HomeMy WebLinkAbout1/23/1995QA
7:00 P.M.
South Coast Air Quality Management District
Auditorium
21865 East Copley Drive
Diamond Bar, California
D, Wd Meyer
c- Ramenbaum
Don /Scbad
FrankUn n
•i Huff
Copies of staff reports or other written documentation relating to agenda items are on file in the Community
Development Office, located at 21660 F— Copley Drive, Suite 190, and are availablefor public inspection.
If you have questions regarding an agenda item, please call (909) 396-5676 during regular business hours.
In an. effort to comply with the requirements of Title II of the Americans with Disabilities Act of 1990, the
City of Diamond Bar requires that any person in need of any type of special equipment, assistance or
.accomodation(s) in order to communicate at a City public meeting must inform the Community
Development Department at (909) M-5676 a minimum of 72 hours prior to the scheduled meeting.
Please refrain from smoking, eating or drinking Tfe City of Diamond Bar uses recycled paper
in the Auditorium and encourages you to do the sane.
CITY OF DIAMOND BAR
PLANNING COMMISSION AGENDA
Monday, January 23, 1995
Next Resolution No. 95-3
CALL TO ORDER: 7:00 p.m.
PLEDGE OF ALLEGIANCE
1. ROLL CALL: COMMISSIONERS: Chairman David Meyer, Vice Chairman
Bruce Flameribaum, Don Schad, Franklin Fong, and Bob Huff
2. MATTERS FROM THE AUDIENCE/PUBLIC ' COMMENTS:
This is the time and place for the general public to address the members of the Planning
Commission on any item that is within their jurisdiction, allowing the public an opportunity
to speak on non-public hearing and non -agenda items. Please complete a Speaker's Card
for the recording; SecretaU (Completion of this form is voluntary). There is a five minute
maximum time limit when addressing; the Planning Commission.
3. CONSENT CALENDAR:
The following items listed on the consent calendar are considered routine and are
approved by a single motion. Consent calendar items may be removed from the agenda
by request of the Commission only:
3.1 Minutes of January 9, 1995
4. CONTINUED PUBLIC HEARING:
41 Development Review No. 94-2 A request to construct. an 18,110 square foot,
two-story office/professional building. The 40,496 square foot project site is
undeveloped and is located at the southeast comer of Brea Canyon Road and
Lycoming Street in Zone C -1 -BE. The project additionally proposes a
freestanding 6 ft. high monument sign on .the Brea Canyon Road frontage.
Continued from December 12, 1994.
01
Applicant/Property Owner: G. Miller Development, 721 Brea Canyon Road #7,
Diamond Bar, CA 91789
Environmental Determination: pursuant to the provisions of the California
Environmental Quality Act (CEQA), the City has determined that this'prqject
requires a Negative Declaration.
RECOMMENDATION: Staff recommends that the Planning Commission open
the public hearing, receive testimony, and Approve Development -Review,No.,
94-2 with Findings of Fact and conditions as listed.
6. OLD BUSINESS: None
7. NEW BUSINESS: None
S. INFORMATIONAL ITEMS
8.1 Transmittal of Precise Alignment Study for Citrus Valley Health Partners
Diamond Bat Medical Plaza.
9. PLANNING COMMISSION ITEMS:
10. ANNOUNCEMENTS
10.1 League of California Cities - PLANNERS INSTITUTE
Wednesday - Friday, March 22 - 24, 1995
10.2 Planning Commission Reorganization - March 13, 1995
I
11, ADJOURNMENT-: February 13, 1995
2
9
MINUTES OF THE CITY OF DIAMOND BAR
REGULAR MEETING OF THE PLANNING COMMISSION
JANUARY 9, 1995
CALL TO ORDER
Chairman Meyer called the meeting to order at 7:12 p.m. at the
South Coast Air'Quality Management District Board Room, 21865 East
Copley Drive, Diamond Bar, California.
PLEDGE OF ALLEGIANCE
The audience was led in the Pledge of Allegiance by Vice Chairman
Flamenbaum.
ROLL CALL
Present: Commissioners: Chairman Meyer, Vice Chairman
Flamenbaum, Schad, Fong, Huff
Also Present: Associate Planner. Robert 'Searcy; Assistant
Planner Ann Lungu; Interim City Attorney
Michael Montgomery, Consultant Engineer
Michael Myers; Recording Secretary Carol
Dennis
MATTERS FROM THE AUDIENCE/PUBLIC COMMENTS - None
CONSENT CALENDAR
1. Minutes of November 14, 1994 and December 12, 1994.
The following corrections/amendmentswere offered:
1. C/Huffj November 14 minutes, Page 7, New
Business, Item I., change "indicative". to
"indigenous,".
2. Chair/Meyer, November 14 and December 12
minutes should reflect that C/Huff abstained
from the minutes approval process.
3. C/Fong, November 14, Page 5, middle of third
paragraph, correct 11topal" to 11topo".
4. Chair/Meyer, December 12, Page 4, motion by
C/Huff regarding Variance 94-2, spell out the
conditions. Copy from the Resolution into the
minutes.
January 91 1995 Page 2 Planning Commission
5. Chair/Meyer asked that the minutes be more
active by abbreviating the staff report And
adding more comments.
6. VC/Flamenbaum, November 14, Items 1 and 2,
outline of proposed Development Ordinance,
should include the request for staff to
present the outline at the January, 1995
meeting. AP/Searcy stated his notes reflected
"expeditiously" and that no date had been
stated in the request during the November 14
meeting.
A motion was made
C/ Schad to accept the
carried unanimously.
PUBLIC HEARING:
by VC/Flamenbaum and seconded by
minutes as amended. The motion was
1. VARIANCE No. 94-3. A request to install a total of six
monument signs: Three monument signs - a maximum height of 10
feet with a maximum sign face area of 36.75 square feet
utilized for tenant identification; and three monument signs -
a maximum height of six feet with a maximum sign face area of
11.38 square feet utilized for center identification.
Property Location: Diamond Bar Village Shopping and
Professional Center, 325-379 South Diamond Bar Boulevard and
23341-23499 East Golden springs Drive, Diamond Bar, CA 91765.
Property Owner/Applicant: Steve Poretta, Poretta Family
Trust, 601 South Glenoaks #301, Burbank, CA 91502.
AstP/Lungu presented the staff report and indicated that staff
feels the proposed project is an opportunity to correct the
sign deficiencies, reduce the sign pollution on the site, and
improve sign visibility for tenants.- If the Planning
commission approves the proposed project, installation for all
monument signs is, proposed to occur within four months of the
approval.
Staff recommends that the Planning Commission approve Negative
Declaration No. 92-7 and Variance 94-3, Findings of Fact, and
conditions as listed within the resolution.
VC/Flamenbaum asked if staff would approve the center
identification signs to which Ast/P Lungu replied, "yes". .
January 9, 1995 Page 3 Planning commission
In response to C/Huf, f , AstP/Lunqu responded the existing signs
are approximately 18 feet high, several feet in excess of the
proposed .10 foot high signs.
Chair/Meyer declared the public hearing open.
Constance Nicholson, owner BCN Lighting & Signs, 2887
Buckhaven Road, Chino Hills stated her company has worked
closely with staff and is available for questions from the
Planning commission.
In response to Chair/Meyer, AstP/Lungu stated it is a
requirement of the Sign Code that all free-standing monument
signs have addresses. In addition, DKS has proposed a minimum
setback of 15 feet from the edge of the travelled way and this
will not create a site distance problem for entering vehicles.
Chair/Meyer stated he believed the stipulated setback
measurement should be from property line, not from curbface.
Responding to Chair/Meyer, Mrs. Nicholson stated she does not
know where the property lines are at the corner of Golden
Springs Road and Diamond Bar Boulevard. Chair/Meyer stated
usually, the 15 foot triangle is measured from property line
rather than curbside.
CE/Meyers referred Chair/Meyer to Condition (g) on Page 5
which -allows for review and approval of the location.
Chair/Meyer stated he would like the parameters spelled out in
the resolution.
In response to Chair/Meyer, AstP/Lungu indicated the applicant
stated he would have the project completed within four months,
even though he is allowed one year.
Chair/Meyer declared the public hearing closed.
Chair/Meyer suggested the following wording be added to
Condition (g): "All freestanding monument signs shall
maintain a minimum 15 feet setback from the travelled roadway
edge, provided that such signs shall not project over the
public right-of-way, nor shall they impair vehicular site
distances, to the satisfaction of the City Engineer."
A motion was made by C/Schad and seconded by C/Fong to adopt
the resolution as amended. The motion was carried
unanimously.
January 9, 1995 Page 4 Planning Commission
2. CONDITIONAL USE PERMIT No. 94-6. A request to modify and
continue operation of an unmanned public utility substation
for a -cellular communication facility. The modification will
incorporate digital in addition to the existing analog
facilities which are now in place. The existing facility is
located at Diamond Bar High School. The equipment is located
on the roof and also in an enclosed interior unit. currently,
the visible equipment consists of roof mounted whip antennae
and a microwave antenna with the majority of the equipment
obscured behind the school's mascot banner. The proposed
project will add additional whip antennae and microwave
antennae.
Applicant: AirTouch Cellular, 3 Park Plaza, Irvine, CA 92714.
Property Owner: Walnut Valley Unified School District, 880 S.
Lemon -Avenue, Diamond Bar.
AP/Searcy reported the project is a request by the applicant
to continue operation and expand the available technology at
the site. The site has been in operation at this location for
seven years and located on the roof of the gymnasium and
within an adjacent equipment room. The current equipment
features an array of antennae placed at various locations on
the roof of the gymnasium. The proposed project would place
additional equipment on existing structures and add new
antennae in perimeter locations around the roof.
The staff recommends that the Planning Commission open the
public hearing and receive testimony and approve the Negative
Declaration and the draft PC Resolution 95 -XX with the
Findings of Fact and conditions listed.
In response to VC/Flamenbaum, AP/Searcy indicated he had
spoken with both AirTouch and L.A. Cellular about combining
efforts and erecting a monopole. He further indicated that
because they are two separate companies providing the same
service, combining, the service may create conflict and cross-
talk within the two systems.
Chair/Meyer declared the public hearing open.
Dennis Lowry, Site Development Consultant, Air Touch Cellular,
stated that this project will be a digital upgrade to provide
better service to the community surrounding the site and
involves minor hardware changes.
January 9, 1995 Page 5 Planning Commission
VC/Flamenbaum stated his concerns that Diamond Bar is starting
to look like an "antenna farm" and asked the applicant if
there 'is a way to combine the applicant and competitor systems
in a single monopole.
Mr. Lowry .responded that in some cases it is possible.
However, in general, there needs to be some distance between
systems..
C/Schad stated he concurs with VC/Flamenbaum.
Craig Clute, 21217 Fountain Springs Road, objects to the lack
of information contained in the flyer distributed to the
residents: He is very concerned that Diamond Bar is becoming
an "antenna farm" and feels the Planning Commission.needs to
place a limit on the number of antennae allowed.
Chair/Meyer declared the public hearing closed.
VC/Flamenbaum announced he will be recusing himself from the
next agenda item since he has a leasehold interest in the
affected land, and proposed the Planning Commission table this
agenda item until the next agenda item* is heard. He suggested
the Commission arrive at a solution by which the two parties
can combine their efforts.
Chair/Meyer asked if this would preclude VC./Flamenbaum from
entering into the debate on this application. VC/Flamenbaum
responded his concern is that somehow the Antennae should be
combined.
Chair/Meyer asked if the question of proliferation of the
antennae should be a part of the Development Code.
VC/Flamenbaum responded that it clearly should be.
C/Schad asked if it is possible for the cellular companies to
combine several systems.on one antenna.
Responding to Chair/Meyer, AP/Searcy stated there will be one
whip antenna approximately 22 feet high. The remainder will
be, hidden by the parapet and by the enclosure and the
aesthetic impact will be approximately the same as currently
exists.
A motion was made by C/Schad and seconded by VC/Flamenbaum to
approve Conditional Use Permit No. .94-6. The motion was
carried unanimously.
January 9, 1995 Page 6 Planning commission
In response to Chait/Meyer, AP/Searcy stated he would have
used a categorical exemption had he been able to determine
that a Negative Declaration had been prepared on *the previous
Conditional Use Permit. In the absence of that, and Los
Angeles County's inability to provide staff with the
information, the Negative Declaration was utilized to cover
all bases.
3. CONDITIONAL USE PERMIT No. 94-7. A request to operate an
unmanned public utility substation for cellular
telecommunication facility with a 90 footmonopole with
antennae and microwave dish. The radio equipment will be
housed within an enclosed modular unit.
Property Location: 3333 S. Brea Canyon Road
Applicant: L.A.-Cellular, Box 6028, Cerritos, CA 90702
Property Owner: Metro Diamond Bar Properties, Inc., 2030 Main
#1020, Irvine, CA 92714
VC/Flamenbaum reminded the Planning Commission that he had
recused himself from deliberation of this project and asked
the record to -reflect that he neither favors or opposes the
project.
AP/Searcy reported the applicant requests approval to locate
a cell site, including a 90 foot monopole and radio equipment
enclosure, in the parking area of an existing two. story office
building. The steel monopole is proposed with three antennae
arrays with four antennae each and a future 4 foot microwave
dish. The proposed 90 foot height is approximately 25 to 30
feet over the height of any other approved monopole within the
City. Because one of the primary service recipients is mobile
cellular users, the monopole must reach this service area.
Because of the grade differential between the freeway and the
area adjacent to the freeway and the area available for the
project to be developed, this height is desired by the
applicant to deliver the required level of service.
The staff recommends that the Planning Commission open the
public hearing, receive testimony, and continue the project
for additional information.
Responding to C/Schad, AP/Searcy stated the parking
requirement for the office building is 127 spaces. With the
removal of four spaces for this project, there will be 134
January 9, 1995 Page 7 Planning Commission
spaces remaining. In addition, there will be a backup
generator at the site. Since the enclosure is soundproof, it
is not expected to generate additional noise.
Chair/Meyer declared the public hearing open.
Dr. Gerald Bushberg, L..A. Cellular representative, stated
there are facilities which have multiple cellular telephone
companies', equipment on a single pole. He further stated this
is technically impossible since the systems were developed
independently and because they are subscription based at this
location.
Dan Hare, AirTouch Cellular, 3 Park Plaza, Irvine, stated the
temporary site has always been a marginal location and, in
order to service the area, there are three sites proposed. At
this time, only six antennae will be installed.
C/Fong requested the applicant consider another location. Mr.
Hare responded several alternative sites had been -considered.
C . /Fong reiterated he is . . not convinced this is the optimum
location for the antenna. He has a problem with the proposed
facility location because of the visual impact.
C/Huff asked why L.A. Cellular has three sites as opposed to
AirTouch's one site. Mr., Hare responded he does not know.
C/Huff stated he agrees with C/Fong that an alternative site
should be considered.
Craig Clute, Diamond Bar resident, - reiterated the Planning
Commission needs to set limitations immediately.
Chair/Meyer declaredthepublic hearing closed.
