HomeMy WebLinkAbout04/23/1990CITY OF DIAMOND BAR
MINUTES OF CITY PLANNING COMMISSION
APRIL 23, 1990
The Planning Commission of the City of Diamond Bar convened in a
regular session at 7:00 p.m. in the Walnut Valley School District
Board Meeting Room, 880 South Lemon Street, Walnut, California.
PRESENT: 5 COMMISSIONERS: Grothe, Lin, Vice Chairman
Harmony, and Chairman Schey
ABSENT: 1 COMMISSIONER: Kane
ALSO PRESENT: Bill Curley, Assistant City Attorney
Ron Kranzer, City Engineer
Dennis Tarango, Acting Planning Director
Robert Searcy, Assistant Planning Director
Dawn Anderson, Planning Technician
MINUTES:
Chairman Schey asked the Commission to consider the Minutes of
April 9, 1990.
Motion was made by Commissioner Grothe and seconded by Vice
Chairman Harmony to approve the minutes. MOTION CARRIED
unanimously.
MATTERS FROM THE PUBLIC:
'' II
There were none.
CONSENT CALENDAR:
l
{
1. City Council Minutes - meeting of April 3, 1990.
2. Approval of Resolution for Denial and recommendation to
the City Council concerning Tract'45290 and'Oak Tree
Permit 89549.
3. Request for time extension on Zone Change/Conditional Use
Permit 87-502-(1).
Motion was made by .Vi a Chairman Harmony and seconded by
Commissioner Grothe to a rove the consent calendar. MOTION
I
pp
CAR n
I,
CARRIED unanimously.
Motion was made by Commissioner Grothe and seconded by Vice
Chairman Harmony to hear Section III Item No. 3 before Item No. 1
1
on the Agenda. MOTION CARRIED unanimously.
PUBLIC HEARINGS:
P� �3e- 555
Grp r1-rL��rA
%o
I. Cv P c9g- 55<5'
1. Zone Change/Conditional Use Permit 88-555.
A Zone Change from A-1-15,000 (Light Agricultural - 15,000
square foot min. lot size) to C-3- DP -BE (Unlimited Commercial
- Development Program - Billboard Exclusion) and Conditional
Use Permit to allow a 100 room hotel on 2.3 acres. The site
is located at 1035 1/2 Banning Way, Diamond Bar, Ca.
The applicant has submitted a letter requesting a continuance
of the project to May 14, 1990. It is staff's recommendation
that the continuance be granted.
Public Hearing was opened. s
Art Fritz, Larkstone, Diamond Bar, inquired as to the status
of the project. Rob Searcy stated that the applicant has
submitted a landscape plan and a tentative site plan. These
show the redesign of the project. The hotel is intended to
be basically the same size with 100 rooms. The landscape plan
outlines the vegetation that will be located on the plan.
Staff is now waiting for the colored renderings for the site.
Mr. Searcy stated that the applicant's reason for asking for
a continuance was that the renderings have not been completed
on schedule.
Mr. Fritz also asked if there was any intent to require the
applicant to provided market studies showing whether this
project is economically viable. Mr. Searcy stated that this
was not a requirement of the Commission at the, last meeting.
Vice Chairman Harmony stated that the Commission has discussed
it and it is a may subject that be discussed at the next
Y
meeting,but has not been established as a formai request.
Ii
Motion was made by Vice Chairman Harmony and seconded by
Commissioner Grothe to continue this project to May 14, 1990.
I
MOTION CARRIED unanimously.
�I
11 2. Zone Change 90-0028.
A Zone Change from R-1-6000 (Single Family Residential, high
I
density) to C -1 -DP (Restricted Business -Development Program)
)
on 1.25 acres located at 21008 Lycoming St., Diamond Bar, Ca.,
on the Southeast corner of Brea Canyon Rd. and Lycoming.
Commissioner Grothe removed himself from the Commission due
to a conflict of interest with Zone Change 90-0028, Zone
Change 90-0036 and Conditional Use Permit 89-440.
