirginkar's remarks about the great w
Commission.
Chair/Pincher said she learned afot from rwho was the chairman when
good leadership and said she
she joined the Commission. She hanked him for his
would miss him and his counsel to the Commission.
IX. INFORMATIONAL ITEMS:
A. `Taking Traffic Signals to the Streets" Presentation
PWD/Liu and SMA/Gomez presented the PowerPoint slide show to the
Commission.
VC/Shay recommended the goals and objectives of the program be shown
at the beginning of the presentation.
C/Shah said itwas a marvelous presentation. He feltthere were two messages
that needed to be delivered to the City Council: 1) the existing problems and
what staff is doing to solve those problems and 2) a bigger message of what
has to come with the future. As wonderful as this system is, there will came a
time that this system will not solveproblems aill ti
nue to
increase and the City needs to ney to take ca of thosefuture
concerns.
JANUARY 12, 2006 PAGE 3
_ T&T COMMISSION
B. Caltrans 67/60 Freeway Construction Project
AE/Molina reported that beginning February 5 the westbound SR60 Brea
Canyon off -ramp would close for approximately one month in order for
Caltrans to complete the sound wall, westbound on-ramp and HOV lane.
Additionally, Caltrans intends to shift traffic on Brea Canyon Road from Via
Sorella to the west side of Brea Canyon Road for approximately four
months (by August 30) to allow additional room for equipment storage and
completion of sound wall construction.
C. Grand Avenue Improvements Project — Phases i&II
AE/Molina stated that Phase I progress slowed down due to utility work. The
new completion date for Phase I is April 2006. The federal funding documents
have been forward to Caltrans for the Phase II portion of the project awaiting
approval. Construction is slated to begin in early May.
D. Traffic Signal Modifications and Installations Project
SMA/Gomez reported that four of the five intersections were completed and
the Diamond Bar Boulevard at Maple Hill Road intersection should be finished
the first part of February and once the signal was energized, the interconnect
would be completed.
E. CDBG Sidewalk Project (Diamond Bar Boulevard from Solitaire Street to Park
& Ride)
AE/Molina informed the Commissioners that the sidewalk was 90 percent
complete and the only area that remained was the northbound SR57 on ramp
within the Caltrans right-of-way before completing the project.
F. Target/Brookfield Homes Project
AE/Molina reported that last week building permits were issued for Target for
the foundation only. Brookfield received building permits two weeks ago for
the recreation building and the single-family detached model homes. Storm
drain and minor grading continues in the area to accommodate the walls being
installed.
G. Industry's Grand Avenue Bridge Widening/Interchange Project
AE/Molina said that the traffic impact study was performed for the Industry
Business Center and was done considering the project only and its impact to
Grand Avenue as well as the intersections within the vicinity. in order to widen
the Grand Avenue bridge that spans the SR 60 and improve the on and off
ramps, a freeway study needs to be completed per Caltrans guidelines and the
MTA model. Another sub -consultant was hired in December to conduct the
freeway study to improve the design of the bridge widening.
JANUARY 12, 2006
PAGE 4 T&T COMMISSION
H
J.
K.
L.
Lemon Avenue/On and Off Ramps Project
AE/Molina stated that staff held two meetings per month for this project, a
Project Development Team Meeting and a Trend Meeting. Five alternatives
were considered for this project and three were submitted to Caltrans for
further consideration. The City Council will hold a study session on February 7
to discuss the alternatives.
Walnut Drive Street Rehabilitation Project
SMA/Gomez reported that this project was nearing completion. The contractor
had one wheelchair ramp that he planned to complete tomorrow and once the
punch list items for concrete repair had been done the street would be ready
for striping. The entire project should be completed within two weeks.
Prospectors Road Street Rehabilitation Project
SMA/Gomez stated that bids were closed for the design phase of this project
on November 29. Staff reviewed 10 proposals and conducted four interviews
today. Staff intends to present the award of contract proposal to the City
Council on February 7 and within two to three weeks issue the notice to
proceed. Staff expects final plans and specifications
by April I with work to
commence the first of July under the 2006107 Fiscal
NTMP
AE/Molina reported that staff held its first public meeting on January 10 at the
Diamond Bar Center for two neighborhoods - Golden Prados Drive on the golf
course side and Maple Spring Drive/Cameron Crest Drive area. Notices were
sent to 172 households and approximately 20 residents attended the meeting
as well as C/Chang and C/Tanaka. The primary concerns of the residents
were speeding on their residentialdownhill slope of the streets). safety concerns due to
topography (curvature and
Slurry Seal Area 2
AE/Molina stated that seven design and construction administration services
proposals were received in Dectramberrostff is CounlciVgon February 7 the proposals and
expects to take an award of con proposal to
X. SCHEDULE OF FUTURE CITY EVENTS: As listed in the Agenda.
JANUARY I2, 2006 PAGE 5 T&T COMMISSION
ADJOURNMENT: There being no further business to come before the Traffic and
Transportation Commission, Chair Pincher adjourned the meeting at 9:58 p.m.
Respectfully,
D d G. , Secre ary
Attest:
- Chairmen Liana Pincher