Chdir/Meyer stated the service station, which is a major sales
tax contributor to the City, cannot have a sign exceeding six
feet. In addition, Diamond Bar does not permit freeway signs.
During the General Plan hearings the Planning Commission
received testimony and recommendations that the City provide
certain advertising upon entering the City. In his opinion,
the various providers, in addition to combining on a pole.,
might do so on a pole which would have benefit to the business
aspects of the community. He further stated that a two foot
wide landscape planter is not adequate. Additionally, off-
street parking for the business may become an issue.
A motion was made by C/Huff and seconded by C/Schad to
January 91 1995 Page 8 Planning Commission
postpone the item to February 13, 1995 and have the _applicant
consider alternative sites, particularly to the south of the
current site. The motion was carried 4-1 with the following
roll pall:
AYES: COMMISSIONERS: Huff, Schad, Fong, Chair/Meyer
NOES: COMMISSIONERS: None
ABSTAIN: COMMISSIONERS: VC/Flamenbaum,
ABSENT: COMMISSIONERS: None
RECESS: Chair/Meyer recessed the meeting at 9:10 p.m.
RECONVENE: Chair/Meyer reconvened the meeting at 9:20 p.m.
4. CONDITIONAL USE.PERMIT No. 94-4. The City is requesting to
develop a 23.8 acre site located east of Pantera Drive and
south of Bowcreek Drive. The master plan for the park
includes development of two ball fields, multi -use hard
courts, tennis courts-, picnic areas, a tot lot, and a
multipurpose community center approximately 7,500,square feet
in size.
Property Location: 700-800 Pantera Drive
Applicant: City of Diamond Bar, 21660 E. Copley Drive, Suite
#100, Diamond Bar
AP/Searcy commented that the role of the PlanningDepartment,
is to present the City's technical review of the project. He
stated that the project has undergone, numerous scoping
sessions with the public. The master plan project as it is
presented has been approved as a "consensus" project by the
Parks and Recreation Department and forwarded to the Planning
Commission for review. CSD/Rose will serve as proponent for
the Parks and Recreation Department's "consensus" project.
AP/Searcy reported that the 23 acre park site was reviewed as
a part of the EIR and established as part of the subdivision
of Tract No. 31479 approved circa 1978. The 23 acre park site
was designated a!3 an element of the residential development
that entailed the area north of Grand Avenue, east of Golden
Springs Drive and.Diamond Bar Boulevard, and south of the SR
60 Freeway. . In 1988 the County Parks and .Recreation
Department initiated a project with similar elements to the
present project and received approval in 1989 but the project
was never constructed. The City Community services Department
then set out to create a new master plan for the Pantera Park
January 91 1995 Page 9 Planning Commission
site and using staff, a professional consultant, and community
input from residents in the immediate vicinity of the park
site.
The General Plan has identified the inadequacy of park
facilities within the City. "By any measure, the City is
inadequately served by active and passive facilities."
(Resource Management Element Page 111-2). The primary active
recreational facilities are located at Diamond Bar High School
and the County Golf Course. As the City continues to grow in
population, the 'disparity in the available active recreational
facilities will increase. currently, there is a total of 23
acres of developed park land to serve Diamond Bar north of
Grand Avenue. There are no lighted baseball fields and no
lighted basketball or tennis courts- to serve north Diamond
Bar.
The General Plan directs the City to provide adequate active
and passive recreation facilities. The present project has
the opportunity to satisfy this directive. The incorporation
of an extensive passive area for picnics, open play and future
interpretive area (hiking trail) and the provision of the hard
court area and ball fields go a long way. However, staff
feels that the current plan does fall short in maximizing the
park's features. In particular, the omission of lights on the
ball fields reduces the opportunity for the utilization of the
facility to its highest and best use. The potential negative
impacts of ball field lighting can be mitigated as previously.
stated and should strongly be considered for this site.
The staff has reviewed the needs of the general community as
it relates the provision of recreation activities and found
that the City lacks adequate facilities. The development of
this park represents the opportunity for the greatest amount
of active park space in the City. This project has undergone
the scrutiny of the neighborhood in the immediate vicinity of
this project and yielded the basis for a truly beneficial
facility.
The primary issues related to the master plan are traffic and
circulation, light spillage, and intensity of use. The master
plan and environmental mitigations have been incorporated to
maximize the use and minimize the impacts. The project
design, limits on hours of operation,
ation., deliveries; and lighting
is def ined in a manner that reduces impact to the existing
residential development.
January 91 1995 Page 1 10 Planning commission
The purpose of this public hearing is to review the Negative
Declaration and Mitigation monitoring Program as this
initiates the public review period.
AP/Searcy stated the proponent for the project is Bob Rose,
Director of Community'Services for the City of Diamond Bar.
i
Staff recommends that the Planning Commission open the public
hearing, receive testimony and consider the Negative
Declaration and direct staff as appropriate.
Responding to VC/Flamenbaum, AP/Searcy stated the City is
bound by the Conditional Use Permit requirements.
Responding to VC/Flamenbaum, DCS/Rose indicated there is
security lighting around the building at Summit Ridge.
Responding to C/Schad, AP/Searcy reiterated that 15.5 acres
would be active and the remaining 7.5 acres would be natural
or passive.
C/Schad voiced his concern that there would be loss of the
facility for night games without night lighting. AP/Searcy
responded that the master plan excludes the use of ball field
lighting. Staff is recommending that the Planning Commission
strongly consider including lighting to maximize usage of the
park.
C/Schad commented that he wishes review of the botanical
features of the park for preservation during the development
process and expansion for certain areas be addressed.
Responding to C/Schad, AP/Searcy stated that Pomona School
District has no definitive plans or schedule for building the
school.
Responding to C/Huff, AP/Searcy - stated the park was
conceptualized as a part of the original approval of the tract
map about 1978 and lighting was included in the original plan.
Again responding to C/Huff, �AP/Searcy indicated Planning staff
was not present at the community workshops.
C/Huff asked AP/Searcy to address the liability factor of the
water element and the costs involved.
AP/Searcy stated he did not have that information available.
January 91 1995 Page 11 Planning commission
Responding to C/Huff, AP/Searcy indicated the mitigation
measures for the lighting system would limit the height of the
standards on which the lights are placed and incorporate light
shields, directing and focusing the light in certain areas.
The Negative Declaration refers to incorporating very -tall
trees along the parameter of the site for diffusion.
Pat Mann, Cotton\Beland\Associates, Inc. stated the Negative
Declaration was prepared under his direction.' The lighting
was removed from the park plan and the firm does not have
information on the type of lighting and intensity which might
be used. He further stated that closing the park at 10:00
p.m. and turning off all lights would be the most effective
measure in limiting the lighting impact.
In response to C/Huff, DCS/Rose indicated the percentage of
increase of use of the park on a year-round basis as a result
of incorporating lighting for the ball field would be 46%.
Inclusion of youth programs use during the winter months would
increase the use percentage by about 102%.
C/Fong asked how deep the water will be in the pond.
AP/Searcy responded there is no specific design for the water
element at this time.
DCS/Rose introduced members of the project I team.
Joe Ruzicka,'Vice Chairman, Parks and Recreation Commission,
stated Pantera Park represents a great opportunity for the
City of 'Diamond Bar. According to state and national
recreation standards, Diamond Bar should have a minimum of IiO
acres of developed active park land. Diamond Bar currently
has about 50 acres and the development of Pantera Park would
bring the total to approximately 65 acres which is still below
the standard.
The design provides facilities for many of the park uses which
have been demanded by the community. These include active
ball fields, tennis, basketball and roller blade/hockey
courts, formal picnic structures, and a jogging path around
the park. Of the 55,000 residents of Diamond Bar, a full 30%
.or 16,000 are children. This park will allow us to further
serve the -children's needs with wholesome activities. The.
process for design incorporated the need to balance the
desires of the local neighborhood with the needs of the entire
community. In order to achieve this goal, the Parks and
Recreation commission conducted an extensive, series of'public
workshops to reach consensus on the elements to be
January 91 1995 Page 12 Planning Commission
incorporated into the park's design. -
Bob Mueting, Landscape Architect, referred the Planning
Commission to the artist's conceptual drawing of the proposed
site project master plan and pointed out the location of each
of the components.
Responding to C/Huff, Mr. Mueting 'stated the development is
notyet phased. It is an overall master plan which needs to
be approved before moving on to the subsequent design
development with the staff.
Responding to VC/Flamenbaum, Mr. Mueting stated that it would
be his intent to make the retention basin attractive, whether
or not it contained water. In addition, the bench drains
would be designed to conform to the General Plan. Mr. Mueting
indicated that whether or not the community center gets built
in the future will not significantly impact the project. The
plan before the Planning Commission represents a consensus of
the community participation, not specifically documented by
needs for each one of the elements.
VC/Flamenbaum stated he feels there are too many elements for
this size park and is concerned that the parking may not be
adequate.
Responding to VC/Flamenbaum, DCS/Rose statedthe response from
Pomona Unified School District is that the school site is
available for overflow parking from the park, should it become
necessary. When the school is built a joint use agreement
would be acceptable.
VC/Flamenbaum suggested that if the school comes with ball
fields, would it not be expedient to enter into a reciprocal
agreement to use some of its facilities and minimize the
elements of Pantera Park. He feels the City is trying to
solve all of its park problems with one facility, thereby
burdening the neighborhood.
Chair/Meyer declared the public hearing open.
Donovan Martinez, 635 Pantera Drive, stated that he was one of
the residents in attendance at all of the Pantera Park
community planning meetings. In the beginning there was
complete division. One group was in favor of an active park
and the other group was in favor of a passive park. By the
end of the deliberation there was consensus for what is before
January 9, 1995 Page 13 Planning commission
the Planning Commission. There was never consensus to include
lighting for the park and it was never part of the
presentation. The only lighting considered was low lighting
for the tennis courts. The majority of the residents were
against field lighting. He asked that the Planning Commission
respect the time and energy of the citizens to arrive at the
current concept.
Ardeshir Malganji, 765 Bowcreek, requested the Planning
Commission reconsider the walkway to Bowcreek since it will
create major parking problems.
Dan Buffington, 2 605 Indian Creek Road, stated although he was
not -a part of the meeting process, he strongly urges the use
of lights in the park for the sake of the youth of Diamond.
Bar.
Chair/Meyer declared the public hearing closed.
Chair/Meyer stated that since this is a neighborhood park and
the residents actively participated in the concept. He would
urge cooperation, as part of this master plan, with the Pomona
Unified School District and to address whether there is
duplication of facilities. In addition, off-site signing
needs to be provided for the park. He further stated that he
is concerned with the feasibility of the water element.
Chair/Meyer further stated he has two major concerns regarding
the project. one is the timing of the Conditional Use Permit
and the ability to exercise the permit in ' the one year time
period. Secondly, regarding the environmental report
concerning traffic. He adamantly disagrees with the report
and believes that a park of this magnitude will generate
significantly more traffic and wants it adequately addressed
in the environmental review. In addition, thd report should
include the cumulative effect of the school traffic.
C/Fong suggested lighting only one of the fields and also
consider lighting ball fields in other parks in the City.
Chair/Meyer reminded staff that the issue of parking I on
Bowcreek needs to be addressed.
C/Huf f asked for feedback on the proposed lighting and the
impact on the neighborhood. He is concerned that other sites
were not planned with lights as part of the project. Pantera.
Park was from the beginning and as distressing as it may be to
January 91 1995 Page 14 Planning Commission
the residents, when they moved into the area, it was part of
the plan.
,Respopding to Chair/Meyer, AP/Searcy asked for clarification
of the traffic study concerns. Chair/Meyer indicated that he
would vote "no" when the environmental study comes before the
Commission. He feels the traffic study is inadequately
addressed.
A motion was made by C/Schad and seconded by C/Huff to
continue the public hearing to February 27, 1995. The motion
was carried unanimously.
OLD BUSINESS - None
NEW BUSINESS - None
PLANNING COMMISSION ITEMS
C/Schad stated he would like to begin working on a Tree
ordinance.
Chair/Meyer referred to a letter from the Mayor of Chino Hills
indicating he found it extremely disappointing that the
Traffic Element of the Draft General Plan did not assume
Diamond Bar's responsibility of solving the traffic problem
created by the City of Chino Hills by placing a four lane road
through the environmentally sens#ive Tonner Canyon.
Chair/Meyer indicated he Would, with the blessing of the
Commission, work with staff to draft -a letter to the mayor
indicating why it was not in the Draft General Plan prepared
by the Planning Commission.
Chair/Meyer stated the Planning Commission would like to take
a pro -active stance on the Development Code. He asked staff
to place the item on the February 13, 1995 agenda.,
VC/Flamenbaum requested the Traffic Development Study for
Calvary Chapel and Inter -Community Hospital also be placed on
the February 13, 1995 agenda. AP/Searcy responded he was
contacted Friday, January 6, 1995 by the traffic engineer
advising staff there are three identified alternative
locations and a cost evaluation associated with each
alternative site. Tentatively, meetings will be held the week
of January 9, 1995 with the two adjacent property owners to
discuss what they wish to do and what future plans Calvary
January 9, 1995 Page 15 Planning Commission
Chapel may have for their site. Staff hopes to bring this
information to the Planning Commission within the next 60
days..
Chair/Meyer asked staff to include the updates in the February
meeting agenda.
ANNOUNCEMENTS - None
Chair/Meyer declared the meeting adjourned at 10:52 p.m.
Respectfully Submitted,
James DeStefano
Secretary
Attest:
David Meyer
Chairman
City of Diamond Bar
PLANNING COMMISSION
Staff Report
AGENDA ITEM NUMBER: 4.1
REPORT DATE: January 19, 1995
MEETING DATE: January 23, 1995
CASE/FILE NUMBER: Development Review No. 94-2
APPLICATION REQUEST: A request to construct an 18,110
square foot, two-story
office/professional building. The
40,496' Square foot project site is -
undeveloped and is located at the
southeast corner of Brea Canyon
Road and Lycoming Street in Zone C.-
1 -BE. The project additionally
proposes a freestanding 6 ft. high
monument sign.
PROPERTY LOCATION: 21008 Lycoming St.
APPLICANT.: ___G.__ Miller -Development-
721 Brea Canyon Road #7
Diamond Bar, CA. 91765
PROPERTY OWNER:
BACKGROUND:
Same
The Planning Commission conducted public hearing on the project
December 12, 1994. At the conclusion of the public testimony, the
Planning commission directed staff to work with the applicant to
provide additional information concerning an update to the traffic
report, resolution to the parking provisions on and off-site, and
future access between the adjacent commercial properties..
In the interim, the applicant has provided staff with an addendum
to the traffic impact analysis that addresses the submitted project
with updated projections based on current conditions. The addendum
also addresses inter -parcel circulation to the extent possible at
the present time. The applicant has also re -designed the office
building on the southern elevation, reducing the gross square
footage and reoriented the parking stalls in the immediate area of
the building.
Q1L=RS1RRF0)ZTSWR94-2A.R"
ANALYSIS:
The applicant has submitted modifications to the previous design
that respond to circulation and parking issues. The modifications
include a redesign of the building and floor plan, relocation of
parking spaces on the south elevation, replacement of the entry
walls with a landscape berm and a proposed modification to the lot
line along the eastern and a portion of the southern boundary.