2
177`777-17-7--
There is currently a single family residence located on the
property. The adjacent zoning consists of C2 -BE, AM -PM mini-
market; R3, condominium complex; MPD, wholesale manufacturing
outlet; C1 -CP, Child care center; RA -8004, backs to Brea
Canyon and M1 -DP, RV storage and sale center. The previous
zone change request was to change the zone to C3 (Unlimited
Commercial). This request has been revised. The applicant
is requesting a change of zone to C1 -DP. At this time there
is no specific development plan. Due to the location of the
site and the surrounding zoning, staff recommends approval of
the zone change.
Vice Chairman Harmony asked staff to briefly discuss the
differences between C1 and C3. Mr. Searcy stated that C1 is
a Restricted Commercial zone and with the Development Program
overlay, any project that is developed at this site will be
very restricted. The project will be required to come back
before the Planning Commission for thorough review. All
concepts of the old plan will be approved as to that time and
follow that purpose. C3 is an Unlimited Commercial zone which
means that any type of commercial project, upon approval,
could apply to be located at that site.
Public Hearing was opened.
Gary Miller, 2505 Indian Creek Rd, Diamond Bar, applicant,
stated that when.the project was originally presented to the
County, the County requested the C3 zoning for the project.
This was to create a zone consistent with freeway -oriented
businesses. The applicants will be using the site for their
offices and the C1 zoning is what they originally requested.
This project will be developed in the Gateway Center which has
restrictive CC&R's that will put the project in compliance
and will be required to go'before the Commission for review.
Those in opposition.
There were none.
Public Hearing was closed.
Chairman Harmony
i n stated that the resolution is declaring
a negative declaration. He is not opposed to this but he
doesn't want to imply that the Commission can not discuss
those issues when the Development Plan is presented to them.
He has discussed with the City Attorney the possibility of
adding language to the resolution that will clarify this and
asked the Commission for their opinion.
I i,l
3
IIID'fl`1,I. 77
Bill Curley stated that on Page No. 2 of the resolution,
Paragraph No. 4 the concern is the definition of the word
"project". Under the CEQA definition, the resolution has been
prepared for the change of zone, not the physical development
project that will come at a subsequent time. He suggested the
possibility of adding a Statement No. 4 to the Recital section
of the resolution stating that the sole project being
considered by this action of the Planning Commission is the
change of zone action. No approvals or consideration of
subsequent development are granted hereby. This will narrow
the resolution down to the change of zone.
Motion was made by Vice Chairman Harmony to approve Zone
Change 90-0028 with this amendment to the resolution.
Mr. Curley stated that the resolution is actually an ordinance
because the Council is the legislative body that makes the
final decision. The Commission makes a recommendation to the
Council. The heading on the Resolution should be changed to
read A Resolution of the Planning Commission of the City of
Diamond Bar, California recommending that the City Council
approve Zone Change 90-0028.
t
Vice Chairman explained that his concern was based on the
language of the resolution. It is declaring action on a
negative declaration for the project and he is not prepared
to do.
i
Commissioner Lin seconded the motion made by Vice Chairman
Harmony. MOTION CARRIED unanimously.
3. Zone Change 90-0036 and Conditional Use Permit 89-440.
A Zone Change from M -1 -DP -BE (Light Manufacturing -
Development Program - Billboard Exclusion), and a Conditional
Use Permit to allow a 3 story hotel 135 room hotel, a 200 seat
restaurant, a 70 seat fast food restaurant with drive through,
two retail shop buildings totaling 21,000 square feet, and
three signs in excess of ,six feet above grade. The site is
located on the east side of Brea Canyon Road between
Interstate 60 and Lycoming St. Diamond Bar, Ca.
4
The property is surrounded by residential, day-care, wholesale
manufacturing, AM -PM mini -mart, condominium complex, and 81-
6000 residences. The site is approximately 7.54 acres and
proposes one access onto Brea Canyon. On the original
application the center proposed a time of operation from 9
a.m. to 1 a.m. with a 24 hour hotel operation. The applicant
has notified staff that they would like to request an
extension of these hours f rom 6 a.m. to 1 a.m. Staff finds
the uses of the site to be very compatible. Landscaping is
in excess of the 10 percent required. The applicants are
proposing a 3'6" wall bordering the flood channel. Along that
wall it has been proposed to plant 12 foot to 15 foot pine
trees that will grow to a height of about 25 feet. The
selection of these trees is to give the surrounding
residential area additional privacy. The site also proposes
2 freeway -oriented signs in excess of 40 feet, 3 monument
signs and a directional sign for hotel. The traffic report
dealt with the intensity of the site with three fast food
establishments. Based upon the revision of the site plan and
the intensity, there is an addendum included in the Commission
packet that identifies the decrease in' traffic that will be
created and the mitigating,, conditions which will ease the
impacts of traffic along Brea Canyon Road and Lycoming. Based
l upon the revised site plan and the revision of'the zone change
to C1 -BE, staff feels that this project is in line with
present usage and recommends approval.
