Loading...
HomeMy WebLinkAbout06/08/1999FV-V� JUNE 89 1999 7:00 P.M. �2opies of staff reports or other written documentation relating to agenda items are on file in the Planning Division of the Dept. of Community & Development Services� located at 21660 E Copley Drive, Suite 190, and are available for public inspection. If you have questions regarding an agenda item, please call (909) 396-5676 during regular business hours. In an effort to comply with the requirements of Title 11 of the Americans with Disabilities Act of 1990, City of Diamond Bar requires that any person in need of any type of special equipment, assistance or accommodation(s) in order to communicate at a City public meeting must inform the Dept. of Community Development Services at (909) 396-5676 a minimum of 72 hours prior to the scheduled meeting, I FAA�TCACONDADW Pfease refrain from smoking, eating or drinking in the Auditorium The City of Diamond Bar. uses recycled paper and encourages you. to do the same. -wft &WC4"'W0%VT CITY OF DLAMOND BAR Tuesday June 8, 1999 AGENDA I I ROLL CALL: COMNUSSIONERS: Chairman Steve Tye, Vice Chairman Steve Nelson, George Kuo, Joe McManus and Joe Ruzicka. 2. MATTERS FROM THE AUDIENCEIPUBLIC COMMENTS: iL?1—t;,rPss 6e members of the Planning Commission on any item Im I I allot �Ilulj —Mm 121, 17�� WIMA The following items listed on the consent calendar are considered routine and are approved by a single motion. Consent calendar items may be removed from the agenda by request of the Commission only: .4.1 Minutes: May 25,1999 6. NEW BUSINESS: 6.1 Capital Improvement Program Planning Commission review of Fiscal Year 1999-2000 Capital Improvement Program for conformance with the General Plan pursuant to California Government Code Section 6540 1. . . . . . . . . . . . . . . . . . &N\agendaNplanning1june 8,1999 juneg, 1999 PC Agenda — Page I areas; two platforms to display new car sales; and retaining wall with a maximum height of 18 feet. The Variance is ed due to the yqo** wa 's e aht H in 9*qq$ of six Act. - �Captjmxd IM PROPERTY ADDRESS: 515 S. Grand Avenue Diamond Bar, CA 91763 PROPERTY OWNER/ Mathew Tachdjian APPLICANT: Col -Am Properties, LLC P.O. Box 4655 Diamond Bar, CA 91765 ENVIRONMENTAL DETERMINATION: Pursuant to the provisions of the California Environmental Quality Act (CEQA), the City has determined that a Negative Declaration is required for this project. According to CEQA Section 15070, Negative Declaration No. 99-3 has been prepared. The Negativiv Declaration review period concluded on April 24, 1999. Ni�COMMENDATION: Staff recommends that the Planning Commission continue the public hearing to June 22, 1999. 8.1 Conditional Use Permit No. 99-2, Minor Conditional Use Permit No. 994 (Pursuant to Code Section 22.58 and 22.56) is a request to provide dancing (through the Conditional Use Permit process), outdoor dining and the sale and on-site consumption of beer and wine (through the Minor Conditional Use Permit process) at an existing restaurant structure (previously identified as Casa O'Brien) that will be reopened as Caf6 Ilustrado. PROJECT ADDRESS: 22640 Golden Springs Drive Diamond Bar, CA 91765. PROPERTY OWNER: Jac Choon Shin 1020 S. Los Angeles Street, Suite B Los Angeles, CA 90015 APPLICANT: James Carson 1241 S. Grand Avenue, Unit H Diamond Bar, CA 91765 Environmental Determination: Pursuant to the provisions of the California Environmental Quality Act (CEQA), the City has determined that a Negative Declaration is required for this project. Negative Declaration No. 99-6 has been prepared. The Negative Declaration's review period began May 18, 1999, and ends June 6, 1999. RECOMMENDATION: Staff recommends that the Planning Commission approve Conditional Use Permit No. 99-2, Minor Conditional Use Permit No. 99-4, and Negative Declaration No. 99-6. IT1111,1M � 11111111! d:\\agenda\p1anning/june 8, 1999 Juneg, 1999 PC Agenda — Page 2 In m T 'fFlIfif "Ik n A=Nb)d 571V-V�� L9 AQMD —Room CC2 21865 E. Copley Drive 'rhursday, June 10, 1999 – 7:00 P.M. . I " - �� I Room 21865 E. Copley Drivf- Saturday, June 12, 1999 9:00 A.M. – 12:00 Noon Walnut High School, 400 Pierre Rjo, 21865 E. Copley Drive Tuesday, June 15, 1999 – 6:30 P.M. AQMD Auditorium, 21865 E. Copley Drive 9di ANNUAL CONCERT IN THE PARKS: Wednesday, June 16, 1999 – 6:30 P.M. – 8:00 P.M. (First in the series of 10 concerts) Sycamore Canyon Park, 22930 Golden Springs Road 1910'0111�1 HUM WiTAXI 01*1 Q, M�� I A al "10 dA\agenda\P)ar"fing1jUnC 8, 1999 Saturday, June 19, 1999 – 9:00 A.M. – 3:00 M& U.S. Postal Services Processing Center 15421 Gale Avenue, City of Industry tit -w—ame Tuesday, June 22, 1999 – 7:00 P.M. j gri.wtu. 21865 E. Copley Drive P�-J,jjdit Tuesday, June 22, 1999 – 7:00 P.M. – 9:00 P. AQMD, CC6 21865 E. Copley Drive Ibursday, June 24, 1999 – 7:00 P.Ari. AQMD Board Hearing Room, 21865 E. Copley Drive Juneg, 1999 PC Agenda — Page 3 MINUTES OF = Crff OF DLAMOND BAR InUd"ITTY AD RAVV'VMfM nV qrPW VT AW1VMr-rnmFw.4zv%1rnw MAY 25,1999 Chairman Tye called the meeting to order at 7:06 p.m. in the South Coast Air Quality Management Auditoriun-L, 21865 East Copley Drive, Diamond Bar, California. [1,'resent: Chairman Steve Tye, Vice Chairman Steve Nelson, and Commissioners George Kuo, Joe McManus and Joe Ruzicka. Also Present: Ann Lungu, Associate Planner; Linda Smith, Development Services Assistant; Sonya Joe, Development Services Assistant, and Stella Marquez, Administrative Secretary. 1. Minutes of May 11, 1999. C/McManus moved, VC/Nelson seconded, to approve the minutes of May 11, 1999, as presented. Motion carried 4-0-1 with Chair/Tye abstaining. OLD BUSINESS: '11'oni� Planning Commission 1999 Goals and Objectives Discussion: ,kssocPALungu presented staff s report. Staff recommends that the Planning Commission discuss tis ro)roposed listing and forward its approved listing to the City Council. 0 I LWTic-fTfamus requestect fliat a goai 33YTEF—t-, 7=1SS1071 De L't it W'fl aesthetics of the community and preservation of open space. VC/Nelson said he concurs with C/McManus. dA\niinutes\vmy25 1999.doc 11 11 � i iffiffiffil Fill III, � � I III I I I I I I I I Ono 11111 j IIJIT , Jill iiiijilill lillipil =11111111111 1111111�111 iiiii ll;�JIIIIJIJJ1111�� 11111111 � — I I 111111111 11 11�11 �illillilli 1111111111111" '1 1 s I 1 11 11 1 i A I , I I I i -IF � 3. Refinements and minor amendments to the Development Code; 4. Code Enforcement - update and revise policy and procedures and consider citation authority; Pad C/Ruzicka moved, C/Kuo seconded, to approve the listing as submitted including additions proposed by C/McManus and AssocP/Lungu. Motion carried 5-0 by Roll Call vote. 1. Conditional Use Permit No. 98-7, Development Review No. 98-12 and Variance No. 99-2 (pursuant Code Section Chapters 22.58, 22.48 and 22.54) is a request to construct an automated car wash. The c wash will consist of the following: A wash tunnel; retail sales boutique, approximately 2,089 square fe three -bay lube center, 1, 140 square feet; detail center with office, approximately 1,467 square feet; six -b auto service center, approximately 4,150 square feet; fuel dispensers; vacuum, queuing and drying areas; platforms to display new car sales, and retaining wall with a maximum height of 18 feet. The Variance requested due to the -retaining wall's height in excess of six feet. (Continued from May 11, 1999.) Eb���W� RROPERTY OWNER/ Mathew Tachdjian APPLICANT: Col -Am Properties, LLC P.O. Boy-46SS.- VI ­ �Cjr -- "19 T LWA the traffic study to be completed. He stated that the traffic study is currently uniler way. VC/Nelson asked for a quantification of the advantage of inflatables with respect to marketing. He said hti is concerned with the unslightliness of the inflatables. He does not want to remove a competitive advantage. dAVninutes\nmy25 1999.doc I MAY 25. 1999 PAGE 3 if the marketing advantage is negligible, he would like to consider including elimination of the inflatables within the project approval. C/McManus moved, C/Ruzicka seconded, to adjourn the meeting. There being no further business to come before the Planning Commission, Chair/Tye adjourned the meeting at 7:21 p.m. Respectfully Submitted, Ann Lungu Attest: Steve Tye Chairman dA\niinutes\nmy25 1999.doc CITY OF DUMOND BAR X -K -0 t" C001 1—or �Meun s to suppo Mt Gasoline taxes, Intermodal Surface Transportation Efficiency Act (ISTEA), Proposition "N' and "C" (transportation), Proposition "N' (parks), Community Development Block Grant (CDBG), Development Impact Fees, Redevelopmdnt, Lighting and Landscape Assessment District, Park Development, Quimby fees and others. The CIP has been developed by the Community and Development Services Department staff based upon the identified improvement needs for the community. The list of projects have been reviewed for conformity with the adopted General Plan. The proposed FY 1999-00 CIP is consistent with the overall Vision Statement and numerous Goals, Objectives, and Strategies contained within the Plan. -777 71,74ITZ mission June 3, 1999 Page 2 Staff recommends that the Planning Commission adopt Resolution No. 99 -XX finding the proposed FY 1999-00 CIP in conformance with the General Plv,.,n. Attachments: 1. Draft Resolutiop 'WX- A. Recital . 1. California Government Code Section 65401 requires the Commission to revie proposed public works projects for the ensuing fiscal year to determine complianc with the City's General Plan. 2. On April 18, 1989, the City of Diamond Bar was established as a duly organize municipal corporation of the State of California. 3. The City Manager of the City of Diamond Bar has prepared a proposed Capit Improvement Program and Budget for the City's 1999-00 Fiscal Year which briefl describes certain proposed public works improvement projects to occur during t 1999-00 Fiscal Year. The projects include, but are not limited to, street and highw improvements, traffic signal installations and modifications and park improvements. 4. This Planning Commission, on June 8, 1999 at a regularly scheduled meetin, discussed the City of Diamond Bar's Fiscal Year'1999-00 Capital Improveme Program, and the projects contained therein, and concluded said discussion prior the adoption of this Resolution. t n#Jeas c�,#,rngy W, I law and local ordinances, regulations, and standards; and "'0 The proposed 1999-00 Capital Improvement Program is Categorically Exempt, pursuant to Section 15301, from the California Environmental Quality Act of 1970, as amended, and the Guidelines promulgated thereunder. 3. This Resolution shall serve as the Planning Commission's report to the City Council regarding the General Plan conformity of the proposed public works projects in the City's Fiscal Year 1999-00 CIP as required by California Government Code Section 65401. 4. Based on the findings and conclusions set forth above, this Planning Commission hereby recommends approval of the 1999-00 Capital Improvement Program as proposed which shall conform to Exhibit 1W dated June 8, 1999. n�] I - I �#- �- �1111 -1 � I I , — I; ru—nMil ol-the City of Diamond Bar for use in its' deliberations regarding the 6ity's budget. 111111piiiiiiiiil� 1111111�111�11111 iiiiiiiiiii��illillilillill 0- ',U I on, I -MR, Steve Tye, Chairman 1, James DeStefano, Secretary of the Planning Commission of the City of Dia I mond Bar, do hereby certify that the foregoing Resolution was duly introduced, passed, and adopted, at a regular meeting of the Planruing Commission held on the 80'day of June, 1999, by the following vote to wit: AYES: NOES: ABSENT: ABSTAINED: James DeStefano, Secretary WAN - MOM UIA I" LOCAL STREET.MILEAGE Capital Improvements Programming E-1 1V -E Capital Improvements Local jurisdictions use both police and corporate powers to serve their resi- dents. Cities have traditionally relied on the police powers to protect public health, safety and welfare through zoning and subdivision regulations. The corporate powers of local government, however, also have -a major impact on land use issues. Corporate powers are used,to develop physical facilities which have long term usef ulhess. These physical facilities include streets and highways, public buildings, water and sewer lines, and park and recreation facilities. Capital improvements programming is the multi-year planning of public infra- structure improvements. Since local government can seldom pay for these facilities through-a-6--an—ndal 0-pena-tirig budget, numerous techniques have evolved to finance capital improvements over a longer period. The total invest- ment, therefore, includes not only the cost of purchase, or design and construc- tion, but also the cost of long-term financing. Financing techniques include the use of current operating budgets, various types of bonding, special districts, special assessments, state and federal grants, and tax increment financing. The capital improvements program must take a longer view than the annual budget process, and must anticipate when new public facilities will be needed or when existing facilities must be replaced. The capital improvements program is a valuable implementation tool for carrying out th ' e general plan. Because the general plan establishes policies for the direction, intensity and rate of future growth, the capital improVements program is instrumental in maintaining the local government's control of devel- opment. State law requires planning agencies to review property acquisition or disposal for conformity with the general plan. Government Code § 65402. Property acquisition includes dedications for street, park or other public pur- poses as well as construction of public buildings or structures. Disposal in- cludes street vacations or abandonments as well as the sale of public land.s. Special districts, school districts and joint powers agencies must also refer their capital improvements programs to the planning agency for review of consis- tency with the applicable general plan. The success of the capital improve-: ments program will be determined, to a large extent, by how the capital im- provement projects fit with the goals and policies of the general plan. The capital improvements p . roqram is also a useful plannin6 tool. The' availabil- lop ity of public facilities can serve as a basis for approval or denial of deve ment proposals. In many cases, the costs of public improvements are borne by the private developer and everitually passed through to the home buyer or the commercial/industrial user. In other cases, local government will pay improvement costs for developments. which will provide significant employment opportunities, increase sales tax revenues, or further adopted goals and policies. The prioritized list of capital improvements, therefore, must be flexible to respond to development opportuni- ties, yet must be guided by the long-term benefits that will accrue to the local jurisdiction and its residents. cn W n Do z w 0 IL z w LL M- w 0> �11 J § 94 Go LO V) m L) co r— CV LO eq 0 Lf) 0 § 0 0 Lf) U) to CV Nli V- § 94 Go LO V) m L) co r— CV LO eq 0 Lf) 0 § C11 U') 0 E 0) CIJ 00 P4 co 0 ,�,l CV) (D x o . LO V) m L) co r— CV LO eq 0 Lf) 0 1- v C11 U') 0 E 0) CIJ 00 P4 -j 04 0) x o . LO V) m U) 0 0 1- v C11 U') 0 E 0) CIJ 00 -j 8000 088 0 8 u 0008p, 0 0 'N U) .0 C'V) N 04 mo 0- (D E cc ID E tm 0 cc E E o to U) o cq a a 01) —i U) tm a) U) E U) �2 w 0 C: > U) U) 0 c c o �2 �2 0 0 LO 1- v C11 U') E 0) CIJ 00 -j 0 0 C*4 0 0 0 a) L) 0 (D E (D > 0 E CL E 00 008 8 8 8 8 0 w CL.V CL d d d d d 0- 0- Cl) m Lo 0' 0 E C6 C-) E 0 0 a) z a) 0 9 M E CL a) CD 0) >- co w U) tm f G m m E > ca 0 U. LL E cL (n E CL a) tp_ E E E —P -r- 2: 9 r_ — — w 0 0 — -i 'a 4= 0 — 0 E j; M 0 — t, o U) U) f.