The building modification provides a better visual complement for
northbound Brea Canyon Road travelers. The site will now provide
landscaping and the architecture of the building as the first
visual elements of the site as opposed to block walls and
automobiles.
Parking/Circulation
The building modifications have reduced the gross square footage by
slightly less than 300 square feet. The modification proposes to
relocate the colonnade to the west. This modification has provided
the opportunity to relocate the four parking spaces north of the
Brea Canyon Road entrance toward the interior of the site and away
from the perimeter of the site. The relocation of the parking
serves to reduce the potential impacts related to the potential
traffic hazards of cars backing into the driveway approach and
drive aisle from both sides. Moving the spaces further into the
interior ofthe site allows for better circulation.
The number of parking stalls for the project have been increased to
51 overall. Forty-six (46) of the stalls are provided on the
subject site, in conformance with the minimum requirement (for
general retail/commercial). Staff recommends that a condition
which restricts the project from medical uses be placed on the
project to maintain the project's integrity..
Five (5) additional stalls are provided as a result of an informal
agreement between the adjacent property owners. The five off-site
spaces are located at the extreme eastern portion of the project at
the point where the L.A.C.F.C.D. easement intersects the abutting
properties. The applicants request that no easements or other
encumbrances be placed on this portion of the project because of
the potential negative financial impacts at the time of any sales
transactions may transpire.
The parking area has undergone an additional revision. The trash
enclosure has been moved forward to the north and reduced in size
in response to the proposed lot line adjustment. The 61 tall
concrete block enclosure will allow pedestrian access from the east
and will feature a 51611 wide planter on the west facing elevation.
The gates for the enclosure swing open toward the parking area but
within the confines of the curb. Staff recommends that a
decorative iron face be incorporated into its design.
C. 1UTMRS1REPORTSWR94-U.Rff 2
The applicant prepared an addendum to the traffic report. The City
has reviewed the addendum report and found it adequately addresses
the traffic impact projections associated with the development of
this site. -The report found that the project will have a
negligible -effect on off-site circulation. The analysis of the
addendum generated conditions related to the City's requirement to
ensure the traffic report format conform to the County's Congestion
Management Plan (CMP).
The internal and future inter -parcel circulation have been reviewed
from the aspect of safety and efficiency. No concerns were
generated subsequent to the reconfiguration of the parking stalls
at the Brea Canyon Road entrance (as stated above). Access and
inter -parcel circulation was the remaining issue addressed.
Analysis of the plan indicates that the project provides a 20 ft.
wide access at the point of the proposed future shared access.
This may create problems' for circulation related to truck traffic.
Staff has developed two scenarios to address this potential
situation.
In one alternative, the access could be increased to a minimum of
24 ft. with the loss of one parking space as the planter is
modified to meet this modification upon development of the shared
access. The other alternative, raised during the public hearing,
calls for direct access from the north/south drive aisle into the
adjacent site. Creation of this access would cost the subject site
four parking spaces as access is gained to the abutting site. With
improvements for vehicular and pedestrian access, guarantees for
--in=kind-...-.rep-l-a-cement-.--on.--.-the - .abutting - parc_e_l____wo_uld.__._need. to___b_e__._
included within the covenants created for the reciprocal access
agreement.
Lot Line Adjustment
The applicant is proposing a lot line adjustment to adjust the
irregular property lines that currently exist on-site. The lot
line adjustment involves approximately 1,500 sq. ft. with the
office building site gaining the majority of the square footage.
The adjustment includes the -eastern boundary in addition to the
south property line. The southerly adjustment will transfer the
existing well site to the southerly property owner thereby aligning
the property with straight boundary. The eastern adjustment will
also transform the irregularly shaped boundary into a straight
north/south boundary ensuring the, office site the 46 required
parking spaces.
Development Standards Proposed Project Status
1. Setbacks - Of side yard 101
20' front yard 20'
Of rear yard 551
2. Height - 13 times buildable area 2 stories, 351
C. 1L9nWRSMEP0RTSWR94-2A.RYT 3
3. Parking 1 space per 400 sq. ft. 45 spaces (minimum)
NOTICE -OF PUBLIC -HEARING:
This item has been advertised in San Gabriel Valley Daily Tribune
and Inland Valley Daily Bulletin on November 21, 1994. Public
notices were mailed to 167 property owners in a 500 ft. radius of
theproject21 days prior to the public hearing.
Staff has reviewed environmental information submitted as a part of
this project and has prepared a Negative Declaration.
RECOMMENDATIONS:
The staff recommends that the Planning Commission re -open the
public hearing and receive testimony and adopt the Resolution of
Approval with the attached conditions.
1. The design and layout of the proposed development will not
unreasonably interfere with the use and enjoyment of the
neighboring existing and future developments, and will not
create traffic or pedestrians hazards;
_.2. The archi-t.e.-c.-t:ural--.-dek-gign. of.- --the is
compatible with the character -of the surrounding neighborhood
and will maintain the harmonious, orderly, and attractive de-
velopment contemplated by this Chapter and the contemplated
General Plan of the City;
3. The design of the proposed development would provide a
desirable environment for its occupants and visiting public
as well as its neighbors through good aesthetic use of
materials, texture and color that will remain aesthetically
appealing and will retain a reasonably adequate level of
maintenance;
4. The proposed use will not be detrimental to the public
health, safety or welfare or materially injurious to the
properties or improvements in the vicinity.
Attachments:
Development Plans
Staff Report Dated December 12, 1994
Traffic Report Addendum
Resolution With Findings of Fact
Lot Line Adjustment Exhibit
4
E RECEIVED 91/19 10:39 1995 AT 909-061-3117 PAGE 2 (PRINTED PAGE 2) 3
Qwl) 7142406592 P. 02
�Kv-j�s_ Gkoup -W dr vr 'Wi
•
OaN I M M
- � l✓fAxiMtiM C�Ut�afly�st Nt!IG4Nf � �tO���v/��� HIl�fH :";dN �t�
H101H
r f-ev 1- - -.- 0- v
AFAA
afltrx' U-0,-nAAOVF, AKOA
4w. rf
PINdWt#Hv;poo 4-21+e
OR- f �, f. 4
1,.^ I A ft
"eo Pm a- ri f.
0,01witio ^fppw;
eff-l"P I'vf I*WeM : 01777 VAR. f.
eprl~ -%o5o *a;
Tef,AV 1.7} ft -7 'Pa. f`�
Op Ftrr��a fl,gY,07 to.
-�l Pf.
Or -.0 -7,
rAlp-KIHrot PAYe7Uf
H~14/^r &F^,0,p0 leoll:p, W10VI 14~k
0P/N~ movi pop
J.
(4?ri rrvmffy)
INa
.... r^r-je4 F
WIN 10
City, of Diamond Ba
PLANNING. COMMISSION
Staff Report
AGENDA ITEM NUMBER: 5.1
REPORT DATE: December 5, 1994
MEETING DATE: December 12, 1994
CASE/FILE NUMBER: Development Review No. 94-2
APPLICATION REQUEST: A request to construct an. 18,110
square foot, two-story
office/professional building. The
40,496 square foot project site is
undeveloped and is located at the
southeast corner of Brea_ Canyon
Road and Lycoming Street in Zone C-
1 -BE. The project additionally
proposes a freestanding 6 ft. high
monument sign at on the Brea Canyon
Road frontage.
PROPERTY LOCATION: 21008 Lycoming St.-
APPLICANT:
t.
APPLICANT: G. Miller Development
721 Brea Canyon Road #7
Diamond Bar, CA. 91765
PROPERTY OWNER: Same
BACKGROUND:
In 1990 the subject site was rezoned from R-1 (Single Family
Residence Zone) to C-1 (Restricted Business Zone). The property is
currently vacant. Formerly, the property had been developed with
a single family residence. Abutting the site from the east to
north lies a Los Angeles County Flood Control Channel, to the south
a recreation vehicle storage site which is located adjacent to the
SR 60 Freeway, to the north a convenience store and a condominium
project, and to the west single family residential development, a
day care center, and a variety of miscellaneous
industrial/manufacturing type uses.
The proposed project is a request for a 18,110 sq. ft. two story
office/professional building on an irregularly- shaped site. A
portion of the project, approximately 4,700 sq. ft., is -covered by
an Los Angeles County Flood Control Easement and lies outside the,.
C.1rXrrRRS1REP0RTSIDR944.RPT 1
property boundary. The use is allowed within the zone subject to
approval of the Development Review.
-The considerations for 'approval of the project, focus - on
compatibility of the project to the surrounding environment,
conformity of the project to the draft General Plan and development
standards, and quality of design and materials.
ANALYSIS:
The project is designed with an orientation toward the interior of
the site rather than to Brea Canyon Road. The advantage of this
design allows for a substantial swath of landscaping along the Brea
Canyon Road frontage thereby reducing the perception of the mass of
the building. The structure will be located at distances ranging
from 10 ft. to 20 ft. behind the sidewalk. An extensive mixture of
plants including shrubs and trees are proposed long this rear
elevation.
The applicant is providing approximately 25 percent landscaping
throughout the site. The project proposes a lot coverage ratio of
69 percent and a FAR of .56. There is an entry statement provided
at the entries to the project in the form of 42 in. high stucco
walls that screen the parking area from the street with assistance
of landscaping. A six foot high block wall is proposed along the
extreme southeast property line as an extension of the existing
wall. All lighting will be designed so as'to provide a minimum of
one candlefoot over the site while minimizing light spillage off-
site.
Landscaping for the project is quite extensive and is intended to
give the project the appearance of instant maturity. For example,
the landscaping along Brea Canyon Road features four 36 in. box
Queen Palms and three 25 ft. tall Mexican Fan Palms in addition to
extensive shrubbery and ground cover. The parking area will be
encased by Yew Pines and Dwarf Salmon along the southerly perimeter
and Mexican Fan Palms, Loquats and various shrubs at the easterly
boundary along the flood channel'. The interior area of the site
will be planted with a variety of trees and shrubs in sizes and
quantities sufficient to detract from the visibility of the
hardscape.
The site provides for two points of ingress and egress, one on Brea
Canyon Road, a four lane major arterial, and the other on Lycoming
Street, a secondary road. All drive aisles conform to the L.A.
County standard of 26 feet. The project is designed with a shared
access easement to afford future inter -parcel circulation for any
future development. The subject project is designed with parking
spaces within this easement. The easement enters the site from the
south and follows the flood channel to the Lycoming Street access.
Staff recommends that the easement be recorded with the County
Recorder upon approval of the City once the instrument is crafted.
C. V_EnWRSUWPO1?TSU)R.04-2.M7 2
The parking standard stipulates a parking ratio of one space per
400 sq. ft. of retail/commercial office space. Additionally, the
code requires one space per 250 sq. ft. of prof essional/medical
office space. -The minimum--requirement--for this project is 45
spaces if no professional /medical uses are located within the
structure. Fifty parking spaces have been proposed on site and
there is no on -street parking on Brea Canyon Road or Lycoming
Street. Landscaping has been distributed in islands to break up
the harshness of the hardscape. Thirty one spaces are standard
size (18.5 ft. X 8 ft.), 16 are compact stalls (8 ft. X 8 ft.) and
three handicapped spaces are proposed and one of these spaces must
accommodate van accessibility requirements.
The site is currently vacant and the construction of the project
will* generate traffic volumes in excess of the previous land use (a
single family residence). The increase will not'however have a
significant adverse impact. The traffic report prepared for more
intensive but similar project identifies a projection of
approximately 1,500 trips per day. For this project the trip
generation will be less. The report identified mitigation measures
which will Assist in reducing the impacts associated with the
project. Included as mitigation measures are restriping Lycoming
at the approaches to Brea Canyon Road to provide a dual left turn
lane into the project and at the intersection and to prohibit
parking on Lycoming Street (currently in effect).
.The building orientation is toward the interior of the site but the
appearance the structure from all sides displays consistency of
theme and style. The design of the two - f loor office building
features a French architectural style and a height of 3.5 feet. The
applicant has proposed the primary exterior finish as Bisque stucco
complemented by a darker Balsa accent. Additional channel accents
are incorporated over areas of the first floor in the 'central
.portion of the building and the corners. The project offers second
floor access to the outside via balconies from all elevations and
is encased by the precast concrete balustrades. Cloud White trim
is proposed for the fascia, trim, qudins and second floor precast
concrete balustrades. The material proposed for the 12:12 roof is
a typical flat concrete tile of dark adobe, adobe, avante light
grey and sand topped with a painted sheet metal roof cap. Perched
atop the 'protruding roof elements, the project proposes
ornamentations. The windows of the project will display painted
sheet metal caps above and typical stucco finish on the remaining
perimeter. The applicant has chosen to place the air conditioning
and heating equipment on the roof in a well area that, in addition
to the parapet, conceals the equipment from view.
Signage for the project is proposed for the corner of the site
closest to the intersection of Brea Canyon Road and Lycoming
Street. The freestanding. sign is designed with a maximum height of
6 ft. The sign will display the "BREA CANYON PLAZA" center
identification in 12 in. high illuminated reverse pan channel
letters. The stucco monument structure will have a 10 ft. long
Q1U=PS1PXP0RTSW"4-2.R" 3
split face in order to maximize exposure to commuters in all
directions. The sign features architectural treatments which
include a central 6 ft. capped stucco pilaster as well as a 42 in.
pilaster with -channels-,* -on the perimeter of each- side. - No other
signage is requested as'a part of this application.
Development Standards Proposed Project Status
1. Setbacks - Of side yard 10,
.20f front yard 20"
01 rear yard 551
2. Height 13 times buildable area 2 stories, 351
3. Parking - 1 space per 400 sq. ft. 45 spaces
4. Basement/Cellar N/A. N/A
NOTICE OF PUBLIC HEARING:
This item has been advertised in San Gabriel Valley Daily Tri ' bune
and Inland Valley Daily Bulletin on November 21, 1994. Public
notices were mailed to 167 property owners in a 500 ft. radius of
the project 21 days prior to the publi.c.hearing.
ENVIRONMENTAL ASSESSMENT:
Staf f . has . reviewed --environmental information -submitted-as- a- part of -
this project and has prepared a Negative Declaration.
RECOMMENDATIONS:
The staff recommends that the Planning commission open the public
hearing and receive testimony and approve the Resolution of
Approval with the attached conditions.
MANDATORY FINDINGS:
1. The design and layout of the proposed development will not
unreasonably interfere with the use and enjoyment of the
neighboring existing and future developments, and will not
create traffic or pedestrians hazards;
2. The architectural design of the proposed residence is
compatible with the character of the surrounding neighborhood
and will maintain the harmonious, orderly, and attractive de-
velopment contemplated by this Chapter and the contemplated
General Plan of the City;
3. The design of the proposed development would , provide a
desirable environment for its occupants and visiting public
as well as its neighbors through good aesthetic use of
Q=rMRSUWP0JZTSW"4_1RM 4
materials, texture and color that will remain aesthetically
appealing and will retain a reasonably adequate level of
maintenance;
4. The proposed use will not be detrimental to the ,public
health, safety or *welfare or materially injurious to the
properties or improvements in the vicinity.