Vice Chairman ;Harmony felt that the traffic study was very
informative and well done. The applicant is proposing to
install a signal adjacent to the off -ramps. 'Reference was
made to a third lane which will help people to exit the hotel
parking lot and cross the street on a left turn and enable the
cars to make a right turn onto the f reeway. . He asked Mr.
Kranzer to explain to the Commission exactly how this is
proposed to work.
Mr. Kranzer stated that the traffic entering onto the freeway
will have free right turn movement when possible. It is not
uncommon to incorporate a left turn movement to enter onto a
west bound freeway on-ramp. This intersection and the signal
at the mid -point between the two other signals will have to
be approved. ,All the signals in the general vicinity will
have to be provided with some type of inter -connection. This
will have to be discussed with the State. Grand Avenue
opening to thee east will have a significant affect on the
traffic on Brea Canyon. The effect will be a reduction in
traffic.
5
�__�-_, �.�.�,�- ,_. �.e.-,�,�1—--�_...,•.,�nwwdw.,e,u.�auwwW�;ww6�:W4.s'.,--. _-. � _. _
Z
i
-' Vice Chairman Harmony stated that the traffic study indicates
that this intersection has been cited as LOS (Level of
Service) rating of D; "A" being the best and "E" the worst.
Mr. Kranzer explained that the proposed improvements are
projected to maintain the current LOS D. Without these
improvements there is a possibility the LOS rating will drop
to E.
Vice Chairman Harmony asked Mr. Kranzer to explain the phasing
of signals and who will be responsible for the financing.
This will have to be coordinated with Cal -trans. Mr. Kranzer
stated that this will involve a program connecting the signal
system at the proposed site and the system on Lycoming. This
will identify the 'movements of the area. The system on Valley
will be traffic actuated and cause the information to be feed
into the system and the signal will be able to adjust for the
peak hours based on a pre-program. Currently it is difficult
to enter the RV sales lot. The phasing of signals will
provide, at certain intervals, a free left turn movement that
will not be in conflict with the other two movements.
Vice Chairman Harmony asked Mr. Kranzer if he thought that,
with the regulation of signals there would be enough control
of the traffic that a left turn out of the project site,
across lanes, to enter the on-ramp of the 60 Freeway will be
achieved. Mr. Kranzer stated that a left turn will not be
able to be made without a left turn arrow.
Commissioner Lin asked staff to explain Item B on Page 4 of
the staff report by illustrating it on the map. The
applicant's engineer demonstrated this for the Commission.
The traffic direction will be down,Brea rCanyon or out of the
project to turn right onto the Freeway west -bound. Presently,
parking is allowed along Brea Canyon and is used for the park -
n -ride lot. These parked cars block moving vehicles from
turning right and as a result the line of cars waiting at the
light is longer. The applicant would like to restrict parking
along the block between the entrance and the freeway on-ramp.
Public Hearing was opened.
l; T
6
` Ken Spear, Cahan/Crisell Properties, the applicant, 362 West
Mission, Escondido, stated that they are presenting a plan
tonight that addresses the concerns that surfaced at the
previous meeting. The applicants have reviewed the staff
report and the conditions for approval and are in agreement
with them except for a few minor points that they would like
to discuss. Item No. 7 on the Conditions for Approval
discusses the hours of operation. The applicants would like
to revise this to reflect 6 a.m. to 1 a.m. Item No. 8
discusses the signage and staff's recommendation. Mr. Spear
commented that, by omission, it stated that one of the
freeway -oriented pole signs will be deleted from the approval.