- W fa GO) Q E :3 -1 tm r- 0 a =I Z m (D > 0 E a) 0 C 0 E c)- > cc (D (D -j mw a) C r_ r- :�, >1 Q) r 0 o 0 c) (-) (.) 10 a US 0 C 0 r L) C t- w cu ca 0 E E w r r 0 0 V M f� A. P7 CL 1�� OE P a M.LD 'E U - o C 0 C'.j z ow ; -C E a- po 0 r- T t - as o E U) E (U C) >1 0 -X CL 'o 0- to co co U) CY) -M co co 9 =1 201 OWN, 0 .2 U) di > Ga U. E 0 U) C 0. m 0. 0 E -o E 6 & ? 0 -E LLJ < S E fr, E CL C 0 0 0 —J z w 0 CL 0 m E L6 0 9 a) jq w CY n N z CY) tm ui >. U. LL cy) S? LU CID Lf) 0 > 0 u 6 6 d 0- 0- U) - co co cli N.P CIA CN v OE P a M.LD 'E U - o C 0 C'.j z ow ; -C E a- po 0 r- T t - as o E U) E (U C) >1 0 -X CL 'o 0- to co co U) CY) -M co co 9 =1 201 OWN, > Ga U. E 0 C 0. m 0. 0 E -o E 6 & ? 0 -E < S E fr, E CL C 0 0 —J A C r cy) S? CID Lf) There are four basic steps in developing a capital improvements program: ° �oojeot identification . " Prioritization � � . - Reconciliation ° Adoption -- Needed capital should beidentified and reliable preliminary cost estimates should beprepared. Once identified, projects should belisted according boneed. This listing should include why each project isinnportentand what the consequences will bmifdimwrisnot funded. The next step iobJreconcile this prioritized listing into a comprehensive capital improvements program which coordinates improvement scheduling and recognizes the constraints of municipal financing. Finally, the capital improvements program should be formally reviewed and adopted by the local government. U-1, ^ 65401. Review Of Public works projects for C ontf ormity. With Pi -an --- It a general plan or part thereof has been adopted, within such time as may be fixed by the legislative body, each county or city officer, department, board, or commission, and each governmental body, commission, or board, including the governing body of any special district pr school district, whose jurisdiction lies wholly or partially within the County or city, whose functions include recommending, preparing plans for, or constructing, major public works, shall submit to the official agency, as designated by the respective county board of supervisors Or city council, a list Of the proposed Public works recommended for planning, initiation or construction during the ensuing'fiscal year. The official agency receiving the list of proposed Public works shall list and classify all such recommendations and shall prepare a coordinated program of proposed public works for the ensuing fiscal Year. Such coordinated program shall be submitted to the county or city planning agency for review and report to said official agenTcy as to cFfORitY with the adopted general plan or part thereof. On April 27, 1999, the referenced project was presented to the Planning Conunission at a public hearing. At that time, the public hearing was opened; public comments were heard; and the public hearing was continued to May 11, 1999. Pursuant to the applicant's requests, the project's public hearing was continued to May 25, 1999 and June 8, 1999. The continuances were to allow the applicant additional time to address issues discussed at the April 27, 1999 Planning Commission meeting. on June 2, 1999 at approximately 4:15 p.m., the ' applicant submitted architectural elevations, a traffic study and noise study for car wash dryer/blower. On June 3, 1999 at 10:13 a.m., the applicant faxed to the City Hydraulic and Hydrology calculations. Staff has begun the review of the referenced materials. The architectural style of the proposed structures is basically unchanged from the third submittal drawings attached to the April 27, 1999 Planning Commission packet. The traffic impact study prepared by'Associated Traffic Consultants must be reviewed by the City' traffic engineer; and air quality issues must be addressed with the assistance of the South Coast Air Quality Management District. Due to that fact that the required information needed to address the issues discussed at this project's public hearing was submitted on June 2, 1999, additional time is needed to analysis said information and revised the Negative Declaration. FZT-1500�� �Z Staff recommends that the Planning commission continue this project's public hearing to June 22, 1999. 1. Architectural elevations; 2. Traffic Impact Study Honda Car Wash and Auto Care Center dated June 1, 1999; 3. Hydraulic & Hydrology Calculation; and 4. Worldwide Drying Systems, Inc.(dryer sound levels). I t, i e S ki F I jll#��M-- CIA e'e4ecIL RE: Dryer Sound Levellm Y S T -E M S- Fo' lo,dinc are aound c -f two dryers in ncrthern Cali fornia reccrdnd ty vle car wash Owners r"t-resentative., Be.-kele�', CA - 35 10�:ate�! on O�jtsid@ of tj�ne' ReadiAnsgs taken WZTSOUT oblatr-.iction (Isndscap�nq, 5trjct-,;rv, etc.) L*Vae-4�n fmOter and dryer. OlStdnce frcT Decibels ---kwe --- - -... 101 20 1 83 30, so 40' 78 so, 76 60, 73 71 2.2-40 INDCbTRIAL I. '.NC CO HUI,.%() sari Rafael, CA 45 Horsepower 1,Dcated just inside tunnel an axit end. I�iterict' tunnal walls of ccjjc.-41�@ b I o c.;� W.' T 40 UT a C a cd u a t i c a I .t r e a t T. c a r C e- f r on 20 3 C 401 50, 606 701 87 84 02 79 78 76 74 Note: 7,)o ii�),,ve did nO have optional sllencir'� t T— (jqkjjp.T.t6nz attachad t-') 'he Flers at the time of rating. in tnt:. evant Icca-I erdInatees carnct, noise lcvi�!-.4 as p tiia stanlird dryeco aptL,)n4l com;t;n@n';s car. be tabri-:ated for _ Zial and Wjthj t i) P- dryer. Utilxzing &CI-'0Q6tic3-L ma�sa I the tunne: t -D ai:sorb any noiso prod-jeGd will a-�rj in the c*rtr 0. an d cow.-ilnMant cf sc-und at the pcoprzrty line, Block beZaj%,& of trl,� hj:d, slick Surface, can cortalln jorne of the noise within the tunrel ar,.--1 tent! to echo t sound placuna-i ' cf tho dryder farthor from the exi. .L. & baat:';-� irt:) tte 4 1 ha:P�S C:�I%ta I n the noise wit!-, in . etc . w4 als, ai-4 in cc levells on your propoirl'y. Rega rd _4 Pg opt ! ona-' ;1(ld `:: : bqffiv! consistint; 0! he�jyy g&uge stakinless trvatv,'A witn foam fc: noise ebaterriert, ranging 1j, 3' in a semi-circ',e C3.11 b%p p�3cej nelc tho of t", -.v "Q--yq: as dcvr-fctf-�d ir A. This redur.—a nQ;�za :D -v 4 - A Secon,] optio! Lee 8 actirld 86f.l@ I'POx" w,61ic.) f"S tiqht-y against the iMtAk-�, tAe entire intakep and forces tV,4-. a . r to be dzu qn thgo,,jgh p di -irance o F f -'ia-m-! i n(-..,! area . P(- f er t c� Attac�mglt E. R d 1 r. 1 1 1 z . n a 19 me t ho -1 0 rd a 5 f 0110 w 9 74 DB 3 0 70 DD unobstr-acted' fr�),m dryor so, 64 DO to metrr 70' -60 DFJ All optiOr&'_ sij-�jcinq eq-i.orp'ent regu'Lras aj--' -�tl,,Pnal tunnel area Wa hcr4� ��As ne:pf�.al. iti your r-�,search. Please 6 Call wit", "J�)estiors. worldwide nry-,nq 3ystems, Inc. M 11 11 z U) z Q) U) rri rri r - U) -n �K U) r rn A LD cp Au M I fe, 07 "M ict—EMTEC-04 SYSTEMS 13 714 4�,2 0355 07 04M J EMTECH SYSTEMS 117-m 714 49Z o155 x Fa W. 1. 4 TRAFFIC IMPACT STUDY E �777 Richard A. Stupin Associates 1445 W. Beverly Boulevard Montebello, CA 90640 IAJ '0 Associated Traffic onsultant-- 624 Brea Canyon Road Walnut, -California 91789 (909) 595-2273 4� June 1, 1999 * 99065 MYR/JR ASSOCIATED TRAFFIC CONSULTANTS 0 Transportation, Planning,& Engineering Post Office Box 90134 Pasadena, CA 91109-5134 909/595-2273 FAX- 909/595-8863 TRAFFIC IMPACT STUDY NONDA CAR WASH & AUTO CARE CENTER Diamond Bar, California NO. TITLE � PA/GE U Executive Summary ' '''' '' . NO. ''`' '' '' `' '' '' ' ' '' '' '' '' . . ,. . |ii I . Introduction , ..,. .,..'. ^...,,.. .. . . 2. 2. . . . . ..` . . . . . .. . . . .. Project Description l 3 ' '' '' '''' '' '' '' '' '' '''' '' '' '' '' '' '' '' - . ���[0���0D2D�/\CC�S3 5. . . . _ . , . . . . . . . Intersection Capacity and Leve] of 2015) . . . . . . . . . . . . , . .. .... .. .. .` . ^ . . . . .... `. .. .. .. .. . } 4. Existing Streets and Circulation System .^... .. ................. 7 5. ��C�Dt�I���F�f�C�OD�3 7. , .... ....^. .. .. . . .. .. .. . .^. . . .. . Other Known Related 6 8. Projects u` ''''''''''''''''''.''''''''.... lPraffiC °e"^^a`^ou 7 . .. .. .' .. .^.. '... . . . . ,. .. .. .. .. .. .. .. 10 V' Traffic Distribution ' '''''' '' ''^''''' ' ' '' '' '' '' '' '' '' .. . 10 lO Intersection Capacity ' ll. " --''- '''..........'''.'....'...... Project Traffic Impact 14 12. ..,.....,.^............'..,....... Year 2015 Buildout 18 13. r/"yxi8 ....' .. .. . . .. . . .... .. .. . . .. .. . CMP Transportation{TDpaCt Analysis' 19 14' ... ,. . . .. .. .... ,. .. .. .. .. Mitigation Measures -- 15 ' ' '' ''..,. .. .. .... '' '' ' ' .. .. .. .. .. .. . �rnicC��*mnnoSi����« ' -'-v Responsibility 22 ' ' ' ' ' ^` ' . . . . . . . . . . . . ' . . ' . . . . . ... . . . . 23 U TABLES NO. TITLE PAGE }. Existing 1999 Traffic \/0|uD2e3 . 2. . . ' . ' ' '� ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' Traffic Generation By Related Projects l . . . . . . . . . . . . . . . . . . . . . . . . Traffic Generation By Project ll 4. . . . . . , . . . . . . . . . . . . . . . . . . . . . . . . Intersection Capacity and Level 0FService (Year 2000) 14 18 5. . . . _ . , . . . . . . . Intersection Capacity and Leve] of 2015) . . . . . . . . . . . . , }Q h. Mitigation Measures and Project's ' 'Sh3re . , . ' . . , . . . . . , . . , . . , 24 U NO. TITU PAGE 1. Vicinity Map .............. ............................ 3 2. Site Plan .............................................. 4 3. Existing Lane Configuration ................................. 7 4. Existing Traffic Volumes ................................. 9 5. Related Project Location ............ 12 6. Existing Plus Related Project Trip Distribution (Year 2000) ........... 13 7. Project Only Traffic Volumes ........................... I ... 15 8. Existing Plus Related Plus Project Traffic (Year 2000) .............. 16 9. Existing Plus Related Project Trip Distribution (Year 2015) ........... 20 10. Existing Plus Related Plus Project Traffic (Year 2015) .............. 21 ii 06/03/1999 10:13 6262801346 W W SCHUBERT PAGE 01 �Ml � t1Al&-"v / YL,�WAjoe (� 177 0 F--- Otvfw O&JO eAP2, 06/03/1999 10:13 6262801346 W W SCKJBERT PAGE 02 I 6 %am TRITECH. ASSOCIATES INC. SUBDIVISION SURVEY ENGINEERING DESIGN 735 W. EMERSON AVENuE. MONTEREY PARK. C -A 91754 TEL: (626) 570-191B JOB. NO. 980416 I 06/03/1999 10:13 6262801346 W W SCFKJBERT PAGE 03 156' 253' AEAR2-(25B+156)/2 AEARI=(25,3+133.6)/2 X149=30843 S.P. X149=213801.7 S.F. =0.705 AC =0.661 AC AEA�2 X1 49_; 258- 133.6' A=30843+28801.7=59644.7 F.S. 59644.7/43560=1.369 AC. 2- RUNOFF FROM L.A. HYDROLOGY MANUAL FIG. C1.22 SEE ATTACH SHEETS ) RAINFALL ZONE: K SOIL CLASSIFICATION: 003 L = 244' A = 1.369 AC. C = 0.9 N = 0.04 i 06/03/1999 10:13 6262BO1346' W W SCHUBERT PAGE 04 USE: Tc 10 MIN. Te = 10 MIN, Im2.806 IN/HOUR, FOR 25—YEAR RAINFALL 0 C x I x A 0 0.9 x 2.-806. x 1-369 3.457 CY.S. Ql = 0.9 x 2.806 x 0.661 1.669 G.F.S. 02 = 0.9, x 2.BO6 x 0.708 1.788 C.F.S. 3. PIPE SIZE. USE. 18" R.C.P. PIPE A 1.767 S.r. 1/2 R 0.375 FT 5 0.01 2/ . 3 op (1,486/0.013)XO.375 XO.01 X1.7157=10.503 C.F.M Qp>Qo+Ql=7.858 C.F.M OK. 06/03/1999 10:13 6262801346 W W SCHUBERT PAGE 05 C-35 J- 6 _A\ Kw4b., 069 V MOO, —7 006 0 All' —7 Z-4 � (), 6 006 z/ 006 / 0 ILA, . do o 6 Y. A- J 00s VA., 0 0 a cm?, 0, 01 Yr; 7 7-1 002 �Y DPA -G- 7 -c 00 k 2.1 V . _00z 017 2 ....002 x 0 -on y 02,Q YOROA Ll SOIL CLASSIFICATION AREA -------- RAINFALL ZONE .......... DEBRIS POTENTIAL AREA --12— 50 -YEAR ISOHYET (MAX, 24-HOUR AMOUNT) LACFCD SAN DIMAS 1960 Revised (10/1121 -SET 5000 Figure C1.22 06/03/1999 10-13 6262801346 W W SCFtJBERT PAGE 06 I STANDARD VALUE TAi, MANNING'S N VALLJE73 W, I 6. a 0.040 0.060 STANDARD LOT VALUES TYPE OF CGvELOPmENT LiN�TH a i - COMercial Residential Rural STANDARD RANGE OF PROPORTION IMPERVIOUS 0-005-0-02 0-01 -0-05 0.05 -1 .00 ryp O;MT PROPORTION] DeVCIM ZMPERVIOUS Single -Family aLm 0.21-0.45 'o t Multi-flFamm1�1y _to , 0.40-0.80 60fftCc me rc i a 1 Industrial Institutional 0.70-o.90 Average Values fOF MOtropolitan LOS AngelOs COU . nty are: S'i ng 1 e-Fami I Y=C - 42 "-!141 t i -Faml 1 Y=Q. 58 IncluStrial=0.91 I Commercial=0.92 For'fnore Cotai I , ImstitUtionalzo,58 Table. se8 IthO Separate-PrOPortion Imperv"Ous 06/03/1999 10:13 6262801346 W W SCKJBERT PAGE 07 O�EAK INTENSiTY-DURATION TABLES 17 Jq K9 AND L ZONES - -------- -- ---- Z. 640 2. 3.720 - a d' 548 2. 34q 0. 3. doo 0.000 4, IM 1.191 2. 117 :1.103 2.171 1.970 7 3. 094 3. 65d 3.-71 1 -1309 .1, IG3 1 . 9W) 2.01-17 a ..gas 3. 191 3.329 1.965 1 - 03:3 1.913 Z. 6C)T 9 2 - 680 219817 2.333 9.970 1.622 2. ale d. 73 lo 2.524 2-606 3. 161 0.927 1.392 2.:58 1 2.396 2,997 a - 020 0.890 1-105 2.13c) 1.391 1. 2.209 4.§34 2.902 0. a94 1.432 2.017 542 1 3 2.199 2. A30 1-802 3. 29D 0.827 :1.371 1-924 121 :.340 Z. 1? 17 0.000 1.220 I .&do 15 2.044 2.256 92d 1-230 0. "2 1.264 1 . 747? l.a7a 1@3 l.:08 1.335 0.732 1.214 I. 2-919 1_916 2. lid d71 0,730 1.170 1.593 LIN Is - Sea 2.060 A07 0,71d 1. 131 2. -Sl is .1 1.1116 2.008 3as Q.age 2.680 log 77() 1.9.99 2.132 0.683 I -Goo 1.417 2 1 1 726 1.911 2. 0.665 1.031 1.264 I-sas 1.868 -23 2. M 0.657 1-002 1.323 .3 '.Gas 1.623 2. 1 to 1,020 0.6415 0 - 9?7 1 .2xo 24 1.615 1.792 2. "to 1.085 0. 9:34 0.986 1.243 25 1 SEA 1.7as 2.026 0.932 �:' " i 26 1 .555 1.726 1.982 0.911 0,911 ", 1 : V 1.329 1.685 0.602 1 . d&4 :16 0.926 28 I.SGa 116613 1 905 0.592 0. a? 1 1. 1 . do 1 1.42.9 ! 4?0 0.384 0.854 30 1 ?A 1.928 O�EAK INTENSiTY-DURATION TABLES 17 Jq K9 AND L ZONES INrENSI 20 YEAR 2.171 1.970 2-3:10 1 -1309 2. 121 0ec) 1.6ad 1.965 4-9419 1.987 1 . SA2 d. 73 1.303 f, ?45 4.000 1 . AA4 ads 1.730 1.391 go 2.5so 1,346 542 3. 29D I. 3C7 1 3.249 1.:72 1 1-230 1.395 l.:08 1.335 2-919 1,162 20 LIN 1. ?38 1 .298 2. -Sl 1. 