0
C.IL=RSUMPORTSIDR94-2.Rn
PC RESOLUTION NO. 95 -XX
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
DIAMOND BAR APPROVING DEVELOPMENT REVIEW NO. 94-2 AN
APPLICATION FOR THE CONSTRUCTION OF AN 17,867 SQ. FT. TWO
STORY PROFESSIONAL OFFICE BUILDING ON A VACANT SITE
LOCATED AT 21008 LYCOMING STREET, DIAMOND BAR, CALIFORNIA,
AND MAKING FINDINGS IN SUPPORT THEREOF.
A. Recitals.
(i) Terry Adkinson, acting as the agent for G. Miller Development, 721 Brea
Canyon Road, Diamond Bar, CA 91765 has heretofore filed an application as described above
in the title of this Resolution. Hereinafter in this Resolution, the project located at 21008
Lycoming Street, Diamond Bar, California, shall be referred to as "the Application".
(ii) On April 18, 1989, the City of Diamond Bar was established as a duly
organized municipal corporation of the State of California. On said date, pursuant to the
requirements of the California Government Code Section 57376, Title 21 and 22, the City
Council of the City of Diamond Bar adopted its Ordinance No. 14, thereby adopting the Los
Angeles County Code as the ordinances of the City of Diamond Bar. Title .21 and 22 of the
Los Angeles County Code contains the Development Code of the County of Los Angeles now
currently applicable to development applications, including the subject application, within the
City of Diamond Bar.
(iii) The City of Diamond Bar lacks an operative General Plan. Action was
taken on this application, as to consistency to the proposed General Plan, pursuant to the terms
and provisions of an Office of Planning and Research Extension of Time granted pursuant to
California Government Code Section 65360 and 65361(a).
(iv) On December 12, 1994 the Planning Commission of the City of Diamond
Bar conducted a duly noticed public hearing on the application and concluded said public
hearing on January 23, 1995.
(v) All legal prerequisites to the adoption of this Resolution have occurred.
C)
B. Resolution.
NOW, THEREFORE, it is found ', determined and resolved by the Planning Commission of the
City of Diamond Bar as follows:
1. The Planning Commission hereby specifically finds that all of the facts
set forth in the Recitals, Part A, of this Resolution are true and correct.
C.ILEnWJZSIREPORTSIDR.%-2A.RIIF 1
2. The Planning Commission hereby finds that the initial study review
prepared by the City of Diamond Bar and Negative Declaration No. 94-6
has been prepared in compliance with the California Environmental
Quality Act 6f 1970, as amended, and the Guidelines promulgated
thereunder, and, further said negative declaration reflects the independent
judgement of the City of Diamond Bar;
3. The Planning Commission hereby specifically finds and determines that,
having considered the record as a whole including the findings set forth
below, and changes and alterations which have been incorporated into
and conditioned upon the proposed project set forth in the application,
there is no evidence before the Planning Commission that the project
proposed herein will have the potential of an adverse effect on wild life
resources or the habitat upon which the wildlife depends. Based upon
substantial evidence, the Commission hereby rebuts the presumption of
adverse effects contained in Section 753.5 (d) of Title 14 of the
California Code of Regulations.
4. Based on the substantial evidence presented to the Planning Commission
during the above -referenced public hearing on December 12, 1994 and
concluded on January 23, 1995, including written and oral staff reports,
together with public testimony, and in conformance with OPR Extension
of Time, the Planning Commission hereby specifically finds as follows:
1. The subject property_ is. located at. 21008..Lycoming Street. on. the..
southeast corner of the intersection of Brea Canyon Road and
Lycoming Street, an area with a mixed concentration of
commercial development bordered by multi -family and single
family development;
2. The property is located in Zone C -1 -BE and allows this use as a
right of zone. The project site is approximately 40,496 sq. ft. in
size and is currently vacant.
3. The applicant's request is for the construction of a two story
office building approximately 17,867 sq. ft. in size.
4. The surrounding properties are developed with commercial and
light industrial manufacturing use to the north and northwest, a
day care center and single family residences to the west, single
family and multi -family development to the east and northeast and
a recreational vehicle storage to the south of the project site.
5. Notification of the public hearing for this project has been made
in the San Gabriel Valley Tribune and the Inland Valley Daily
GILT MRSIRRPORTSIDR94-1A RPT 2
Bulletin on November 21, 1994. There are 167 property owners
within 500 feet of the project site who were notified by mail.
6. The design and layout of the proposed development is consistent
with the applicable elements of the City's contemplated General
Plan, , and design guidelines and architectural criteria of the
appropriate district;
7, The design and layout of the proposed development will not
unreasonably interfere with the use and enjoyment of the
neighboring existing and future developments, and will not create
traffic or pedestrians hazards;
8. The architectural design of the proposed residence is compatible
with the character of the surrounding neighborhood and will
maintain the harmonious, orderly, and attractive development
contemplated by this Chapter and the contemplated General Plan
of the City;
9. The design of the proposed development would provide a
desirable environment for its occupants and visiting public as well
as its neighbors through good aesthetic use of materials, texture
and color that will remain aesthetically appealing and will retain
a reasonably adequate level of maintenance;
10. The proposed use will not be detrimental to the public health,
safety or welfare or materially injurious to the properties or im-
provements in the vicinity.
5. Based on the fmdings ,and conclusions set forth in paragraphs 1, 2, 3,
and 4 above, the Planning Commission hereby approves the application
subject to the following restrictions as to use:
1. This permit shall not be effective for any purpose until a duly
authorized representative of the owner of the property involved
has filed, at the office of Diamond Bar Community Development
Department, an affidavit stating that the applicant is aware of,
and accepts all the conditions of this permit.
2. That three copies of the revised plot plan and marked Exhibit "A"
and conforming to such of the following conditions as can shown
on a plan, shall be submitted for approval of the Community
Development Director. The. property shall thereafter be
developed and maintained in substantial conformance with the
approved plans.
C.IUMxsu?EroxTsinn94-2A.RFr . 3
I This grant is valid for two years and must be exercised (i.e.
construction started) within that period or this grant will expire.
A one'year extension may be requested in writing and submitted
to the City 30 days prior to the expiration date.
4. All construction materials must comply with materials board
approved by the Planning Commission and marked as Exhibit "A-
1" and dated January 23, 1995.
5. Notwithstanding any previous Subsection of this Resolution, if the
Department of Fish and Game requires payment of a fee pursuant
to Section 711.4 of the Fish and Game Code, payment thereof
shall be made by the applicant prior to the issuance of any
building permit or any other entitlement.
6. The property shall be maintained in a condition which is free of
debris both during and after the construction, addition, or
implementation of the entitlements granted herein. The removal
of all trash, debris, and refuse, whether during or subsequent to
construction, shall be done only by the property owner, applicant
or by a duly permitted waste contractor who has been authorized
by the City to provide collection, transportation, and disposal of
solid waste from residential, commercial, construction, and
industrial areas within the City. It shall be the applicant's
_--obligation -to insure. that the waste contractor utilized has obtained -
permits from the City of Diamond Bar to provide such services.
7. The applicant must comply with all federal, state, Zone C -1 -BE,
Engineering Department, and Building and Safety Department
requirements unless otherwise amended as a part of this grant.
8. The applicant must submit a revised landscape plan for approval
of the Community Development Director prior to issuance of
building permits.
9. All drive aisles shall be marked as Fire Lanes and all compact
parking stalls shall be marked as "Compact".
10. As proposed project is within Zone AO as designated on the
FEMA Flood Insurance Rate Map, the applicant shall assure that
all earthwork and construction complies with Ordinance No. 30
(1989) . of the City adopting Flood Damage Prevention
Regulations. Priorto the issuance of any grading or building
permits the applicant shall obtain from the City a Development
Permit as required by said ordinance.
C. IUTMRSUWPOR TS IDR94-2A. RPT 4
1.1. Applicant shall obtain permission from the Los Angeles County
Sanitation Districts to directly connect building sewers to
Sanitation District No. 21 trunk sewer. If permission to connect
is not obtained, applicant shall prepare plans to the satisfaction of
the City Engineer and construct public sanitary sewer to extend
existing public sanitary sewer to serve the project prior to
occupancy of building.
12. Applicant shall obtain permission from the Los Angeles County
Flood Control District for access, driveways, parking and other
improvements as proposed over District easement.
13. Applicant shall install street lights on Marbelite poles along the
frontages of the project to the satisfaction of the City Engineer.
14. Applicant shall install street trees along the frontages of the
project to the satisfaction of the City Engineer.
15. Applicant shall submit to the City for processing, a lot line
adjustment application prior to issuance of building permits. The
applicant shall record the approved lot line adjustment with the
County of Los Angeles and provide to the City verification
thereof, prior to issuance of a Cetificate of Occupancy. -
.16. - The—project .--shall. -be-- designed . with . - commercial driveway
approaches with a minimum 30 ft. width in order to
accommodate proposed traffic flow.
17. Applicant shall comply with the recommended mitigation
measures identified in the Traffic Impact Analysis Addendum
dated January, 1995, to the satisfaction of the City Engineer.
18. The applicant shall work cooperatively with the adjacent property
owner in order to obtain, as feasible, appropriate agreements
related to reciprocal vehicular access and parking in conjuntion
with future development of the southerly adjacent parcel.
19. That all grading, drainage plans and wall plans shall conform to
all City standards or as amended by this action.
20. The office building is restricted to non-professional and non-
medical uses in order for the project to conform to the parking
standards.
21. The applicant shall construct landscaped berms on the perimeter
C:1UnWRSIRHP0RTS1DR94-24.RPT 5
of the parking areas it abuts the public streets.
22. The project shall be conditioned to include a Trip
Reduction/Travel Demand Management Plan (TR/TDM) program
sufficient to comply with the CMP program.
23. The project shall provide traffic mitigation consistent with the
CMP sufficient to account for a minimum of 293 development
points as determined by the L.A. County CMP program
guidelines.
The Planning Commission shall:
(a) Certify to the adoption of this Resolution; and
(b) Forthwith transmit a certified copy of this Resolution, to Terry Adkinson
and G. Miller Development at the addresses as set forth on the applica-
tion.
19W."11,21 No •10 11010 LOW96)• a 01F.10 [
David Meyer, Chairman
I, James DeStefano, Secretary of the Planning Commission of the City of Diamond
Bar, do hereby certify that the foregoing Resolution was duly introduced, passed, and
adopted, at a regular meeting of the Planning Commission held on the 23rd day of
January, 1995, by the following vote -to -wit:
AYES: [COMIV.IISSIONERS:]
NOES: [COMMISSIONERS:]
ABSTAIN: [COMMISSIONERS:]
ABSENT: [COMMISSIONERS:]
Attest:
James DeStefano, Secretary
C.1UTTERSMEPORTSIDR94-2A.Rn 6
PC RESOLUTION NO. 95 -XX
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
DIAMOND BAR APPROVING DEVELOPMENT REVIEW NO. 94-2 AN
APPLICATION FOR THE CONSTRUCTION OF AN 17,867 SQ. FT. TWO
STORY PROFESSIONAL OFFICE BUILDING ON A VACANT SITE
LOCATED AT 21008 LYCOMING STREET, DIAMOND BAR, CALIFORNIA,
AND MAKING FINDINGS IN SUPPORT THEREOF.
A. Recitals.
. (i) Terry Adkinson, acting as the agent for G. Miller Development, 721 Brea
Canyon Road, Diamond Bar, CA 91765 has heretofore filed an application as described above
in the title of this Resolution. Hereinafter in this Resolution, the project located at 21008
Lyco'ming Street, Diamond Bar, California, shall be referred to as "the Application".
(ii) On April 18, 1989, the City of Diamond Bar was established as a duly
organized municipal corporation of the State of California. On said date, pursuant to the
requirements of the California Government Code Section 57376, Title 21 and 22, the City
Council of the City of Diamond Bar adopted its Ordinance No. 14, thereby adopting the Los
Angeles County Code as the ordinances of the City of Diamond Bar. Title 21 and 22 of the
Los Angeles County Code contains the Development Code of the County of Los Angeles now
currently applicable to development applications, including the subject application, within the
City of Diamond Bar.
(iii) The City of Diamond Bar lacks an operative General Plan. Action was
taken on this application, as to consistency to the proposed General Plan, pursuant to the terms
and provisions of an Office of Planning and Research Extension of Time granted pursuant to
California Government Code Section 65360 and 65361(a).
(iv) On December 12, 1994 the Planning Commission of the City_ of Diamond
Bar conducted a duly noticed public hearing on the application and concluded said public
hearing on January 23, 1995.
C�
(v) All legal prerequisites to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is found, determined and resolved by the Planning Commission of the
City of Diamond Bar as follows:
1. The Planning Commission hereby specifically finds that all of the facts
set forth in the Recitals, Part A, of this Resolution are true and correct.
C.- ILE TTERS LREPOR TS IDR94-2A. Kff 1
2. The Planning Commission hereby finds that the initial study review
prepared by the City of Diamond Bar and Negative Declaration No. 94-6
has been prepared in compliance with the California Environmental
-Quality Act of 1970, as amended, and the Guidelines promulgated
thereunder, and, further said negative declaration reflects the independent
judgement of the City of Diamond Bar;
3. The Planning Commission hereby specifically finds and determines that,
having considered ,the record as a whole including the findings set forth
below, and changes and alterations which have been incorporated into
and conditioned upon the proposed project set forth in the application,
there is no evidence before the Planning Commission that the project
proposed herein will have the potential of an adverse effect on wild life
resources or the habitat upon which the wildlife depends. Based upon
substantial evidence, the Commission hereby rebuts the presumption of
adverse effects contained in Section 753.5 (d) of Title 14 of the
California Code of Regulations.
4. Based on the substantial evidence presented to the Planning Commission
during the above -referenced public hearing on December 12, 1994 and
concluded on January 23, 1995, including written and oral staff reports,
together with public testimony, and in conformance with OPR Extension
of Time, the Planning Commission hereby specifically finds as follows:
_l._ The subject_property.islocated.at_21008 Lycoming._Street.on the
southeast corner of the intersection of Brea Canyon Road and
Lycoming Street, an area with a mixed concentration of
commercial development bordered by multi -family and single
family development;
2. The property is located in Zone C -1 -BE and allows this use as a
right of zone. The project site is approximately 40,496 sq. ft. in
size and is currently vacant.
3. The applicant's request is for the construction of a two story
office building approximately 17,867 sq. ft. in size.
4. The surrounding properties are developed with commercial and
light industrial manufacturing use to the north and northwest, a
day care center and single family residences to the west, single
family and multi -family development to the east and northeast and
a recreational vehicle storage to the south of the project site.
5. Notification of the public hearing for this project has been made
in the San Gabriel` Valley Tribune and the Inland Valley Daily
r UXTMxsinaroxzswxsa-za.xrr 2
Bulletin on November 21, 1994. There are 167 property owners
within 500 feet of the project site who were notified by mail.