The applicant would like to re -instate both shopping center
pylons signs as part of the approval. The last point that
they wanted to discuss was the Engineering conditions. Item
No. 1 restrict vehicular access onto Brea Canyon Road. The
applicant wanted to clarify that the curb cut, as shown on the
site plan, is an approved access to the project; otherwise,
total access to the project is restricted.
The applicants have met with the property owners that live in
the area. The site plan indicates a heavy landscape screening
along the north property line, along the flood control
channel. This is intended to address the concerns of the
residences across from the channel regarding parking lot
lights, noise and visual barrier. In addition, they are
w proposing a 3' 6" block wall which will impede headlights from
vehicles heading in that direction. The major modification
is that the applicants have eliminated two of the fast food
restaurants which were originally proposed. _They are
requesting only one fast food use. They have secured a letter
of intent from a quality luncheon house restaurant to be
located on one of the pads, replacing one of the fast food
establishments. The third fast food establishment has been
modified to be constructed as a retail building. They have
also secured a letter of intent from a real estate office to
occupy 4,000 square feet of the retail shop that will be
located in the rear of the property. This is also a less
intense use than the previous one in terms of traffic.
Vice Chairman Harmony asked if the soils report was completed.
Ken Spears indicated that they did have a complete soils
report indicating that the applicants have to excavate and
re -compact some of the existing fill on the property so that
there is not any soils conditions that they are not aware of.
Vice Chairman Harmony asked if this is an area that would be
subject to liquefaction if there was an earthquake. The
applicant stated that this information was indicated on the
soils report.
7
r' -
t
Rock Miller, Principal Transportation Engineer for Basmaciyan-
Darnell, Inc., Registered Traffic Engineer and Registered
Civil Engineer, spoke. He stated that they are basically
presenting a package that consists of five (5) improvements.
1. Obtaining an approved access condition to the site; 2.
Approving the traffic conditions along Brea canyon Road. He
feels that the Grand Avenue improvement will provide a
substantial amount of traffic relief. He clarified that the
right turn lane at the freeway on-ramp will not be a free
right turn lane. This implies that you can turn right all of
the'time. What is proposed is that cars will not be able to
turn right when cars are turning -left from the other
direction. However, a left turn arrow is proposed for the
traffic coming from under the bridge and turn left to enter
the freeway headed west -bound. Although this might take a
long, time to accomplish, he is quite confident that this can
be accomplished in the same time frame as the development of
the buildings;, 3. Right turn signal for the on-ramp. This
will allow traffic to turn right at the same time as through
traffic or traffic entering the freeway on-ramp and the same
time as left turn traffic onto the freeway; 4. He felt that
it was essential for this project to have a signalized access
for several reasons, i.e. due to the heavy traffic on Brea
Canyon, left turns are difficult to make in or out of the
project; and 5. He is also proposing some left turn
improvements at Brea Canyon and Lycoming. The left turn
volumes at that location is also very difficult.
The previous proposal had slightly an excess of 5000 trips per
day forecast. The current proposal has 3,600 trips per day
forecast. He did not calculate the passer-by factor in the
Traffic Addendum. Retail uses attract a fair amount of
traffic that is already traveling on that street. This
constitutes about 700 to 800 trips that are included in the
traffic count. These will contribute to the need for a
traffic signal at the site but does not represent new traffic
on Brea Canyon Road. The Level of Service for :all the
intersections in the corridor, which are currently
unacceptable, is brought down to a LOS D acceptability. He
also concurs with staff that the Grand Avenue improvements
will further reduce these volumes.
Chairman Schey asked if the reduction in the number of trips
per day was a result of changing from fast food to retail.
Mr. Miller indicated that this was true. Drive-in fast food
restaurants are one of the most notoriously high trips per
square foot of any land use that can be constructed. Fast
food establishments also have a very high passer-by factor.
The other significant factor to the reduction in trips, per day
was that one whole restaurant pad was converted to general
retail. This use is a significantly lower amount of traffic
than fast food.
8
IIT1flC"TF11'-7 ,'
Chairman Schey stated that he had a concern with coordinating
this project with the project that is proposed for the site
located to the north. The problem that he foresees is that
the property at the corner needs access. It wi 71 be difficult
to receive access onto Brea Canyon with the access for this
project located so close together. Lycoming is also very
congested and it would be difficult to obtain access onto this
street. He asked if there was a reason why they could not
create an access for both properties at the property line.