1:37 2.680 log 1.08a I.Col 1.163 1.029 T. 2-Aa6 1,020 I.?Il 2.389 9.998 1.085 2.340 0.978 1.097 0.960 C329 0.926 1.012 O�EAK INTENSiTY-DURATION TABLES 17 Jq K9 AND L ZONES 06/03/1999 10:13 6262801346 W W SCRJBERT PAGE 06 I r- 0-50 mm M1,115 L74F 4 6 r -al .005- Iff Imilso Q M-CM-0- ME- 'All 4 6 r -al .005- Iff Imilso Q M-CM-0- ME- W 7 TO R� M1 IF]KI, The project, located on the south side of Grand Avenue west of SR-57/Sr-60 Freeways in the City, of Diamond Bar, consists of constructing a car wash, a lube and a auto care facility. The lube facility will provide a total of 3 service stalls while the auto care service will provide a total of 6 stalls. A total of 3 fueling pumps (adjacent to and for use by the lube facility) and a small auto -item store (in the customer waiting area) will also be provided as ancillary uses. The existing use of car parking/storage by Honda auto dealership on-site will be relocated to an upper-level auto display area. These ancillary uses are not expected to generate additional trips to and from the project. The car wash facility will not open before 9:00 AM, and therefore, will not generate trips during the 7 AM to 9 AM peak hours of adjacent street traffic. The average daily and peak hour trips expected to be generated by the project have been estimated based on information provided in Institute of Transportation Engineers' (ITE) manual "Trip Generation", OhEdition, published in January, 1997. Additional information was obtained from San Diego Association of Governments' (SANDAG) publication "Traffic Generators Manual". Trip generation was calculated for each of the facilities separately and then summed up to determine the total trips to be generated from the operation of the facilities. -A total of 1, 140 trips are expected to be generated on an average weekday from the site (570 trips inbound, 570 trips outbound). During the - AM peak hour approximately 19 trips will be made (13 vehicles will arrive and 6 vehicles will depart). Approximately 217 trips will be made during the PM peak hour (97 vehicle's will arrive and 120 vehicles will depart from the site). Vehicles will access the site via a driveway on Old Brea Canyon Road and a driveway on Grand Avenue. The average peak hour trips to be generated by the project were distributed onto the local circulation system using the percentages of trip distribution on a regional scale. These percentages were assumed based on regional distribution of population, characteristics of local roadway system, traffic control and lane configurations at the intersections as well -as observed travel patterns during the peak hours. In order to determine whether and how much traffic impact the project will have on the existing operating conditions of the local circulation system, a detailed cumulative traffic impact analysis was conducted. The analysis was based on existing traffic volumes,at the key intersections, intersection am lane configuration and traffic controls, traffic generation of a total of six other known related projects in the area, and a I % per year traffic growth factor. Using the Intersection Capacity Analysis (ICU) method for calculating volume/capacity ratio and level of service it was determined that the project traffic will have a significant impacron two of the 4 key intersections analyzed - Grand Avenue/SR- 57/SR-60 Freeway westbound ramps and Grand Avenue/SR-57/SR-60 Freeway westbound ramps. Appropriate mitigation measures were identified for both year 2000 (project opening year) and year 2015 (area buil.dout year) conditions to ensure an acceptable level of service at these intersections. The project's fair share towards the implementation cost of these measures was calculated using the City of Diamond Bar and Los'Angeles County traffic impact study guidelines. The developer of this project may be. required to participate -in a mitigation implementation program and/or an impact mitigation fee program to be developed by the City of Diamond Bar. IV WKE, F,11 INTRODUCTION U _ 7- r] 1�- IMART, MEN= This traffic study has been prepared to determine the traffic impacts on the local roadway system from the proposed Honda Car Wash and Auto Care Center. The project is located on the west side of Grand Avenue north of SR-57/SR-60 Freeways in the City of Diamond Bar, California. The project consists of constructing a car wash, a lube service and an auto care facility. The project's parking needs will be accommodated on-site. The daily and peak hour'trips expected to be generated by this project have been estimated and added to the existing on -street traffic volumes. Their impacts have been analyzed at a total of four key intersections in the vicinity of the project. The following material sets forth existing traffic counts, estimated trip generation, distribution of generated traffic and capacity analysis at the key intersections. The intersection capacity and level of service analysis was conducted for the existing 1999 conditions as well as projected 2000 and 2015 buildout conditions with and withoutthe proposed development. This traffic study has been prepared in accordance with the Traffic Impact Study Guidelines of � 1, the City of Diamond Bar as well as the Congestion Management Program (CMP) guidelines of Los Angeles County Metropolitan Transportation Authority (MTA). 1 The proposed Honda Car Wash and Auto Care Center development consists of constructing a car wash facility (100 feet tunnel), a 3 -service stall lube facility, and a 6 -stall auto care facility. Parking for the project will be provided on-site. A total of 3 fuel pumps (adjacent to and for use by the lube facility) and a small auto -item store�in the customer waiting area) will also be provided for the cpstomers' ancillary uses. The site is currently undeveloped, but used as a parking/storage of vehicles owned by the adjacent Honda dealership. This use will be replace d by an upper-level auto display area to be built as part of this project. SITE LOCATION AND ACCESS The project site is located on the west side of Grand Avenue adjacent to the north edge of SR- 57/SR-66 Freeways. Figure I shows the vicinity map and Figure 2 shows the proposed site plan and the adjacent roadway system. Access to the site will be provided via two driveways - one on Grand Avenue and the other on Old Brea Canyon Road. The driveway on Grand Avenu . e will allow only right -turn in and right -turn out movements due to a raised median on Grand Avenue. EXISTING STREETS AND CIRCULATION SYSTEM Major north -south access to the project is provided by Grand Avenue. Major east -west access is provided by SR-57/SR-60 Freeways, Valley Boulevard, Diamond Bar Boulevard and Golden Springs Drive. In the vicinity of the project, SR -57 (the Orange Freeway) is an 8 -lane access -controlled facility which provides a primary transportation corridor linking the Central Orange County cities to the south and the San Bernardino Freeway (I-10) and the Foothill Freeway (1-210) to the . north. The interchanges of the freeway, located on Grand Avenue (both northbound and southbound), provide direct access to the project site. SR -57 currently carries an average daily traffic (ADT) volume of 188,000 vehicles per day (vpd) at Grand Avenue. N VS. Ito sl 17 t: tux - X :Mu LU CLM T ram Ui la U') -;- - Q z IL w I Honda Auto Service and Car Wash Pro?'ect PROJECT SITE PL&N ai� PTr.TTPR n9 SR -60 (the Pomona Freeway) is an 8 -lane access -controlled facility which provides a primary transportation corridor linking the Central Los Angeles County cities to the west and the San Bernardino and Riverside County'cities to the east. The interchanges of the freeway, located on Grand Avenue (both westbound and eastbound), provide direct access to the project site. SR -60 currently carries an average daily traffic (ADT) y_Qlume of 203,000 vehicles per day (vpd) at Grand Avenue.. SR -60 and SR -57 Freeways merge to the south of Grand Avenue interchanges and are one and the same freeway until they diverge to the north of the Grand Avenue interchanges. Grand Avenue is a major north-southarterial which functions as a primary thoroughfare between the Cities of Diamond Bar and Chino Hills to the south and the City of Glendora near the Foothill Freeway to the north. Grand Avenue is designated as a CMP (Congestion Management Program) route between the SR -57 Freeway and San Bernardino County line. In the vicinity of the project site, Grand Avenu e is a 4 -lane divided roadway. Grand Avenue south of Valley Boulevard currently carries an ADT of 28,500 vpd and has a raised median. Golden Springs Drive is a north -south thoroughfare in the vicinity of the project. The roadway provides two lanes in each direction with a 2 -way left -turn lane in the median. All major intersections on Golden Springs Drive are signalized. Diamond Bar Boulevard is a north -south thoroughfare traversing the City of Diamond Bar, approximately I mile to the east of this project. The roadway provides two lanes in each direction with a raised median. Exclusive left -turn lanes are provided at most of the intersections on the roadway. All major intersections on Diamond Bar BQulevard are signalized. Valley Boulevard is a major east -west arterial street which provides a primary thoroughfare for local traffic between the City of Industry to the west and the City of Pomona to the east. Within the project vicinity, Valley Boulevard is a 4 -lane roadway with painted and raised medians 61 providing separation of directional traffic. ,zpproximately 20,000 to 30,000 vp , i Valley Boulevard. currently carries an ADT of Figure 3 shows the existing lane configuration and traffic controls on the roadway system and key intersections. RECENT AREA TRAFFIC COUNTS Traffic volume counts conducted at 4 key intersections and major roadways show typical peak periods associated with major streets in commercial areas of the City of Diamond Bar. The counts show a peak during the morning period and a peak during the evening period. Counts were conducted manually at the intersections from 7 AM to 9 AM and also from 4 PM to 6 PM to estimate turn ing movements during the peak hours. The average peak hour volumes were used in this study in. calculating capacity and level of service at the intersections. Table I shows a summary of peak period manual counts recently conducted at the intersections. - Figure 4 shows existing 1999 on -street traffic volumes'at the key locations. OTHER KNOWN RELATED PROJECTS The City of Diamond Bar traffic impact study guidelines require that a traffic impact study must include impacts from all other projects that I have been planned for development in the vicinity of a project under study. A total of six other projects have been identified in the vicinity of this project, based on a review of a number of recently prepared traffic studies, communications with tile City of Diamond Bar and adjacent jurisdictions. A total of 3 projects are expected to be constructed by year 2000. The remaining 3 projects: have been assumed to be in place by the study buildout year 2015. In addition, a I % per year growth rate was assumed for existing traffic volumes in order to estimate future background traffic volumes in the area. This would include any small-scale projects to be planned in the near future as well as normal increases in traffic No RIT Location Count Date Direction e e v rag Average Daily Daily Volume Volume AM Peak Hour AM Peak Hour PM Peak Hour -iio-ur- Volume Hour Volume Counter Hour Used Grand Avenue SIO Valley Boulevard 4GrandAvenu, 5/18/99. NB CA SD Both I , 8 13,538 3 53 14,391 1 4 3 9 1 27 929 �7,929 -�T -15 --T 504 6:00 15 1 .504 6.00 --- 7:00 935 4:45 -7:15 2,431 - 5:15 -92- cr,; 3 1,188 - 2,054 24-hour MacWne Count N/0 Grand Avenue NIO SR -60 W/B Ramps 5/18/99 NB SB Both 1 3 762 13,762 14,632 28,394 7:15 1,492 6: "92 6'00 7:00 959 4:45 9 9 j5 4-45 7:15 2,449 5:15 9 2 5 . 15 928 - 1,205 1 11 ro, 80 24-hour MacWne Count Grand Avenue SIO SR -60 E/B Ramps 5/18/99 NB SB Both 15,939 19,085 35,024 .15 1,460 5:00 7:45 1,088 5:15 30 ­�---T-- ---T ,420 ()0 1,079 1,603 2,680 24-hour Machine Count Grand Avenue E/O Golden Springs Dr. Grand Avenue E/O Diamond Bar Bl. 5/18/99 - 5/18/99 NB SB 18,60 7 13,415 -00 11:00 726 - 657 6 6:00 5 0 5:00 1,181 1,419 2 4 -110 I 0 24 clune Ma M Co u 0 7untr aa cc MC 2 4 _h 24-hour 0 11 Machine ou C n Count Both 32,022 NB 13,048 �B 25,568 Both 38,616 7-15 6:30 7:17 6:45 M7 2,118 --7735 7 35 1,407 1 ' 407 1 1 3,121 5 5:45 '45 5 - 4 0 2 2:45 3 5:30 --�-30 5 2,495 69 3 831 4,384 I Grand Avenue @ SR -57/SR-60 W/B Ramps 5/13/99 ttt NB - -15 7:15 1 1,733 5:00 1,128 1,31 Peak Perio( Period M nu. Manual Count Cou I SB EB 919 9 44 - 609 67 WB .. 584 Grand Avenue SR-57/SR-60 E/B Ramps Grand Avenue @ Golden Springs Drive Grand Avenue e 10 Diamond Bar B oulev r 5/25/99 oulevard 5/0/99 5/20*/99 NB -SB 7: 15 7:15 '77:15 7:00 - 7,607 863 556 1,791 956 --7300 5,00 5:00 1, 61 ' 26 670 670 Peak Period Manual Count EB WB NB SB 5:00 959 Peak Period Manual Count -- -�,462 I , 462 EB - 346 1,690 WB N NB B 1,276 2,169 504 5:00 982 Peak Period Manual Count SB B MB- 529 1,663 E 897 - 1,846 - 832 W WB Counts conducted ---= ted Traffic 6nsultants RIT volume because of potential population increases. This growth rate is consistent with the projections provided by the Los Angeles County's 1997 CMP manual which shows an 18.8 % increase in traffic volume betw6en 1992 and 2010 for the San Gabriel Valley area (project location). The increase translates into a 0.96% per year ambient traffic growth for the study area. Table 2 shows a list of other known related projects, and estimated traffic volumes to be generated by these projects. The trip generation estimates shown are based on ITE trip generation rates . and estimated trips as reported in the traffic impact studies (TIA) prepared for these projects. Figure 5 shows the location of the related projects. Figure 6 shows existing plus I % ambient growth plus traffic from related projects. TRAFFIc GENERATION The daily and peak hour traffic volumes expected to be generated from the proposed project were estimated based on the trip generation rates obtained from the Institute of Transportation Engineers' (ITE) "Trip Generation", 6th Edition, published in January, 1997 and supplemented by information from San Diego Association of Governments' "Traffic Generators Manual", 1996. Table 3 shows the daily and peak hour trip generation rates and resulting volumes (trip ends) for the project. It is estimated that the project will generate approximately 1, 140 new vehicular trip ends per day on weekdays with 19 AM peak hour trips and 217 PM peak hour trips. The estimated AM and PM peak hour volumes were used in intersection capacity and level of service analysis. As shown on Table 3 the project will add an additional 13 vehicles arriving and 6 vehicles departing during the AM peak hour, and 97 vehicles arriving and 120 vehicles departing during the PM peak hour. TRAFFIc DISTRIBUTION The expected project related traffic volumes were distributed onto the local roadway system based on manual traffic counts, observation of peak hour traffic movements, characteristics of the 10 vo_ W m C 00 C4 t1r) tr) -0 00 r4 C7, M 00 w 0� L) ca > '60" CD t— 0 C:) "t -0 - r- C, ,� C, & cn C) 0� ON tn 0 00 M m 00 U U W) m m ON m 00 f) 4 "D M 00 m M tf) I'D a\ In 00 m Q) C) LV 0� tf) kr) 00 ll� CD m kr) rq ("I ca CD 00 CD 00 m 00 CD 00 CD ON CD CD W) eq In cq cli co V's > 00 eq 00 00 00 r- cq 00 Cl C:) C) tn eq eq r- \D tn 00 W cq cc ul CD CD LT. CD C� 00(/) cr\ aj m 00 m 00 �T \0 CD aj u m CD 116 \0 ON 00 V4 ON tn f2w z �D En 0 CD u r- P4 cq m 0 E� o a u 0 U, 0 Ln c, 6 :0 Ri - - M =.— Ln t. m > C) COE ca C)m > =0 0 CO PQ 7a z E u r U�— Mtn ;-, �,. r4 > a4 .