6. The design and layout of the proposed development is consistent
with the applicable elements of the City's contemplated General
Plan, and design guidelines and architectural criteria of the
appropriate district;
7, The design and layout of the proposed development will not
unreasonably interfere with the use and enjoyment of the
neighboring existing and future developments, and will not create
traffic or pedestrians hazards;
8. The architectural design of the proposed residence is compatible
with the character of the surrounding neighborhood and will
maintain the harmonious, orderly, and attractive development
contemplated by this Chapter and the contemplated General Plan
of the City;
9. The design of the proposed development would provide a
desirable environment for its occupants and visiting public as well
as its neighbors through good aesthetic use of materials, texture
and color that will remain aesthetically appealing and will retain
a reasonably adequate level of maintenance;
10. The proposed use will not be detrimental to the public health,
safety or welfare or materially injurious to the properties or im-
provements in the vicinity.
5. Based on the findings and conclusions set forth in paragraphs 1, 2, 3,
and 4 above, the Planning Commission hereby approves the application
subject to the following restrictions as to use:
1. This permit shall not be effective for any purpose until a duly
authorized representative of the owner of the property involved
has filed, at the office of Diamond Bar Community Development
Department, an affidavit stating that the applicant is aware of,
and accepts all the conditions of this permit.
2. That three copies of the revised plot plan and marked Exhibit "A"
and conforming to such of the following conditions as can shown
on a plan, shall be submitted for approval of the Community
Development Director. The. property shall thereafter be
developed and maintained in substantial conformance with the
approved plans.
C:IUnWRSIRRPORTSlDR94-2A.RPT 3
3. This grant is valid for two years and must be exercised (i.e.
construction started) within that period or this grant will expire.
A one year extension may be requested in writing and submitted
to the City 30 days prior to the expiration date.
4. All construction materials must comply with materials board
approved by the Planning Commission and marked as Exhibit "A-
1" and dated January 23, 1995.
5. Notwithstanding any previous Subsection of this Resolution, if the
Department of Fish and Game requires payment of a fee pursuant
to Section 711.4 of the Fish and Game Code, payment thereof
shall be made by the applicant prior to the issuance of any
building permit or any other entitlement.
6. The property shall be maintained in a condition which is free of
debris both during and after the construction, addition, or
implementation of the entitlements granted herein. The removal
of all trash, debris, and refuse, whether during or subsequent to
construction, shall be done only by the property owner, applicant
or by a duly permitted waste contractor who has been authorized
by the City to provide collection, transportation, and disposal of
solid waste from residential, commercial, construction, and
industrial areas within the City. It shall be the applicant's
_..obligation.to- insure that_the-waste. contractor- utilized has_obtained_._..___.---
permits from the City of Diamond Bar to provide such services.
7. The applicant must comply with all federal, state, Zone C -1 -BE,
Engineering Department, and Building and Safety Department
requirements unless otherwise amended as a part of this grant.
8. The applicant must submit a revised landscape plan for approval
of the Community Development Director prior to issuance of
building permits.
9. All drive aisles shall be marked as Fire Lanes and all compact
parking stalls shall be marked as "Compact
10. As proposed project is within Zone AO as designated on the
FEMA Flood Insurance Rate Map, the applicant shall assure that
all earthwork and construction complies with Ordinance No. 30
(1989) of the City adopting Flood Damage Prevention
Regulations. Prior to the issuance of any grading or building
permits the applicant shall obtain from the City a Development
Permit as required by said ordinance.
C:IIBTTERSiRRPORTSIDR94-1A.RPT 4
11. Applicant shall obtain permission from the Los Angeles County
Sanitation Districts to directly connect building sewers to
Sanitation District No. 21 trunk sewer. If permission to connect
is not obtained, applicant shall prepare plans to the satisfaction of
the City Engineer and construct public sanitary sewer to extend
existing public sanitary sewer to serve the project prior to
occupancy of building.
12. Applicant shall obtain permission from the Los Angeles County
Flood Control District for access, driveways, parking and other
improvements as proposed over District easement.
13. Applicant shall install street lights on Marbelite poles along the
frontages of the project to the satisfaction of the City Engineer.
14. Applicant shall install street trees along the frontages of the
project to the satisfaction of the City Engineer.
15. Applicant shall submit to the City for processing, a lot line
adjustment application prior to issuance of building permits. The
applicant shall record the approved lot line adjustment with the
County of Los Angeles and provide to the City verification
thereof, prior to issuance of a Cetifica.te of Occupancy.
_.The_ _project .shall be designed with --commercial __driveway-- - -
approaches with a minimum 30 ft. width in order to
accommodate proposed traffic flow.
17. Applicant shall comply with the recommended mitigation
measures identified in the Traffic Impact Analysis. Addendum
dated January, 1995, to the satisfaction of the City Engineer.
18. The applicant shall work cooperatively with the adjacent property
owner in order to obtain, as feasible, appropriate agreements
related to reciprocal vehicular access and parking in conjuntion
with future development of the southerly adjacent parcel.
19. That all grading, drainage plans and wall plans shall conform to
all City standards or as amended by this action.
20. The office building is restricted to non-professional and non-
medical uses in order for the project to conform to the parking
standards.
21. The applicant shall construct landscaped berms on the perimeter
C: LU=RSLUPORTSIDRSW-2A.RPT 5
of the parking areas it abuts the public streets.
22. The project shall be conditioned to include a Trip
Reduction/Travel Demand Management Plan (TR/TDM) program
sufficient to comply with the CMP program.
23. The project shall provide traffic mitigation consistent with the
CMP sufficient to account for a minimum of 293 development
points as determined by the L.A. County CMP program
guidelines.
The Planning Commission shall:
(a) Certify to the adoption of this Resolution; and
(b) Forthwith transmit a certified copy of this Resolution, to Terry Ad%inson
and G. Miller Development at the addresses as set forth on the applica-
tion.
••••• r • r •r•• r •r -1 - • -• ••
• �� • • • : • r MIN r :• •
David Meyer, Chairman
I, James DeStefano, Secretary of the Planning Commission of the City of Diamond
Bar, do hereby certify that the foregoing Resolution was duly introduced, passed, and
adopted, at a regular meeting of the Planning Commission held on the 23rd day of
January, 1995, by the following vote -to -wit:
AYES: - [COMMISSIONERS:]
NOES: [COMNIISSIONERS:]
ABSTAIN: [COMIVIISSIONERS:]
ABSENT: [COMMISSIONERS:]
Attest:
James DeStefano, Secretary
C.1UTTERSMEP0RTSIDR94-Z4.RPT 6
IT "All
LOT LINE ADJUSTMENT
L_YCOM 1 NG S TREE T
SCALE
V - 100'
SEE DETAIL BELOW
\ AREA OF ADJUSTMENT
\s 2, 037.47 S. F.
s, TO LOT 7
LOT 7 S75.50. E y ZOS _ _ _
TRACT 216 6 N75. 2 �2-M - ` F� OOD N pC l COUNTY
NB2•.W 05' E 211.98 1�, 02' AREA OF ADJUSTMENT `
92.�N0T33'55'N15.00' 796.23 S.F.
97
AREA OF ADJUSTMENT TO LOT 79
�I 225.00 S. f.
TO LOT 79
\ N82' 26' 05' E 15.001 LOT 7 9
S07'33'55'E 15.00'
O TRACT 33069
O
.y0 .
R-267.50' `-
L-80.18'
!o'29AREA OF ADJUSTMENT --
r \ 2, 037.47 S. F:
TO LOT 7 267.50'
L-
22.98'
`507-315 519E
s'\
76,50,05,E
F \ S82'26� 00
\`N7�'42 0
4441
4' N75'
t`2.M
N B7 88'
63.00'_
.n 582' 26' 05' N
582! 26-05 N \
`-AREA OF ADJUSTMENT
11 r' T A 1 1 796.23 S. F.
TRAFFIC BIPACT ANALYSIS
ADDENDUM
THE BREA CANYON PLAZA
Prepared for:
G. MILLER DEVELOPMENT CO.
Prepared by:
and Assocites, Inc.
c January 1995
TRAFFIC IMPACT ANALYSIS
ADDENDUM
FOR
THE BREA CANYON PLAZA
Prepared for:
G. Miller Development Co.
721 South -Brea Canyon Rd., Suite 7
Walnut, California 91789
Prepared by:
Kimley-Horn and Associates, Inc.
2100 W Orangewood Ave., Suite 140
Orange, California 92668
0 January 1995
SUMMARY
Kimley-Horn and Associates has been retained to conduct professional transportation engineering services
for the purpose of updating the August 30, 1989 Traffic Impact Study performed by ASL Consulting
Engineers. The previous study was done for a proposed site plan that included an office/retail complex
with 21,000 square feet of total space. The current site plan calls for approximately 18,100 square feet
of office use. City staff has indicated that an addendum to the 1989 report would be an acceptable format
for this updated study.
This study includes a comparison of. "existing" 1988 and "future" 1995 traffic conditions; estimated
project trip generation and distribution, based on the "old" and "new" land uses; and project -related
impacts in the context of build -out conditions for both the "old" and "new" land uses.
In addition, this study assesses potential traffic flow at shared access points on the project site as well as
on-site circulation issues.
EXISTING CONDITIONS
To analyze the potential traffic 'impacts of the proposed new office building, it was necessary to
reassemble existing condition traffic data. Updated traffic volumes were collected on December 15,
1994 and are shown on Figure 1. Figure 2-1 from the previous study by ASL illustrates the "existing"
1988 traffic volumes used for that analysis.
As the figures indicate, the study area -intersections on Brea Canyon Road show fewer trips, primarily
in the northbound direction, in 1994 than in 1988. This decrease in trips can be attributed to the opening
of the Grand Avenue roadway link connecting Valley Boulevard to SR -60. The opening of this link
diverts a number of trips from Brea Canyon Road onto Grand Avenue.
PROJECT TRAFFIC
Trip Generation
Trip generation and peak hour trip ends were determined to establish the magnitude of any potential
traffic impacts of the newly proposed office building on the existing street system. The trip generation
of the new land use was determined using the trip generation rates and equations from the Institute of
Transportation Engineers (ITE) Trip Generation Report (Fifth Edition, 1991) for General Office gM
Category 710).
Table 1 shows the estimated daily and peak hour trips generated by the proposed project. The table also
illustrates the daily and peak hour trips previously estimated for the 1989 ASL report.
TABLE -1
SUINSIARY OF PROJECT TRIP GENERATION
AM PEAK HOUR PM PEAK HOUR
PROJECT ADT IN' OUT IN OUT
New (1995)
386
45
6
9
44
Old (1989)*
1507
50
19
70
103
099020.000reaCyn.Rpt -1- January 11, 1995
The new office only project will generate 1121 fewer daily trips than the previously studied office/retail
project. There will be 5 fewer inbound trips and 13 fewer outbound trips in the morning peak hour, and
61 fewer inbound and 59 fewer outbound trips in the evening peak hour for the new project versus the
old project.
Trin Distribution
The original trip distribution characteristics used in the 1989 ASL study were found to remain reasonable
carried over for this study. The, directional distribution characteristics were used to assign the new
project traffic to the study area intersections previously determined. Figure 2 shows the project traffic
volumes for the new project. Figure 3-3 from the previous study shows the project traffic volumes for
the old project.
BACKGROUND PLUS PROJECT TRAFFIC
The new office development is anticipated to take two years to complete; therefore 1997 has been used
as the build -out year for this study. The 6.1 percent two year growth rate used in the original study was
used again in this update and applied to the existing 1994 traffic volumes to project the anticipated traffic
for 1997. Figure 3 illustrates the background traffic volumes at project build -out.
Estimated project traffic volumes were added to the background traffic volumes to help determine the
impact that the proposed project would have on the build -out traffic conditions. The background plus
project traffic volumes are shown on Figure 4.
IMPACT ANALYSIS
The previous study, performed prior to the adoption of Congestion Management Program standards, used
TRACS computer modeling software to evaluate intersection level of service. The level of service (LOS)
analysis for the new project was conducted using the Intersection Capacity Utilization (ICU) method as
specified by the 1993 Congestion Management Program for Los Angeles County. Each study area
intersection was reanalyzed for the new project based on existing, 1997 background, and 1997
background plus project traffic conditions.
Table 2 summarizes the "existing" level of service found at each intersection and compares it to the
"existing" LOS found in the original study. Between 1988 and 1994, the LOS at three of the study area
intersections decreased slightly, while the LOS at one intersection actually improved. The LOS
differences between both studies can be attributed to: the change in traffic volumes between 1988 and
1994, consistent with the overall growth in the area; the opening of the Grand Avenue extension; and the
inherent difference between the methods used to evaluate the LOS. If the 1988 "existing" conditions were
reevaluated using current CMP analysis methodology the LOS results would be approximately .10 higher
than the 1989 ASL study results indicate. This difference in LOS can be attributed to a lost time factor
of .10 that is currently required under the CMP standards.
Table 3 illustrates the future background LOS results for both studies. The table shows that the 1997
LOS is somewhat higher at some of the intersections than the 1991 LOS. This increase in LOS can again
be attributed to the change in "existing" traffic conditions.
Table 4 shows the expected LOS for background plus project traffic conditions for both the 1989 study
and this 1995 update. The old report indicates a LOS ranging from "A" (Brea Canyon/Lycoming, Brea
Canyon/Golden Springs, and SR -60 EB/Golden Springs) in the morning peak hour to "E" (Brea
099020.001BreaCyn.Rpt -2- January 11, 1995
Canyon/SR-60 WB) in the rang
evening peak hour. The updated study shows a e of LOS from "B" (Brea
t>
Canyon/Golden Springs and SR -60 EB/Golden Springs) in the morning peak hour to "E" (Brea
Springs t) 0
Canyon/Lycoming, Brea Canyon/SR-60 WB and Brea Canyon/Golden Springs) in the evening peak hour.
The results of the impact analysis indicate that all of the study area intersections will continue to operate
at an acceptable level of service under the new 1997 future background plus project conditions.
TABLE
SUMMARY OF EXISTING TRAFFIC LOS
INTERSECTION
NEW PROJECT (199)
OLD PROJECT (19$9)*
AAIPEAK
PM PEAK
AM PEAK
PM PEAK
ICU
T -LOS
ICU
LOS
ICU
LOS
ICU
LOS
Brea Canyon/Lycoming
.67
B
.86
D
.38
A
.61
A
Brea Canyon/SR-60 WB
.76
C
.86
D
.63
A
.89
D
Brea Canyon/Golden Springs
.58
A
M2
E
.51
A
.76
C
-60 EB/Golden Springs
50
A
63
B
.41
A
.52
F A
TABLE
SUASIARY OF BACKGROUND TRAFFIC LOS
INTERSECTION
NEW PROJECT. UM
OLD PROJECT (1991)* -
AAI PEAK
PINI PEAK
AM PEAK
PM PEAK
ICU -1
LOS
ICU
LOS
ICU
LOS
ICU LOS
Brea Canyon/Lycoming
.71
C
.90
E
.39
A
.64
B
Brea Canyon/SR-60 WB
.74
C
.90
E
.67
B
.95
E
Brea Canyon/Golden Springs
.61
B
.97
E
.56
A
-F
.81
D
SR 60 EB/Golden Springs
64
B
66
B J
.42
A
7.5=
fA
TABLE
SUMMARY OF BACKGROUND PLUS PROJECT LOS
INTERSECTION'
NEW PROJECT (1997)
OLD PROJECT (1991)*
AM PEAK
PM PEAK
AM PEAK
A K
PAI PEAK
ICL
ICU 7
-LOS
ICU
LOS
ICU LOS
Brea Canyon/Lycoming
.72
C
.91
E
.39
A
.69
B
Brea Canyon/SR-60 WB
.74
C
.91
E
.68
a
.97
E
Brea Canyon/Golden Springs
.61
B
.98
E
.57
A
.82
D
SR -60 EB/Golden Springs
.67
.42
A
56
fA
ryfflr. I-Rct
Analvsis
mn rt nroduced
by ASL ConsuldnEr Eneinctn.