The Traffic Engineer indicated that this does present a
problem. He stated that he worked with the applicant to
locate the driveway site. There is a regulation on where left
turn lanes may be placed. It is necessary to have left turn
lanes on both blocks due to the heavy traffic.
Vice Chairman Harmony asked if, with the phasing of signals,
there be a problem of cars blocking the intersection. The
Traffic Engineer stated that there will not be a problem.
Vice Chairman Harmony asked if the metering of traffic
entering the freeway will cause a back-up. The Traffic
Engineer stated that he has not looked into this matter.
Back-up would occur in the right turn lane onto the freeway,
not the through lane. If traffic backs -up onto to the surface
street, Cal Trans will then take care of the problem.
Commissioner Lin asked if a right turn signal at -the off -ramp
of the 60 Freeway and Brea Canyon Road was proposed. The
Traffic Engineer indicated that this was correct.
Commissioner Lin asked if this signal will cause traffic on
the off -ramp to back-up onto the freeway. The Traffic
Engineer stated that the signal should help the flow of
traffic. There will be free right turns on the green -light
and right turns permitted on the red light when it is safe to
do so.
Vice Chairman Harmony stated that the City of Industry would
not allow a left turn signal for the Honda project due to the
closeness to the freeway on -ramps. He asked the Traffic
Engineer if he knew the reasoning for this. The Traffic
Engineer did not know. Vice Chairman Harmony asked staff to
come back to the Commission with more information on this
matter.
�
9
ISI'
-_ ��
F—
�17—
- „
117"' 717q'77
` Those in Favor of the Project.
Joe Han, 826 1/2 Silver Fir, stated that when the project was
first presented before the Commission, he spoke in opposition
of the project. Since then he attended a homeowners meeting
conducted -by the applicants. At this meeting the homeowners
were able to discuss their concerns with the applicants. With
the revised zone change and site plan, he is in favor of the
project. He looked into a similar Marriott hotel and feels
that the rates will not invite truckers. The traffic is stili
an issue, but the applicant has been very thorough in their
report.
Those in Opposition of the Project.
Sunny Martindale, was concerned with having four (4) traffic
signals within a two block area. She was also concerned with,
developing another hotel when, in her opinion,' -the Gays Inn
is not able to keep their rooms full. She was concerned with
cars not being able to turn' into existing development along
Lycoming if the traffic 'flight is installed. She was concerned
with cars Backing -up to the freeway while waiting to turn into
the site. She was also concerned with Diamond Bar eventually
being overcrowded with development thus creating a
deterioration of the City's appearance.
Claudia Yeager, Dryander', stated that she is not completely
against the project after review of the revisions, but she did
have some concerns. She wanted to know if the zone change was
approved, would there be a guarantee that the traffic signal
will be installed? If the light is not permitted, will there
be a provision for left turns? When the train passes by, this
backs -up the traffic and needs to be considered.. She was in
favor of the trees proposed to be planted along the flood
control channel, but was concerned with the size of the trees.
She wants some insurance that there will be immediate
protection provided instead of planting small trees with the
intention that they will grow and create a planting wall.
Chairman Schey asked staff to verify the height of the wall
along the flood control charnel Staff indicated that the
wall is proposed to be 3' 6" wall.
Robert Martindale, 1333 Rapidview, stated that he did not feel
that Diamond Bar needs another hotel or even additional
restaurants. He doesn't feel that adequate parking will be
provided. He was concerned with the traffic and felt that the
traffic improvements that have been proposed should not be
contingent upon approval of the project.
a � ✓
Janice Roller, 785 Windwood, stated that at the homeowners
meeting with the applicant, the homeowners voiced their desire
to see a family restaurant be developed instead of fast food
restaurants. The applicants have revised their site plan to
include this and delete 2 of the fast food restaurants. She
felt that most of the homeowners speaking against the project
were more concerned with their property not necessarily what
is best for the area or the majority of the people's needs in
that area.