— 0 E 0,4 - = = a. 0.) = — = LA = = = = !�o . C, 7� cu tnj C) Q)'O <,4 -0 4. 04, C"o u 2 0.)u 0 QU4 �6 w U vo_ Honda a n d C a4,,,, Approximate Projects (see in JIA) location of Related related projects table f—I go Auto k'�'ervwe Wash Pro)'e c t NG4 0 t sw"" Location of Related Projects Year 2000 Related Traffic Volumes AM and PM Peak Hours Table 3 TRIP GENERATION BY EONDA CAR -WASH & AUTO CARE CENTEJ-X,' nearby roadway system and the population distribution of the region. Figure 7 shows the directional percentages of project trips on the local network and the project related traffic distributed on the local roadway system for AM and PM peak hours. Figure 8 shows the total peak hou r volumes (existing traffic plus a I % yearly traffic growth plus related projects and traffic from the project) at the key intersections for future 2000 conditions. INTERSECTION CAPACITY ANALYSIS The year 2000 was selected for project opening �bar impact analysis purposes. Analysis assumptions include the following: 1 - The proposed project will be completed by late 1999 or early 2000 with traffic E (10%) - x Of Project Traffic @n segmen t —3(10) - AM(PMIPodk Hour Traffic in the I action Indicated patterns and roadway configurations established. For the purposes of this study, the year 2000 was considered as the opening year to determine project impacts. 2. Traffic volumes on the area streets will increase at a rate of 1 % per year due to normal traffic growth and any other small-scale projects that may be planned in the vicinity. 3. The intersection lane configuration and traffic control system will remain as observed under existing conditions. The intersection analysis was based on information obtained from manual counts of turning movements andexisting lane configuration at the key intersections. The intersections were analyzed for existing 1999 conditions as well as future 2000 conditions with and without the proposed project. The analysis was conducted using the Intersection Capacity Utilization (ICU) method. A computer traffic analysis software, TRAFFIX Version 6.8, was utilized for intersection volume/capacity (V/Q ratio and level of service (LOS) calculations. Table 4 presents a summary of results of the volume/capacity (V/Q ratio and Level of Service (LOS) calculations for existing 1999 and projected 2000 AM and PM peak hour conditions with and without project traffic at key intersections. See the Technical Appendix for details of the LOS calculations. 17 INTERSECTION CAPACITY AND LEVEL OF SERVICE WITH AND WITHOUT PROJECT (YEAR. 2000) Future 2000 Future 2000 Intersection Peak Existing 1999 (Existing Plus (Widi Other Future 2000 ro ect Project Hour - Amb. Growth) Projects) (With Project) Impact ct qVpja V/C LOS OS V V/C /C LOS V/C OS LOS - V/C V/C LOS /C V/C Grand Avenue and SR-57/SR-60 WB AM 0.754 C C 0.760 0. 760 C 1.544 F F 1. 607 1.607 ff F 0. 127 PM 0.586 A 0.591 9 JD0. A 0.791 C 0 0.804 D 0.013 Grand Avenue and AiT'�-_928 E 0.936 9 E 1 3-33 _F 1.337 F 0.011 SR-57/SR-60 EB Ram Ps PM 0 - .815 _�. 823 D _E 1.071 F 1.103 F 0.032* Grand Avenue and AiT 972 E 0.981 .040 F 1.042 F Golden Springs Drive PM 0.865 D 0.873 D 0.926 E 0.933 E .002 0.007 Grand Avenue and AM 0. 910 E 0.918 E 0.956 E .956 E 0 Diamond Bar Boulevard p 1.062 F 1.072 F .091 _F .0 5 F 0.004 *Intersections expected to be impacted by Project. PROJECT TRAFFIC IMPACT The traffic impact of a project is measured in terms of increase in an intersection V/C ratio by project related traffic. Acceptable minimum increases in V/C ratio are less than 0.040 within LOS C, 0.020 within LOS D, 0.010 within LOS E or F. A significant impact, as indicated by an increase in V/C ratio beyond the acceptable limits, must be mitigated by the developer of a project in order to implement the development. Using the results of ICU analysis, the increases in V/C ratio by the project -related traffic have . , I been determined at the key intersections, and shown in Table 4. Based on the above discussion, two of the four key intersections analyzed show a significant impact due to the project in year 2000 when the project is completed. These intersections are: Ift Grand Avenue and SR-57/SR-60 Northbound Ramps YEAR 2015 (BuiLDOUT) ANALYSIS An analysis was conducted, for a scenario representing full buildout of the area, per the traffic impact study guidelines of the City of Diamond Bar. Year 2015 was.selected for this purpose since most traffic impact studies prepared for other area projects identified 2015 as the buildout year. A total of three additional projects have been identified to be developed between 2000 and 2015 (see Table 3). The results of ICU analysis for this scenario are shown in Table 5. Figure 9 shows buildout conditions (existing plus 1 % per. year plus additional related projects) prior to the addition of project traffic. Figure 10 illustrates total buildout conditions with the addition of project traffic. Table 5 INTERSECTION CAPACITY AND LEVEL OF SERVICE WITH AND WITHOUT PROJECT (YEAR 2015) M Future 2015 Future 2015 Future 2015 Project Peak Existing 1999 (Existing Plus (With Other (With Project) Impact Intersection Hour —LO Amb. Growth) —V/ —LO Projects) —V/ —LOS V F S C S C V/C LOS V/C Grand Avenue and AM 0.754 C 0.874 D 1.790 F 1.853 F 0. 127 SR-57/SR-60 W13 Ramps pM 0,586 A 680 B 0.920 E 0.935 E 0.015* Grand Avenue and AM —�M 0.928 E 1.076 F 1.549 F 1.553 F 0.011* SR-57/SR-60 EB Ramps . 15 D 0.945 E 1.313 F 1.341 F 0.032* Grand Avenue and AM 0.972 E 1.128 F 1.199 F 1.201 F 0.002 Golden Springs Drive PM 0.865 D 1.003 F 1.142 F 1.149 F 0.007 Grand Avenue and AM 0.910 E 1.056] F 1.1211 F 1.121 ME F 0 —FM !IE.O6]2 F E1.232 F 1.274 1 F 1.27 F 0.003 Diamond Bar Boulevard *Intersections expected to be impacted by Project. M 2015 + Related + Project Volumeff� Year 1. S g AM and PM Peak Hours Ob ID! Cb C, CMIP TRANSPORTATION IMPACT ANALYSIS The Los Angeles County Congeslion Management Program (CMP) guidelines require all CMP monitoring intersections and arterial/freeway segments to be included in a project's traffic impact analysis if the following conditions are met: For CMP monitoring intersections, if the project adds 50 or more trips during either the AM or PM weekday peak hours (of adjacent str eet traffic) 0 For CMP arterial segments, if the project traffic adds 50 or more peak hour trips (total of both directions) For mainline freeway segments, if the project traffic adds 150 or more trips in either direction during either the AM or PM weekday peak hours Accordingly, the arterial segment of Grand Avenue between SR-60/SR-57 and Golden Springs Drive needed to be analyzed. This is a very short segment (approximately 300 feet), and influenced by peak hour traffic conditions at the adjacent intersections of Grand Avenue/SR-60 Eastbound Ramps and Grand Avenue and Golden Springs 'Drive. These two intersections were analyzed and the results are discussed in the. previous sections as part of the k ey intersection analysis. Therefore, a separate analysis to meet the CMP requirements was deemed unnecessary. MITIGATION MEASURES The following mitigation measures have been identified to reduce the level of service at the impacted intersections to an acceptable threshold LOS D: V'A Grand Avenue and SR-57/SR-60 Westbound Ramps: Provide an additional right -turn lane on the off -ramp (resulting in two right -turn lanes) and an. additional through lane on the northbound approach of Grand Avenue (resulting in three through lanes). Grand Avenue and'SR-57/SR-60 Eastbound Ramps: Provide an additional left -turn lane on t's southbound approach of Grand Avenue (resulting in two left -turn lanes) and an additional left -turn lane on the eastbound off -ramp (resulting in two left -turn lanes). Year 2013–M-aii—gaiM Grand Avenue and SR-57/SR-60 Westbound Ramps: Provide an additional right -turn lane and an additional left -turn lane on the off -ramp (resulting in two left -turn and right -turn lanes) and an additional through lane on the northbound approach of Grand Avenue (resulting in three through lanes). Grand Avenue and SR-57/SR-60 Eastbound Ramps: Provide an additional left -turn lane on the southbound approach of Grand Avenue (resulting in two left -turn lanes), an additional through and a shared through -right turn lane on the northbound approach of Grand Avenue (resulting in three through and a shared -right -turn lanes) and an additional left -turn lane on the eastbound off -ramp (resulting in two left -turn lanes). PROJECT RESPONSIBILITY The proposed project will be required to contribute a failr-share towards the mitigation cost of the intersections impacted by traffic from the project. The City of Diamond Bar uses the following formula to determine the project's proportionate share of the cost of mitigation: IN Project Traffic Project's Fair Share = ------------ — ------ — ---- — — -- Project Traffic + Other Project's Traffic in using the above formula, the traffic volumes during the worst peak hour conditions were used. The proposed mitigation measures, estimated cost of each measure (without right-of-way or bridge widening costs) and the project's fair.share have been calculated and shown in Table 6. Table 6 MITIGATION MEASURES AND PROJECTS FAIR SHARE Intersection Mitigation Measures Estimated Total Cost I Other Project Project Project's Project F7ai I r Share Volume Volume Share Cost Year 2000 Mitigation . I W/B Right -turn Lane $150,000 Grand/SR -57/SR-60 Westbound Ramps I N/B Through Lane Total I S/B Left -turn Lane �Iuuluoo Orand/SR-57/SR-60 Eastbound Ramps I E/B Left -turn Lane $100,000 I N/B Through Lane $260,000 785 12 1.51% $6t926 Total $460,000 Total Cost �170,000 $13,539 Year 2015 Mitigation (assuming 110 improvement in 2000) I W/B Right -turn Lane $150 , 000 I W/B Left -turn Lane $100,000 Grand/SR-57/SR-60 Westbound Ramps 1,768 22 1.23% $6,268 I N/B Through Lane $260,000 Total $510,000 1 S/B Left -turn Lane $100,000 I E/B Left -turn Lane $100,000 Grand/SR-57/SR-60 .Eastbound Ramps I E/B Through Lane $260,000 1 N/B Through Lane $260,000 1,023 12 1.16% $11,362 1 N/B Through -Right Lane $260,000 Total $980,000 Total Cost $1,080,000 $17,630 24 CONCLUSION The daily and peak hour traffic eseiinated to be generated from the proposed Honda Car Wash and Auto Care Center is expected to impact two of the four key intersections analyzed. These two intersections are: 1) Grand Avenue and SR-57/SR-60 Freeway Westbound Ramps, -and 2) Grand Avenu e and SR-57/SR-60 Freeway Eastbound Ramps. Mitigation measures have been identified to reduce the impacts . to an acceptable level for both Year 2000 (project opening year) and Year 2015 (area buildout year) cumulative traffic conditions. The project developer is expected to contribute a fair share towards the cost of implementing the mitigation measures. M Tuff�nq Movemeni Count AnalysIs PROJECT NAME: PROJECT NO: DATE: 99047X04 05.25.99 TIME N -S STREET: Grand Awnue 0 0 E-WSTREET: DiamondBarBlvd 01 q NL PED COUNT SL EL WL NORTHBOUND _T_0Ff___fHR'6_j_RIGHT SOUTH BOUND LEFT _Y�HRU_ RIdHF­T N -S TOTAL EAST BOUND WEST BOUND LEFT THRU I RIGHT E -1A TOTAL EFT R I G H T 07:00-07:15 235 3081-8 0 —14 56 670 _66- —60 23 12 282 19 452 9 0 3 0 07:15-07:30 225 3311 9 13 54 45 677 78 87 65 8 255 32 525 1 1 0 2 07:30-07:45 220 3051 ig —36 52 57 686 69 131 61 18 242 27 548 1 2 1 2 07:4548:00 184 2961 32 41 78 34 665 84 132 51 28 192 14 501 2 2 0 0 o8!00*8:15 1---- 0T___0j 275 T24 42. 79. 42 635. 88 112 50 36 160 35 481 2 0 3 01 01 08:15-08:30 140 14 247 23 3217 1021 37 Sal 611 891 43 32 1391 14� 378 8 31 21 9 08:30-08:45 131 2133 22 291 741 28 517 551 79 35 231 821 26 300 51 1 1 0 08:45-09:00 141 234 17 1 451 891 29 -i-55 661 107__ 45 211 951 11 345 VVR 65 41 21 1100-11 15 0 0 0 0 01 q 0 0 01 0 0 01 q 0 0 0 0 0 11:15-11:30 0 0 0 0 0 0 0 0 01 0 0 0 0 0 0 0 0 0 11:30-11:45 0 0 0 0 0 0 0 0 .0 0 0 0 0 0 0 0 0 0 11:45-12:00 0 0 0 0 0 0 0 0 'o 0 0 0 0 0 0 0 0 0 12!00-12:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 S.T2 � 0 0 0 0 o o o o o 0 0 0 o o o 0 0 0 0 12:30-12:45 1---- 0T___0j 0 46 o o o o o — 0 0 0 0 0 _11 4 0 75 246 191 2 F_ 01. 0 12:45-13:00 0 01 01 1 ��o �o 0 �j �o 01 01 01 01 0 981 12OF 18[ 654 16.(>0-16,15 79 107 17 611 2521 381 554 57 2191 ill 60 951 131 557 2 9 4 9 16'l 5.16.30 93 100 11 62 1981 30 494 63 214 176 62 104 25 644 0 1 5 1630 1645 90 123 14 63 244 68 602 60 223 144 55 106 19 607 2 4 6 2 16 4 5.17:00 100 151 13 55 245 49 613 61 220 167 88 130 13 685 3 0 3 1 17.DO-17:15 96 113 14 39 277 46 585 64 235 161 80 108 12 660 0 1 2 4 �7 15-17 30 17 W_. �7 45 101 __100_ 137 13 �1251 14 49 56 346 2Y5 45 47 691 ii� 46 204 206 75 113 , 15 659 0 0 3 0 0 _11 4 0 75 246 191 2 F_ 71 102 20 705 17 A5 1660 —184 156 1 76 i4— 49 48 7421 _5 561 197 [ 1 C, 5 981 12OF 18[ 654 0 0 5 5 0 PEAK -HOUR VOLUME ANALYSIS 287 410 200 CALCULAIED EL ET ER 192 SR NL 864 PEAK HOUR 233 ST 07:DOM:00 NT 1240 VOLUMES 104 SL NR 65 -AM WR wr W1 92 Wl 66 ADJUSTED EL ET ER PEAK SR NL HOUR YQLUMES-AM ST NT SL NR WR WT WL CALCUL6TED PEM HOU13 Y.QLUbdES-NQQN 60JUSTED PEA9 HOUR YQLUMES-NOQN 0 0 a SR ST SL SR , ST SL 0 EL WR 0 EL WR 0 ET 11:00-12:00 WT 0 ET WT 0 ER WL 0 ER WL NL NT NR NL NT NR 0 0 0 C6LQULATEQ_RE6K 106 HOUR 1257 YOLUMES-PM 220 ;6K HOUR VOLUMES -EM SR ST SL SR ST SL 241 EL VVR 65 EL WR 882 ET 17:DD.18:00 WT 443 ET VVT 723 ER "IL 324 ER vvL NL NT NR NL NT NR 401 525 56 Turning Movernent Count Analysis PROJECT NAME: PROJECT NO: 9904701 DATE: 05/20M 11:00-11:15 -il 15-11 �3O :I0 4_ 30-1145 1 ] 11 7]45-1200 -12:15 1� 15-12 30 T2 30-12 45 12 45-13:00 1 WSSTREET: 0 0 0 0 0 0 0 0 0 01 0 0 GrandAvenue 0 a 0 0 G 0 a 0 0 o 0 0 0 0 0 0 0 0 -0 0 ;;;;;!::!� 0 u 0 0 0 0 0 0 E-WSTREET: Golden Springs Dnve 0 0 ---------- 0 0 0 0 -0 0 01 __7_0 __�,o 0 u 0 TIME —1 PED COUNT —0 2 1 — NORTH BOUND SOUTH BOUND N -S TOTAL EAST BOUND WESTBOUND WESTBOUND E*%A EAA TOTAL TOT L LIFF_TT_THR_UrR­1GH_T LEFT THRU RIGHT _L —EF—TFT-H _RR 'U -TR I -GH T T LEFT THRU RIGHT 67000-7.15 ZT-7—'.15-07.30 T7.530-07-.45 _67T__'45.�08.00 Za 00-0-8.15 _T68—:15-08:30 TO. -30-08 45 (TO -45-09'.00 -A- 113 173 118 170 150 138 102 821 2Z.1 241 313 325 258 265 273 248 2321 11 5 9 4 4 a —7 27 26 41 49 37 55 64 41 79 71 78 123 131 123 127 130 82 70 91 151 104 - 93 553 654 650 69 738 697 _645 _5o5 21 15 11 2 1 "1 16 15 22 25 28 14 I 20 42 3 0 1 31 33 42 32 32 32 1 21 21 —28 24 M-34 — 7 9 9 22 17 31 22 16 11 , , XLEFA 214 205 212 213 180 114 63 9, 59 Be 89 88 109 70 62 50 329 329 368 405 - 432 417 296 2 2 6 1 —0 —0 —0 —3 0 2 0 0 0 0 0 0 0 0 0 0 0 1 0 — _1 0 1 11:00-11:15 -il 15-11 �3O :I0 4_ 30-1145 1 ] 11 7]45-1200 -12:15 1� 15-12 30 T2 30-12 45 12 45-13:00 1 0 0 _0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01 0 0 1 u u u u 0 0 0 a 0 0 G 0 a 0 0 o 0 0 0 0 0 0 0 0 -0 0 ;;;;;!::!