099020.00WreaCyn.Rpt -3- January' 11, 1995
TRAFFIC FLOW AND CIRCULATION
Internal Site Circulation
Access to Brea Canyon Plaza and circulation within it were also considered as part of this updated study.
The parking supply *meets and exceeds City code per the architects site plan data.
Circulation within the site is adequate and will allow vehicles to comfortably enter, park and exit with
little or no problem. The layout of parking and the relationship to the driveway activities is of common
design and should serve the site adequately.
Furthermore, an analysis of SU -30 truck turning movements indicates that garbage trucks should be able
to access the site without any obstructions.
Shared Access
The City has expressed concern about future access to the parcel of land south of Brea. Canyon Plaza and
any potential limitations at the south site access locations. The south site currently has only direct access
to Brea Canyon Road. The geometry of Brea Canyon Road and the spacing of intersections (Lycoming
and WB SR -60 ramps) may indicate that an additional access point could be needed if the south site is
redeveloped. Residential tracts along Lycoming preclude access to the south site; thus, a shared access
arrangement with Brea Canyon Plaza is the only viable mean to provide an additional access point for
the south site.
A site plan for a 1989 proposed development on the south site was obtained and used for this study.
Since the 1989 traffic study was unable to be located in the City files, it was necessary to recreate an
estimate of trip generation, trip distribution and trip assigiunent using the same assumptions and principles
assumed for the north site.
The results of the trip generation estimates indicate that there would be 3,075 average daily trips
produced by the south site. Of the daily trips, 357 would occur in the morning peak hour and 323 trips
would occur in the evening peak hour.
Trip distribution estimates show 25% of the daily traffic from the south site would utilize a shared access
driveway through the north site. This results in a potential access demand from the south site across the
north site of 52 inbound and 37 outbound trips in the morning peak hour, and 42 inbound and 39
outbound trips in the evening peak hour.
The current design of the Brea Canyon Plaza driveway on Lycoming could handle the additional traffic
created by the south site if a shared access arrangement is needed. Three or four parking spaces would
most likely need to be eliminated on the Brea Canyon Plaza site to provide access to the south site. The
elimination of these spaces could cause Brea Canyon Plaza to fall short of the parking spaces required
by City code. If the shared access is to be implemented, a shared parking arrangement should be made
with the developer of the south site to provide parking on that site to replace all of the parking spaces
that would be eliminated, from the Brea Canyon Plaza site, to construct the shared access driveway.
099020.000reaC�n.Rpt -4- January 11, 1995
N
O
Z
Oz
Ld
it
m
Co
Co
0) Co
17/33
(a U') 1814/99
116/191
f
LYCOMING
64/134 P
46/111 �o
9 —)1
155/lk7g�/
>
U)tV <Z7-> F=t
PROJECT SITE
NOT TO SCALE
'p
991 /831
0
r
0
276/535
00
0 U0
NOT TO SCALE
FIGURE I
EXISTING 1994 TRAFFIC VOLUMES
LEGEND
XX/YY = AM/PM TRAFFIC VOLUMES
@) = STUDY AREA INTERSECTIONS
mmp� mrl
LJ=
Kimley—Horn and Associates, Inc.
N
W
m
m
F.
0
0
276/535
00
622/540
19/23
19 /�
.287 /270 J
SPRINGS RD.
174/225
r
260/889
2 146 Ou
128/1
GOLDEN
GOLD
330/897—
po tn tn
to to to
" I'll,
"
13/25
to c) Ca
It ro
FIGURE I
EXISTING 1994 TRAFFIC VOLUMES
LEGEND
XX/YY = AM/PM TRAFFIC VOLUMES
@) = STUDY AREA INTERSECTIONS
mmp� mrl
LJ=
Kimley—Horn and Associates, Inc.
N
W
m
m
F.
Gf.
44 LYCOMING
G.
POMONA
FR`q-(.
d
�
a=
P
_
Gf.
44 LYCOMING
G.
POMONA
FR`q-(.
� 4
COLIMA RD- �sr
851--�' tk8` tl
G7
LEGEND
10,700- EXISTING DAILY VOLUMES (2 -WAY)
i— 1,496- P.M. PEAK VOLUME Gf GATEWAY. '
NUMBER OF THROUGH LANES
1 Q /NTER,9EGT/DN /HUMBER N.T s.
,ASS. Consulting Engineers FIGURE 2-
Arcadia' • Santa Ana : Palm Springs E X IST I N G CONDITIONS
Rancho Cucamonga Camarillo (AL1GUrS'T 988)
i
d
�
a=
z
c�
�.
?o
Z
a
w
Q
U
Q
_i
�
� 4
COLIMA RD- �sr
851--�' tk8` tl
G7
LEGEND
10,700- EXISTING DAILY VOLUMES (2 -WAY)
i— 1,496- P.M. PEAK VOLUME Gf GATEWAY. '
NUMBER OF THROUGH LANES
1 Q /NTER,9EGT/DN /HUMBER N.T s.
,ASS. Consulting Engineers FIGURE 2-
Arcadia' • Santa Ana : Palm Springs E X IST I N G CONDITIONS
Rancho Cucamonga Camarillo (AL1GUrS'T 988)
i
Q
M
z
0
z
w
10
Lip. F
LYCOMING
... .....
..................
Y.
4c�s IT E
pOtAot4A.
IFIR\v.
7
J
COLIMA RD'
LEGEND
*— JU EXITING TRAFFIC
4•- 00 'ENTERING TRAFFIC
N.T.S.
ASL Consulting Engineers FIGURE 3-3
Arcadia • Santa Am • Palm Sprhigs PROJECT TRAFFIC VOLUMES
Rancho Cucamonga. • Camarillo P. M. PEAK HOUR
LYCOMING
pOMONA FR`NY-
GOLDEN SPRINGS
d
Cr
Z
0
Z
a
a
w
m
0 t0
00
\� %�-20/48
0) 01 ? ---90/109
1 r 127/229
68/142
54/119 -*- `s "c� s�
164/190 -} �.Q
S
� I
L
iV c4 RTH
INOT TO SCALE
PROJECT SITE
„
' t
LYCOMING
pOMONA FR`NY-
GOLDEN SPRINGS
d
Cr
Z
0
Z
a
a
w
m
0 t0
00
\� %�-20/48
0) 01 ? ---90/109
1 r 127/229
68/142
54/119 -*- `s "c� s�
164/190 -} �.Q
S
� I
L
iV c4 RTH
INOT TO SCALE
PROJECT SITE
Co
N
to 295/579
toa
M n 660/573
,J j �.. (' 20/24
185/239-,
350/952
14/27
a,
"� ""' A,:\.-�
261 /21,
i�ta
p� ao,� �� 189 173
276/g13`' �—
,36/155
a
LEGEND a
XX/YY = AM/PM TRAFFIC VOLUMES 3
Q = STUDY AREA INTERSECTIONS
a
w
m
FIGURE 3
BACKGROUND PLUS PROJECT TRAFFIC VOLUMES
Kimley-Hom and Associates, Inc.
„
�bi
R.
Co
N
to 295/579
toa
M n 660/573
,J j �.. (' 20/24
185/239-,
350/952
14/27
a,
"� ""' A,:\.-�
261 /21,
i�ta
p� ao,� �� 189 173
276/g13`' �—
,36/155
a
LEGEND a
XX/YY = AM/PM TRAFFIC VOLUMES 3
Q = STUDY AREA INTERSECTIONS
a
w
m
FIGURE 3
BACKGROUND PLUS PROJECT TRAFFIC VOLUMES
Kimley-Hom and Associates, Inc.
cr- Ir
Z a
O Li-
z Ld
Q
V _J
Q N
w
a
m
N
m 37 (4)
< N v (ZZ)
i t► a'!59 (97)
LYCOMING
:57( ......... ..
S ITE
J 4
O
• iso Ulo) r� - � �'
COLIMA ga2C9o2)—► rs�Cr�) 'fit w�, o,r3
J
LEGEND
181 (176)
TOTAL BACKGROUND
TRAFFIC TRAFFIC
NTS.
ASL. Consulting Engineers FIGURE 4.-1
Arcadia • . Santa Ma Palm Springs
BACKGROUND PLUS
RanchoCucarrowga • Canwino PROJECT TRAFFIC VOLUMES
P. MI.' PEAK HOUR
.Offiloin
INTERSECTION CAPACITY UTILIZATION
WORKSHEET
INTERSECTION: Brea Canyon Road/Lycoming
DATE: 12/20194
TIME: AM PEAK HOUR
-------------
BRAELYC.wki
r
n
'
INTERSECTION CAPACITY UTILIZATION
WORKSHEET
INTERSECTION: Brea Canyon Road/Lycoming
DATE: 12/20194
TIME: AM PEAK HOUR
-------------
BRAELYC.wki
INTERSECTION: Brea Canyon Road/Lycoming
DATE: 12/20/94
TIME: PM PEAK HOUR
------BREALYC.wkf
EXISTING CONDITIONS
1997 BACKGROUND
1997 BACKGROUND PLUS PROJECT
----------------------
No.
---------------
AM Peak
CriL
--------------------
1997 AM Peak Crit
PROJ.
PROJ.
PM Peak
Crit
Movemnt Lanes
Cap. Vol. V/C •
Mvmt
Gwth Vol.
---- ---
V/C
----
Mvmt
-----
VOL
----
Vol.
---
V/C
----
Mvmt
-----
---------
NL 1
--- --- ----
1600 259 0.16
-----
0
0.061 275
0.17
0
0
275
0.17
0
NR 1
1600 60 0.04
0
0.061 64
0.04
0
27
91
0.06
0
NT 2
3200 1242 0.39
1
0.061 1318
0.41
1
0
1318
0.41
1
SL 1
1600 14 0.01
1
0.061 15
0.01
1
14
29
0.02
1
SR 1
1600 65 0.04
0
0.061 69
0.04
0
0
69
0.04
0
ST 2
3200 561 0.18
0
0.061 595
0.19
0
0
595
0.19
0
EL 1
800 64 0.08
0
0.061 68
0.08
0
0
68
0.08
0
ER 1
1600 155 0.10
0
0.061 164
0.10
0
0
164
0.10 •
0
ET 1
1600 46 0.03
1
0.061 49
0.03
1
5
54
0.03
1
WL 1
800 116 0.15
1
0.061 123
0.15
1
4
127
0.16
1
WR 1
1600 17 0.01
0
0.061 18
0.01
0
2
20
0.01
0
WT 1
1600 84 0.05
0
0.061 89
0.06
0
1
90
0.06
0
0.33
N/S component
0.40
N/S component
0.42
N/S component
RtTn. comp.
0.43
0.00
E/W component
0.17
E/W component
0.18
E!W component
Lost Time
0.19
0.10
RtTm comp.
0.00
RtTn. comp.
0.00
RtTn. comp.
ICU
0.00
0.90
Lost Time
0.10
Lost Time
Critical movement identified by a 1.
0.10
Lost Time
0.10
ICU
0.67
ICU
0.71
ICU
0.72
Critical movement identified by a 1.
Ten lanes for a right turn indicates free movement
NA - Not Applicable
INTERSECTION: Brea Canyon Road/Lycoming
DATE: 12/20/94
TIME: PM PEAK HOUR
------BREALYC.wkf
EXISTING CONDITIONS
1997 BACKGROUND
1997 BACKGROUND PLUS PROJECT
----------------------
No.
---------------
PM Peak Crit
--------------------
1997 PM Peak
Crit
PROJ.
PM Peak
Crit
Movemnt Lanes
Cap. Vol. V/C Mvmt
Gwth Vol.
---
V/C
----
MvmL
-----
VOL Vol.V/C
---- ---
----
Mvmt
-----
---------
NL 1
---- --- ---- -----
1600 187 0.12
0
----
0.051 1198
0.12
0
0 198
0.12
0
NR 1
160084 0.05
0
0.061 89
0.06
0
5 94
0.06
0
NT 2,
3200 1363 0.43
1
0.061 '1446
0.45
1
0 1446
0.45
1
SL 1
1600 38 0.02
1
0.061 40
0.03
1
3 43
0.03
1
SR 1
1500 39 0.02
0
0.061 41
0.03
0
0 41
0.03
0
ST 2
3200 984 0.31
0
0.061 1044
0.33
0
0 1044
0.33
0
EL 1
800 134 0.17
0
0.061 142
0.18
0
26 168
0.21
0
ER 1
1600 179 0.11
0
0.061 190
0.12
0
13 203
0.13
0
ET 1
1600 111 0.07
1
0.061 118
0.07
1
4 122
0.08
1
WL 1
800 191 0.24
1
0.061 203
0.25
1
0 203
0.25
1
WR 1
1600 33 0.02
0
0.061 35
0.02
0
0 35
0.02
0
WT 1
1600 99 0.06
0
0.061 105
0.07
0
1 106
0.07
0
N/S component
0.45
N/S component
0.48
N/S component
0.48
E/W component
0.31
E/W component
0.33
E/W component
0.33
RLTn. comp.
0.00
RtTn. comp.
0.00
RtTn. comp.
0.00
Lost Time
0.10
Lost Time
0.10
Lost Time
0.10
ICU
0.86
ICU
0.90
ICU
0.91
Critical movement identified by a 1.
Ten lanes for a right turn indicates free movement
NA - Not Applicable
•- MovementNotAllowed
Critical movement identified by a 1.
Ten lanes for a right tum Indicates free movement
NA - Not Applicable
INTERSECTION: Brea Canyon Road/SR-60 WB Ramp
Q
INTERSECTION CAPACITY UTILIZATION
WORKSHEET
HOUR
FOR ON-OFF RAMP INTERSECTION
BREA60WB.wk1
INTERSECTION:
Brea Canyon Road/SR-60 WB Ramp
EXISTING CONDITIONS
1997 BACKGROUND
1997 BACKGROUND PLUS PROJECT
----------------------
No•
DATE:
12/20/94
------------------
1997 PM Peak
Crit
PROJ. PM Peak
Crit.
Direction Movemnt Lanes
TIME:
AM PEAK HOUR
Mvmt.
Gwth Vol. V/C
Mvmt.