Art Fritz, Larkstone, stated that if the policy of Diamond Bar
is to permit an owner of property to develop that property in
the way that is most profitable to them, then the efforts put
in to incorporate Diamond Bar are wasted. He did not feel
that an owner of a piece of property had an absolute right to
develop that property. He felt that the community has a,right
to a development that is appropriate, high quality and
consistent with the people that live in that area.
Lewey Marshland, 850 Brea Canyon, owner of property, stated
that he has been approached by several developers, but he
feels that none of them would have done as well a job as the
present applicants. They have done a thorough traffic study
and have spent much time developing a project that will be
pleasing to the community.
Wayne Sant, Marriott 'Hotel, 3130 S. Harbor, Santa Ana, stated
that the Marriott Corporation is excited about the new
proposal. They feel that Knollwood is a high quality
restaurant. They have performed a market study which has
indicated that there is a need for another hotel.
Robert Martindale, stated that there are several hotels that
have been built along the freeway but he does not see them
being occupied to their capacity. He was concerned if
Marriott could not survive, that a hotel with lower quality
might occupy this location. He was concerned with the future
of this site.
Claudia Yeager, stated that there are some homeowners who plan
to stay in this area for a long time. They are not against
this site being developed but are asking that the development
is not rushed into; that the Commission consider each detail
carefully.
11
k,
F__ 'T -.F7 -_ �,_ � 11711777-7 r
r
Paul Ryan, 506 Acacia, Corona Del Mar, represents Mr.
Marshland, the owner and Cahan Crisel, the developer. He
stated that they have been developing this project for many
years and have given much consideration to it. They have also
conducted research regarding locating in the City of Diamond
Bar. He felt that this situation was an example of the basic
concepts of democracy, majority rule and minority rights. Our
constitution gives us a basic set of perimeters on what can
or cannot be done no matter what the majority feels.
sunny Martindale, stated that she is not opposed to this site
being developed, but if the market is already glutted with
hotels then why does this property have to be developed now.
She felt that the Commission should wait until the General
Plan is completed to approve development like this which
involves extensive review of traffic, etc.
Dick Silva, Marketing Representative, stated that the
applicants feel the timing of the project is critical due to
the cost of land that has been presented to them. It is
possible that two or three years down the road the cost of
land that is available to them today will no longer be
feasible for the hotel and the type of hotel users they are
_! going to attract. As the cost of land goes up,. so will the
price of the hotel rooms in order to support this cost.
Diamond Bar will not be able.tosupport a hotel where the room
rates are $116-120 a night. He stated that the applicants
welcome suggestions from the residents as to the type of
development that they would' like to see occupy the retail
building.
Vice Chairman Harmony questioned Mr.- Silva's statement
indicating that the applicants probably could not afford this
project if they waited a few years. There is a timeliness of
buying land at current prices. 'Mr. Silva stated that the
applicants looked at different uses ,including apartments.
They talked to developers that represent apartment interests
who looked at the cost implications of development in this
area and the cost of property and several of them decided that
it was not economically viable to put a project at this
location. Before they started doing business with the
Marriott Corporation, the applicants talked to several hotel
chains. After they did a cost analysis, they determined that
the local community and the supporters of the hotel could only
justify paying a certain level of room price. As a result
they had several hotel corporations 'walk away from this
development.
I --
12
yam,
J
\y"
Vice Chairman Harmony was concerned that this project is not
economically viable due to cost of land. If the property
values become excessive, this development might not be able
to continue to operate. Mr. Silva stated that at this point
and time the best use for this property is for the hotel use
being proposed. As for several years down the road, he feels
that the cost of property and development in this area may
discount the possibility of having the type of use the
community wants today.
Ken Spear stated that by having Marriott as one of the
tenants, the applicants are able to generate the types of
rents on the front of the property to off -set what they have
to subsidize in order for Marriott to locate their hotel on
the site. He stated that -he felt that due to the freeway off -
ramp location of the site, the site should be zoned C1. The
Commission recently re -zoned a piece of property located to
the north of this site to C1. This property was located
further from the freeway than this property is located.
Deanna Hoy, 1271 Blenarm, asked if the Traffic Engineer did
the traffic study when the train was crossing the street. The
Traffic Engineer stated that it was not a specific
consideration in the traffic study but there are ways to
prevent traffic from creating a gridlock, situation when a
train passes by.