� 0 u 0 0 0 0 0 0 0 0 0 0 n 0 0 0 ---------- 0 0 0 0 -0 0 01 __7_0 __�,o 0 u 0 0 0 1 0 0 0 0 nuo :�:;o 67 I 1&00-16.15 35 1 1 61 20U 33 511 91 34 Ob 25 6 �1516 30� 50 Jj 159 27 67 190 41 534 62 155 —95 45 47 44 1630-1645 51 168 23 68 194 35 539 67 IDU 110 20 42 49 36 42:: 4511 T6 45-17 00 52 167 21 60 218 41 559 63 162 128 ET _i7 00-17 15 39 176 22 68 238 42 585 82 185 —118 ZI 70 _5 a 49, 1 � 17 30 40 161 20 242 31 554 87 vvr — —159 36 49 51( NT NR 49 1 331 78 261 6671 236 201 70 4B ___52 62( — NL NT 77 187 137 291 F 34 51f 17 45-18 00 166 28 89 241 5 — 615 861 1851 1511 u�l 0 PEAK -HOUR VOLUME ANALYSIS u 0 01 0 u n 0 n 0 0 400 v u 0 0 u 0 0 0 0 400 403 153 SR ST St. 100 EL WR 374 SR ST SL 118 ET 07:15-08:15 wr 810 EL ET vvR — 128 ER "IL 92 vvr — NL NT NR ER WI. — NL NT NR 611 1161 19 CALCULAIED 0 REAK HQUE 0 0 AK SR ST SL 0 EL SR ST St. WR 0 EL WR 0 ET 11:00-12:00 W7 0 ET 77 0 ER WL 0 wr NI. NT NR ER NL NT NR 0 0 0 6DJUSTED PEAK 185 . 982 295 H SR ST SL 332 EL WR 176 SR ST SL 793 ET 17:00-18:00 WT 226 EL WR 565 ER 'm 102 ET wr NL NT NR ER %,VL NL NT ' NR 167 689 103 PROJECT NAME: PROJECT NO: DATE: 9904743 05113199 TIME N -S STREET: -Grand Avenue E.WSTREET: SR-60EBRarn 0 NL PED COUNT SL EL WL NORTH BOUND SOUTH BOUND N -S EAST BOUND WEST BOUND E." ___'THRU I TEFT LEFT THRU RIGHT TOTAL "'T THRU GHT LEFT FWFd-H—T LEFT fHkU RIGHT TOTAL , .w.o7.15 = —297 77 66 92 0 532 68 0 '9 39 0 0 07 107 E14 0 0 0 0 --67.15-07 30 0 '341 103 58 128 0 630 114 0 0 34 0 _0 0 01 0 FiE� 148 � _80 0 0 0 —0-0 0 -677--- .30�07,45 0 290 F6 — 63 iji 0 570 161 M34 0 19 19 0 0 0 I go � 0 0 0 0 0 (5-7-4_,, 0-8 0() —0 313 T6 78 187 0 654 134 0 'o 10 0 0 0 144 0 0 0 0 -68 00 _08 15 0 300 go 48 1 170 0 616 73 0 ill 01 0 0 _4 0 0 0 01 0 0 08:15-08*30 0 320 82 491 157, 0 608 74 o i 1 0 0 0 85 0 01 0. 0 30-0:84[L-0 2701 0 r 8:7 431 1 1801 ET 5801 J1,85-1 57 0 7 —18 0 _+�o I ___O��_ wr 1____�o :_Z. —:4 "g, 0 __ 2311 __: '9 571 1731 0 701--0 — WL — L-4 NL NT NR 1100-11 15 01 01 0 0 al 0 0 0 0 u 0 01 q 0 0 0 0 — TI'715-11 30 0 0 0 0 01 0 0 a 0 0 0 0 q 0 0 0 0 0 1 30-11 4 5 0 0 0 0 0 0 0 0 .0 0 0 0 0 0 0 0 0 0 1 45-12 00 0 0 0 a 0 0 0 0 .0 o 0 0 0 0 0 0 0 _12 00 12 15 0 0 0 0 0 0 212 0 0 0 0 0 0 0 0 0 0 0 12 15-1230 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 — 0 0 0 T2 30-12 45 0 0 0 0 0 o 0 0 0 0 _L_T=F�o 0 0 0 io i _0 Sp 0 6 V2 45-13 00 01 0 0 0 0 0 0 _4 0 0 0 0 01 og 0 0 0 01 0 16.00-16:15 0 240 120 54 1761 0� 590 47 01 53 0 01 01 100 0 01 U 0 15-16 30 0 212 106 60 171 01 549 55 0 48 0 0 0 103 0 01 0 0 _�6 30-16 45 0 211 133 53 174 0 571 62 0 49 0 0 0 0 ill 0 0 0 0 1645-1700 0 249 120 87 215 0 671 45 0 68 0 EE 0 0 0 113 0 0 0 0 �_700 17-15 17 15-1736 17 30-17 45 —0 210 97 81 212 0 600 58 0 72 0 0 0 0 130 0 0 0 0 0 228 115 - _­__ 1 - — 01 K2 12'5 86 209 0 0 6381 687 71 01 93 _ _ - 78 0 0 0 164 0 ____ o 0 0 -*--' - __-6 o 0 - 0 0 _2 -i- 76 1745-18.00 0! 121. 731 2701 0 6361 79 01 122 0 0 01 01 io i 0 0 6 PEAK -HOUR VOLUME ANALYSIS CALCULATED EEAK HOUB VOLUME5-AM ADJUSTED PEA9 HQUB YOLUMES-AM 0 616 247 SR ST SL SR ST SL 482 EL W R 0 EL VVR — 0 ET 07:15-08:15 VVT 0 ET WT — 74 ER WL 0 ER VVL — NL NT NR NL NT NR 0 1244 363 CA CULAIED 0 PEAK HQUI3VQLUMES-NQON 0 0 ADJU51 DPE6KHQURYQLUMES-NQQ SR ST SL SR ST SL 9 EL WR 0 — EL WR — 0 ET 11:00-12:00 wr 0 — ET wr 0 ER wl. 0 — ER WL — NL NT NR NL NT NR 0 0 0 — CALCULAIED eEAK HQUB VOLUMES -PM ADJUSTED PEAK HQQR VOLUMES -PM 0 932 329 SR ST SL SR ST SL 286 EL WR 0 EL V,/R _ 0 ET 17:00-18:00 WT 0 ET WT 384 ER WIL 0 ER WL — NL NT NR NL NT NR 0 842 458 T—ing Mmffvont Comt Anatysis PROJECT NAME: PROJECT NO: 9904702 DATE: 05113/99 TIME T7 00-07.15 -67 1 —t-07'.30 67 30 _07A 5 T7 45-0-8 00 08:00-08:15 TS_�_15_-0830 _C8 30-0-8 45 08:45-09:00 N-SSTREET: GrandAvwm 0 0 0 0 0 0 0 E-WSTREET: SR.60WBRa TP/Old Brea 0 0 0 0 0 0 0 0 0 0 0 0 0 —0-0 —0 —0 —0 1 -f:-- 0 PED COUNT 0 1 _0 0 0 0 —0 0 0 0 0 0 0 0 0 !Lo —0 0 0 0 0 0 0 ol 2 NORTH.BO - LIND SC�UTH B NO SOUTH LIND OIL .6 — - _j�IGHT _[E _FT -THFiG N -S WS TOTAL TOTAL 559 559 681 �698 699 574 5741 7 1 EAST BOUND VIEST 130 WEST 13OUND E_'A E* TOTAL TOTAL 92 92 105 128 248 172 1 1 177 �TH�RG �iGHT LEEI lij W4 4 156 11 155 10 346 97 7 345 93 15 254 1 07 15 241 133 14 1 5 1261 20 193 Be THR R fGHT 89 89 lo6 1 81 138 3 99 142 4 92 159 3 : i 1 7 1 1 126 1 65 113WS 4 681 1171 -q-5211 LEFT THRU IG HT 2 1 2 3 6 5 3 5 5 2 4 3 2 4 2 4 1 11 __T3 51-4 I__1_05 — JIND — LEFT — U F�JdHTT �HRU RdHT 51 51 2 34 4 0 40 4 47 48 5 62 98 1 140 92 1 71 _62�__18252: 60 'o 0 11:00-11:15 Tl___15_1l 30 _1 11 3 0-1-11 4 5 1 4 5-1-2 00 T2 00-12 15 T2 �_1512 3O� 12:30-12:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 u 0 0 0 u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ol 0 0 — - 50 0 0 0 E 00 0 5-0 —0 0 0 0 0 0 EOO — o 0 =0 u u —0 u 0 0 o 0 0 0 0 q 0 0 0 0 OT 0 0 0 0 0 0 v 0 0 0 0 0 u 0 H 0 0 0 0 0 " ol L=I— 0 0 — 0 -0 —0 0 0 0 0 -0 -0 —0 —0 ol u 0 0 0 -0 -0 -0 —0 0 0 —0 —0 01 0 ol ol oi-ol 16.00-16.15 T6 15 1-6 30 1630-1645 ___ _16 2 -6 iJ ' !=I 141 149 154 128' 117 10 6 75 201 5 91 185 3 562 551 534 7 9 4 2 47 4 11 33 4 5 ito 41 a 9 45 -17 -.Dl) 1700 1-7 15 T7_1 5.17-30 i F3�6-_l �_5 12 13 2 --,7F— 121-153T-921-68 162 145 —176 q 1-9 4 0 11 11 7 11 104 —9 jut 1 1 AA 3 609 602 666 —6:iF-91 .5 2 u 4 3 4 10 04 J4 5A 4 75 13! 13! 5 94 236 3 210 1 —5361 71 6 6 84 3 631 3 3 7 129 5 a? 16� —99-C PEAK -HOUR VOLUME ANALYSIS 10 19 15 0 o o o 0 PEAK 565 343 ST SL 07:15-08:15 NT NR 1238 452 0 n 0 0 0 u U a 0 .6 W�o a — 0 u u n 0 0 0 v 0 0 0 0 0 0 0 0 0 0 0 0 1 0 10 19 15 QALQULATED EL ET ER 11 SR NL 43 PEAK 565 343 ST SL 07:15-08:15 NT NR 1238 452 vvR WT VVL — 320 11 27. 278 T___7 ADJUSTEQ EL ET ER PEAK SR NL Hot IR ST NT Vp SL NR WR vvr — Wt. _ CALCULMED 0 PE6K Hot I * 0 0 SR ST SL 0 EL SR ST SL WR 0 EL WR 0 ET 11:00-12:00 wr 0 — 0 ER WL 0 ET WT — ER vvl NL NT NR — NL NT NR 0 0 0 6=5IE PAK 956 351 SR ST SL 20 EL SR ST SL VVR 278 EL 16 ET 17:00-18:Do wr 13 WR — 31 ER wt 293 ET wr — ER vlt WL NL NT NR — 54 668 4D6 NL NT NR WeatK:?r : ACCUTEK Counted by: 21114 TRIGGER LANE Site Code : 000000258251 Board V DIAMOND BAR, CA 91765 Start Date: 05/18/1999 Other PHONE (909)595-6199, FAX (909)595-6022 FiLe I.D. 258251 no I me :GRAND A Direction i va e —street Begin ------ NB ------ >< ------ SB ------ >< ------ Ccqrbined ------ > Tuesday Time A.M. P.M. A.M. P.M. A.M. P.M. 12:00 05/18 31 131 30 211 61 342 12:15 32 181 29 185 61 366 12:30 27 174 16 218 43 392 12:45 22 112 191 67-7 17 92 212 826 39 204 403 1503 01:00 23 180 19 208 42 388 01:15 13 218 10 206 23 424 01:30 20 190 5 218 L 25 408 01:45 9 65 165 753 6 40 202 834 15 105 367 1587 02:00 15 168 7 194 22 362 02:15 11 168 8 226 19 394 02:30 9 174 6 210 15 384 02:45 7 42 218 728 11 32 248 878 18 74 466 '1606, 03:00 5 217 5 251 10 468 03:15 9 231 14 265 23 496 03:30 8 194 13 239 21 433 03:45 7 29 211 853 10 42 280 1035 17 71 491 1888 04:00 6 206 7 239 13 445 04:15 9 162 14 249 23 411 04:30 15 168 is 259 30 427 04:45 32 62 207 743 26 62 285 1032 58 124 492 1775 05:00 20 200 35 280 55 480 05:15 46 204 53 313 99 517 05:30 56 236 65 310 Iv 546 05:45 84 206 230 870 103 256 264 1167 187 462 494 2037 06:00 90 202 122 295 212 497 06:15 119 216 174 264 293 480 06:30 169 263 170 258 339 521 06:45 197 575 242 923 192 658 221 1038 389 1233 463 1961 07:00 252 199 218 215 470 414 07:15 330 165 249 236 579 401 .07:30 424 139 241 181 665 320 07:45 429 1435 127 630 227 935 178 810 656 2370 305 1440 08:00 321 143 210 193 531 336 08:15 272 116 206 160 478 - 276 08�30 252 113 188 180 440 293 08:45 229 1074 121 493 179 783 154 687 408 1857 275 1180 09:00 207 123 201 157 408 280 09:15 188 119 182 126 370 245 09:30 177 98 167 146 344 244 09:45 183 755 88 428 170 720 Ill 540 353 1475 199 968 10:00 188 92 193 92 381 184 10:15 196 78 180 81 376 159 10:30 277 77 189 76 466 153 10:45 272 933 70 317 166 728 57 306 438 1661 127 623 11:00 185 45 209 55 394 100 11:15 149 47 151 24 300 71 11:30 175 56 175 30 350 86 11-45 151 660 27 215 750 31 140 3�6 1410 58 315 Totats 5948 7590 5098 9293 11046 16883 Day TotaLs 13538 14391 27929 Sptit % 53.8% 44.9% 46.1% 55.0% Peak Hour 07:15 06:00 07:00 04:45 07:15 05:15 VoLLffne 1504 923 935 1188 2431 2054 P.H.F. .87 .87 .93 .94 .91 .94 Weather I ACCUTEK Counted by: 21114 TRIGGER LANE Board Site Code : 000000238261 Other DIAMOND BAR, CA 91765 Start Date: 05/18/1999 Strcct PHONE (909)595-6199, FAX (909)595-6022 Fil. Y n '=DnX 4 1LIJ RAMP Direction 1 Begin Time B ------ >< ------ so ------ >< ------ C(xpbined ...... > p Tuesday A.M. _,p. m. — . 'A.M. P.M. A m 12:00 05/18 32 144 31 227 63 371 12:15 33 181 32 189 65 370 12:30 28 191 17 219 45 410 12:45 22 115 180 696 18 98 223 858 40 213 403 1554 01:00 22 191 19 213 41 404 01:15 17 218 10 215 27 433 01:30 15 J95 5 213 20 408 01:45 11 65 173 777 6 40 202 843 17 105 375 1620 02:00 18 178 7 207 25 385 02:15 169 8 241 16 410 02:30 186 7 214 18 400 02:45 4 41 218 751 8 30 243 905 12 71 461 1656 03:00 5 219 7 270 12 489 03:15 8 215 12 257 20 472 03:30 9 189 12 251 21 440 03:45 6 28 225 848 12 43 304 1082 18 71 529 1930 04:00 6 202 6 249 12 451 04:15 11 162 14 262 25 424 04:30 17 185 15 260 32 445 04:45 29 63 194 743 26 61 288 1059 55 124 482 1802 05:00 23 203 32 289 55 492 05:15 54 225 54 314 108 539 05:30 65 233 66 314 1�1 547 05:45 105 247 229 890 100 252 268 1185 205 499 497 2075 06:00 106 218 122 307 228 525 06:15 142 209 171 269 313 478 06:30 173 269 164 260 337 529 06:45 202 623 232 928 192 649 222 1058 394 1272 454 1986 07:00 267 184 220 209 447 393 07:15 317 166 252 238 569 404 07:30 427 136 240 181 667 317 07:45 440 1451 130 616 247 959 181 809 687 2410 311 1425 08:00 308 131 218 191 526 322 08:15 266 130 195 160 461 -- 290 08:30 268 107 185 175 453 282 08:45 254 1096 114 482 181 779 153 679 435 1875 267 1161 09:00 197 117 201 153 398 270 09:15 206 118 192 134 398 252 09:30 189 93 18.2 139 371 232 09:45 177 769 97 425 184 759 110 536 361 1528 207 961 10:00 214 83 200 94 414 177 10:15 219 82 179 83 398 165 10:30 282 78 200 73 482 151 10:45 252 967 69 312 158 737 61 311 410 1704 130 623 11:00 178 51 209 57 387 108 11:15 144 46 155 24 299 70 11:30 178 49 179 29 357 78 11:45 11511 651 _ 32 171 1� _L 216 719 31 141 3�7 1410 63� 319 Totals 6116 7646 5166 9466 11282 17112 Day Totals 13762 14632 S21it % —54.2% 44.6% 5.7% 55.3% 28394 Peak Hour ' 07:15 06.-00 07:00 04:45 07:15 05:15 Volume 1492 928 959 1205 2449 2108 P.H.F. .84 .86 .95 .95 .89 .96 Weather : ACCUTEK ,,Counted by: 21114 TRIGGER LANE Site Code : 581810258271 Board DIAMOND BAR, CA 91765 Start Date: 05/18/1999 nth— P"nmp tQnQ)s9S-Al,9Q,.-,FAY f9n9lS95-6nl?2 Fille I -ID— 758271, Street name :GRAND AVE. S10 SR -60 EB RAMP — Direction 1 Paue Begin < ------ NB ...... >< ------ so ------ >< ------ Combined ------ > Tuesday Time A.M. P.M. A.M. P.M. A.M. P.M. 12:00 05/18 26 205 51 265 77 470 12:15 19 207 58 277 77 484 12:30 30 247 32 240 62 487 12:45 21 96 181 840 40 181 275 1057 61 277 456 1897 01:00 25 193 32 279 57 472 01:15 16 167 32 272 48 439 01:30 16 185 21 268 37 453 01-45 13 70 194 739 25 110 253 1072 38 180 447 1811 02:00 10 173 22 256 32 429 02:15 18 205 23 287 41 492 02:30 11 209 20 259 31 468 02:45 8 47 222 809 16 81 300 1102 24 128 522 1911 03:00 10 233 15 338 25 571 03:15 16 251 22 322 38 573 03:30 15 230 11 325 26 555 03:45 13 54 215 929 13 61 325 1310 26 115 540 2239 04:00 23 241 11 279 34 520 04:15 36 250 11 330 47 580 04:30 42 264 20 336 62 600 04:45 55 156 226 981 22 64 321 1266 77 220 547 2247 05:00 98 293 32 383 130 676 05:15 145 291 54 410 199 701 05:30 160 242 71 418 231 660 05:45 189 592 253 1079 120 277 390 1601 309 869 643 2680 06:00 230 245 101 385 331 630 06:15 248 205 124 403 372 608 06:30 283 257 152 383 435 640 06:45 286 1047 225 932 214 591 384 1555 500 1638 609 2487 07:00 330 181 207 388 537 569 07:15 375 179 210 396 585 575 07:30 383. 166 200 304 583 470 07:45 357 1445 134 660 258 875 266 1354 615 2320 400 2014 08:00 345 142 275 282 620 424 08:15 316 132 286 784 602 - 416 08:30 305 130 269 244 574 374 08:45 266 1232 130 534 247 1077 229 1039 513 2309 359 1573 09:00 252 128 230 245 482 373 09:15 264 144 220 247 484 391 09:30 241 121 215 234 456 355 09:45 215 972 126 519 199 864 202 928 414 1836 328 1447 10:00 201 140 215 174 416 314 10:15 211 133 188 175 399 308 10:30 207 87 201 139 408 226 10:45 187 806 66 426 194 798 140 628 381 1604 206 1054 11:00 215 59 223 109 438 168 11:15 176 57 192 76 368 133 11:30 208 44 216 84 424 128 11:45 180 779 35 195 236 867 58 327 41'6 1646 93 522 Totats 7296 8643 5846 13239 13142 21882 Day Totats 15939 19085 35024 split % 55.5% 39.5% 44.4% 60.5% Peak Hour 07:15 05:00 07:45 05:15 07:30 05:00 Vo I ume 1460 1079 1088 1603 2420 2680 P.H.F. .95 .92 .95 .95 .97 .95 Weather ACCUTEK v Counted by: 21114 TRIGGER LANE Site Code : 000000258281 Board DIAMOND BAR, CA 91765 Start Date: 05/18/1999 Other PHONE (909)595-6199, FAX (909)595-6022 File I.D. 25R;),Al 1-3-1" UULUrN W -MM.- 13AR Direction 1 Beg i n 'c ------ NB ------ >.c ------ SB ------ >< ------ Combined ------ > Tuesday Time _A.M. M. M. P.M. 12:00 05/18 26 240 36 188 62 428 12:15 23 226 40 156 63 382 12:30 30 273 19 164 49 437 12:45 25 104 232 971 25 120 189 697 50 224 421 1668 01:00 27 240 23 188 50 428 01:15 15 250 25 173 40 423 01:30 10 223 10 184 20 407 01:45 15 67 234 947 18 76 , 189 734 33 143 423 1681 02:00 11 226 .15 185 26 411 02:15 12 265 11 210 23 475 02:30 9 252 11 189 20 441 02:45 9 41 285 1028 12 49 237 821 21 90 522 1849 03:00 10 293 9 258 19 551 03:15 17 296 11 243 28 539 03:30 22 268 7 260 29 528 03:45 12 61 257 1114 7 34 250 1011 19 95 507 2125 04:00 20 246 9 255 29 501 04:15 36 270 2 281 38 551 04:30 51 281 10 267 61 548 04:45 62 169 221 1018 6 27 282 1085 68 196 503 2103 05:00 130 266 11 326 141 592 05:15 199 262 14 356 213 618 05:30 203 271 21 352 224 623 05:45 249 781 263 1062 36 82 385 1419 285 863 648 2481 06:00 294 265 32 313 326 578 06:15 364 284 46 340 410 624 06:30 364 352 55 293 419 645 06:45 380 1402 280 1181 78 211 332 1278 458 1613 612 2459 07:00 404 261 79 288 483 549 07:15 453 239 87 297 540 536 07:30 438 197 104 260 542 457 07:45 431 1726 198 895 118 388 198 1043 549 2114 396 1938 08:00 360 185 127 206 487, 391 08:15 387 180 117 247 504 427 08:30 307 170 116 191 423 361 08:45 305 1359 146 681 126 486 183 827 431 1845 329 1508 09:00 264 144 130 158 394 302 09:1 5 290 141 115 184 405 325 09:30 263 140 136 162 399 302 0:45 218 1035 129 554 116 497 155 659 334 1532 284 1213 10:00 201 143 135 127 336 270 10:15 231 133 118 128 349 261 10:30 226 92 138 93 364 185 10:45 217 875 93 461 120 511 110 458 337 1386 203 919 11:00 215 66 143 79 358 145 11:15 205 58 170 52 375 110 11:30 224 49 174 61 398 110 11:45 222 AAA '<A 170 657 53 245 L__�,9� 1523 89 454 Totals 8486 10121 3138 -- 10277 11624 20398 Day Totals 18607 13415 32022 S21it % 73..0% 49.6% 27.0% 50.3% Peak Hour 07:00 06:00 11:00 05:00 07:15 05:45 Volume 1726 1181 657 1419 2118 2495 P.H.F. .95 .83 .94 .92 .96 .96 Weathe�- : ACCUTEK Counted by: 21114 TRIGGER LANE Site Code : 000000258291 Board DIAMOND BAR, CA 91765 Start Date: 05/18/1999 Other PHONE (909)595-6199, FAX (909)595-6022 FiLe I.D. 258291 Street name :GRAND AV DIAMOND BAR BLVD. DirectiLon I _ Begin ------ NB ------ >< ...... SB ------ >< ------ Combined ------ > Tuesday Time A.M. P.M. A.M. P.M. A.M. P.M., 12:00 05/18 20 121 38 164 58 285 12:15 17 124 54 200 71 324 12:30 13 137 24 213 37 350 12:45 17 67 146 528 28 144 193 770 45 211 339 1298 01:00 11 138 23 205 34 343 01:15 10 139 29 208 39 347 01:30 8 166 12 226 20 392 01:45 W 39 158 601 18 82 227 866 28 121 385 1467 02:00 4 161 16 250 20 411 02:15 7 174 16 272 23 446 02:30 6 173 11 271 17 444 02:45 6 23 224 732 10 53 311 1104 16 76 535 1836 03:00 6 221 10 352 16 573 03:15 8 230 14 347 22 577 03:30 13 194 9 390 22 584 03:45 12 39 206 851 14 47 365 1454 26 86 571 2305 04:00 11 204 12 335 23 539 04:15 19 217 14 402 33 619 04:30 34 156 28 554 62 710 04:45 38 102 156 733 39 93 670 1961 77 195 826 2694 05:00 106 170 89 740 195 910 05:15 147 186 136 718 283 904 05:30 195 127 183 954 378 1081 05:45 242 690 128 611 235 643 1048 3460 477 1333 1176 4071 06:00 292 136 295 909 587 1045 06:15 390 162 304 920 694 1082 06:30 416 164 309 903 725 1067 06:45 445 1543 130 592 350 1258 810 3542 795 2801 940 4134 07:00 447 107 331 647 778 754 07:15 427 117 365 519 792. 