VOL. Vol. V/C
MvmL
ARTERIAL:
---------------------------
BREA60WB.wkl
-2
EXISTING CONDITIONS
1997 BACKGROUND
1
1997 BACKGROUND PLUS PROJECT
----------------------
0.07
---------------
No. AM Peak -
-Crit.
------------------
1997 ----- AM Peak Crit.------PROJ.
- AM Peak
Crit.
Direction Movemnt
Lanes Cap. Vol. V/C
---- ---- -----
Mvmt.
----
Gwth Vol. V/C
---- --- -----
NA
Mvmt.
----
VOL. Vol. V/C
---- --- '-----
Mvmt.
----
0
------------- ----
ARTERIAL Brea Canyon Road
3200 830
0.26
0
0.061 681
0.28
0
3 804
-------Left
2 2400 193 NA
0
0.081 205
0.09
0
0 205
0.09
0
NORTH Right •`
NA NA 0 NA
0
0.061 0
NA
0
0 0
NA
0
Through
2 3200 595 0.25
1
0.061 631
0.20
1
18 647
0.20
1
Left ••
NA NA 0 NA
0
0.051 0
NA
0
0 0
NA
0
SOUTH Right
1 1600 199 0.12
1
0.061 211
0.13
1
1 212.
0.13
1
Through
2 3200 320 0.10
0
0.061 340
0.11
0
2 342
0.11
0
RAMP: SR -60 WS
0
O.C61 882
0.37
0
2 884
0.37
0
----- Thrgh ••
NA NA 0 NA
0
0.061 0
NA
0
0 0
NA,
0
WEST flight
2 2400 991 0.41
1
0.061 1051
0.44
1
11 1062
0.44
1
Left
1 800 211 0.26
0
0.061 224
0.28
0
0 224
0.28
0
EAST Left •'
NA 0 0 NA
0
0.061 0
NA
0
0 0
NA
0
Right ••
NA 0 0 NA
0
0.061 0
- NA
0,
0 0
NA
0
Thrgh •'
NA 0 0 NA
0
0.061 0
NA
0
0 0
NA
0
Ramp Component
Arterial Component
0.25
Arterial Component
0.20
Arterial Component
Right -turn Component
0.20
0.00
Ramp Component
0.41
Ramp Component
0.44
Ramp Component
Lost Time
0.44
0.10
Right -tum Component
0.00
Right -tum Component
0.00
flight -tum Component
0.10
0.00
ICU
Lost Time
0.10
Lost Time
.0.90
0.10
Lost Time
0.10
` - Movement Not Allowed
ICU
0.76
ICU
0.74
ICU
0.74
•- MovementNotAllowed
Critical movement identified by a 1.
Ten lanes for a right tum Indicates free movement
NA - Not Applicable
INTERSECTION: Brea Canyon Road/SR-60 WB Ramp
DATE: 12/20/94
TIME: PM PEAK
HOUR
BREA60WB.wk1
EXISTING CONDITIONS
1997 BACKGROUND
1997 BACKGROUND PLUS PROJECT
----------------------
No•
---------------
PM Peak
Crit.
------------------
1997 PM Peak
Crit
PROJ. PM Peak
Crit.
Direction Movemnt Lanes
Cap. Vol. V/C
Mvmt.
Gwth Vol. V/C
Mvmt.
VOL. Vol. V/C
MvmL
ARTERIAL:
-2
2400 160
0.07
1
0.061 170
0.07
1
0 170
0.07
1
NORTH flight" NA
NA 0
NA
0
0.061 0
NA
0
0 0
NA
0
Through 2
3200 830
0.26
0
0.061 681
0.28
0
3 804
0.28
0
Left" NA
NA 0
NA
0
0.061 0
NA
0
0 0
NA
0
SOUTH Right 1
1ciao 320
0.20
0
0.061 340
0.21
0
9 349
0.22
0
Through 2
3200 1037
0.32
1
0.061 1100
0.34
1
18 1118
0.35
1
RAMP: SR -60 WB
--------Thrgh `• NA
NA 0
0.00
0
0.061 0
NA
0
0 0
NA
0
WEST Right 2
2400 831 .0.35
0
O.C61 882
0.37
0
2 884
0.37
0
Left 1
800 293
0.37
1
0.061 311
0.39
1
0 311
0.39
1
Left •• NA
NA 0
NA
0
0.061 0
NA
0
0 0
NA
0
Right ^ NA
NA 0
NA
0
0.061 0
NA
0
0 - 0
NA
0
Thrgh " NA
NA 0
NA
0
0.061 0
NA
0
0 0
NA
0
Arterial Component
0.39
Arterial Component
0.41
Arterial Component
0.42
Ramp Component
0.37
Ramp Component
0.39
Ramp Component
0.39
Right -turn Component
0.00
Right -tum Component
0.00
Right -tum Component
0.00
Lost Time
0.10
Lost Time
0.10
Lost Time
0.10
ICU
0.85
ICU
.0.90
ICU
0.91
` - Movement Not Allowed
Critical movement identified by
a 1.
Ten lanes for a right tum indicates free movement
INTERSECTION CAPACITY UTILIZATION
WORKSHEET
INTERSECTION: Brea Canyon Road/Gilden Springs Road
DATE: 12/20/94
TIME: AM PEAK HOUR
M� BRAEGLD.wkt
EXISTING CONDITIONS
1997 BACKGROUND
1997 BACKGROUND PLUS PROJECT
----------------------
---------------
No. AM Peak Crit
--------------------
1997 AM Peak
Crit
PROD. . PM Peak Crit.
Movemnt lanes Cap. Vol. V/C Mvmt
Gwth Vol. V/C
---- --- ----
Mvmt
-----
VOL Vol.
---- ---
V/C MvmL
---- -----
--------- --- --- ---- -----
NL 1 1600 171 0.11 1
0.061 181
0.11
1
0 181
0.11
1
NR 1 1600 136 0.09 0
0.061 144
0.09
0
0 144
0.09
0
NT 2 3200 201 0.06 0
0.061 213
0.07
0
5 218
0.07
0
SL 1 1600 102 0.06 0
0.061 108
0.07
0
0 108
0.07
0
SR 1 1600 386 0.24 1
0.061 410
0.26
1
2 412
0.26
1
ST 2 3200 332 0.10 1
0.061 352
0.11
1
1 .353
0.11
1
EL 2 2400 287 0.12 1
0.061 305
0.13
1
9 314
0.13
1
ER. 1 1600 128 0.08 0
0.061 136
0.08
0
0 136
0.08
0
ET 2 3200 260 0.08 0
0.061 276
0.09
0
0 276
0.09
0
W1. 1 1600 179 0.11 0
0.061 190
0.12
0
0 190
0.12
0
WR 1 1600 244 0.15 0
0.061 259
0.16
0
2 261
0.16
0
WT 2 3200 435 0.14 1
0.061 462
0.14
1
0 462
0.14
1
N/S component 0.21
N/S component
0.22
N/S component
0.22
E/W component 0.26
E/W component
0.27
E/W component
0.27
RtTn. comp. 0.02
RLTn. comp.
0.02
RtTn. comp.
0.02
Lost Time 0.10
Lost Time
0.10
LostT•une
0.10
ICU 0.58
ICU
0.61
ICU
0.61
Critical movement identified by a 1.
Ten lanes for a right turn indicates free movement
NA - Not Applicable
INTERSECTION: Brea Canyon Road/Golden Springs Road
DATE: 12/20/94
TIME- PM PEAK HOUR
BREAGLD.wkt
EXISTING CONDITIONS
1997 BACKGROUND
-
1997 BACKGROUND PLUS PROJECT
---
No. PM Peak Crit
1997 1997 --_---PM Peak
Crit
PROJ.
PM Peak
Crit
Movemnt Lanes Gap. Vol. V/C MvmL
Gwth Vol.
---
V/C
-
Mvmt
VOL Vol.
V/C
MvmL
--------- ---- --- ---- -----
NL 1 1600 177 0.11 0
----
0.061 188
0.12
0
0 188
0.12
0
NR 1 1600 503 0.31 1
0.061 534
0.33
1
0 534
0.33
1
NT 2 3200 430 0.13 1
0.061 456
0.14
1
1 457
0.14
1
SL 1 1600 285 0.18 1
0.061 302
0.19
1
2 304
0.19
1
SR 1 1600 590 ' 0.37 1
0.061 626
0.39
1
11 637
0.40
1
ST 2 3200 468 0.15 0
0.061 497
0.16
0
4 501
0.16
0
EL 2 1600 270 0.17 0
0.061 285
0.18
0
2 288
0.18
0
' ER 1 1600 146 0.09 0
0.061 155
0.10
0
0 155
0.10
0
ET 2 3200 889 0.28 1
0.061 943
0.29
1
0 943
0.29.
1
WL 1 1600 163 0.10 1
0.061 173
0.11
1
0 173
0.11
1
WR 1 1600 199 0.12 0
0.061 '211
0.13
0
0 211
0.13
0
WT 2 3200 413 0.13 0
0.061 438
0.14
0
0 438
0.14
0
N/S component 0.31
N/S component
0.33
ITS component
0.33
E/W component 0.38
E/W component
0.40
E/W component
0.40
RLTn. comp. 0.13
RLTn. comp.
0.14
RLTn. comp.
0.14
Lost Time 0.10
Lost Time
0.10
Lost Time
0.10
ICU 0.92
ICU
0.97
ICU
0.98
Critical movement identified by a 1.
Ten lanes for a right turn indicates free movement
NA- Not Applicable
• - Movement Not Allowed
Critical movement identified by a 1.
Ten lanes for a right tum indicates free movement
NA - Not Applicable
INTERSECTION:
INTERSECTION CAPACITY UTILIZATION
DATE:
WORKSHEET
FOR ON-OFF RAMP INTERSECTION
TIME:
PM PEAK HOUR
INTERSECTION:
Golden Springs Road/SR-60 EB Ramp
---------------------------
BREA60EB.wk1
DATE:
12/20/94
TIME:
AM PEAK HOUR
1997 BACKGROUND
1997 BACKGROUND PLUS PROJECT
----------------------
No.
---------------------------
BREA60ES.wk1
Crit.
------------------
1997 PM Peak Crit.
PROD. PM Peak
Crit.
Direction Movemnt Lanes
Cap.
Vol. V/C
---- -----
EXISTING CONDITIONS
1997 BACKGROUND
Gwth Vol. V/C
1997 BACKGROUND PLUS PROJECT
----------------------
VOL. Vol. WC
---------------
No. AM Peak_ Crit.
------------------
1997 AM Peak Crit.
PROJ. AM Peak Crit.
Direction Movemnt
_.
Lanes Cap. Vol. V/C Mvmt._
---- ----- ----
Gwth Vol. V/C
---- --- -----
M4mt
----
'
VOL Vol VIC
---- --- -----
Mvint.
----
------------- ---- ----
ARTERIAL: Golden Springs Road
1
1600
225
0.14
1
0.061 239
0.15
-------Left
1 1600 174 NA
1
0.061 185
0.12
1
0 185
0.12
1
EAST Right
1 1600 13 0.01
1
0.061 14
0.01
1
0 14
0.01
1
Through
2 3200 330 0.16
0
0.061 350
0.11
0
0 350
0.11
0
Left
1 1600 19 0.01
0
0.061 20
0.01
0
0 20
0.01
0
WEST Right
1 1600 276 0.17
0
0.061 293
0.18
0
2 295
0.18
0
Through
2 2400 622 0.26
1
0.061 660
0.27
1
0 660
0.27
1
RAMP: SR -60 ES
540
0.23
1
0.061 573
0.24
1
0 573
0.24
------ Thrgh
0 160 3 NA
0
0.061 3
0.02
0
0 3
0.02
0
SOUTH Right
0 640 43 0.07
0
0.061 46
0.07
0
0 46
0.07
0
Left
2 2400 344 0.14
1
0.061 365
OAS
1
9 374
0.16
1
NORTH Left
NA 0 45 NA
0
0.061 48
NA
0
0 48
NA
0
Right
NA o S NA
0
0.061 5
NA
0
0 5
NA
0
Thrgh
1 1600 39 NA
0
0.061 41
NA
0
0 41
NA
0
0
Arterial Component
0.26
Arterial Component
0 49
0.39
Arterial Component
Right
0.39
NA
Ramp Component
0.14
Ramp Component
0.051 37
OAS
Ramp Component
0 37
0.16
0
Right -turn Component
0.00
Right=tum Component
0.00
Right -tum Component
0
. 0.00
0.02
LostT'ime
0.10
Lost Time
0
0.10
Lostriime
Arterial Component
0.10
0.37
ICU
0.50
ICU
Arterial Component
'0.64
ICU
0.65
• - Movement Not Allowed
Critical movement identified by a 1.
Ten lanes for a right tum indicates free movement
NA - Not Applicable
INTERSECTION:
Golden Springs Road/SR-60 EB Ramp
DATE:
12/20/94
TIME:
PM PEAK HOUR
---------------------------
BREA60EB.wk1
EXISTING CONDITIONS
1997 BACKGROUND
1997 BACKGROUND PLUS PROJECT
----------------------
No.
---------------
PM Peak
Crit.
------------------
1997 PM Peak Crit.
PROD. PM Peak
Crit.
Direction Movemnt Lanes
Cap.
Vol. V/C
---- -----
Mvmt.
-----
Gwth Vol. V/C
Mvmt.
VOL. Vol. WC
Mvmt.
----------------- ----
ARTERIAL: Golden Springs Road
-------Lett
1
1600
225
0.14
1
0.061 239
0.15
1
0 239
0.15
1
EAST Right
1
1600
25
0.02
0
0.061 27
0.02
1
0 27
0.02
1
Through
2
3200
897
0.28
0
0.061 952
0.30
0
0 952
0.30
0
Left
1
1600
23
0.01
0
0.061 24
0.02
0
0 24
0.02
0
WEST Right
1
1600
320
0.20
0
0.061 340
0.21
0
11 351
0.22
0
Through
2
2400
540
0.23
1
0.061 573
0.24
1
0 573
0.24
1
RAMP: SR -60 EB
-------Thrgh
0
160
9
0.00
0
0.061 10
0.06
0
0 10
0.06
0
SOUTH Right
0
640
31
0.05
0
0.061 . 33
0.05
0
0 33
0.05
0
Left
2
2400
400
0.17
1
0.061 424
0.18
1
2 426
0.18
1
NORTH Left
NA
NA
45
NA
0
0.061 49
NA
0
0 49
NA
0
Right
NA
NA
35
NA
0
0.051 37
NA
0
0 37
NA
0
Thrgh
1
1600
35
NA
0
0.061 37
0.02
0
0 37
0.02
0
Arterial Component
0.37
Arterial Component
0.39
Arterial Component
0.39
'Ramp
Component
0.17
Ramp Component
0.18
Ramp Component
0.18
Right -tum
Component
0.00
flight -tum Component
0.00
Right -tum Component
0.00
Lost Time
0.10
Lost Time
0.10
Lost Time
0.10
•
ICU
0.63
ICU
0.66
ICU
0.67
- Movement Not Allowed
Critical movement identified by a 1.