Public Hearing was Closed.
Vice Chairman Harmony asked who was going to pay for the
phasing and installation of the proposed traffic lights. Ken
Spear stated that the developer was prepared to pay for these
costs. Vice Chairman Harmony asked that the Traffic Engineer
come back with a memorandum explaining why the City of
Industry did not allow a left turn light at the freeway on-
ramp for the Honda Dealership site. City of Industry's policy
on left turn signals located by freeway on -ramps. Chairman
Schey stated that he felt that the reason why City of Industry
did not approve a left turn signal at the Honda Dealership
location had more to do with the City of Industry not having
a need to address the Honda Dealership site in that it does
not affect them. He stated that he is comfortable with
dealing with the City Engineer and Traffic Engineer's
recommendations on this project based on the circumstances
surroundings this project without drawing analogies from other
projects whether they have similarities or not.
r
13
,� 7
- r 11"x°"''° II",I '" P1'"ITS'"11 , L
Secretary Tarango suggested that it might be more appropriate
to direct our City policy to the City Engineer rather than the
applicant's Engineer, Vice Chairman Harmony stated that he
felt that the applicants presenting the project have the
responsibility to do the research and to pay for this research
to be done. He felt that the applicant's Traffic Engineer had
done an excellent traffic study report. He could understand
the engineer's statistics, the traffic flow movements, and he
felt that the engineer's recommendations are brilliant,
Mr. Curley stated that this would be asking the applicants to
perform an analysis that isn't germane to their project. The
applicant's engineer has prepared a study that has been
reviewed by th'e City's Engineer. The City Engineer has
reviewed the traffic report for the Honda Dealership and has
approved the recommendations as he has approved a separate set
of recommendations for this project. To ask the applicant's
engineer to review a study done for a project that is remote
from their own is not an appropriate request, Vice Chairman
Harmony stated that he would like to stand by his request.
Vice Chairman Harmony would like to see the eight (81) foot
high wall reinstated. He does agree with staff's
recommendation for only one .pole sign. The pole sign as
proposed by the Chamber of Commerce to be fifty (5p') feet
does seem excessive to him. The sign existing on the site now
is approximately the same height as the proposed sign. Vice
Chairman Harmony stated that this appeared to be a reasonable
height. Staff indicated that the applicant is proposing to
plant 12' to 15', 24 inch box trees for the landscape wall.
Chairman Schey stated that he was comfortable with approving
the project with the requirement that the issues that are
still of concern such as signs and screening of flood control
channel be brought back to the Commission, Vice Chairman
Harmony stated that he was also concerned with the
architecture of the buildings. Ken Spear indicated that they
have taken some of the major elements of the Hotel and have
incorporated them into the other buildings. The roofs are not
red tile. Chairman Schey asked, under the Design Review
Ordinance, if the Commission approves the Conditional Use
Permit/Zone Change tonight, would this constitute approval
under the Design Review Ordinance and would the applicants
come back with further detail of the project. Secretary
Tarango stated that under the Development Program zone, the
Commission has the ability to look at the exterior of the
buildings, grading, landscaping, arrangement of buildings,
etc. Vice Chairman asked staff to look into the parking
requirements per the Cc & R's for the site.
Mr. Curley stated that if all the conditions are not met, the
applicants will not be allowed to have occupancy granted.
14
Vice Chairman Harmony stated that he would like to see the
applicant submit an economic feasibility study stating whether
this project is viable at this time conducted by a private
company hired by the City and paid for by the developer. He
also asked for information on the flood plain for that area.
Mr. Kranzer stated that the City has recently applied for a
program of the Federal Insurance (FEMA) and the only area
identified in the entire City of Diamond Bar as subject to a
100 year storm is the intersection of Lycoming and Brea Canyon
Road. That identification was made prior to the recent
approvement of the completion of the storm drain at that
location. That area and all other areas of Diamond Bar are
free of a 100 year storm. Vice Chairman Harmony asked for
that report to be presented at the next meeting. He also
asked for a report calculating the existing signs and
comparing them with the proposed signs. Secretary Tarango
stated that a survey was conducted with the Chamber of
Commerce's interest in mind.