636 07:30 407 115 349 447 756 562 07:45 386 1667 94 433 359 1404 396 2009 '745 3071 490 2442 08:00 302 95 334 375 636 470 08:15 298 83 324 380 622 - 463 08:30 271 80 316 353 587 433 08:45 233 1104 73 331 273 1247 253 1361 506 2351 326 1692 09:00 187 69 221 272 408 341 09:15 219 65 249 239 468 304 09:30 162 62 208 250 370 312 09:45 166 734 63 259 184 862 239 1000 350 1596 302 1259 10:00 144 50 157 198 301 248 10:15 139 50 178 151 317 201 10:30 136 49 153 122 289 171 10:45 155 574 36 185 182 670 120 591 337 1244 156 776 11:00 141 25 178 93 319 118 11:15 115 25 158 67 273 92 11:30 134 20 173 42 3Q7 62 11:45 139 529 11 329 Totats 7111 5937 7202 18366 14313 24303 Day Totats 13048 25568 38616 Sp[it % 49.6% 24.4% 50.3% 75.5% Peak Hour 06:30 02:45 07:15 05-30 06:45 05-30 Vo t ume 1735 869 1407 3831 3121 4384 P.H.F. .97 .94 .96 .91 .98 .93 99065EAM.IN Thu May 27, 1999 14:09:41 Page 1-1 ------------------------------------------ ------------------------------------- HONDA CAR WASH AND AUTO SERVICE PROJECT AM PEAK EXISTING CONDITIONS -------------------------------------------------------------------------------- Impact Analysis Report Lqvel Of Service Intersection Base Future Change Del/ V/ -Del/ V/ in LOS Veh C LOS Veh C # 3 GRAND AV AND 60 FRWY WB RAMPS C 17.5 0.454 C 17.5 0.754 + 0.000 V/C # 5 GRAND AV AND 60 FRWY EB RAMPS E 30..5 0.928 E 30.5 0.928 + 0.000 V/C # 6 GRAND AVE AND GOLDEN SPRINGS E 47 .5 0.972 E 47.5 0.972 + 0.000 V/C ff 34 GRAND AVENUE AND DIAMOND BAR B E 36 .1 0.910 E 36.1 0.910 + 0.000 V/C Traffix 6.8.0113 (c) 1997 Dowling Assoc. Licensed to TRANSTECH, Walnutf CA 99065EAM.IN . Thu May 27, 1999 14:09:41 Page 2-1 -------------------------------------------------------------------------------- HONDA CAR WASH AND AUTO SERVICE PROJECT AM PEAK EXISTING CONDITIONS -------------------------------------------------------------------------------- Level Of Service Computation Report ICU l(Loss as Cycle Length %) Method (Base Volume Alternative) Intersection #3 GRAND AV AND 60 FRWY WB RAMPS Cycle (sec): 100 Critical Vol./Cap. (X): 0.754 Loss Time (sec): 10 Average -Delay (sec/veh): 17.5 Optimal Cycle: 58 Level Of Service: C *** ** V Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T R L T R ------------ I --------------- --------------- 11 --------------- 11 --------------- Control: Protected Protected Split Phase Split Phase Rights: Ovl Include Include Ovl Min. Green: 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 2 0 1 1 0 1 0 0 1 0 ------------ I --------------- 11 --------------- --------------- 11 --------------- Volume Module: Base Vol: 43 1238 452 343 565 11 10 19 15 278 11 320 Growth Adj: 1.00 1.0o 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 43 1238 452 343 565 11 10 19 15 278 11 320 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 43 1238 452 343 565 11 10 19 15 278 11 320 Reduct Vol: 0 0 0 0 0 0 0 0 0 Reduced Vol: 43 1238 452 343 565 11 10 19 15 278 11 320 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 43 1238 452 343 565 11 10 19 15 278 11 320 ------------ I --------------- 11 --------------- 11 --------------- 11 --------------- Saturation Flow Module: Sat./Lafte: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 .1600 Adjustment: 1.00 1.0o 1.00 0.90 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 2.00 1.96 0.04 1.00 0.56 0.44 1.37 0.05 1.58 Final Sat.: 1600 3200 1600 2880 3139 61 1600 894 706 2191 87 2522 ------------ I --------------- --------------- --------------- --------------- Capacity Analysis Module: Vol/Sat: 0.03 0.3.9 0.28 0.12 0.18 0.18 0.01 0.02 0.02� 0.13 0.13 0.13 Crit Moves: Green/Cycle: 0.09 0.53 0.71 0.16 0.61 0.61 0.03 0.03 0.03 0.17 0.17 0.34 Volume/Cap: 0.30 0.73 0.40 0.73 0.30 0.30 0.21 0.73 0.73 0.73 0.73 b.37 ------------ I --------------- --------------- --------------- --------------- Level Of Service Module: Delay/Veh: 33.1 14.9 4.7 34.4 7.3 8.6 36.9 78.0 85.2 34.7 89.1 19.4 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 33.1 14.9 4.7 34.4 7.3 8.6 36i9 78.0 85.2 34.7 89.1 19.4 Queue: 1 27 5 10 8 0 0 1 1 8 1 7 Traffix 6.8.0113 (c) 1997 Dowling Assoc. Licensed to TRANSTECH, Walnut, CA 99065EAM.IN Thu May 27, 1999 14:09:41 Page 3-1 HONDA CAR WASH AND AUTO SERVICE PROJECT - -11 t'�Vl r ��LX EXISTING CONDITIONS -------------------------------------------------------------------------------- Level Of Service Computation Report ICU l(Loss as Cycle Length %) Method (Base Volume Alternative) Intersection #5 GRAND AV AND 60 FRWY EB RAMPS Cycle (sec): 120 Critical Vol./Cap. W: 0.928 Loss Time (sec): 10 Average _Qelay (sec/veh): 30.5 optimal Cycle: 129 Level Of Service: E Approach: North Bound South,Bound East Bound West Bound Movement: L - T - R L - T - R L T R L T ------------ I --------------- --------------- 11 --------------- 11 --------------- Control: Protected Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 2 0 1. 1 0 2 0 0 0 1 0 0 1 ------------ I --------------- 11 --------------- --------------- 11 --------------- Volume Module: Base Vol: 0 1244 363 247 616 0 482 0 74 0 0 0 Growth Adj: 1.00 1.00 1.00 1-00 1-00 1-00 1-00 1-00 1-00 1-00 1-00 1-00 Initial Bse: 0 1244 363 247 616 0 482 0 74 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00. PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 1244 363 247 616 0 482 0 74 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0. 0 Reduced Vol: 0 1244 363 247 616 0 482 0 74 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 0 1244 363 247 616 0 482 0 74 0 0 0 - ---------- I --------------- --------------- --------------- --------------- Saturation Flow Module: Sat/Lane: .1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1-00 1-00 1-00 1-00 1-00 1-00 1-00 1-00 Lanes: 0.00 2.00 1.00 1.00 2.00 0.00 1.00 0.00 1-00 0-00 0-00 0-00 Final Sat.: 0 3200 1600 1600 3200 0 1600 0 1600 0 0 0 - ---------- I --------------- --------------- 11 --------------- 11 --------------- Capacity Analysis Module: Vol/Sat: 0.00 0.39 0.23 0.15 0.19 0.00 0.30 0.00 0.05 0.00 0.00 0.00 Crit Moves: k*.k* Green/Cycle: 0.00 0.42 0.42 0.17 0.59 0.00 0.33 0.00 0.65 0.00 0.00 0.00 Volume/Cap: 0.00 0.92 0.54 .0.92 0.33 0.00 0.92 0.00 0.07 0.00 0.00 0.00 - ---------- I --------------- 11 --------------- 11 --------------- --------------- Level of Service Module: 0.0 45.6 0.0 5.8 0.0 0.0 0.0 Delay/Veh: 0.0 32.9 20.6 62.6 9.7 1.00 1.00 1.00 1.00 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 0.0 32.9 20.6 62.6 9.7 0.0 �45,6 0.0 5.8 0.0 0.0 0.0 Queue: 0 43 9 11 10 0 18 0 1 0 0 0 * * *.k * * * * -k * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Traffix 6.8.0113 (c) 1997 Dowling Assoc. Licensed to TRANSTECH, Walnut, CA 99065EAM.IN Thu May 27, 1999 14:09:41 Page 3-1 -------------------------------------------------------------------------------- HONDA CAR WASH AND AUTO SERVICE PROJECT AM PEAK EXISTING CONDITIONS ---------------------- 1� ----------------------------------------------------------- Level ' Of Service Computation Report ICU l(Loss as Cycle� Length %) Method (Base Volume Alternative) Intersection #5 GRAND AV AN'D 60 FRWY EB RAMPS Cycle (sec): 120 Critical Vol./Cap. (X): 0.928 Loss Time (sec): 10 Average -Delay (sec/veh): 30.5 Optimal Cycle: 129 Level Of Service: E Approach: North Bound South Bound East Bound West Bound Movement: L - T - R, L - T -1 R L T R L Control: Protected Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 2 0 1 1 0 2 0 0 0 1 0 .0 1 0 ------------ --------------- --------------- --------------- --------------- Volume Module: Base Vol: 0 1244 363 247 616 0 482 0 74 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: � 0 1244 363 247 616 0 482 0 74 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 1244 363 247 616 0 482 0 74 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 1244 363 247 616 0 482 0 74 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 HLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1,00 1.00 1.00 1.00 1.00 Final Vol.: 0 1244 363 247 616 0 482 0 74 0 0 0 ------------ I --------------- 11 --------------- 11 --------------- 11 --------------- Saturation Flow Module: Sat/Lane: 160.0 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 L anes: 0.00 2.00 1.00 1.00 2.00 0.00 1.00 0.00 1.00 0.00 0.00 0.00 Final Sat.: 0 3200 1600 1600 3200 0 1600 0 1600 0 0 0 ------------ I --------------- 11 --------------- 11 --------------- 11 --------------- Capacity Analysis Module: Vol/Sat: 0.00 0.39 0.23 0.15 0.19 0.00 0.30 0.00 0.05 0.00 0.00 0.00 Crit Moves: Green/Cycle: 0.00 0.42 0.42 0.17 0.59 0.00 0.33 0.00 0.65 0.00 0.00 0.00 Volume/Cap: 0.00 0.92 0.54 0.92 0.33 0,00 0.92 0.00 0.07 0.00 0.00 0.00 ------------ I --------------- --------------- --------------- --------------- Level Of Service Module: Delay/Veh: 0.0 32.9 20.6 62.6 9.7 0.0 45.6 0.0 5.8 0.0 0.0 0.0 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 0.0 32.9 20.6 62.6 9.7 0.0 45,.6 0.0 5.8 0.0 0.0 0.0 Queue: 0 43 9 11 10 0 18 0 1 0 0 0 Traffix 6.8.0113 (c) 1997 Dowling Assoc. Licensed to TRANSTECH, Walnut, CA 99065EAM.IN Thu May 27, 1999 14:09:41 Page 4-1 Pnmnh rhp w7i c u A n A ryrn C -L -n YTt-T,- nr3� 7�-- AM PEAK EXISTING CONDITIONS -------------------------------------------------------------------------------- Level Of Service Computation Report ICU l(Loss as Cycle - Length %) Method (Base Volume Alternative) Intersection #6 GRAND AVE AND GOLDEN SPRINGS Cycle (sec): 130 Critical Vol./Cap. (X): 0.972 Loss Time (sec): 10 Average -Delay (sec/veh): 47.5 Optimal Cycle: 180 Level Of Service: E 4, Approach: North Bound" South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- --------------- 11 --------------- 11 --------------- Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 1 1 0. 2 0 2 0 1 1 0 2 0 1 1 0 1 1 0 ------------ I --------------- --------------- --------------- --------------- Volume Module: Base Vol: 611 1161 19 153 403 400 100 118 128 92 810 374 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 611 1161 19 153 403 400 100 118 128 92 810 374 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 611 1161 19 153 403 400 100 118 128 92 810 374 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 611 1161 19 153 403 400 100 118 128 92 810 374 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 611 1161 19 153 403 400 100 118 128 92 810 374 ------------ --------------- ---------------- --------------- 11 --------------- Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 0.90 1.00 1.00 0.90 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 1.97 0.03 2.00 2.00 1.00 1.00 2.00 1.00 1.00 1.37 0.63 Final Sat.: 2880 3148 52 2880 3200 1600 1600 3200 1600 1600 2189 1011 ------------ --------------- --------------- --------------- 11 --------------- Capacity Analysis Module: Vol/Sat: 0.21 0.3.7 0.37 0.05 0.13 0.25 0.06 0.04 0.08 0.06 0.37 0.37 Crit Moves: **** **** ****. Green/Cycle: 0.22 0.42 0.42 0.06 0.2'6 0.26 0.06 0.26 0.26 0.19 0.38 0.38 Volume/Cap: 0.97 0.88 0.88 0.88 0.49 0.97 0.97 0.14 0.31 0.31 0.97 0.97 ------------ I --------------- --------------- --------------- --------------- Level Of Service Module: Delay/Veh: 59.8 32.4 122.5 72.9 31.9 63.7 105.0 28.5 30.0 35.3 48.1 58.4 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 59.8 32.4 122.5 72.9 31.9 63.7 105'.0 28.5 30.0 35.3 48.1 58.4 Queue: 27 41 1 7 12 18 6 3 4 3 34 17 Traffix 6.8.0113 (c) 1997 Dowling Assoc. Licensed to TRANSTECH, Walnut, CA 99065EAM.IN Thu May 27, 1999 14:09:41 � Page 5-1 HONDA CAR WASH AND AUTO SERVICE PROJECT AM PEAK EXISTING CONDITIONS -------------------------------------------------------------------------------- Level Of Service Computation Report ICU l(Loss as Cycle Length %) Method (Base Volume Alternative) Intersection #34 GRAND AVENUE AND DIAMOND BAR BLVD Cycle (sec): 120 Critical Vol./Cap. (X): 0.910 Loss Time (sec): 10 Average -Delay (sec/veh): 36.1 Optimal Cycle: 115 Level Of Service: E Approach: North Bound South Bound' East Bound West Bound Movement: L - T - R L - T - R L - T - R L T R ------------ I --------------- --------------- 11 --------------- 11 --------------- Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 0 1 2 0 2 0 1 2 0 1 1 1 2 0 2 0 1 ------------ I --------------- 11 --------------- --------------- --------------- Volume Module: Base Vol: 864 1240 65 104 233 192 287 410 200 66 971 92 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 864 1240 65 104 233 192 287 410 200 66 971 92 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 864 1240 65 104 233 192 287 410 200 66 971 92 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 864 1240 65 104 233 192 287 410 200 66 971 92 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 864 1240 65 104 233 192 287 410 200 66 971 92 ------------ --------------- 11 --------------- 11 --------------- 11 --------------- Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 0.90 1.00 1.00 0.90 1.00 1.00 0.90 1.00 1.00 0.90 1.00 1.00 Lanes: 2.00 2.00 1.00 2.00 2.00 1.00 2.00 2.00 1.00 2.00 2.00 1.00 Final Sat.: 2880 3200 1600 2880 3200 1600 2880 3200 1600 2880 3200 1600 ------------- I ---------------- --------------- 11 --------------- --------------- Capacity Analysis Module: Vol/Sat: 0.30 0.39 0.04 0.04 0.07 0.12 0.10 0.13 0.13 0.02 0.30 0.06 Crit Moves: Gre'en/Cycle: 0.34 0.43 0.43 0.04 0.13 0.13 0.11 0.38 0.38 0.07 0.34 0.34 Volume/Cap: 0.89 0.90 0.09 0.90 0.54 0.89 0.90 0.34 0.33 0.34 0.90 0.17 ------------ I --------------- ---------------- --------------- --------------- Level Of Service Module: Delay/Veh: 36.8 30.7 15.7 82.1 38.5 63.3 59.8 20.5 20.5 41.5 36.8 21.6 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 36.8 30.7 15.7 82.1 38.5 63.3 59'.8 20.5 20.5 41.5 36.8 21.6 Queue: 30 42 1 5 7 8 12 10 5 2 34 2 Traffix 6.8.0113 (c) 1997 Dowling Assoc. Licensed to TRANSTECH, Walnut, CA 99065EPM.IN Thu May 27, 1999 14:24:55 Page 1-1 -------------------------------------------------------------------------------- Honda Car Wash and Auto Service Project PM FEAY\ Existing Conditions -------------------------------------------------------------------------------- Impact Analysis Report Level Of Service Intersection Base Future Change Del/ V/ Del/ V/ in LOS Veh C LOS Veh C # 3 GRAND AV AND 60 FRWY WB RAMPS A 16.9 0,586 A 16.9 0.586 + 0.000 V/C 5 GRAND AV AND 60 FRWY EB RAMPS D 23.6 0.815 D 23.6 0.815 + 0.000 V/C if 6 GRAND AVE AND GOL DEN SPRINGS D 34.1 0.865 D 34.1 0.865 + 0.000 V/C 34 GRAND AVENUE AND DIAMOND BAR B F 63.6 1.062 F 63.6 1.062 + 0.000 V/C Traffix 6.8.0113 (c) 1997 Dowling Assoc. Licensed to TRANSTECH, Walnut, CA 99065EPM.IN Thu May 27, 1999 14:24:55 Page 2-1 -------------------------------------------------------------------------------- Honda Car Wash and Auto Service Pro�prt PM PEAK Existing Conditions -------------------------------------------------------------------------------- Level Of Service Computation Report ICU l(Loss as Cycle Length %) Method (Base Volume Alternative) Intersection #3 GRAND AV AND 60 FRWY WB RAMPS Cycle (sec): 100 Critical Vol./Cap. (X): 0.586 Loss Time (sec): 10 Average Delay (sec/veh): 16.9 Optimal Cycle: 39 Level Of Service: A Approach: North Bbund South Bound East Bound West Bound Movement: L - T - R L - T - R L - T R L T R ------------ I --------------- --------------- 11 ---------------- 11 --------------- Control: Protected Protected Split Phase Split Phase Rights: Ov1 Include Include Ov1 Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 2 0 *1 1 0 1 0 0 1 0 1 0 1! 