Ten lanes for a right tum indicates free movement
a �
r
I' � _ \� i _ �*_
AM Peak Hr Begins at 730 AM
PEAK
VOLUMES = 46 39
ADDITIONS:SIGNALIZED
8 '344 3 45 174 330 13 19 622 276
1919
SOUTHLAND
CAR COUNTERS
VEHICLE
AND
MANUAL COUNTS
r -S STREET:
I- ' 60 EB
-RAMPS/
DATE:
12/15/94
CITY:
DIAMOND
BAR
DWY
-W STREET:
GOLDEN
SPRINGS
DAY:
THURSDAY
PROJECTV
0187001A
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
NL
NT
NR
SL
ST
SR
'EL ET
ER
WL
WT
WR
TOTAL
LANES:
0
1
0
1.5
0.5
1 2
1
1
2
1
6:00
AM
15
AM
30
AM
45
AM
7:00
AM
6
0
2
70
0
7
44 102
5
7
154
68
465
15
AM
2
5
1
75
1
6
35 47
6
2
147
70
397
30
AM
6
3
4
88
1
2
49 56
2
5
144
73
433
45
AM
18
18
2
102
2
17
39 105
4
9
-193
71
580
8:00
AM
15
16
0
65
0
10
44 107
5
2
152
69
485
15
AM
7
2
2
89
0
16
42 62
2
3
133
63
421
.30
AM
4
3
2
68
3
13
27 86
3
4
143
67
423
45
AM
4
5•
1
64
1
10
33 72
1
3
134
61
.389
9:00
AM
15
AM
30
AM
45
AM
10:00
AM
15
AM
30
AM
45
AM
TOTAL
NL
NT
NR
SL
ST
SR
EL ET
ER
WL
WT
WR
TOTAL
VOLUMES =
62
52
14
621
8
81
313 637
28
35
1200
542
3593
AM Peak Hr Begins at 730 AM
PEAK
VOLUMES = 46 39
ADDITIONS:SIGNALIZED
8 '344 3 45 174 330 13 19 622 276
1919
N -S STREET:
I-60 EB -RAMPS/
DATE:
12/15/94
CITY:
DIAMOND
BAR
DWY
E -W STREET:
GOLDEN
SPRINGS
DAY:
THURSDAY
PROJECT#
-0187001P
_
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
NL
NT
NR
SL
ST
SR
EL
ET
ER
WL
WT
WR
TOTAL
LANES:
0
1
0
1.5
0.5
1
2
1
1
2
1
2:00 PM
15 PM
30 PM
45 PM
3:00 PM
15 PM -
30 PM
.45 PM
4:00 PM
10
4
14
114
2
12
56
208
8
6
127
74
635
15 PM
16
5
5
101
0
6
50
208
6
2
120
113
632
30 PM
14
7
4
111
0
9
43
203
7
2
123
97
620.
45 PM
15
10
6
104
0
12
51
231
7
5.
181
118
740
5:00 PM
16
8.
15
72
1
3
60
208
7
6
112
127
635'
15 PM
18
5
7
136
6
12
54
219
7
5
123
131
723
30.PM
19
.12
7
108
2
4
60
239
4
7
124
159
745
45 PM
14
7
7
87
2
6
50
211
6
4
117
131
642
6:00 PM
15. PM
30 PM
45 PM
TOTAL
NL
NT
NR
SL
ST
SR
EL
ET
ER
WL
WT
WR
TOTAL
VOLUMES —
122
58
65
833
13
64
424
1727
52
.37-1027
950
.5372
PM Peak Hr
Begins at
445
PM
PEAK
VOLUMES =
68
35
35
420
9
31
225
897
25
23
540
535
2843
ADDITIONS:SIGNALIZED
4-S STREET:
SOUTHLAND CAR COUNTERS
VEHICLE AND MANUAL COUNTS
BREA CYN. RD DATE: 12/15/94
F 0 Fliy.,ry on ykll ::&
-�-W STREET:-
GOLDEN
SPRINGS
DAY:
THURSDAY
PROJECT# 0187002A
-----------
SOUTHBOUND
'EASTBOUND
'WESTBOUND
NORTHBOUND
NL
NT
NR
SL
ST
SR
EL
ET
ER
WL
WT
WR
TOTAL
LANES:
1
2
.0
1
'2
1
2
2
1
1
.2
1
6:00
AM
15
AM
30
AM
45
AIS
7:00
AM
30
43
26
16
66
75
49
51
34
- 59
96
70
615
15
AM
41
39
23
12
80
91
63
47
30
44
106
46
622
30
AM
27
47
33
18
106
106
69
47
22
69
101
65
710
45
AM
73
49
58
33
77
104
99
77
29
31
120
73
823
8:00
AM
39
53
24
26
66
80
47
84
43
28
101
55
646
15
AM
32
52
21
25
83
96
72
52
34
51
113
51
682
30
AM
37
42
20
21
55
78
70
69
25
23
81
48
569
45
AM
31
36
24
22
65
66
64
58
21
25
79
50
541
9:00
AM
15
AM
30
AM
45
AM
10:00
AM
15
AM
30
AM
45
AM
TOTAL
NL
NT
NR
SL
ST
SR
EL
ET
ER
WL
WT
WR
TOTAL
VOLUMES =
310
361
229.
173
598
696
533
485
238
330
797
458
5208.
AM Peak Hr Begins at 730 AM
PEAK
VOLUMES = 171 201 136 102 332 386 287 260 128 179 435 244 28'.61
ADDITIONS:SIGNALIZED
r r '
SOUTHLAND CAR COUNTERS
VEHICLE AND MANUAL COUNTS
N -S STREET: BREA CYN. RD DATE: 12/15/94
CITY: DIAMOND BAR
E -W STREET:
GOLDEN
SPRINGS
DAY:
THURSDAY
PROJECT` 0187002P
------------------------
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
NL
NT
NR
SL
ST
SR
EL
ET
ER
WL
WT
WR
TOTAL
LANES:
1
2
0
1
2
1
2
2
1
1
2
1
.2:00
PM
15
PM
30
PM
45
PM
3:00
PM
15
PM
30
PM
45
PM
4:00
PM
49
89
89
74
77
66
74
184
35
21
83
37
878
15
PM
47
69
116
75
66
123
72
189
44
27
90
36
954
30
PM
46
99
124
73
92
121
88
210
21.
19
72
43
1008
45
PM
29
121
153
66
93
148
79
198
33
36
108
29
1093
5:00
PM
46
107
'126
62
150
120
60
210
36
45
88
51
1101
15
PM
61
95
103
59
.111
153
76
225
36
37
93
41
1090
30
PM
41
107
121
98
114
169,
55
256
41
45
124
78
1249
45
PM
43
93
107
76
101
133
50
225
32
36
119
53.
1068
6:00
PM
15
PM
30
PM
45
PM
TOTAL
NL
-NT�
NR
SL
ST
SR
EL
ET
ER
WL
WT
WR
TOTAL
VOLUMES =
362
780
939
583
804
1033
554
1697
278
266
777
368
8441
PM Peak Hr Begins at 445 PM
PEAK
VOLUMES = 177 430 503 285 468 590 270 889 146 163 413 199
ADDITIONS:SIGNALIZED
4533
SOUTHLAND CAR COUNTERS
VEHICLE AND MANUAL COUNTS
d -S STREET:
BREA CYN. RD
DATE:
12/15/94
CITY:
DIAMOND
BAR
-W STREET:
I-60 WB RAMPS
DAY:
THURSDAY
PROJECT#
0187003A
NORTHBOUND SOUTHBOUND
EASTBOUND
WESTBOUND
NL
NT NR SL
ST
SR
EL ET
ER WL WT
WR
TOTAL
LANES:
2
2
2
0
0.5
1.5
6:00 AM
15 AM
30 AM
45 AM
7:00 AM
32
99
159
29
37
161
517
15 AM
34
117
134
44
48
168
545
30 AM
39
147
183
53
58
262
742
45 AM
44
173
166
58
54
247
742
8:00 AM
51
148
154
46
43
254
696
15 AM
59'
127
129
42
56
228
641
30 AM
41
118
113
38
41
164
515
45 AM
25
126
114
33
43
150.
491
9:00 AM
15 AM
30 AM
45 AM
10:00 AM
15 AM
30 AM
45 AM
TOTAL
NL�
NT NR �SL�
ST
SR
EL ET
ER WL WT
WR
TOTAL
VOLUMES =
325
1055 0 0
1152
343
0 0
0 380 0
1634
4889
AM Peak Hr
Begins
at 730
AM
PEAK
VOLUMES = 193 595 0 0 632 199 0 0 0 211 0 991 2821
ADDITIONS:SIGNALIZED
C
SOUTHLAND CAR COUNTERS
VEHICLE AND MANUAL COUNTS
N -S STREET:
BREA CYN.
RD
DATE:
12/15/94
CITY:
DIAMOND
BAR
E -W STREET:
I-60 WB RAMPS
DAY:
THURSDAY
PROJECT#
0187003P
----------
------------
NORTHBOUND
SOUTHBOUND SOUTHBOUND
EASTBOUND
WESTBOUND
NL NT NR
SL
ST
SR
EL ET
ER
WL WT
WR
TOTAL
LANES:
2 2
2
0
0.5
1.5
2:00 PM
15 PM
30 PM
45 PM
3:00 PM
15 PM
30 PM
45 PM
4:00 PM
33 .127
171
71
62
186
650
15 PM
36 131
182
84
73
184
690
30 PM
41 136
214
90
79
183
743
45 PM
37 169
234
91
77
208
816
5:00 PM
44 247
289
72
78
215
945
15 PM
41 203
.266
83
66
222
881
30 PM
38 211
248
74
72
186
829
45 PM
33 197
219
64
70
178
761
6:00 PM
15 PM
30 PM
45 PM
TOTAL
NL NT NR
SL
ST
SR
EL ET
ER
WL WT
WR
TOTAL
VOLUMES =
303 1421 0
0
1823
629
0 0
0
577 0
1562
6315
PM Peak Hr
Begins at
445
PM
PEAK
VOLUMES =
160 830 0
0
1037
320
0 0
0
293 0
831
3471
ADDITIONS:SIGNALIZED
SOUTHLAND CAR COUNTERS
VEHICLE AND MANUAL COUN'T'S
f -S STREET:
BREA
CYN. RD
DATE:
12/15/94
CITY:
DIAMOND
BAR
.-W STREET:
LYCOMING ST
DAY:
THURSDAY
PROJECT#
0187004A
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
NL
*NT
NR
SL
ST
SR
EL
ET
ER
WL
WT
WR
TOTAL
LANES:
1
2
0
1
2
0
0
1
0
0
1
0
6:00 AM
15 AM
30 AM
45 AM
7:00 AM
40
214
8
3
124
11
12
9
29
32
19
4
505
15 AM
42
.238
9
4
119
13
15
12
27
33
25
3-
540
30 AM
58
321
12
6
164
18
17
7
40
32
17
5
697
45 AM
76
325
17
3
157
19
13
11
41
27
21
4
714-
8:00 AM
68
312
17
3
129
12
18
15
46
25
24
5
674
15 AM
57
284
14
2
111
16
16
13
28
32
22
3
598
30 AM
34
226
13
5
107
11
12
9
26
29
23
4
499'
45 AM
28
234
9
4'
103
13
9
10
22
24
17
6
479
9:00 AM
15 AM
30 AM
45 AM
10:00 AM
15 AM
30 AM
45 AM
TOTAL
NL—
NT
-NR
SL
ST
SR
EL
ET
ER
WL
WT
WR
TOTAL
VOLUMES =
403
2154
99
30
1014
113
112
86
259
234
168
34
4706
AM Peak Hr Begins at 730 AM
PEAK
'VOLUMES = 259 1242 60 14 561 65 64 46 155 116 84 17 2683
ADDITION5:SIGNALIZED
N -S STREET:
SOUTHLAND CAR COUNTERS
VEHICLE AND MANUAL COUNTS
LYCOMING ST
DATE: 12/15/94
DAY: THURSDAY
CITY: DIAMOND BAR
PROJECT# 0187004P
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
PEAK
VOLUMES = 187 1363 - 84 38 984 39 134. 111 179 191 99 33 3442
ADDITIONS:SIGNALIZED
NL
NT
NR
SL
ST
SR
EL
ET
ER
WL
WT
WR
TOTAL
LANES:
1
2
0
1
2
0
0
1
0
0
1
0
2:00 PM
15 PM
30 PM
45 PM
3:00 PM
15 PM
30 PM
45 PM
4:00 PM
45
243
13
12
184
6
29
21
30
33
22
5
643
15 PM
42
261
:12
13
197
7
28
23
32
32
24
6
677
30 PM
38
271
14
9
211
8
32
24
38
39
19
8
711
45 PM
47
279
19
7
231
11
34
33
49
44
28
13
795
5:00 PM
59
376
31
8
273
13
29
31
52
58
23
4
957
15 PM
42
368
16
11
.251
7
37
28
43
48
27
9
887
30 PM
39
340
18
12
229
8
34
19
35
41
21
7
803
45 PM
34
321
17
7
207
5
28
24
27
42
19
3
734
6:00 PM
15 PM
30 PM
45 PM
TOTAL
NL
NT
NR
SL
ST
SR
EL
ET
ER
WL
WT
WR
TOTAL
VOLUMES =
346
2459
140
79-1783
65
251
203
306
337
183
55
.6207
PM Peak Hr
Begins at
445
PM
PEAK
VOLUMES = 187 1363 - 84 38 984 39 134. 111 179 191 99 33 3442
ADDITIONS:SIGNALIZED
6m. es
4
EXHIBIT .11 All
LOT LINE ADJUSTMENT
LYCOMING
STAEET
LOT 7�
• N2S' '4 �1.
\ y TRACT 2 � 66 44
.16
26' 05• E 211-
COO)
11.N82•�,
9zgj � �N07'33'55'X 15.00'
AREA OF ADJUSTMENT
7 s 225.00 S. F.
TO LOT 79
\ N82.26' 05' E 15.00'
S07' 33'55'E 15.00'
y®
SCALE
V - 100'
EE DETAIL BELOW
AREA OF ADJUSTMENT
2, 037.47 S. F.
TO LOT 7
S76'50,00• _
LOS ECES
FLOOD=TRO( EOUNTY
\--AREA OF ADJUSTMENT ~`
796.23 S. F.
TO LOT 79
' •
TRACT1••
N,
N
� R•267.50' '�
\ AREA OF ADJUSTMENT
2,037.47 S. F.
TO LOT 7 0.267.50'
L-22.98'
._SD7'3155'E
5�6-x'55'18'
S82' 2%05'0-
.0 o '
\- N25'�2' `�`
44.
.. N75.
rn �,
610(),-
2. 26' 05' X w 582' 26'
.._ AREA OF ADJUSTMENT
D E T A I L TO LOT . 79F.
Agenda Item 4.1 — DR No. 94.2
Plans found in project file.
Z,i iJmj a
File revi by
• and Is ready.
onFile revi wed by
and is ready for -
destruction by city clerk