Motion was made by Vice Chairman Harmony to continue Zone
Change 90-0036 (Conditional Use Permit 89-440) requiring the
applicant to come back to the Commission with the following
items: signage report, economic study based on the point of
view of the City. Wayne Sant stated that the consultants
recommend levels of rate and occupancy and recommend a certain
type of facility to meet the needs of the customer that they
are targeting. If the hotel can survive given that level of
rate and occupancy then the projects generally are successful,
This is what Marriott's market study was based on given the
rates and occupancies of hotels in the trade area and what the
guests staying at those hotels were paying. He stated that
he would look into Imaking this information available 'to the
Commission. To employ a consultant to conduct an Market Study
would be very costly. Vice Chairman, stated that he would like
to see an economic report indicating the viability of this
project.
Lewey Marshland stated that he has spent a large amount of
time looking at various types of developments and developers.
He feels that Marriott, with its reputation, will be a
development that will be able to remain.
Vice Chairman Harmony continued to list those items he wished
to require the applicant to bring back to the Commission.
These included signage report, flood control report, site line
study addressing the issue of privacy for the surrounding
neighborhood.
Chairman Schey stated that he felt that the issues raised by
Vice Chairman Harmony were issues that would normally be
addressed in the Design Review portion of the Planning
Commission's review of the project.
15
_._..I-,, -- -_, „L_1,LI �_,
Mr. Curley stated that the Development Program presented to
the Commission tonight mimics, to a great extent, the
Development Review process. Most of the elements discussed
are elements of the Development Program under 22-40.050
section of the code. He cautioned the Commission against
approving the CUP subject to additional review of the design
criteria.
- Commissioner Lin stated that before a developer proceeds with
a project they have to conduct a market study and then
evaluate the land value to determine if the project will be
feasible. She did not feel that the Commission needed to
review a market study because if the project is not marketable
the applicants are not going to go through with it. If the
applicant could submit a report containing simple statistics,
this should be sufficient to determine the feasibility of the
project.
Vice Chairman Harmony stated that in a free society investors
make a determination of what is economically viable.
Government also tries to insure that development is not
constructed that will not survive. If the citizens of the
community voice concerns towards a project, then he wants the
applicants to provide the Commission with the same information
that they have in order to answer the questions.
Motion was made by Vice Chairman Harmony and seconded by
Chairman Schey to continue the project to May 14th, requiring
the applicant to come back with sign program, materials,
colors and architectural for buildings, conceptual landscape
plan, walls and screened landscaping along north boundary,
site -line study, detailed parking plan and how it compares to
the original proposal and a general report indicating the
market studies from Marriott.
Ken Spear stated that if they could receive approval for the
site as to the uses, the applicants would be willing to come
back to address the specific issues requested by the
Commission. If the Commission is not willing to do that, then
he asked them to render the best decision they can make
tonight to enable them'to move onto the City Council.
The Commission decided to review the whole project at one
time.
Vice Chairman Harmony asked that each person who spoke tonight
be notified when this project is scheduled to come back before
the Commission.
Chairman Schey made a call to question on the previous motion.
MOTION CARRIED unanimously.
16
e V
` ANNOUNCEMENTS:
Vice Chairman Harmony sent a memorandum to the Commission members
regarding asking Jones Intercable to televise the Commission
meetings. Jones Intercable is available to do this. The Council
is discussing implementing the same process. This will make the
meetings available to those who can not attend.
Mr. Curley advised the Commission to discuss this with the City
Council.
The Commission decided to discuss this at the June lith meeting.
Commissioner Grothe suggested that the Commission follow a set of
guidelines limiting the audience on the amount of time allowed to
speak in reference to a project.
ADJOURNMENT:
There being no further business to come before the Commission,
Motion was made by Vice Chairman Harmony and seconded by
Commissioner and carried unanimously to adjourn the meeting at
10:30 p.m. to the next regularly schedule meeting of May 14, 1990
-31 to be held at the Walnut Valley Unified School District Board Room
at 7:00 p.m.
ATTEST :/�
Dennis A. Tarango
Secretary, Planning Commission
I
David Schey
Chairman
1
17
- J -
------- -- -- --
���'��7ISI ��! a,��=, _ .