0 1 ------------ I --------------- 11 --------------- --------------- 11 --------------- Volume Module: Base Vol: 54 668 406 351 956 8 20 16 31 293 13 278 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 54 668 406 351 956 8 20 16 31 293 13 278 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 54 668 406 351 956 8 20 16 31 293 13 278 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 54 668 406 351 956 8 20 16 31 293 13 278 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 54 668 406 351 956 8 20 16 31 293 13 278 ------------ --------------- --------------- 11 --------------- 11 --------------- Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 0.90 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 2.00 1.98 0.02 1.00 0.34 0.66 1.50 0.07 1.43 Final Sat.: 1600 3200 1600 2880 3173 27 1600 545 1055 2408 107 2285 ------------ I ------------ --------------- --------------- 11 --------------- Capacity Analysis Module: Vol/Sat: 0.03 0.21 0.25 0.12 0.30 0.30 0.01 0.03 0.03 0.12 0.12 0.12 Crit Moves: **41* * I *** Green/Cycle: 0.06 0.42 0.64 0.20 0.56 0.56 0.05 0.05 0.05 0.23 0.23 0.43 Volume/Cap: 0.54 0.50 0.39 0.61 0.54 0.54 0.23 0.54 0.54 0.54 0.54 0.29 -7 ---------- I --------------- ---------------- --------------- 7 --------- Level Of Service Module: - Delay/Veh: 39.4 16.7 6.7 29.3 11.0 32.6 35.1 48.1 42.6 27.2 41.2 14.5 .Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 39.4 16.7 6.7 29.3 11.0 32.6 35:1 48.1 42.6 27.2 41.2 14.5 Queue: 2 14 5 9 17 0 1 1 1 7 0 5 Traffix 6.8.0113 (c) 1997 Dowling Assoc. Licensed to TRANSTECH, Walnut, CA 9906SEPM.IN Thu May 27, 1999 14:24:55 Page 3-1 -------------------------------------------------------------------------------- 11;7,7,da Car Wach and Autc Scrv-4--c- P_r-_J-_-_4- PM PEAK Existing Conditions -------------------------------------------------------------------------------- Level Of Service Computation Report ICU l(Loss as Cycle Length %) Method (Base Volume Alternative) Intersection #5 GRAND AV AND 60 FRWY EB RAMPS Cycle (sec): 120 Critical Vol./Cap. (X): 0.815 Loss Time (sec): 10 Average -Delay (sec/veh): 23.6 Optimal.Cycle: 75 Level Of Service: D Approach: North Bound South -Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- --------------- 11 --------------- --------------- Control: Protected Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 2 0 l' 1 0 2 0 0 0 1 0 0 1 0 0 0 0 0 ------------ I --------------- --------------- --------------- --------------- Volume Module: Base Vol: 0 842 458 329 932 0 286 0 384 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 842 458 329 932 0 286 0 384 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 842 458 329 932 0 286 0 384 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 .0 Reduced Vol: 0 842 458 329 932 0 286 0 384 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 0 842 458 329 932 0 286 0 384 0 0 0 ------------ --------------- ---------------- --------------- --------------- Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 0.00 2.00 1.00 1.00 2.00 0.00 1.00 0.00 1.00 0.00 0.00 0.00 Final Sat.: 0 3200 1600 1600 3200 0 1600 0 1600 0 0 0 --- L -------- I --------- ------- --------------- --------------- --------------- Capacity Analysis Module: Vol/Sat: 0.00 0.26 0.29 0.21 0.29 0.00 0.18 0.00 0.24 0.00 0.00 0.00 Crit Moves: **** **** Green/Cycle: 0.00 0.36 0.36 0.26 0.62 0.00 0.60 0.00 0.30 0.00 0.00 0.00 Volume/Cap: 0.00 0.73 0.80 0.80 0.47 0.00 0.30 0.00 0.80 0.00 0.00 0.00 ------------ I --------------- 11 --------------- --------------- --------------- Level Of Service Module: Delay/V'eh: 0.0 27.5 32.1 39.4 9.7 0.0 9.0 0.0 36.1 0.0 0.0 0.0 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 0.0 27.5 32.1 39.4 9.7 0.0 �10 0.0 36.1 0.0 0.0 0.0 Queue: 0 25 15 11 17 0 5 0 13 0 0 0 Traffix 6.8.0113 (c) 1997 Dowling Assoc. Licensed to TRANSTECH, Walnut, CA 99065EPM.IN Thu May 27, 1999 14:24:55 Page 4-1 ----------------------------------------------------------------------- -------- Honda Car Wash and Aiit-n q,-riTi e-- T),--;,-4- PM PEAK Existing Conditions -------------------------------------------------------------------------------- Level Of Service Computation Report ICU l(Loss as Cycle Length %) Method (Base Volume Alternative) Intersection #6 GRAND AVE AND GOLDEN SPRINGS Cycle (sec): 120 Critical Vol./Cap. (X): 0.865 Loss Time (sec): 10 Average -Delay (sec/veh): 34.1 Optimal Cycle: 92 Level Of Service: D Approach: North Bound South Bound' East Bound West Bound Movement: L - T - R L - T - R L T R L T ------------ I --------------- --------------- 11 --------------- 11 --------------- Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 1 1 0 2 0 2 0 1 1 0 2 0 1 1 0 1 1 ------------ I --------------- --------------- --------------- 11 --------------- Volume Module: Base Vol:, 167 689 103 295 982 185 332 793 565 102 226 176 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 167 689 103 295 982 185 332 793 565 102 226 176 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 167 689 103 295 982 185 332 793 565 102 226 176 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 167 689 103 295 982 185 332 793 565 102 226 176 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 167 689 103 295 982 185 332 793 565 102 226 176 ------------ --------------- --------------- 11 --------------- 11 --------------- Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 0.90 1.00 1.00 0.90 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2-00 1.74 0.26 2.00 2.00 1.00 1.00 2.00 1.00 1.00 1.12 0.88 .Final Sat.: 2880 2784 416 2880 3200 1600 1600 3200 1600 1600 1799 1401 ------------ I --------------- ------------- 11 --------------- --------------- Capacity Analysis Module: Vol/Sat: 0.06 0.25 0.25 0.10 0.31 0.12 0.21 0.25 0'.35 0.06 0.13 0.13 Crit Moves: **** **** **** Green/Cycle: 0.07 0.30 0.30 0.13 0.36 0.36 0.30 0.41 0.41 .0.07 0.18 0418 Volume/Cap: 0.85 0.82 0.82 0.82 0.85 0.32 0.68 0.60 0.85 0.85 0.68 0.68 ------------ I --------------- --------------- --------------- --------------- Level Of Service Module: Delay/Veh: 62.1 34.3 51.7 48.8 31.8 21.5 30.9 21.6 31.9 70.1 39.0 40.0 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 62.1 34.3 51.7 48.8 31.8 21.5 30:9 21.6 31.9 70.1 39.0 40.0 Queue: 7 23 4 11 32 4 10 21 19 5 7 6 Traffix 6.8.0113 (c) 1997 Dowling Assoc. Licensed to TPANSTECH, Walnut, CA 99065EPM.IN Thu May 27, 1999 14:24:55 Page 5-1 Honda Car Wash and Auto Service Project PM PEAK Existing Conditions -------------------------------------------------------------------------------- Level Of Service Computation Report ICU l(Loss as Cycle Length %) Method (Base Volume Alternative) Intersection #34 GRAND AVENUE AND DIAMOND BAR BLVD Cycle (sec): 120 Critical Vol./Cap. (X): 1.062 Loss Time (sec):' 10 Average Delay (sec/veh): 63.6 Optimal Cycle: 180 Level Of Service: F Approach: North Round South Bound East Bound West Bound Movement: L - T - R L - T - R L - T R L T R ------------ I --------------- --------------- --------------- III --------------- Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 0 1 2 0 2 0 1 2 0 1 1 1 2 0 2 0 1 ------------ I --------------- --------------- --------------- --------------- Volume Module: Base Vol: 401 525 56 220 1257 186 241 882 723 324 443 65 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1-00 1-00 1-00 1-00 1-00 1-00 1-00 Initial Bse: 401 525 56 220 1257 186 241 882 723 324 443 65 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 401 525 56 220 1257 186 241 882 723 324 443 65 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 401 525 56 220 1257 186 241 882 723 324 443 65 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.0 * 0 1.00 1.00 1.00 1.00 1.00 Final Vol.: 401 525 56 220 1257 186 241 882 723 324 443 65 ------------ I --------------- --------------- --------------- --------------- Saturation Flow Module: 1600 1600 1600 1600 Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 0.90 1.00 1.00 0.90 1.00 1-00 0-90 1-00 1-00 0-90 1-00 1-00 Lanes: 2.00 2.00 1.00 2.00 2.00 1.00 2.00 1.65 1.35 2.00 2.00 1.00 Final Sat.: 2880 3200 1600 2880 3200 1600 2880 2638 2162 2880 3200 1600 ------------ I ------- ------- --------------- --------------- --------------- Capacity Analysis Module: Vol/Sat: 0.14 0.16 0.04 0.08 0.3� 0.12 0.08 0.33 0.33 0.11 0.14 0.04 Crit Moves: **** Green/Cycle: 0.13 0.34 0.34 0.16 0.37 0.37 0.16 0.31 0.31 0.11 0.26 0.26 Volume/Cap: 1.07 0.48 0.10 0.48 1.07 0.32 0.53 1.07 1.07 1.07 0.53 0.16 ------------ I --------------- --------------- --------------- 11 --------------- Level Of Service Module: Delay/Veh: 98.2 24.4 20.9 36.1 71.2 21.0 36.7 77.6 80.3 103.9 29.8 26.3 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.Q0 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 98.2 24.4 20.9 36.1 71.2 21.0 3617 77.6 80.3 103.9 29.8 26.3 Queue: 21 14 1 7 61 4 8 44 36 18 13 2 Traffix 6.8.0113 (c) 1997 Dowling Assoc. Licensed to TRANSTECH, Walnut, CA 99065BAMiIN Thu May 27, 1999 14:33:35 Page 1-1 -------------------------------------------------------------------------------- HONDA CAR WASH AND AUTO SERVICE PROJECT AM PEAK 2000 BASE CONDITIONS -------------------------------------------------------------------------------- Impact Analysis Report Level Of Service Intersection Base Future Change Del/ V/ Del/ V/ in LOS Veh C LOS Veh C # 3 GRAND AV AND 60 FRWY WB RAMPS C 17.6 0.260 C 17.6 0.760 + 0.000 V/C # 5 GRAND AV AND 60 FRWYEB RAMPS E 31.2 0.936 E 31.2 0.936 + 0.000 V/C 6 GRAND AVE AND GOLDEN SPRINGS E 48.9 0.981 E 48.9 0.981 + 0.000 V/C # 34 GRAND AVENUE AND DIAMOND BAR B E 36.9 0.918 E 36.9 0.918 + 0.000 V/C Traffix 6.8.0113 (c) 1997 Dowling Assoc. Licensed to TRANSTECH, Walnut, CA 99065BAM.IN Thu May 27, 1999 14:33:35 Page 2-1 -------------------------------------------------------------------------------- HONDA CAR WASH AND AUTO SERVICE PROJECT am Llh;AK 2000 BASE CONDITIONS -------------------------------------------------------------------------------- Level Of Service Computation Report ICU l(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #3 GRAND AV AND 60 FRWY WB RAMPS Cycle (sec): 100 Critical Vol./Cap. (X): 0.760 Loss Time (sec): 10 Average Delay (sec/veh): 17.6 Optimal Cycle: 59 Level Of Service: C Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T R L T R ------------ I --------------- --------------- 11 --------------- 11 --------------- Control: Protected Protected Split Phase Split Phase Rights: Ovl Include Include Ovl Min. Green: 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 1 2 0 1 1 o 1 0 0 1 0 ------------ I --------------- --------------- --------------- --------------- Volume Module: Base Vol: 43 1238 452 343 565 11 10 19 15 278 11 320 Growth Adj: 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 Initial Bse: 43 1250 457 346 571 11 10 19 15 281 11 323 Added Vol: 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 43 1250 457 346 571 11 10 '19 15 281 11 323 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 43 1250 457 346 571 11 10 19 15 281 11 323 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 43 1250 457 346 571 11 10 19 15 281 11 323 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Fin.,11 Vol.: 43 1250 457 346 571 11 10 '19 15 281 11 .323 ------------ --------------- --------------- 11 --------------- 11 ---------------- I Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 0.90 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 2.00 1.96 0.04 1.00 0.56 0.44 1.37 0.05 1.58 Final Sat.: 1600 32,00 1600 2880 3140 60 1600 894 70*6 2193 86 2521 ------------ I --------------- --------------- --------------- --------------- Capacity Analysis Module: Vol/Sat: 0.03 0.39 0.29 0.12 0.18 0.18 0.01 0.0'2 0.02 0.13 0.13 0.13 Crit Moves: Green/Cycle: 0.09 0.53 0.71 0.16 0.61 0.61 0.03 0.03 0.03 0.17 0.17 0.34 Volume/Cap: 0.30 0.73 0.40 0.73 0.30 0.30 0.22 0.73 0.73 0.73 0.73 0.38 ------------ I --------------- --------------- 11--7 ------------ --------------- Level Of Service Module: Delay/Veh: 33.2 15.0 4.8 34.6 7.3 8.6 36.9 79.7 87.1 35.0 91.4 19.5 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 33.2 15.0 4.8 34.6 7.3 ' 8.6 36.9 79.7 87.1 35.0 91.4 19.5 Queue: 1 27 5 10 8 0 0 1 1 8 1 7 Traffix 6.8.0113 (c) 1997 Dowling Assoc. Licensed to TRANSTECH, Walnut, CA 99065BAM.IN Thu May 27, 1999 14:33:35 Page 3-1 RnmnA rAR WASH AND AUTO SERVICE PROJECT AM PEAK 2000 BASE CONDITIONS -------------------------------------------------------------------------------- Level Of Service Computation Report ICU l(Loss as Cycle Length %) Method (Future Volume Alternative) intersection #5 GRAND AV AND 60 FRWY EB RAMPS Cycle (sec): 120 Critical Vol./Cap. (X): 0.936 Loss Time (sec): 10 Average -Delay (sec/veh): 31.2 Optimal Cycle: 136 Level Of Service: E Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T R L T R ------------ I --------------- --------------- 11 ---------------- --------------- Control: Protected Protected Permitted Permitted Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 2 0 1 1 0 2 0 0 0 1 0 0 1 0 0 0 0 0 ------------ I --------------- 11 --------------- --------------- --------------- Volume Module: Base Vol: 0 1244 363 247 616 0 482 0 74 0 0 0 Growth Adj: 1.01 1.01 1.01 1.01 1.01 1.01 1-01 1-01 1-01 1-01 1-01 1-01 Initial Bse: 0 1256 367 249 622 0 487 0 75 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 0 1256 367 249 622 0 487 0 75 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 1256 367 249 622 0 487 0 75 0 0 0 Reduct Vol: 0 0 0 0 0 0 ' 0 0 0 0 0 0 Reduced Vol: 0 1256 367 249 622 0 487 0 75 0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 -Final Vol.: 0 1256 367 249 622 0 487 - 0 75 0 0 0 ------------ I --------------- --------------- --------------- --------------- Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 1.00 1.00 1-00 1-00 1-00 1-00 1-00 1-00 1-00 Lanes: 0.00 2.00 1.00 1.00 2.00 0.00 1.00 0.00 1.00 0.00 0.00 0.00 Final Sat.: 0 3200 1600 1600 3200 0 1600 0 1600 0 0 0 ------------ I --------------- --------------- --------------- --------------- Capacity Analysis Module: Vol/Sat: 0.00 0.39 0.23 0.16 0.19 0.00 0.30 0.00 0.05 0.00 0.00 0.00 Crit Moves: Green/Cycle: 0.00 0.42 0.42 0.17 0.59 0.00 0.33 0.00 0.65 0.00 0.00 0.00 Volume/Cap: 0.00 0.93 0.54 0.93 0.33 0.00 0.93 0.00 0.07 0.00 0.00 0.00 ------------ I --------------- 11 --------------- ------------ 11 --------------- Level Of Service Module: Delay/Veh: 0.0 33.8 20.7 64.3 9.7 0.0 46.9 0.0 5.8 0.0 0.0 0.0 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 0.0 33.8 20.7 64.3 9.7 0.0 46.9 0.0 5.8 0.0 0.0 0.0 Queue: 0 44 9 11 11 0 19 0 1 0 0 0 Traffix 6.8.0113 (c) 1997 Dowling Assoc. Licensed to TRANSTECH, Walnut, CA 99065BAM.IN Thu May 27, 1999 14:33:35 Page 4-1 -------------------------------------------------------------------------------- HONDA CAR WASH AND AUTO SERVICE PRn,Trr.T AM PEAK 2000 BASE CONDITIONS -------------------------------------------------------------------------------- Level Of Service Computation Report ICU l(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #6 GRAND AVE AND GOLDEN SPRINGS Cycle (sec): 130 Critical Vol./C*ap. (X): 0.981 Loss Time (sec): 10 Average -Delay (sec/veh): 48.9 Optimal Cycle: 180 Level Of Service: E Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L T R L T ------------ I --------------- --------------- 11 --------------- 11 --------------- Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 1 1 0 2 0 2 0 1 1 0 2 0 1 1 0 1 ------------ I --------------- --------------- --------------- --------------- Volume Module: Base Vol: 611 1161 19 153 403 400 loo 118 128 92 810 374 Growth Adj: 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 Initial Bse: .617 1173 19 155 407 404 101 119 129 93 818 378 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 617 1173 19 155 407 404 101 119 129 93 818 378 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 617 1173 19 155 407 404 101 119 129 �93 818 378 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 617 1173 19 155 407 404 101 119 129 93 818 378 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 VILF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 617 1173 19 155 407 404 101 119 129 93 818 378 ------------- I --------------- 11 --------------- 11 ------------- --------------- Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 0.90 1.00 1.00 0.90 1.00 1.00 1.00 1.00 1.00 1.0 0 1.00 1.00 Lanes: 2.00 1.97 0.03 2.00 2.00 1.00 1.00 2.00 1.00 1.00 1.37 0.63 Final Sat.: 2880 3149 51 2880 3200 1600 1600 3200 1600 1600 2189 loll ------------ I --------------- 11 --------------- 11 --------------- --------------- Capacity Analysis Module: Vol/Sat: 0.21 0.37 0.37 0.05 0.13 0.25 0.06 0.04 0.08 0.06 0.37 0.37 Crit Moves: **** **** **** Green/Cycle: 0.22 0.42 0.42 0.06 0.26 0.26 0.06 0.26 0.26 0.19 0.38 0.38 Volume/Cap: 0.98 0.89 0.89 0.89 0.49 0.98 0.98 0.14 0.31 0.31 0.98 0.98 ------------ I --------------- --------------- ------------ --------------- Level Of Service Module: Delay/Veh: 61.8 33.1 127.1 74.5 32.0 65.9 108.0 28.5 30.0 35.3 50.0 60.7 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 61.8 33.1 127.1 74.5 32.0 65.9 108.0 28.5 30.0 35.3 50.0 60.7 Queue: 27 42 1 7 13 19 6 3 4 3 35 18 Traffix 6.8.0113 (c) 1997 Dowling Assoc. Licensed to TRANSTECH, Walnut, CA 99065BAM.IN Thu May 27, 1999 14:33:35 Page 5-1 HONDA CAR WASH AND AUTO SERVICE PROJECT AM PEAK 2000 BASE CONDITIONS --------------------------------------------------------------------------------- Level Of Service Computation Report ICU l(Loss as Cycle Lengt11 %) Method (Future Volu ' me Alternative) Intersection #34 GRAND AVENUE AND DIAMOND BAR BLVD Cycle (sec): 120 Critical Vol./Cap. (X): 0.918 Loss Time (sec): 10 Average -Delay . (sec/veh): 36.9 Optimal Cycle: 121 Level Of Service: E Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L T R L T R ------------ I --------------- --------------- 11 -------------- ------------ Control: Protected Protected Protected Protected Rights: Include Include Include Include, Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 2 0 2 0 1 2 0 2 0 1 2 0 1 1 1 2 0 2 0 1 ------------ I --------------- --------------- --------------- --------------- Volume Module: Base Vol: 864 1240 65 104 233 192 287 410 200 66 971 92 Growth Adj: 1.01 1.01 1.01 1.01 1-01 1-01 1-01 1-01 1-01 1-01 1-01 1-01 Initial Bse: 873 1252 66 105 235 194 290 414 202 67 981 93 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 873 1252 66 105 235 194 290 414 202 67 981 93 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 873 1252 66 105 235 194 290 414 202 67 981 93 Reduct Vol: 0 0 0 0 0 0 ' 0 0 0 0 0 0 Reduced Vol: 873 1252 66 105 235 194 290 414 202 67 981 93 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1'.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 873 1252 66 105 235 194 290 414 202 67 981 . 93 - ---------- I --------------- --------------- --------------- --------------- Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 0.90 1.00 1,00 0.90 1-00 1-00 0-90 1-00 1-00 0-90 1-00 1 . 00 Lanes: 2.00 2.00 1.00 2.00 2.00 1.00 2.00 2.00 1.00 2.00 2.00 1.00 Final Sat.: 2880 3200 1600 2880 3200 1600 2880 3200 1600 2880 3200 1600 ------------ I --------------- --------------- --------------- --------------- Capacity Analysis Module: Vol/Sat: 0.30 0.39 0.04 0.04 0.07 0.12 0.10 0.13 0.13 0.02 0.31 0.06 Crit Moves: Green/Cycle: 0.34 0.43 0.43 0.04 0.13 0.13 0.11 0.38 0.38 0.07 0.34 0.34 Volume/Cap: 0.90 0.91 0.10 0.91 0.55 0.90 0.91 0.34 0.33 0.34 0.91 0.17 - ---------- I --------------- --------------- --------------- 11 --------------- Level Of Service Module: Delay/Veh: 37.7 31.5 15.7 84.1 38.5 65.0 61.1 20.5 20.5 41.5 37.6 21.6 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 37.7 31.5 15.7 84.1 38.5 65.0 61.1 20.5 20.5 41.5 37.6 21.6 Queue: 31 42 1 5 7 8 12 10 5 2 34 2 Traffix 6.8.0113 (c) 1997 Dowling Assoc. Licensed to TRANSTECH, Walnut, CA 99065BPM.IN Thu May 27, 1999 14:33:58 Page 1-1 -------------------------------------------------------------------------------- Honda Car Wash and Auto Service Project PM PEAK 2000 Base Conditions -------------------------------------------------------------------------------- Impact Analysis Report LQvel Of Service Intersection Base Future Change Del/ V/ Del/ V/ in LOS Veh C LOS Veh C # 3 GRAND AV AND 60 FRWY WB RAMPS A 17.0 0.-591 A 17.0 0.591 + 0.000 V/C # 5 GRAND AV AND' 60 FRWY EB RAMPS D '23.9 0.823 D 23.9 0.823 + 0.000 V/C 4 6 GRAND'AVE AND GOLDEN SPRINGS D 34.6 0.873 D 34.6 0.873 + 0.000 V/C 34 GRAND AVENUE AND DIAMOND BAR B F 66.6 1.072 F 66.6 1 .072 + 0.000 V/C Traffix 6.8.0113 (c) 1997 Dowling Assoc. Licensed to TRANSTECH, Walnut, CA 99065BPM.IN Thu May 27, 1999 14:33:58 Page 2-1 -------------------------------------------------------------------------------- Honda Car Wash and Auto Servirp Pynsect PM PEAK 2000 Base Conditions -------------------------------------------------------------------------------- Level Of Service Computation Report ICU l(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #3 GRAND AV AND 60 FRWY WB RAMPS Cycle (sec): 100 Critical Vol./Cap. (X): 0.591 Loss Time (sec): 10 Average -Delay (sec/veh): 17.0 Optimal_Cycle: 39 Level Of Service: A Approach: North Bound South' Bound East Bound West Bound Movement: L - T - R L - T R L T ------------ I --------------- --------------- 11 --------------- 11 --------------- Control: Protected Protected Split Phase Split Phase Rights: Ovl Include Include Ovl Min. Green: 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 0 l' 2 0 1 1 0 1 0 0 ------------ I --------------- --------------- --------------- --------------- Volume Module: Base Vol: 54 668 406 351 956 8 20 16 31 293 13 278 Growth Adj: 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 Initial Bse: 55 675 410 355 966 8 20 16 31 296 13 281 Added Vol: 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 Initial Fut: 55 675 410 355 966 8 20 16 31 296 13 281 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 55 675 410 055 966 8 20 16 31 296 13 281 Reduct Vol: 0 0 0 0 0 0 0 0 Reduced Vol: 55 675 410 355 966 8 20 16 31 296 13 281 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 55 675 410 355 966 8 20 -16 31 296 13 281 ------------ I --------------- 11 --------------- 11 --------------- 11 --------------- Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 1.00 1.00 1.00 0.90 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.00 1.00 2.00 1.98 0.02 1.00 0.34 0.66 1.50 0.07 1.43 Final Sat.: 1600 3200 1600 2880 3174 26 1600 545 1055 2408 106 2286 ------------ I --------------- 11 --------------- --------------- --------------- Capacity Analysis Module: Vol/Sat: 0.03 0.21 0.26 0.12 0.30 0.30 0.01 0.03 0.03 0.12 0.12 0.12 Crit Moves: **** **** Green/Cycle; 0.06 0.42 0.64 0.20 0.56 0.56 0.05 0.05 0.05 0.23 0.23 0.43 Volume/Cap: 0.55 0.50 0.40 0.61 0.55 0.55 0.23 0.55 0.55 0.55 0.55 0.29 ------------ I --------------- --------------- --------------- --------------- Level Of Service Module: Delay/Veh: 39.5 16.7 6.7 29.4 11.1 33.6 35.2 48.7 43.0 27.2 41.9 14.5 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 39.5 16.7 6.7 29.4 11.1 33.6 35.2 48.7 43.0 27.2 41.9 14.5 Queue: 2 14 5 9 17 0 1 1 1 7 0 5 Traffix 6.8-0113 (c) 1997 Dowling Assoc. Licensed to TRANSTECH, Walnut, CA 99065BPM.IN Thu May 27, 1999 14:33:58 Page 3-1 -------------------------------------------------------------------------------- Hcnda Cmr Wpqh ;;nd Aiito Service Prolect PM PEAK 2000 Base Conditions -------------------------------------------------------------------------------- Level Of Service Computation Report ICU l(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #5 GRAND AV AND 60 FRWY EB RAMPS Cycle (sec): 120 Critical Vol./Cap. (X): 0.823 Loss Time (sec): 10 Average -Delay (sec/veh): 23.9 Optimal Cycle: 77 Level Of Service: D * * *-k * * * * * * * * * * * * * . * * * * * * * * * * * * * * * * * * * * * * *'* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L T R L T ------------ I --------------- 11 --------------- 11 --------------- 11 --------------- Control: Protected Protected Permitted Permitted Rights: Include Include Include Include, Min. Green: 0 0 0 0 0 0 0 0 0 0 0 Lanes: 0 0 2 0 1' 1 0 2. 0 0 0 1 0 0 1 0 - ---------- I --------------- 11 --------------- --------------- 11 --------------- Volume Module: 0 286 0 384 0 0 0 Base Vol: 0 842 458 329 932 Growth Adj: 1.01 1.01 1.01 1.01 1-01 1-01 1-01 1-01 1-01 1-01 1-01 1-01 Initial Bse: 0 850 463 332 941 0 289 0 388 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 0 850 463 332 941 0 289 0 388 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF.Volume: 0 850 463 332 941 0 289 0 388 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 0 850 463 332 941 0 289 0 388 .0 0 0 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol. 0 850 463 332 941 0 289 - 0 388 0 0 0 ---------- --------------- --------------- --------------- If --------------- Saturation Flow Module: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Sat/Lane: 1600 1600 Adjustment: 1.00 1.100 1.00 1-00 1-00 1-00 1-00 1-00 1-00 1-00 1-00 1-00 Lanes: 0.00 2.00 1.00 1.00 2.00 0.00 1.00 0.00 1.00 0-00 0-00 0-00 Final Sat.: 0 3200 1600 1600 3200 0 1600 0 1600 0 0 0. ------------ I --------------- 11 --------------- 11 --------------- --------------- Capacity Analysis Module: 0.00 0.24 0.00 0.00 0.00 Vol/Sat: 0.00 0.27 0.29 0.21 0.29 0.00 0.18 Crit Moves: **** **** Green/Cycle: 0.00 0.36 0.36 0.26 0.62 0.00 0.60 0.00 0.30 0.00 0.00 0.00 .Volume/Cap: 0.00 0.74 0.81 0.81 0.48 0.00 0.30 0.00 0.81 0.00 0.00 0.00 ------------ I --------------- 11 --------------- --------------- --------------- Level Of Service Module: Delay/Veh: 0.0 27.7 32.5 39.9 9.8 0.0 9.0 0.0 36.6 0.0 0.0 0.0 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 0.0 27.7 32.5 39.9 9.8 0.0 9.0 0.0 36.6 0.0 0.0 0.0 Queue: 0 25 15 12 17 0 5 0 13 0 0 0 Traffix 6.8.0113 (c) 1997 Dowling Assoc. Licensed to TRANSTECH, Walnut, CA 99065BPM.IN Thu May 27, 1999 14:33:58 Page 4-1 -------------------------------------------------------------------------------- Honda Car Wash and Auto Service Project PM PEAK 2000 Base Conditions -------------------------------------------------------------------------------- Level Of Service Computation Report ICU l(Loss as Cycle Length %) Method (Future Volume Alternative) Intersection #6 GRAND AVE AND GOLDEN SPRINGS Cycle (sec): 120 Critical Vol./Cap. (X): 0.873 Loss Time (sec): 10 Average -Delay (sec/veh): 34.6 Optimal Cycle: 95 Level Of Service: D Approach: North Bound South Bound' East Bound West Bound Movement: L - T - R L - T - R L T R ------------ I --------------- --------------- 11 --------------- 11 --------------- Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 Lanes: 2 0 1 1 0 2 0 2 0 1 1 0 2 0 ------------ I --------------- --------------- --------------- --------------- Volume Module: Base Vol: 167 689 103 295 982 185 332 793 565 102 226 176 Growth Adj: 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 Initial Bse: 169 696 104 298 992 187 335 801 571 103 228 178 Added Vol: 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 169 696 104 298 992 187 335 801 571 103 228 178 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 169 696 104 298 992 187 335 801 571 103 228 178 Reduct Vol: 0 0 0 0 0 0 0 0 0 Reduced Vol: 169 696 104 298 992 187 335 801 571 103 228 178 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 169 696 104 298 992 187 335 801 571 103 228 .178 ------------ I --------------- 11 --------------- 11 --------------- 11 --------------- Saturation Flow Module: Sat/Lane: 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 Adjustment: 0.90 1.0o 1.00 0.90 1.00 1*.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 2.00 1.74 0.26 2.00 2.00 1.00 1.00 2.00 1.00 1.00 1.12 0.88 Final Sat.: 2880 2784 416 2880 3200 1600 1600 3200 1'600 1600 1797 1403 ------------ I --------------- 11 -------- I ------- 11 --------------- --------------- Capacity Analysis Module: .Vol/Sat: 0.06 0.25 0.25 0.10 0.31 .0.12 0.21 0.25 0.36 0.06 0.13 0.13 Crit Moves: * 41 * * * * * * Green/Cycle: 0.07 0.30 0.30 0.13 0.36 0.36 0.30 0.41 0.41 0.07 0.18 0.18 Volume/Cap: 0.86 0.83 0.83 0.83 0.86 0.32 0.69 0.60 0.86 0.86 0.69 0.69 ------------ I --------------- --------------- ---------------- --------------- Level Of Service Module: Delay/Veh: 63.3 34.7 52.9 49.5 32.3 21.6 31.1 21.7 32.6 71.7 39.2 40.3 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 AdjDel/Veh: 63.3 34.7 52.9 49.5 32.3 21.6 31.1 21.7 32.6 71.7 39.2 40.3 Queue: 7 23 4 11 33 5 10 21 19 5 8 6 � * * * * * * * * * * * * * * * * * * * * * * * 4,* * *'* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Traffix 6.8.0113 (c) 1997 Dowling Assoc. Licensed to TRANSTECH, Walnut, CA